CN115749197A - Assembled steel construction elevator well - Google Patents

Assembled steel construction elevator well Download PDF

Info

Publication number
CN115749197A
CN115749197A CN202211475863.5A CN202211475863A CN115749197A CN 115749197 A CN115749197 A CN 115749197A CN 202211475863 A CN202211475863 A CN 202211475863A CN 115749197 A CN115749197 A CN 115749197A
Authority
CN
China
Prior art keywords
rod
groove
assembly
elevator shaft
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211475863.5A
Other languages
Chinese (zh)
Inventor
拱悦然
张林涛
赵红亮
赵丽娜
陈皓阳
梁胜利
于宗远
孟若冰
马书刚
王健健
刘明洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Yatai Jindian Construction Engineering Co ltd
Beijing Urban Construction Yatai Group Co Ltd
Original Assignee
Beijing Urban Yatai Jindian Construction Engineering Co ltd
Beijing Urban Construction Yatai Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Yatai Jindian Construction Engineering Co ltd, Beijing Urban Construction Yatai Group Co Ltd filed Critical Beijing Urban Yatai Jindian Construction Engineering Co ltd
Priority to CN202211475863.5A priority Critical patent/CN115749197A/en
Publication of CN115749197A publication Critical patent/CN115749197A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B50/00Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

本申请涉及一种装配式钢结构电梯井道,涉及电梯井道的领域,其包括设置于电梯井道边角处的四个竖向支撑组件、四个设置于相邻竖向支撑组件之间的横向连接组件和多个用于将竖向支撑组件和横向连接组件装配的装配组件,多个装配组件设置于竖向支撑组件上,每个竖向支撑组件包括上下依次连接的多组支撑件,每组支撑件包括上下依次连接的第一支撑杆和第二支撑杆,横向连接组件包括多个连接杆,装配组件包括用于固定连接第一支撑杆和第二支撑杆的卡接件和用于对连接杆定位的定位件。本申请具有能够减少电梯井道安装对居民生活环境的污染,且安装较为快速方便的效果。

Figure 202211475863

The present application relates to a prefabricated steel structure elevator shaft, and relates to the field of elevator shafts, which includes four vertical support assemblies arranged at the corners of the elevator shaft, and four horizontal connections arranged between adjacent vertical support assemblies assembly and a plurality of assembly assemblies for assembling the vertical support assembly and the horizontal connection assembly. The supporting member includes a first supporting rod and a second supporting rod connected up and down in sequence, the transverse connecting assembly includes a plurality of connecting rods, and the assembly assembly includes a clamping piece for fixedly connecting the first supporting rod and the second supporting rod and for aligning Positioning piece for connecting rod positioning. The application has the effect of reducing the pollution of the living environment of residents caused by the installation of the elevator shaft, and the installation is relatively fast and convenient.

Figure 202211475863

Description

一种装配式钢结构电梯井道A prefabricated steel structure elevator shaft

技术领域technical field

本申请涉及电梯井道的领域,尤其是涉及一种装配式钢结构电梯井道。The present application relates to the field of elevator shafts, in particular to an assembled steel structure elevator shaft.

背景技术Background technique

随着人口老龄化进程的加快和居民生活水平的日益提高,对已建多层楼房加装电梯的需求也将日趋增大。已建多层楼房加装电梯因事先没有设计电梯井道,通常的办法是增设一个室外井道供电梯安装和运行。电梯井道,建筑物中专供电梯上下行驶的垂直通道,其横截面呈矩形或正方形。一般一个井道供一部电梯使用,在每一层楼的楼面开设门洞,可安装井道门。井道内装有电梯轿厢和平衡重块滑行的导轨。井道底坑装有电梯轿厢的缓冲器。电动机和传动机械大多装置在井道顶部。With the acceleration of population aging process and the improvement of residents' living standards, the demand for installing elevators in multi-storey buildings will also increase day by day. Built multi-storey building installs elevator additional because of not designing elevator shaft in advance, common way is to add an outdoor shaft for elevator installation and operation. Elevator shaft, a vertical passage in a building dedicated to elevators traveling up and down, with a rectangular or square cross-section. Generally, one shaft is used by one elevator, and door openings are opened on the floor of each floor, and shaft doors can be installed. The hoistway is equipped with guide rails for the elevator car and the counterweight to slide. The shaft pit is equipped with buffers for the elevator car. Most of the motors and transmission machinery are installed on the top of the hoistway.

现有的电梯井道安装方式通常是矩形管焊接技术或模块式安装,其中,矩形管焊接安装因需现场焊接,所耗工时长,且现场焊接易对居民生活环境造成污染,严重影响现场居民的生活;而模块式安装因产品的体积较大,很多施工现场不能满足施工要求,例如吊车的进入,且模块式产品加工周期长,工艺要求复杂,产品成本较高。The existing elevator shaft installation methods are usually rectangular tube welding technology or modular installation. Among them, the rectangular tube welding installation requires on-site welding, which takes a long time, and the on-site welding is easy to pollute the living environment of residents, which seriously affects the safety of residents on site. Life; and the modular installation due to the large volume of the product, many construction sites cannot meet the construction requirements, such as the entry of a crane, and the modular product has a long processing cycle, complex process requirements, and high product costs.

针对上述中的相关技术,发明人认为亟需一种能够解决现有电梯加装方式所存在问题的钢结构电梯井道。In view of the related technologies mentioned above, the inventor believes that there is an urgent need for a steel structure elevator shaft that can solve the problems existing in the existing elevator installation methods.

发明内容Contents of the invention

为了改善现有的电梯井道安装方式,本申请提供一种装配式钢结构电梯井道。In order to improve the existing elevator shaft installation method, the present application provides an assembled steel structure elevator shaft.

本申请提供的一种装配式钢结构电梯井道,采用如下的技术方案:An assembled steel structure elevator shaft provided by this application adopts the following technical scheme:

一种装配式钢结构电梯井道,包括设置于电梯井道边角处的四个竖向支撑组件、四个设置于相邻所述竖向支撑组件之间的横向连接组件和多个用于将所述竖向支撑组件和所述横向连接组件装配的装配组件,多个所述装配组件设置于所述竖向支撑组件的相邻两侧;A prefabricated steel structure elevator shaft, comprising four vertical support assemblies arranged at the corners of the elevator shaft, four transverse connection assemblies arranged between adjacent vertical support assemblies, and multiple An assembly assembly assembled by the vertical support assembly and the horizontal connection assembly, and a plurality of the assembly assemblies are arranged on adjacent two sides of the vertical support assembly;

每个所述竖向支撑组件包括上下依次连接的多组支撑件,每组支撑件包括上下依次连接的第一支撑杆和第二支撑杆,相邻所述竖向支撑组件之间形成有第一空间、第二空间、第三空间和第四空间,每个空间内设置有一个所述横向连接组件;Each of the vertical support components includes a plurality of sets of support members connected up and down in sequence, and each set of support members includes a first support rod and a second support rod connected up and down in sequence, and a second support rod is formed between adjacent vertical support components. A space, a second space, a third space, and a fourth space, each of which is provided with one horizontal connection assembly;

所述横向连接组件包括多个连接杆,用于将对应的空间分割为多个子空间,所述竖向支撑组件的相邻侧壁上沿竖直方向开设有滑动槽,所述连接杆的两端分别滑动连接于相邻所述竖向支撑组件的所述滑动槽内;The horizontal connecting assembly includes a plurality of connecting rods, which are used to divide the corresponding space into multiple sub-spaces. The adjacent side walls of the vertical supporting assembly are provided with sliding grooves along the vertical direction, and the two connecting rods ends are respectively slidably connected in the sliding grooves of the adjacent vertical support components;

所述装配组件包括用于固定连接所述第一支撑杆和所述第二支撑杆的卡接件和用于对所述连接杆定位的定位件。The assembly assembly includes a clamping part for fixedly connecting the first support rod and the second support rod and a positioning part for positioning the connecting rod.

通过采用上述技术方案,多个第一支撑杆、第二支撑杆和连接杆在工厂加工完成后,运输到施工现场进行装配,先将第一支撑杆和第二支撑杆装配完成,之后将连接杆的两端置于滑动槽内,使其在重力的作用下滑动,并在定位件的作用下固定于指定位置,完成电梯井道的装配,无需现场焊接,且第一支撑杆、第二支撑杆和连接杆所占用空间较小,便于运输。By adopting the above-mentioned technical scheme, after the processing of multiple first support rods, second support rods and connecting rods is completed in the factory, they are transported to the construction site for assembly. Firstly, the first support rods and the second support rods are assembled, and then the connection The two ends of the rod are placed in the sliding groove to make it slide under the action of gravity, and are fixed at the designated position under the action of the positioning piece to complete the assembly of the elevator shaft without on-site welding, and the first support rod and the second support Rods and connecting rods take up less space and are easy to transport.

可选的,所述第一支撑杆包括第一连接部、固设于所述第一连接部上端的第一上衔接部、固设于所述第一连接部下端的第一下衔接部,所述第二支撑杆包括第二连接部、固设于所述第二连接部上端的第二上衔接部、固设于所述第二连接部下端的第二下衔接部;Optionally, the first support rod includes a first connecting portion, a first upper engaging portion fixed at the upper end of the first connecting portion, and a first lower engaging portion fixed at the lower end of the first connecting portion, so The second support rod includes a second connecting portion, a second upper engaging portion fixed at the upper end of the second connecting portion, and a second lower engaging portion fixed at the lower end of the second connecting portion;

所述第二上衔接部的顶部开设有可容纳所述第一下衔接部的插接槽,所述卡接件包括复位弹簧和卡块,所述第一下衔接部的侧壁上开设有容纳槽,所述复位弹簧的一端固定连接于所述容纳槽的底部,另一端固定连接于所述卡块,所述插接槽的内壁上开设有可容纳所述卡块的固定槽,所述卡块下部远离所述容纳槽的一侧设置有移动斜面。The top of the second upper connecting part is provided with an insertion groove capable of accommodating the first lower connecting part, the engaging member includes a return spring and a block, and the side wall of the first lower connecting part is provided with One end of the return spring is fixedly connected to the bottom of the accommodating groove, and the other end is fixedly connected to the block, and the inner wall of the insertion groove is provided with a fixed groove capable of accommodating the block. A moving slope is provided on the side of the lower part of the clamping block away from the receiving groove.

通过采用上述技术方案,将第一下衔接部插入插接槽内的过程中,卡块先被压入容纳槽内,当第一下衔接部的底部与插接槽的内底壁相抵接时,卡块在复位弹簧的弹性恢复作用下卡入固定槽内,实现第一支撑杆和第二支撑杆的快速安装。By adopting the above technical solution, during the process of inserting the first lower connecting part into the insertion groove, the block is first pressed into the receiving groove, when the bottom of the first lower connecting part abuts against the inner bottom wall of the insertion groove , the clamping block is clamped into the fixing groove under the elastic recovery action of the return spring, so as to realize the quick installation of the first support rod and the second support rod.

可选的,所述定位件包括定位杆和固设于所述定位杆靠近所述卡块一侧的限位板,所述限位板滑动连接于所述固定槽内,所述固定槽远离所述容纳槽的侧壁上开设有贯穿的滑移孔,所述滑移孔与所述滑动槽相连通,所述定位杆滑动连接于所述滑移孔内,所述限位板的直径大于所述滑移孔的内径,当所述限位板与所述固定槽的内底壁相抵接时,所述定位杆部分露出于所述滑移孔,所述连接杆的侧壁上开设有可容纳所述定位杆的定位槽。Optionally, the positioning member includes a positioning rod and a limiting plate fixed on the side of the positioning rod close to the block, the limiting plate is slidably connected in the fixing groove, and the fixing groove is away from The side wall of the receiving groove is provided with a through sliding hole, the sliding hole communicates with the sliding groove, the positioning rod is slidably connected in the sliding hole, the diameter of the limiting plate greater than the inner diameter of the sliding hole, when the limiting plate abuts against the inner bottom wall of the fixing groove, the positioning rod part is exposed in the sliding hole, and the side wall of the connecting rod is opened There is a positioning groove that can accommodate the positioning rod.

通过采用上述技术方案,当卡块卡入固定槽内时,能够将定位杆向远离容纳槽的方向推动,使定位杆部分露出于滑动槽内,当连接杆沿着滑动槽的方向落下时,定位杆露出的部分能够卡入定位槽内,使连接杆固定在确定位置。By adopting the above technical solution, when the clamping block is snapped into the fixing groove, the positioning rod can be pushed away from the receiving groove, so that the positioning rod part is exposed in the sliding groove, and when the connecting rod falls along the direction of the sliding groove, The exposed part of the positioning rod can be snapped into the positioning groove, so that the connecting rod is fixed at a definite position.

可选的,所述定位杆的侧壁上和所述定位槽的内壁上设置有配合使用的磁吸片。Optionally, a cooperating magnetic sheet is provided on the side wall of the positioning rod and the inner wall of the positioning groove.

通过采用上述技术方案,能够使连接杆和定位杆的连接更紧固,减小连接杆在滑动槽内随意晃动的可能性。By adopting the above technical solution, the connection between the connecting rod and the positioning rod can be tightened, and the possibility of random shaking of the connecting rod in the sliding groove can be reduced.

可选的,所述装配组件还包括连接件,所述连接件设置于所述定位件的上方,所述连接件包括抵压杆和固定连接于所述抵压杆下部侧壁的压动杆,所述第二上衔接部靠近所述连接杆的侧壁上开设有安置槽,所述抵压杆铰接于所述安置槽内,未安装所述连接杆时,所述抵压杆设置于所述安置槽内,所述压动杆部分露出于所述安置槽。Optionally, the assembly assembly further includes a connecting piece, the connecting piece is arranged above the positioning piece, and the connecting piece includes a pressing rod and a pressing rod fixedly connected to the lower side wall of the pressing rod , the second upper connecting portion is provided with a placement groove on the side wall close to the connecting rod, and the pressing rod is hinged in the placement groove. When the connecting rod is not installed, the pressing rod is arranged on the In the settling groove, the pressure rod part is exposed in the settling groove.

通过采用上述技术方案,连接杆在重力的作用下落下时,能够将压动杆压入安置槽内,从而使抵压杆抵接于连接杆,进一步减小连接杆在滑动槽内随意晃动的可能性。By adopting the above technical solution, when the connecting rod falls under the action of gravity, the pressing rod can be pressed into the placement groove, so that the pressing rod abuts against the connecting rod, further reducing the random shaking of the connecting rod in the sliding groove. possibility.

可选的,所述抵压杆包括连接部和插入部,所述连接杆的侧壁上开设有连接槽,当所述连接杆安装完毕时,所述压动杆设置于所述安置槽内,所述插入部固定连接于所述连接槽内。Optionally, the pressing rod includes a connecting portion and an inserting portion, a connecting groove is opened on the side wall of the connecting rod, and when the connecting rod is installed, the pressing rod is arranged in the placement groove , the insertion part is fixedly connected in the connection groove.

通过采用上述技术方案,抵压杆的插入部能够卡入连接槽内,加固了连接杆与第二支撑杆之间的连接。By adopting the above technical solution, the insertion portion of the pressing rod can be snapped into the connecting groove, thereby strengthening the connection between the connecting rod and the second supporting rod.

可选的,还包括多个加固组件,所述加固组件设置于所述第一空间、所述第二空间和所述第三空间内,所述加固组件包括四个固定杆和一个加固螺杆,所述固定杆的一端铰接于所述第二连接部的侧壁,另一端铰接于所述连接杆的侧壁,四个所述固定杆围成加固框架,所述第二连接部的侧壁上设置有所述安装块,所述加固螺杆的两端分别螺纹连接于同一水平方向上相邻的两个安装块,所述第二上衔接部靠近所述连接杆的侧壁上转动连接有转动板,所述连接杆转动连接于所述第二上衔接部。Optionally, it also includes a plurality of reinforcement assemblies, the reinforcement assemblies are arranged in the first space, the second space and the third space, the reinforcement assemblies include four fixing rods and a reinforcement screw, One end of the fixed rod is hinged to the side wall of the second connecting part, and the other end is hinged to the side wall of the connecting rod. The four fixed rods form a reinforced frame, and the side wall of the second connecting part The mounting block is arranged on the top, and the two ends of the reinforcement screw are respectively screwed to two adjacent mounting blocks in the same horizontal direction, and the side wall of the second upper joint close to the connecting rod is rotatably connected with The rotating plate, the connecting rod is rotatably connected to the second upper connecting portion.

通过采用上述技术方案,相邻的两个连接杆安装完毕后,将上方的连接杆转动180°,此时将铰接于第二连接部上的四个固定杆安装于连接杆上,转动加固螺杆,使相邻的两个第二连接部向相互靠近的方向移动,将相邻的两个连接杆向相互远离的方向移动,从而增强电梯井道的稳固程度。By adopting the above technical scheme, after the two adjacent connecting rods are installed, the upper connecting rod is rotated 180°, at this time, the four fixing rods hinged on the second connecting part are installed on the connecting rods, and the reinforcing screw is rotated , to move the two adjacent second connecting parts toward each other, and move the two adjacent connecting rods toward the direction away from each other, thereby enhancing the stability of the elevator shaft.

可选的,所述连接杆的侧壁上固定连接有铰接块,所述固定杆远离所述第二连接部的一侧开设有嵌入槽,所述嵌入槽上部靠近所述连接杆一侧的内壁开设有拉动槽,所述拉动槽内滑动连接有拉动杆,所述拉动杆与所述拉动槽的内底壁之间设置有抵紧弹簧。Optionally, a hinge block is fixedly connected to the side wall of the connecting rod, an embedding groove is opened on the side of the fixing rod far away from the second connecting part, and the upper part of the embedding groove is close to the side of the connecting rod. The inner wall is provided with a pulling groove, and a pulling rod is slidably connected in the pulling groove, and a spring is arranged between the pulling rod and the inner bottom wall of the pulling groove.

通过采用上述技术方案,连接杆安装完毕后,向靠近铰接块的方向转动固定杆,滑动拉动杆,使铰接块卡入嵌入槽内,松开拉动杆,拉动杆在抵紧弹簧的弹性恢复作用下将嵌入槽封堵,使固定杆能够转动连接于铰接块,且安装简单快捷。By adopting the above technical scheme, after the connecting rod is installed, turn the fixed rod in the direction close to the hinge block, slide the pull rod, make the hinge block snap into the embedded groove, loosen the pull rod, and the pull rod will press against the elastic recovery effect of the spring The embedding groove is blocked, so that the fixed rod can be rotatably connected to the hinge block, and the installation is simple and quick.

可选的,所述加固螺杆包括第一安装部和与所述第一安装板可拆卸连接的第二安装部,所述第一安装部远离所述安装块的一端套设有连接管,所述连接管滑动连接于所述第一安装部,所述连接管的侧壁上穿设有固定销,所述第二安装部的侧壁上设置有可容纳所述固定销的限位孔。Optionally, the reinforcing screw includes a first mounting portion and a second mounting portion detachably connected to the first mounting plate, and a connecting pipe is sheathed on the end of the first mounting portion away from the mounting block, so that The connecting pipe is slidably connected to the first mounting part, the side wall of the connecting pipe is pierced with a fixing pin, and the side wall of the second mounting part is provided with a limiting hole capable of accommodating the fixing pin.

通过采用上述技术方案,固定杆安装完毕后,再将第一安装部和第二安装部分别安装于对应的安装块上,之后滑动连接管使其套设于第一安装部和第二安装部的连接处,并将固定销插入限位孔内,此时第一安装部和第二安装部可同时转动。By adopting the above technical solution, after the fixing rod is installed, the first installation part and the second installation part are respectively installed on the corresponding installation blocks, and then the connecting pipe is slid to be sleeved on the first installation part and the second installation part , and insert the fixing pin into the limit hole, at this time the first mounting part and the second mounting part can rotate at the same time.

可选的,所述连接管内设置有导向条,所述第二安装部的外壁上开设有导向槽,所述导向条滑动连接于所述导向槽内。Optionally, a guide bar is provided in the connecting pipe, a guide groove is opened on the outer wall of the second installation part, and the guide bar is slidably connected in the guide groove.

通过采用上述技术方案,当导向条插入导向槽内时,沿水平方向移动连接管即可保证固定销能够插入限位孔内,无需工人费力调整固定销和限位孔的位置。By adopting the above technical solution, when the guide bar is inserted into the guide groove, moving the connecting pipe in the horizontal direction can ensure that the fixing pin can be inserted into the limiting hole, and workers do not need to laboriously adjust the positions of the fixing pin and the limiting hole.

综上所述,本申请包括以下至少一种有益技术效果:In summary, the present application includes at least one of the following beneficial technical effects:

1.当卡块卡入固定槽内时,能够将定位杆向远离容纳槽的方向推动,使定位杆部分露出于滑动槽内,当连接杆沿着滑动槽的方向落下时,定位杆露出的部分能够卡入定位槽内,使连接杆固定在确定位置;1. When the clamping block is stuck in the fixing groove, the positioning rod can be pushed away from the receiving groove, so that the positioning rod part is exposed in the sliding groove. When the connecting rod falls along the direction of the sliding groove, the positioning rod is exposed Part of it can be snapped into the positioning groove, so that the connecting rod can be fixed at a certain position;

2.连接杆在重力的作用下落下时,能够将压动杆压入安置槽内,从而使抵压杆抵接于连接杆,且抵压杆的插入部能够卡入连接槽内,加固了连接杆与第二支撑杆之间的连接;2. When the connecting rod falls under the action of gravity, the pressing rod can be pressed into the placement groove, so that the pressing rod abuts against the connecting rod, and the insertion part of the pressing rod can be snapped into the connecting groove, which reinforces the a connection between the connecting rod and the second support rod;

3.相邻的两个连接杆安装完毕后,将上方的连接杆转动180°,此时将铰接于第二连接部上的四个固定杆安装于连接杆上,转动加固螺杆,使相邻的两个第二连接部向相互靠近的方向移动,将相邻的两个连接杆向相互远离的方向移动,从而增强电梯井道的稳固程度。3. After the two adjacent connecting rods are installed, turn the upper connecting rod 180°. At this time, install the four fixed rods hinged on the second connecting part on the connecting rods, and turn the reinforcing screw so that the adjacent The two second connecting parts move toward each other, and the two adjacent connecting rods move away from each other, thereby enhancing the stability of the elevator shaft.

附图说明Description of drawings

图1是本申请装配式钢结构电梯井道的结构示意图;Fig. 1 is the structural representation of the application's fabricated steel structure elevator shaft;

图2是本申请装配式钢结构电梯井道的剖视图;Fig. 2 is the cross-sectional view of the application's assembled steel structure elevator shaft;

图3是图2中A部分的放大图;Fig. 3 is an enlarged view of part A in Fig. 2;

图4是本申请装配式钢结构电梯井道固定杆的剖视图;Fig. 4 is the cross-sectional view of the fixed rod of the steel structure elevator hoistway of the present application;

图5是图4中B部分的放大图;Fig. 5 is an enlarged view of part B in Fig. 4;

图6是本申请装配式钢结构电梯井道加固螺杆的剖视图;Fig. 6 is the cross-sectional view of the reinforced screw rod of the assembled steel structure elevator shaft of the present application;

图7是图6中C部分的放大图。Fig. 7 is an enlarged view of part C in Fig. 6 .

附图标记说明:1、竖向支撑组件;11、滑动槽;2、支撑件;21、第一支撑杆;211、第一连接部;212、第一上衔接部;213、第一下衔接部;2131、容纳槽;22、第二支撑杆;221、第二连接部;222、第二上衔接部;2221、插接槽;2222、固定槽;2223、安置槽;2224、转动板;223、第二下衔接部;3、横向连接组件;31、连接杆;311、支撑部;3111、铰接块;312、滑移部;3121、定位槽;4、装配组件;41、卡接件;411、复位弹簧;412、卡块;42、定位件;421、定位杆;422、限位板;43、连接件;431、抵压杆;4311、连接部;4312、插入部;432、压动杆;5、加固组件;51、固定杆;511、嵌入槽;512、拉动杆;513、拉动槽;514、抵紧弹簧;52、加固螺杆;521、第一安装部;5211、连接管;5212、固定销;5213、导向条;5214、固定孔;522、第二安装部;5221、导向槽;5222、限位孔;53、安装块;6、磁吸片。Explanation of reference numerals: 1. Vertical support assembly; 11. Slide groove; 2. Support member; 21. First support rod; 211. First connecting part; 212. First upper joint part; 213. First lower joint 2131, receiving groove; 22, the second support rod; 221, the second connecting part; 222, the second upper connecting part; 2221, the insertion groove; 2222, the fixing groove; 2223, the placement groove; 2224, the rotating plate; 223. Second lower connecting part; 3. Transverse connection assembly; 31. Connecting rod; 311. Support part; 3111. Hinge block; 312. Sliding part; ; 411, return spring; 412, block; 42, positioning piece; 421, positioning rod; 422, limit plate; 43, connector; 431, pressing rod; Pressing rod; 5, reinforcement assembly; 51, fixed rod; 511, embedding groove; 512, pulling rod; 513, pulling groove; 514, pressing spring; 52, reinforcing screw rod; 5212, fixed pin; 5213, guide strip; 5214, fixed hole; 522, second installation part; 5221, guide groove; 5222, limit hole; 53, installation block; 6, magnetic sheet.

具体实施方式Detailed ways

以下结合附图1-7对本申请作进一步详细说明。The present application will be described in further detail below in conjunction with accompanying drawings 1-7.

参照图1、图2和图3,本申请实施例公开的一种装配式钢结构电梯井道包括四个分别设置于电梯井道边角处的竖向支撑组件1、四个分别设置于相邻竖向支撑组件1之间的横向连接组件3、多个用于装配竖向支撑组件1和横向连接组件3的装配组件4和用于增强电梯井道稳固性的加固组件5。Referring to Fig. 1, Fig. 2 and Fig. 3, a prefabricated steel structure elevator shaft disclosed by the embodiment of the application includes four vertical support assemblies 1 respectively arranged at the corners of the elevator shaft, and four vertical support assemblies 1 respectively arranged at adjacent vertical The horizontal connection assembly 3 between the support assemblies 1, a plurality of assembly assemblies 4 for assembling the vertical support assembly 1 and the horizontal connection assembly 3, and a reinforcement assembly 5 for enhancing the stability of the elevator shaft.

竖向支撑组件1包括多个沿竖直方向依次连接的支撑件2,支撑件2又包括沿竖直方向依次连接的第一支撑杆21和第二支撑杆22,需要理解的是,本申请中的第一支撑杆21和第二支撑杆22的结构相同。第一支撑杆21包括第一连接部211、设置于第一连接部211顶端的第一上衔接部212和设置于第一连接部211底端的第一下衔接部213,同样的,第二支撑杆22包括第二连接部221、设置于第二连接部221顶端的第二上衔接部222和设置于第二连接部221底端的第二下衔接部223,第二上衔接部222的顶端开设有插接槽2221,第一下衔接部213可固定连接于插接槽2221内。The vertical support assembly 1 includes a plurality of support members 2 sequentially connected in the vertical direction, and the support member 2 further includes a first support rod 21 and a second support rod 22 connected in sequence in the vertical direction. It should be understood that the present application The first support rod 21 and the second support rod 22 have the same structure. The first support rod 21 includes a first connecting portion 211, a first upper engaging portion 212 arranged at the top end of the first connecting portion 211, and a first lower engaging portion 213 arranged at the bottom end of the first connecting portion 211. Similarly, the second support The rod 22 includes a second connecting portion 221, a second upper engaging portion 222 arranged at the top end of the second connecting portion 221, and a second lower engaging portion 223 arranged at the bottom end of the second connecting portion 221. The top end of the second upper engaging portion 222 is opened There is an insertion slot 2221 , and the first lower connecting portion 213 can be fixedly connected in the insertion slot 2221 .

相邻竖向支撑组件1之间依次形成有第一空间、第二空间、第三空间和第四空间,四个横向连接组件3分别设置于四个空间内。横向连接组件3包括多个沿水平方向设置的连接杆31,能够将对应的空间分割为多个子空间,换言之,每一子空间由同一水平方向上的相邻两个第一支撑杆21或第二支撑杆22和同一竖直方向上的相邻两个连接杆31围合而成。第一支撑杆21的侧壁上沿竖直方向开设有滑动槽11,连接杆31包括支撑部311和设置于支撑部311两端的滑移部312,滑移部312滑动连接于滑动槽11内,且滑移部312的侧壁与滑动槽11的内壁相贴合。A first space, a second space, a third space and a fourth space are sequentially formed between adjacent vertical support components 1 , and four horizontal connecting components 3 are respectively arranged in the four spaces. The transverse connection assembly 3 includes a plurality of connecting rods 31 arranged in the horizontal direction, which can divide the corresponding space into a plurality of subspaces. In other words, each subspace consists of two adjacent first support rods 21 or the second Two supporting rods 22 are surrounded by two adjacent connecting rods 31 in the same vertical direction. The side wall of the first support rod 21 is provided with a sliding groove 11 along the vertical direction. The connecting rod 31 includes a supporting part 311 and sliding parts 312 arranged at both ends of the supporting part 311. The sliding part 312 is slidably connected in the sliding groove 11. , and the side wall of the sliding portion 312 is in contact with the inner wall of the sliding groove 11 .

参照图3,所述装配组件4包括卡接件41,第一下衔接部213相邻的侧壁上均设置有一个卡接件41,卡接件41包括复位弹簧411和卡块412,第一下衔接部213的侧壁上开设有容纳槽2131,且容纳槽2131的尺寸大于卡块412的尺寸,复位弹簧411的一端焊接于容纳槽2131的内底壁,另一端焊接于卡块412的侧壁,卡块412远离容纳槽2131的侧壁下部开设有移动斜面,同时,插接槽2221的内壁上开设有对应的固定槽2222。第一下衔接部213插入插接槽2221内的过程中,卡块412先被插接槽2221的侧壁压入容纳槽2131内,此时复位弹簧411处于压缩状态,当第一下衔接部213的底部抵接于插接槽2221的内底壁时,此时卡块412在复位弹簧411的弹性恢复作用下卡入固定槽2222内,实现第一支撑杆21与第二支撑杆22之间的快速装配。Referring to FIG. 3 , the assembly assembly 4 includes a clip 41, and a clip 41 is provided on the adjacent side walls of the first lower joint 213. The clip 41 includes a return spring 411 and a block 412. A receiving groove 2131 is provided on the side wall of the lower connecting portion 213, and the size of the receiving groove 2131 is larger than that of the block 412. One end of the return spring 411 is welded to the inner bottom wall of the receiving groove 2131, and the other end is welded to the block 412. The side wall of the locking block 412 is provided with a moving slope on the lower part of the side wall away from the receiving groove 2131 , and at the same time, the inner wall of the insertion groove 2221 is provided with a corresponding fixing groove 2222 . When the first lower connecting part 213 is inserted into the insertion groove 2221, the block 412 is first pressed into the receiving groove 2131 by the side wall of the insertion groove 2221. At this time, the return spring 411 is in a compressed state. When the first lower connecting part When the bottom of 213 abuts against the inner bottom wall of insertion groove 2221, at this moment, clamping block 412 is snapped into fixing groove 2222 under the elastic recovery action of return spring 411, and realizes the connection between first support rod 21 and second support rod 22. Quick assembly between.

所述装配组件4还包括定位件42,定位件42包括定位杆421和设置于定位杆421一端的限位板422,定位杆421与限位板422一体成型,定位杆421的横截面为方形,而限位板422的横截面为圆形,固定槽2222的内底壁上开设有贯穿的滑移孔,限位板422的直径大于滑移孔的内径,由此,定位杆421滑动连接于滑移孔内,限位板422滑动连接于固定槽2222内,当卡块412卡入固定槽2222内时,能够推动限位板422使其抵接于固定槽2222的内底壁,定位杆421部分露出于滑移孔,且位于滑动槽11内,滑移部312的底部开设有定位槽3121。The assembly assembly 4 also includes a positioning member 42, the positioning member 42 includes a positioning rod 421 and a limiting plate 422 arranged at one end of the positioning rod 421, the positioning rod 421 and the limiting plate 422 are integrally formed, and the cross section of the positioning rod 421 is square , and the cross-section of the limiting plate 422 is circular, the inner bottom wall of the fixing groove 2222 is provided with a through sliding hole, the diameter of the limiting plate 422 is larger than the inner diameter of the sliding hole, thus, the positioning rod 421 is slidably connected In the sliding hole, the limiting plate 422 is slidably connected in the fixing groove 2222. When the clamping block 412 is inserted into the fixing groove 2222, the limiting plate 422 can be pushed to abut against the inner bottom wall of the fixing groove 2222 for positioning. Part of the rod 421 is exposed from the sliding hole and is located in the sliding groove 11 . The bottom of the sliding part 312 defines a positioning groove 3121 .

当连接杆31在重力的作用下滑动落下,定位杆421露出于滑动槽11内的部分会进入定位槽3121内,使得连接杆31能够停在指定位置,不会再继续下落。更优的是,定位槽3121的内底壁和定位杆421的侧壁上粘接有能够配合使用的磁吸片6,减小连接杆31停在指定位置之后随意晃动的可能性。When the connecting rod 31 slides and falls under the action of gravity, the part of the positioning rod 421 exposed in the sliding groove 11 will enter the positioning groove 3121, so that the connecting rod 31 can stop at the designated position and will not continue to fall. More preferably, the inner bottom wall of the positioning groove 3121 and the side wall of the positioning rod 421 are bonded with a magnetic attraction piece 6 that can be used in conjunction, so as to reduce the possibility of the connecting rod 31 shaking randomly after stopping at a designated position.

所述装配组件4还包括连接件43,连接件43设置于滑移孔的上方,第二上衔接部222的侧壁还开设有安置槽2223,连接件43包括抵压杆431和设置于抵压杆431下部侧壁的压动杆432,抵压杆431的下部铰接于安置槽2223内,抵压杆431包括连接部4311和一体成型于连接部4311上部侧壁的插入部4312,压动杆432和插入部4312均设置于连接部4311远离安置槽2223底部的一侧,且压动杆432的长度大于插入部4312的长度,另外,滑移部312的顶部还开设有可容纳插入部4312的连接槽,连接槽设置于定位槽3121的上方。The assembly assembly 4 also includes a connecting piece 43, which is arranged above the sliding hole, and the side wall of the second upper connecting portion 222 is also provided with a placement groove 2223, and the connecting piece 43 includes a pressing rod 431 and is arranged on The pressing rod 432 on the lower side wall of the pressing rod 431, the lower part of the pressing rod 431 is hinged in the placement groove 2223, and the pressing rod 431 includes a connecting part 4311 and an insertion part 4312 integrally formed on the upper side wall of the connecting part 4311. The rod 432 and the insertion part 4312 are both arranged on the side of the connecting part 4311 away from the bottom of the placement groove 2223, and the length of the pressing rod 432 is greater than the length of the insertion part 4312. In addition, the top of the sliding part 312 is also provided with a space for accommodating the insertion part. The connection groove of 4312, the connection groove is set above the positioning groove 3121.

当连接杆31未安装时,连接部4311和插入部4312均位于安置槽2223内,压动杆432部分露出于安置槽2223;当连接杆31滑动落下时,滑移部312将压动杆432压入安置槽2223内,同时,插入部4312嵌入连接槽内,加强连接杆31与第二支撑杆22之间的连接,同时进一步减小连接杆31随意晃动的可能性。When the connecting rod 31 is not installed, both the connecting part 4311 and the inserting part 4312 are located in the placement groove 2223, and the pressing rod 432 is partly exposed in the fitting groove 2223; Press into the placement groove 2223, and at the same time, the insertion part 4312 is inserted into the connecting groove, so as to strengthen the connection between the connecting rod 31 and the second support rod 22, and further reduce the possibility of the connecting rod 31 shaking randomly.

需要补充的是,第二衔接部靠近连接杆31的侧壁上设置有圆形的转动板2224,滑移孔和连接件43均设置于转动板2224上,当连接杆31安装完毕,能够沿其水平方向的几何中心线旋转。What needs to be added is that a circular rotating plate 2224 is provided on the side wall of the second connecting portion close to the connecting rod 31, and the sliding hole and the connecting piece 43 are both arranged on the rotating plate 2224. When the connecting rod 31 is installed, it can be moved along the Its horizontal geometric centerline rotation.

参照图1和图4,由于需要预留安装电梯门的空间,因此加固组件5间隔设置于第一空间、第二空间和第三空间内,包括四个固定杆51和一个加固螺杆52,一个加固组件5可以设置于一个子空间内,也可以设置于两个子空间内,在本实施例中,一个加固组件5设置于一个子空间内。固定杆51的一端铰接于第二连接部221的侧壁,另一端铰接于连接杆31的侧壁上,且四个固定杆51能够围合成一个菱形的加固框架,沿水平方向相邻的第二连接部221的侧壁上焊接有安装块53,加固螺杆52螺纹连接于两个安装块53内,需要说明的是,加固螺杆52为双向丝杆。转动加固螺杆52使相邻的第二支撑杆22向相互靠近的方向移动时,固定杆51会向相互远离的方向移动,使连接杆31与第二支撑杆22之间的连接更紧密。Referring to Fig. 1 and Fig. 4, since the space for installing the elevator door needs to be reserved, the reinforcement assembly 5 is arranged at intervals in the first space, the second space and the third space, including four fixing rods 51 and a reinforcement screw 52, a The reinforcing component 5 can be arranged in one subspace, or in two subspaces. In this embodiment, one reinforcing component 5 is arranged in one subspace. One end of the fixed rod 51 is hinged to the side wall of the second connecting part 221, and the other end is hinged to the side wall of the connecting rod 31, and the four fixed rods 51 can form a rhombus-shaped reinforced frame, and the horizontally adjacent first Mounting blocks 53 are welded on the side walls of the second connecting portion 221 , and the reinforcing screw 52 is screwed into the two mounting blocks 53 . It should be noted that the reinforcing screw 52 is a bidirectional screw. When the reinforcing screw 52 is rotated to make the adjacent second support rods 22 move towards each other, the fixed rods 51 will move away from each other, making the connection between the connecting rod 31 and the second support rod 22 tighter.

参照图1和图5,为了便于安装,连接杆31的侧壁上焊接有圆柱形的铰接块3111,固定杆51远离第二连接部221的一侧开设有嵌入槽511,嵌入槽511靠近第二连接部221的上部内壁开设有拉动槽513,拉动槽513的内底壁上焊接有抵紧弹簧514,抵紧弹簧514的另一端焊接有拉动杆512,拉动杆512滑动连接于拉动槽513内,当抵紧弹簧514处于初始状态时,拉动杆512能够将嵌入槽511的顶部封堵。工人可先将拉动杆512压入拉动槽513内,当铰接块3111卡入嵌入槽511内后,松开拉动杆512,拉动杆512会在抵紧弹簧514的弹性恢复作用下弹起,将嵌入槽511封堵,使固定杆51铰接于连接杆31上。1 and 5, in order to facilitate installation, a cylindrical hinge block 3111 is welded on the side wall of the connecting rod 31, and the side of the fixed rod 51 away from the second connecting portion 221 is provided with an embedded groove 511, and the embedded groove 511 is close to the second connecting portion 221. The upper inner wall of the second connecting part 221 is provided with a pulling groove 513, and the inner bottom wall of the pulling groove 513 is welded with a pressing spring 514, and the other end of the pressing spring 514 is welded with a pulling rod 512, and the pulling rod 512 is slidably connected to the pulling groove 513 Inside, when the compression spring 514 is in the initial state, the pulling rod 512 can block the top of the insertion groove 511 . Workers can first press the pull rod 512 into the pull groove 513, and when the hinged block 3111 snaps into the insertion groove 511, release the pull rod 512, and the pull rod 512 will spring up under the elastic recovery effect of the compression spring 514, and the The embedding groove 511 is blocked, so that the fixing rod 51 is hinged on the connecting rod 31 .

参照图6和图7,更优的是,加固螺杆52包括第一安装部521和第二安装部522,第一安装部521和第二安装部522的螺纹方向相反,第一安装部521远离安装块53的一端套设有连接管5211,连接管5211滑动连接于第一安装部521,且连接管5211靠近第二安装部522的一侧设置有贯穿的固定孔5214,固定孔5214内设置有固定销5212,对应的,第二安装部522上开设有贯穿的限位孔5222,固定销5212螺纹连接于限位孔5222内。为了便于将固定孔5214和限位孔5222对准,连接管5211的内壁一体成型有导向条5213,第二安装部522的外壁上开设有对应的导向槽5221,当导向条5213插入导向槽5221内,说明固定孔5214的几何中心线和限位孔5222的几何中心线处于同一平面内,继续滑动连接管5211即可使固定块与限位块对准,无需工人费力调整限位孔5222的位置。6 and 7, more preferably, the reinforcement screw 52 includes a first mounting portion 521 and a second mounting portion 522, the thread directions of the first mounting portion 521 and the second mounting portion 522 are opposite, and the first mounting portion 521 is away from One end of the mounting block 53 is covered with a connecting pipe 5211, the connecting pipe 5211 is slidably connected to the first mounting part 521, and the side of the connecting pipe 5211 close to the second mounting part 522 is provided with a through fixing hole 5214, and the fixing hole 5214 is provided with a There is a fixing pin 5212 , and correspondingly, the second mounting portion 522 is provided with a through limiting hole 5222 , and the fixing pin 5212 is screwed into the limiting hole 5222 . In order to align the fixing hole 5214 with the limit hole 5222, the inner wall of the connecting pipe 5211 is integrally formed with a guide bar 5213, and the outer wall of the second mounting part 522 is provided with a corresponding guide groove 5221, when the guide bar 5213 is inserted into the guide groove 5221 It shows that the geometric centerline of the fixing hole 5214 and the geometric centerline of the limiting hole 5222 are in the same plane, and the fixed block can be aligned with the limiting block by continuing to slide the connecting tube 5211, without laborious adjustment of the limiting hole 5222. Location.

本申请实施例一种装配式钢结构电梯井道的实施原理为:工人在施工现场先将第一支撑杆21插接于第二支撑杆22上,实现支撑件2的快速装配,同时,卡块412将定位杆421推出,使其部分露出于滑动槽11内。完成四个支撑件2的安装后,将连接杆31两端的滑移孔插入对应的滑动槽11内,使其在重力作用下滑动落下,并架设于两个定位杆421上,在连接杆31滑动落下的同时,能够将压动杆432压入安置槽2223内,使得插入部4312嵌入连接槽内。The implementation principle of a prefabricated steel structure elevator shaft in the embodiment of the present application is as follows: workers first insert the first support rod 21 onto the second support rod 22 at the construction site to realize the rapid assembly of the support member 2. At the same time, the block 412 to push out the positioning rod 421 so that part of it is exposed in the sliding groove 11 . After completing the installation of the four supports 2, insert the sliding holes at both ends of the connecting rod 31 into the corresponding sliding groove 11, make it slide and fall under the action of gravity, and erect it on the two positioning rods 421, on the connecting rod 31 While sliding and falling, the pressing rod 432 can be pressed into the placement groove 2223 so that the insertion part 4312 is inserted into the connecting groove.

使用相同的装配方式完呈竖向支撑组件1和横向连接组件3的安装后,在子空间内安装加固组件5,首先将子空间内上方的连接杆31沿其水平方向的几何中心线转动180°,使连接件43位于滑移部312的下方,之后转动铰接于第二连接部221上的固定杆51,将固定杆51远离第二连接部221的一端安装在连接杆31的铰接块3111上,完成四个固定杆51的安装后,四个固定杆51围合成一个加固框架。随后将加固螺杆52的第一安装部521和第二安装部522分别安装于对应的安装块53上,再通过连接管5211实现二者的固定。最后转动加固螺杆52,使相邻的支撑件2向相互靠近的方向移动,同时,通过固定杆51将相邻的两个连接杆31向相互远离的方向推动,由于定位杆421的存在,连接杆31不会在滑动槽11内随意移动,当加固螺杆52无法继续转动时,竖向支撑组件1与横向连接组件3之间相互抵紧,增强了电梯井道结构的稳固性。After the vertical support assembly 1 and the horizontal connection assembly 3 are installed using the same assembly method, the reinforcement assembly 5 is installed in the subspace, and the upper connecting rod 31 in the subspace is first rotated 180 degrees along its horizontal geometric centerline. °, so that the connecting piece 43 is located below the sliding part 312, and then the fixed rod 51 hinged on the second connecting part 221 is rotated, and the end of the fixed rod 51 away from the second connecting part 221 is installed on the hinge block 3111 of the connecting rod 31 Above, after the installation of the four fixing rods 51 is completed, the four fixing rods 51 form a reinforced frame. Then install the first installation part 521 and the second installation part 522 of the reinforcement screw 52 on the corresponding installation block 53 respectively, and then realize the fixing of the two through the connecting pipe 5211 . Finally, the reinforcement screw 52 is rotated so that the adjacent supports 2 move toward each other. At the same time, the two adjacent connecting rods 31 are pushed away from each other by the fixed rod 51. Due to the existence of the positioning rod 421, the connection The rod 31 will not move arbitrarily in the sliding groove 11. When the reinforcing screw rod 52 cannot continue to rotate, the vertical support assembly 1 and the transverse connection assembly 3 will press against each other, which enhances the stability of the elevator shaft structure.

通过装配的方式安装电梯井道,一方面,无需在现场进行焊接操作,减小对施工现场的污染;另一方面,零件体积小,便于运输及装配。The elevator shaft is installed by assembly. On the one hand, there is no need for on-site welding operations, which reduces pollution to the construction site; on the other hand, the parts are small in size and easy to transport and assemble.

以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。All of the above are preferred embodiments of the present application, and are not intended to limit the protection scope of the application. Therefore, all equivalent changes made according to the structure, shape and principle of the application should be covered by the protection scope of the application. Inside.

Claims (10)

1.一种装配式钢结构电梯井道,其特征在于:包括设置于电梯井道边角处的四个竖向支撑组件(1)、四个设置于相邻所述竖向支撑组件(1)之间的横向连接组件(3)和多个用于将所述竖向支撑组件(1)和所述横向连接组件(3)装配的装配组件(4),多个所述装配组件(4)设置于所述竖向支撑组件(1)的相邻两侧;1. A prefabricated steel structure elevator shaft, characterized in that it includes four vertical support assemblies (1) arranged at the corners of the elevator shaft, four adjacent vertical support assemblies (1) between the horizontal connection assembly (3) and a plurality of assembly assemblies (4) for assembling the vertical support assembly (1) and the horizontal connection assembly (3), and a plurality of the assembly assemblies (4) are set on adjacent two sides of the vertical support component (1); 每个所述竖向支撑组件(1)包括上下依次连接的多组支撑件(2),每组支撑件(2)包括上下依次连接的第一支撑杆(21)和第二支撑杆(22),相邻所述竖向支撑组件(1)之间形成有第一空间、第二空间、第三空间和第四空间,每个空间内设置有一个所述横向连接组件(3);Each of the vertical support components (1) includes a plurality of sets of support members (2) connected up and down in sequence, and each set of support members (2) includes a first support rod (21) and a second support rod (22) connected up and down in sequence ), a first space, a second space, a third space and a fourth space are formed between adjacent vertical support components (1), and one horizontal connection component (3) is arranged in each space; 所述横向连接组件(3)包括多个连接杆(31),用于将对应的空间分割为多个子空间,所述竖向支撑组件(1)的相邻侧壁上沿竖直方向开设有滑动槽(11),所述连接杆(31)的两端分别滑动连接于相邻所述竖向支撑组件(1)的所述滑动槽(11)内;The horizontal connecting component (3) includes a plurality of connecting rods (31), which are used to divide the corresponding space into multiple subspaces, and the adjacent side walls of the vertical supporting component (1) are vertically opened with a sliding groove (11), the two ends of the connecting rod (31) are respectively slidingly connected in the sliding groove (11) of the adjacent vertical support component (1); 所述装配组件(4)包括用于固定连接所述第一支撑杆(21)和所述第二支撑杆(22)的卡接件(41)和用于对所述连接杆(31)定位的定位件(42)。The assembly assembly (4) includes a clip (41) for fixedly connecting the first support rod (21) and the second support rod (22) and for positioning the connecting rod (31) locator (42). 2.根据权利要求1所述的装配式钢结构电梯井道,其特征在于:所述第一支撑杆(21)包括第一连接部(211)、固设于所述第一连接部(211)上端的第一上衔接部(212)、固设于所述第一连接部(211)下端的第一下衔接部(213),所述第二支撑杆(22)包括第二连接部(221)、固设于所述第二连接部(221)上端的第二上衔接部(222)、固设于所述第二连接部(221)下端的第二下衔接部(223);2. The prefabricated steel structure elevator shaft according to claim 1, characterized in that: the first support rod (21) includes a first connection part (211), fixed on the first connection part (211) The first upper connecting part (212) at the upper end, the first lower connecting part (213) fixed at the lower end of the first connecting part (211), the second support rod (22) includes the second connecting part (221 ), the second upper connecting portion (222) fixed on the upper end of the second connecting portion (221), and the second lower connecting portion (223) fixed on the lower end of the second connecting portion (221); 所述第二上衔接部(222)的顶部开设有可容纳所述第一下衔接部(213)的插接槽(2221),所述卡接件(41)包括复位弹簧(411)和卡块(412),所述第一下衔接部(213)的侧壁上开设有容纳槽(2131),所述复位弹簧(411)的一端固定连接于所述容纳槽(2131)的底部,另一端固定连接于所述卡块(412),所述插接槽(2221)的内壁上开设有可容纳所述卡块(412)的固定槽(2222),所述卡块(412)下部远离所述容纳槽(2131)的一侧设置有移动斜面。The top of the second upper joint (222) is provided with an insertion slot (2221) that can accommodate the first lower joint (213), and the clamp (41) includes a return spring (411) and a clamp block (412), a receiving groove (2131) is opened on the side wall of the first lower connecting portion (213), one end of the return spring (411) is fixedly connected to the bottom of the receiving groove (2131), and One end is fixedly connected to the block (412), the inner wall of the insertion slot (2221) is provided with a fixed slot (2222) that can accommodate the block (412), and the lower part of the block (412) is away from One side of the receiving groove (2131) is provided with a moving slope. 3.根据权利要求2所述的装配式钢结构电梯井道,其特征在于:所述定位件(42)包括定位杆(421)和固设于所述定位杆(421)靠近所述卡块(412)一侧的限位板(422),所述限位板(422)滑动连接于所述固定槽(2222)内,所述固定槽(2222)远离所述容纳槽(2131)的侧壁上开设有贯穿的滑移孔,所述滑移孔与所述滑动槽(11)相连通,所述定位杆(421)滑动连接于所述滑移孔内,所述限位板(422)的直径大于所述滑移孔的内径,当所述限位板(422)与所述固定槽(2222)的内底壁相抵接时,所述定位杆(421)部分露出于所述滑移孔,所述连接杆(31)的侧壁上开设有可容纳所述定位杆(421)的定位槽(3121)。3. The assembled steel structure elevator shaft according to claim 2, characterized in that: the positioning member (42) includes a positioning rod (421) and is fixed on the positioning rod (421) close to the block ( 412) a limiting plate (422) on one side, the limiting plate (422) is slidably connected in the fixing groove (2222), and the fixing groove (2222) is away from the side wall of the receiving groove (2131) A through sliding hole is opened on the top, the sliding hole is connected with the sliding groove (11), the positioning rod (421) is slidingly connected in the sliding hole, and the limiting plate (422) The diameter is greater than the inner diameter of the sliding hole. When the limiting plate (422) abuts against the inner bottom wall of the fixing groove (2222), the positioning rod (421) is partially exposed to the sliding The side wall of the connecting rod (31) is provided with a positioning slot (3121) capable of accommodating the positioning rod (421). 4.根据权利要求3所述的装配式钢结构电梯井道,其特征在于:所述定位杆(421)的侧壁上和所述定位槽(3121)的内壁上设置有配合使用的磁吸片(6)。4. The prefabricated steel structure elevator shaft according to claim 3, characterized in that: the side wall of the positioning rod (421) and the inner wall of the positioning groove (3121) are provided with a magnetic attraction piece for cooperating use (6). 5.根据权利要求4所述的装配式钢结构电梯井道,其特征在于:所述装配组件(4)还包括连接件(43),所述连接件(43)设置于所述定位件(42)的上方,所述连接件(43)包括抵压杆(431)和固定连接于所述抵压杆(431)下部侧壁的压动杆(432),所述第二上衔接部(222)靠近所述连接杆(31)的侧壁上开设有安置槽(2223),所述抵压杆(431)铰接于所述安置槽(2223)内,未安装所述连接杆(31)时,所述抵压杆(431)设置于所述安置槽(2223)内,所述压动杆(432)部分露出于所述安置槽(2223)。5. The assembled steel structure elevator shaft according to claim 4, characterized in that: the assembly component (4) further includes a connecting piece (43), and the connecting piece (43) is arranged on the positioning piece (42 ), the connecting piece (43) includes a pressing rod (431) and a pressing rod (432) fixedly connected to the lower side wall of the pressing rod (431), and the second upper engaging part (222 ) is provided with a placement groove (2223) on the side wall close to the connecting rod (31), and the pressing rod (431) is hinged in the placement groove (2223). When the connecting rod (31) is not installed , the pressing rod (431) is arranged in the seating groove (2223), and the pressing rod (432) is partially exposed in the seating groove (2223). 6.根据权利要求5所述的装配式钢结构电梯井道,其特征在于:所述抵压杆(431)包括连接部(4311)和插入部(4312),所述连接杆(31)的侧壁上开设有连接槽,当所述连接杆(31)安装完毕时,所述压动杆(432)设置于所述安置槽(2223)内,所述插入部(4312)固定连接于所述连接槽内。6. The assembled steel structure elevator shaft according to claim 5, characterized in that: the pressing rod (431) includes a connection part (4311) and an insertion part (4312), and the side of the connecting rod (31) There is a connecting groove on the wall. When the connecting rod (31) is installed, the pressing rod (432) is set in the placement groove (2223), and the insertion part (4312) is fixedly connected to the in the connection slot. 7.根据权利要求2所述的装配式钢结构电梯井道,其特征在于:还包括多个加固组件(5),所述加固组件(5)设置于所述第一空间、所述第二空间和所述第三空间内,所述加固组件(5)包括四个固定杆(51)和一个加固螺杆(52),所述固定杆(51)的一端铰接于所述第二连接部(221)的侧壁,另一端铰接于所述连接杆(31)的侧壁,四个所述固定杆(51)围成加固框架,所述第二连接部(221)的侧壁上设置有安装块(53),所述加固螺杆(52)的两端分别螺纹连接于同一水平方向上相邻的两个所述安装块(53),所述第二上衔接部(222)靠近所述连接杆(31)的侧壁上转动连接有转动板(2224),所述连接杆(31)转动连接于所述第二上衔接部(222)。7. The prefabricated steel structure elevator shaft according to claim 2, characterized in that it further comprises a plurality of reinforcement components (5), and the reinforcement components (5) are arranged in the first space and the second space and in the third space, the reinforcing assembly (5) includes four fixing rods (51) and a reinforcing screw rod (52), and one end of the fixing rod (51) is hinged to the second connecting part (221 ), the other end is hinged to the side wall of the connecting rod (31), the four fixed rods (51) form a reinforced frame, and the side wall of the second connecting part (221) is provided with a mounting block (53), the two ends of the reinforcement screw (52) are threadedly connected to two adjacent mounting blocks (53) in the same horizontal direction, and the second upper joint (222) is close to the connection A rotating plate (2224) is rotatably connected to the side wall of the rod (31), and the connecting rod (31) is rotatably connected to the second upper engaging portion (222). 8.根据权利要求7所述的装配式钢结构电梯井道,其特征在于:所述连接杆(31)的侧壁上固定连接有铰接块(3111),所述固定杆(51)远离所述第二连接部(221)的一侧开设有嵌入槽(511),所述嵌入槽(511)上部靠近所述连接杆(31)一侧的内壁开设有拉动槽(513),所述拉动槽(513)内滑动连接有拉动杆(512),所述拉动杆(512)与所述拉动槽(513)的内底壁之间设置有抵紧弹簧(514)。8. The assembled steel structure elevator shaft according to claim 7, characterized in that: a hinge block (3111) is fixedly connected to the side wall of the connecting rod (31), and the fixed rod (51) is far away from the One side of the second connecting part (221) is provided with an embedding groove (511), and the inner wall of the upper part of the embedding groove (511) close to the side of the connecting rod (31) is provided with a pulling groove (513), and the pulling groove A pull rod (512) is slidably connected inside (513), and a spring (514) is provided between the pull rod (512) and the inner bottom wall of the pull groove (513). 9.根据权利要求7所述的装配式钢结构电梯井道,其特征在于:所述加固螺杆(52)包括第一安装部(521)和与所述第一安装板可拆卸连接的第二安装部(522),所述第一安装部(521)远离所述安装块(53)的一端套设有连接管(5211),所述连接管(5211)滑动连接于所述第一安装部(521),所述连接管(5211)的侧壁上穿设有固定销(5212),所述第二安装部(522)的侧壁上设置有可容纳所述固定销(5212)的限位孔(5222)。9. The prefabricated steel structure elevator shaft according to claim 7, characterized in that: the reinforcing screw (52) includes a first mounting part (521) and a second mounting part detachably connected to the first mounting plate part (522), the end of the first installation part (521) away from the installation block (53) is sleeved with a connecting pipe (5211), and the connecting pipe (5211) is slidably connected to the first installation part ( 521), the side wall of the connecting pipe (5211) is pierced with a fixing pin (5212), and the side wall of the second installation part (522) is provided with a limit that can accommodate the fixing pin (5212) hole (5222). 10.根据权利要求9所述的装配式钢结构电梯井道,其特征在于:所述连接管(5211)内设置有导向条(5213),所述第二安装部(522)的外壁上开设有导向槽(5221),所述导向条(5213)滑动连接于所述导向槽(5221)内。10. The prefabricated steel structure elevator shaft according to claim 9, characterized in that: the connecting pipe (5211) is provided with guide strips (5213), and the outer wall of the second installation part (522) is provided with A guide groove (5221), the guide bar (5213) is slidably connected in the guide groove (5221).
CN202211475863.5A 2022-11-23 2022-11-23 Assembled steel construction elevator well Pending CN115749197A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211475863.5A CN115749197A (en) 2022-11-23 2022-11-23 Assembled steel construction elevator well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211475863.5A CN115749197A (en) 2022-11-23 2022-11-23 Assembled steel construction elevator well

Publications (1)

Publication Number Publication Date
CN115749197A true CN115749197A (en) 2023-03-07

Family

ID=85336177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211475863.5A Pending CN115749197A (en) 2022-11-23 2022-11-23 Assembled steel construction elevator well

Country Status (1)

Country Link
CN (1) CN115749197A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120830379A (en) * 2025-09-10 2025-10-24 重庆迈高电梯有限公司 Outdoor residential portable elevator and installation method, control system, and medium thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI20110118A0 (en) * 2011-03-30 2011-03-30 Kone Corp Elevator with control arrangement
CN211895605U (en) * 2020-02-19 2020-11-10 西子电梯科技有限公司 Steel construction elevator derrick and elevator
CN112482690A (en) * 2020-12-07 2021-03-12 康力幸福加装电梯(苏州)有限公司 Square tube type steel structure well
CN213837564U (en) * 2020-10-27 2021-07-30 陶新宇 Assembled steel construction elevator well

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI20110118A0 (en) * 2011-03-30 2011-03-30 Kone Corp Elevator with control arrangement
CN211895605U (en) * 2020-02-19 2020-11-10 西子电梯科技有限公司 Steel construction elevator derrick and elevator
CN213837564U (en) * 2020-10-27 2021-07-30 陶新宇 Assembled steel construction elevator well
CN112482690A (en) * 2020-12-07 2021-03-12 康力幸福加装电梯(苏州)有限公司 Square tube type steel structure well

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120830379A (en) * 2025-09-10 2025-10-24 重庆迈高电梯有限公司 Outdoor residential portable elevator and installation method, control system, and medium thereof

Similar Documents

Publication Publication Date Title
CN111962742B (en) Novel ceiling type suspended ceiling structure and installation method
CN115749197A (en) Assembled steel construction elevator well
CN116717020A (en) Steel structure building assembled steel bar truss floor support plate and construction method thereof
CN203769069U (en) Rapidly-assembled integrated house
CN209025294U (en) A reserved modular ceiling structure
CN209941962U (en) Vertical connection structure of a prefabricated shear wall
CN216787444U (en) Steel construction building crossbeam connecting piece
CN211817259U (en) A two-way shock absorption connection device for aerated concrete external wall panels
CN209603344U (en) A building glass curtain wall installation structure
CN216689740U (en) Double-deck coincide prefabricated outer wall structure of basement
CN114960925B (en) an assembled building
CN209429326U (en) A wall modular steel structure strength strengthening column
CN211395983U (en) A kind of building house frame steel structure with stable beam structure
CN217949851U (en) Constructional engineering frame roof beam reinforcing apparatus
CN220285224U (en) Assembled building wallboard
CN221073094U (en) Firewall mounting structure of factory building
CN218580860U (en) Novel assembly type building component
CN114263273A (en) Anti-seismic beam-column joint for prefabricated building and construction method thereof
CN115992570A (en) Prefabricated concrete PC panels for prefabricated buildings based on BIM model
CN219451156U (en) Thermal insulation building wall connection structure
CN218933419U (en) A two-way plug-in composite beam-column quick connection structure
CN220469167U (en) An assemblable wall structure for construction
CN221030788U (en) Assembled building wallboard module
CN216304961U (en) A prefabricated connection structure for construction engineering
CN219138056U (en) Steel frame structure for assembled building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned
AD01 Patent right deemed abandoned

Effective date of abandoning: 20251219