CN115773405A - Pipeline installation structure and construction method thereof - Google Patents

Pipeline installation structure and construction method thereof Download PDF

Info

Publication number
CN115773405A
CN115773405A CN202211471635.0A CN202211471635A CN115773405A CN 115773405 A CN115773405 A CN 115773405A CN 202211471635 A CN202211471635 A CN 202211471635A CN 115773405 A CN115773405 A CN 115773405A
Authority
CN
China
Prior art keywords
clamping block
screw rod
transmission screw
installation structure
pipelines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211471635.0A
Other languages
Chinese (zh)
Other versions
CN115773405B (en
Inventor
何杰义
朱崴
杨文瀚
袁黄峻
刘阳
刘恒杰
唐超
李赟
陈星�
吴光辉
高维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202211471635.0A priority Critical patent/CN115773405B/en
Publication of CN115773405A publication Critical patent/CN115773405A/en
Application granted granted Critical
Publication of CN115773405B publication Critical patent/CN115773405B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Supports For Pipes And Cables (AREA)
  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

本发明涉及一种管道安装结构,供连接两根管道,包括:底板;位置可调的安装于所述底板两端的两个移动底座;以及安装于所述移动底座的夹具,两个所述管道分别夹设于两个所述夹具,通过移动调节两个所述移动底座之间的相对距离,以使得两个所述管道的对应的端部相贴合。

Figure 202211471635

The invention relates to a pipeline installation structure for connecting two pipelines, comprising: a base plate; two movable bases installed at both ends of the base plate with adjustable positions; and a clamp installed on the movable base, the two pipelines The two clamps are clamped respectively, and the relative distance between the two moving bases is adjusted by moving, so that the corresponding ends of the two pipes fit together.

Figure 202211471635

Description

一种管道安装结构及其施工方法A pipeline installation structure and its construction method

技术领域technical field

本发明涉及建筑给排水技术领域,特指一种管道安装结构及其施工方法。The invention relates to the technical field of building water supply and drainage, in particular to a pipeline installation structure and a construction method thereof.

背景技术Background technique

在建筑给排水工程中需要对给排水的管道进行对接安装,而现有的对接安装方式普遍通过手持拉动或者夹具固定其中一个管道,使两个管道进行对接安装,在实际的使用过程中,时常会出现由于管道太大,施工人员无法很好的控制,而出现管道对接出现误差,且通常的管道为圆柱形,在没有合适的抓取点位时,经常会由于人工搬运的过程中而使管道转动,在具体定位时,需要重新去转动管道以拼合管道,现如今为了保证排水工程中管道的质量,管道的材质大多为金属或混凝土材质,人力很难去搬动上述的安装方式不仅不方便且对管道进行定位锁紧要求繁琐,同时不方便按安装所需进行拼合,导致管道安装精度较低。In building water supply and drainage projects, it is necessary to connect and install the water supply and drainage pipes. However, the existing docking installation methods generally use hand-held pulling or fixtures to fix one of the pipes, so that the two pipes can be docked and installed. In the actual use process, often Due to the large size of the pipe, the construction personnel cannot control it very well, and there will be errors in the butt joint of the pipe, and the usual pipe is cylindrical. When there is no suitable grabbing point, it is often caused by manual handling. When the pipe is rotated, it is necessary to re-rotate the pipe to join the pipe in the specific positioning. Nowadays, in order to ensure the quality of the pipe in the drainage project, the material of the pipe is mostly metal or concrete, and it is difficult for manpower to move the above installation method. It is convenient and requires cumbersome positioning and locking of the pipeline, and it is inconvenient to assemble according to the installation requirements, resulting in low installation accuracy of the pipeline.

发明内容Contents of the invention

本发明的目的在于克服现有技术的缺陷,提供一种管道安装结构及其施工方法,通过将处于两端的管道分别固定于两个所述夹具上,将所述移动底座向着底板的中心位置移动,以结合两个所述管道首尾。The purpose of the present invention is to overcome the defects of the prior art, and provide a pipeline installation structure and its construction method, by fixing the pipelines at both ends on the two clamps respectively, and moving the moving base towards the center of the bottom plate , to combine the two said pipes end to end.

实现上述目的的技术方案是:一种管道安装结构,供连接两根管道,包括:The technical solution for achieving the above purpose is: a pipeline installation structure for connecting two pipelines, comprising:

底板;floor;

位置可调的安装于所述底板两端的两个移动底座;以及two movable bases adjustable in position mounted on both ends of said floor; and

安装于所述移动底座的夹具,两个所述管道分别夹设于两个所述夹具,通过移动调节两个所述移动底座之间的相对距离,以使得两个所述管道的对应的端部相贴合。The fixture installed on the mobile base, the two pipes are respectively clamped on the two fixtures, and the relative distance between the two mobile bases is adjusted by moving so that the corresponding ends of the two pipes The parts fit together.

进一步的,还包括:转动安装于所述底板的顶面的传动螺杆,两个所述移动底座螺合于所述传动螺杆,通过转动所述传动螺杆,使得两个所述移动底座靠近,并带动两个所述管道的对应的端部相贴合。Further, it also includes: rotating the transmission screw installed on the top surface of the bottom plate, the two mobile bases are screwed to the transmission screw, and by rotating the transmission screw, the two mobile bases are close to each other, and Drive the corresponding ends of the two pipes to fit together.

进一步的,所述移动底座包括:Further, the mobile base includes:

相对设置于所述传动螺杆两侧的第一夹持块和第二夹持块,所述第一夹持块的顶部部分延伸于所述第二夹持块的顶部形成了延伸段,所述夹具固定安装于所述第一夹持块的延伸段;Relative to the first clamping block and the second clamping block arranged on both sides of the drive screw, the top part of the first clamping block extends from the top of the second clamping block to form an extension section, the The clamp is fixedly installed on the extension section of the first clamping block;

开设于所述第一夹持块的侧部且对应所述传动螺杆设置的第一螺纹槽;以及a first thread groove provided on the side of the first clamping block and corresponding to the drive screw; and

开设于所述第二夹持块的侧部且对应所述传动螺杆设置的第二螺纹槽,所述第一螺纹槽和所述第二螺纹槽相拼合形成容置空间,所述传动螺杆螺合于所述容置空间。The second thread groove provided on the side of the second clamping block and corresponding to the transmission screw, the first thread groove and the second thread groove are combined to form an accommodation space, and the transmission screw screw suitable for the accommodating space.

进一步的,还包括:Further, it also includes:

开设于所述第二夹持块的侧壁的连接孔、开设于所述第一夹持块的靠近所述第二夹持块的一侧且对应所述连接孔开设的设置孔以及供螺合于所述连接孔和所述设置孔的固定螺杆,The connecting hole opened on the side wall of the second clamping block, the setting hole opened on the side of the first clamping block close to the second clamping block and corresponding to the connecting hole, and the screw for a fixing screw fitted to the connecting hole and the setting hole,

通过旋拧所述固定螺杆,使得所述固定螺杆脱出所述设置孔,并使得所述第一夹持块和所述第二夹持块脱出所述传动螺杆。By screwing the fixing screw, the fixing screw is disengaged from the setting hole, and the first clamping block and the second clamping block are disengaged from the driving screw.

进一步的,还包括:套设于所述固定螺杆且位于所述第一夹持块和所述第二夹持块之间的弹簧,通过向外旋拧所述固定螺杆,使得所述固定螺杆脱出所述设置孔,所述弹簧的回弹力推抵所述第一夹持块向远离所述传动螺杆的方向移动。Further, it also includes: a spring sleeved on the fixing screw and located between the first clamping block and the second clamping block, by screwing the fixing screw outward, the fixing screw Out of the setting hole, the resilient force of the spring pushes against the first clamping block to move away from the driving screw.

进一步的,还包括:Further, it also includes:

位于所述传动螺杆的相对的两侧的两个限位杆;以及two stop rods located on opposite sides of the drive screw; and

对应所述限位杆开设于所述第一夹持块和所述第二夹持块的条形孔,所述条形孔与底板平行设置,所述限位杆穿设于所述条形孔,当所述弹簧推抵所述第一夹持块时,所述第二夹持块通过所述条形孔沿所述限位杆移动。Corresponding to the limit bar, the bar-shaped holes opened in the first clamping block and the second clamping block, the bar-shaped holes are arranged in parallel with the bottom plate, and the limit bar passes through the bar-shaped hole, when the spring pushes against the first clamping block, the second clamping block moves along the limit bar through the bar-shaped hole.

进一步的,还包括:固定安装于所述底板的且相对的设置于所述底板的两端的两个固定板,两个所述移动底座置于两个所述固定板之间,两个所述固定板套设于所述传动螺杆;以及Further, it also includes: two fixed plates fixedly installed on the bottom plate and oppositely arranged at both ends of the bottom plate, the two mobile bases are placed between the two fixed plates, and the two fixed plates the fixing plate is sheathed on the driving screw; and

固定安装于固定板且驱动连接所述传动螺杆的电机。The motor is fixedly installed on the fixed plate and drives the driving screw connected to the drive screw.

进一步的,所述夹具包括:Further, the clamp includes:

固定安装于所述移动底座的顶面的第一安装架;a first installation frame fixedly installed on the top surface of the mobile base;

一端螺合于所述第一安装架的端部的调节螺杆,所述调节螺杆相对的设置有两个;以及One end of the adjusting screw is screwed to the end of the first installation frame, and there are two adjusting screws opposite to each other; and

转动连接于两个所述调节螺杆的远离所述第一安装架的一端的第二安装架,所述管道放置于所述第一安装架和所述第二安装架之间,通过旋拧所述调节螺杆,使得所述第二安装架向所述第一安装架移动,从而所述第二安装架和所述第一安装架夹住了所述管道。Rotate the second mounting frame connected to the two ends of the adjusting screw rods away from the first mounting frame, the pipeline is placed between the first mounting frame and the second mounting frame, and the The adjustment screw makes the second mounting frame move toward the first mounting frame, so that the second mounting frame and the first mounting frame clamp the pipe.

进一步的,还包括:安装于所述底座的顶面的吹风装置,所述吹风装置靠近两个所述管道的贴合处设置。Further, it also includes: a blowing device installed on the top surface of the base, and the blowing device is arranged near the junction of the two pipes.

在本发明中,还提供一种施工方法,包括如下步骤:In the present invention, a construction method is also provided, comprising the steps of:

提供管道安装结构,将两个所述管道分别安装于对应的夹具内,转动所述传动螺杆,以使得两个所述移动底座靠近,并使得两个所述管道对应的端部相贴合。A pipeline installation structure is provided, and the two pipelines are respectively installed in corresponding fixtures, and the driving screw is rotated to make the two moving bases approach and make the corresponding ends of the two pipelines fit together.

本发明与现有技术相比,具有以下有益效果:Compared with the prior art, the present invention has the following beneficial effects:

通过将处于两端的管道分别固定于两个所述夹具上,旋拧所述传动螺杆,使得两个所述移动底座互相靠近并结合两个所述管道首尾。By fixing the pipes at both ends on the two clamps respectively, and screwing the driving screw, the two mobile bases are close to each other and join the two pipes from head to tail.

附图说明Description of drawings

图1为本发明一种管道安装结构及其施工方法的整体结构图。Fig. 1 is an overall structural diagram of a pipeline installation structure and its construction method according to the present invention.

图2为本发明一种管道安装结构及其施工方法的底座的结构的螺合于传动螺杆图。Fig. 2 is a diagram of the structure of the base of a pipeline installation structure and construction method of the present invention, which is screwed to the transmission screw.

图3为本发明一种管道安装结构及其施工方法的底座的结构的远离传动螺杆图。Fig. 3 is a diagram of the structure of the base of a pipeline installation structure and its construction method in the present invention away from the transmission screw.

图4为本发明一种管道安装结构及其施工方法的底座的结构的移动底座的结构图。Fig. 4 is a structural diagram of a moving base of the base structure of a pipeline installation structure and construction method thereof according to the present invention.

图例说明:1、底板;2、管道;3、电机;4、固定板;5、移动底座;6、夹具;7、吹风装置;8、限位杆;9、传动螺杆;11、第一安装架;17、第一夹持块;18、第二夹持块;19、固定螺杆;21、设置孔;22、弹簧;23、条形孔;24、调节螺杆;25、第二安装架;26、连接孔。Legend: 1. Bottom plate; 2. Pipeline; 3. Motor; 4. Fixed plate; 5. Mobile base; 6. Fixture; 7. Blowing device; 8. Limit rod; 9. Drive screw; Frame; 17, the first clamping block; 18, the second clamping block; 19, the fixed screw; 21, the setting hole; 22, the spring; 23, the strip hole; 24, the adjusting screw; 25, the second mounting frame; 26, connecting hole.

具体实施方式Detailed ways

下面结合附图和具体实施例对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

参阅图1,一种管道安装结构,供连接两根管道2,包括:底板1;位置可调的安装于所述底板1两端的两个移动底座5;以及安装于所述移动底座5的夹具6,两个所述管道2分别夹设于两个所述夹具6,通过移动调节两个所述移动底座5之间的相对距离,以使得两个所述管道2的对应的端部相贴合。为了保证使用寿命,所述移动底座5和所述夹具6由钢制成。Referring to Fig. 1, a pipe installation structure for connecting two pipes 2, comprising: a base plate 1; two movable bases 5 installed at both ends of the base plate 1 with adjustable positions; and clamps installed on the movable base 5 6. The two pipes 2 are sandwiched between the two clamps 6 respectively, and the relative distance between the two moving bases 5 is adjusted by moving, so that the corresponding ends of the two pipes 2 are in contact with each other. combine. In order to ensure the service life, the mobile base 5 and the clamp 6 are made of steel.

参阅图2,进一步的,还包括:转动安装于所述底板1的顶面的传动螺杆9,两个所述移动底座5螺合于所述传动螺杆9,通过转动所述传动螺杆9,使得两个所述移动底座5靠近,并带动两个所述管道2的对应的端部相贴合。Referring to Fig. 2, further, it further includes: rotating the transmission screw 9 installed on the top surface of the bottom plate 1, the two moving bases 5 are screwed to the transmission screw 9, by rotating the transmission screw 9, so that The two moving bases 5 approach and drive the corresponding ends of the two pipes 2 to fit together.

在本发明中,一种较佳的实施方式是:所述传动螺杆9的一端为左旋螺纹且另一端为右旋螺纹,两个所述移动底座5分别安装于所述左旋螺纹和所述右旋螺纹,当转动所述传动螺杆9,处于所述传动螺杆9的两端的所述移动底座5传动沿着所述传动螺杆9的长度方向向着所述传动螺杆9的中心相贴靠,直至两个所述管道2的对应的端部相贴合。In the present invention, a preferred embodiment is: one end of the drive screw 9 is a left-handed thread and the other end is a right-handed thread, and the two moving bases 5 are installed on the left-handed thread and the right-handed thread respectively. screw thread, when the transmission screw 9 is rotated, the moving base 5 at the two ends of the transmission screw 9 will drive along the length direction of the transmission screw 9 toward the center of the transmission screw 9 until the two ends The corresponding ends of the two pipes 2 are fitted together.

参阅图3和图4,进一步的,所述移动底座5包括:相对设置于所述传动螺杆9两侧的第一夹持块17和第二夹持块18,所述第一夹持块17的顶部部分延伸于所述第二夹持块18的顶部形成了延伸段,所述夹具6固定安装于所述第一夹持块17的延伸段;开设于所述第一夹持块17的侧部且对应所述传动螺杆9设置的第一螺纹槽;以及开设于所述第二夹持块18的侧部且对应所述传动螺杆9设置的第二螺纹槽,所述第一夹持块17和所述第二夹持块18相拼合形成容置空间,所述传动螺杆9螺合于所述容置空间。Referring to FIG. 3 and FIG. 4 , further, the mobile base 5 includes: a first clamping block 17 and a second clamping block 18 oppositely arranged on both sides of the drive screw 9 , the first clamping block 17 The top portion of the top portion extends from the top of the second clamping block 18 to form an extension, and the clamp 6 is fixedly installed on the extension of the first clamping block 17; The first thread groove provided on the side and corresponding to the drive screw 9; and the second thread groove opened on the side of the second clamping block 18 and corresponding to the drive screw 9, the first clamp The block 17 and the second clamping block 18 are combined to form an accommodating space, and the driving screw 9 is screwed into the accommodating space.

进一步的,还包括:开设于所述第二夹持块18的侧壁的连接孔26、开设于所述第一夹持块17的靠近所述第二夹持块18的一侧且对应所述连接孔26开设的设置孔21以及供螺合于所述连接孔26和所述设置孔21的固定螺杆19,通过旋拧所述固定螺杆19,使得所述固定螺杆19脱出所述设置孔21,并使得所述第一夹持块17和所述第二夹持块18不再螺合所述传动螺杆9。Further, it also includes: a connection hole 26 opened on the side wall of the second clamping block 18, opened on the side of the first clamping block 17 close to the second clamping block 18 and corresponding to the The setting hole 21 provided by the connecting hole 26 and the fixing screw 19 screwed in the connecting hole 26 and the setting hole 21, by screwing the fixing screw 19, the fixing screw 19 is released from the setting hole 21, so that the first clamping block 17 and the second clamping block 18 are no longer screwed to the drive screw 9 .

进一步的,还包括:套设于所述固定螺杆19且位于所述第一夹持块17和所述第二夹持块18之间的弹簧22,通过向外旋拧所述固定螺杆19,使得所述固定螺杆19脱出所述设置孔21,所述弹簧22的回弹力推抵所述第一夹持块17向远离所述传动螺杆9的方向移动。Further, it also includes: a spring 22 sleeved on the fixing screw 19 and located between the first clamping block 17 and the second clamping block 18, by screwing the fixing screw 19 outward, The fixing screw 19 escapes from the setting hole 21 , and the resilient force of the spring 22 pushes against the first clamping block 17 to move away from the driving screw 9 .

在本发明中,一种较佳的实施方式是:当一侧所述管道2为不能移动或位置固定时,使用所述夹具6固定不能移动的管道2,向外旋拧处于不能移动的所述管道2的底部的固定螺杆19,使得所述固定螺杆19脱出所述设置杆,所述弹簧22的回弹力推抵所述第一夹持块17相远离所述传动螺杆9的方向移动,处于不能移动的所述管道2的下方的所述移动底座5不再螺合于所述传动螺杆9,将另一个所述管道2固定于另一个所述移动底座5中,转动所述传动螺杆9,另一个所述管道2向着不能移动的所述管道2靠近,以使得两个所述管道2的对应的端部相贴合。In the present invention, a preferred embodiment is: when the pipeline 2 on one side is immovable or its position is fixed, use the clamp 6 to fix the pipeline 2 that cannot move, and screw the pipeline 2 that is immovable outward. The fixed screw 19 at the bottom of the pipeline 2, so that the fixed screw 19 escapes from the setting rod, and the resilience of the spring 22 pushes against the first clamping block 17 to move away from the direction of the transmission screw 9, The moving base 5 under the immovable pipeline 2 is no longer screwed to the transmission screw 9, the other pipeline 2 is fixed in the other moving base 5, and the transmission screw is rotated 9. The other pipe 2 approaches the non-movable pipe 2 so that the corresponding ends of the two pipes 2 fit together.

进一步的,还包括:位于所述传动螺杆9的相对的两侧的两个限位杆8;以及对应所述限位杆8开设于所述第一夹持块17和所述第二夹持块18的条形孔23,所述条形孔23与底板1平行设置,所述限位杆8穿设于所述条形孔23,当所述弹簧22推抵所述第一夹持块17时,通过所述条形孔23沿所述限位杆8移动,以限制所述第一夹持块17。Further, it also includes: two limit rods 8 located on opposite sides of the drive screw 9; The strip-shaped hole 23 of the block 18, the strip-shaped hole 23 is arranged in parallel with the bottom plate 1, the said limit rod 8 is passed through the said strip-shaped hole 23, when the said spring 22 pushes against the said first clamping block 17, move along the limiting rod 8 through the bar-shaped hole 23 to limit the first clamping block 17 .

在本发明中,一种较佳的实施方式是:为了防止所述弹簧22将所述第一夹持块17和所述第二夹持块18推出于所述底板1外,所述限位杆8穿设于所述第一夹持块17和所述第二夹持块18,当所述弹簧22将所述第一夹持块17和所述第二夹持块18推出时,所述第一夹持块17和所述第二夹持块18沿着所述条形孔23的开设方向移动,所述限位杆8处于所述条形孔23的水平部分的边缘时,所述限位杆8卡死所述第一夹持块17和所述第二夹持块18,以防止所述第一夹持块17和所述第二夹持块18块脱出所述底板1的顶面。In the present invention, a preferred embodiment is: in order to prevent the spring 22 from pushing the first clamping block 17 and the second clamping block 18 out of the bottom plate 1, the limit The rod 8 is passed through the first clamping block 17 and the second clamping block 18, when the spring 22 pushes the first clamping block 17 and the second clamping block 18 out, the The first clamping block 17 and the second clamping block 18 move along the opening direction of the bar-shaped hole 23, and when the limit rod 8 is at the edge of the horizontal part of the bar-shaped hole 23, the The stop rod 8 blocks the first clamping block 17 and the second clamping block 18, so as to prevent the first clamping block 17 and the second clamping block 18 from breaking out of the bottom plate 1 top surface.

进一步的,还包括:固定安装于所述底板1的且相对的设置于所述底板1的两端的两个固定板4,两个所述移动底座5置于两个所述固定板4之间,两个所述固定板4套设于所述传动螺杆9;以及固定安装于固定板4且驱动连接所述传动螺杆9的电机3。Further, it also includes: two fixed plates 4 fixedly installed on the bottom plate 1 and oppositely arranged at both ends of the bottom plate 1, and the two mobile bases 5 are placed between the two fixed plates 4 , the two fixing plates 4 are sheathed on the driving screw 9 ;

进一步的,所述夹具6包括:固定安装于所述移动底座5的顶面的第一安装架11;一端螺合于所述第一安装架11的端部的调节螺杆24,所述调节螺杆24相对的设置有两个;以及转动连接于两个所述调节螺杆24的远离所述第一安装架11的一端的第二安装架25,所述管道2放置于所述第一安装架11和所述第二安装架25之间,通过旋拧所述调节螺杆24,使得所述第二安装架25向所述第一安装架11移动,从而所述第二安装架25贴合于所述管道2的顶面。Further, the fixture 6 includes: a first installation frame 11 fixedly installed on the top surface of the mobile base 5; an adjustment screw 24 with one end screwed to the end of the first installation frame 11, and the adjustment screw 24 are oppositely provided with two; and a second mounting frame 25 that is rotatably connected to one end of the two adjusting screw rods 24 away from the first mounting frame 11, and the pipeline 2 is placed on the first mounting frame 11 Between the second mounting frame 25 and the adjusting screw 24, the second mounting frame 25 moves toward the first mounting frame 11, so that the second mounting frame 25 fits on the The top surface of the pipeline 2.

进一步的,还包括:安装于所述底座的顶面的除尘吹风装置7,所述吹风装置7靠近两个所述管道2的贴合处设置。所述吹风装置7供吹除附着于管道2的灰尘。Further, it also includes: a dust removal blowing device 7 installed on the top surface of the base, and the blowing device 7 is arranged near the junction of the two pipes 2 . The blowing device 7 is used to blow off the dust attached to the pipeline 2 .

在本发明中,还提供一种施工方法,包括如下步骤:In the present invention, a construction method is also provided, comprising the steps of:

提供管道2安装结构,将两个所述管道2分别安装于对应的夹具6内,转动所述传动螺杆9,以使得两个所述移动底座5靠近,并使得两个所述管道2对应的端部相贴合。Provide a pipe 2 installation structure, install the two pipes 2 in the corresponding fixtures 6, turn the drive screw 9, so that the two mobile bases 5 are close, and make the two pipes 2 correspond to each other The ends fit together.

下面对本发明一种管道安装结构的使用过程进行说明。The use process of a pipeline installation structure of the present invention will be described below.

提供管道2安装结构,将所述管道2放置于所述第一安装架11和所述第二安装架25之间,转动所述调节螺杆24使得所述第二安装架25下降,以使得所述第一安装架11和所述第二安装架25夹住所述管道2,较佳的,为了使得所述第一安装架11和所述第二安装架25能更好的固定所述管道2,所述第一安装架11和所述第二安装架25对应管道2形成有弧形槽,将两个所述管道2的两个所述移动底座5分别螺合于所述传动螺杆9;Provide the pipeline 2 installation structure, place the pipeline 2 between the first installation frame 11 and the second installation frame 25, turn the adjusting screw 24 to make the second installation frame 25 descend, so that the The first mounting frame 11 and the second mounting frame 25 clamp the pipe 2. Preferably, in order to enable the first mounting frame 11 and the second mounting frame 25 to better fix the pipe 2. The first mounting frame 11 and the second mounting frame 25 are formed with arc-shaped grooves corresponding to the pipeline 2, and the two moving bases 5 of the two pipelines 2 are respectively screwed to the transmission screw 9 ;

当需要对施工管道的中间段进行更换,处于两侧的管道为不能移动或位置固定时,使用所述夹具6固定不能移动的管道2,向外旋拧处于不能移动的所述管道2的底部的固定螺杆19,使得所述固定螺杆19脱出所述设置杆,所述弹簧22的回弹力推抵所述第一夹持块17向远离所述传动螺杆9的方向移动,为了防止所述弹簧22将所述第一夹持块17和所述第二夹持块18推出于所述底板1外,所述第一夹持块17和所述第二夹持块18沿着所述限位杆8移动,处于不能移动的所述管道2的下方的所述移动底座5脱出于所述传动螺杆9,将另一个所述管道2固定于另一个所述移动底座5中,转动所述传动螺杆9,另一个所述管道2向着不能移动的所述管道2靠近,以使得两个所述管道2的对应的端部相贴合;When the middle section of the construction pipeline needs to be replaced, and the pipelines on both sides cannot be moved or their positions are fixed, the clamp 6 is used to fix the immovable pipeline 2, and the bottom of the immovable pipeline 2 is screwed outward the fixed screw 19, so that the fixed screw 19 escapes from the setting rod, and the resilient force of the spring 22 pushes against the first clamping block 17 to move away from the transmission screw 9, in order to prevent the spring from 22 Push the first clamping block 17 and the second clamping block 18 out of the bottom plate 1, and the first clamping block 17 and the second clamping block 18 are along the limit The rod 8 moves, and the moving base 5 under the immovable pipeline 2 breaks away from the transmission screw 9, and the other pipeline 2 is fixed in the other moving base 5, and the transmission is rotated. Screw 9, the other said pipe 2 approaches the said pipe 2 which cannot move, so that the corresponding ends of the two said pipes 2 fit together;

当布设新的管道,且两侧的所述管道2均可以移动时,驱动所述电机3,所述驱动电机3驱动所述传动螺杆9转动,以带动两个所述移动底座5向着所述底板1的中间位置靠近,以贴合两个管道2相对的端部。When a new pipeline is laid and the pipelines 2 on both sides can be moved, the motor 3 is driven, and the driving motor 3 drives the transmission screw 9 to rotate to drive the two mobile bases 5 toward the The middle of the bottom plate 1 is close to fit the opposite ends of the two pipes 2 .

以上结合附图实施例对本发明进行了详细说明,本领域中普通技术人员可根据上述说明对本发明做出种种变化例。因而,实施例中的某些细节不应构成对本发明的限定,本发明将以所附权利要求书界定的范围作为本发明的保护范围。The present invention has been described in detail above with reference to the embodiments of the accompanying drawings, and those skilled in the art can make various changes to the present invention according to the above description. Therefore, some details in the embodiments should not be construed as limiting the present invention, and the present invention will take the scope defined by the appended claims as the protection scope of the present invention.

Claims (10)

1. The utility model provides a pipeline mounting structure for connecting two pipelines, characterized by: the method comprises the following steps:
a base plate;
two movable bases which are arranged at two ends of the bottom plate and have adjustable positions; and
the two pipelines are respectively clamped on the two clamps, and the relative distance between the two movable bases is adjusted through movement, so that the corresponding end parts of the two pipelines are attached to each other.
2. A piping installation structure as claimed in claim 1, wherein: further comprising: the two movable bases are screwed on the transmission screw rod in a rotating mode, the two movable bases are close to each other by rotating the transmission screw rod, and the corresponding end portions of the two pipelines are driven to be attached to each other.
3. A pipe installation structure as claimed in claim 2, wherein: the mobile base includes:
the clamp comprises a first clamping block and a second clamping block which are oppositely arranged on two sides of the transmission screw rod, wherein the top part of the first clamping block extends to the top of the second clamping block to form an extension section, and the clamp is fixedly arranged on the extension section of the first clamping block;
the first thread groove is formed in the side part of the first clamping block and corresponds to the transmission screw; and
the second thread groove is formed in the side portion of the second clamping block and corresponds to the transmission screw, the first thread groove and the second thread groove are spliced to form an accommodating space, and the transmission screw is screwed in the accommodating space.
4. A pipe installation structure as claimed in claim 3, wherein: further comprising:
a connecting hole arranged on the side wall of the second clamping block, a setting hole arranged on one side of the first clamping block close to the second clamping block and corresponding to the connecting hole, and a fixing screw rod for screwing the connecting hole and the setting hole,
and the fixing screw is screwed to be disengaged from the arrangement hole, and the first clamping block and the second clamping block are disengaged from the transmission screw.
5. A pipe installation structure as claimed in claim 4, wherein: further comprising: the spring is sleeved on the fixing screw rod and located between the first clamping block and the second clamping block, the fixing screw rod is screwed outwards, so that the fixing screw rod is separated from the setting hole, and the resilience force of the spring pushes the first clamping block to move towards the direction far away from the transmission screw rod.
6. A piping installation structure as claimed in claim 5, wherein: further comprising:
two limiting rods positioned on two opposite sides of the transmission screw rod; and
correspond the gag lever post is seted up in first grip block with the bar hole of second grip block, bar hole and bottom plate parallel arrangement, the gag lever post is worn to locate the bar hole works as the spring pushes away when first grip block, the second grip block passes through the bar hole is followed the gag lever post removes.
7. A pipe installation structure as claimed in claim 2, wherein: further comprising: the two fixed plates are fixedly arranged on the bottom plate and are oppositely arranged at the two ends of the bottom plate, the two movable bases are arranged between the two fixed plates, and the two fixed plates are sleeved on the transmission screw rod; and
and the motor is fixedly arranged on the fixed plate and is in driving connection with the transmission screw rod.
8. A pipe installation structure as claimed in claim 1, wherein: the jig includes:
the first mounting frame is fixedly mounted on the top surface of the movable base;
one end of each adjusting screw is screwed with the end part of the first mounting frame, and two adjusting screws are oppositely arranged; and
the second mounting rack is connected to one end, far away from the first mounting rack, of the two adjusting screws in a rotating mode, the pipeline is placed between the first mounting rack and the second mounting rack, the adjusting screws are screwed, the second mounting rack is made to move towards the first mounting rack, and therefore the pipeline is clamped by the second mounting rack and the first mounting rack.
9. A piping installation structure as claimed in claim 1, wherein: further comprising: and the blowing device is arranged on the top surface of the base and is close to the joint of the two pipelines.
10. A construction method of a pipe installation structure according to claim 1, wherein: the method comprises the following steps:
and providing a pipeline mounting structure, respectively mounting the two pipelines in corresponding clamps, and rotating the transmission screw rod to enable the two movable bases to be close to each other and enable the corresponding end parts of the two pipelines to be attached to each other.
CN202211471635.0A 2022-11-23 2022-11-23 Pipeline installation structure and construction method thereof Active CN115773405B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211471635.0A CN115773405B (en) 2022-11-23 2022-11-23 Pipeline installation structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211471635.0A CN115773405B (en) 2022-11-23 2022-11-23 Pipeline installation structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN115773405A true CN115773405A (en) 2023-03-10
CN115773405B CN115773405B (en) 2025-06-24

Family

ID=85389909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211471635.0A Active CN115773405B (en) 2022-11-23 2022-11-23 Pipeline installation structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN115773405B (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100937157B1 (en) * 2009-04-14 2010-01-15 우주쎄미텍 주식회사 Pipe connecting apparatus
US20150165672A1 (en) * 2013-12-18 2015-06-18 Isco Industries, Inc. Assembly and Method of Coupling Pipes
CN210732335U (en) * 2019-09-21 2020-06-12 上海贤力新能源科技有限公司 Butt joint device for natural gas pipeline installation
CN211779639U (en) * 2020-03-12 2020-10-27 单鲁维 Gas pipeline butt joint fixing device
CN212011945U (en) * 2020-06-15 2020-11-24 河北强胜通信工程有限公司 A pipeline positioner for communication construction
CN212095108U (en) * 2020-05-21 2020-12-08 吴海丹 Pipeline welding butt joint mould anchor clamps
CN212429970U (en) * 2020-04-21 2021-01-29 陶家全 Pipeline auxiliary connection device for building water supply and drainage
CN212683008U (en) * 2020-07-16 2021-03-12 胡振斌 Butt joint device for building steel pipe welding
CN112483726A (en) * 2020-12-10 2021-03-12 周凯锋 Auxiliary butt joint equipment for installation of heating and ventilation pipe fittings
CN214236919U (en) * 2021-01-21 2021-09-21 宋拥军 Auxiliary pipeline butt joint device for building construction
CN215397010U (en) * 2021-07-30 2022-01-04 鑫盟管道工程(辽宁)有限公司 HDPE pipeline hot melting fixing device
CN216279760U (en) * 2021-09-24 2022-04-12 齐明辉 Pipeline butt joint auxiliary device for natural gas engineering construction
CN216577552U (en) * 2021-11-26 2022-05-24 中国能源建设集团西北电力建设工程有限公司 Pipeline butt joint auxiliary fixtures
CN217529864U (en) * 2022-05-07 2022-10-04 河北辛大洲环保科技有限公司 Pressure pipeline installation interfacing apparatus

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100937157B1 (en) * 2009-04-14 2010-01-15 우주쎄미텍 주식회사 Pipe connecting apparatus
US20150165672A1 (en) * 2013-12-18 2015-06-18 Isco Industries, Inc. Assembly and Method of Coupling Pipes
CN210732335U (en) * 2019-09-21 2020-06-12 上海贤力新能源科技有限公司 Butt joint device for natural gas pipeline installation
CN211779639U (en) * 2020-03-12 2020-10-27 单鲁维 Gas pipeline butt joint fixing device
CN212429970U (en) * 2020-04-21 2021-01-29 陶家全 Pipeline auxiliary connection device for building water supply and drainage
CN212095108U (en) * 2020-05-21 2020-12-08 吴海丹 Pipeline welding butt joint mould anchor clamps
CN212011945U (en) * 2020-06-15 2020-11-24 河北强胜通信工程有限公司 A pipeline positioner for communication construction
CN212683008U (en) * 2020-07-16 2021-03-12 胡振斌 Butt joint device for building steel pipe welding
CN112483726A (en) * 2020-12-10 2021-03-12 周凯锋 Auxiliary butt joint equipment for installation of heating and ventilation pipe fittings
CN214236919U (en) * 2021-01-21 2021-09-21 宋拥军 Auxiliary pipeline butt joint device for building construction
CN215397010U (en) * 2021-07-30 2022-01-04 鑫盟管道工程(辽宁)有限公司 HDPE pipeline hot melting fixing device
CN216279760U (en) * 2021-09-24 2022-04-12 齐明辉 Pipeline butt joint auxiliary device for natural gas engineering construction
CN216577552U (en) * 2021-11-26 2022-05-24 中国能源建设集团西北电力建设工程有限公司 Pipeline butt joint auxiliary fixtures
CN217529864U (en) * 2022-05-07 2022-10-04 河北辛大洲环保科技有限公司 Pressure pipeline installation interfacing apparatus

Also Published As

Publication number Publication date
CN115773405B (en) 2025-06-24

Similar Documents

Publication Publication Date Title
CN219300078U (en) Thermodynamic pipeline butt joint supporting device and control system
CN109014323A (en) A kind of portable high-efficiency bored machine and its boring method for coating steel pipe
CN109163146B (en) Pipeline installation structure and installation method thereof
CN210849239U (en) A three-way pipe fitting fixture for machining
CN116526396A (en) Subway signal cable lays locating device
CN221609520U (en) Adjustable spring clip fixing device
CN115773405B (en) Pipeline installation structure and construction method thereof
CN209387426U (en) A bending test device for rubber hose assembly
CN213748508U (en) A connection and fixing mechanism for detection of underground pipelines
CN218378052U (en) Pipeline sleeve centering positioner
CN115355363A (en) A pipe limiting device for municipal water supply and drainage
CN209598660U (en) A kind of automated exchanged cutter mechanism
CN211374324U (en) Product physical characteristic experiment positioner
CN115342844A (en) Debugging fixing device of turbine blade vibration equipment
CN223848145U (en) Steel pipe drilling auxiliary positioning device for building
CN222818022U (en) A power pipe cutter for power construction
CN221924945U (en) Pipeline butt joint detection device
CN221196390U (en) Quick fixing tool for indoor hydropower pipeline
CN222102931U (en) A construction engineering pipeline installation structure
CN223063331U (en) Sheet metal part fixing pipe clamp
CN212107199U (en) Pipeline positioning device
CN223947214U (en) Portable equipment installation auxiliary device for engineering
CN215802672U (en) Cantilever beam
CN218365039U (en) Hose port cutting device
CN224116021U (en) An auxiliary device for pipeline inspection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant