CN115874751A - A building interior decoration installation structure and construction method - Google Patents
A building interior decoration installation structure and construction method Download PDFInfo
- Publication number
- CN115874751A CN115874751A CN202211587997.6A CN202211587997A CN115874751A CN 115874751 A CN115874751 A CN 115874751A CN 202211587997 A CN202211587997 A CN 202211587997A CN 115874751 A CN115874751 A CN 115874751A
- Authority
- CN
- China
- Prior art keywords
- keel
- installation structure
- ceiling
- several
- matched
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 57
- 238000005034 decoration Methods 0.000 title claims abstract description 40
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 238000013461 design Methods 0.000 claims description 11
- 230000003796 beauty Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 2
- 230000000630 rising effect Effects 0.000 claims 1
- 238000012545 processing Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 10
- 239000000463 material Substances 0.000 description 7
- 229910052782 aluminium Inorganic materials 0.000 description 6
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 4
- 229910052602 gypsum Inorganic materials 0.000 description 4
- 239000010440 gypsum Substances 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000005336 cracking Methods 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 239000011521 glass Substances 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000011490 mineral wool Substances 0.000 description 2
- 239000011120 plywood Substances 0.000 description 2
- 238000010079 rubber tapping Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005253 cladding Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 239000002861 polymer material Substances 0.000 description 1
- 230000001953 sensory effect Effects 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Finishing Walls (AREA)
Abstract
Description
技术领域technical field
本发明涉及建筑施工技术领域,具体地说尤其涉及一种建筑室内装饰安装结构及施工方法。The invention relates to the technical field of building construction, in particular to a building interior decoration installation structure and a construction method.
背景技术Background technique
吊顶是室内装饰的重要部分,通常是指房屋居住环境的顶部装修的一种装饰,更通俗而言就是指天花板的装饰。常见的吊顶包括轻钢龙骨石膏板吊顶、石膏板吊顶、矿棉板吊顶、夹板吊顶、异形长条铝扣板吊顶、方形镀漆铝扣板吊顶、彩绘玻璃吊顶、铝蜂窝穿孔吸音板吊顶、全房复式吊顶等。Suspended ceiling is an important part of interior decoration. It usually refers to a kind of decoration on the top decoration of the living environment of the house, and more generally refers to the decoration of the ceiling. Common ceilings include light steel keel gypsum board ceiling, gypsum board ceiling, mineral wool board ceiling, plywood ceiling, special-shaped long strip aluminum gusset ceiling, square painted aluminum gusset ceiling, painted glass ceiling, aluminum honeycomb perforated sound-absorbing board ceiling, Duplex ceiling of the whole room, etc.
吊顶在整个室内装饰中占有相当重要的地位,对居室顶面作适当的装饰,不仅能美化室内环境,还能营造出丰富多彩的室内空间艺术形象。在选择吊顶装饰材料与设计方案时,要遵循既省材、牢固、安全、又美观、实用的原则。The suspended ceiling occupies a very important position in the entire interior decoration. Appropriate decoration on the top surface of the room can not only beautify the indoor environment, but also create a rich and colorful artistic image of the interior space. When choosing ceiling decoration materials and design schemes, the principles of material saving, firmness, safety, beauty and practicality should be followed.
传统吊顶通常由吊杆、龙骨骨架和罩面板等三大部分组成,随着建筑设计的发展,轻钢龙骨吊顶安装是目前吊顶安装常见的安装方式,通过吊杆与天花板固定连接,龙骨骨架上部连接吊杆,下部常通过挂件或者副龙骨配合自攻螺丝连接罩面板或其他辅件,将吊顶底板安装固定在吊顶龙骨上,该种吊顶的外观虽然较为平整统一,但在实际使用中由于吊顶高度不可调,仅适用于造型简单的平面整体吊顶,安装过程中角度调整难度大、对平整度要求较高,且很依赖于基层的平整度,难以满足一些特定的装饰设计需求。The traditional suspended ceiling is usually composed of three parts: the suspender, the keel frame and the cover panel. With the development of architectural design, the installation of the light steel keel ceiling is a common installation method for the current ceiling installation. The suspender is fixedly connected to the ceiling, and the upper part of the keel frame Connect the suspender, and the lower part is usually connected to the cover panel or other accessories through the pendant or the auxiliary keel with self-tapping screws, and the ceiling bottom plate is installed and fixed on the ceiling keel. Although the appearance of this type of ceiling is relatively flat and uniform, in actual use, due to the The height cannot be adjusted, and it is only suitable for flat overall ceilings with simple shapes. During the installation process, it is difficult to adjust the angle, has high requirements for flatness, and is very dependent on the flatness of the base layer, and it is difficult to meet some specific decorative design requirements.
发明内容Contents of the invention
本发明的目的在于提出一种建筑室内装饰安装结构及施工方法,以解决上述背景技术中提出的问题。The object of the present invention is to propose a building interior decoration installation structure and construction method to solve the problems raised in the above-mentioned background technology.
为实现上述目的,本发明通过如下技术手段实现:To achieve the above object, the present invention realizes by following technical means:
一种建筑室内装饰安装结构,包括有几字龙骨,所述几字龙骨的两侧横板分别与布设在几字龙骨两侧的若干组副龙骨配合连接,位于同一侧的各所述副龙骨的顶部分别通过设置有若干组主龙骨放置夹分别与若干主龙骨对应配合装设,各所述主龙骨放置夹分别连接有吊杆,所述几字龙骨通过连接件与吊杆组件配合相接。An installation structure for building interior decoration, comprising a keel, the horizontal plates on both sides of the keel are respectively connected with several groups of auxiliary keels arranged on both sides of the keel, and each of the auxiliary keels on the same side The top of the main keel is provided with several groups of main keel placement clips to cooperate with several main keel respectively. .
进一步地,所述几字龙骨的顶部横板开设有若干组依次排列的配合孔,各配合孔处配合相接有三维调节连接件,三维调节连接件能够与吊杆组件配合连接。Further, the top horizontal plate of the several-character keel is provided with several sets of matching holes arranged in sequence, each matching hole is matched with a three-dimensional adjustment connector, and the three-dimensional adjustment connector can be mated and connected with the boom assembly.
与现有技术相比,本发明具有如下有益效果:Compared with the prior art, the present invention has the following beneficial effects:
本发明现场不需要进行额外加工,直接将各配件进行装配安装,节省工时,能够降低成本,并可根据需要对装置结构进行微调整,能够在三维方向上进行微调,实现适应多种规格形状吊顶安装的需求,增加了安装调节的灵活性,使得施工后吊顶更加平整美观,而且保证了安装结构的稳定性,提高了工作效率,有效保证装饰面的平整度。The present invention does not require additional processing on site, and directly assembles and installs various accessories, which saves man-hours, reduces costs, and can fine-tune the structure of the device according to needs, and can fine-tune in three-dimensional directions to achieve ceilings that adapt to various specifications and shapes. The demand for installation increases the flexibility of installation and adjustment, making the suspended ceiling more flat and beautiful after construction, and ensuring the stability of the installation structure, improving work efficiency, and effectively ensuring the flatness of the decorative surface.
附图说明:Description of drawings:
图1为本发明产品结构示意图;Fig. 1 is a schematic diagram of product structure of the present invention;
图2为本发明产品部分结构示意图;Fig. 2 is a partial structure schematic diagram of the product of the present invention;
图3为本发明产品部分结构示意图;Fig. 3 is a partial structure schematic diagram of the product of the present invention;
图4为本发明产品部分结构示意图;Fig. 4 is a partial structure schematic diagram of the product of the present invention;
图5为本发明产品部分结构示意图;Fig. 5 is a partial structure schematic diagram of the product of the present invention;
图6为本发明产品结构示意图;Fig. 6 is a schematic diagram of the product structure of the present invention;
图7为本发明产品部分结构示意图;Fig. 7 is a partial structural schematic diagram of the product of the present invention;
图8为本发明产品部分结构示意图;Fig. 8 is a partial structure schematic diagram of the product of the present invention;
图9为本发明产品部分结构示意图;Fig. 9 is a partial structural schematic diagram of the product of the present invention;
图10为本发明产品部分结构示意图。Fig. 10 is a schematic diagram of the partial structure of the product of the present invention.
具体实施方式:Detailed ways:
下面将结合附图对本申请技术方案的实施例进行详细的描述。以下实施例和附图仅用于更加清楚地说明本申请的技术方案,因此只作为示例,而不能以此来限制本申请的保护范围。附图中只示意性地表示出了与本申请技术方案相关的部分,它们并不代表其作为产品的实际结构。Embodiments of the technical solutions of the present application will be described in detail below in conjunction with the accompanying drawings. The following embodiments and drawings are only used to illustrate the technical solution of the present application more clearly, and therefore are only examples, and should not be used to limit the protection scope of the present application. The accompanying drawings only schematically show the parts related to the technical solution of the present application, and they do not represent the actual structure of the product.
除非另有定义,本文所使用的所有的技术和科学术语与属于本申请的技术领域的技术人员通常理解的含义相同;本文中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本申请;本申请的说明书和权利要求书及上述附图说明中的术语“包括”和“具有”以及它们的任何变形,意图在于覆盖不排他的包含。Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the technical field of the application; the terms used herein are only for the purpose of describing specific embodiments, and are not intended to To limit this application; the terms "comprising" and "having" and any variations thereof in the specification and claims of this application and the description of the above drawings are intended to cover a non-exclusive inclusion.
在本申请实施例的描述中,技术术语“第一”、“第二”等仅用于区别不同对象,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量、特定顺序或主次关系。在本申请实施例的描述中,术语“多个”指的是两个以上(包括两个),同理,“多组”指的是两组以上(包括两组),“多片”指的是两片以上(包括两片)。In the description of the embodiments of the present application, the technical terms "first", "second" and so on are only used to distinguish different objects, and should not be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features, A specific order or primary-secondary relationship. In the description of the embodiments of the present application, the term "multiple" refers to more than two (including two), similarly, "multiple groups" refers to more than two groups (including two), and "multiple pieces" refers to More than two pieces (including two pieces).
在本文中提及“实施例”意味着,结合实施例描述的特定特征、结构或特性可以包含在本申请的至少一个实施例中。在说明书中的各个位置出现该短语并不一定均是指相同的实施例,也不是与其它实施例互斥的独立的或备选的实施例。本领域技术人员显式地和隐式地理解的是,本文所描述的实施例可以与其它实施例相结合。Reference herein to an "embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the present application. The occurrences of this phrase in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments. It is understood explicitly and implicitly by those skilled in the art that the embodiments described herein can be combined with other embodiments.
在本申请实施例的描述中,术语“和/或”仅仅是一种描述关联对象的关联关系,表示可以存在三种关系,例如A和/或B,可以表示:单独存在A,同时存在A和B,单独存在B这三种情况。另外,本文中字符“/”,一般表示前后关联对象是一种“或”的关系。In the description of the embodiment of the present application, the term "and/or" is only a kind of association relationship describing associated objects, which means that there may be three kinds of relationships, such as A and/or B, which may mean: A exists alone, and A exists at the same time and B, there are three cases of B alone. In addition, the character "/" in this article generally indicates that the contextual objects are an "or" relationship.
在本申请实施例的描述中,技术术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”、“顺时针”、“逆时针”、“轴向”、“径向”、“周向”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本申请实施例和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请实施例的限制。In the description of the embodiments of the present application, the technical terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", "rear" , "Left", "Right", "Vertical", "Horizontal", "Top", "Bottom", "Inner", "Outer", "Clockwise", "Counterclockwise", "Axial", " The orientation or positional relationship indicated by "radial", "circumferential", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the embodiment of the present application and simplifying the description, rather than indicating or implying the referred device or Elements must have certain orientations, be constructed and operate in certain orientations, and therefore should not be construed as limitations on the embodiments of the present application.
在本申请实施例的描述中,除非另有明确的规定和限定,技术术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;也可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本申请实施例中的具体含义。In the description of the embodiments of this application, unless otherwise clearly specified and limited, the technical terms "installation", "connection", "connection", "fixation" and other terms should be understood in a broad sense, for example, it can be a fixed connection, or It can be a detachable connection, or integrated; it can also be a mechanical connection, it can also be an electrical connection; it can be directly connected or indirectly connected through an intermediary, and it can be the internal communication of two components or the interaction of two components relation. Those of ordinary skill in the art can understand the specific meanings of the above terms in the embodiments of the present application according to specific situations.
现有室内装修,吊顶是室内装饰的重要部分,本领域技术人员应知晓吊顶通常是指房屋居住环境的顶部装修的一种装饰,通俗而言就是指天花板的装饰。现有常见的吊顶包括轻钢龙骨石膏板吊顶、石膏板吊顶、矿棉板吊顶、夹板吊顶、异形长条铝扣板吊顶、方形镀漆铝扣板吊顶、彩绘玻璃吊顶、铝蜂窝穿孔吸音板吊顶、全房复式吊顶等等多种吊顶。In the existing interior decoration, the suspended ceiling is an important part of the interior decoration. Those skilled in the art should know that the suspended ceiling usually refers to a kind of decoration of the top decoration of the living environment of the house, and generally speaking refers to the decoration of the ceiling. Existing common ceilings include light steel keel gypsum board ceilings, gypsum board ceilings, mineral wool board ceilings, plywood ceilings, special-shaped long strip aluminum gusset ceilings, square painted aluminum gusset ceilings, painted glass ceilings, aluminum honeycomb perforated sound-absorbing panels Suspended ceiling, whole room duplex ceiling and so on.
传统吊顶通常由吊杆、龙骨骨架和罩面板等三大部分组成,随着建筑设计的发展,轻钢龙骨吊顶安装是目前吊顶安装常见的安装方式,通过吊杆与天花板固定连接,龙骨骨架上部连接吊杆,下部常通过挂件或者副龙骨配合自攻螺丝连接罩面板或其他辅件,将吊顶底板安装固定在吊顶龙骨上,该种吊顶的外观虽然较为平整统一,但在实际使用中由于吊顶高度不可调,仅适用于造型简单的平面整体吊顶,安装过程中角度调整难度大、对平整度要求较高,且很依赖于基层的平整度,难以满足一些特定的装饰设计需求。The traditional suspended ceiling is usually composed of three parts: the suspender, the keel frame and the cover panel. With the development of architectural design, the installation of the light steel keel ceiling is a common installation method for the current ceiling installation. The suspender is fixedly connected to the ceiling, and the upper part of the keel frame Connect the suspender, and the lower part is usually connected to the cover panel or other accessories through the pendant or the auxiliary keel with self-tapping screws, and the ceiling bottom plate is installed and fixed on the ceiling keel. Although the appearance of this type of ceiling is relatively flat and uniform, in actual use, due to the The height cannot be adjusted, and it is only suitable for flat overall ceilings with simple shapes. During the installation process, it is difficult to adjust the angle, has high requirements for flatness, and is very dependent on the flatness of the base layer, and it is difficult to meet some specific decorative design requirements.
现有技术中有通过装配式装饰进行室内装饰,对本领域技术人员来说,装配式装饰即是将装饰所需要使用的各个部品部件在工厂内实现生产完成,然后运输到装饰现场进行组合安装,免去了传统的装饰现场对各部品部件的测量、切割等作业,施工更为简单方便,可以极大地提高装饰现场的施工效率,并且施工现场更为整洁和美观,不会产生过多的装饰材料垃圾,是一种更为绿色环保的装饰施工形式,本发明所公开技术方案便是一种用于室内装饰的装配式吊顶安装结构。In the prior art, there is interior decoration through prefabricated decoration. For those skilled in the art, prefabricated decoration is to complete the production of various parts and components required for decoration in the factory, and then transport them to the decoration site for assembly and installation. It eliminates the traditional decoration site's measurement and cutting of various parts and components, and the construction is simpler and more convenient, which can greatly improve the construction efficiency of the decoration site, and the construction site is more tidy and beautiful without excessive decoration Material waste is a more green and environmentally friendly form of decoration construction, and the technical solution disclosed in the present invention is a prefabricated suspended ceiling installation structure for interior decoration.
在本发明实施例中,一种建筑室内装饰安装结构,包括有几字龙骨100,所述几字龙骨100的两侧横板分别与布设在几字龙骨100两侧的若干组副龙骨200配合连接,位于同一侧的各所述副龙骨200的顶部分别通过设置有若干组主龙骨放置夹400与若干主龙骨300对应配合装设,各所述主龙骨放置夹400分别连接有吊杆500,所述几字龙骨100通过连接件600配合与吊杆组件700配合相接。In an embodiment of the present invention, a building interior decoration installation structure includes a
具体地,所述几字龙骨100的两翻边部110分别与若干组等距排列的副龙骨200配合相接,各所述副龙骨200上表面均等距设置有若干主龙骨放置夹400,上述各副龙骨200上设置的主龙骨放置夹400分别对应配合装设有主龙骨300,各主龙骨300与副龙骨200呈纵向横向排列,所述几字龙骨100的两侧部分别对称设置有若干与吊杆组件700配合的连接件600。Specifically, the two flanged
在本发明的具体应用中,所述几字龙骨100的两翻边部110的上表面开设有若干组等距排列的对应槽111,所述副龙骨200的下表面两端部对称设置有与对应槽111相配合的凸起部210,通过副龙骨200的下表面设置的凸起部210与对应槽111配合相接,便于副龙骨200与几字龙骨100配合安装,且便于通过沉头铆钉将副龙骨200固定在几字龙骨100上。In the specific application of the present invention, the upper surface of the two
具体地,为便于对主龙骨放置夹400进行解释,本发明中所述主龙骨放置夹400包括有固定在副龙骨200上的冂字形吊件410,所述冂字形吊件410呈向上开口设置,冂字形吊件410的一竖板连接有L型板420,L型板420的顶板设置有套接吊杆500的通孔,所述冂字形吊件410的两相对竖板分别开设有连接孔411,两相对连接孔411通过螺栓螺母组件412配合,主龙骨300穿过冂字形吊件410,并通过螺栓螺母组件412与两连接孔411配合,将主龙骨300固定夹持在冂字形吊件410内,具体地,在本发明的具体应用中,所述冂字形吊件410与L型板420为一体成型,其材质为金属或高分子材料制成,优选为不锈钢。Specifically, in order to facilitate the explanation of the main
具体地,所述主龙骨300包括有与主龙骨放置夹400相抵且中部凸起的相接部310,相接部310的两端对称连接有呈水平设置的搭接部320,搭接部320的端部设置有向内弯曲且具有一定刚性的弧形部330,在本发明的具体应用时,所述主龙骨300为一体成型结构,使用时,直接将主龙骨300插入各副龙骨200上相配合设置的主龙骨放置夹400内即可,节省工时。Specifically, the
具体地,所述吊杆组件700包括有与天花板配合的吊顶连接件710,所述吊顶连接件710的下部连接有可调节转动角度的吊顶转接件720,所述吊顶转接件720配合连接有可调节高度的L型配合件730,通过将吊顶连接件710装设在天花板上,吊顶转接件720与吊顶连接件710配合相接,可通过对吊顶转接件720进行转动,能够对与吊杆组件700配合的部件进行角度调整,适应多种安装环境及安装结构;在本发明具体应用中,所述吊顶连接件710包括有开设有若干配合孔并与天花板配合的环状盘711,所述环状盘711与向下凸起的顶件712配合连接,顶件712的底部中心处通过连接螺栓组件与吊顶转接件720配合连接,所述吊顶转接件720包括有主板721,所述主板721的上部两相对侧面分别设置有与顶件712的底面配合的支撑翼板722,所述主板721开设有若干横螺纹孔723,主板721沿其竖直中心轴线位置开设有与环状盘711配合的竖螺纹孔724,通过相应配合螺栓、旋紧螺母将主板721与环状盘711进行旋紧,能够对主板721相对于环状盘711进行转动调节,便于在实际应用中,对连接螺杆的角度进行调节,以适应其他配件的调节;通过设置的横螺纹孔723与L型配合件730进行配合连接,可实现对几字龙骨100进行横纵方向微调。Specifically, the
具体地,所述几字龙骨100的顶部横板120开设有若干组依次排列的配合孔130,各配合孔130处配合相接有具有三维方向上微调功能的三维调节连接件800,三维调节连接件800能够与吊杆组件700配合连接;在本发明的具体实施应用中,三维调节连接件800包括有与配合孔130配合的连接基座810,所述连接基座810包括有与配合孔130配合的上凸起部811,上凸起部811配合连接有四面开设有槽口8121的下凸起部812,上凸起部811与下凸起部812呈阶梯状配合,连接基座810内装设有调节基座820,所述调节基座820包括有与吊杆螺纹配合的柱状体821,所述柱状体821的下表面通过U型件8211配合连接有吊环螺纹连接杆8212,所述调节基座820的下方设置有与连接基座810、调节基座820配合的调节定位件830,所述调节定位件830包括有配合挡板831,配合挡板831的形状能够与连接基座810配合,并与连接基座810的内壁保持距离,所述配合挡板831的下表面设置有定位基体832,所述定位基体832的外圆周开设有与各槽口8121配合的定位螺纹孔8321,定位基体832的竖轴中心轴线上开设有与吊环螺纹连接杆8212配合的竖直定位螺纹孔8322,吊环螺纹连接杆8212与竖直定位螺纹孔8322配合,并通过旋紧调节螺母,可调节柱状体821相对高度,并通过相应螺栓及调节螺母与连接基座810上槽口8121及调节定位件830上定位螺纹孔8321进行适应配合,能够对配合挡板831、调节定位件830的位置进行调整,从而实现对几字龙骨100、吊杆组件700之间的三维配合进行微调整,保证施工后吊顶更加平整美观。Specifically, the top
本发明在具体应用时,根据施工场地情况进行相应图纸绘制,设计产品规格要求,并工厂化统一生产,加工,通过现场组装,一次性成型,通过将产品部件运输至施工现场,分段或整体吊装安装,并与顶面吊杆螺栓紧密连接,完成安装,然后并覆饰面材料完成顶面装修装修,大大节约了施工成本。In the specific application of the present invention, according to the conditions of the construction site, the corresponding drawings are drawn, the product specification requirements are designed, and the factory unified production, processing, assembly on site, one-time molding, and transportation of product parts to the construction site, segmented or integral It is hoisted and installed, and tightly connected with the top suspender bolts to complete the installation, and then the top surface decoration is completed by covering the surface material, which greatly saves the construction cost.
为此,本发明公开了一种建筑室内装饰安装结构的施工方法,包括:For this reason, the invention discloses a construction method of a building interior decoration installation structure, comprising:
步骤一:图纸设计,根据场地设计需求进行图纸建模设计,确定产品各部件的规格尺寸、吊杆安装连接位置;Step 1: Drawing design, carry out drawing modeling design according to site design requirements, determine the specifications and dimensions of each component of the product, and the installation and connection position of the boom;
然后预装板块单元,并根据板块单元的连接位置将安装座预焊在主体桁架上;Then pre-install the plate unit, and pre-weld the mounting seat on the main truss according to the connection position of the plate unit;
步骤二:吊装施工,将安装结构的各部件运输至施工现场,然后使用起吊装置对安装结构的各部件进行安装,将吊杆或吊杆组件装设在天花板连接位置,然后根据需要与连接件或三维调节连接件进行配合装设,对几字龙骨进行固定并微调,然后对副龙骨与主龙骨进行组合,并与几字龙骨配合装设,并通过吊杆组件或三维调节连接件旋动调节,控制安装结构升降,调节板块单元的安装高度,并提高施工后的吊顶平整美观;Step 2: Hoisting construction, transport the components of the installation structure to the construction site, then use the lifting device to install the components of the installation structure, install the boom or boom assembly at the connection position of the ceiling, and then connect the connecting parts as needed Or the three-dimensional adjustment connectors are installed together, the several keels are fixed and fine-tuned, and then the auxiliary keel is combined with the main keel, and installed with the several keels, and rotated through the boom assembly or the three-dimensional adjustment connectors Adjust, control the lifting of the installation structure, adjust the installation height of the panel unit, and improve the flatness and beauty of the suspended ceiling after construction;
步骤三:位置锁定,安装结构的各单元完成高度调节后,通过沉头铆钉或焊接方式对副龙骨与几字龙骨之间进行固定,从而对安装结构的位置进行固定,完成安装结构的安装。Step 3: Position locking. After the height adjustment of each unit of the installation structure is completed, fix the auxiliary keel and the double keel by countersunk rivets or welding, so as to fix the position of the installation structure and complete the installation of the installation structure.
后续通过的覆饰面材可逐块进行覆面紧贴安装;因根据饰面材料不同,其安装方式不同,可根据其特性则其安装方式。Subsequent cladding materials can be installed block by block; since the installation method is different according to the different decorative materials, the installation method can be determined according to its characteristics.
本发明公开安装结构及安装方法通过后期涂料完成显示,阴角处,拼接点处,开裂较少,比传统工艺开裂率降低80%,平整度最大偏差1mm.整体感观效果良好。The installation structure and installation method disclosed by the invention are displayed through late-stage paint, with less cracking at the inner corners and splicing points, 80% lower than the cracking rate of traditional technology, and the maximum deviation of flatness is 1mm. The overall sensory effect is good.
本发明所公开具体实施例落入本发明权利要求保护范围之内,为本发明的特征部分的具体下位实施范围,具体实施例保护内容仅仅是为本发明权利要求保护范围的说明,本发明保护范围不止于具体实施例保护内容,具体实施例保护内容不应理解为对本发明权利要求保护范围的限制,本发明附图中未公开相应螺栓组件或相应配件结构的螺纹线,不影响本领域技术人员对本发明技术方案的实施。The specific embodiments disclosed in the present invention fall within the protection scope of the claims of the present invention, and are the specific lower implementation scope of the characteristic parts of the present invention. The protection content of the specific embodiments is only an explanation of the protection scope of the claims of the present invention. The scope is not limited to the protection content of the specific embodiment, and the protection content of the specific embodiment should not be construed as limiting the protection scope of the claims of the present invention. The drawings of the present invention do not disclose the threaded lines of the corresponding bolt assembly or the corresponding accessory structure, which does not affect the technology in this field. Personnel implement the technical solution of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211587997.6A CN115874751B (en) | 2022-12-07 | 2022-12-07 | Building interior decoration mounting structure and construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211587997.6A CN115874751B (en) | 2022-12-07 | 2022-12-07 | Building interior decoration mounting structure and construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN115874751A true CN115874751A (en) | 2023-03-31 |
| CN115874751B CN115874751B (en) | 2025-01-10 |
Family
ID=85767022
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211587997.6A Active CN115874751B (en) | 2022-12-07 | 2022-12-07 | Building interior decoration mounting structure and construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115874751B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118547823A (en) * | 2024-06-20 | 2024-08-27 | 圣晖系统集成集团股份有限公司 | Clean room ceiling and installation method |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN200940304Y (en) * | 2006-09-06 | 2007-08-29 | 张慕贞 | Rail type active keel made of light steel |
| CN203947656U (en) * | 2014-07-21 | 2014-11-19 | 青岛东亚装饰股份有限公司 | Buckle-type main joist hanging piece |
| CN206512911U (en) * | 2017-01-18 | 2017-09-22 | 深圳市恒和装饰设计工程有限公司 | Novel environment friendly grid ceiling |
| CN112814249A (en) * | 2020-12-26 | 2021-05-18 | 宁波市城展建设工程有限公司 | Suspended ceiling construction process |
-
2022
- 2022-12-07 CN CN202211587997.6A patent/CN115874751B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN200940304Y (en) * | 2006-09-06 | 2007-08-29 | 张慕贞 | Rail type active keel made of light steel |
| CN203947656U (en) * | 2014-07-21 | 2014-11-19 | 青岛东亚装饰股份有限公司 | Buckle-type main joist hanging piece |
| CN206512911U (en) * | 2017-01-18 | 2017-09-22 | 深圳市恒和装饰设计工程有限公司 | Novel environment friendly grid ceiling |
| CN112814249A (en) * | 2020-12-26 | 2021-05-18 | 宁波市城展建设工程有限公司 | Suspended ceiling construction process |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118547823A (en) * | 2024-06-20 | 2024-08-27 | 圣晖系统集成集团股份有限公司 | Clean room ceiling and installation method |
| CN118547823B (en) * | 2024-06-20 | 2024-11-19 | 圣晖系统集成集团股份有限公司 | Clean room ceiling and installation method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN115874751B (en) | 2025-01-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105863207A (en) | Timber veneer finish clamp type assembling component and mounting method | |
| US4188656A (en) | Light frame adapter | |
| CN112443076A (en) | Connecting member of ceiling decorative panel, ceiling system and mounting method | |
| CN109537793B (en) | Suspended ceiling structure convenient to install and level and installation method thereof | |
| CN112554425B (en) | Can install drop-level suspended ceiling connecting piece, suspended ceiling system and installation method fast | |
| CN108505665B (en) | A ceiling connection structure | |
| CN115874751A (en) | A building interior decoration installation structure and construction method | |
| CN213682775U (en) | Ceiling installation structure with pre-embedded bolts for prefabricated calcium silicate ceiling panels | |
| CN115928932B (en) | Integrated furred ceiling structure of room assembled | |
| CN205677192U (en) | Wood facing cassette mounting structure | |
| CN109322428B (en) | Window wall system unit type curtain wall and installation method thereof | |
| CN217325973U (en) | Chrysanthemum-shaped aluminum veneer decorative curtain wall steel structure butt joint assembly | |
| CN112814257B (en) | Anti-displacement suspended ceiling connection structure and installation method thereof | |
| CN214614935U (en) | Can install fast and fall level furred ceiling connecting piece and furred ceiling system | |
| CN212129646U (en) | Light steel gypsum suspended ceiling support of rapid Assembly | |
| CN218492822U (en) | Adjustable grade thin layer furred ceiling that falls of assembled | |
| CN115680186A (en) | Indoor suspended ceiling structure | |
| CN216690011U (en) | Installation design structure of super-large hyperboloid modeling felt plate embedded with light-transmitting soft film | |
| CN112815278B (en) | Lamp slot mounting structure and mounting method thereof | |
| CN215888865U (en) | Magnetic ceiling | |
| CN223088739U (en) | A special-shaped ceiling installation device | |
| CN219080839U (en) | Mounting assembly | |
| CN223661156U (en) | Hyperboloidal Surface Components and Curved Surface Assembly Systems for Public Buildings | |
| CN1873151B (en) | Tie rod device for building suspended ceiling | |
| CN212053414U (en) | Reflector lamp groove system for architectural decoration |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |