CN115897674A - A fertilizer tank type anti-floating system integrating filtration and overflow monitoring and its construction and use method - Google Patents
A fertilizer tank type anti-floating system integrating filtration and overflow monitoring and its construction and use method Download PDFInfo
- Publication number
- CN115897674A CN115897674A CN202211678352.3A CN202211678352A CN115897674A CN 115897674 A CN115897674 A CN 115897674A CN 202211678352 A CN202211678352 A CN 202211678352A CN 115897674 A CN115897674 A CN 115897674A
- Authority
- CN
- China
- Prior art keywords
- water
- overflow
- pipe
- reservoir
- underground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/108—Rainwater harvesting
Landscapes
- Sewage (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本发明提供了一种集滤水溢流监测一体的肥槽式抗浮系统,包括肥槽、导水沟、蓄排水装置。肥槽位于地下构造物、岩土地基和围护桩之间,肥槽内设置溢流管、数据线缆和溢流支管;导水沟内设置滤水管、土工布、导水砂砾和隔水层;蓄排水装置包括蓄水池、汇水管、砂砾填料、无砂砼滤块和排水管道。本发明通过孔压传感器实时监测,可预测溢流水量,地下水通过滤水管和溢流管流入汇水管并到达蓄水池,同时,地表下渗和地基上渗到砂砾填料的水也流进蓄水池,并从排水管道排走,达到控制地下水压力作用的抗浮目的。
The invention provides a fertilizer trough type anti-floating system integrated with filtration and overflow monitoring, including a fertilizer trough, a water guide ditch, and a storage and drainage device. The fertilizer tank is located between underground structures, rock foundations and retaining piles. Overflow pipes, data cables and overflow branch pipes are arranged in the fertilizer tank; water filter pipes, geotextiles, water-conducting gravel and water-proof layer; storage and drainage devices include reservoirs, catchment pipes, gravel fillers, sand-free concrete filter blocks and drainage pipes. The invention monitors in real time through the pore pressure sensor to predict the amount of overflow water. The groundwater flows into the water collection pipe through the filter pipe and the overflow pipe and reaches the reservoir. pool, and drained from the drainage pipe to achieve the anti-floating purpose of controlling the pressure of groundwater.
Description
技术领域technical field
本发明涉及一种地下构造物抗浮技术,具体涉及一种集滤水溢流监测一体的肥槽式抗浮系统及其施工使用方法。The invention relates to an anti-floating technology for underground structures, in particular to a fertilizer trough type anti-floating system integrating filtration and overflow monitoring and a construction and use method thereof.
背景技术Background technique
随着城市化的发展,地下空间的开发已引起人们的关注,大规模的地下构造物也越来越多,如地下商场、地下停车场、地铁及隧道等。地下构造物建造时会设计必要的抗浮措施以避免上浮,但随着所处水文地质环境越来越复杂,特别是不可预测的极端暴雨频发,抗浮设计方法和措施难以实现安全与经济的统一,成为推进地下空间开发进程中亟需解决的重难点问题。With the development of urbanization, the development of underground space has attracted people's attention, and there are more and more large-scale underground structures, such as underground shopping malls, underground parking lots, subways and tunnels. Necessary anti-floating measures will be designed to avoid floating when underground structures are constructed. However, as the hydrogeological environment becomes more and more complex, especially the unpredictable and frequent extreme rainstorms, it is difficult to achieve safe and economical anti-floating design methods and measures. The unification of the underground space has become an important and difficult problem that needs to be solved urgently in the process of promoting the development of underground space.
现有抗浮技术主要包括被动抗浮技术和主动抗浮技术两大类。工程中采用较多的被动抗浮技术是抗拔桩和抗拔锚杆,抗拔桩通常和基础底板完全固结,当地下水位较高时是抗拔桩,当地下水位较低时变成了受压桩;抗浮锚杆仅通过钢绞线锚固在基础底板上,只在地下水位较高时发挥作用。另外,被动抗浮技术针对的是常水位条件,难以应对近年频发的不可预测极端暴雨,其引发的突增水位对地下构造物的抗浮带来严峻挑战。主动抗浮技术采用疏导的思路解决地下构造物的浮力问题,通过主动导水和泄压等措施降低或释放地下构造物浮力而达到抗浮目的,但需要在基础底板上开孔,给地下构造物的防水和施工带来不便,使得技术的推广范围受限。Existing anti-floating technologies mainly include passive anti-floating technologies and active anti-floating technologies. The more passive anti-floating technologies used in the project are the uplift piles and the uplift anchors. The uplift piles are usually fully consolidated with the foundation floor. When the groundwater level is high, they are uplift piles, and when the groundwater level is low, they become The anti-floating anchor rod is only anchored to the foundation floor through steel strands, and it only plays a role when the groundwater level is high. In addition, the passive anti-floating technology is aimed at constant water level conditions, and it is difficult to cope with the unpredictable and extreme heavy rains that have occurred frequently in recent years. The sudden increase in water level caused by it has brought severe challenges to the anti-floating of underground structures. Active anti-floating technology adopts the idea of dredging to solve the buoyancy problem of underground structures, and achieves the purpose of anti-floating by reducing or releasing the buoyancy of underground structures through measures such as active water diversion and pressure relief. Waterproofing and construction of objects bring inconvenience, which limits the scope of popularization of the technology.
综上所述,为应对不可预测的极端暴雨对现有抗浮设计方法和措施带来的严峻挑战,且避免对地下构造物施工造成的不便,迫切需要一套新型抗浮系统和方法。In summary, in order to cope with the severe challenges brought by unpredictable extreme rainstorms to the existing anti-floating design methods and measures, and to avoid the inconvenience caused to the construction of underground structures, a new anti-floating system and method is urgently needed.
发明内容Contents of the invention
本发明所要解决的技术问题在于针对上述现有技术的不足,提供一种集滤水溢流监测一体的肥槽式抗浮系统及其施工使用方法,该抗浮系统设计科学合理,实用性强,能通过监测的孔压预测渗流量,利用滤水溢流监测一体孔,在不破坏地下构造物的前提下,将基底水浮力以限压溢流的方式控制在许可范围内,达到抗浮目的。The technical problem to be solved by the present invention is to provide a fertilizer trough anti-floating system integrated with filtered water overflow monitoring and its construction and use method in view of the above-mentioned deficiencies in the prior art. The anti-floating system has a scientific and reasonable design and strong practicability , the seepage flow can be predicted through the monitored pore pressure, and the integral pore can be monitored by using the filter overflow to control the buoyancy of the base water within the allowable range by means of pressure-limited overflow without damaging the underground structure, so as to achieve anti-floating Purpose.
为解决上述技术问题,本发明采用的技术方案是:一种集滤水溢流监测一体的肥槽式抗浮系统,其特征在于,包括肥槽、导水沟和蓄排水装置;所述肥槽位于地下构造物、岩土地基与围护桩之间,所述导水沟开设在地下构造物的地下结构底板下方的岩土地基上,所述导水沟内埋设滤水管,所述围护桩上固定溢流管,所述滤水管和溢流管导通连接,所述岩土地基内埋设孔压传感器,所述孔压传感器上连接数据线缆,所述数据线缆依次穿过滤水管和溢流管延伸至肥槽外,所述肥槽内填充黏土填料,所述肥槽内设置蓄排水装置。In order to solve the above-mentioned technical problems, the technical solution adopted by the present invention is: a kind of fertilizer tank type anti-floating system integrating filtration and overflow monitoring, which is characterized in that it includes a fertilizer tank, a water guide ditch and a storage and drainage device; the fertilizer The groove is located between the underground structure, the rock foundation and the surrounding protection piles. The water guide ditch is opened on the rock foundation below the underground structure floor of the underground structure. A water filter pipe is buried in the water guide ditch. An overflow pipe is fixed on the guard pile, the filter pipe is connected to the overflow pipe, a pore pressure sensor is buried in the rock foundation, and a data cable is connected to the pore pressure sensor, and the data cable passes through the filter in turn. The water pipe and the overflow pipe extend to the outside of the fertilizer tank, the inside of the fertilizer tank is filled with clay filler, and the storage and drainage device is arranged in the fertilizer tank.
优选地,所述蓄排水装置包括蓄水池、溢流支管、汇水管和排水管道,所述蓄水池设置在肥槽内,所述溢流支管通过三通连接在溢流管上,所述溢流支管连接汇水管,汇水管连接蓄水池,排水管道连接蓄水池。Preferably, the storage and drainage device includes a water storage tank, an overflow branch pipe, a water collection pipe and a drainage pipe, the water storage tank is arranged in the fertilizer tank, and the overflow branch pipe is connected to the overflow pipe through a tee, so that The overflow branch pipe is connected to the water collection pipe, the water collection pipe is connected to the water storage tank, and the drainage pipe is connected to the water storage tank.
优选地,所述导水沟开设在两列结构柱位之间,所述结构柱矩形阵列连接在地下结构底板的上底面上,所述导水沟包括沟槽和隔水层,所述沟槽的截面为倒梯形,所述沟槽内铺设土工布,所述沟槽内填充导水砂砾,所述沟槽顶部设置隔水层。Preferably, the water guide ditch is opened between two columns of structural columns, the rectangular array of structural columns is connected to the upper bottom surface of the underground structure floor, the water guide ditch includes a groove and a water-resistant layer, and the groove The cross-section of the groove is an inverted trapezoid, the geotextile is laid in the groove, the water-conducting gravel is filled in the groove, and the water-proof layer is arranged on the top of the groove.
优选地,所述黏土填料中填充砂砾填料,所述蓄水池一半埋入黏土填料,另一半埋入砂砾填料,所述蓄水池与砂砾填料接触的侧面嵌入设置无砂砼滤块。Preferably, the clay filler is filled with gravel filler, half of the reservoir is embedded with clay filler, and the other half is embedded with gravel filler, and a sandless concrete filter block is embedded in the side of the reservoir in contact with the gravel filler.
优选地,所述蓄水池顶部设置检修井,所述排水管道穿过检修井引出。Preferably, an inspection well is arranged on the top of the reservoir, and the drainage pipe is led out through the inspection well.
优选地,所述地下结构底板与导水沟之间设置施工垫层。Preferably, a construction cushion is provided between the bottom plate of the underground structure and the water guide ditch.
优选地,溢流支管的预设高度基于地下构造物的自重计算得到,即预设高度下的基底孔压形成的浮力的1.5倍值须小于或等于地下构造物的自重。汇水管的位置低于无砂砼滤块的位置。Preferably, the preset height of the overflow branch pipe is calculated based on the self-weight of the underground structure, that is, the value of 1.5 times the buoyancy formed by the basement pore pressure at the preset height must be less than or equal to the self-weight of the underground structure. The location of the water collection pipe is lower than that of the sandless concrete filter block.
优选地,隔水层的材料为压密黏土或防水卷材。Preferably, the material of the waterproof layer is compacted clay or waterproof membrane.
一种集滤水溢流监测一体的肥槽式抗浮系统的施工使用方法,包括以下步骤:A construction and use method of a fertilizer tank type anti-floating system integrating filtration and overflow monitoring, comprising the following steps:
S、在相邻两排结构柱位的中间岩土地基上开挖导水沟,在导水沟内底面埋入孔压传感器,在导水沟内埋设滤水管,在围护桩上安装溢流管,将溢流管与滤水管导通连接,将连接在孔压传感器上的数据线缆依次穿过滤水管和溢流管;S. Excavate a water diversion ditch on the middle rock and soil foundation of two adjacent rows of structural columns, embed a pore pressure sensor in the inner bottom of the water diversion ditch, bury a water filter pipe in the water diversion ditch, and install overflow on the surrounding protection piles. The flow pipe connects the overflow pipe with the water filter pipe, and passes the data cable connected to the pore pressure sensor through the water filter pipe and the overflow pipe in turn;
S1、在导水沟内底面和内侧面铺设土工布,在导水沟内填充导水砂砾,在导水沟顶部设置隔水层,在隔水层上方浇筑施工垫层,在施工垫层上施工地下构造物;S1. Lay geotextiles on the inner bottom and inner side of the water diversion ditch, fill the water diversion ditch with water-conducting gravel, set a water-proof layer on the top of the water- diversion ditch, pour a construction cushion on the top of the water-resisting layer, and pour a construction cushion on the construction cushion. construction of underground structures;
S2、在溢流管上预设高度处连通溢流支管,将多根溢流支管连接在汇水管;S2. Connect the overflow branch pipe at a preset height on the overflow pipe, and connect multiple overflow branch pipes to the water collection pipe;
S3、在肥槽中填充黏土填料至蓄水池预设高度,将蓄水池的下半部分埋入黏土填料,在蓄水池侧板安装无砂砼滤块,在蓄水池内部安装排水管道,排水管道沿检修井延伸至地面,将汇水管连接至蓄水池;S3. Fill the fertilizer tank with clay filler to the preset height of the reservoir, bury the lower half of the reservoir with clay filler, install sand-free concrete filter blocks on the side panels of the reservoir, and install drainage inside the reservoir Pipeline, the drainage pipe extends along the manhole to the ground, connecting the catchment pipe to the reservoir;
S4、填入砂砾填料至没过蓄水池顶部,在砂砾填料上方继续填充黏土填料至地面,此时完成整个系统的安装;S4. Fill in the gravel filler to cover the top of the reservoir, and continue to fill the clay filler above the gravel filler to the ground, and complete the installation of the entire system at this time;
S5、在使用阶段,当地下水位上升时,地下结构底板下的孔压被孔压传感器实时监测并据此预测溢流水量,地下水依次经过滤水管、溢流管、溢流支管和汇水管流入蓄水池内;S5. In the use stage, when the groundwater level rises, the pore pressure under the bottom plate of the underground structure is monitored in real time by the pore pressure sensor and the overflow water volume is predicted accordingly. The groundwater flows in through the filter water pipe, overflow pipe, overflow branch pipe and water collection pipe in sequence in the cistern;
S6、同时,地表下渗水和直接从岩土地基上渗进入砂砾填料的水也流入蓄水池内,汇聚在蓄水池内的水通过排水管道排走,最终达到控制地下水压力作用的抗浮目的。S6. At the same time, the seepage water under the surface and the water directly infiltrated into the gravel filler from the rock foundation also flow into the storage tank, and the water accumulated in the storage tank is drained through the drainage pipe, finally achieving the anti-floating purpose of controlling the pressure of the groundwater.
本发明与现有技术相比具有以下优点:Compared with the prior art, the present invention has the following advantages:
本发明设置在导水沟中的滤水管可汇聚地下水,其延伸至围护桩边与溢流管相连,可在不破坏地下构造物的前提下,将地下水输送至预设高度的溢流支管,并经汇水管和蓄水池后最终被排走,溢流支管的预设高度在充分利用地下构造物自重的基础上实现了限压,地下水位上升形成的水压驱使水流溢出,且经孔压传感器和穿于滤水管与溢流管的数据线缆可实时监测基底孔压,以预测渗流量。因此,本发明能在不影响地下构造物的前提下,将基底水浮力以限压溢流的方式控制在许可范围内,达到抗浮目的,解决了现有抗浮技术中的不足。The water filter pipe arranged in the water diversion ditch of the present invention can gather groundwater, extend to the side of the surrounding pile and connect with the overflow pipe, and can transport the groundwater to the overflow branch pipe at a preset height without destroying the underground structure , and finally drained away after the water collection pipe and the reservoir. The preset height of the overflow branch pipe realizes the pressure limit on the basis of making full use of the self-weight of the underground structure. The water pressure formed by the rise of the groundwater level drives the water to overflow, and after The pore pressure sensor and the data cable passing through the filter pipe and the overflow pipe can monitor the pore pressure of the basement in real time to predict the seepage amount. Therefore, the present invention can control the buoyancy of the base water within the permissible range by means of pressure-limited overflow without affecting the underground structures, so as to achieve the purpose of anti-floating and solve the deficiencies in the existing anti-floating technology.
下面结合附图和实施例对本发明作进一步详细说明。The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments.
附图说明Description of drawings
图1是本发明的整体主视剖面结构示意图。Fig. 1 is a schematic diagram of the overall front sectional structure of the present invention.
图2是本发明的俯视剖面结构示意图。Fig. 2 is a top view sectional structure schematic diagram of the present invention.
图3是本发明中导水沟的剖面结构示意图。Fig. 3 is a schematic cross-sectional structure diagram of the gutter in the present invention.
图4是本发明中蓄水池位置的局部放大结构示意图。Fig. 4 is a partially enlarged structural schematic diagram of the location of the reservoir in the present invention.
附图标记说明:Explanation of reference signs:
1—地下构造物; 2—岩土地基; 3—围护桩;1—Underground structure; 2—Rock foundation; 3—Enclosure pile;
4—溢流管; 5—黏土填料; 6—地下结构底板;4—overflow pipe; 5—clay filler; 6—underground structure floor;
7—施工垫层; 8—导水沟; 9—孔压传感器;7—construction cushion; 8—water guide ditch; 9—pore pressure sensor;
10—滤水管; 11—数据线缆; 12—砂砾填料;10—filter pipe; 11—data cable; 12—gravel filler;
13—溢流支管; 14—汇水管; 15—结构柱;13—overflow branch; 14—collection pipe; 15—structural column;
16—蓄水池; 17—隔水层; 18—土工布;16—reservoir; 17—aquifer; 18—geotextile;
19—导水砂砾; 20—沟槽; 21—无砂砼滤块;19—water-conducting gravel; 20—groove; 21—sandless concrete filter block;
22—排水管道; 23—检修井。22—drainage pipe; 23—management well.
具体实施方式Detailed ways
实施例1Example 1
如图1至图4所示,一种集滤水溢流监测一体的肥槽式抗浮系统,包括肥槽、导水沟8和蓄排水装置;所述肥槽位于地下构造物1、岩土地基2与围护桩3之间,所述导水沟8开设在地下构造物1的地下结构底板6下方的岩土地基2上,所述导水沟8内埋设滤水管10,所述围护桩3上固定溢流管4,所述滤水管10和溢流管4导通连接,所述岩土地基2内埋设孔压传感器9,所述孔压传感器9上连接数据线缆11,所述数据线缆11依次穿过滤水管10和溢流管4延伸至肥槽外,所述肥槽内填充黏土填料5,所述肥槽内设置蓄排水装置。As shown in Figures 1 to 4, a fertilizer tank type anti-floating system integrating filtration and overflow monitoring includes a fertilizer tank, a
本实施例中,所述蓄排水装置包括蓄水池16、溢流支管13、汇水管14和排水管道22,所述蓄水池16设置在肥槽内,所述溢流支管13通过三通连接在溢流管4上,所述溢流支管13连接汇水管14,汇水管14连接蓄水池16,排水管道22连接蓄水池16。In this embodiment, the storage and drainage device includes a
本实施例中,所述导水沟8开设在两列结构柱位15之间,所述结构柱15矩形阵列连接在地下结构底板6的上底面上,所述导水沟8包括沟槽20和隔水层17,所述沟槽20的截面为倒梯形,所述沟槽20内铺设土工布18,所述沟槽20内填充导水砂砾19,所述沟槽20顶部设置隔水层17。In this embodiment, the
本实施例中,所述黏土填料5中填充砂砾填料12,所述蓄水池16一半埋入黏土填料5,另一半埋入砂砾填料12,所述蓄水池16与砂砾填料12接触的侧面嵌入设置无砂砼滤块21。In this embodiment, the
本实施例中,所述蓄水池16顶部设置检修井23,所述排水管道22穿过检修井23引出。In this embodiment, an
本实施例中,所述地下结构底板6与导水沟8之间设置施工垫层7。In this embodiment, a
本实施例中,溢流支管13的预设高度基于地下构造物1的自重计算得到,即预设高度下的基底孔压形成的浮力的1.2倍值须小于或等于地下构造物1的自重。汇水管14的位置低于无砂砼滤块21的位置。In this embodiment, the preset height of the
无砂砼滤块21为素混凝土块,制作时只用水泥和石子,不放砂子,滤水管10为PPR塑料管,滤水管10上按梅花型布置孔洞用于渗入地下水。No-sand
本实施例中,隔水层17的材料为压密黏土或防水卷材。In this embodiment, the material of the water-
实施例2Example 2
一种集滤水溢流监测一体的肥槽式抗浮系统的施工使用方法,包括以下步骤:A construction and use method of a fertilizer tank type anti-floating system integrating filtration and overflow monitoring, comprising the following steps:
S1、在相邻两排结构柱15位的中间岩土地基2上开挖导水沟8,在导水沟8内底面埋入孔压传感器9,在导水沟8内埋设滤水管10,在围护桩3上安装溢流管4,将溢流管4与滤水管10导通连接,将连接在孔压传感器9上的数据线缆11依次穿过滤水管10和溢流管4;S1. Excavate a
S2、在导水沟8内底面和内侧面铺设土工布18,在导水沟8内填充导水砂砾19,在导水沟8顶部设置隔水层17,在隔水层17上方浇筑施工垫层7,在施工垫层7上施工地下构造物1;S2. Lay geotextile 18 on the inner bottom surface and the inner side surface of
S3、在溢流管4上预设高度处连通溢流支管13,将多根溢流支管13连接在汇水管14;S3, connecting
S4、在肥槽中填充黏土填料5至蓄水池16预设高度,将蓄水池16的下半部分埋入黏土填料5,在蓄水池16侧板安装无砂砼滤块21,在蓄水池16内部安装排水管道22,排水管道沿检修井23延伸至地面,将汇水管14连接至蓄水池16;S4. Fill the fertilizer tank with
S4、填入砂砾填料12至没过蓄水池16顶部,在砂砾填料上方继续填充黏土填料5至地面,此时完成整个系统的安装;S4. Fill in the
S5、在使用阶段,当地下水位上升时,地下结构底板6下的孔压被孔压传感器9实时监测并据此预测溢流水量,地下水依次经过滤水管10、溢流管4、溢流支管13和汇水管14流入蓄水池16内;S5. In the use stage, when the groundwater level rises, the pore pressure under the bottom plate of the
S6、同时,地表下渗水和直接从岩土地基2上渗进入砂砾填料12的水也流入蓄水池16内,汇聚在蓄水池16内的水通过排水管道22排走,最终达到控制地下水压力作用的抗浮目的。S6. Simultaneously, the seepage water under the surface and the water directly infiltrated into the
以上所述,仅是本发明的较佳实施例,并非对本发明作任何限制。凡是根据发明技术实质对以上实施例所作的任何简单修改、变更以及等效变化,均仍属于本发明技术方案的保护范围内。The above descriptions are only preferred embodiments of the present invention, and do not limit the present invention in any way. All simple modifications, changes and equivalent changes made to the above embodiments according to the technical essence of the invention still belong to the protection scope of the technical solution of the invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211678352.3A CN115897674A (en) | 2022-12-26 | 2022-12-26 | A fertilizer tank type anti-floating system integrating filtration and overflow monitoring and its construction and use method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211678352.3A CN115897674A (en) | 2022-12-26 | 2022-12-26 | A fertilizer tank type anti-floating system integrating filtration and overflow monitoring and its construction and use method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN115897674A true CN115897674A (en) | 2023-04-04 |
Family
ID=86472797
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211678352.3A Pending CN115897674A (en) | 2022-12-26 | 2022-12-26 | A fertilizer tank type anti-floating system integrating filtration and overflow monitoring and its construction and use method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115897674A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119122017A (en) * | 2024-10-24 | 2024-12-13 | 南京工业大学 | Active and passive combined anti-floating method and device based on pressure-limited overflow |
| CN119466981A (en) * | 2024-11-10 | 2025-02-18 | 中铁第四勘察设计院集团有限公司 | An underground gas storage |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004285678A (en) * | 2003-03-20 | 2004-10-14 | Fujita Corp | Structure buoyancy suppression method and structure buoyancy suppression structure |
| CN106759531A (en) * | 2016-12-30 | 2017-05-31 | 华中科技大学 | A kind of self-adapting large underground structure lets out drainage pressure-reducing anti-floating system and method |
| CN212129256U (en) * | 2020-02-23 | 2020-12-11 | 北京中岩智泊科技有限公司 | A decompression and anti-floating structure for underground buildings/structures |
| CN215759065U (en) * | 2021-06-25 | 2022-02-08 | 河南五建建设集团有限公司 | Pipeline backfilling structure |
| CN114382109A (en) * | 2022-01-17 | 2022-04-22 | 孙华 | Anti-floating underground space and underground garage |
-
2022
- 2022-12-26 CN CN202211678352.3A patent/CN115897674A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004285678A (en) * | 2003-03-20 | 2004-10-14 | Fujita Corp | Structure buoyancy suppression method and structure buoyancy suppression structure |
| CN106759531A (en) * | 2016-12-30 | 2017-05-31 | 华中科技大学 | A kind of self-adapting large underground structure lets out drainage pressure-reducing anti-floating system and method |
| CN212129256U (en) * | 2020-02-23 | 2020-12-11 | 北京中岩智泊科技有限公司 | A decompression and anti-floating structure for underground buildings/structures |
| CN215759065U (en) * | 2021-06-25 | 2022-02-08 | 河南五建建设集团有限公司 | Pipeline backfilling structure |
| CN114382109A (en) * | 2022-01-17 | 2022-04-22 | 孙华 | Anti-floating underground space and underground garage |
Non-Patent Citations (1)
| Title |
|---|
| 王家伟: "《辽宁岩土工程》", 31 January 2015, 东北大学出版社, pages: 87 * |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119122017A (en) * | 2024-10-24 | 2024-12-13 | 南京工业大学 | Active and passive combined anti-floating method and device based on pressure-limited overflow |
| CN119466981A (en) * | 2024-11-10 | 2025-02-18 | 中铁第四勘察设计院集团有限公司 | An underground gas storage |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| LU500273B1 (en) | New comprehensive dewatering and drainage method and drainage device for mudstone subway station | |
| CN102418347B (en) | Drainage construction method for blind drain and sump wells in deep foundation pit | |
| CN216640547U (en) | Drainage decompression anti-floating system suitable for weak permeable soft soil stratum | |
| CN103046565B (en) | Draining method for ultra-deep batholith deep foundation pit | |
| CN110397050B (en) | Beam-anchor type light drainage retaining wall and construction method thereof | |
| CN216475132U (en) | Quick dewatering system of foundation ditch | |
| CN103510528A (en) | Blind trench water discharging structure used for underground structure up-floating prevention | |
| CN110080254A (en) | Draining friction pile-water guide culvert structure and construction method for oblique slope reinforcement | |
| CN102535488A (en) | Waterproof construction method and system for bottom plate of high-water-level basement | |
| CN105569094A (en) | Water discharge and drainage system and construction method adopting basement bottom plate water buoyant force releasing method | |
| CN115807444A (en) | Active and passive anti-floating structure of subway station and design, construction and use method thereof | |
| CN205152970U (en) | Underground structure oozes drainage system | |
| CN112832288A (en) | Anti-floating structure for basement of sloping building and construction method thereof | |
| CN113089681B (en) | Waterproof invasion structure of deep foundation pit base concrete cushion layer and construction method | |
| CN111636408A (en) | A system and method for maintaining smooth drainage of ground fill in gullies | |
| CN1657712A (en) | Drainage and anti-float method for underground building and its used device | |
| CN114293578B (en) | System for monitoring drainage and water level of basement and construction method thereof | |
| CN205077527U (en) | Drainage system is dredged to basement bottom plate release water buoyancy method | |
| CN107100206A (en) | A kind of prevention and controls of basement leakage | |
| CN115045311A (en) | Method for combining foundation pit drainage and structure anti-floating | |
| CN214657275U (en) | Self-flowing drainage pressure-limiting anti-floating structure | |
| CN202440826U (en) | Waterproof system for high-water level basement foundation slabs | |
| CN118600961B (en) | A waterproof and anti-floating structure for underground facilities of subway | |
| CN210712967U (en) | Impervious anti structure that floats of basement | |
| CN220058012U (en) | Fertilizer groove backfilling and anti-floating pressure relief observation matching system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |