CN115818393A - Elevator guide rail installation auxiliary frame - Google Patents
Elevator guide rail installation auxiliary frame Download PDFInfo
- Publication number
- CN115818393A CN115818393A CN202310007342.5A CN202310007342A CN115818393A CN 115818393 A CN115818393 A CN 115818393A CN 202310007342 A CN202310007342 A CN 202310007342A CN 115818393 A CN115818393 A CN 115818393A
- Authority
- CN
- China
- Prior art keywords
- guide rail
- plate
- sliding
- clamping
- sliding arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
本发明涉及电梯导轨辅助安装设备领域,公开了电梯导轨安装辅助架,包括:设置在轿厢顶板上表面的支撑架,支撑架包括沿前后方向设置的支撑杆;分别设置在导轨前后两侧的两个滑动臂,滑动臂的一端与支撑杆滑动连接;用于限制滑动臂的一端沿支撑杆滑动位移的限位组件;以及与滑动臂一一对应设置的夹持组件,夹持组件与滑动臂的另一端固定连接,夹持组件用于夹持导轨。本发明减少现有技术中施工过程,能够实现导轨一次性安装定位问题,从而提升了电梯导轨的安装效率。
The invention relates to the field of elevator guide rail auxiliary installation equipment, and discloses an elevator guide rail installation auxiliary frame. Two sliding arms, one end of the sliding arm is slidably connected with the support rod; a limiting component for limiting the sliding displacement of one end of the sliding arm along the supporting rod; and a clamping component corresponding to the sliding arm, the clamping component and the sliding The other end of the arm is fixedly connected, and the clamping assembly is used to clamp the guide rail. The invention reduces the construction process in the prior art, and can realize the one-time installation and positioning problem of the guide rail, thereby improving the installation efficiency of the elevator guide rail.
Description
技术领域technical field
本发明涉及电梯导轨辅助安装设备领域,特别是涉及电梯导轨安装辅助架。The invention relates to the field of elevator guide rail auxiliary installation equipment, in particular to an elevator guide rail installation auxiliary frame.
背景技术Background technique
一部电梯的导轨一般采用分段安装的方式,导轨的尺寸和位置需要严格按照图纸进行施工,并且导轨之间需要保持平行,整体的误差要求非常严格,否则会影响电梯正常运行以及电梯寿命,并且有可能带来安全隐患。The guide rails of an elevator are generally installed in sections. The size and position of the guide rails need to be constructed in strict accordance with the drawings, and the guide rails must be kept parallel. The overall error requirements are very strict, otherwise it will affect the normal operation of the elevator and the life of the elevator. And it may bring security risks.
现有的电梯导轨安装的常见的方法为,首先在电梯井内利用膨胀螺栓安装导轨支架,然后在导轨支架上安装导轨,导轨利用校导尺进行校正。电梯导轨校导尺是一种用于校正电梯导轨的工具,在传统的电梯安装流程中往往需要使用电梯导轨校导尺来校正电梯导轨的垂直度、轨道距离以及扭斜度,在使用过程中需要先搭设脚手架,利用脚手架作为一个安装平台进行安装及校正导轨,但是利用电梯导轨校导尺校正导轨的方式无法实现将导轨一次性安装定位,需要通过铁锤等工具反复敲导轨支架来调整导轨的位置,施工过程非常繁琐,安装效率低下。The common method that existing elevator guide rail is installed is, at first utilizes expansion bolt to install guide rail bracket in elevator well, then guide rail is installed on guide rail bracket, and guide rail utilizes calibration guide ruler to correct. The elevator guide rail calibration guide is a tool used to correct the elevator guide rail. In the traditional elevator installation process, it is often necessary to use the elevator guide rail calibration guide to correct the verticality, track distance and skew of the elevator guide rail. During use Scaffolding needs to be set up first, and the scaffolding should be used as an installation platform to install and correct the guide rails. However, the method of calibrating the guide rails by using the elevator guide rails to correct the guide rails cannot realize the one-time installation and positioning of the guide rails. It is necessary to repeatedly tap the guide rail brackets with tools such as hammers to adjust the guide rails. location, the construction process is very cumbersome and the installation efficiency is low.
鉴于以上情况,如何解决现有技术中施工过程繁琐,无法实现将导轨一次性安装定位及安装效率低下的问题,成为本领域技术人员亟需解决的技术问题。In view of the above, how to solve the problems of cumbersome construction process in the prior art, the inability to realize one-time installation and positioning of the guide rail, and low installation efficiency have become technical problems urgently needed to be solved by those skilled in the art.
发明内容Contents of the invention
本发明为克服上述情况不足,旨在提供电梯导轨安装辅助架,以减少现有技术中施工过程,能够实现导轨一次性安装定位问题,从而提升了电梯导轨的安装效率。In order to overcome the above disadvantages, the present invention aims to provide an auxiliary frame for elevator guide rail installation, so as to reduce the construction process in the prior art and realize the one-time installation and positioning of the guide rail, thereby improving the installation efficiency of the elevator guide rail.
为了能够达到上述目的,本发明的技术方案是:电梯导轨安装辅助架,包括:In order to achieve the above object, the technical solution of the present invention is: the elevator guide rail installation auxiliary frame, comprising:
设置在轿厢顶板上表面的支撑架,所述支撑架包括沿前后方向设置的支撑杆;A support frame arranged on the upper surface of the car roof, the support frame includes support rods arranged along the front and rear directions;
分别设置在导轨前后两侧的两个滑动臂,所述滑动臂的一端与所述支撑杆滑动连接;Two sliding arms respectively arranged on the front and rear sides of the guide rail, one end of the sliding arms is slidingly connected to the support rod;
用于限制所述滑动臂的一端沿所述支撑杆滑动位移的限位组件;a limiting assembly for limiting the sliding displacement of one end of the sliding arm along the supporting rod;
以及与所述滑动臂一一对应设置的夹持组件,所述夹持组件与所述滑动臂的另一端固定连接,所述夹持组件用于夹持所述导轨。And a clamping assembly corresponding to the sliding arm one by one, the clamping assembly is fixedly connected with the other end of the sliding arm, and the clamping assembly is used to clamp the guide rail.
进一步地,所述夹持组件包括:Further, the clamping assembly includes:
截面为“匚”形的夹持框架,所述夹持框架包括顺次固定连接的夹持板、中间侧板和固定板,所述夹持板和固定板相对设置,所述中间侧板与所述滑动臂的另一端固定连接;A clamping frame with a "匚"-shaped section, the clamping frame includes a clamping plate, a middle side plate and a fixing plate fixedly connected in sequence, the clamping plate and the fixing plate are arranged oppositely, and the middle side plate and the fixing plate are arranged oppositely. The other end of the sliding arm is fixedly connected;
以及设置在所述夹持板和固定板之间的活动板,所述活动板与夹持板相互配合用于夹持所述导轨的调节面。And a movable plate arranged between the clamping plate and the fixed plate, the movable plate cooperates with the clamping plate to clamp the adjustment surface of the guide rail.
进一步地,所述夹持板和活动板的相对面上均设置有滚珠,所述夹持板和活动板配合夹持所述导轨的调节面时,所述夹持板和活动板的相对面上的所述滚珠与所述导轨的调节面滑动连接。Further, balls are arranged on the opposite surfaces of the clamping plate and the movable plate, and when the clamping plate and the movable plate cooperate to clamp the adjustment surface of the guide rail, the opposite surfaces of the clamping plate and the movable plate The balls on the guide rail are slidingly connected with the adjustment surface of the guide rail.
进一步地,所述固定板靠近所述导轨的侧面设置有所述滚珠Further, the side of the fixed plate close to the guide rail is provided with the ball
进一步地,所述滚珠贯穿设置有滚针,所述滚珠和滚针转动连接,所述滚针沿水平方向贯穿所述滚珠的球心设置,所述夹持板、活动板和固定板内均嵌设安装所述滚针的两端,所述滚珠均凸出于所述夹持板、活动板和固定板设置。Further, the ball is penetrated by a needle roller, the ball and the needle are rotatably connected, and the needle is arranged through the center of the ball in the horizontal direction, the clamping plate, the movable plate and the fixed plate are all The two ends of the needle rollers are embedded and installed, and the balls protrude from the clamping plate, the movable plate and the fixed plate.
进一步地,所述活动板靠近所述中间侧板的一端设置有滑块,所述中间侧板靠近活动板的表面设置有沿左右方向设置的滑槽,所述滑块与滑槽滑动连接,所述固定板上螺纹连接有第一螺栓,所述第一螺栓朝向所述活动板方向延伸设置。Further, a slider is provided at one end of the movable plate close to the middle side plate, and a chute arranged along the left and right direction is arranged on the surface of the middle side plate close to the movable plate, and the slider is slidably connected with the chute, A first bolt is threaded on the fixed plate, and the first bolt is extended toward the movable plate.
进一步地,所述滑动臂包括第一滑动臂和第二滑动臂,所述第一滑动臂沿左右方向设置,所述第一滑动臂的一端与所述支撑杆滑动连接,所述第一滑动臂的另一端与第二滑动臂的一端固定连接,所述第二滑动臂沿前后方向设置,所述第二滑动臂的另一端与所述中间侧板远离所述活动板的表面固定连接。Further, the sliding arm includes a first sliding arm and a second sliding arm, the first sliding arm is arranged along the left-right direction, one end of the first sliding arm is slidably connected to the support rod, and the first sliding arm The other end of the arm is fixedly connected with one end of the second sliding arm, the second sliding arm is arranged along the front-rear direction, and the other end of the second sliding arm is fixedly connected with the surface of the middle side plate away from the movable plate.
进一步地,所述限位组件包括:Further, the limit assembly includes:
设置在两所述第一滑动臂之间的两个限位块,两个所述限位块套设在所述支撑杆周侧且与所述支撑杆滑动连接;Two limit blocks arranged between the two first sliding arms, the two limit blocks are sleeved on the peripheral side of the support rod and slidably connected with the support rod;
与所述限位块一一对应螺纹连接的第二螺栓,所述第二螺栓能够贯穿所述限位块与所述支撑杆抵接;A second bolt that is threadedly connected to the limiting block one by one, and the second bolt can pass through the limiting block and abut against the support rod;
以及第三螺栓和螺母,所述第三螺栓贯穿两所述第一滑动臂螺纹连接有所述螺母。And a third bolt and a nut, the third bolt runs through the two first sliding arms and is threadedly connected with the nut.
进一步地,所述支撑架还包括:Further, the support frame also includes:
两个立杆,两个所述立杆的上端分别与所述支撑杆的两端固定连接;Two vertical rods, the upper ends of the two vertical rods are respectively fixedly connected to the two ends of the support rod;
以及与两所述立杆一一对应设置的两个横杆,所述横杆的一端与所述立杆的下端固定连接,所述横杆的另一端与所述轿厢顶板上表面可拆卸连接。And two cross bars corresponding to the two vertical bars one by one, one end of the cross bar is fixedly connected to the lower end of the vertical bar, and the other end of the cross bar is detachable from the upper surface of the car roof. connect.
进一步地,所述导轨设置在两所述横杆之间,且所述支撑杆设置在所述导轨远离所述轿厢的一侧,多个所述导轨对称设置在所述轿厢左右两侧,且多个所述导轨与所述轿厢滑动连接。Further, the guide rail is arranged between the two cross bars, and the support rod is arranged on the side of the guide rail away from the car, and a plurality of the guide rails are symmetrically arranged on the left and right sides of the car , and a plurality of guide rails are slidingly connected with the car.
本发明与现有技术相比至少具有以下优点:Compared with the prior art, the present invention has at least the following advantages:
使用时,依据传统的安装方法完成第一根导轨的安装过程,并在第一根导轨上安装轿厢,并通过钢丝绳与机房的滑轮连接,然后在轿厢上方安装本发明电梯导轨安装辅助架,在保证轿厢与已安装完成的导轨上滑动的前提下上提轿厢,配合使用限位组件并利用夹持组件对上方待安装导轨进行夹持,实现了导轨安装位置的固定过程,此时无需对导轨反复调整,即可实现导轨的一次性定位过程,此时可进行导轨支架与导轨之间的固定工作,重复上述操作即可实现导轨的安装过程,整个过程无需搭建设手架,工作人员可在轿厢顶部实现对导轨安装过程,减少了施工步骤,且整个过程无需反复校正导轨的位置,能够实现一次性定位,提高了施工效率。When in use, complete the installation process of the first guide rail according to the traditional installation method, and install the car on the first guide rail, and connect it with the pulley of the machine room through a steel wire rope, and then install the elevator guide rail installation auxiliary frame of the present invention above the car , under the premise of ensuring that the car slides on the installed guide rail, lift the car, cooperate with the use of the limit component and use the clamping component to clamp the upper guide rail to be installed, and realize the fixing process of the guide rail installation position. The one-time positioning process of the guide rail can be realized without repeated adjustment of the guide rail. At this time, the fixing work between the guide rail bracket and the guide rail can be carried out. The installation process of the guide rail can be realized by repeating the above operation. The whole process does not need to build a hand frame. The staff can realize the installation process of the guide rail on the top of the car, reducing the construction steps, and the whole process does not need to repeatedly correct the position of the guide rail, which can realize one-time positioning and improve the construction efficiency.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings required in the embodiments. Obviously, the accompanying drawings in the following description are only some of the present invention. Embodiments, for those of ordinary skill in the art, other drawings can also be obtained according to these drawings without paying creative labor.
图1为本发明电梯导轨安装辅助架使用状态效果图;Fig. 1 is the effect diagram of the use state of the elevator guide rail installation auxiliary frame of the present invention;
图2为本发明图1中A区域的局部放大图;Fig. 2 is the partially enlarged view of A region in Fig. 1 of the present invention;
图3为本发明电梯导轨安装辅助架整体结构示意图;Fig. 3 is a schematic diagram of the overall structure of the elevator guide rail installation auxiliary frame of the present invention;
图4为本发明夹持组件的结构示意图;Fig. 4 is a schematic structural view of the clamping assembly of the present invention;
图5为本发明夹持组件另一方向的结构示意图。Fig. 5 is a structural schematic diagram of another direction of the clamping assembly of the present invention.
附图标记:1、支撑杆;2、立杆;3、横杆;4、第一滑动臂;5、第二滑动臂;6、夹持板;7、中间侧板;8、固定板;9、活动板;10、滚珠;11、滚针;12、滑块;13、滑槽;14、第一螺栓;15、限位块;16、第二螺栓;17、第三螺栓;18、第四螺栓;19、导轨;20、轿厢;21、滑轮;22、驱动电机。Reference signs: 1. Support rod; 2. Vertical rod; 3. Cross bar; 4. First sliding arm; 5. Second sliding arm; 6. Clamping plate; 7. Middle side plate; 8. Fixed plate; 9. movable plate; 10. ball; 11. needle roller; 12. slider; 13. chute; 14. first bolt; 15. limit block; 16. second bolt; 17. third bolt; 18. The fourth bolt; 19, guide rail; 20, car; 21, pulley; 22, driving motor.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
为使本发明的上述目的、特征和优点能够更加明显易懂,下面结合附图和具体实施方式对本发明作进一步详细的说明。In order to make the above objects, features and advantages of the present invention more comprehensible, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
参照图1-3,本发明提供了电梯导轨安装辅助架,应用于电梯的T形导轨19的辅助安装,导轨19包括沿前后方向设置的调节面,调节面用于与导轨支架之间固定,导轨19还设置有沿左右方向延伸的夹紧面,夹紧面用于与轿厢20滑动连接。Referring to Figures 1-3, the present invention provides an elevator guide rail installation auxiliary frame, which is applied to the auxiliary installation of the T-shaped
本发明具体包括支撑架、滑动臂、限位组件和夹持组件。其中,支撑架设置在轿厢20顶板上表面,支撑架包括支撑杆1、两个立杆2和两个横杆3,支撑杆1沿前后方向设置,支撑杆1的两端分别与两个立杆2的上端固定连接,两个横杆3与两个立杆2一一对应设置,横杆3的一端与立杆2的下端固定连接,横杆3的另一端与轿厢20顶板上表面可拆卸连接。具体地,横杆3的另一端开设有安装孔,安装孔内安装有第四螺栓18,第四螺栓18贯穿安装孔与轿厢20顶板可拆卸连接,安装孔的尺寸大于第四螺栓18的螺杆直径,通过对安装孔与第四螺栓18的接触位置调整可实现两个横杆3沿左右方向位置调整。The invention specifically includes a support frame, a sliding arm, a limiting component and a clamping component. Wherein, the support frame is arranged on the top surface of the
两个滑动臂分别设置在导轨19前后两侧,滑动臂的一端与支撑杆1滑动连接,滑动臂的另一端与夹持组件固定连接。具体地,滑动臂包括一一对应设置的第一滑动臂4和第二滑动臂5,第一滑动臂4沿左右方向设置,第二滑动臂5沿前后方向设置,第一滑动臂4的一端与支撑杆1滑动连接,第一滑动臂4的另一端与第二滑动臂5的一端固定连接,第二滑动臂5的另一端与夹持组件固定连接。Two sliding arms are respectively arranged on the front and rear sides of the
限位组件用于限制第一滑动臂4的一端沿支撑杆1滑动位移。具体地,限位组件包括限位块15、第二螺栓16和第三螺栓17,限位块15的数量为两个,两个限位块15设置在两个第一滑动臂4之间,两个限位块15套设在支撑杆1周侧且与支撑杆1滑动连接,限位块15上一一对应安装有第二螺栓16,第二螺栓16能够贯穿限位块15且与支撑杆1抵接,沿靠近支撑杆1的方向旋转第二螺栓16使得第二螺栓16与支撑杆1相抵,此时相对应的限位块15将无法沿支撑杆1延伸方向位移,即限位块15与支撑杆1之间保持相对静止的位置关系,第三螺栓17贯穿两个第一滑动臂4设置,第三螺栓17贯穿两个第一滑动臂4螺纹连接有螺母。使用时通过沿靠近支撑杆1的方向旋转第二螺栓16,使得两个限位块15与支撑杆1保持相对静止,通过调整螺母位置使得两个第一滑动臂4相互靠近,并运动到与限位块15抵接,能够实现第一滑动臂4相对于轿厢20处于静止状态,从而实现第一滑动臂4的位置固定过程。反之解除螺母的锁定,或沿远离支撑杆1的方向旋转第二螺栓16,能够实现第一滑动臂4的位置调整工程。The limit assembly is used to limit the sliding displacement of one end of the first sliding
结合参照图4-5,夹持组件与第二滑动臂5的另一端固定连接,夹持组件用于夹持导轨19。具体地,夹持组件包括夹持框架和活动板9。夹持框架的截面为“匚”形,夹持框架包括顺次固定连接的夹持板6、中间侧板7和固定板8,夹持板6和固定板8相对设置,中间侧板7与第二滑动臂5的另一端固定连接,活动板9设置在夹持板6和固定板8之间,活动板9与夹持板6相互配合用于夹持导轨19的调节面,沿前后方向相对设置的两个固定板8用于夹持导轨19的夹紧面。Referring to FIGS. 4-5 , the clamping assembly is fixedly connected to the other end of the second sliding
可选地,夹持板6和活动板9的相对面上设置有滚珠10,滚珠10的数量为多个,夹持板6和活动板9的相对面上均以矩形阵列的方式分布多个滚珠10,在夹持板6和活动板9配合夹持导轨19的调节面时,滚珠10与导轨19的调节面滑动连接。Optionally,
此外,固定板8靠近导轨19的侧面也设置有滚珠10,固定板8上设置有一列滚珠10。沿前后方向相对设置的两个固定板8夹持导轨19的夹紧面时,固定板8上的滚珠10与导轨的夹紧面滑动连接。In addition,
可选地,滚珠10贯穿设置有滚针11,滚珠10与滚针11转动连接,滚针11沿水平方向贯穿滚珠10的球心设置,夹持板6、活动板9和固定板8均嵌设安装滚针11的两端,滚珠10均凸出于夹持板6、活动板9和固定板8设置。这样的设计可以保证在夹持板6和活动板9共同夹持导轨19的调节面时,夹持板6和活动板9能够且仅沿竖直方向与导轨19的调节面发生相对滑动;沿前后方向相对设置的两个固定板8夹持导轨19的夹紧面时,固定板8上的滚珠10与导轨的夹紧面能够发生相对滑动。Optionally, a
优选地,活动板9靠近中间侧板7的一端设置有滑块12,中间侧板7靠近活动板9的表面设置有沿左右方向设置的滑槽13,滑块12与滑槽13滑动连接,固定板8上螺纹连接由第一螺栓14,第一螺栓14朝向活动板9方向延伸设置。第一螺栓14的数量给多个,多个第一螺栓14成矩形阵列方式与固定板8螺纹连接。沿靠近夹持板6方向旋转第一螺栓14,第一螺栓14将推动活动板9朝向夹持板6方向移动。Preferably, the
本发明中,导轨19设置在轿厢20左右两侧,且导轨19与轿厢20滑动连接。且导轨19设置在两横杆3之间,且支撑杆1设置在导轨19远离轿厢20的一侧。In the present invention, the guide rails 19 are arranged on the left and right sides of the
本发明电梯导轨安装辅助架使用过程:The use process of the elevator guide rail installation auxiliary frame of the present invention:
首先,依据传统导轨19安装的施工方法分别安装完成轿厢20左右两侧的第一根导轨19,即完成最低处的两个第一根导轨19安装过程,当第一根导轨19安装完成后,将轿厢20安装到第一根导轨19上,轿厢20安装完成后通过钢丝绳(图中未示出)与机房的滑轮21连接,滑轮21与机房的驱动电机22传动连接。First, the
其次,将本发明电梯导轨安装辅助架进行初步组装,在轿厢20的顶部安装本发明电梯导轨安装辅助架,通过调整轿厢20的高度,保证支撑杆1位于第一根导轨19相对应的所有导轨支架的上方,安装横杆3时,应保证导轨19的调节面位于活动板9和夹持板6之间,且使得夹持板6上的滚珠10与第一根导轨19的调节面相抵。通过调整第一滑动臂4的位置实现固定板8上的滚珠10与第一根导轨19的夹紧面抵接,此时,沿靠近支撑杆1的方向旋转第二螺栓16实现限位块15的定位,通过调整螺母位置使得两个第一滑动臂4相互靠近,实现对第一滑动臂4位置的调整。Secondly, the elevator guide rail installation auxiliary frame of the present invention is initially assembled, and the elevator guide rail installation auxiliary frame of the present invention is installed on the top of the
再次,向上移动轿厢20,保证轿厢20与第一根导轨19滑动连接,且保证支撑杆1位于第二根导轨19的活动架上方,调整螺母位置解除第三螺栓17对第一滑动臂4的限位,通过吊装的方式使第二根导轨19放置在第一根导轨19的正上方,通过再次调整螺母位置恢复第三螺栓17对第一滑动臂4的限位,使得两个固定板8相互靠近第二根导轨19的夹紧面实现对第二根导轨19前后方向限位;通过旋拧第一螺栓14使活动板9靠近夹持板6运动,进一步地使得活动板9与夹持板6共同夹持第二根导轨19的调节面,从而实现对第二根导轨左右方向的限位;此时实现了第二根导轨19的一次性定位过程,可以对第二根导轨19与相对应最低处导轨支架进行固定,继续上提轿厢20,滚珠10与第二根导轨19的调节面相对滑动,可实现第二根导轨19与其对应其他导轨支架之间的固定工作。Again, move the
当安装第三根导轨19时,调整螺母位置解除第三螺栓17对第一滑动臂4的限位,沿远离夹持板6方向旋转第一螺栓14并控制活动板9远离夹持板6运动,手动拨动活动板9远离夹持板6运动,并将第三根导轨19吊装至第二根导轨19的上方,通过再次调整螺母位置恢复第三螺栓17对第一滑动臂4的限位,使得两个固定板8相互靠近第三根导轨19的调夹紧面实现对第二根导轨19前后方向限位;通过旋拧第一螺栓14使活动板9靠近夹持板6运动,进一步地使得活动板9与夹持板6共同夹持第三根导轨19的调节面,从而实现对第三根导轨19左右方向的限位;此时实现了第三根导轨19的一次性定位过程,通过上提轿厢20,可实现第三根导轨19与导轨支架之间的固定。重复上述操作,即可完成其余导轨19的安装过程。When installing the
应当说明的是立杆2的长度应大于竖直方向上相邻两个导轨支架之间的距离,且导轨支架与导轨19之间安装时,导轨支架应位于支撑杆1的下方,否则将影响轿厢20的上升过程。It should be noted that the length of the
本发明在第一根导轨19安装完成后,工作人员仅需站在轿厢20上方即可完成其他导轨19的安装过程,期间无需搭设脚手架,减少了工作步骤,提高了工作效率,利用两个中间侧板7实现对导轨19前后方向的夹持,利用活动板9和夹持板6实现对导轨19左右方向的夹持,无需通过敲击的方式调整导轨19的位置,能够实现一次性定位过程,且同一根的导轨19与导轨支架安装过程中无需调整活动板9和第一滑动臂4的位置,提高了施工过程中的便捷性,安装效率得到有效提升。In the present invention, after the installation of the
在本发明的描述中,需要理解的是,术语“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In describing the present invention, it should be understood that the terms "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", "vertical", The orientations or positional relationships indicated by "horizontal", "top", "bottom", "inner", "outer", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention, rather than indicating or It should not be construed as limiting the invention by implying that a referenced device or element must have a particular orientation, be constructed, and operate in a particular orientation.
以上所述的实施例仅是对本发明的优选方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通技术人员对本发明的技术方案做出的各种变形和改进,均应落入本发明权利要求书确定的保护范围内。The above-mentioned embodiments are only to describe the preferred mode of the present invention, not to limit the scope of the present invention. Without departing from the design spirit of the present invention, those skilled in the art may make various Variations and improvements should fall within the scope of protection defined by the claims of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310007342.5A CN115818393A (en) | 2023-01-04 | 2023-01-04 | Elevator guide rail installation auxiliary frame |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310007342.5A CN115818393A (en) | 2023-01-04 | 2023-01-04 | Elevator guide rail installation auxiliary frame |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN115818393A true CN115818393A (en) | 2023-03-21 |
Family
ID=85520087
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310007342.5A Pending CN115818393A (en) | 2023-01-04 | 2023-01-04 | Elevator guide rail installation auxiliary frame |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115818393A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119660512A (en) * | 2025-02-21 | 2025-03-21 | 四川迪斯卡电梯制造有限公司 | Elevator installation device convenient to loading and unloading |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05278968A (en) * | 1992-04-03 | 1993-10-26 | Hitachi Ltd | Elevator guide rail centering device and method thereof |
| JPH08245116A (en) * | 1995-03-14 | 1996-09-24 | Toshiba Corp | Elevator installation method |
| US20160311659A1 (en) * | 2015-04-23 | 2016-10-27 | Kone Corporation | Method and an arrangement for installing elevator guide rails |
| CN109987478A (en) * | 2019-04-18 | 2019-07-09 | 湖南电气职业技术学院 | A kind of auxiliary positioning system and method for elevator guide rail bracket installation |
| CN110304518A (en) * | 2018-03-20 | 2019-10-08 | 株式会社日立大厦系统 | Rail fixing device, guide rail installation system and the guide rail installation method of elevator |
| CN211102826U (en) * | 2019-11-27 | 2020-07-28 | 昆山根伟精密模具有限公司 | Positioning fixture is used in processing of zinc-aluminum alloy article |
| CN114455429A (en) * | 2022-02-21 | 2022-05-10 | 无锡瑞吉德机械有限公司 | Device for measuring straightness of elevator guide rail and automatically calibrating straightness of elevator guide rail and application of device |
| CN217322941U (en) * | 2022-01-20 | 2022-08-30 | 江苏菱智电梯制造有限公司 | Positioning device for installation of multifunctional elevator |
| CN218114708U (en) * | 2022-08-24 | 2022-12-23 | 安徽静秋加装电梯工程有限公司 | Mounting bracket for main rail of elevator |
-
2023
- 2023-01-04 CN CN202310007342.5A patent/CN115818393A/en active Pending
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05278968A (en) * | 1992-04-03 | 1993-10-26 | Hitachi Ltd | Elevator guide rail centering device and method thereof |
| JPH08245116A (en) * | 1995-03-14 | 1996-09-24 | Toshiba Corp | Elevator installation method |
| US20160311659A1 (en) * | 2015-04-23 | 2016-10-27 | Kone Corporation | Method and an arrangement for installing elevator guide rails |
| CN106064800A (en) * | 2015-04-23 | 2016-11-02 | 通力股份公司 | For installing method and the facility of cage guide |
| CN110304518A (en) * | 2018-03-20 | 2019-10-08 | 株式会社日立大厦系统 | Rail fixing device, guide rail installation system and the guide rail installation method of elevator |
| CN109987478A (en) * | 2019-04-18 | 2019-07-09 | 湖南电气职业技术学院 | A kind of auxiliary positioning system and method for elevator guide rail bracket installation |
| CN211102826U (en) * | 2019-11-27 | 2020-07-28 | 昆山根伟精密模具有限公司 | Positioning fixture is used in processing of zinc-aluminum alloy article |
| CN217322941U (en) * | 2022-01-20 | 2022-08-30 | 江苏菱智电梯制造有限公司 | Positioning device for installation of multifunctional elevator |
| CN114455429A (en) * | 2022-02-21 | 2022-05-10 | 无锡瑞吉德机械有限公司 | Device for measuring straightness of elevator guide rail and automatically calibrating straightness of elevator guide rail and application of device |
| CN218114708U (en) * | 2022-08-24 | 2022-12-23 | 安徽静秋加装电梯工程有限公司 | Mounting bracket for main rail of elevator |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119660512A (en) * | 2025-02-21 | 2025-03-21 | 四川迪斯卡电梯制造有限公司 | Elevator installation device convenient to loading and unloading |
| CN119660512B (en) * | 2025-02-21 | 2025-04-25 | 四川迪斯卡电梯制造有限公司 | Elevator installation device convenient to loading and unloading |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN114892998B (en) | Prefabricated building wall installation device and use method thereof | |
| CN110306776B (en) | Lifting platform for high-rise building elevator shaft construction | |
| CN113460842B (en) | Reconfigurable robot system for automatic installation of elevator guide rails | |
| CN115818393A (en) | Elevator guide rail installation auxiliary frame | |
| CN116397895A (en) | A kind of prefabricated wall hoisting construction method | |
| CN220664639U (en) | Prefabricated Liang Yongdiao fixture | |
| CN112091535A (en) | Processing method of curved curtain wall plate | |
| CN220487145U (en) | Construction reinforcement cage equipment, gesture adjustment and lifting operation equipment | |
| CN219471557U (en) | Building engineering template fixing device | |
| CN213774549U (en) | Steel bar positioning frame erecting device | |
| CN117303255A (en) | Hoisting device for steel structure installation | |
| CN111254844B (en) | A bridge pier column rectification and reset device and rectification and reset method | |
| CN119349392B (en) | Automatic lifting device for crane arm support | |
| CN221937206U (en) | A water drill fixing frame | |
| CN222362779U (en) | A steel structure pre-tensioning member with bidirectional adjustment | |
| CN217999059U (en) | Floor beam reinforcing structure | |
| CN120844803B (en) | Superimposed sheet positioning assembly and fabricated building superimposed sheet construction equipment and method | |
| CN220364260U (en) | Track center alignment device | |
| CN217054244U (en) | High-stability construction support frame for building technology | |
| CN221799178U (en) | A building formwork support frame | |
| CN220011857U (en) | Steel construction lifting device | |
| CN217912943U (en) | Positioning and punching device for machining steel structure | |
| CN222361797U (en) | A steel structure profile lifting device | |
| CN223592287U (en) | A detachable and mobile lifting device | |
| CN222478145U (en) | Building engineering template fixing device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |