CN115897689A - Settlement correction device and correction method for settlement of pipeline support foundation - Google Patents

Settlement correction device and correction method for settlement of pipeline support foundation Download PDF

Info

Publication number
CN115897689A
CN115897689A CN202211396832.0A CN202211396832A CN115897689A CN 115897689 A CN115897689 A CN 115897689A CN 202211396832 A CN202211396832 A CN 202211396832A CN 115897689 A CN115897689 A CN 115897689A
Authority
CN
China
Prior art keywords
plate
settlement
support
foundation
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211396832.0A
Other languages
Chinese (zh)
Inventor
劳俊
李康
李淼
闫鹤
刘力力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guoneng Longyuan Environmental Protection Co Ltd
Original Assignee
Guoneng Longyuan Environmental Protection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guoneng Longyuan Environmental Protection Co Ltd filed Critical Guoneng Longyuan Environmental Protection Co Ltd
Priority to CN202211396832.0A priority Critical patent/CN115897689A/en
Publication of CN115897689A publication Critical patent/CN115897689A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明涉及工业管道设计和安全生产领域,公开了一种沉降纠偏装置和管道支架基础沉降的纠偏方法,沉降纠偏装置包括设置在管道支架基础(10)上的支架板(2)、设置在所述管道支架基础(10)内部的筒体(5)、连接于所述支架板(2)并向下延伸到所述筒体(5)中的支撑杆(1)、设置在所述筒体(5)中的垫板(6)以及固定件(4),所述支撑杆(1)能够相对于所述筒体(5)沿竖直方向上下滑动,所述固定件(4)能够将所述支撑杆(1)可拆卸地固定在所述筒体(5)上,所述支撑杆(1)的下端支撑在所述垫板上。通过上述技术方案,撬升支架板能够实现管道支架的沉降纠偏,同时避免大规模的基础开挖,并且具有良好的安全性及稳定性。

Figure 202211396832

The invention relates to the field of industrial pipeline design and safe production, and discloses a settlement correction device and a correction method for the settlement of a pipeline support foundation. The settlement correction device includes a support plate (2) arranged on a pipeline support foundation (10), a The cylinder body (5) inside the pipeline support foundation (10), the support rod (1) connected to the support plate (2) and extending downward into the cylinder body (5), and the cylinder body (1) arranged on the cylinder body (5) the backing plate (6) and the fixing piece (4), the support rod (1) can slide up and down in the vertical direction relative to the cylinder (5), and the fixing piece (4) can The support rod (1) is detachably fixed on the cylinder body (5), and the lower end of the support rod (1) is supported on the backing plate. Through the above-mentioned technical solution, prying up the support plate can realize the settlement and deviation correction of the pipeline support, avoid large-scale foundation excavation, and have good safety and stability.

Figure 202211396832

Description

沉降纠偏装置和管道支架基础沉降的纠偏方法Settlement correction device and correction method for settlement of pipeline support foundation

技术领域technical field

本发明涉及工业管道设计和安全生产领域,具体地涉及一种沉降纠偏装置和管道支架基础沉降的纠偏方法。The invention relates to the fields of industrial pipeline design and safe production, in particular to a settlement deviation correction device and a deviation correction method for settlement of pipeline support foundations.

背景技术Background technique

地面沉降又称为地面下沉或地陷,它是在人类工程经济活动影响下,由于地下松散地层固结压缩,导致地壳表面标高降低的一种局部的下降运动(或工程地质现象),它一般表现为区域性下沉和局部下沉两种形式;工业厂区地表沉陷会造成区域内工业管道基础发生不均匀沉降,导致管道受损、破裂,威胁生产安全。Land subsidence, also known as ground subsidence or subsidence, is a local downward movement (or engineering geological phenomenon) that reduces the elevation of the crustal surface due to the consolidation and compression of loose underground strata under the influence of human engineering economic activities. It generally manifests in two forms: regional subsidence and partial subsidence; the subsidence of the industrial factory area will cause uneven settlement of the industrial pipeline foundation in the area, resulting in damage and rupture of the pipeline, threatening production safety.

目前,针对工业管道基础发生不均匀沉降的现象,主要有两种措施,其一是将管道基础全部拆除重做,其二是在原有的管道基础下层进行灌浆。但拆除重做的成本太高,费时费力;而灌浆受空间影响,不便于操作,灌浆不实则会导致灌浆强度低,易产生预应力钢材的腐蚀。At present, there are two main measures for the uneven settlement of industrial pipeline foundations. One is to completely dismantle the pipeline foundation and redo it, and the other is to grout the lower layer of the original pipeline foundation. However, the cost of dismantling and redoing is too high, time-consuming and labor-intensive; and grouting is affected by space, which is inconvenient to operate, and inaccurate grouting will lead to low grouting strength and easy corrosion of prestressed steel.

发明内容Contents of the invention

本发明的目的是为了克服现有技术存在的沉降纠偏成本高、效果差问题,提供沉降纠偏装置和管道支架基础沉降的纠偏方法,该装置具有升降结构,能够简单、有效地提高管道支架的高度。The purpose of the present invention is to overcome the problem of high cost and poor effect of settlement deviation existing in the prior art, and provide a settlement deviation correction device and a correction method for the settlement of the pipeline support foundation. The device has a lifting structure, which can simply and effectively increase the height of the pipeline support .

为了实现上述目的,本发明一方面提供一种沉降纠偏装置,包括设置在管道支架基础上的支架板、设置在所述管道支架基础内部的筒体、连接于所述支架板并向下延伸到所述筒体中的支撑杆、设置在所述筒体中的垫板以及固定件,所述支撑杆能够相对于所述筒体沿竖直方向上下滑动,所述固定件能够将所述支撑杆可拆卸地固定在所述筒体上,所述支撑杆的下端支撑在所述垫板上。In order to achieve the above object, the present invention provides a settlement correction device on the one hand, comprising a support plate arranged on the foundation of the pipeline support, a cylinder disposed inside the foundation of the pipeline support, connected to the support plate and extending downward to The support rod in the cylinder body, the backing plate and the fixing piece arranged in the cylinder body, the support rod can slide up and down in the vertical direction relative to the cylinder body, and the fixing piece can support the The rod is detachably fixed on the barrel, and the lower end of the support rod is supported on the backing plate.

可选地,所述筒体的下端的侧部设置有容纳所述垫板穿过的第一开口。Optionally, a side portion of the lower end of the barrel is provided with a first opening through which the backing plate passes.

可选地,所述筒体由四个侧板和顶板围成,所述支撑杆与所述顶板相连接。Optionally, the barrel is surrounded by four side plates and a top plate, and the support rods are connected with the top plate.

可选地,所述筒体内部设有连接于所述侧板的加强板。Optionally, a reinforcement plate connected to the side plate is provided inside the barrel.

可选地,所述支撑杆为螺栓,所述固定件为螺接于所述螺栓且能够夹持所述顶板的螺母。Optionally, the support rod is a bolt, and the fixing member is a nut screwed on the bolt and capable of clamping the top plate.

可选地,所述支架板上设有可供所述支撑杆穿过的通孔,所述支撑杆通过所述固定件夹持于所述支架板上。Optionally, the support plate is provided with a through hole through which the support rod can pass, and the support rod is clamped on the support plate by the fixing member.

可选地,所述筒体的任一侧板的顶部上设有第二开口。Optionally, a second opening is provided on the top of any side plate of the cylinder.

可选地,还包括设置在所述筒体底部的锚板。Optionally, an anchor plate arranged at the bottom of the cylinder is also included.

可选地,还包括设置在所述锚板底部竖直向下延伸的锚筋,所述锚筋远离所述锚板的一端上设有水平延伸的钩爪。Optionally, it also includes an anchor bar arranged at the bottom of the anchor plate and extending vertically downward, and a hook claw extending horizontally is provided on the end of the anchor bar away from the anchor plate.

本发明第二方面提供一种管道支架基础沉降的纠偏方法,所述管道支架基础中设置有沉降纠偏装置,所述沉降纠偏装置包括在所述管道支架基础上的支架板、设置在所述管道支架基础内部的筒体、连接于所述支架板并向下延伸到所述筒体中的支撑杆、设置在所述筒体中的垫板以及固定件,所述固定件将所述支撑杆可拆卸地固定在所述筒体上,所述支撑杆的下端支撑在所述垫板上;The second aspect of the present invention provides a deviation correction method for the settlement of the pipeline support foundation. The settlement deviation correction device is arranged in the pipeline support foundation, and the settlement deviation correction device includes a support plate on the pipeline support foundation, a The cylinder body inside the support foundation, the support rod connected to the support plate and extending downward into the cylinder body, the backing plate and the fixing part arranged in the cylinder body, the fixing part connects the support rod It is detachably fixed on the cylinder, and the lower end of the support rod is supported on the backing plate;

在所述管道支架基础发生部分沉降后,挖除所述沉降纠偏装置周围的部分,松开所述支撑杆与所述筒体的顶板之间的所述固定件,同步撬升所述支架板到达预定高度位置,将另外的垫板放入所述筒体以支撑所述支撑杆,锁紧所述固定件并回填所述管道支架基础,使得所述管道支架基础支撑所述支架板。After partial settlement of the pipeline support foundation, excavate the part around the settlement correction device, loosen the fixing member between the support rod and the top plate of the cylinder, and pry up the support plate synchronously Reaching the predetermined height position, put another backing plate into the cylinder to support the support rod, lock the fixing part and backfill the pipe support foundation, so that the pipe support foundation supports the support plate.

通过上述技术方案,撬升支架板能够实现管道支架的沉降纠偏,同时避免大规模的基础开挖,并且具有良好的安全性及稳定性。Through the above-mentioned technical solution, prying up the support plate can realize the settlement and deviation correction of the pipeline support, avoid large-scale foundation excavation, and have good safety and stability.

附图说明Description of drawings

图1是本发明中的沉降纠偏装置的一种实施方式的结构示意图;Fig. 1 is a schematic structural view of an embodiment of a settlement deviation correction device in the present invention;

图2是本发明中的沉降纠偏装置的一种实施方式的A-A剖面图;Fig. 2 is an A-A sectional view of an embodiment of the settlement deviation correction device in the present invention;

图3是本发明中的筒体的一种实施方式的结构示意图。Fig. 3 is a structural schematic diagram of an embodiment of the cylinder in the present invention.

附图标记说明Explanation of reference signs

1、支撑杆,2、支架板,3、第一开口,4、固定件,5、筒体,6、垫板,7、加强板,8、锚板,9、锚筋,10、管道支架基础,11、顶板,12、侧板,13、第二开口。1. Support rod, 2. Bracket plate, 3. First opening, 4. Fixing piece, 5. Cylinder body, 6. Backing plate, 7. Reinforcing plate, 8. Anchor plate, 9. Anchor bar, 10. Pipe support Foundation, 11, top plate, 12, side plate, 13, second opening.

具体实施方式Detailed ways

以下结合附图对本发明的具体实施方式进行详细说明。应当理解的是,此处所描述的具体实施方式仅用于说明和解释本发明,并不用于限制本发明。Specific embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are only used to illustrate and explain the present invention, and are not intended to limit the present invention.

本发明一方面提供一种沉降纠偏装置,包括设置在管道支架基础10上的支架板2、设置在管道支架基础10内部的筒体5、连接于支架板2并向下延伸到筒体5中的支撑杆1、设置在筒体5中的垫板6以及固定件4,支撑杆1能够相对于筒体5沿竖直方向上下滑动,固定件4能够将支撑杆1可拆卸地固定在筒体5上,支撑杆1的下端支撑在垫板6上。One aspect of the present invention provides a settlement correction device, including a support plate 2 arranged on the pipeline support foundation 10, a cylinder body 5 disposed inside the pipeline support foundation 10, connected to the support plate 2 and extending downward into the cylinder body 5 The supporting rod 1, the backing plate 6 and the fixing part 4 arranged in the cylinder body 5, the supporting rod 1 can slide up and down in the vertical direction relative to the cylinder body 5, and the fixing part 4 can detachably fix the supporting rod 1 on the cylinder On the body 5, the lower end of the support rod 1 is supported on the backing plate 6.

如图1所示,在管道支架基础10的顶面上设有支架板2,支架板2用于支撑管道支架,管道支架基础10中形成大致为圆柱形的凹陷部,以容纳筒体5,其底面为平面,使筒体5竖直安置。当管道支架基础10发生部分沉降而使得沉降纠偏装置沉降时,将固定件4松开,向上撬升支架板2使管道支架上升至预设位置,与此同时,支撑杆1与支架板2同步上升,支撑杆1相对于筒体5向上滑动,并向筒体5的底部补充垫板6,使其弥补支撑杆1的底部与凹陷部底面之间的距离,以通过补充的垫板6支撑支撑杆1,然后拧紧固定件4,保证装置整体的固定连接。As shown in Figure 1, a support plate 2 is provided on the top surface of the pipeline support foundation 10, the support plate 2 is used to support the pipeline support, and a substantially cylindrical depression is formed in the pipeline support foundation 10 to accommodate the cylinder body 5, Its bottom surface is a plane, so that the cylinder body 5 is placed vertically. When the pipeline support foundation 10 partially settles and the settlement correction device settles, the fixing part 4 is loosened, and the support plate 2 is pried up to raise the pipe support to the preset position. At the same time, the support rod 1 and the support plate 2 are synchronized Ascending, the support rod 1 slides upward relative to the cylinder body 5, and supplements the backing plate 6 to the bottom of the cylinder body 5, making it compensate for the distance between the bottom of the support rod 1 and the bottom surface of the recess, so as to be supported by the supplementary backing plate 6 Support the rod 1, and then tighten the fixing part 4 to ensure the fixed connection of the whole device.

通过上述技术内容,能够有效地实现沉降纠偏功能,避免了大规模的基础开挖,操作简单、便捷、有效,节省成本,缩短修复周期,同时提高工业管道的安全性、稳定性。Through the above-mentioned technical content, the settlement correction function can be effectively realized, large-scale foundation excavation can be avoided, the operation is simple, convenient and effective, the cost can be saved, the repair period can be shortened, and the safety and stability of industrial pipelines can be improved at the same time.

作为一种实施方式,筒体5的下端的设置有容纳垫板6穿过的第一开口3。As an embodiment, the lower end of the cylinder body 5 is provided with a first opening 3 through which the backing plate 6 passes.

结合图1和图3所示,筒体5设置为中空的,支撑杆1从筒体5的顶部穿入并向下延伸,垫板6放置在筒体5的底部,在筒体5的下端设有第一开口3,能够轻松拿取或安放垫板6。As shown in Figure 1 and Figure 3, the cylinder 5 is set to be hollow, the support rod 1 penetrates from the top of the cylinder 5 and extends downward, the backing plate 6 is placed on the bottom of the cylinder 5, at the lower end of the cylinder 5 A first opening 3 is provided so that the backing plate 6 can be easily taken or placed.

其中,筒体5由四个侧板12和顶板11围成,支撑杆1与顶板11相连接。Wherein, the cylinder body 5 is surrounded by four side plates 12 and a top plate 11 , and the support rod 1 is connected with the top plate 11 .

结合图1和图3所示,筒体5可以为圆形筒、方形筒等任意形状的筒体,为了便于加工制造及安装,在本申请中,筒体5设置为方形筒,由四个侧板12和顶板11焊接而成,顶板11上设有可供支撑杆1穿过的中心孔,支撑杆1可滑动地连接于顶板11上;第一开口3设置在侧板12上,第一开口3的数量可以任意设置,在本申请中,筒体5中的其中一组平行设置的侧板12上均设有第一开口3,这样既能够保证取放垫板6的便捷性,同时也能够保证筒体5的结构强度。As shown in Fig. 1 and Fig. 3, the cylinder body 5 can be a cylinder body of any shape such as a circular cylinder and a square cylinder. The side plate 12 and the top plate 11 are welded, and the top plate 11 is provided with a central hole for the support rod 1 to pass through, and the support rod 1 is slidably connected to the top plate 11; the first opening 3 is arranged on the side plate 12, and the second The number of openings 3 can be set arbitrarily. In the present application, first openings 3 are provided on one group of side plates 12 arranged in parallel in the cylinder body 5, so that the convenience of picking and placing the backing plate 6 can be ensured. At the same time, the structural strength of the barrel body 5 can also be ensured.

作为一种实施方式,筒体5内部设有连接于侧板12的加强板7。As an embodiment, a reinforcing plate 7 connected to the side plate 12 is provided inside the cylindrical body 5 .

如图1所示,由于筒体5为中空结构,为了增加其结构强度,可以在筒体5的内部设置一个或多个加强板7,加强板7为方形板,其四周均与侧板12的内壁相连接,并且加强板7上设有可供支撑杆1穿过的开孔。As shown in Figure 1, since the cylinder body 5 is a hollow structure, in order to increase its structural strength, one or more reinforcing plates 7 can be arranged inside the cylinder body 5. The inner wall is connected, and the reinforcing plate 7 is provided with an opening for the support rod 1 to pass through.

其中,支撑杆1为螺栓,固定件4为螺接于螺栓且能够夹持顶板11的螺母。Wherein, the supporting rod 1 is a bolt, and the fixing member 4 is a nut screwed on the bolt and capable of clamping the top plate 11 .

如图1所示,为了便于装置的安装和调整,将支撑杆1设置为螺栓,通过螺接的方式与顶板11相连,那么固定件4则可以设置为与螺栓相配合的螺母,在顶板11的上下两侧均设有螺母,使其能够夹紧顶板11并锁紧,将支撑杆1固定连接于顶板11上;松开螺母,即可实现支撑杆1相对于顶板11上下滑动。在本申请中,支撑杆1设置为地脚螺栓,地脚螺栓的抗拉能力强、强度高,适用于各种设备固定。As shown in Figure 1, in order to facilitate the installation and adjustment of the device, the support rod 1 is set as a bolt, which is connected to the top plate 11 by screwing, then the fixing part 4 can be set as a nut matched with the bolt, on the top plate 11 Nuts are provided on the upper and lower sides of the upper and lower sides, so that the top plate 11 can be clamped and locked, and the support rod 1 is fixedly connected to the top plate 11; In this application, the support rod 1 is set as an anchor bolt, which has strong tensile capacity and high strength, and is suitable for fixing various equipment.

进一步地,支架板2上设有可供支撑杆1穿过的通孔,支撑杆1通过固定件4夹持于支架板2上。Further, the support plate 2 is provided with a through hole for the support rod 1 to pass through, and the support rod 1 is clamped on the support plate 2 by the fixing member 4 .

如图1所示,支撑杆1与支架板2的连接方式和支撑杆1与顶板11的连接方式相同,便于装置的安装、拆卸及调整,在支架板2的上下两侧均设有固定件4,使其能够夹紧支撑架2并锁紧,将支撑杆1固定连接于支架板2上。作为一种可选的实施方式,在安装固定件4时,在固定件4内侧装有垫片,垫片能够增加固定件4的安装强度,防止固定件4由于震动等因素而导致自动松开,从而造成危害。As shown in Figure 1, the connection mode between the support rod 1 and the support plate 2 is the same as the connection mode between the support rod 1 and the top plate 11, which is convenient for installation, disassembly and adjustment of the device, and there are fixing parts on the upper and lower sides of the support plate 2 4. Make it able to clamp and lock the support frame 2, and fix the support rod 1 to the support plate 2. As an optional embodiment, when installing the fixing part 4, a gasket is installed inside the fixing part 4, and the gasket can increase the installation strength of the fixing part 4, and prevent the fixing part 4 from being loosened automatically due to factors such as vibration , causing harm.

作为一种实施方式,筒体5的任一侧板的顶部上设有第二开口。As an embodiment, a second opening is provided on the top of any side plate of the cylinder body 5 .

如图1所示,顶板11的内侧设置有固定件4,为了便于操作固定件4,需要在侧板12上设有可供操作工具伸入的第二开口,如扳手等,使扳手能够伸入筒体5内以松开或拧紧固定件4。As shown in Figure 1, the inner side of the top plate 11 is provided with a fixing piece 4. In order to facilitate the operation of the fixing piece 4, it is necessary to provide a second opening on the side plate 12 for the insertion of the operating tool, such as a wrench, etc., so that the wrench can be extended. Insert it into the barrel 5 to loosen or tighten the fixing part 4.

其中,沉降纠偏装置还包括设置在筒体1底部的锚板8。Wherein, the settlement deviation correction device also includes an anchor plate 8 arranged at the bottom of the cylinder body 1 .

如图1所示,为了提高筒体1在管道支架基础10内的稳定性,将锚板8水平放置在管道支架基础10内,并将筒体1竖直焊接在锚板8上,以免出现晃动、滑动等不稳固的现象,同时锚板8具有足够的金属强度以提供对筒体1的支撑力。As shown in Figure 1, in order to improve the stability of the cylinder 1 in the pipeline support foundation 10, the anchor plate 8 is horizontally placed in the pipeline support foundation 10, and the cylinder 1 is welded vertically on the anchor plate 8 to avoid Shaking, sliding and other unstable phenomena, while the anchor plate 8 has sufficient metal strength to provide support for the cylinder 1.

进一步地,沉降纠偏装置还包括设置在锚板8底部竖直向下延伸的锚筋9,锚筋9远离锚板8的一端上设有水平延伸的钩爪。Further, the settlement deviation correction device also includes an anchor bar 9 extending vertically downward at the bottom of the anchor plate 8 , and a horizontally extending claw is provided on the end of the anchor bar 9 away from the anchor plate 8 .

如图1所示,为了防止锚板8在管道支架基础10内晃动甚至偏移,在锚板8的底部设有锚筋9,锚筋9能够将锚板8与管道支架基础10锚固连接,并且锚筋9上设有钩爪,能够增加锚筋9与管道支架基础10之间的抗拉力,防止沉降纠偏装置在外力的作用下会发生倾斜等现象,增加了安全性。As shown in Figure 1, in order to prevent the anchor plate 8 from shaking or even shifting in the pipe support foundation 10, an anchor bar 9 is provided at the bottom of the anchor plate 8, and the anchor bar 9 can anchor the anchor plate 8 to the pipe support foundation 10. In addition, hook claws are provided on the anchor bar 9, which can increase the tensile force between the anchor bar 9 and the pipeline support foundation 10, prevent the settlement and deviation correction device from tilting under the action of external force, and increase safety.

本发明第二方面提供一种管道支架基础沉降的纠偏方法,管道支架基础10中设置有沉降纠偏装置,沉降纠偏装置包括在管道支架基础10上的支架板2、设置在管道支架基础10内部的筒体5、连接于支架板2并向下延伸到筒体5中的支撑杆1、设置在筒体5中的垫板6以及固定件4,固定件4将支撑杆1可拆卸地固定在筒体5上,支撑杆1的下端支撑在垫板6上;在管道支架基础10发生部分沉降后,挖除沉降纠偏装置周围的回填土,松开支撑杆1与筒体5的顶板11之间的固定件4,同步撬升支架板2到达预定高度位置,将垫板6放入筒体5以支撑支撑杆1,锁紧固定件4并回填管道支架基础10,使得管道支架基础10支撑支架板2。该装置可操作性强,并且具有良好的安全性及稳定性,通过该装置能够有效的实现沉降纠偏功能,避免大规模的基础开挖,节省了大量成本,能够极大限度地缩短修复周期,有效解决了工业厂区地表沉陷会造成区域内工业管道基础发生不均匀沉降,导致管道受损、破裂,威胁生产安全的问题。The second aspect of the present invention provides a method for correcting the settlement of the pipeline support foundation. The settlement deviation correction device is arranged in the pipeline support foundation 10. The cylinder body 5, the support rod 1 connected to the bracket plate 2 and extending downward into the cylinder body 5, the backing plate 6 arranged in the cylinder body 5 and the fixing piece 4, the fixing piece 4 detachably fixes the support rod 1 on the On the cylinder body 5, the lower end of the support rod 1 is supported on the backing plate 6; after partial settlement of the pipeline support foundation 10, the backfill soil around the settlement deviation correction device is excavated, and the gap between the support rod 1 and the top plate 11 of the cylinder body 5 is loosened. The fixing part 4 between them, pry up the support plate 2 to reach the predetermined height position synchronously, put the backing plate 6 into the cylinder body 5 to support the support rod 1, lock the fixing part 4 and backfill the pipeline support foundation 10, so that the pipeline support foundation 10 supports Bracket plate 2. The device is highly operable, and has good safety and stability. The device can effectively realize the settlement correction function, avoid large-scale foundation excavation, save a lot of cost, and greatly shorten the repair period. It effectively solves the problem that the ground subsidence of the industrial factory area will cause uneven settlement of the industrial pipeline foundation in the area, resulting in damage and rupture of the pipeline and threatening production safety.

在搭建管道支架时,将沉降纠偏装置预埋到管道支架基础内,首先预埋的方法为:将四块侧板12与顶板11进行焊接固定形成筒体5,再将筒体5焊接固定在锚板8上;再锚板8的底部焊接有多根锚筋9,将该整体放入到管道支架基础10内,再将支撑杆1插入到筒体5中,使支撑杆1与锚板8相抵;然后,将支架板2穿过支撑杆1,调整支架板2的高度使其贴合在管道支架基础10上,并锁紧固定件4,实现支撑杆1与筒体5之间的固定、支撑杆1与支架板2之间的固定。When building the pipeline support, the settlement correction device is pre-embedded into the foundation of the pipeline support. The first pre-embedding method is: welding and fixing the four side plates 12 and the top plate 11 to form the cylinder 5, and then welding and fixing the cylinder 5 on the On the anchor plate 8; the bottom of the anchor plate 8 is welded with a plurality of anchor ribs 9, the whole is put into the pipeline support foundation 10, and then the support rod 1 is inserted into the cylinder 5, so that the support rod 1 and the anchor plate 8 offset; then, pass the support plate 2 through the support rod 1, adjust the height of the support plate 2 so that it fits on the pipe support foundation 10, and lock the fixing part 4 to realize the support between the support rod 1 and the cylinder 5 Fixation, the fixation between the support rod 1 and the bracket plate 2.

其次,在管道支架基础10发生部分沉降后,挖开沉降纠偏装置的侧方,使沉降纠偏装置露出,通过扳手将顶板11上下两侧的固定件4松开,同步利用千斤顶等驱动件撬升支架板2,使支架板2达到预定高度位置,支撑杆1会随着支架板2上移,并将垫板6通过第一开口3放入到筒体5内,使其位于支撑杆1的底部以填补支撑杆1上移的高度;将支撑杆1固定好后再通过扳手将顶板11上下两侧的固定件4拧紧,并将千斤顶等驱动件撤出,最后将管道支架基础10进行回填,完成了管道支架基础10部分沉降的纠偏。Secondly, after partial settlement of the pipeline support foundation 10, dig out the side of the settlement deviation correction device to expose the settlement deviation correction device, loosen the fixing parts 4 on the upper and lower sides of the top plate 11 with a wrench, and use jacks and other driving parts to pry up simultaneously. Support plate 2, make the support plate 2 reach the predetermined height position, the support rod 1 will move up with the support plate 2, and put the backing plate 6 into the cylinder 5 through the first opening 3, so that it is located at the center of the support rod 1 The bottom is used to fill the height of the upward movement of the support rod 1; after the support rod 1 is fixed, the fixing parts 4 on the upper and lower sides of the top plate 11 are tightened with a wrench, and the driving parts such as the jack are withdrawn, and finally the pipe support foundation 10 is backfilled , Completed the rectification of the settlement of the 10 part of the pipeline support foundation.

其中,沉降纠偏装置可以为以上方案所述的沉降纠偏装置。Wherein, the settlement deviation correction device may be the settlement deviation correction device described in the above solution.

以上结合附图详细描述了本发明的优选实施方式,但是,本发明并不限于上述实施方式中的具体细节,在本发明的技术构思范围内,可以对本发明的技术方案进行多种简单变型,这些简单变型均属于本发明的保护范围。The preferred embodiment of the present invention has been described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the specific details of the above embodiment, within the scope of the technical concept of the present invention, various simple modifications can be made to the technical solution of the present invention, These simple modifications all belong to the protection scope of the present invention.

另外需要说明的是,在上述具体实施方式中所描述的各个具体技术特征,在不矛盾的情况下,可以通过任何合适的方式进行组合,为了避免不必要的重复,本发明对各种可能的组合方式不再另行说明。In addition, it should be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable way if there is no contradiction. The combination method will not be described separately.

此外,本发明的各种不同的实施方式之间也可以进行任意组合,只要其不违背本发明的思想,其同样应当视为本发明所公开的内容。In addition, various combinations of different embodiments of the present invention can also be combined arbitrarily, as long as they do not violate the idea of the present invention, they should also be regarded as the disclosed content of the present invention.

Claims (10)

1. The utility model provides a subside deviation correcting device, its characterized in that is in including mounting panel (2), the setting that sets up on pipe support basis (10) inside barrel (5), connect in mounting panel (2) and downwardly extending to bracing piece (1), the setting in barrel (5) are in backing plate (6) and mounting (4) in barrel (5), bracing piece (1) can for barrel (5) slide from top to bottom along vertical direction, mounting (4) can with bracing piece (1) detachably fixes on barrel (5), the lower extreme of bracing piece (1) is in support on backing plate (6).
2. The settlement correcting device according to claim 1, wherein a side portion of a lower end of the cylinder (5) is provided with a first opening (3) for receiving the pad (6) therethrough.
3. The settlement correcting device according to claim 2, wherein the cylinder (5) is surrounded by four side plates (12) and a top plate (11), and the support rod (1) is connected with the top plate (11).
4. The settlement correcting device according to claim 3, wherein a reinforcing plate (7) connected to the side plate (12) is provided inside the cylinder (5).
5. The settlement correcting device according to claim 3, wherein the supporting rod (1) is a bolt, and the fixing member (4) is a nut screwed on the bolt and capable of clamping the top plate (11).
6. The settlement correcting device according to claim 5, wherein the supporting plate (2) is provided with a through hole for the supporting rod (1) to pass through, and the supporting rod (1) is clamped on the supporting plate (2) through the fixing member (4).
7. The settlement rectification device according to claim 6, wherein a second opening (13) is provided on the top of either side plate of the cylinder (5).
8. The settlement rectification device according to claim 1, further comprising an anchor plate (8) connected to the bottom of the drum (5).
9. The settlement correcting device of claim 8, further comprising an anchor bar (9) vertically extending downwards at the bottom of the anchor plate (8), wherein a horizontally extending claw is arranged at one end of the anchor bar (9) far away from the anchor plate (8).
10. The pipeline bracket foundation settlement correcting method is characterized in that a settlement correcting device is arranged in a pipeline bracket foundation (10), the settlement correcting device comprises a support plate (2) on the pipeline bracket foundation (10), a barrel body (5) arranged in the pipeline bracket foundation (10), a support rod (1) connected to the support plate (2) and extending downwards into the barrel body (5), a base plate (6) arranged in the barrel body (5) and a fixing piece (4), the fixing piece (4) detachably fixes the support rod (1) on the barrel body (5), and the lower end of the support rod (1) is supported on the base plate (6);
after the pipeline bracket foundation (10) is partially settled, the part around the settlement correcting device is dug out, the supporting rod (1) and the fixing part (4) between the top plate (11) of the cylinder body (5) are loosened, the supporting plate (2) is synchronously pried to reach a preset height position, an additional base plate (6) is placed into the cylinder body (5) to support the supporting rod (1), the fixing part (4) is locked and the pipeline bracket foundation (10) is backfilled, so that the pipeline bracket foundation (10) supports the supporting plate (2).
CN202211396832.0A 2022-11-09 2022-11-09 Settlement correction device and correction method for settlement of pipeline support foundation Pending CN115897689A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211396832.0A CN115897689A (en) 2022-11-09 2022-11-09 Settlement correction device and correction method for settlement of pipeline support foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211396832.0A CN115897689A (en) 2022-11-09 2022-11-09 Settlement correction device and correction method for settlement of pipeline support foundation

Publications (1)

Publication Number Publication Date
CN115897689A true CN115897689A (en) 2023-04-04

Family

ID=86472061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211396832.0A Pending CN115897689A (en) 2022-11-09 2022-11-09 Settlement correction device and correction method for settlement of pipeline support foundation

Country Status (1)

Country Link
CN (1) CN115897689A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110016931A (en) * 2019-05-15 2019-07-16 龙源(北京)风电工程设计咨询有限公司 A kind of novel pre-stressed anchor bolt blower foundation and method
CN112376602A (en) * 2020-07-28 2021-02-19 中国电力科学研究院有限公司 Buckle type foundation bolt of power transmission tower
CN213390271U (en) * 2020-08-21 2021-06-08 国能龙源环保有限公司 Tank body sedimentation deviation rectifying structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110016931A (en) * 2019-05-15 2019-07-16 龙源(北京)风电工程设计咨询有限公司 A kind of novel pre-stressed anchor bolt blower foundation and method
CN112376602A (en) * 2020-07-28 2021-02-19 中国电力科学研究院有限公司 Buckle type foundation bolt of power transmission tower
CN213390271U (en) * 2020-08-21 2021-06-08 国能龙源环保有限公司 Tank body sedimentation deviation rectifying structure

Similar Documents

Publication Publication Date Title
KR101632030B1 (en) Installation structure and method of steel tube columns and brackets
KR101341679B1 (en) Device for constructing an underground structure and method thereof
KR101070426B1 (en) Improved Underpinning Method Using the micro pile
CN111622268B (en) Protection construction method based on large rigid box culvert passing under power pipe gallery
KR101414155B1 (en) Self-supported shoring structure using shelf and construction method using the relieving platform
CN112503247A (en) Slope section water pipeline and construction method thereof
CN112854280A (en) Positioning construction method for steel pipe pile embedded column base foundation bolt
JP4973621B2 (en) Method for correcting horizontal height of structure, equipment used in the method, and method for reinforcing bearing capacity of structure
KR20160000702A (en) Fastening member used in concrete filled steel tube and its using concrete filled steel tube mounting structure and method and its includes build underground structure and method
JP5584812B1 (en) Tilt repair device
CN115897689A (en) Settlement correction device and correction method for settlement of pipeline support foundation
CN112854281A (en) Positioning construction method for column bottom embedded steel pipe pile
CN207213329U (en) A kind of supporting construction of oil pipeline
KR101415867B1 (en) Precast concrete structure construction method for downward construction of underground structures
CN112359888B (en) Static pile reaction frame jacking system for carbon filter tank body deviation rectifying and reinforcing construction and construction method
JP6084388B2 (en) How to build a new foundation
CN106223344A (en) A kind of ground line piled anchor framework foundation pit supporting method
CN117513351A (en) Recoverable deep foundation pit inclined throwing support system
CN112376602B (en) A kind of transmission tower clip-on anchor bolt
CN111877315B (en) Partial prefabricated ground connecting wall guide wall under underground facility and construction method
KR20140116695A (en) The underground structure and pressing device
CN212001231U (en) Steel constructs bridge stand and connects foundation structure
KR20130050172A (en) Self-supporting temporary structure using steel wire and method of the same
CN105465484A (en) Steel structure pipeline support mounting method and support structure thereof
CN206815345U (en) Foundation ditch supports pit prop stake underpinning construction structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination