CN115898262A CN202211272484.6A CN202211272484A CN115898262A CN 115898262 A CN115898262 A CN 115898262A CN 202211272484 A CN202211272484 A CN 202211272484A CN 115898262 A CN115898262 A CN 115898262A
Authority
CN
China
Prior art keywords
crawler
groups
frame
positioning plate
fastening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211272484.6A
Other languages
Chinese (zh)
Inventor
张承善
金东华
陈海林
许少军
谢晓阳
连海建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Pudong New District Road Construction Development Co ltd
Original Assignee
Shanghai Pudong New District Road Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Pudong New District Road Construction Development Co ltd filed Critical Shanghai Pudong New District Road Construction Development Co ltd
Priority to CN202211272484.6A priority Critical patent/CN115898262A/en
Publication of CN115898262A publication Critical patent/CN115898262A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00—Road transport of goods or passengers
    • Y02T10/60—Other road transportation technologies with climate change mitigation effect
    • Y02T10/70—Energy storage systems for electromobility, e.g. batteries

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a crawler-type lifting platform which is characterized by comprising crawler assemblies for equipment movement, wherein each crawler assembly comprises a walking component and two groups of mounting components, each group of mounting components comprises a positioning plate and a first connecting flange, the positioning plate is arranged on one side of the walking component, and the first connecting flange is welded on the positioning plate; the bearing portal frame is used for lifting equipment and provided with two groups, and each group of bearing portal frame comprises two groups of stand columns and a jacking oil cylinder; still including the frame type platform that is used for installing full rotary drilling machine, frame type platform includes steel structure frame and bottom plate. Crawler-type lift platform can realize walking by oneself of equipment, has solved special operating mode, like the quick-witted problem of moving of low headroom, can realize at ground dismouting sleeve pipe with the lifting of full rotary drilling machine through jacking cylinder, can also move the machine after disassembling, makes the sleeve pipe drill way be located ground, has saved effective headroom for the low headroom construction.

Description

履带式升降平台Crawler Lifting Platform

技术领域technical field

本发明涉及全回转钻机升降平台设备技术领域,具体为履带式升降平台。The invention relates to the technical field of lifting platform equipment for a full-turn drilling rig, in particular to a crawler-type lifting platform.

背景技术Background technique

全回转钻机是由动力装置带动钻机回转装置转动,从而带动有刀头的套管转动,由套管刀头切削土壤。全回转钻机用于全套管成孔的灌注桩或拔桩清障等施工,成孔方式为旋转成孔。The full-turn drilling rig is driven by the power unit to rotate the rotary device of the drilling rig, thereby driving the casing with the cutter head to rotate, and the casing cutter head cuts the soil. The full-rotary drilling rig is used for the construction of cast-in-place piles or pile pulling for obstacle removal with full casing, and the hole forming method is rotary hole forming.

全回转钻机在使用时会遇到各种问题,如:A full-turn drilling rig will encounter various problems during use, such as:

1、全回转钻机自重48吨,无法应对特殊工况,如低净空的移机问题,常规情况移机需用大吨位履带吊吊装,过程繁琐,而且需要较高的成本;1. The self-weight of the full-rotary drilling rig is 48 tons, which cannot cope with special working conditions, such as the problem of moving the machine with low headroom. The moving machine needs to be hoisted by a large-tonnage crawler crane under normal conditions, and the process is cumbersome and requires high costs;

2、常规全回转钻机在钻进过程中无法拆装位于地面的套管接头。2. Conventional full-rotary drilling rigs cannot disassemble the casing joints located on the ground during the drilling process.

发明内容Contents of the invention

本发明的目的在于提供履带式升降平台,一方面,通过履带式升降平台可实现自行走,解决了特殊工况,如低净空的移机问题,另一方面,通过顶升油缸能够将全回转钻机抬升,实现在地面拆装套管,拆解后还可以移机,使套管孔口位于地面,为低净空施工节省了有效净空,以解决上述背景技术中提出的问题。The purpose of the present invention is to provide a crawler-type lifting platform. On the one hand, the crawler-type lifting platform can realize self-propelling, which solves the special working conditions, such as the problem of moving the machine with low headroom. The drilling rig is lifted to realize disassembly and assembly of the casing on the ground. After disassembly, the machine can be moved so that the hole of the casing is located on the ground, which saves effective headroom for low-headroom construction and solves the problems raised in the above-mentioned background technology.

为实现上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:

履带式升降平台,其特征在于,包括:The crawler lifting platform is characterized in that it includes:

用于设备移动的履带总成,所述履带总成共设置有两组,每组所述履带总成均包括行走组件和两组安装组件,两组所述安装组件均包括定位板和第一连接法兰,所述定位板设于行走组件一侧,所述定位板上焊接有第一连接法兰;The crawler belt assembly used for equipment movement, the crawler belt assembly is provided with two groups, each group of the crawler belt assembly includes a walking assembly and two sets of installation assemblies, and the two installation assemblies include a positioning plate and a first Connecting flanges, the positioning plate is arranged on one side of the walking assembly, and the positioning plate is welded with a first connecting flange;

用于升降设备的承重门架,所述承重门架设有两组,每组所述承重门架均包括两组立柱和顶升油缸,所述立柱安装于履带总成的定位板上,所述立柱的内部安装有顶升油缸,所述顶升油缸的伸缩杆端部开设有销孔;The load-bearing gantry used for lifting equipment, the load-bearing gantry is provided with two groups, and each group of the load-bearing gantry includes two sets of columns and jacking cylinders, and the columns are installed on the positioning plate of the crawler belt assembly. A jacking cylinder is installed inside the column, and the end of the telescoping rod of the jacking cylinder is provided with a pin hole;

还包括用于安装全回转钻机的框型平台,所述框型平台包括钢构框架和底板,所述钢构框架的底端焊接有底板,所述底板的四周位于钢构框架的外壁上焊接有用于连接顶升油缸伸缩杆的连接件。It also includes a frame-shaped platform for installing a full-turn drilling rig, the frame-shaped platform includes a steel frame and a bottom plate, the bottom end of the steel frame is welded with a bottom plate, and the periphery of the bottom plate is welded on the outer wall of the steel frame There are connectors for the telescopic rod of the jacking cylinder.

优选的,所述行走组件包括履带梁、驱动轮和导向轮,所述履带梁的上下两侧均安装有多组导向轮,所述履带梁的一端均安装有驱动轮。Preferably, the walking assembly includes a crawler beam, a driving wheel and a guide wheel, multiple sets of guide wheels are installed on the upper and lower sides of the track beam, and a driving wheel is installed at one end of the track beam.

优选的,所述安装组件的两组定位板对称焊接于履带梁的一侧,所述履带梁上位于驱动轮和导向轮外部安装有履带。Preferably, the two sets of positioning plates of the installation assembly are symmetrically welded to one side of the crawler beam, and crawler belts are installed on the outside of the driving wheel and the guide wheel on the track beam.

优选的,所述立柱的下端安装于定位板上,且立柱的一侧壁上设有和第一连接法兰相适配的第二连接法兰。Preferably, the lower end of the column is installed on the positioning plate, and a second connecting flange matching the first connecting flange is provided on the side wall of the column.

优选的,所述承重门架还包括紧固组件,所述紧固组件包括紧固油缸和横梁,所述承重门架中的两组立柱之间依次设置有紧固油缸和横梁。Preferably, the load-bearing gantry further includes a fastening assembly, the fastening assembly includes a fastening oil cylinder and a crossbeam, and the fastening oil cylinder and the crossbeam are sequentially arranged between two sets of columns in the load-bearing gantry.

优选的,所述承重门架中的两组立柱的上端外壁上均焊接有限位支架,所述限位支架上插接有横梁,所述承重门架中的一组立柱一侧安装有紧固油缸,所述承重门架中的另一组立柱一侧焊接有紧固座,所述紧固油缸的伸缩杆一端固定连接于紧固座的端部。Preferably, limit brackets are welded on the outer walls of the upper ends of the two sets of columns in the load-bearing gantry, and beams are inserted into the limit brackets, and fastening brackets are installed on one side of a set of columns in the load-bearing gantry. For an oil cylinder, a fastening seat is welded on one side of another group of columns in the load-bearing gantry, and one end of the expansion rod of the fastening oil cylinder is fixedly connected to the end of the fastening seat.

优选的,四组所述顶升油缸呈同步设置,所述顶升油缸的伸缩杆端部通过销杆销接于钢构框架上的连接件。Preferably, the four sets of jacking cylinders are arranged synchronously, and the ends of the telescopic rods of the jacking cylinders are pinned to the connectors on the steel frame through pins.

优选的,所述底板上开设有用于安装全回转钻机底座的圆形缺口。Preferably, a circular notch for installing the base of the full-turn drilling rig is opened on the bottom plate.

与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:

本发明通过在履带总成上安装承重门架,承重门架的顶升油缸伸缩杆一端销接于钢构框架上的连接件,钢构框架底部焊接用于安装全回转钻机设备的底板,一方面,通过履带式升降平台可实现自行走,解决了特殊工况,如低净空的移机问题,另一方面,通过顶升油缸能够将全回转钻机抬升,实现在地面拆装套管,拆解后还可以移机,使套管孔口位于地面,为低净空施工节省了有效净空。In the present invention, a load-bearing mast is installed on the crawler belt assembly, and one end of the jacking cylinder expansion rod of the load-bearing mast is pinned to a connector on the steel structure frame, and the bottom plate of the steel structure frame is welded for installing the full-rotation drilling rig equipment. On the one hand, the crawler-type lifting platform can realize self-propelling, which solves special working conditions, such as the problem of moving the machine with low headroom; After unwinding, the machine can also be moved so that the casing hole is located on the ground, which saves effective headroom for low-headroom construction.

附图说明Description of drawings

图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图2为本发明履带的结构示意图;Fig. 2 is the structural representation of crawler belt of the present invention;

图3为本发明履带总成的结构示意图;Fig. 3 is the structural representation of crawler belt assembly of the present invention;

图4为本发明承重门架的结构示意图;Fig. 4 is the structural representation of load-bearing door frame of the present invention;

图5为本发明第二连接法兰的结构示意图;Fig. 5 is a structural schematic diagram of a second connecting flange of the present invention;

图6为本发明框型平台的结构示意图;Fig. 6 is a structural schematic diagram of the frame platform of the present invention;

图7为本发明圆形缺口的结构示意图。Fig. 7 is a schematic diagram of the structure of the circular notch of the present invention.

图中:1、定位板;2、第一连接法兰;3、立柱;4、顶升油缸;5、钢构框架;6、底板;7、连接件;8、履带梁;9、驱动轮;10、导向轮;11、履带;12、第二连接法兰;13、紧固油缸;14、横梁;15、紧固座;16、圆形缺口。In the figure: 1. positioning plate; 2. first connecting flange; 3. column; 4. jacking cylinder; 5. steel frame; 6. bottom plate; 7. connector; 8. crawler beam; 9. driving wheel ; 10, guide wheel; 11, caterpillar; 12, second connection flange; 13, fastening oil cylinder; 14, beam; 15, fastening seat; 16, circular gap.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

实施例:Example:

请参阅图1-7,本发明提供一种技术方案:履带式升降平台,其特征在于,包括用于设备移动的履带总成,履带总成共设置有两组,每组履带总成均包括行走组件和两组安装组件,两组安装组件均包括定位板1和第一连接法兰2,定位板1设于行走组件一侧,定位板1上焊接有第一连接法兰2;用于升降设备的承重门架,承重门架设有两组,每组承重门架均包括两组立柱3和顶升油缸4,立柱3安装于履带总成的定位板1上,立柱3的内部安装有顶升油缸4,顶升油缸4的伸缩杆端部开设有销孔;还包括用于安装全回转钻机的框型平台,框型平台包括钢构框架5和底板6,钢构框架5的底端焊接有底板6,底板6的四周位于钢构框架5的外壁上焊接有用于连接顶升油缸4伸缩杆的连接件7。Please refer to Figures 1-7, the present invention provides a technical solution: crawler-type lifting platform, which is characterized in that it includes a crawler assembly for equipment movement, and there are two sets of crawler assembly, each set of crawler assembly includes The walking assembly and two sets of installation assemblies, the two sets of installation assemblies all include a positioning plate 1 and a first connecting flange 2, the positioning plate 1 is arranged on one side of the walking assembly, and the positioning plate 1 is welded with a first connecting flange 2; for The load-bearing gantry of the lifting equipment has two sets of load-bearing gantry, each set of load-bearing gantry includes two sets of columns 3 and jacking cylinders 4, the columns 3 are installed on the positioning plate 1 of the crawler belt assembly, and the inside of the columns 3 are installed The jacking cylinder 4 has a pin hole at the end of the telescopic rod of the jacking cylinder 4; it also includes a frame-shaped platform for installing a full-turn drilling rig. The frame-shaped platform includes a steel frame 5 and a bottom plate 6, and the bottom of the steel frame 5 The end is welded with a base plate 6, and the periphery of the base plate 6 is positioned on the outer wall of the steel frame 5 and is welded with a connector 7 for connecting the telescopic rod of the jacking cylinder 4.

本发明通过在履带总成上安装承重门架,承重门架的顶升油缸4伸缩杆一端销接于钢构框架5上的连接件7,钢构框架5底部焊接用于安装全回转钻机设备的底板6,一方面,通过履带总成的设置可实现自行走,解决了特殊工况,如低净空的移机问题,另一方面,通过顶升油缸4能够将全回转钻机抬升,实现在地面拆装套管,拆解后还可以移机,使套管孔口位于地面,为低净空施工节省了有效净空。In the present invention, a load-bearing mast is installed on the crawler belt assembly, and one end of the telescopic rod of the jacking cylinder 4 of the load-bearing mast is pinned to the connector 7 on the steel frame 5, and the bottom of the steel frame 5 is welded to install the full-rotation drilling rig equipment On the one hand, self-propelling can be realized through the setting of the crawler belt assembly, which solves the problem of special working conditions, such as the problem of moving the machine with low headroom; The casing is disassembled on the ground, and the machine can be moved after disassembly, so that the hole of the casing is located on the ground, which saves effective headroom for low-headroom construction.

如图3所示:As shown in Figure 3:

行走组件包括履带梁8、驱动轮9和导向轮10,履带梁8的上下两侧均安装有多组导向轮10,履带梁8的一端均安装有驱动轮9,安装组件的两组定位板1对称焊接于履带梁8的一侧,履带梁8上位于驱动轮9和导向轮10 外部安装有履带11,立柱3的下端安装于定位板1上,且立柱3的一侧壁上设有和第一连接法兰2相适配的第二连接法兰12。The walking assembly includes a track beam 8, a driving wheel 9 and a guide wheel 10. Multiple sets of guide wheels 10 are installed on the upper and lower sides of the track beam 8, and a driving wheel 9 is installed on one end of the track beam 8. Two sets of positioning plates of the installation assembly 1 is symmetrically welded to one side of the crawler beam 8, and the track beam 8 is equipped with a track 11 outside the driving wheel 9 and the guide wheel 10, and the lower end of the column 3 is installed on the positioning plate 1, and the side wall of the column 3 is provided with A second connecting flange 12 adapted to the first connecting flange 2 .

在具体使用时,行走组件的设置能够实现设备的移动,在组装时,将承重门架的立柱3安装在定位板1上,同时,立柱3上的第二连接法兰12和定位板1上的第一连接法兰2相连接,即可将履带总成和承重门架之间实现定位和组装。In specific use, the setting of the walking assembly can realize the movement of the equipment. When assembling, the column 3 of the load-bearing gantry is installed on the positioning plate 1. At the same time, the second connecting flange 12 on the column 3 and the positioning plate 1 The first connecting flange 2 is connected to realize positioning and assembly between the crawler track assembly and the load-bearing mast.

如图4和5所示:As shown in Figures 4 and 5:

承重门架还包括紧固组件,紧固组件包括紧固油缸13和横梁14,承重门架中的两组立柱3之间依次设置有紧固油缸13和横梁14,承重门架中的两组立柱3的上端外壁上均焊接有限位支架,限位支架上插接有横梁14,承重门架中的一组立柱3一侧安装有紧固油缸13,承重门架中的另一组立柱3一侧焊接有紧固座15,紧固油缸13的伸缩杆一端固定连接于紧固座15的端部,The load-bearing gantry also includes a fastening assembly, which includes a fastening oil cylinder 13 and a crossbeam 14. A fastening cylinder 13 and a crossbeam 14 are sequentially arranged between two sets of columns 3 in the load-bearing gantry. Limiting brackets are welded on the outer walls of the upper ends of the columns 3, and crossbeams 14 are plugged into the limiting brackets. Fastening oil cylinders 13 are installed on one side of a group of columns 3 in the load-bearing gantry, and another group of columns 3 in the load-bearing gantry. A fastening seat 15 is welded on one side, and one end of the telescopic rod of the fastening oil cylinder 13 is fixedly connected to the end of the fastening seat 15,

通过上述结构,本发明通过在承重门架的两个立柱3之间设置横梁,能够加强整个承重门架的强度,使得设备的安全性和可靠性得到了提高;Through the above-mentioned structure, the present invention can strengthen the strength of the entire load-bearing gantry by arranging a beam between the two columns 3 of the load-bearing gantry, so that the safety and reliability of the equipment are improved;

另外,在两个立柱3上分别设置紧固油缸13和紧固座15,紧固油缸13 的伸缩杆一端连接于紧固座15,使得承重门架能够的整体连接更为紧密,牢固,进一步提高了设备的可靠性。In addition, a fastening oil cylinder 13 and a fastening seat 15 are respectively arranged on the two columns 3, and one end of the telescopic rod of the fastening oil cylinder 13 is connected to the fastening seat 15, so that the overall connection of the load-bearing gantry can be more closely, firmly, and further The reliability of the equipment is improved.

如图6和7所示:As shown in Figures 6 and 7:

四组顶升油缸4呈同步设置,顶升油缸4的伸缩杆端部通过销杆销接于钢构框架5上的连接件7,底板6上开设有用于安装全回转钻机底座的圆形缺口16。Four sets of jacking cylinders 4 are set synchronously. The ends of the telescopic rods of the jacking cylinders 4 are pinned to the connectors 7 on the steel frame 5 through pins. The bottom plate 6 is provided with a circular gap for installing the base of the full-turn drilling rig. 16.

在具体使用时,顶升油缸4的伸缩杆端部销接于连接件7,能够实现对全钻机设备的升降功能,同时,全回转钻机的底座安装在圆形缺口16内,使得本发明提供的履带式升降平台可以使全回转钻机落地,因此在钻进过程中全回转钻机保持原始工作状态,不损失全回转钻机的原始性能,这一点使履带式升降平台与全回转钻机加装履带有着本质区别,本履带式升降平台可配合使用各种型号的全回转钻机完成特定工作。In specific use, the end of the telescopic rod of the jacking oil cylinder 4 is pinned to the connector 7, which can realize the lifting function of the full drilling rig equipment. At the same time, the base of the full rotary drilling rig is installed in the circular gap 16, so that the present invention provides The unique crawler-type lifting platform can make the full-turn drilling rig land on the ground, so the full-turn drilling rig maintains the original working state during the drilling process without losing the original performance of the full-turn drilling rig. This makes the crawler lifting platform and the full-turn drilling rig equipped with crawlers The essential difference is that this crawler lifting platform can be used in conjunction with various types of full-turn drilling rigs to complete specific tasks.

在本发明的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”、“顺时针”、“逆时针”、“轴向”、“径向”、“周向”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In describing the present invention, it should be understood that the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", " Back", "Left", "Right", "Vertical", "Horizontal", "Top", "Bottom", "Inner", "Outer", "Clockwise", "Counterclockwise", "Axial", The orientation or positional relationship indicated by "radial", "circumferential", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying the referred device or element Must be in a particular orientation, be constructed in a particular orientation, and operate in a particular orientation, and therefore should not be construed as limiting the invention.

此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。在本发明的描述中,“多个”的含义是至少两个,例如两个,三个等,除非另有明确具体的限定。In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be interpreted as indicating or implying relative importance or implicitly specifying the quantity of indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include at least one of these features. In the description of the present invention, "plurality" means at least two, such as two, three, etc., unless otherwise specifically defined.

尽管上面已经示出和描述了本发明的实施方式,可以理解的是,上述实施方式是示例性的,不能理解为对本发明的限制,本领域的普通技术人员在本发明的范围内可以对上述实施方式进行变化、修改、替换和变型。Although the embodiment of the present invention has been shown and described above, it can be understood that the above embodiment is exemplary and should not be construed as a limitation of the present invention, and those skilled in the art can make the above-mentioned The embodiments are subject to changes, modifications, substitutions and variations.

Claims (8)

1. Crawler-type lift platform, its characterized in that includes:
the crawler assembly is used for moving equipment and is provided with two groups, each group of crawler assembly comprises a walking component and two groups of mounting components, each group of mounting components comprises a positioning plate (1) and a first connecting flange (2), the positioning plate (1) is arranged on one side of the walking component, and the first connecting flange (2) is welded on the positioning plate (1);
the bearing portal frame comprises two groups, each group of bearing portal frame comprises two groups of stand columns (3) and jacking oil cylinders (4), the stand columns (3) are mounted on a positioning plate (1) of a track assembly, the jacking oil cylinders (4) are mounted inside the stand columns (3), and pin holes are formed in the end parts of telescopic rods of the jacking oil cylinders (4);
still including the frame type platform that is used for installing full rotary drilling rig, frame type platform includes steel structure frame (5) and bottom plate (6), the bottom welding of steel structure frame (5) has bottom plate (6), the welding has connecting piece (7) that are used for connecting jacking cylinder (4) telescopic link on the outer wall that lies in steel structure frame (5) all around of bottom plate (6).
2. The tracked lift platform of claim 1, wherein: the walking assembly comprises a crawler beam (8), driving wheels (9) and guide wheels (10), wherein the upper side and the lower side of the crawler beam (8) are provided with a plurality of groups of guide wheels (10), and the driving wheels (9) are arranged at one end of the crawler beam (8).
3. The tracked lift platform of claim 2, wherein: two sets of locating plates (1) of installation component symmetrical weld in one side of track roof beam (8), it has track (11) to lie in drive wheel (9) and leading wheel (10) externally mounted on track roof beam (8).
4. The tracked lift platform of claim 1, wherein: the lower end of the upright post (3) is arranged on the positioning plate (1), and a second connecting flange (12) matched with the first connecting flange (2) is arranged on one side wall of the upright post (3).
5. The tracked lift platform of claim 1, wherein: the bearing portal frame further comprises a fastening assembly, the fastening assembly comprises fastening oil cylinders (13) and cross beams (14), and the fastening oil cylinders (13) and the cross beams (14) are sequentially arranged between two groups of stand columns (3) in the bearing portal frame.
6. The tracked lift platform of claim 5, wherein: the bearing portal frame is characterized in that limiting supports are welded on the outer walls of the upper ends of two groups of stand columns (3) in the bearing portal frame, cross beams (14) are inserted into the limiting supports, fastening oil cylinders (13) are installed on one sides of the two groups of stand columns (3) in the bearing portal frame, fastening seats (15) are welded on one sides of the other group of stand columns (3) in the bearing portal frame, and one ends of telescopic rods of the fastening oil cylinders (13) are fixedly connected to the end portions of the fastening seats (15).
7. The tracked lift platform of claim 1, wherein: four sets jacking cylinder (4) are synchronous setting, the telescopic link tip of jacking cylinder (4) is through the connecting piece of round pin pole pin joint on steel structure frame (5).
8. The tracked lift platform of claim 1, wherein: and a round notch (16) for installing a base of the full-rotary drilling machine is formed in the bottom plate (6).
CN202211272484.6A 2022-10-18 2022-10-18 Crawler Lifting Platform Pending CN115898262A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211272484.6A CN115898262A (en) 2022-10-18 2022-10-18 Crawler Lifting Platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211272484.6A CN115898262A (en) 2022-10-18 2022-10-18 Crawler Lifting Platform

Publications (1)

Publication Number Publication Date
CN115898262A true CN115898262A (en) 2023-04-04

Family

ID=86494072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211272484.6A Pending CN115898262A (en) 2022-10-18 2022-10-18 Crawler Lifting Platform

Country Status (1)

Country Link
CN (1) CN115898262A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117552420A (en) * 2023-12-14 2024-02-13 上海市基础工程集团有限公司 Implementation method of ultra-deep PHC pile removal under ultra-low headroom conditions
CN118911595A (en) * 2024-09-29 2024-11-08 江苏中贵重工有限公司 Straddling type tunnel drill carriage for shield tunneling tunnel and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000096563A (en) * 1998-09-25 2000-04-04 Nippon Sharyo Seizo Kaisha Ltd Self-propelled all casing construction machine
CN102966307A (en) * 2012-11-22 2013-03-13 浙江盾安精工集团有限公司 Crawler-type expanded walking device for all-casing full-circle slewing drilling machine
CN106193000A (en) * 2016-08-26 2016-12-07 中铁局集团有限公司 Hydraulic pressure full circle swinging drill machine with casing
CN107620574A (en) * 2017-10-11 2018-01-23 南京路鼎搅拌桩特种技术有限公司 A kind of full circle swinging all casing drill main body and full circle swinging all casing drill
CN208934591U (en) * 2018-08-21 2019-06-04 徐州盾安重工机械制造有限公司 Integral type full-sleeve full-rotation drill
CN210483528U (en) * 2019-07-02 2020-05-08 天津市北洋水运水利勘察设计研究院有限公司 Hydraulic pressure lift detachable crawler drill work platform
CN217421058U (en) * 2022-02-23 2022-09-13 山河智能装备股份有限公司 Self-propelled full-rotation full-casing drilling machine
CN218862530U (en) * 2022-10-18 2023-04-14 上海浦东新区公路建设发展有限公司 Crawler-type lifting platform

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000096563A (en) * 1998-09-25 2000-04-04 Nippon Sharyo Seizo Kaisha Ltd Self-propelled all casing construction machine
CN102966307A (en) * 2012-11-22 2013-03-13 浙江盾安精工集团有限公司 Crawler-type expanded walking device for all-casing full-circle slewing drilling machine
CN106193000A (en) * 2016-08-26 2016-12-07 中铁局集团有限公司 Hydraulic pressure full circle swinging drill machine with casing
CN107620574A (en) * 2017-10-11 2018-01-23 南京路鼎搅拌桩特种技术有限公司 A kind of full circle swinging all casing drill main body and full circle swinging all casing drill
CN208934591U (en) * 2018-08-21 2019-06-04 徐州盾安重工机械制造有限公司 Integral type full-sleeve full-rotation drill
CN210483528U (en) * 2019-07-02 2020-05-08 天津市北洋水运水利勘察设计研究院有限公司 Hydraulic pressure lift detachable crawler drill work platform
CN217421058U (en) * 2022-02-23 2022-09-13 山河智能装备股份有限公司 Self-propelled full-rotation full-casing drilling machine
CN218862530U (en) * 2022-10-18 2023-04-14 上海浦东新区公路建设发展有限公司 Crawler-type lifting platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117552420A (en) * 2023-12-14 2024-02-13 上海市基础工程集团有限公司 Implementation method of ultra-deep PHC pile removal under ultra-low headroom conditions
CN118911595A (en) * 2024-09-29 2024-11-08 江苏中贵重工有限公司 Straddling type tunnel drill carriage for shield tunneling tunnel and construction method

Similar Documents

Publication Publication Date Title
CA2846550C (en) Apparatus for and method of folding a mast or derrick
EP2165963B1 (en) Trunnion transportation system and crane using same
CN203186473U (en) Crawler chassis and crawler construction machinery
CN115419431A (en) Duct piece removing method and duct piece removing equipment
CN218862530U (en) Crawler-type lifting platform
CN214424452U (en) Novel centralizer convenient to disassemble and assemble
CN211924165U (en) Assembled steel sleeve structure for shield launching and receiving
CN220538624U (en) Construction equipment for large-diameter and ultra-long filling pile in limited space
CN220827702U (en) Steel structure bridge girth construction platform capable of being quickly disassembled and assembled and moved
CN113107551A (en) Prefabricated part assembling machine and prefabricated part assembling method
CN116180767B (en) A deep foundation pit steel skeleton support load-bearing device
CN110847189A (en) An assembled foundation pit column underpinning structure
CN214575526U (en) A detachable operating platform for steel pipe column construction
CN118187080A (en) Auxiliary dismantling device for upper and lower overlapped concrete support beams and construction method
CN211735418U (en) Fabricated foundation pit upright post underpinning structure
JP2006028880A (en) Pile hole excavator
CN218563653U (en) Movable vertical shaft excavation operation platform
CN222949548U (en) Auxiliary device for dismantling reinforced concrete inner supporting beam
CN115306412A (en) Method for integrally transferring rear matched trailer of shield tunneling machine in tunnel
CN217896490U (en) Telescopic double-layer guide frame
CN111364677A (en) Assembling and disassembling method for assembled steel structure main beam
CN220974387U (en) Maintenance bracket
CN222102029U (en) A kind of segment assembly layer structure for shaft construction
CN211777192U (en) Low clearance drilling machine
CN111022063A (en) A rotary translation lifting trolley used for supporting equipment behind shield machine in limited space

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination