CN115897674A - A fertilizer tank type anti-floating system integrating filtration and overflow monitoring and its construction and use method - Google Patents

A fertilizer tank type anti-floating system integrating filtration and overflow monitoring and its construction and use method Download PDF

Info

Publication number
CN115897674A
CN115897674A CN202211678352.3A CN202211678352A CN115897674A CN 115897674 A CN115897674 A CN 115897674A CN 202211678352 A CN202211678352 A CN 202211678352A CN 115897674 A CN115897674 A CN 115897674A
Authority
CN
China
Prior art keywords
water
overflow
pipe
reservoir
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211678352.3A
Other languages
Chinese (zh)
Inventor
宋林辉
刘新原
唐逸凡
黄金斌
王杰
叶冉
赵宏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CN202211678352.3A priority Critical patent/CN115897674A/en
Publication of CN115897674A publication Critical patent/CN115897674A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00—Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108—Rainwater harvesting

Landscapes

  • Sewage (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明提供了一种集滤水溢流监测一体的肥槽式抗浮系统,包括肥槽、导水沟、蓄排水装置。肥槽位于地下构造物、岩土地基和围护桩之间,肥槽内设置溢流管、数据线缆和溢流支管;导水沟内设置滤水管、土工布、导水砂砾和隔水层;蓄排水装置包括蓄水池、汇水管、砂砾填料、无砂砼滤块和排水管道。本发明通过孔压传感器实时监测,可预测溢流水量,地下水通过滤水管和溢流管流入汇水管并到达蓄水池,同时,地表下渗和地基上渗到砂砾填料的水也流进蓄水池,并从排水管道排走,达到控制地下水压力作用的抗浮目的。

Figure 202211678352

The invention provides a fertilizer trough type anti-floating system integrated with filtration and overflow monitoring, including a fertilizer trough, a water guide ditch, and a storage and drainage device. The fertilizer tank is located between underground structures, rock foundations and retaining piles. Overflow pipes, data cables and overflow branch pipes are arranged in the fertilizer tank; water filter pipes, geotextiles, water-conducting gravel and water-proof layer; storage and drainage devices include reservoirs, catchment pipes, gravel fillers, sand-free concrete filter blocks and drainage pipes. The invention monitors in real time through the pore pressure sensor to predict the amount of overflow water. The groundwater flows into the water collection pipe through the filter pipe and the overflow pipe and reaches the reservoir. pool, and drained from the drainage pipe to achieve the anti-floating purpose of controlling the pressure of groundwater.

Figure 202211678352

Description

一种集滤水溢流监测一体的肥槽式抗浮系统及其施工使用方法A fertilizer tank type anti-floating system integrating filtration and overflow monitoring and its construction and use method

技术领域technical field

本发明涉及一种地下构造物抗浮技术,具体涉及一种集滤水溢流监测一体的肥槽式抗浮系统及其施工使用方法。The invention relates to an anti-floating technology for underground structures, in particular to a fertilizer trough type anti-floating system integrating filtration and overflow monitoring and a construction and use method thereof.

背景技术Background technique

随着城市化的发展,地下空间的开发已引起人们的关注,大规模的地下构造物也越来越多,如地下商场、地下停车场、地铁及隧道等。地下构造物建造时会设计必要的抗浮措施以避免上浮,但随着所处水文地质环境越来越复杂,特别是不可预测的极端暴雨频发,抗浮设计方法和措施难以实现安全与经济的统一,成为推进地下空间开发进程中亟需解决的重难点问题。With the development of urbanization, the development of underground space has attracted people's attention, and there are more and more large-scale underground structures, such as underground shopping malls, underground parking lots, subways and tunnels. Necessary anti-floating measures will be designed to avoid floating when underground structures are constructed. However, as the hydrogeological environment becomes more and more complex, especially the unpredictable and frequent extreme rainstorms, it is difficult to achieve safe and economical anti-floating design methods and measures. The unification of the underground space has become an important and difficult problem that needs to be solved urgently in the process of promoting the development of underground space.

现有抗浮技术主要包括被动抗浮技术和主动抗浮技术两大类。工程中采用较多的被动抗浮技术是抗拔桩和抗拔锚杆,抗拔桩通常和基础底板完全固结,当地下水位较高时是抗拔桩,当地下水位较低时变成了受压桩;抗浮锚杆仅通过钢绞线锚固在基础底板上,只在地下水位较高时发挥作用。另外,被动抗浮技术针对的是常水位条件,难以应对近年频发的不可预测极端暴雨,其引发的突增水位对地下构造物的抗浮带来严峻挑战。主动抗浮技术采用疏导的思路解决地下构造物的浮力问题,通过主动导水和泄压等措施降低或释放地下构造物浮力而达到抗浮目的,但需要在基础底板上开孔,给地下构造物的防水和施工带来不便,使得技术的推广范围受限。Existing anti-floating technologies mainly include passive anti-floating technologies and active anti-floating technologies. The more passive anti-floating technologies used in the project are the uplift piles and the uplift anchors. The uplift piles are usually fully consolidated with the foundation floor. When the groundwater level is high, they are uplift piles, and when the groundwater level is low, they become The anti-floating anchor rod is only anchored to the foundation floor through steel strands, and it only plays a role when the groundwater level is high. In addition, the passive anti-floating technology is aimed at constant water level conditions, and it is difficult to cope with the unpredictable and extreme heavy rains that have occurred frequently in recent years. The sudden increase in water level caused by it has brought severe challenges to the anti-floating of underground structures. Active anti-floating technology adopts the idea of dredging to solve the buoyancy problem of underground structures, and achieves the purpose of anti-floating by reducing or releasing the buoyancy of underground structures through measures such as active water diversion and pressure relief. Waterproofing and construction of objects bring inconvenience, which limits the scope of popularization of the technology.

综上所述,为应对不可预测的极端暴雨对现有抗浮设计方法和措施带来的严峻挑战,且避免对地下构造物施工造成的不便,迫切需要一套新型抗浮系统和方法。In summary, in order to cope with the severe challenges brought by unpredictable extreme rainstorms to the existing anti-floating design methods and measures, and to avoid the inconvenience caused to the construction of underground structures, a new anti-floating system and method is urgently needed.

发明内容Contents of the invention

本发明所要解决的技术问题在于针对上述现有技术的不足,提供一种集滤水溢流监测一体的肥槽式抗浮系统及其施工使用方法,该抗浮系统设计科学合理,实用性强,能通过监测的孔压预测渗流量,利用滤水溢流监测一体孔,在不破坏地下构造物的前提下,将基底水浮力以限压溢流的方式控制在许可范围内,达到抗浮目的。The technical problem to be solved by the present invention is to provide a fertilizer trough anti-floating system integrated with filtered water overflow monitoring and its construction and use method in view of the above-mentioned deficiencies in the prior art. The anti-floating system has a scientific and reasonable design and strong practicability , the seepage flow can be predicted through the monitored pore pressure, and the integral pore can be monitored by using the filter overflow to control the buoyancy of the base water within the allowable range by means of pressure-limited overflow without damaging the underground structure, so as to achieve anti-floating Purpose.

为解决上述技术问题,本发明采用的技术方案是:一种集滤水溢流监测一体的肥槽式抗浮系统,其特征在于,包括肥槽、导水沟和蓄排水装置;所述肥槽位于地下构造物、岩土地基与围护桩之间,所述导水沟开设在地下构造物的地下结构底板下方的岩土地基上,所述导水沟内埋设滤水管,所述围护桩上固定溢流管,所述滤水管和溢流管导通连接,所述岩土地基内埋设孔压传感器,所述孔压传感器上连接数据线缆,所述数据线缆依次穿过滤水管和溢流管延伸至肥槽外,所述肥槽内填充黏土填料,所述肥槽内设置蓄排水装置。In order to solve the above-mentioned technical problems, the technical solution adopted by the present invention is: a kind of fertilizer tank type anti-floating system integrating filtration and overflow monitoring, which is characterized in that it includes a fertilizer tank, a water guide ditch and a storage and drainage device; the fertilizer The groove is located between the underground structure, the rock foundation and the surrounding protection piles. The water guide ditch is opened on the rock foundation below the underground structure floor of the underground structure. A water filter pipe is buried in the water guide ditch. An overflow pipe is fixed on the guard pile, the filter pipe is connected to the overflow pipe, a pore pressure sensor is buried in the rock foundation, and a data cable is connected to the pore pressure sensor, and the data cable passes through the filter in turn. The water pipe and the overflow pipe extend to the outside of the fertilizer tank, the inside of the fertilizer tank is filled with clay filler, and the storage and drainage device is arranged in the fertilizer tank.

优选地,所述蓄排水装置包括蓄水池、溢流支管、汇水管和排水管道,所述蓄水池设置在肥槽内,所述溢流支管通过三通连接在溢流管上,所述溢流支管连接汇水管,汇水管连接蓄水池,排水管道连接蓄水池。Preferably, the storage and drainage device includes a water storage tank, an overflow branch pipe, a water collection pipe and a drainage pipe, the water storage tank is arranged in the fertilizer tank, and the overflow branch pipe is connected to the overflow pipe through a tee, so that The overflow branch pipe is connected to the water collection pipe, the water collection pipe is connected to the water storage tank, and the drainage pipe is connected to the water storage tank.

优选地,所述导水沟开设在两列结构柱位之间,所述结构柱矩形阵列连接在地下结构底板的上底面上,所述导水沟包括沟槽和隔水层,所述沟槽的截面为倒梯形,所述沟槽内铺设土工布,所述沟槽内填充导水砂砾,所述沟槽顶部设置隔水层。Preferably, the water guide ditch is opened between two columns of structural columns, the rectangular array of structural columns is connected to the upper bottom surface of the underground structure floor, the water guide ditch includes a groove and a water-resistant layer, and the groove The cross-section of the groove is an inverted trapezoid, the geotextile is laid in the groove, the water-conducting gravel is filled in the groove, and the water-proof layer is arranged on the top of the groove.

优选地,所述黏土填料中填充砂砾填料,所述蓄水池一半埋入黏土填料,另一半埋入砂砾填料,所述蓄水池与砂砾填料接触的侧面嵌入设置无砂砼滤块。Preferably, the clay filler is filled with gravel filler, half of the reservoir is embedded with clay filler, and the other half is embedded with gravel filler, and a sandless concrete filter block is embedded in the side of the reservoir in contact with the gravel filler.

优选地,所述蓄水池顶部设置检修井,所述排水管道穿过检修井引出。Preferably, an inspection well is arranged on the top of the reservoir, and the drainage pipe is led out through the inspection well.

优选地,所述地下结构底板与导水沟之间设置施工垫层。Preferably, a construction cushion is provided between the bottom plate of the underground structure and the water guide ditch.

优选地,溢流支管的预设高度基于地下构造物的自重计算得到,即预设高度下的基底孔压形成的浮力的1.5倍值须小于或等于地下构造物的自重。汇水管的位置低于无砂砼滤块的位置。Preferably, the preset height of the overflow branch pipe is calculated based on the self-weight of the underground structure, that is, the value of 1.5 times the buoyancy formed by the basement pore pressure at the preset height must be less than or equal to the self-weight of the underground structure. The location of the water collection pipe is lower than that of the sandless concrete filter block.

优选地,隔水层的材料为压密黏土或防水卷材。Preferably, the material of the waterproof layer is compacted clay or waterproof membrane.

一种集滤水溢流监测一体的肥槽式抗浮系统的施工使用方法,包括以下步骤:A construction and use method of a fertilizer tank type anti-floating system integrating filtration and overflow monitoring, comprising the following steps:

S、在相邻两排结构柱位的中间岩土地基上开挖导水沟,在导水沟内底面埋入孔压传感器,在导水沟内埋设滤水管,在围护桩上安装溢流管,将溢流管与滤水管导通连接,将连接在孔压传感器上的数据线缆依次穿过滤水管和溢流管;S. Excavate a water diversion ditch on the middle rock and soil foundation of two adjacent rows of structural columns, embed a pore pressure sensor in the inner bottom of the water diversion ditch, bury a water filter pipe in the water diversion ditch, and install overflow on the surrounding protection piles. The flow pipe connects the overflow pipe with the water filter pipe, and passes the data cable connected to the pore pressure sensor through the water filter pipe and the overflow pipe in turn;

S1、在导水沟内底面和内侧面铺设土工布,在导水沟内填充导水砂砾,在导水沟顶部设置隔水层,在隔水层上方浇筑施工垫层,在施工垫层上施工地下构造物;S1. Lay geotextiles on the inner bottom and inner side of the water diversion ditch, fill the water diversion ditch with water-conducting gravel, set a water-proof layer on the top of the water- diversion ditch, pour a construction cushion on the top of the water-resisting layer, and pour a construction cushion on the construction cushion. construction of underground structures;

S2、在溢流管上预设高度处连通溢流支管,将多根溢流支管连接在汇水管;S2. Connect the overflow branch pipe at a preset height on the overflow pipe, and connect multiple overflow branch pipes to the water collection pipe;

S3、在肥槽中填充黏土填料至蓄水池预设高度,将蓄水池的下半部分埋入黏土填料,在蓄水池侧板安装无砂砼滤块,在蓄水池内部安装排水管道,排水管道沿检修井延伸至地面,将汇水管连接至蓄水池;S3. Fill the fertilizer tank with clay filler to the preset height of the reservoir, bury the lower half of the reservoir with clay filler, install sand-free concrete filter blocks on the side panels of the reservoir, and install drainage inside the reservoir Pipeline, the drainage pipe extends along the manhole to the ground, connecting the catchment pipe to the reservoir;

S4、填入砂砾填料至没过蓄水池顶部,在砂砾填料上方继续填充黏土填料至地面,此时完成整个系统的安装;S4. Fill in the gravel filler to cover the top of the reservoir, and continue to fill the clay filler above the gravel filler to the ground, and complete the installation of the entire system at this time;

S5、在使用阶段,当地下水位上升时,地下结构底板下的孔压被孔压传感器实时监测并据此预测溢流水量,地下水依次经过滤水管、溢流管、溢流支管和汇水管流入蓄水池内;S5. In the use stage, when the groundwater level rises, the pore pressure under the bottom plate of the underground structure is monitored in real time by the pore pressure sensor and the overflow water volume is predicted accordingly. The groundwater flows in through the filter water pipe, overflow pipe, overflow branch pipe and water collection pipe in sequence in the cistern;

S6、同时,地表下渗水和直接从岩土地基上渗进入砂砾填料的水也流入蓄水池内,汇聚在蓄水池内的水通过排水管道排走,最终达到控制地下水压力作用的抗浮目的。S6. At the same time, the seepage water under the surface and the water directly infiltrated into the gravel filler from the rock foundation also flow into the storage tank, and the water accumulated in the storage tank is drained through the drainage pipe, finally achieving the anti-floating purpose of controlling the pressure of the groundwater.

本发明与现有技术相比具有以下优点:Compared with the prior art, the present invention has the following advantages:

本发明设置在导水沟中的滤水管可汇聚地下水,其延伸至围护桩边与溢流管相连,可在不破坏地下构造物的前提下,将地下水输送至预设高度的溢流支管,并经汇水管和蓄水池后最终被排走,溢流支管的预设高度在充分利用地下构造物自重的基础上实现了限压,地下水位上升形成的水压驱使水流溢出,且经孔压传感器和穿于滤水管与溢流管的数据线缆可实时监测基底孔压,以预测渗流量。因此,本发明能在不影响地下构造物的前提下,将基底水浮力以限压溢流的方式控制在许可范围内,达到抗浮目的,解决了现有抗浮技术中的不足。The water filter pipe arranged in the water diversion ditch of the present invention can gather groundwater, extend to the side of the surrounding pile and connect with the overflow pipe, and can transport the groundwater to the overflow branch pipe at a preset height without destroying the underground structure , and finally drained away after the water collection pipe and the reservoir. The preset height of the overflow branch pipe realizes the pressure limit on the basis of making full use of the self-weight of the underground structure. The water pressure formed by the rise of the groundwater level drives the water to overflow, and after The pore pressure sensor and the data cable passing through the filter pipe and the overflow pipe can monitor the pore pressure of the basement in real time to predict the seepage amount. Therefore, the present invention can control the buoyancy of the base water within the permissible range by means of pressure-limited overflow without affecting the underground structures, so as to achieve the purpose of anti-floating and solve the deficiencies in the existing anti-floating technology.

下面结合附图和实施例对本发明作进一步详细说明。The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments.

附图说明Description of drawings

图1是本发明的整体主视剖面结构示意图。Fig. 1 is a schematic diagram of the overall front sectional structure of the present invention.

图2是本发明的俯视剖面结构示意图。Fig. 2 is a top view sectional structure schematic diagram of the present invention.

图3是本发明中导水沟的剖面结构示意图。Fig. 3 is a schematic cross-sectional structure diagram of the gutter in the present invention.

图4是本发明中蓄水池位置的局部放大结构示意图。Fig. 4 is a partially enlarged structural schematic diagram of the location of the reservoir in the present invention.

附图标记说明:Explanation of reference signs:

1—地下构造物;        2—岩土地基;          3—围护桩;1—Underground structure; 2—Rock foundation; 3—Enclosure pile;

4—溢流管;            5—黏土填料;          6—地下结构底板;4—overflow pipe; 5—clay filler; 6—underground structure floor;

7—施工垫层;          8—导水沟;            9—孔压传感器;7—construction cushion; 8—water guide ditch; 9—pore pressure sensor;

10—滤水管;           11—数据线缆;         12—砂砾填料;10—filter pipe; 11—data cable; 12—gravel filler;

13—溢流支管;         14—汇水管;           15—结构柱;13—overflow branch; 14—collection pipe; 15—structural column;

16—蓄水池;           17—隔水层;           18—土工布;16—reservoir; 17—aquifer; 18—geotextile;

19—导水砂砾;         20—沟槽;             21—无砂砼滤块;19—water-conducting gravel; 20—groove; 21—sandless concrete filter block;

22—排水管道;         23—检修井。22—drainage pipe; 23—management well.

具体实施方式Detailed ways

实施例1Example 1

如图1至图4所示,一种集滤水溢流监测一体的肥槽式抗浮系统,包括肥槽、导水沟8和蓄排水装置;所述肥槽位于地下构造物1、岩土地基2与围护桩3之间,所述导水沟8开设在地下构造物1的地下结构底板6下方的岩土地基2上,所述导水沟8内埋设滤水管10,所述围护桩3上固定溢流管4,所述滤水管10和溢流管4导通连接,所述岩土地基2内埋设孔压传感器9,所述孔压传感器9上连接数据线缆11,所述数据线缆11依次穿过滤水管10和溢流管4延伸至肥槽外,所述肥槽内填充黏土填料5,所述肥槽内设置蓄排水装置。As shown in Figures 1 to 4, a fertilizer tank type anti-floating system integrating filtration and overflow monitoring includes a fertilizer tank, a water guide ditch 8 and a storage and drainage device; the fertilizer tank is located in the underground structure 1, rock Between the soil foundation 2 and the retaining pile 3, the water guide ditch 8 is opened on the rock foundation 2 below the underground structure floor 6 of the underground structure 1, and a water filter pipe 10 is embedded in the water guide ditch 8, and the The overflow pipe 4 is fixed on the surrounding protection pile 3, the water filter pipe 10 and the overflow pipe 4 are conductively connected, the pore pressure sensor 9 is embedded in the rock foundation 2, and the data cable 11 is connected to the pore pressure sensor 9 , the data cable 11 extends through the water filter pipe 10 and the overflow pipe 4 in sequence to the outside of the fertilizer tank, the inside of the fertilizer tank is filled with clay filler 5, and the storage and drainage device is arranged in the fertilizer tank.

本实施例中,所述蓄排水装置包括蓄水池16、溢流支管13、汇水管14和排水管道22,所述蓄水池16设置在肥槽内,所述溢流支管13通过三通连接在溢流管4上,所述溢流支管13连接汇水管14,汇水管14连接蓄水池16,排水管道22连接蓄水池16。In this embodiment, the storage and drainage device includes a reservoir 16, an overflow branch pipe 13, a water collection pipe 14 and a drainage pipe 22. The reservoir 16 is arranged in a fertilizer tank, and the overflow branch pipe 13 passes through Connected to the overflow pipe 4 , the overflow branch pipe 13 is connected to the water collection pipe 14 , the water collection pipe 14 is connected to the reservoir 16 , and the drainage pipe 22 is connected to the reservoir 16 .

本实施例中,所述导水沟8开设在两列结构柱位15之间,所述结构柱15矩形阵列连接在地下结构底板6的上底面上,所述导水沟8包括沟槽20和隔水层17,所述沟槽20的截面为倒梯形,所述沟槽20内铺设土工布18,所述沟槽20内填充导水砂砾19,所述沟槽20顶部设置隔水层17。In this embodiment, the water guide ditch 8 is set between two columns of structural columns 15, the structural columns 15 are connected in a rectangular array to the upper bottom surface of the underground structure floor 6, and the water guide ditch 8 includes a groove 20 and a water-repellent layer 17, the cross section of the groove 20 is an inverted trapezoid, a geotextile 18 is laid in the groove 20, water-conducting gravel 19 is filled in the groove 20, and a water-resistant layer is arranged on the top of the groove 20 17.

本实施例中,所述黏土填料5中填充砂砾填料12,所述蓄水池16一半埋入黏土填料5,另一半埋入砂砾填料12,所述蓄水池16与砂砾填料12接触的侧面嵌入设置无砂砼滤块21。In this embodiment, the clay filler 5 is filled with a gravel filler 12, half of the reservoir 16 is buried in the clay filler 5, and the other half is embedded in the gravel filler 12, and the side surface of the reservoir 16 in contact with the gravel filler 12 is Sand-free concrete filter block 21 is embedded.

本实施例中,所述蓄水池16顶部设置检修井23,所述排水管道22穿过检修井23引出。In this embodiment, an inspection well 23 is arranged on the top of the reservoir 16 , and the drainage pipe 22 is led out through the inspection well 23 .

本实施例中,所述地下结构底板6与导水沟8之间设置施工垫层7。In this embodiment, a construction cushion 7 is provided between the underground structure bottom plate 6 and the water guide ditch 8 .

本实施例中,溢流支管13的预设高度基于地下构造物1的自重计算得到,即预设高度下的基底孔压形成的浮力的1.2倍值须小于或等于地下构造物1的自重。汇水管14的位置低于无砂砼滤块21的位置。In this embodiment, the preset height of the overflow branch pipe 13 is calculated based on the self-weight of the underground structure 1, that is, the value of 1.2 times the buoyancy formed by the base pore pressure at the preset height must be less than or equal to the self-weight of the underground structure 1. The position of the water collection pipe 14 is lower than the position of the sandless concrete filter block 21 .

无砂砼滤块21为素混凝土块,制作时只用水泥和石子,不放砂子,滤水管10为PPR塑料管,滤水管10上按梅花型布置孔洞用于渗入地下水。No-sand concrete filter block 21 is plain concrete block, only uses cement and stone during making, does not put sand, and water filter pipe 10 is a PPR plastic pipe, and on the water filter pipe 10, press plum-shaped arrangement hole to be used for infiltrating groundwater.

本实施例中,隔水层17的材料为压密黏土或防水卷材。In this embodiment, the material of the water-repellent layer 17 is compacted clay or waterproof coiled material.

实施例2Example 2

一种集滤水溢流监测一体的肥槽式抗浮系统的施工使用方法,包括以下步骤:A construction and use method of a fertilizer tank type anti-floating system integrating filtration and overflow monitoring, comprising the following steps:

S1、在相邻两排结构柱15位的中间岩土地基2上开挖导水沟8,在导水沟8内底面埋入孔压传感器9,在导水沟8内埋设滤水管10,在围护桩3上安装溢流管4,将溢流管4与滤水管10导通连接,将连接在孔压传感器9上的数据线缆11依次穿过滤水管10和溢流管4;S1. Excavate a water diversion ditch 8 on the middle rock and soil foundation 2 with 15 adjacent rows of structural columns, embed a pore pressure sensor 9 in the inner bottom of the water diversion ditch 8, and bury a water filter pipe 10 in the water diversion ditch 8, An overflow pipe 4 is installed on the protective pile 3, the overflow pipe 4 is connected to the water filter pipe 10, and the data cable 11 connected to the hole pressure sensor 9 is passed through the water filter pipe 10 and the overflow pipe 4 in sequence;

S2、在导水沟8内底面和内侧面铺设土工布18,在导水沟8内填充导水砂砾19,在导水沟8顶部设置隔水层17,在隔水层17上方浇筑施工垫层7,在施工垫层7上施工地下构造物1;S2. Lay geotextile 18 on the inner bottom surface and the inner side surface of water diversion ditch 8, fill water diversion gravel 19 in water diversion ditch 8, set water-proof layer 17 at the top of water diversion ditch 8, and pour construction pad above water-proof layer 17 Layer 7, construct the underground structure 1 on the construction cushion layer 7;

S3、在溢流管4上预设高度处连通溢流支管13,将多根溢流支管13连接在汇水管14;S3, connecting overflow branch pipes 13 at a predetermined height on the overflow pipe 4, and connecting multiple overflow branch pipes 13 to the water collection pipe 14;

S4、在肥槽中填充黏土填料5至蓄水池16预设高度,将蓄水池16的下半部分埋入黏土填料5,在蓄水池16侧板安装无砂砼滤块21,在蓄水池16内部安装排水管道22,排水管道沿检修井23延伸至地面,将汇水管14连接至蓄水池16;S4. Fill the fertilizer tank with clay filler 5 to the preset height of the reservoir 16, bury the lower half of the reservoir 16 into the clay filler 5, install a sand-free concrete filter block 21 on the side plate of the reservoir 16, and A drainage pipe 22 is installed inside the reservoir 16, and the drainage pipe extends to the ground along the maintenance well 23, and the water collection pipe 14 is connected to the reservoir 16;

S4、填入砂砾填料12至没过蓄水池16顶部,在砂砾填料上方继续填充黏土填料5至地面,此时完成整个系统的安装;S4. Fill in the gravel filler 12 to cover the top of the reservoir 16, continue to fill the clay filler 5 above the gravel filler to the ground, and complete the installation of the entire system at this time;

S5、在使用阶段,当地下水位上升时,地下结构底板6下的孔压被孔压传感器9实时监测并据此预测溢流水量,地下水依次经过滤水管10、溢流管4、溢流支管13和汇水管14流入蓄水池16内;S5. In the use stage, when the groundwater level rises, the pore pressure under the bottom plate of the underground structure 6 is monitored in real time by the pore pressure sensor 9 and the overflow water volume is predicted accordingly. The groundwater passes through the filter water pipe 10, the overflow pipe 4, and the overflow branch pipe in sequence 13 and the water collecting pipe 14 flow in the reservoir 16;

S6、同时,地表下渗水和直接从岩土地基2上渗进入砂砾填料12的水也流入蓄水池16内,汇聚在蓄水池16内的水通过排水管道22排走,最终达到控制地下水压力作用的抗浮目的。S6. Simultaneously, the seepage water under the surface and the water directly infiltrated into the gravel filler 12 from the rock foundation 2 also flow into the reservoir 16, and the water gathered in the reservoir 16 is drained away through the drainage pipe 22, finally achieving the control of groundwater. Anti-floating purpose of pressure action.

以上所述,仅是本发明的较佳实施例,并非对本发明作任何限制。凡是根据发明技术实质对以上实施例所作的任何简单修改、变更以及等效变化,均仍属于本发明技术方案的保护范围内。The above descriptions are only preferred embodiments of the present invention, and do not limit the present invention in any way. All simple modifications, changes and equivalent changes made to the above embodiments according to the technical essence of the invention still belong to the protection scope of the technical solution of the invention.

Claims (7)

1. A water filtration and overflow monitoring integrated fertilizer trough type anti-floating system is characterized by comprising a fertilizer trough, a water guide channel (8) and a water storage and drainage device; fertile groove is located between underground structure (1), ground foundation (2) and fender post (3), ditch (8) are seted up on ground foundation (2) of underground structure bottom plate (6) below of underground structure (1), bury filter tube (10) underground in ditch (8), fixed overflow pipe (4) are gone up in fender post (3), filter tube (10) and overflow pipe (4) turn-on connection, bury hole pressure sensor (9) underground in ground foundation (2), connect data cable (11) on hole pressure sensor (9), data cable (11) pass filter tube (10) and overflow pipe (4) in proper order and extend to fertile inslot outside, fill clay filler (5) in the fertile inslot, fertile inslot sets up holds drainage device.
2. The trough type anti-floating system integrating water filtering and overflow monitoring is characterized in that the water storage and drainage device comprises a water storage tank (16), overflow branch pipes (13), a water collecting pipe (14) and drainage pipelines (22), the water storage tank (16) is arranged in the trough type anti-floating system, the overflow branch pipes (13) are connected to an overflow pipe (4) through tee joints, the overflow branch pipes (13) are connected with the water collecting pipe (14), the water collecting pipe (14) is connected with the water storage tank (16), and the drainage pipelines (22) are connected with the water storage tank (16).
3. The gutter anti-floating system integrating water filtration overflow monitoring is characterized in that the water guide gutter (8) is arranged between two columns of structure post positions (15), the structure posts (15) are connected to the upper bottom surface of the underground structure bottom plate (6) in a rectangular array mode, the water guide gutter (8) comprises a groove (20) and a water-resisting layer (17), the cross section of the groove (20) is inverted trapezoid, geotextile (18) is laid in the groove (20), water-guiding gravel (19) is filled in the groove (20), and the water-resisting layer (17) is arranged at the top of the groove (20).
4. The trough type anti-floating system integrating water filtration overflow monitoring is characterized in that gravel fillers (12) are filled in clay fillers (5), half of the water storage pool (16) is embedded into the clay fillers (5), the other half of the water storage pool is embedded into the gravel fillers (12), and sand-free concrete filter blocks (21) are embedded in the side surfaces of the water storage pool (16) in contact with the gravel fillers (12).
5. The trough type anti-floating system integrating water filtration and overflow monitoring as claimed in claim 2, wherein a manhole (23) is arranged on the top of the water storage tank (16), and the drainage pipeline (22) is led out through the manhole (23).
6. A water filtration and overflow monitoring integrated trough type anti-floating system according to claim 1, wherein a construction cushion layer (7) is arranged between the underground structure bottom plate (6) and the water guiding ditch (8).
7. The construction and use method of the water filtration overflow monitoring integrated trough type anti-floating system as claimed in any one of claims 1-6, characterized by comprising the following steps:
s1, excavating a water guide ditch (8) on an intermediate rock foundation (2) of two adjacent rows of structure column positions (15), burying a hole pressure sensor (9) on the inner bottom surface of the water guide ditch (8), burying a water filter pipe (10) in the water guide ditch (8), installing an overflow pipe (4) on a fender post (3), conducting and connecting the overflow pipe (4) with the water filter pipe (10), and sequentially penetrating a data cable (11) connected to the hole pressure sensor (9) through the water filter pipe (10) and the overflow pipe (4);
s2, laying geotextiles (18) on the inner bottom surface and the inner side surface of the water guide ditch (8), filling water guide gravel (19) in the water guide ditch (8), arranging a water-resisting layer (17) on the top of the water guide ditch (8), pouring a construction cushion layer (7) above the water-resisting layer (17), and constructing an underground structure (1) on the construction cushion layer (7);
s3, communicating overflow branch pipes (13) at preset heights on the overflow pipe (4), and connecting the overflow branch pipes (13) to a water collecting pipe (14);
s4, filling clay filler (5) in the fertilizer tank to a preset height of a reservoir (16), embedding the clay filler (5) into the lower half part of the reservoir (16), installing a sand-free concrete filter block (21) on a side plate of the reservoir (16), installing a drainage pipeline (22) inside the reservoir (16), extending the drainage pipeline to the ground along an inspection well (23), and connecting a water collection pipe (14) to the reservoir (16);
s4, filling the gravel packing (12) to the position which is over the top of the water storage tank (16), and continuously filling clay packing (5) above the gravel packing to the ground, so that the whole system is installed;
s5, in the using stage, when the underground water level rises, the pore pressure under the underground structure bottom plate (6) is monitored in real time by the pore pressure sensor (9) and the overflow water quantity is predicted according to the pore pressure, and the underground water flows into the reservoir (16) through the water filtering pipe (10), the overflow pipe (4), the overflow branch pipe (13) and the water collecting pipe (14) in sequence;
s6, simultaneously, the water seeping from the ground surface and directly seeping into the gravel packing (12) from the rock-soil foundation (2) also flows into the reservoir (16), the water gathered in the reservoir (16) is discharged through the drainage pipeline (22), and finally the anti-floating purpose of controlling the underground water pressure is achieved.
CN202211678352.3A 2022-12-26 2022-12-26 A fertilizer tank type anti-floating system integrating filtration and overflow monitoring and its construction and use method Pending CN115897674A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211678352.3A CN115897674A (en) 2022-12-26 2022-12-26 A fertilizer tank type anti-floating system integrating filtration and overflow monitoring and its construction and use method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211678352.3A CN115897674A (en) 2022-12-26 2022-12-26 A fertilizer tank type anti-floating system integrating filtration and overflow monitoring and its construction and use method

Publications (1)

Publication Number Publication Date
CN115897674A true CN115897674A (en) 2023-04-04

Family

ID=86472797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211678352.3A Pending CN115897674A (en) 2022-12-26 2022-12-26 A fertilizer tank type anti-floating system integrating filtration and overflow monitoring and its construction and use method

Country Status (1)

Country Link
CN (1) CN115897674A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119122017A (en) * 2024-10-24 2024-12-13 南京工业大学 Active and passive combined anti-floating method and device based on pressure-limited overflow
CN119466981A (en) * 2024-11-10 2025-02-18 中铁第四勘察设计院集团有限公司 An underground gas storage

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285678A (en) * 2003-03-20 2004-10-14 Fujita Corp Structure buoyancy suppression method and structure buoyancy suppression structure
CN106759531A (en) * 2016-12-30 2017-05-31 华中科技大学 A kind of self-adapting large underground structure lets out drainage pressure-reducing anti-floating system and method
CN212129256U (en) * 2020-02-23 2020-12-11 北京中岩智泊科技有限公司 A decompression and anti-floating structure for underground buildings/structures
CN215759065U (en) * 2021-06-25 2022-02-08 河南五建建设集团有限公司 Pipeline backfilling structure
CN114382109A (en) * 2022-01-17 2022-04-22 孙华 Anti-floating underground space and underground garage

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285678A (en) * 2003-03-20 2004-10-14 Fujita Corp Structure buoyancy suppression method and structure buoyancy suppression structure
CN106759531A (en) * 2016-12-30 2017-05-31 华中科技大学 A kind of self-adapting large underground structure lets out drainage pressure-reducing anti-floating system and method
CN212129256U (en) * 2020-02-23 2020-12-11 北京中岩智泊科技有限公司 A decompression and anti-floating structure for underground buildings/structures
CN215759065U (en) * 2021-06-25 2022-02-08 河南五建建设集团有限公司 Pipeline backfilling structure
CN114382109A (en) * 2022-01-17 2022-04-22 孙华 Anti-floating underground space and underground garage

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王家伟: "《辽宁岩土工程》", 31 January 2015, 东北大学出版社, pages: 87 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119122017A (en) * 2024-10-24 2024-12-13 南京工业大学 Active and passive combined anti-floating method and device based on pressure-limited overflow
CN119466981A (en) * 2024-11-10 2025-02-18 中铁第四勘察设计院集团有限公司 An underground gas storage

Similar Documents

Publication Publication Date Title
LU500273B1 (en) New comprehensive dewatering and drainage method and drainage device for mudstone subway station
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN216640547U (en) Drainage decompression anti-floating system suitable for weak permeable soft soil stratum
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN110397050B (en) Beam-anchor type light drainage retaining wall and construction method thereof
CN216475132U (en) Quick dewatering system of foundation ditch
CN103510528A (en) Blind trench water discharging structure used for underground structure up-floating prevention
CN110080254A (en) Draining friction pile-water guide culvert structure and construction method for oblique slope reinforcement
CN102535488A (en) Waterproof construction method and system for bottom plate of high-water-level basement
CN105569094A (en) Water discharge and drainage system and construction method adopting basement bottom plate water buoyant force releasing method
CN115807444A (en) Active and passive anti-floating structure of subway station and design, construction and use method thereof
CN205152970U (en) Underground structure oozes drainage system
CN112832288A (en) Anti-floating structure for basement of sloping building and construction method thereof
CN113089681B (en) Waterproof invasion structure of deep foundation pit base concrete cushion layer and construction method
CN111636408A (en) A system and method for maintaining smooth drainage of ground fill in gullies
CN1657712A (en) Drainage and anti-float method for underground building and its used device
CN114293578B (en) System for monitoring drainage and water level of basement and construction method thereof
CN205077527U (en) Drainage system is dredged to basement bottom plate release water buoyancy method
CN107100206A (en) A kind of prevention and controls of basement leakage
CN115045311A (en) Method for combining foundation pit drainage and structure anti-floating
CN214657275U (en) Self-flowing drainage pressure-limiting anti-floating structure
CN202440826U (en) Waterproof system for high-water level basement foundation slabs
CN118600961B (en) A waterproof and anti-floating structure for underground facilities of subway
CN210712967U (en) Impervious anti structure that floats of basement
CN220058012U (en) Fertilizer groove backfilling and anti-floating pressure relief observation matching system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination