CN115897984A CN202211488933.0A CN202211488933A CN115897984A CN 115897984 A CN115897984 A CN 115897984A CN 202211488933 A CN202211488933 A CN 202211488933A CN 115897984 A CN115897984 A CN 115897984A
Authority
CN
China
Prior art keywords
chimney
ring beam
inner ring
radiation
derrick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211488933.0A
Other languages
Chinese (zh)
Inventor
曾庆林
李振乾
徐贝
阳刚
陈鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Shanghai Baoye Engineering Technology Co Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Shanghai Baoye Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd, Shanghai Baoye Engineering Technology Co Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN202211488933.0A priority Critical patent/CN115897984A/en
Publication of CN115897984A publication Critical patent/CN115897984A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The application relates to a chimney rollover construction operating platform and a device, wherein the chimney rollover construction operating platform comprises a lifting derrick, an inner ring beam, a radiation beam, a stay cable, an outer ring beam and a supporting beam. Wherein the setting of inner circle roof beam is around promoting the derrick, and has the clearance between the two, and a plurality of radiation roof beams set up on the inner circle roof beam along circumference interval, and the one end of every radiation roof beam is all installed on the inner circle roof beam, and the inner circle roof beam extension is then kept away from to the other end, and movable mounting has a locating part on the radiation roof beam, and the top of every cable is all connected on promoting the derrick, and the locating part is then connected to the bottom, and the outer circle roof beam is installed at the radiation roof beam other end, and a supporting beam installs in the radiation roof beam below. This chimney turns over mould construction operation platform can change the radial position of cable bottom through changing the mounted position of locating part on the radiant beam, can adjust the radial position of cable bottom in the work progress in wider, higher precision to higher stability has.

Description

烟囱翻模施工操作平台及装置Chimney overturning construction operation platform and device

技术领域technical field

本申请涉及翻模施工技术领域,特别是涉及一种烟囱翻模施工操作平台及装置。The present application relates to the technical field of mold-turning construction, in particular to an operation platform and device for mold-turning construction of a chimney.

背景技术Background technique

翻模施工是指将两节以上的模具在竖直方向上堆叠并对其进行浇筑,在每次浇筑之后上部的模具保留不动,仅拆除下部的模具,并通过塔吊等起重设备提升至上部未拆除模具的上方,而后再次进行浇筑,从而实现交替上升,直至达到设计的施工高度位置。Overturning construction refers to stacking more than two molds in the vertical direction and pouring them. After each pouring, the upper mold remains unchanged, and only the lower mold is removed, and lifted to the upper mold by tower cranes and other lifting equipment. The upper part of the mold is not removed, and then poured again, so as to achieve alternate rise until reaching the designed construction height.

翻模施工相较于滑模施工与爬模施工具有如下优点:施工工艺简单,模具的提升可以直接采用塔吊等起重设备进行,不需配备专用的提升油泵,节省材料;模具可以周转使用,节约成本,经济优势明显,并且可自由的调节浇筑高度;模具拼装容易,内模可现场进行加工拼装,施工速度快,适用范围广。但由于操作平台在上升过程中,需要根据烟囱直径的变化,以及操作平台高度的变化,对拉索底端的吊挂点进行调节,防止拉索出现短距离滑动,因此常常通过在辐射梁上拉索的两侧各焊接一段钢筋或其他型材,作为限制拉索的限位装置,以保证其牵引的质量。Compared with sliding formwork construction and climbing formwork construction, overturning formwork construction has the following advantages: the construction process is simple, the lifting of the mold can be carried out directly by lifting equipment such as tower cranes, and there is no need to be equipped with a special lifting oil pump, saving materials; the mold can be used in turnover, Cost saving, obvious economic advantages, and the pouring height can be adjusted freely; mold assembly is easy, the inner mold can be processed and assembled on site, the construction speed is fast, and the application range is wide. However, during the ascent of the operating platform, it is necessary to adjust the hanging point at the bottom of the cable according to the change in the diameter of the chimney and the height of the operating platform to prevent short-distance sliding of the cable. A section of steel bar or other profile is welded on both sides of the cable as a limit device to limit the cable to ensure the quality of its traction.

但是,这种限位装置会使得拉索底端的径向调节范围变小、调节精度变低,且不便于施工过程中的调节,降低了操作平台的稳定性。However, this limiting device will reduce the radial adjustment range of the bottom end of the cable, lower the adjustment accuracy, and is inconvenient to adjust during the construction process, reducing the stability of the operating platform.

发明内容Contents of the invention

基于此,有必要针对上述技术问题,提供一种相较于传统的烟囱翻模施工操作平台,具有更高的稳定性并且能够在施工过程中更大范围、更高精度地调节拉索底端径向位置的烟囱翻模施工操作平台及装置。Based on this, it is necessary to address the above technical problems and provide a chimney turning platform that has higher stability and can adjust the bottom end of the cable in a larger range and with higher precision than the traditional chimney turning platform. Chimney turning form construction operation platform and device in radial position.

一种烟囱翻模施工操作平台,其特征在于,包括:A chimney overturning construction operation platform is characterized in that it includes:

一提升井架;a lifting derrick;

一内圈梁,设置在所述提升井架的四周,且两者之间存在间隙;An inner ring beam is arranged around the lifting derrick with a gap between them;

多个辐射梁,所述多个辐射梁沿周向间隔设置在所述内圈梁上,且每个辐射梁的一端均安装在所述内圈梁上,另一端则向远离所述内圈梁的一侧延伸,所述辐射梁上活动安装有限位件;A plurality of radiating beams, the plurality of radiating beams are arranged at intervals on the inner ring beam along the circumferential direction, and one end of each radiating beam is installed on the inner ring beam, and the other end is far away from the inner ring One side of the beam is extended, and a limiting member is movably installed on the radiating beam;

多个拉索,每个拉索的顶端均连接在所述提升井架上,底端则连接所述限位件;Multiple stay cables, the top end of each stay cable is connected to the lifting derrick, and the bottom end is connected to the stopper;

一外圈梁,安装在所述辐射梁远离所述内圈梁的端部,所述外圈梁、辐射梁以及内圈梁形成一个以内圈梁的中心为圆心的圆环结构;An outer ring beam installed on the end of the radiating beam away from the inner ring beam, the outer ring beam, the radiating beam and the inner ring beam form a ring structure with the center of the inner ring beam as the center;

一支撑梁,与所述内圈梁以及外圈梁同圆心安装在所述辐射梁下方,且所述内圈梁、支撑梁以及外圈梁的半径依次增大;A support beam, which is installed under the radiation beam concentrically with the inner ring beam and the outer ring beam, and the radii of the inner ring beam, the support beam and the outer ring beam increase sequentially;

其中,在外圈梁、辐射梁以及内圈梁形成的圆环结构上满铺平台板,并由提升井架通过拉索吊起,在施工过程中通过改变限位件在辐射梁上的安装位置,进而调整拉索底端的径向位置。Among them, the platform slab is fully paved on the ring structure formed by the outer ring beam, the radiation beam and the inner ring beam, and is hoisted by the hoisting derrick through the cable. During the construction process, the installation position of the limiter on the radiation beam is changed Then adjust the radial position of the bottom end of the dragline.

在其中一个实施例中,所述辐射梁包括主梁与次梁,两者数量相同,并依次间隔设置在所述内圈梁上,所述限位件活动安装在所述主梁上。In one of the embodiments, the radiating beams include main beams and secondary beams, the number of which is the same, and they are sequentially arranged on the inner ring beam at intervals, and the limiting member is movably installed on the main beams.

在其中一个实施例中,所述内圈梁以及外圈梁通过紧固件与所述主梁连接,所述内圈梁以及外圈梁通过绑扎与所述次梁连接,所述支撑梁与所述主梁以及次梁均通过绑扎连接。In one of the embodiments, the inner ring beam and the outer ring beam are connected to the main beam by fasteners, the inner ring beam and the outer ring beam are connected to the secondary beam by binding, and the support beam is connected to the secondary beam. Both the main beam and the secondary beam are connected by binding.

在其中一个实施例中,所述拉索上具有手拉葫芦,用于提升所述辐射梁的高度。In one of the embodiments, a chain hoist is provided on the cable for raising the height of the radiating beam.

在其中一个实施例中,所述内圈梁上设置有多个限位件,所述多个限位件对称设置在内圈梁上,用于连接所述拉索。In one of the embodiments, the inner ring beam is provided with a plurality of limiting members, and the plurality of limiting members are arranged symmetrically on the inner ring beam for connecting the stay cables.

在其中一个实施例中,所述辐射梁靠近外圈梁的一端具有外吊架,用于供人员安装拆卸模具,所述外吊架外周设置有防坠网。In one of the embodiments, the end of the radiating beam near the outer ring beam has an outer hanger for personnel to install and disassemble the mold, and the outer periphery of the outer hanger is provided with an anti-falling net.

在其中一个实施例中,一种烟囱翻模施工装置还包括吊笼、卷扬机以及模具,所述模具呈环形设置在所述外圈梁的外部,其内部具有浇筑腔,用于浇筑囱壁,所述吊笼安装在所述提升井架内部,并与所述卷扬机连接。In one of the embodiments, a chimney overturning construction device further includes a cage, a hoist, and a mould, the mold is annularly arranged outside the outer ring beam, and has a pouring cavity inside it for pouring the chimney wall, The cage is installed inside the lifting derrick and connected with the winch.

在其中一个实施例中,所述烟囱翻模施工装置还包括顶杆,所述顶杆一端连接所述提升井架,另一端连接浇筑完成的囱壁,且所述顶杆与地面平行。In one embodiment, the chimney overturning construction device further includes a push rod, one end of the push rod is connected to the lifting derrick, and the other end is connected to the poured chimney wall, and the push rod is parallel to the ground.

在其中一个实施例中,所述顶杆沿所述提升井架竖直方向间隔设置多组,每组内顶杆设为四根并沿水平方向绕所述提升井架间隔设置。In one of the embodiments, multiple groups of ejector rods are arranged at intervals along the vertical direction of the lifting derrick, and each group of inner ejector rods is set to four and arranged at intervals around the lifting derrick in the horizontal direction.

在其中一个实施例中,所述烟囱翻模施工装置还包括支撑钢管,设置在浇筑完成的囱壁顶端,用于支撑所述辐射梁。In one of the embodiments, the chimney overturning construction device further includes a supporting steel pipe, which is arranged on the top of the poured chimney wall and used to support the radiation beam.

上述烟囱翻模施工操作平台及装置,将每个辐射梁的两端分别连接在内圈梁以及外圈梁上,使三者构成一个圆环结构,并满铺平台板用于工人施工,再将此圆环结构套设在提升井架外部,在辐射梁上活动安装限位件用以牵挂拉索的底端,拉索的顶端则安装在提升井架上,通过拉索的牵引将辐射梁、内圈梁以及外圈梁提升至施工所需要的高度。本烟囱翻模施工操作平台及装置,通过改变限位件在辐射梁上的安装位置即可改变拉索底端的径向位置,能够在施工过程中更大范围内、更高精度上对拉索底端的径向位置进行调节,并具有更高的稳定性。The above-mentioned chimney overturning construction operation platform and device connect the two ends of each radiating beam to the inner ring beam and the outer ring beam respectively, so that the three form a ring structure, and the platform board is fully paved for workers to construct, and then The ring structure is set outside the lifting derrick, and the limit piece is installed on the radiating beam to hang the bottom end of the cable, and the top of the cable is installed on the lifting derrick, and the radiating beam, The inner ring beam and the outer ring beam are raised to the height required for construction. The chimney overturning construction operation platform and device can change the radial position of the bottom end of the cable by changing the installation position of the limiter on the radiation beam, and can adjust the cable in a larger range and with higher precision during the construction process. The radial position of the bottom end is adjusted and has higher stability.

附图说明Description of drawings

图1为本申请中一个实施例的烟囱翻模施工操作平台的结构示意图;Fig. 1 is the structural representation of the chimney overturning formwork construction operating platform of an embodiment among the present application;

图2为本申请中一个实施例的烟囱翻模施工操作平台的局部俯视图;Fig. 2 is a partial top view of the chimney overturning construction operation platform of an embodiment in the present application;

图3为本申请中一个实施例的烟囱翻模施工装置的局部结构示意图。Fig. 3 is a partial structural schematic diagram of a chimney overturning construction device according to an embodiment of the present application.

图中:110、提升井架;120、内圈梁;130、辐射梁;131、主梁;132、次梁;140、限位件;150、拉索;160、外圈梁;170、支撑梁;180、手拉葫芦;190、外吊架;191、防坠网;210、吊笼;220、模具;230、顶杆;240、支撑钢管。In the figure: 110, hoisting derrick; 120, inner ring beam; 130, radiation beam; 131, main beam; 132, secondary beam; 140, limit piece; 150, stay cable; 160, outer ring beam; 180, chain block; 190, outer hanger; 191, anti-falling net; 210, hanging cage; 220, mould; 230, ejector rod;

具体实施方式Detailed ways

为使本申请实施例的目的、技术方案和优点更加清楚,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地说明,显然,所描述的实施例是本申请一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments It is a part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of this application.

需要说明的是,当组件被称为“固定于”或“设置于”另一个组件,它可以直接在另一个组件上或者也可以存在居中的组件。当一个组件被认为是“连接”另一个组件,它可以是直接连接到另一个组件或者可能同时存在居中组件。本申请的说明书所使用的术语“垂直的”、“水平的”、“上”、“下”、“左”、“右”以及类似的表述只是为了说明的目的,并不表示是唯一的实施方式。It should be noted that when a component is referred to as being “fixed on” or “set on” another component, it may be directly on the other component or there may also be an intervening component. When a component is said to be "connected" to another component, it may be directly connected to the other component or there may be intervening components at the same time. The terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used in the specification of this application are for the purpose of illustration only and do not represent the only implementation Way.

此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。在本申请的描述中,“多个”的含义是至少两个,例如两个,三个等,除非另有明确具体的限定。In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be interpreted as indicating or implying relative importance or implicitly specifying the quantity of indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include at least one of these features. In the description of the present application, "plurality" means at least two, such as two, three, etc., unless otherwise specifically defined.

在本申请中,除非另有明确的规定和限定,第一特征在第二特征“上”、“下”可以是第一特征直接和第二特征接触,或第一特征和第二特征间接地通过中间媒介接触。而且,第一特征在第二特征“之上”、“上方”和“上面”可是第一特征在第二特征正上方或斜上方,或仅表示第一特征水平高度高于第二特征。第一特征在第二特征“之下”、“下方”和“下面”可以是第一特征在第二特征正下方或斜下方,或仅表示第一特征水平高度小于第二特征。In this application, unless otherwise clearly specified and limited, a first feature is “on” or “under” a second feature, which means that the first feature is directly in contact with the second feature, or that the first feature and the second feature are indirectly contact through an intermediary. Moreover, "above", "above" and "above" the first feature on the second feature may mean that the first feature is directly above or obliquely above the second feature, or it just means that the first feature is higher in level than the second feature. "Below", "beneath" and "under" the first feature may mean that the first feature is directly below or obliquely below the second feature, or it just means that the level of the first feature is smaller than that of the second feature.

除非另有定义,本申请的说明书所使用的所有的技术和科学术语与属于本申请的技术领域的技术人员通常理解的含义相同。在本申请的说明书中所使用的术语只是为了描述具体的实施方式的目的,不是旨在于限制本申请。本申请的说明书所使用的术语“及/或”包括一个或多个相关的所列项目的任意的和所有的组合。Unless otherwise defined, all technical and scientific terms used in the description of the present application have the same meaning as commonly understood by those skilled in the technical field of the present application. The terms used in the description of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The term "and/or" used in the specification of the present application includes any and all combinations of one or more related listed items.

如图1所示,在一个实施例中,一种烟囱翻模施工操作平台,包括提升井架110、内圈梁120、外圈梁160、支撑梁170、多个辐射梁130以及多个拉索150。具体的,内圈梁120设置在提升井架110的四周,且两者之间存在间隙,多个辐射梁130沿周向间隔设置在内圈梁120上,且每个辐射梁130的一端均安装在内圈梁120上,另一端则向远离内圈梁120的一侧延伸,辐射梁130上活动安装有限位件140,每个拉索150的顶端均连接在提升井架110上,底端则连接限位件140,外圈梁160,安装在辐射梁130远离内圈梁120的端部,支撑梁170,与内圈梁120以及外圈梁160同圆心安装在辐射梁130下方,且内圈梁120、支撑梁170以及外圈梁160的半径依次增大。As shown in Fig. 1, in one embodiment, a kind of chimney overturning construction operation platform includes lifting derrick 110, inner ring beam 120, outer ring beam 160, support beam 170, a plurality of radiation beams 130 and a plurality of stay cables 150. Specifically, the inner ring beam 120 is arranged around the hoisting derrick 110, and there is a gap between the two, and a plurality of radiation beams 130 are arranged on the inner ring beam 120 at intervals along the circumferential direction, and one end of each radiation beam 130 is installed On the inner ring beam 120, the other end extends to the side away from the inner ring beam 120, the radiating beam 130 is movably installed with a limiting member 140, the top end of each cable 150 is connected to the lifting derrick 110, and the bottom end is Connect the limiter 140, the outer ring beam 160 is installed on the end of the radiation beam 130 away from the inner ring beam 120, the support beam 170 is installed under the radiation beam 130 concentrically with the inner ring beam 120 and the outer ring beam 160, and the inner The radii of the ring beam 120 , the supporting beam 170 and the outer ring beam 160 increase sequentially.

其中,在外圈梁160、辐射梁130以及内圈梁120形成的圆环结构上满铺平台板,并由提升井架110通过拉索150吊起,在施工过程中通过改变限位件140在辐射梁130上的安装位置,进而调整拉索150底端的径向位置。Among them, the platform slab is fully paved on the ring structure formed by the outer ring beam 160, the radiation beam 130 and the inner ring beam 120, and is hoisted by the hoisting derrick 110 through the cable 150. The installation position on the beam 130, and then adjust the radial position of the bottom end of the cable 150.

上述烟囱翻模施工操作平台,将每个辐射梁130的两端分别连接在内圈梁120以及外圈梁160上,使三者构成一个圆环结构,并满铺平台板用于工人施工,再将此圆环结构套设在提升井架110外部,并在辐射梁130上按动安装限位件140用以牵挂拉索150,拉索150的顶端则安装在提升井架110上,通过拉索150的牵引将辐射梁130、内圈梁120以及外圈梁160提升至施工所需要的高度。本烟囱翻模施工操作平台及装置,通过改变限位件140在辐射梁130上的安装位置即可改变拉索150底端的径向位置,能够在施工过程中更大范围内、更高精度上对拉索150底端的径向位置进行调节,并具有更高的稳定性。The above-mentioned chimney overturning construction operation platform connects the two ends of each radiating beam 130 to the inner ring beam 120 and the outer ring beam 160 respectively, so that the three form a ring structure, and the platform board is fully paved for workers to construct. Then set this circular structure on the outside of the lifting derrick 110, and press and install the stopper 140 on the radiation beam 130 to hang the cable 150, and the top of the cable 150 is installed on the lifting derrick 110. The traction of 150 lifts the radiation beam 130, the inner ring beam 120 and the outer ring beam 160 to the height required for construction. The chimney turnover construction operation platform and device can change the radial position of the bottom end of the cable 150 by changing the installation position of the limiter 140 on the radiation beam 130, which can be used in a larger range and with higher precision during the construction process. The radial position of the bottom end of the cable 150 is adjusted and has higher stability.

如图2所示,在本实施例中,辐射梁130包括主梁131与次梁132,两者数量相同,并依次间隔设置在内圈梁120上,限位件140安装在主梁131上。具体的,主梁131采用十号槽钢制成,其上安装有限位件140,用于牵挂拉索150来提升高度,次梁132采用Φ48*3钢管制成,并且在每两根主梁131之间安装一根次梁132,用于使该烟囱翻模施工操作平台更加稳固。其中主梁131与次梁132的数量及规格可以根据实际需要进行调整。As shown in FIG. 2 , in this embodiment, the radiating beam 130 includes a main beam 131 and a secondary beam 132 , the number of which is the same, and they are sequentially arranged on the inner ring beam 120 at intervals, and the limiting member 140 is installed on the main beam 131 . Specifically, the main beam 131 is made of No. 10 channel steel, on which a limit piece 140 is installed, which is used to hang the cable 150 to increase the height. The secondary beam 132 is made of Φ48*3 steel pipe, and every two main beams A secondary beam 132 is installed between 131, and is used for making this chimney overturning construction operation platform more stable. The quantity and specification of the main beam 131 and the secondary beam 132 can be adjusted according to actual needs.

在本实施例中,内圈梁120以及外圈梁160通过紧固件与主梁131连接,内圈梁120以及外圈梁160通过绑扎与次梁132连接,支撑梁170与主梁131以及次梁132均通过绑扎连接。具体的,由于次梁132所采用的钢管长度易于调整,扣件连接简便,因而可适应各种平面、立面的建筑物与构筑物用脚手架,通过铅丝绑扎即可与内圈梁120以及外圈梁160接连,安装灵活,便于拆卸。用于固定限位件140以提升水平高度的主梁131通过紧固件与内圈梁120以及外圈梁160接连,连接关系更加稳定,提供更大的承载力。由于支撑梁170对主梁131以及次梁132起到支撑作用,通过绑扎的方式快速拆装,能够在保证稳定的同时节约时间。In this embodiment, the inner ring beam 120 and the outer ring beam 160 are connected to the main beam 131 by fasteners, the inner ring beam 120 and the outer ring beam 160 are connected to the secondary beam 132 by binding, and the supporting beam 170 is connected to the main beam 131 and The secondary beams 132 are all connected by binding. Specifically, since the steel pipe length adopted by the secondary beam 132 is easy to adjust, and the fasteners are easy to connect, it can be used as scaffolding for buildings and structures on various planes and elevations. Beams 160 are connected one after another, flexible to install and easy to disassemble. The main beam 131 used to fix the limiter 140 to raise the level is connected to the inner ring beam 120 and the outer ring beam 160 through fasteners, the connection relationship is more stable, and a greater bearing capacity is provided. Since the support beam 170 supports the main beam 131 and the secondary beam 132, it can be quickly disassembled and assembled by binding, which can save time while ensuring stability.

在本实施例中,拉索150上具有手拉葫芦180,用于提升辐射梁130的高度。具体的,手拉葫芦180是一种使用简单、携带方便的手动起重机械,具有维护简便、机械效率高、手链拉力小、自重较轻便于携带且经久耐用的特点。通过手拉葫芦180对辐射梁130上的限位件140进行牵引,能够精准地控制操作平台的高度。In this embodiment, there is a chain hoist 180 on the cable 150 for raising the height of the radiation beam 130 . Specifically, the chain hoist 180 is a manual lifting machine that is easy to use and easy to carry. It has the characteristics of easy maintenance, high mechanical efficiency, small pulling force of the bracelet, light weight, easy to carry and durable. The stopper 140 on the radiating beam 130 is pulled by the hand chain hoist 180 to precisely control the height of the operating platform.

在本实施例中,内圈梁120上设置有多个限位件140,多个限位件140对称设置在内圈梁120上,用于连接拉索150。具体的,通过在内圈梁120上设置限位件140并连接拉索150,能够对内圈梁120提供一个接近竖直方向上的力,相较于只对辐射梁130进行牵引能够起到更加稳定的效果。In this embodiment, a plurality of limiting members 140 are arranged on the inner ring beam 120 , and the plurality of limiting members 140 are symmetrically arranged on the inner ring beam 120 for connecting the pull cables 150 . Specifically, by setting the limiter 140 on the inner ring beam 120 and connecting the cable 150, a force close to the vertical direction can be provided to the inner ring beam 120, compared with only pulling the radiation beam 130 can play a more stable effect.

如图3所示,在本实施例中,辐射梁130靠近外圈梁160的一端具有外吊架190,用于供人员安装拆卸模具220,外吊架190外周设置有防坠网191。具体的,通过在辐射梁130靠近外圈梁160的底部设置至少一个外吊架190,用于供人员安装拆卸模具220,并设置与外圈梁160或辐射梁130的底面固定的防坠网191,使外吊架190被包覆在防坠网191的内部,防止在操作不当或突发危险时人员跌落造成伤亡。As shown in FIG. 3 , in this embodiment, the end of the radiation beam 130 close to the outer ring beam 160 has an outer hanger 190 for personnel to install and disassemble the mold 220 . Specifically, at least one outer hanger 190 is provided at the bottom of the radiation beam 130 close to the outer ring beam 160, which is used for personnel to install and disassemble the mold 220, and an anti-falling net fixed to the bottom surface of the outer ring beam 160 or the radiation beam 130 is provided. 191, so that the outer hanger 190 is covered in the inside of the anti-drop net 191, so as to prevent personnel from falling and causing casualties in case of improper operation or sudden danger.

在本实施例中,一种烟囱翻模施工装置还包括吊笼210、卷扬机(图中未示出)以及模具220,模具220呈环形设置在外圈梁160的外部,其内部具有浇筑腔,用于浇筑囱壁,吊笼210安装在提升井架110内部,并与卷扬机连接。In this embodiment, a chimney overturning construction device also includes a cage 210, a hoist (not shown in the figure) and a mold 220. The mold 220 is arranged on the outside of the outer ring beam 160 in a ring shape, and has a pouring cavity inside it. For pouring the chimney, the hanging cage 210 is installed inside the lifting derrick 110 and connected with the winch.

具体的,将两节以上的模具220在竖直方向上堆叠并对其进行浇筑,在每次浇筑之后上部的模具220保留不动,仅拆除下部的模具220,并通过外吊架190提升至上部未拆除模具220的上方,而后再次进行浇筑,从而实现交替上升,直至达到设计的施工高度位置,并伴随着模具220高度的提升,同时提高烟囱翻模施工操作平台的高度,使两者高度基本保持平衡。施工人员则乘坐吊笼210,并通过卷扬机的牵引到达施工操作平台进行施工。Specifically, more than two molds 220 are stacked in the vertical direction and poured. After each pouring, the upper mold 220 remains motionless, and only the lower mold 220 is removed and lifted to the upper surface by the outer hanger 190. Part of the top of the mold 220 was not removed, and then poured again, so as to realize alternate rises until reaching the designed construction height position, and with the elevation of the height of the mold 220, the height of the chimney turning over construction operation platform was increased at the same time, so that the height of the two Basically keep the balance. The construction workers then take the hanging cage 210 and arrive at the construction operation platform through the traction of the winch for construction.

上述烟囱翻模施工装置,将每个辐射梁130的两端分别连接在内圈梁120以及外圈梁160上,使三者构成一个圆环结构,并满铺平台板用于工人施工,再将此圆环结构套设在提升井架110外部,并在辐射梁130上按动安装限位件140用以牵挂拉索150,拉索150的顶端则安装在提升井架110上,通过拉索150的牵引将辐射梁130、内圈梁120以及外圈梁160提升至提升至模具220的高度,并在施工人员乘坐吊笼210到达施工操作平台后开始施工。本烟囱翻模施工装置,通过改变限位件140在辐射梁130上的安装位置即可改变拉索150底端的径向位置,能够在施工过程中更大范围内、更高精度上对拉索150底端的径向位置进行调节,并具有更高的稳定性。The above-mentioned chimney overturning construction device connects the two ends of each radiating beam 130 to the inner ring beam 120 and the outer ring beam 160 respectively, so that the three form a ring structure, and the platform board is fully paved for workers to construct, and then Set this ring structure on the outside of the lifting derrick 110, and press and install the stopper 140 on the radiating beam 130 to hang the cable 150. The top of the cable 150 is installed on the lifting derrick 110. The traction of the radiation beam 130, the inner ring beam 120 and the outer ring beam 160 are lifted to the height of the mold 220, and the construction starts after the construction personnel arrive at the construction operation platform by the hanging cage 210. The chimney overturning construction device can change the radial position of the bottom end of the cable 150 by changing the installation position of the limiting member 140 on the radiation beam 130, and can adjust the cable in a larger range and with higher precision during the construction process. The radial position of the bottom end of the 150 is adjusted and has higher stability.

在本实施例中,该烟囱翻模施工装置还包括顶杆230,顶杆230一端连接提升井架110,另一端连接浇筑完成的囱壁,且顶杆230与地面平行。In this embodiment, the chimney overturning construction device further includes a push rod 230, one end of the push rod 230 is connected to the lifting derrick 110, and the other end is connected to the poured chimney wall, and the push rod 230 is parallel to the ground.

在本实施例中,顶杆230沿提升井架110竖直方向间隔设置多组,每组内顶杆230设为四根并沿水平方向绕提升井架110间隔设置。具体的,顶杆230两端分别连接提升井架110以及烟囱内壁,能够对两者起到连接固定作用,并根据施工进程,按照模具220的高度间隔设置多组顶杆230,能够有效提升烟囱及提升井架110的稳定性,保证施工过程的安全系数。In this embodiment, multiple groups of ejector rods 230 are arranged at intervals along the vertical direction of the hoisting mast 110 , and each group of inner ejector rods 230 is set to four and arranged at intervals around the hoisting mast 110 in the horizontal direction. Specifically, the two ends of the ejector rod 230 are respectively connected to the lifting derrick 110 and the inner wall of the chimney, which can connect and fix the two. According to the construction process, multiple sets of ejector rods 230 are arranged at intervals according to the height of the mold 220, which can effectively lift the chimney and the inner wall of the chimney. Improve the stability of the derrick 110 to ensure the safety factor of the construction process.

在本实施例中,该烟囱翻模施工装置还包括支撑钢管240,设置在浇筑完成的囱壁顶端,用于支撑辐射梁130。具体的,在浇筑完成的烟囱顶端设置多根支撑钢管240,该支撑钢管240顶端顶起辐射梁130,在更换模具220的时候对辐射梁130起到支撑作用,提高本装置的稳定性。In this embodiment, the chimney overturning construction device further includes a supporting steel pipe 240 disposed on the top of the poured chimney wall for supporting the radiation beam 130 . Specifically, a plurality of supporting steel pipes 240 are arranged at the top of the poured chimney, and the tops of the supporting steel pipes 240 support the radiating beam 130 to support the radiating beam 130 when the mold 220 is replaced, improving the stability of the device.

以上所述实施例的各技术特征可以进行任意的组合,为使描述简洁,未对上述实施例中的各个技术特征所有可能的组合都进行描述,然而,只要这些技术特征的组合不存在矛盾,都应当认为是本说明书记载的范围。The technical features of the above-mentioned embodiments can be combined arbitrarily. To make the description concise, all possible combinations of the technical features in the above-mentioned embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, should be considered as within the scope of this specification.

以上所述实施例仅表达了本申请的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对本申请专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本申请构思的前提下,还可以做出若干变形和改进,这些都属于本申请的保护范围。因此,本申请专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only express several implementation modes of the present application, and the description thereof is relatively specific and detailed, but should not be construed as limiting the patent scope of the present application. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the scope of protection of the patent application should be based on the appended claims.

Claims (10)

1. The utility model provides a chimney rollover construction operation platform which characterized in that includes:
a hoisting derrick;
the inner ring beam is arranged around the lifting derrick, and a gap is formed between the inner ring beam and the lifting derrick;
the radiation beams are arranged on the inner ring beam at intervals along the circumferential direction, one end of each radiation beam is arranged on the inner ring beam, the other end of each radiation beam extends to one side far away from the inner ring beam, and a limiting part is movably arranged on each radiation beam;
the top end of each guy cable is connected to the lifting derrick, and the bottom end of each guy cable is connected to the limiting piece;
the outer ring beam is arranged at the end part of the radiation beam far away from the inner ring beam, and the outer ring beam, the radiation beam and the inner ring beam form a circular ring structure taking the center of the inner ring beam as the center of a circle;
the supporting beam is concentrically arranged below the radiation beam with the inner ring beam and the outer ring beam, and the radiuses of the inner ring beam, the supporting beam and the outer ring beam are sequentially increased;
wherein, full berth the landing slab on the ring structure that outer collar tie-beam, radiation beam and inner collar tie-beam formed to by promoting the derrick and pass through the cable hoist, through changing the mounted position of locating part on the radiation beam in the work progress, and then the radial position of adjustment cable bottom.
2. The chimney rollover construction operation platform according to claim 1, wherein the radiation beams include main beams and secondary beams, the number of the main beams and the secondary beams is the same, the main beams and the secondary beams are sequentially arranged on the inner ring beam at intervals, and the limiting members are movably arranged on the main beams.
3. The chimney rollover construction operation platform according to claim 2, wherein the inner ring beam and the outer ring beam are connected with the main beam through fasteners, the inner ring beam and the outer ring beam are connected with the secondary beam through binding, and the support beam is connected with the main beam and the secondary beam through binding.
4. The chimney rollover construction operation platform according to claim 3, wherein a chain block is arranged on the inhaul cable and used for lifting the height of the radiant beam.
5. The chimney rollover construction operation platform according to claim 4, wherein a plurality of limiting members are arranged on the inner ring beam, and the limiting members are symmetrically arranged on the inner ring beam and used for connecting the inhaul cable.
6. The chimney rollover construction operation platform according to any one of claims 1 to 5, wherein one end of the radiant beam close to the outer ring beam is provided with an outer hanger for personnel to mount and dismount the mould, and the outer hanger is provided with an anti-falling net on the periphery.
7. The chimney rollover construction device is characterized by comprising a suspension cage, a winch, a mold and the chimney rollover construction operation platform of claim 6, wherein the mold is annularly arranged outside the outer ring beam, a pouring cavity is formed inside the mold and used for pouring a chimney wall, and the suspension cage is installed inside the lifting derrick and connected with the winch.
8. The chimney rollover construction device according to claim 7, further comprising a jacking rod, wherein one end of the jacking rod is connected with the lifting derrick, the other end of the jacking rod is connected with the poured chimney wall, and the jacking rod is parallel to the ground.
9. The chimney rollover construction apparatus according to claim 8, wherein the plurality of groups of the ejector rods are arranged at intervals in a vertical direction of the lifting derrick, and each group of the inner ejector rods is four and arranged at intervals around the lifting derrick in a horizontal direction.
10. The chimney rollover construction device according to claim 9, further comprising a support steel pipe arranged at the top end of the poured chimney wall for supporting the radiant beam.
CN202211488933.0A 2022-11-25 2022-11-25 Chimney overturning construction operation platform and device Pending CN115897984A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211488933.0A CN115897984A (en) 2022-11-25 2022-11-25 Chimney overturning construction operation platform and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211488933.0A CN115897984A (en) 2022-11-25 2022-11-25 Chimney overturning construction operation platform and device

Publications (1)

Publication Number Publication Date
CN115897984A true CN115897984A (en) 2023-04-04

Family

ID=86492969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211488933.0A Pending CN115897984A (en) 2022-11-25 2022-11-25 Chimney overturning construction operation platform and device

Country Status (1)

Country Link
CN (1) CN115897984A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117166730A (en) * 2023-09-27 2023-12-05 中国十七冶集团有限公司 A tool-type equipment steel chimney high-altitude assembly platform and its use method
CN117627342A (en) * 2024-01-26 2024-03-01 山西一建集团有限公司 Chimney lining construction mold turning inner formwork construction platform and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU573556A1 (en) * 1975-12-30 1977-09-25 Челябинское Специальное Конструкторское Бюро Главмостостроя Suspended scaffolding
CN201224993Y (en) * 2007-11-27 2009-04-22 吴杰 Elevating rack body for chimney and well path inner wall constructions
CN101748799A (en) * 2009-12-30 2010-06-23 河南四建股份有限公司 Hydraulic lifting rollover construction method of chimney reinforced concrete shaft wall
CN202611234U (en) * 2012-04-23 2012-12-19 中化二建集团第三安装工程有限公司 Lifting device of building construction template of chimney
CN206233576U (en) * 2016-10-21 2017-06-09 中亿丰建设集团股份有限公司 For the hydraulic pressure lift turnover formwork construction device of bundled-tube structure chimney
CN110685433A (en) * 2019-10-17 2020-01-14 鞍山三冶建筑工程有限公司 Chimney construction device and construction method applying hydraulic lifting and rollover technology
CN211286601U (en) * 2019-10-17 2020-08-18 鞍山三冶建筑工程有限公司 Chimney construction device applying hydraulic lifting and rollover technology

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU573556A1 (en) * 1975-12-30 1977-09-25 Челябинское Специальное Конструкторское Бюро Главмостостроя Suspended scaffolding
CN201224993Y (en) * 2007-11-27 2009-04-22 吴杰 Elevating rack body for chimney and well path inner wall constructions
CN101748799A (en) * 2009-12-30 2010-06-23 河南四建股份有限公司 Hydraulic lifting rollover construction method of chimney reinforced concrete shaft wall
CN202611234U (en) * 2012-04-23 2012-12-19 中化二建集团第三安装工程有限公司 Lifting device of building construction template of chimney
CN206233576U (en) * 2016-10-21 2017-06-09 中亿丰建设集团股份有限公司 For the hydraulic pressure lift turnover formwork construction device of bundled-tube structure chimney
CN110685433A (en) * 2019-10-17 2020-01-14 鞍山三冶建筑工程有限公司 Chimney construction device and construction method applying hydraulic lifting and rollover technology
CN211286601U (en) * 2019-10-17 2020-08-18 鞍山三冶建筑工程有限公司 Chimney construction device applying hydraulic lifting and rollover technology

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117166730A (en) * 2023-09-27 2023-12-05 中国十七冶集团有限公司 A tool-type equipment steel chimney high-altitude assembly platform and its use method
CN117627342A (en) * 2024-01-26 2024-03-01 山西一建集团有限公司 Chimney lining construction mold turning inner formwork construction platform and construction method
CN117627342B (en) * 2024-01-26 2024-04-19 山西一建集团有限公司 Chimney lining construction mold turning inner formwork construction platform and construction method

Similar Documents

Publication Publication Date Title
CN104652807B (en) Self-circulation construction system and method for internal climbing tower supporting steel beam in hydraulic climbing formwork system
CN100588809C (en) Chimney, hoistway inner wall construction lifting frame body
CN205387439U (en) Mast hoisting accessory
CN211286601U (en) Chimney construction device applying hydraulic lifting and rollover technology
CN202467191U (en) Hydraulic slip form device used for construction of circular reinforced concrete chimney wall
CN115897984A (en) Chimney overturning construction operation platform and device
CN104803303B (en) A kind of single movable-arm floor mast with rock type counter-jib
CN110685433A (en) Chimney construction device and construction method applying hydraulic lifting and rollover technology
CN109081247A (en) A kind of hanging method of vestibule large-span steel girder
CN101566005B (en) Chimney hydraulic mould lifting device
CN103832933A (en) Group tower type crane with auxiliary boom
CN106639608A (en) Built-in tower for construction for prestress steel strand concrete tower barrel and installation method
CN101649684B (en) Installing method of roof mast
CN110206377A (en) Chimney hydraulic lifting apparatus
CN108590170A (en) A kind of rectangle chimney twin-well frame displacement type template integral lifting apparatus and its construction method
CN220059545U (en) Half moon shaped vertical shaft ascending hydraulic template
CN204569237U (en) A kind of oscillating type pole equilibrium arm
CN110409803B (en) Hoisting method for disassembling central drum ring of hydraulic mold lifting device
CN216920365U (en) Intelligent climbing type steel formwork and operation platform integrated equipment for ultra-deep foundation pit
CN219031629U (en) Lifting equipment for indoor plate installation
CN112412152B (en) Construction method of underslung derrick-free variable-section rectangular chimney support system
CN114382089A (en) Ultra-deep foundation pit intelligent climbing steel formwork and operation platform integrated equipment
CN215564411U (en) Sliding construction device for high-rise cylindrical building
CN206128803U (en) Adopt liftable steel construction radar tower of bottom jacking formula
CN110293341B (en) Eccentric arc-shaped ring gallery section high-altitude lifting tool and lifting method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination