CN115853275A - A construction method for automatic pouring and leveling of slab concrete by laser measurement - Google Patents

A construction method for automatic pouring and leveling of slab concrete by laser measurement Download PDF

Info

Publication number
CN115853275A
CN115853275A CN202211621530.9A CN202211621530A CN115853275A CN 115853275 A CN115853275 A CN 115853275A CN 202211621530 A CN202211621530 A CN 202211621530A CN 115853275 A CN115853275 A CN 115853275A
Authority
CN
China
Prior art keywords
pouring
slab
concrete
laser
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202211621530.9A
Other languages
Chinese (zh)
Inventor
冯健军
唐靖
卢智聪
林虹瑶
姜文杰
李�杰
马蕴玉
崔振利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Zhuhuahui Construction Technology Co ltd
Original Assignee
Anhui Zhuhuahui Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Zhuhuahui Construction Technology Co ltd filed Critical Anhui Zhuhuahui Construction Technology Co ltd
Priority to CN202211621530.9A priority Critical patent/CN115853275A/en
Publication of CN115853275A publication Critical patent/CN115853275A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明提供了一种板面混凝土激光测量自动浇筑与整平施工方法,属于混凝土浇筑技术领域,包括浇筑基面、自爬式布料组件、激光测量装备、自动整平装备以及终端电脑,浇筑基面还包括浇筑板面,浇筑板面侧壁设置有外架安全网,浇筑板面顶部固定连接有板面钢筋;该发明本发明通过激光测距仪和光学镜头之间的配合,将施工板面划分为等间距的网格,并每个网格进行编号和坐标定位,形成以网格为单位的三维地图,并可以通过激光回程实时测量地面的高低程度,传输板面混凝土标高的图像,指导自爬式布料组件进行混凝土补充,控制自动整平装备对凸出部位进行振捣,以此有效提高混凝土浇筑质量与浇筑效率。

Figure 202211621530

The invention provides a construction method for automatic pouring and leveling of slab concrete by laser measurement, which belongs to the technical field of concrete pouring and includes pouring The surface also includes the pouring slab surface, the side wall of the pouring slab surface is provided with an outer frame safety net, and the top of the pouring slab surface is fixedly connected to the slab surface steel bar; the invention uses the cooperation between the laser rangefinder and the optical lens to make the construction slab The surface is divided into equidistant grids, and each grid is numbered and coordinates positioned to form a three-dimensional map with the grid as the unit, and the height of the ground can be measured in real time through the laser backhaul, and the image of the concrete elevation of the slab surface can be transmitted. Guide the self-climbing material distribution components to replenish concrete, control the automatic leveling equipment to vibrate the protruding parts, so as to effectively improve the quality and efficiency of concrete pouring.

Figure 202211621530

Description

一种板面混凝土激光测量自动浇筑与整平施工方法A construction method for automatic pouring and leveling of slab concrete by laser measurement

技术领域technical field

本发明涉及混凝土浇筑领域,具体而言,涉及一种板面混凝土激光测量自动浇筑与整平施工方法。The invention relates to the field of concrete pouring, in particular to an automatic pouring and leveling construction method for slab concrete laser measurement.

背景技术Background technique

在建筑施工过程中,对于混凝土分项工程施工,传统做法是由数名混凝土施工工人形成一个团队,采用手拉式布料机、混凝土汽车泵等机械,将商品混凝土泵送至高层楼面,工人手持振捣棒进行混凝土整平。数名工人分工协作,有的工人手拉绳子控制混凝土布料机的转动以在板面铺开混凝土,有的工人开动振捣棒推赶混凝土,有的工人用手持整平机械振捣板面以整平。传统施工过程全凭混凝土工人长期的施工经验和责任心,对于标高控制全凭眼看、用标尺测量,施工经验不足的工人往往出现板面混凝土高低不平、板面凹凸的情况,混凝土的施工质量往往出现很多问题。In the process of building construction, for the construction of concrete sub-projects, the traditional method is to form a team of several concrete construction workers to use hand-pulled distributors, concrete truck pumps and other machinery to pump commercial concrete to high-rise floors. Concrete leveling with a vibrator in hand. Several workers work together in a division of labor. Some workers control the rotation of the concrete placing machine by pulling the rope to spread the concrete on the slab surface. Some workers start the vibrating rod to push the concrete away. Leveling. The traditional construction process depends entirely on the long-term construction experience and sense of responsibility of the concrete workers. The height control is all based on sight and measurement with a ruler. Workers with insufficient construction experience often have uneven concrete slabs and uneven slabs. The construction quality of concrete is often Many problems arise.

基于以上国内市场大部分混凝土浇筑施工的传统做法,由于混凝土工程施工的特殊性,其施工质量直接影响到建筑工程的安全结构,对此提出发明新的施工方式,并采用目前新技术。创建一种新型的施工方法。首先采用新型的自动转向的自爬式布料机,接通混凝土泵送管,该种布料机无需人工手拉绳子转向,内设自动旋转电机,大臂可以进行360°旋转,由终端电脑控制转向角度,可以预设转动角度和速度,达到自动铺浇混凝土的目的。其次采用激光测量智能装备,对板面混凝土面层标高进行扫描,即可得出板面不平整的图像,将图像发送至控制人员,通过网络下发指令给自动整平智能装备,并设置好行走路径,去到板面混凝土凸的地方进行整平、控制人员将测量结果图传输给自爬式布料机,凹的地方进行补料,以达到精准布料以及整平的效果。Based on the above-mentioned traditional methods of concrete pouring construction in the domestic market, due to the particularity of concrete engineering construction, its construction quality directly affects the safety structure of the construction project. In this regard, a new construction method is proposed and the current new technology is adopted. Create a new type of construction method. First, a new type of automatic steering self-climbing distribution machine is adopted, and the concrete pumping pipe is connected. This type of distribution machine does not need to be manually steered by a rope. It is equipped with an automatic rotation motor. The boom can rotate 360°, and the steering is controlled by the terminal computer. Angle, the rotation angle and speed can be preset to achieve the purpose of automatic pouring of concrete. Secondly, laser measurement intelligent equipment is used to scan the elevation of the concrete surface on the slab surface to obtain an image of the unevenness of the slab surface, and the image is sent to the control personnel, and instructions are sent to the automatic leveling intelligent equipment through the network, and the settings are completed. Walking path, go to the convex place of the slab surface for leveling, the control personnel will transmit the measurement result map to the self-climbing distribution machine, and fill the concave place to achieve the effect of precise distribution and leveling.

发明内容Contents of the invention

为了弥补以上不足,本发明提供了一种板面混凝土激光测量自动浇筑与整平施工方法,旨在改善传统混凝土浇筑依靠工人施工经验进行,容易出现板面混凝土高低不平、板面凹凸等情况的问题。In order to make up for the above deficiencies, the present invention provides a laser measurement automatic pouring and leveling construction method for slab concrete, which aims to improve the traditional concrete pouring which relies on the construction experience of workers, and is prone to uneven slab concrete, uneven slab surface, etc. question.

本发明是这样实现的:The present invention is achieved like this:

本发明提供一种板面混凝土激光测量自动浇筑与整平施工方法,施工方法使用到如下组件,包括浇筑基面、自爬式布料组件、激光测量装备、自动整平装备以及终端电脑,浇筑基面还包括浇筑板面,浇筑板面侧壁设置有外架安全网,浇筑板面顶部固定连接有板面钢筋;The invention provides a construction method for automatic pouring and leveling of slab concrete by laser measurement. The construction method uses the following components, including pouring base surface, self-climbing material distribution component, laser measurement equipment, automatic leveling equipment and terminal computer, pouring base The surface also includes the pouring slab surface, the side wall of the pouring slab surface is provided with an outer frame safety net, and the top of the pouring slab surface is fixedly connected to the slab surface reinforcement;

自爬式布料组件设置在不同浇筑板面之间,自爬式布料组件用于将自身在不同的浇筑板面上进行爬升,The self-climbing fabric assembly is arranged between different pouring slabs, and the self-climbing fabric assembly is used to climb itself on different pouring slabs.

激光测量装备设置在浇筑板面顶部,激光测量装备用于将施工板面划分为200X200的网格,并对每个网格进行编号和坐标定位,形成以网格为单位的三维地图;The laser measurement equipment is installed on the top of the pouring slab, and the laser measurement equipment is used to divide the construction slab into 200X200 grids, and number and coordinate each grid to form a three-dimensional map with the grid as the unit;

自动整平装备设置在浇筑板面顶部,自动整平装备通过激光水平光束的照射,实时调整自身与激光束的距离,达到精准振捣的目的。The automatic leveling equipment is set on the top of the pouring slab. The automatic leveling equipment adjusts the distance between itself and the laser beam in real time through the irradiation of the laser horizontal beam to achieve the purpose of precise vibration.

优选的,自爬式布料组件包括布料机本体,布料机本体安装在浇筑板面顶部,布料机本体顶部固定连接有旋转电机,旋转电机侧壁固定连接有水平大臂,水平大臂左侧固定连接有混凝土泵送管,混凝土泵送管远离旋转电机的一端固定连接有泵送管前端软管,水平大臂右侧固定连接有配重块,水平大臂两侧与布料机本体顶部之间固定连接有塔身斜拉杆。Preferably, the self-climbing distributing component includes a distributing machine body, the distributing machine body is installed on the top of the pouring slab, the top of the distributing machine body is fixedly connected with a rotating motor, the side wall of the rotating motor is fixedly connected with a horizontal arm, and the left side of the horizontal arm is fixed The concrete pumping pipe is connected, and the end of the concrete pumping pipe far away from the rotating motor is fixedly connected with the hose at the front end of the pumping pipe. The tower body is fixedly connected with diagonal stay rods.

优选的,布料机本体侧壁等间距设置有四脚钢支撑,四脚钢支撑靠近布料机本体的一端侧壁设置有爬升电机,爬升电机可以转动四脚钢支撑由原来的水平放置转变为竖向放置,布料机本体侧壁啮合连接有提升框架,且提升框架与四脚钢支撑固定连接。Preferably, the side walls of the distribution machine body are equidistantly provided with four-legged steel supports, and the side wall at one end of the four-legged steel supports near the distribution machine body is provided with a climbing motor. The climbing motor can rotate the four-legged steel supports from the original horizontal placement to vertical placement. Placed in the opposite direction, the side wall of the machine body is engaged with a lifting frame, and the lifting frame is fixedly connected to the four-legged steel support.

优选的,旋转电机内部设置有控制软件系统,控制软件系统与终端电脑之间电性连接,控制软件系统包括接收模块和路径分析模块,接收模块用于接收终端电脑输入旋转电机内的指令,路径分析模块用于根据输入指令完成旋转电机的路径规划。Preferably, a control software system is provided inside the rotating motor, and the control software system is electrically connected to the terminal computer. The control software system includes a receiving module and a path analysis module. The analysis module is used to complete the path planning of the rotating electrical machine according to the input instruction.

优选的,激光测量装备包括履带式小车,履带式小车放置在浇筑板面顶部,履带式小车中部固定连接有电池仓,电池仓顶部固定连接有圆形升降杆,圆形升降杆顶端设置有激光测距仪,激光测距仪与终端电脑电性连接,激光测距仪两侧均固定连接有光学镜头,光学镜头用于发射水平激光束。Preferably, the laser measurement equipment includes a crawler trolley. The crawler trolley is placed on the top of the pouring slab. The middle part of the crawler trolley is fixedly connected to a battery compartment. The top of the battery compartment is fixedly connected to a circular elevating pole. The rangefinder and the laser rangefinder are electrically connected to the terminal computer, and both sides of the laser rangefinder are fixedly connected with optical lenses, and the optical lenses are used to emit horizontal laser beams.

优选的,自动整平装备包括AGV小车,AGV小车放置在浇筑板面顶部,AGV小车顶部固定连接有柴油机,柴油机顶部设置有GPS全球定位系统接收器,AGV小车左侧设置有传动杆,传动杆远离AGV小车的一端固定连接有振捣板,振捣板中部设置有高频振捣泵,振捣板两侧均固定连接有电动伸缩杆,电动伸缩杆顶端固定连接有前端激光接收装置。Preferably, the automatic leveling equipment includes an AGV trolley, the AGV trolley is placed on the top of the pouring slab, the top of the AGV trolley is fixedly connected to a diesel engine, the top of the diesel engine is provided with a GPS global positioning system receiver, and the left side of the AGV trolley is provided with a transmission rod. The end away from the AGV trolley is fixedly connected with a vibrating plate, and the middle part of the vibrating plate is equipped with a high-frequency vibrating pump. Both sides of the vibrating plate are fixedly connected with electric telescopic rods, and the top of the electric telescopic rod is fixedly connected with a front-end laser receiving device.

优选的,前端激光接收装置用于接收光学镜头发射的水平激光束,GPS全球定位系统接收器与终端电脑电性连接。Preferably, the front-end laser receiving device is used to receive the horizontal laser beam emitted by the optical lens, and the GPS global positioning system receiver is electrically connected with the terminal computer.

一种板面混凝土激光测量自动浇筑与整平施工方法,步骤如下:S1、将布料机本体提升至待施工的浇筑板面,并将混凝土泵送管与泵车之间进行有效连接;A construction method for automatic pouring and leveling of slab concrete by laser measurement, the steps are as follows: S1. Lift the body of the distributor to the pouring slab to be constructed, and effectively connect the concrete pumping pipe to the pump truck;

S2、通过终端电脑向旋转电机输入预先设定好的混凝土浇筑路径,使得水平大臂根据路径指令进行摆臂以此完成混凝土的浇筑;S2. Input the pre-set concrete pouring path to the rotating motor through the terminal computer, so that the horizontal arm swings according to the path instruction to complete the concrete pouring;

S3、在浇筑板面长方向两端设置各一台激光测量装备,并在其顶部设置的激光测距仪和光学镜头的配合下,将浇筑板面的形状划分为200X200的方格网,并对每个方格网进行编号、设置其坐标,并将数据传输至终端电脑内;S3. Set up a laser measuring device at both ends of the pouring slab in the longitudinal direction, and with the cooperation of the laser rangefinder and optical lens set on the top, divide the shape of the pouring slab into a 200X200 grid, and Number each grid, set its coordinates, and transmit the data to the terminal computer;

S4、通过终端电脑向GPS全球定位系统接收器输送实时坐标信息,使得AGV小车带动振捣板以及高频振捣泵对浇筑后的浇筑板面进行一次振捣;S4. Send real-time coordinate information to the GPS global positioning system receiver through the terminal computer, so that the AGV trolley drives the vibrating plate and the high-frequency vibrating pump to vibrate the pouring slab surface after pouring;

S5、激光测量装备顶部设置的激光测距仪和光学镜头将会对一次振捣后的浇筑板面进行实时扫描,并标记出不同类型的不合格点位,随即将上述不合格的数据信息传输至终端电脑,随后通过上述数据信息进行补料或者二次振捣。S5. The laser rangefinder and optical lens installed on the top of the laser measurement equipment will scan the pouring slab surface after a vibration in real time, and mark different types of unqualified points, and then transmit the above unqualified data information to the terminal computer, and then carry out feeding or secondary vibration through the above data information.

本发明的有益效果是:The beneficial effects of the present invention are:

1、本发明通过自爬式布料组件的使用,减少了传统布料机的安拆繁琐作业准备工作,其自身通过旋转电机的驱动以及四脚钢支撑的打开收放,实现布料机本体的自动爬升与安装,减少了传统安拆方式占用塔吊的时间。同时,通过水平大臂与旋转电机之间的转向功能,可以根据需要设定转向的角度,自动进行混凝土布料,无需工人的手拉绳子控制转向,通过输入特定的摆动路径,可以一次性自动完成混凝土的精准布料,提高了混凝土浇筑的施工质量,同时也提高了施工的效率。1. Through the use of self-climbing material distribution components, the present invention reduces the cumbersome installation and disassembly preparation work of the traditional material distribution machine, and realizes the automatic climbing of the material distribution machine body through the drive of the rotating motor and the opening and retracting of the four-legged steel support. With installation, it reduces the time occupied by the tower crane by the traditional installation and disassembly method. At the same time, through the steering function between the horizontal boom and the rotating motor, the steering angle can be set according to the needs, and the concrete can be placed automatically, without the need for workers to pull the rope to control the steering. By inputting a specific swing path, it can be completed automatically at one time. The precise distribution of concrete improves the construction quality of concrete pouring and also improves the efficiency of construction.

2、本发明通过激光测距仪和光学镜头之间的配合,将施工板面划分为200X200的网格,并每个网格进行编号和坐标定位,形成以网格为单位的三维地图,并可以通过激光回程实时测量地面的高低程度,传输板面混凝土标高的图像,指导自爬式布料组件进行混凝土补充,控制自动整平装备对凸出部位进行振捣,以此有效提高混凝土浇筑质量与浇筑效率。2. The present invention divides the construction board surface into 200X200 grids through the cooperation between the laser rangefinder and the optical lens, and carries out numbering and coordinate positioning on each grid to form a three-dimensional map with the grid as the unit, and It can measure the height of the ground in real time through the laser backhaul, transmit the image of the concrete elevation on the slab surface, guide the self-climbing distribution components to replenish concrete, and control the automatic leveling equipment to vibrate the protruding parts, so as to effectively improve the quality of concrete pouring and pouring efficiency.

3、本发明通过前端激光接收装置接收光学镜头发射的水平激光束,以此控制电动伸缩杆的高度,实时调整振捣板与激光束的距离,达到精准振捣的目的;并通过路径优化,进行整遍振捣过后,对于部分出现不平整的地方,通过激光测量装备的网格状三维地图的信息反馈,进行二次振捣,定点振捣浇筑不合格的点位,以达到整个板面平整的目的,进而提高了混凝土的浇筑质量。3. The present invention receives the horizontal laser beam emitted by the optical lens through the front-end laser receiving device, so as to control the height of the electric telescopic rod, adjust the distance between the vibrating plate and the laser beam in real time, and achieve the purpose of precise vibration; and through path optimization, After the whole round of vibration, for some uneven places, through the information feedback of the grid-shaped three-dimensional map of the laser measurement equipment, a second vibration is performed, and the unqualified points are vibrated at fixed points to reach the entire surface. The purpose of leveling, thereby improving the quality of concrete pouring.

附图说明Description of drawings

为了更清楚地说明本发明实施方式的技术方案,下面将对实施方式中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本发明的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to illustrate the technical solutions of the embodiments of the present invention more clearly, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of the present invention, and therefore do not It should be regarded as a limitation on the scope, and those skilled in the art can also obtain other related drawings based on these drawings without creative work.

图1是本发明实施方式提供的一种板面混凝土激光测量自动浇筑与整平施工方法的主体外观结构示意图;Fig. 1 is a schematic diagram of the main body appearance structure of a slab concrete laser measurement automatic pouring and leveling construction method provided by the embodiment of the present invention;

图2是本发明实施方式提供的一种板面混凝土激光测量自动浇筑与整平施工方法的自爬式布料组件结构示意图;Fig. 2 is a structural schematic diagram of a self-climbing cloth component of a slab concrete laser measurement automatic pouring and leveling construction method provided by an embodiment of the present invention;

图3是本发明实施方式提供的一种板面混凝土激光测量自动浇筑与整平施工方法的布料机本体爬升阶段一结构示意图;Fig. 3 is a structural schematic diagram of the climbing stage of the distributing machine body of a slab concrete laser measurement automatic pouring and leveling construction method provided by the embodiment of the present invention;

图4是本发明实施方式提供的一种板面混凝土激光测量自动浇筑与整平施工方法的布料机本体爬升阶段二结构示意图;Fig. 4 is a structural schematic diagram of the climbing stage 2 of the distributing machine body of a slab concrete laser measurement automatic pouring and leveling construction method provided by the embodiment of the present invention;

图5是本发明实施方式提供的一种板面混凝土激光测量自动浇筑与整平施工方法的布料机本体爬升阶段三结构示意图;Fig. 5 is a schematic diagram of the third structure of the climbing stage of the distributor body of a slab concrete laser measurement automatic pouring and leveling construction method provided by the embodiment of the present invention;

图6是本发明实施方式提供的一种板面混凝土激光测量自动浇筑与整平施工方法的水平大臂预设路径结构示意图;Fig. 6 is a schematic diagram of the horizontal arm preset path structure of a slab concrete laser measurement automatic pouring and leveling construction method provided by the embodiment of the present invention;

图7是本发明实施方式提供的一种板面混凝土激光测量自动浇筑与整平施工方法的AGV小车移动路径结构示意图;Fig. 7 is a schematic diagram of the moving path structure of an AGV trolley in a slab concrete laser measurement automatic pouring and leveling construction method provided by an embodiment of the present invention;

图8是本发明实施方式提供的一种板面混凝土激光测量自动浇筑与整平施工方法的激光测量装备结构示意图;Fig. 8 is a schematic structural diagram of a laser measurement equipment for a slab concrete laser measurement automatic pouring and leveling construction method provided by an embodiment of the present invention;

图9是本发明实施方式提供的一种板面混凝土激光测量自动浇筑与整平施工方法的自动整平装备结构示意图;Fig. 9 is a structural schematic diagram of automatic leveling equipment for a slab concrete laser measurement automatic pouring and leveling construction method provided by an embodiment of the present invention;

图10是本发明实施方式提供的一种板面混凝土激光测量自动浇筑与整平施工方法的左侧网格结构示意图;Fig. 10 is a schematic diagram of the grid structure on the left side of a slab concrete laser measurement automatic pouring and leveling construction method provided by the embodiment of the present invention;

图11是本发明实施方式提供的一种板面混凝土激光测量自动浇筑与整平施工方法的中部网格结构示意图;Fig. 11 is a schematic diagram of the grid structure in the middle of a slab concrete laser measurement automatic pouring and leveling construction method provided by the embodiment of the present invention;

图12是本发明实施方式提供的一种板面混凝土激光测量自动浇筑与整平施工方法的右侧网格结构示意图。Fig. 12 is a schematic diagram of the grid structure on the right side of a slab concrete laser measurement automatic pouring and leveling construction method provided by an embodiment of the present invention.

图中:1、浇筑基面;101、浇筑板面;102、外架安全网;103、板面钢筋;2、自爬式布料组件;21、布料机本体;211、旋转电机;22、水平大臂;23、混凝土泵送管;24、泵送管前端软管;25、配重块;26、塔身斜拉杆;27、四脚钢支撑;28、爬升电机;29、提升框架;3、激光测量装备;31、履带式小车;32、电池仓;33、圆形升降杆;34、激光测距仪;35、光学镜头;4、自动整平装备;41、AGV小车;42、柴油机;43、GPS全球定位系统接收器;44、传动杆;45、振捣板;46、高频振捣泵;47、电动伸缩杆;48、前端激光接收装置。In the figure: 1, pouring base surface; 101, pouring slab surface; 102, outer frame safety net; 103, slab surface reinforcement; 2, self-climbing distribution component; 21, distribution machine body; 211, rotating motor; Boom; 23. Concrete pumping pipe; 24. Flexible pipe at the front end of pumping pipe; 25. Counterweight; , laser measuring equipment; 31, crawler trolley; 32, battery compartment; 33, circular lifting rod; 34, laser rangefinder; 35, optical lens; 4, automatic leveling equipment; 41, AGV trolley; 42, diesel engine ; 43. GPS global positioning system receiver; 44. transmission rod; 45. vibrating plate; 46. high-frequency vibrating pump; 47. electric telescopic rod;

具体实施方式Detailed ways

为使本发明实施方式的目的、技术方案和优点更加清楚,下面将结合本发明实施方式中的附图,对本发明实施方式中的技术方案进行清楚、完整地描述,显然,所描述的实施方式是本发明一部分实施方式,而不是全部的实施方式。基于本发明中的实施方式,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施方式,都属于本发明保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments It is some embodiments of the present invention, but not all of them. Based on the implementation manners in the present invention, all other implementation manners obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

实施例Example

参照图1-12,一种板面混凝土激光测量自动浇筑与整平施工方法,施工方法使用到如下组件,包括浇筑基面1、自爬式布料组件2、激光测量装备3、自动整平装备4以及终端电脑,浇筑基面1还包括浇筑板面101,浇筑板面101侧壁设置有外架安全网102,浇筑板面101顶部固定连接有板面钢筋103;Referring to Figure 1-12, a construction method for automatic pouring and leveling of slab concrete by laser measurement, the construction method uses the following components, including pouring base 1, self-climbing fabric component 2, laser measurement equipment 3, and automatic leveling equipment 4 and the terminal computer, the pouring base 1 also includes a pouring slab 101, the side wall of the pouring slab 101 is provided with an outer frame safety net 102, and the top of the pouring slab 101 is fixedly connected with a steel bar 103 for the slab;

自爬式布料组件2设置在不同浇筑板面101之间,自爬式布料组件2用于将自身在不同的浇筑板面101上进行爬升,The self-climbing fabric assembly 2 is arranged between different pouring slabs 101, and the self-climbing fabric assembly 2 is used to climb itself on different pouring slabs 101,

激光测量装备3设置在浇筑板面101顶部,激光测量装备3用于将施工板面划分为200X200的网格,并对每个网格进行编号和坐标定位,形成以网格为单位的三维地图;The laser measurement equipment 3 is set on the top of the pouring slab 101. The laser measurement equipment 3 is used to divide the construction slab into 200X200 grids, and to number and coordinate each grid to form a three-dimensional map with the grid as the unit ;

自动整平装备4设置在浇筑板面101顶部,自动整平装备4通过激光水平光束的照射,实时调整自身与激光束的距离,达到精准振捣的目的。The automatic leveling equipment 4 is arranged on the top of the pouring slab 101. The automatic leveling equipment 4 adjusts the distance between itself and the laser beam in real time through the irradiation of the laser horizontal beam to achieve the purpose of precise vibration.

参照图2-图5,进一步地,自爬式布料组件2包括布料机本体21,布料机本体21安装在浇筑板面101顶部,布料机本体21顶部固定连接有旋转电机211,旋转电机211侧壁固定连接有水平大臂22,水平大臂22左侧固定连接有混凝土泵送管23,混凝土泵送管23远离旋转电机211的一端固定连接有泵送管前端软管24,水平大臂22右侧固定连接有配重块25,水平大臂22两侧与布料机本体21顶部之间固定连接有塔身斜拉杆26;Referring to Fig. 2-Fig. 5, further, the self-climbing distributing component 2 includes a distributing machine body 21, the distributing machine body 21 is installed on the top of the pouring slab 101, the top of the distributing machine body 21 is fixedly connected with a rotating motor 211, and the side of the rotating motor 211 The wall is fixedly connected with a horizontal arm 22, and the left side of the horizontal arm 22 is fixedly connected with a concrete pumping pipe 23, and the end of the concrete pumping pipe 23 away from the rotating motor 211 is fixedly connected with a hose 24 at the front end of the pumping pipe, and the horizontal arm 22 The right side is fixedly connected with a counterweight 25, and between the two sides of the horizontal boom 22 and the top of the distribution machine body 21 is fixedly connected with a tower body slanting rod 26;

参照图2-图5,进一步地,布料机本体21侧壁等间距设置有四脚钢支撑27,四脚钢支撑27靠近布料机本体21本体的一端侧壁设置有爬升电机28,爬升电机28可以转动四脚钢支撑27由原来的水平放置转变为竖向放置,布料机本体21侧壁啮合连接有提升框架29,且提升框架29与四脚钢支撑27固定连接;Referring to Fig. 2-Fig. 5, further, four-legged steel supports 27 are arranged at equal intervals on the side walls of the distribution machine body 21, and a climbing motor 28 is arranged on the side wall of the four-legged steel support 27 near the distribution machine body 21 body, and the climbing motor 28 The four-leg steel support 27 can be rotated from the original horizontal placement to vertical placement, and the side wall of the distribution machine body 21 is engaged with a lifting frame 29, and the lifting frame 29 is fixedly connected to the four-leg steel support 27;

需要说明的是,在每层的浇筑板面101均设置了用于抬升布料机本体21的预留洞。通过爬升电机28的转动将四脚钢支撑27由原来的水平放置转变为竖向放置,并通过提升框架29与布料机本体21侧壁设置的条状齿条啮合,转动提升框架29内部的齿轮,可以将竖直状态的四脚钢支撑27穿过预留孔,至上一层的板面,然后转动爬升电机28,使得四脚钢支撑27由竖向放置变转为水平放置,以此张开支撑在上一层的结构板面。完成后,位于下一层的四脚钢支撑27也是同样的机构、同样的原理,从下一层爬升至上一层,如此往复,完成一次次爬升即可一直升到顶层,以此有效减少了传统布料机的安拆繁琐作业准备工作,从而提高了该装置使用的便捷性。It should be noted that a reserved hole for lifting the placing machine body 21 is provided on the pouring slab surface 101 of each floor. Through the rotation of the climbing motor 28, the four-legged steel support 27 is changed from the original horizontal placement to the vertical placement, and the lifting frame 29 is engaged with the rack rack provided on the side wall of the distribution machine body 21, and the gear inside the lifting frame 29 is rotated. , the four-legged steel support 27 in the vertical state can be passed through the reserved hole to the board surface of the upper layer, and then the climbing motor 28 is rotated so that the four-legged steel support 27 is changed from vertical placement to horizontal placement, so as to expand Structural slabs supported on the upper floor. After completion, the four-legged steel support 27 located on the next floor is also the same mechanism and the same principle, climbing from the next floor to the upper floor, so reciprocating, and climbing up to the top floor after each climb, effectively reducing the The installation and disassembly of the traditional distribution machine is cumbersome and the preparation work has improved the convenience of using the device.

进一步地,旋转电机211内部设置有控制软件系统,控制软件系统与终端电脑之间电性连接,控制软件系统包括接收模块和路径分析模块,接收模块用于接收外界终端电脑输入旋转电机211内的指令,路径分析模块用于根据输入指令完成旋转电机211的路径规划;Further, the rotating motor 211 is provided with a control software system, which is electrically connected to the terminal computer. The control software system includes a receiving module and a path analysis module. Instructions, the path analysis module is used to complete the path planning of the rotating electrical machine 211 according to the input instructions;

需要说明的是,通过终端电脑、控制软件系统以及旋转电机211之间的电性连接配合,以此可以远程控制水平大臂22的转向,根据需要设定转向的角度,自动进行混凝土布料,无需工人的手拉绳子控制水平大臂22转向,通过输入特定的摆动路径,可以一次性自动完成混凝土的精准布料,以此提高了混凝土浇筑的施工质量,同时也提高了混凝土浇筑施工的效率(参照图6和图7)。It should be noted that through the electrical connection and cooperation between the terminal computer, the control software system and the rotating motor 211, the steering of the horizontal boom 22 can be remotely controlled, the steering angle can be set according to the needs, and the concrete can be placed automatically without The worker’s hand pulls the rope to control the steering of the horizontal arm 22. By inputting a specific swing path, the precise distribution of concrete can be automatically completed at one time, thereby improving the construction quality of concrete pouring, and at the same time improving the efficiency of concrete pouring construction (see Figure 6 and Figure 7).

参照图1、图8,进一步地,激光测量装备3包括履带式小车31,履带式小车31放置在浇筑板面101顶部,履带式小车31中部固定连接有电池仓32,电池仓32顶部固定连接有圆形升降杆33,圆形升降杆33顶端设置有激光测距仪34,激光测距仪34与终端电脑电性连接,激光测距仪34两侧均固定连接有光学镜头35,光学镜头35用于发射水平激光束;Referring to Fig. 1 and Fig. 8, further, the laser measurement equipment 3 includes a crawler trolley 31, which is placed on the top of the pouring slab 101, the middle part of the crawler trolley 31 is fixedly connected to a battery compartment 32, and the top of the battery compartment 32 is fixedly connected to There is a circular lifting rod 33, and a laser range finder 34 is arranged on the top of the circular lifting rod 33. The laser range finder 34 is electrically connected to the terminal computer. Both sides of the laser range finder 34 are fixedly connected with an optical lens 35. The optical lens 35 for emitting a horizontal laser beam;

需要说明的是,在浇筑板面101长方向两端设置各一台激光测量装备,并在其顶部设置的激光测距仪34和光学镜头35的配合下,将浇筑板面101的形状划分为200X200的方格网,并对每个方格网进行编号、设置其坐标,并通过激光回程实时测量地面的高低程度,向终端电脑传输浇筑板面101的混凝土标高图像,以此利用终端电脑内的混凝土标高图像,即可分别完成后续的布料与整平工序,无需人工进行现场观察,有效降低了人力消耗,而且所得标高更加精准,从而有效确保了混凝土的浇筑质量(参照图6、图7、图10、图11和图12)。It should be noted that a laser measuring device is installed at both ends of the pouring slab 101 in the longitudinal direction, and with the cooperation of the laser rangefinder 34 and the optical lens 35 arranged on the top, the shape of the pouring slab 101 is divided into 200X200 grid, and number each grid, set its coordinates, and measure the height of the ground in real time through the laser backhaul, and transmit the concrete elevation image of the pouring slab 101 to the terminal computer, so as to use the terminal computer to The concrete elevation image can be used to complete the subsequent laying and leveling processes respectively, without manual on-site observation, which effectively reduces manpower consumption, and the obtained elevation is more accurate, thus effectively ensuring the quality of concrete pouring (see Figure 6 and Figure 7 , Figure 10, Figure 11 and Figure 12).

参照图1、图9,进一步地,自动整平装备4包括AGV小车41,AGV小车41放置在浇筑板面101顶部,AGV小车41顶部固定连接有柴油机42,柴油机42顶部设置有GPS全球定位系统接收器43,AGV小车41左侧设置有传动杆44,传动杆44远离AGV小车41的一端固定连接有振捣板45,振捣板45中部设置有高频振捣泵46,振捣板45两侧均固定连接有电动伸缩杆47,电动伸缩杆47顶端固定连接有前端激光接收装置48;Referring to Fig. 1 and Fig. 9, further, the automatic leveling equipment 4 includes an AGV trolley 41, the AGV trolley 41 is placed on the top of the pouring slab 101, the top of the AGV trolley 41 is fixedly connected with a diesel engine 42, and the top of the diesel engine 42 is provided with a GPS global positioning system The receiver 43 is provided with a transmission rod 44 on the left side of the AGV trolley 41, and the end of the transmission rod 44 away from the AGV trolley 41 is fixedly connected with a vibrating plate 45, and the middle part of the vibrating plate 45 is provided with a high-frequency vibrating pump 46. Both are fixedly connected with an electric telescopic rod 47, and the top of the electric telescopic rod 47 is fixedly connected with a front-end laser receiving device 48;

进一步地,前端激光接收装置48用于接收光学镜头35发射的水平激光束,GPS全球定位系统接收器43与终端电脑电性连接;Further, the front-end laser receiving device 48 is used to receive the horizontal laser beam emitted by the optical lens 35, and the GPS global positioning system receiver 43 is electrically connected with the terminal computer;

其中,前端激光接收装置48可以根据光学镜头35发射的水平激光束高度,来判定振捣板45的高低位置,以此根据水平激光束的位置,向AGV小车41输送调整信息,从而通过调整传动杆44的高度,实时调整振捣板45的高低,以此实现精准高效的振捣(参照图7);Among them, the front-end laser receiving device 48 can determine the height of the vibrating plate 45 according to the height of the horizontal laser beam emitted by the optical lens 35, so as to transmit adjustment information to the AGV trolley 41 according to the position of the horizontal laser beam, thereby adjusting the transmission The height of the rod 44 is adjusted in real time to the height of the vibrating plate 45 to achieve precise and efficient vibrating (refer to Figure 7);

需要说明的是,首先将混凝土泵送管23的移动路径坐标输入至GPS全球定位系统接收器43内,以此控制AGV小车41带动振捣板45和高频振捣泵46对浇筑后的浇筑板面101进行一次振捣,随后再将激光测距仪34传输至终端电脑内的实时标高图像进行处理分析,分拣出不合格点位的坐标(包括凹点位和凸点位),并将不同类型的不合格点位坐标分别输送至旋转电机211和GPS全球定位系统接收器43内,以此使得水平大臂22带动混凝土泵送管23对凹处点位进行补料,使得AGV小车41带动振捣板45和高频振捣泵46对凸处点位进行二次振捣,以此实现混凝土的精准浇筑和高效整平,从而提高了混凝土的浇筑质量(参照图10、图11和图12)。It should be noted that firstly, the moving path coordinates of the concrete pumping pipe 23 are input into the GPS global positioning system receiver 43, so as to control the AGV trolley 41 to drive the vibrating plate 45 and the high-frequency vibrating pump 46 to the pouring slab after pouring. 101 performs a vibration, and then transmits the laser range finder 34 to the real-time elevation image in the terminal computer for processing and analysis, sorting out the coordinates of unqualified points (including concave points and convex points), and different The coordinates of unqualified points of different types are sent to the rotary motor 211 and the GPS global positioning system receiver 43 respectively, so that the horizontal arm 22 drives the concrete pumping pipe 23 to replenish the concave points, so that the AGV trolley 41 drives The vibrating plate 45 and the high-frequency vibrating pump 46 perform secondary vibration on the convex points, so as to realize precise pouring and efficient leveling of concrete, thereby improving the pouring quality of concrete (refer to Fig. 10, Fig. 11 and Fig. 12) .

参照图1-12,一种板面混凝土激光测量自动浇筑与整平施工方法,步骤如下:Referring to Figure 1-12, a construction method for automatic pouring and leveling of slab concrete by laser measurement, the steps are as follows:

S1、通过爬升电机28、四脚钢支撑27、提升框架29以及布料机本体21之间的配合,将位于底层的浇筑板面101,穿过预留洞甚至上一层,以此将布料机本体21提升至待施工的浇筑板面101,并将混凝土泵送管23与泵车之间进行有效连接;S1. Through the cooperation between the climbing motor 28, the four-legged steel support 27, the lifting frame 29 and the distribution machine body 21, the pouring slab 101 on the bottom layer will pass through the reserved hole or even the upper layer, so that the distribution machine The main body 21 is lifted to the pouring slab surface 101 to be constructed, and the concrete pumping pipe 23 is effectively connected to the pump truck;

S2、通过终端电脑、控制软件系统以及旋转电机211之间的电性连接配合,工作人员将预先设定好的混凝土浇筑路径通过终端电脑向旋转电机211输入,使得水平大臂22根据路径指令进行摆臂,以此完成浇筑板面101的混凝土浇筑工作;S2. Through the electrical connection and cooperation between the terminal computer, the control software system and the rotating motor 211, the staff will input the preset concrete pouring path to the rotating motor 211 through the terminal computer, so that the horizontal boom 22 can be carried out according to the path instruction. Swing arm, finish the concrete pouring work of pouring slab 101 with this;

S3、在浇筑板面101长方向两端设置各一台激光测量装备,并在其顶部设置的激光测距仪34和光学镜头35的配合下,将浇筑板面101的形状划分为200X200的方格网,并对每个方格网进行编号、设置其坐标,并将数据传输至终端电脑内;S3. Install a laser measuring device at both ends of the pouring slab 101 in the longitudinal direction, and divide the shape of the pouring slab 101 into a square of 200X200 with the cooperation of the laser rangefinder 34 and the optical lens 35 arranged on the top. grid, and number each grid, set its coordinates, and transmit the data to the terminal computer;

S4、通过终端电脑向GPS全球定位系统接收器43输送原先水平大臂22移动的实时坐标信息,使得AGV小车41带动振捣板45以及高频振捣泵46对浇筑后的浇筑板面101进行一次振捣;S4. Send the real-time coordinate information of the original horizontal boom 22 movement to the GPS global positioning system receiver 43 through the terminal computer, so that the AGV trolley 41 drives the vibrating plate 45 and the high-frequency vibrating pump 46 to vibrate the pouring slab surface 101 after pouring Pound;

S5、激光测量装备顶部设置的激光测距仪34和光学镜头35将会对一次振捣后的浇筑板面101进行实时扫描,并标记出不同类型的不合格点位,随即将上述不合格的数据信息传输至终端电脑;工作人员将不同类型的不合格信息通过终端电脑将分别传递至旋转电机211和GPS全球定位系统接收器43上,以此进行补料或者二次振捣。S5. The laser range finder 34 and the optical lens 35 arranged on the top of the laser measuring equipment will scan the pouring slab surface 101 after a vibration in real time, and mark out different types of unqualified points, and then remove the above-mentioned unqualified points The data information is transmitted to the terminal computer; the staff transmits different types of unqualified information to the rotating motor 211 and the GPS global positioning system receiver 43 respectively through the terminal computer, so as to perform feeding or secondary vibration.

该一种板面混凝土激光测量自动浇筑与整平施工方法:通过智能装备以及物联网的应用,施工主题由工人转为智能装备,机械施工无疲倦不用休息、施工速度快效率高,施工质量统一无差距,施工质量控制容易。增加智能装备的数量,可以采用多机联动的方式,多台自动整平智能装备参与施工,并统一由控制人员进行控制,施工效率大大提高,从而降低施工成本。This is a slab concrete laser measurement automatic pouring and leveling construction method: through the application of intelligent equipment and the Internet of Things, the construction theme is changed from workers to intelligent equipment, mechanical construction without fatigue and no rest, fast construction speed and high efficiency, and uniform construction quality No gap, easy construction quality control. To increase the number of intelligent equipment, a multi-machine linkage method can be adopted. Multiple automatic leveling intelligent equipment participate in the construction and are uniformly controlled by the controller. The construction efficiency is greatly improved, thereby reducing the construction cost.

需要说明的是,电机具体的型号规格需根据该装置的实际规格等进行选型确定,具体选型计算方法采用本领域现有技术,故不再详细赘述。It should be noted that the specific model specification of the motor needs to be selected according to the actual specification of the device, etc., and the specific calculation method for the type selection adopts the existing technology in the field, so it will not be described in detail.

以上所述仅为本发明的优选实施方式而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.

Claims (8)

1.一种板面混凝土激光测量自动浇筑与整平施工方法,其特征在于,所述施工方法使用到如下组件,包括浇筑基面(1)、自爬式布料组件(2)、激光测量装备(3)、自动整平装备(4)以及终端电脑,所述浇筑基面(1)还包括浇筑板面(101),所述浇筑板面(101)侧壁设置有外架安全网(102),所述浇筑板面(101)顶部固定连接有板面钢筋(103);1. A slab concrete laser measurement automatic pouring and leveling construction method is characterized in that the construction method uses the following components, including the pouring base surface (1), self-climbing cloth assembly (2), laser measurement equipment (3), automatic leveling equipment (4) and terminal computer, the pouring base (1) also includes a pouring slab (101), and the side wall of the pouring slab (101) is provided with an outer frame safety net (102 ), the top of the pouring slab (101) is fixedly connected with a slab reinforcing bar (103); 所述自爬式布料组件(2)设置在不同浇筑板面(101)之间,自爬式布料组件(2)用于将自身在不同的浇筑板面(101)上进行爬升,The self-climbing distribution component (2) is arranged between different pouring slabs (101), and the self-climbing distribution component (2) is used to climb itself on different pouring slabs (101), 所述激光测量装备(3)设置在浇筑板面(101)顶部,激光测量装备(3)用于将施工板面划分为200X200的网格,并对每个网格进行编号和坐标定位,形成以网格为单位的三维地图;The laser measurement equipment (3) is arranged on the top of the pouring slab (101), and the laser measurement equipment (3) is used to divide the construction slab into 200X200 grids, and perform numbering and coordinate positioning on each grid to form 3D map with grid as the unit; 所述自动整平装备(4)设置在浇筑板面(101)顶部,自动整平装备(4)通过激光水平光束的照射,实时调整自身与激光束的距离,达到精准振捣的目的。The automatic leveling equipment (4) is arranged on the top of the pouring slab (101), and the automatic leveling equipment (4) adjusts the distance between itself and the laser beam in real time through the irradiation of the laser horizontal beam to achieve the purpose of precise vibration. 2.根据权利要求1所述的一种板面混凝土激光测量自动浇筑与整平施工方法,其特征在于,所述自爬式布料组件(2)包括布料机本体(21),所述布料机本体(21)安装在浇筑板面(101)顶部,所述布料机本体(21)顶部固定连接有旋转电机(211),所述旋转电机(211)侧壁固定连接有水平大臂(22),所述水平大臂(22)左侧固定连接有混凝土泵送管(23),所述混凝土泵送管(23)远离旋转电机(211)的一端固定连接有泵送管前端软管(24),所述水平大臂(22)右侧固定连接有配重块(25),所述水平大臂(22)两侧与布料机本体(21)顶部之间固定连接有塔身斜拉杆(26)。2. A kind of slab concrete laser measurement automatic pouring and leveling construction method according to claim 1, characterized in that, the self-climbing distributing component (2) comprises a distributing machine body (21), and the distributing machine The body (21) is installed on the top of the pouring slab (101), the top of the distribution machine body (21) is fixedly connected with a rotating motor (211), and the side wall of the rotating motor (211) is fixedly connected with a horizontal arm (22) , the left side of the horizontal big arm (22) is fixedly connected with a concrete pumping pipe (23), and the end of the concrete pumping pipe (23) away from the rotating motor (211) is fixedly connected with a hose (24 at the front end of the pumping pipe) ), the right side of the horizontal boom (22) is fixedly connected with a counterweight (25), and the horizontal boom (22) both sides and the top of the distribution machine body (21) are fixedly connected with a tower diagonal stay 26). 3.根据权利要求2所述的一种板面混凝土激光测量自动浇筑与整平施工方法,其特征在于,所述布料机本体(21)侧壁等间距设置有四脚钢支撑(27),所述四脚钢支撑(27)靠近布料机本体(21)本体的一端侧壁设置有爬升电机(28),所述爬升电机(28)可以转动四脚钢支撑(27)由原来的水平放置转变为竖向放置,所述布料机本体(21)侧壁啮合连接有提升框架(29),且所述提升框架(29)与四脚钢支撑(27)固定连接。3. A kind of slab concrete laser measurement automatic pouring and leveling construction method according to claim 2, characterized in that, the side walls of the distributor body (21) are equidistantly provided with four-legged steel supports (27), The four-legged steel support (27) is provided with a climbing motor (28) near one end of the distribution machine body (21) body, and the climbing motor (28) can rotate the four-legged steel support (27) from the original horizontal position. Transformed into vertical placement, the side wall of the distribution machine body (21) is engaged with a lifting frame (29), and the lifting frame (29) is fixedly connected to the four-legged steel support (27). 4.根据权利要求2所述的一种板面混凝土激光测量自动浇筑与整平施工方法,其特征在于,所述旋转电机(211)内部设置有控制软件系统,所述控制软件系统与终端电脑之间电性连接,所述控制软件系统包括接收模块和路径分析模块,所述接收模块用于接收终端电脑输入旋转电机(211)内的指令,所述路径分析模块用于根据输入指令完成旋转电机(211)的路径规划。4. A kind of slab concrete laser measurement automatic pouring and leveling construction method according to claim 2, it is characterized in that, described rotating motor (211) interior is provided with control software system, and described control software system and terminal computer The control software system includes a receiving module and a path analysis module, the receiving module is used to receive instructions from the terminal computer input into the rotating motor (211), and the path analysis module is used to complete the rotation according to the input instructions Path planning of the motor (211). 5.根据权利要求1所述的一种板面混凝土激光测量自动浇筑与整平施工方法,其特征在于,所述激光测量装备(3)包括履带式小车(31),所述履带式小车(31)放置在浇筑板面(101)顶部,所述履带式小车(31)中部固定连接有电池仓(32),所述电池仓(32)顶部固定连接有圆形升降杆(33),所述圆形升降杆(33)顶端设置有激光测距仪(34),所述激光测距仪(34)与终端电脑电性连接,所述激光测距仪(34)两侧均固定连接有光学镜头(35),所述光学镜头(35)用于发射水平激光束。5. A kind of slab concrete laser measurement automatic pouring and leveling construction method according to claim 1, is characterized in that, described laser measurement equipment (3) comprises crawler type dolly (31), and described crawler type dolly ( 31) placed on the top of the pouring slab (101), the middle part of the crawler trolley (31) is fixedly connected with a battery compartment (32), and the top of the battery compartment (32) is fixedly connected with a circular lifting rod (33), so A laser range finder (34) is arranged on the top of the circular elevating rod (33), and the laser range finder (34) is electrically connected to the terminal computer, and both sides of the laser range finder (34) are fixedly connected with An optical lens (35), the optical lens (35) is used for emitting horizontal laser beams. 6.根据权利要求5所述的一种板面混凝土激光测量自动浇筑与整平施工方法,其特征在于,所述自动整平装备(4)包括AGV小车(41),所述AGV小车(41)放置在浇筑板面(101)顶部,所述AGV小车(41)顶部固定连接有柴油机(42),所述柴油机(42)顶部设置有GPS全球定位系统接收器(43),所述AGV小车(41)左侧设置有传动杆(44),所述传动杆(44)远离AGV小车(41)的一端固定连接有振捣板(45),所述振捣板(45)中部设置有高频振捣泵(46),所述振捣板(45)两侧均固定连接有电动伸缩杆(47),所述电动伸缩杆(47)顶端固定连接有前端激光接收装置(48)。6. A kind of slab concrete laser measurement automatic pouring and leveling construction method according to claim 5, is characterized in that, described automatic leveling equipment (4) comprises AGV trolley (41), and described AGV trolley (41 ) is placed on the top of the pouring slab (101), the top of the AGV trolley (41) is fixedly connected with a diesel engine (42), and the top of the diesel engine (42) is provided with a GPS global positioning system receiver (43), and the AGV trolley (41) A transmission rod (44) is arranged on the left side, and one end of the transmission rod (44) away from the AGV trolley (41) is fixedly connected with a vibrating plate (45), and the middle part of the vibrating plate (45) is provided with a high-frequency vibration Pound the pump (46), the electric telescopic rod (47) is fixedly connected with both sides of the described vibration plate (45), and the top end of the electric telescopic rod (47) is fixedly connected with the front end laser receiving device (48). 7.根据权利要求6所述的一种板面混凝土激光测量自动浇筑与整平施工方法,其特征在于,所述前端激光接收装置(48)用于接收光学镜头(35)发射的水平激光束,所述GPS全球定位系统接收器(43)与终端电脑电性连接。7. The construction method for automatic pouring and leveling of slab concrete laser measurement according to claim 6, characterized in that, the front-end laser receiving device (48) is used to receive the horizontal laser beam emitted by the optical lens (35) , the GPS global positioning system receiver (43) is electrically connected with the terminal computer. 8.采用如权利要求1-7中任意一项所述的一种板面混凝土激光测量自动浇筑与整平施工方法,其特征在于,所述施工方法步骤如下:8. Adopting a kind of slab concrete laser measurement automatic pouring and leveling construction method as described in any one of claims 1-7, it is characterized in that, described construction method steps are as follows: S1、将布料机本体(21)提升至待施工的浇筑板面(101),并将混凝土泵送管(23)与泵车之间进行有效连接;S1. Lift the distributor body (21) to the pouring slab surface (101) to be constructed, and effectively connect the concrete pumping pipe (23) to the pump truck; S2、通过终端电脑向旋转电机(211)输入预先设定好的混凝土浇筑路径,使得水平大臂(22)根据路径指令进行摆臂以此完成混凝土的浇筑;S2. Input the pre-set concrete pouring path to the rotary motor (211) through the terminal computer, so that the horizontal arm (22) swings the arm according to the path instruction to complete the pouring of concrete; S3、在浇筑板面(101)长方向两端设置各一台激光测量装备,并在其顶部设置的激光测距仪(34)和光学镜头(35)的配合下,将浇筑板面(101)的形状划分为200X200的方格网,并对每个方格网进行编号、设置其坐标,并将数据传输至终端电脑内;S3. Set up a laser measurement device at both ends of the pouring slab (101) in the long direction, and with the cooperation of the laser range finder (34) and the optical lens (35) set on the top, the pouring slab (101) ) is divided into 200X200 grids, and each grid is numbered, its coordinates are set, and the data is transmitted to the terminal computer; S4、通过终端电脑向GPS全球定位系统接收器(43)输送实时坐标信息,使得AGV小车(41)带动振捣板(45)以及高频振捣泵(46)对浇筑后的浇筑板面(101)进行一次振捣;S4. Send real-time coordinate information to the GPS global positioning system receiver (43) through the terminal computer, so that the AGV trolley (41) drives the vibrating plate (45) and the high-frequency vibrating pump (46) to the pouring slab surface (101) after pouring perform a vibration; S5、激光测量装备顶部设置的激光测距仪(34)和光学镜头(35)将会对一次振捣后的浇筑板面(101)进行实时扫描,并标记出不同类型的不合格点位,随即将上述不合格的数据信息传输至终端电脑,随后通过上述数据信息进行补料或者二次振捣。S5. The laser range finder (34) and the optical lens (35) installed on the top of the laser measurement equipment will scan the pouring slab (101) after a vibration in real time, and mark different types of unqualified points, Immediately, the above-mentioned unqualified data information is transmitted to the terminal computer, and then feeding or secondary vibration is carried out through the above-mentioned data information.
CN202211621530.9A 2022-12-16 2022-12-16 A construction method for automatic pouring and leveling of slab concrete by laser measurement Withdrawn CN115853275A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211621530.9A CN115853275A (en) 2022-12-16 2022-12-16 A construction method for automatic pouring and leveling of slab concrete by laser measurement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211621530.9A CN115853275A (en) 2022-12-16 2022-12-16 A construction method for automatic pouring and leveling of slab concrete by laser measurement

Publications (1)

Publication Number Publication Date
CN115853275A true CN115853275A (en) 2023-03-28

Family

ID=85673530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211621530.9A Withdrawn CN115853275A (en) 2022-12-16 2022-12-16 A construction method for automatic pouring and leveling of slab concrete by laser measurement

Country Status (1)

Country Link
CN (1) CN115853275A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116816096A (en) * 2023-07-11 2023-09-29 中国水利水电第八工程局有限公司 Construction terrace concrete construction leveling method
CN118600795A (en) * 2024-04-08 2024-09-06 武汉市汉阳市政建设集团有限公司 Construction method and device for ultra-long and ultra-wide continuous reinforced concrete pavement

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116816096A (en) * 2023-07-11 2023-09-29 中国水利水电第八工程局有限公司 Construction terrace concrete construction leveling method
CN118600795A (en) * 2024-04-08 2024-09-06 武汉市汉阳市政建设集团有限公司 Construction method and device for ultra-long and ultra-wide continuous reinforced concrete pavement

Similar Documents

Publication Publication Date Title
CN204435179U (en) A kind of automatic leveling head of laser and evener
CN114995452A (en) Concrete pouring path planning and control system and method for concrete conveying pump truck
CN203430003U (en) Infrared projection tile laying machine
CN108412160B (en) Robot capable of realizing plastering of building wall surfaces
CN112459437A (en) Building laser ground leveling robot
CN102433996A (en) Waffle slab construction method using SMC (sheet molding compound) as hole-leaving mold
CN110172916B (en) Bridge high pier concrete curing method
CN116352845A (en) A kind of multifunctional concrete 3D printing equipment and using method
RU2616306C1 (en) Method for construction of multistore buildings of three-dimensional blocks
CN113833020A (en) Construction method of large fish belly type inclined column structure in underground space
CN116717002A (en) Precast concrete walls, prefabricated buildings and construction methods
CN1978838A (en) Construction method for combined V-shape steel pipe concrete pile
CN220539637U (en) Concrete spraying trowelling trolley for tunnel primary support
CN207082019U (en) A kind of unmanned plane projects actinobacillus device
CN104153324B (en) A kind of scraper type canal slope filter sand bed course paves compacting machine
CN112049386B (en) Ground leveling system
CN109281320A (en) Sprayed concrete sliding film construction device and method for leveling layer construction of foundation pit side wall
CN203462765U (en) Floor flatness control system of large-area concrete building
CN119572017A (en) Intelligent vibrating equipment for building machine top mold platform and construction method
CN107675867A (en) High-precision leveling unit for floor leveling
CN101812919B (en) Multi-directional wall surface plastering machine
CN213710422U (en) Concrete Laser Leveling Machine
CN117988558A (en) A concrete robot collaborative construction method
CN201671085U (en) Slope building machine
CN209742385U (en) Simple and easy distributing device of high-rise concrete placement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20230328