CN115748447A - Bridge outer side construction platform for highway bridge construction and working method thereof - Google Patents
Bridge outer side construction platform for highway bridge construction and working method thereof Download PDFInfo
- Publication number
- CN115748447A CN115748447A CN202211435069.8A CN202211435069A CN115748447A CN 115748447 A CN115748447 A CN 115748447A CN 202211435069 A CN202211435069 A CN 202211435069A CN 115748447 A CN115748447 A CN 115748447A
- Authority
- CN
- China
- Prior art keywords
- construction
- rotating
- platform
- bridge
- telescopic rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明提供基于公路桥梁建设用桥梁外侧施工平台及其工作方法,属于桥梁施工设备技术领域,其包括转动臂;支撑筋,支撑筋固定连接于转动臂的下侧;高架平台,高架平台设置于转动臂的下侧,高架平台的顶部设置有移动平台,移动平台的顶部设置有转动机构,在两个限位槽与两个限位块的滑动配合下,实现对支撑滑块进行引导,同时两个支撑槽与两个支撑块滑动配合,实现对施工栏进行辅助支撑,实现对施工栏与高架平台的倾斜推动接近,使得施工栏的一端与高架平台的侧端相贴近,消除高架桥平台下侧倾斜度产生影响,便于排水管道及其他电力线路等架设,实现近距离施工,提高施工效率。
The invention provides a bridge outer construction platform based on highway bridge construction and a working method thereof, which belongs to the technical field of bridge construction equipment, and includes a rotating arm; supporting ribs, the supporting ribs are fixedly connected to the lower side of the rotating arm; an elevated platform, and the elevated platform is arranged on The lower side of the rotating arm and the top of the elevated platform are provided with a mobile platform, and the top of the mobile platform is provided with a rotating mechanism. Under the sliding cooperation of the two limit grooves and the two limit blocks, the support slider is guided, and at the same time The two support grooves and the two support blocks slide and cooperate to realize auxiliary support for the construction fence, and realize the tilting and pushing close to the construction fence and the elevated platform, so that one end of the construction fence is close to the side end of the elevated platform, eliminating the need for The influence of side inclination is convenient for the erection of drainage pipes and other power lines, realizing close-distance construction and improving construction efficiency.
Description
技术领域technical field
本发明属于桥梁施工设备技术领域,具体涉及基于公路桥梁建设用桥梁外侧施工平台及其工作方法。The invention belongs to the technical field of bridge construction equipment, and in particular relates to a bridge-outside construction platform and a working method based on highway bridge construction.
背景技术Background technique
公路桥梁工程是指公路跨越水域、山谷及一切交通通道的构造物的规划、设计、施工、养护、维修等全部工作,公路线路穿过江河、港湾、湖泊、水库、灌渠等水域,或跨过高差大的深谷地带,或跨过其他交通线路,为了保持交通畅通需要架设桥梁,繁华的市区有时需设有高架桥组成的高架路。旁山路线或因开凿路基工程浩大,或因地质构造不稳定,或因保护景观,有时也修建高架桥,而不修筑路基。Highway and bridge engineering refers to the planning, design, construction, maintenance, and repair of structures that cross waters, valleys, and all traffic passages. In deep valleys with large elevation differences, or across other traffic lines, bridges need to be erected in order to keep traffic flowing, and bustling urban areas sometimes need elevated roads composed of viaducts. The side mountain route is sometimes built with a viaduct instead of a roadbed, either because of the huge excavation of the roadbed, or because of the unstable geological structure, or because of the protection of the landscape.
通常意义上的施工平台为,通过脚手架搭建的钢架结构系统,用以对建筑工程进行辅助施工,但在桥梁的建设过程中,除去钢架结构系统外,还需要在高架桥的外侧架设排水管道及其他电力线路等的施工,需要使用到特制可移动的施工平台进行辅助施工,方便工作人员的架设施工。In the usual sense, the construction platform is a steel frame structure system built by scaffolding to assist in the construction of the construction project. However, in the construction process of the bridge, in addition to the steel frame structure system, it is also necessary to erect drainage pipes on the outside of the viaduct The construction of power lines and other power lines requires the use of special movable construction platforms for auxiliary construction, which is convenient for the staff to erect and construct.
现有的桥梁外侧施工平台在使用过程中,受限于高架桥平台下侧倾斜度影响,使得排水管道及其他电力线路等架设使用中,难以进行近距离进行施工,致使架设施工效率低下,为此我们提出基于公路桥梁建设用桥梁外侧施工平台及其工作方法。During the use of the existing construction platform on the outside of the bridge, it is limited by the inclination of the underside of the viaduct platform, which makes it difficult to carry out construction at close distances during the erection of drainage pipes and other power lines, resulting in low construction efficiency. We propose a construction platform on the outside of the bridge for road-based bridge construction and its working method.
发明内容Contents of the invention
本发明的目的在于提供基于公路桥梁建设用桥梁外侧施工平台及其工作方法,旨在解决现有的桥梁外侧施工平台在使用过程中,受限于高架桥平台下侧倾斜度影响,使得排水管道及其他电力线路等架设使用中,难以进行近距离进行施工,致使架设施工效率低下。The purpose of the present invention is to provide a bridge outer construction platform based on highway bridge construction and its working method, aiming to solve the problem that the existing bridge outer construction platform is limited by the inclination of the viaduct platform during use, making drainage pipes and During the erection and use of other power lines, it is difficult to carry out construction at close range, resulting in low efficiency of erection construction.
为实现上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:
基于公路桥梁建设用桥梁外侧施工平台,包括转动臂;Construction platforms on the outside of bridges for road-based bridge construction, including swivel arms;
支撑筋,所述支撑筋固定连接于转动臂的下侧;Support ribs, the support ribs are fixedly connected to the lower side of the rotating arm;
高架平台,所述高架平台设置于转动臂的下侧,所述高架平台的顶部设置有移动平台,所述移动平台的顶部设置有转动机构,所述转动机构与转动臂相连接;An elevated platform, the elevated platform is arranged on the lower side of the rotating arm, the top of the elevated platform is provided with a mobile platform, the top of the mobile platform is provided with a rotating mechanism, and the rotating mechanism is connected to the rotating arm;
施工栏,所述施工栏设置于高架平台的一侧,所述施工栏的内壁上固定连接有操作模板;以及A construction column, the construction column is arranged on one side of the elevated platform, and an operation template is fixedly connected to the inner wall of the construction column; and
联动机构,所述联动机构设置于转动臂的下侧,所述联动机构与施工栏相连接,用以对施工栏进行移动。A linkage mechanism, the linkage mechanism is arranged on the lower side of the rotating arm, the linkage mechanism is connected with the construction fence, and is used to move the construction fence.
作为本发明一种优选的方案,所述联动机构包括偏转组件、伸缩组件和推动组件,所述偏转组件设置于转动臂的顶部,所述伸缩组件设置于转动臂的底部,所述伸缩组件与伸缩组件相连接,所述推动组件设置于施工栏的侧端,所述推动组件与伸缩组件相连接。As a preferred solution of the present invention, the linkage mechanism includes a deflection assembly, a telescopic assembly and a push assembly, the deflection assembly is arranged on the top of the rotating arm, the telescopic assembly is arranged on the bottom of the rotating arm, and the telescopic assembly and The telescopic assembly is connected, the push assembly is arranged at the side end of the construction column, and the push assembly is connected with the telescopic assembly.
作为本发明一种优选的方案,所述偏转组件包括保护壳、旋转电机、从动齿轮和转动齿轮,所述保护壳固定连接于转动臂的顶部,所述转动齿轮固定连接于保护壳的顶部,所述转动齿轮的输出端延伸至保护壳的内壁之间,所述旋转电机固定连接于转动齿轮的输出端,所述从动齿轮设置于保护壳的内壁之间,所述从动齿轮与旋转电机相啮合。As a preferred solution of the present invention, the deflection assembly includes a protective case, a rotating motor, a driven gear and a rotating gear, the protective case is fixedly connected to the top of the rotating arm, and the rotating gear is fixedly connected to the top of the protective case , the output end of the rotating gear extends between the inner walls of the protective case, the rotating motor is fixedly connected to the output end of the rotating gear, the driven gear is arranged between the inner walls of the protective case, and the driven gear and The rotating motor is meshed.
作为本发明一种优选的方案,所述伸缩组件包括第一伸缩杆、第一容纳槽、第二伸缩杆、第二容纳槽、第一滑块、第三伸缩杆、第二滑块和气动推杆,所述第一伸缩杆转动连接于转动臂的底部,所述第一伸缩杆的顶部延伸至保护壳的内壁之间,且所述第一伸缩杆的顶部与旋转电机固定连接,所述第一容纳槽设置有多个,多个所述第一容纳槽开设于第一伸缩杆的圆周表面,所述第二伸缩杆套设于第一伸缩杆的圆周表面,所述第一滑块设置有多个,多个所述第一滑块均固定连接于第二伸缩杆的圆周内壁上,多个所述第一滑块滑动于多个第一容纳槽内,所述第二容纳槽设置有多个,多个所述第二容纳槽开设于第二伸缩杆的圆周表面,所述第三伸缩杆滑动于第二伸缩杆的圆周表面,所述第二滑块设置有多个,多个所述第二滑块固定连接于第三伸缩杆的圆周表面,多个所述第二滑块滑动于多个第二容纳槽内,所述气动推杆固定连接于第一伸缩杆的圆周内壁之间,所述气动推杆的输出端与第三伸缩杆的下内壁固定连接。As a preferred solution of the present invention, the telescopic assembly includes a first telescopic rod, a first storage slot, a second telescopic rod, a second storage slot, a first slider, a third telescopic rod, a second slider and a pneumatic Push rod, the first telescopic rod is rotatably connected to the bottom of the rotating arm, the top of the first telescopic rod extends between the inner walls of the protective shell, and the top of the first telescopic rod is fixedly connected to the rotating motor, so There are a plurality of first accommodation grooves, the plurality of first accommodation grooves are opened on the circumferential surface of the first telescopic rod, the second telescopic rod is sleeved on the circumferential surface of the first telescopic rod, and the first slide There are multiple blocks, and the multiple first sliders are all fixedly connected to the circumferential inner wall of the second telescopic rod, and the multiple first sliders slide in multiple first accommodation grooves, and the second accommodation There are multiple slots, the multiple second receiving slots are set on the peripheral surface of the second telescopic rod, the third telescopic rod slides on the peripheral surface of the second telescopic rod, and the second slider is provided with multiple A plurality of the second sliders are fixedly connected to the circumferential surface of the third telescopic rod, a plurality of the second sliders slide in a plurality of second receiving grooves, and the pneumatic push rod is fixedly connected to the first telescopic rod The output end of the pneumatic push rod is fixedly connected with the lower inner wall of the third telescopic rod.
作为本发明一种优选的方案,所述推动组件包括安装板、固定块、支撑槽、滑槽、限位槽、推动电机、丝杆、支撑滑块、限位块和支撑块,所述安装板固定连接于第三伸缩杆的圆周表面,所述固定块固定连接于安装板的侧端,所述滑槽开设于支撑槽的侧端,所述丝杆转动连接于滑槽的内壁之间,所述推动电机固定安装于固定块的侧端,所述推动电机的输出端与丝杆相连接,所述支撑滑块套设于丝杆的圆周表面,所述支撑滑块滑动于滑槽的内壁之间,所述支撑滑块与施工栏的侧端固定连接,所述限位槽设置有两个,两个所述限位槽开设于滑槽的内壁上,所述限位块设置有两个,两个所述限位块固定连接于支撑滑块的侧端,两个所述限位块滑动于两个限位槽的内壁之间,所述支撑槽设置有两个,两个所述支撑槽开设于固定块的侧端,所述支撑块设置有两个,两个所述支撑块滑动于两个支撑槽的内壁之间,两个所述支撑块均固定连接于施工栏的侧端。As a preferred solution of the present invention, the push assembly includes a mounting plate, a fixed block, a support groove, a chute, a limit groove, a push motor, a screw rod, a support slider, a limit block and a support block. The plate is fixedly connected to the circumferential surface of the third telescopic rod, the fixed block is fixedly connected to the side end of the mounting plate, the chute is opened at the side end of the support groove, and the screw rod is rotatably connected between the inner walls of the chute , the push motor is fixedly installed on the side end of the fixed block, the output end of the push motor is connected with the screw rod, the support slider is sleeved on the circumferential surface of the screw rod, and the support slider slides on the chute Between the inner walls of the chute, the support slider is fixedly connected to the side end of the construction column. There are two limiting slots, and the two limiting slots are set on the inner wall of the chute. The limiting block is set There are two, and the two limiting blocks are fixedly connected to the side ends of the supporting slider, and the two limiting blocks slide between the inner walls of the two limiting grooves, and the supporting grooves are provided with two, two Two of the support slots are opened at the side ends of the fixed block, and two of the support blocks are provided, and the two support blocks slide between the inner walls of the two support slots, and the two support blocks are fixedly connected to the construction side of the bar.
作为本发明一种优选的方案,所述转动机构包括转动盘、涡轮、转动电机和蜗杆,所述转动盘安装固定于移动平台的顶部,所述涡轮转动连接于转动盘的圆周内壁,所述蜗杆转动连接于涡轮的内壁之间,所述蜗杆与涡轮相啮合,所述转动电机固定安装于涡轮的圆周表面,所述转动电机的输出端延伸至涡轮内,且所述转动电机的输出端与蜗杆相连接。As a preferred solution of the present invention, the rotating mechanism includes a rotating disk, a turbine, a rotating motor and a worm, the rotating disk is installed and fixed on the top of the mobile platform, the turbine is rotatably connected to the inner wall of the rotating disk, the The worm is rotatably connected between the inner walls of the turbine, the worm is meshed with the turbine, the rotating motor is fixedly mounted on the circumferential surface of the turbine, the output end of the rotating motor extends into the turbine, and the output end of the rotating motor connected to the worm.
作为本发明一种优选的方案,所述施工栏侧端固定连接有固定架,所述固定架的内壁之间通过转轴安装有滚轮。As a preferred solution of the present invention, a fixed frame is fixedly connected to the side end of the construction fence, and rollers are installed between the inner walls of the fixed frame through rotating shafts.
作为本发明一种优选的方案,所述转动臂的侧端固定连接有配重箱,所述转动臂的顶部固定安装有运行指示灯。As a preferred solution of the present invention, a counterweight box is fixedly connected to the side end of the rotating arm, and a running indicator light is fixedly installed on the top of the rotating arm.
作为本发明一种优选的方案,所述移动平台的顶部固定连接有缓冲板。As a preferred solution of the present invention, a buffer plate is fixedly connected to the top of the mobile platform.
基于公路桥梁建设用桥梁外侧施工平台的工作方法,包括如下步骤:The working method based on the construction platform on the outside of the bridge for highway bridge construction comprises the following steps:
S1、旋转布置:S1, rotation arrangement:
启动转动电机,转动电机的输出端带动蜗杆进行旋转,蜗杆通过与涡轮相啮合带动涡轮进行旋转,涡轮带动转动臂进行旋转,转动臂进行旋转带动施工栏进行旋转,实现对施工栏进行旋转布置;Start the rotating motor, the output end of the rotating motor drives the worm to rotate, the worm drives the turbine to rotate by meshing with the turbine, the turbine drives the rotating arm to rotate, the rotating arm rotates to drive the construction fence to rotate, and the construction fence is rotated and arranged;
S2、升降移动:S2. Lifting and moving:
启动气动推杆,气动推杆的输出端推动第三伸缩杆进行下降,继而实现第二伸缩杆在多个第一滑块与多个第一容纳槽的滑动配合下进行下降,第三伸缩杆在多个第二容纳槽与多个第二滑块的滑动配合下降,实现对施工栏的升降移动;Start the pneumatic push rod, the output end of the pneumatic push rod pushes the third telescopic rod to descend, and then the second telescopic rod descends under the sliding cooperation of multiple first sliders and multiple first receiving grooves, and the third telescopic rod The sliding cooperation between the multiple second receiving grooves and the multiple second sliders is lowered to realize the lifting and moving of the construction column;
S3、偏转移动:S3. Deflection movement:
启动转动齿轮,转动齿轮的输出端带动旋转电机进行旋转,旋转电机通过与从动齿轮的啮合带动从动齿轮进行旋转,从动齿轮带动第一伸缩杆进行旋转,第一伸缩杆带动第二伸缩杆进行旋转,第二伸缩杆带动第三伸缩杆进行旋转,第三伸缩杆带动安装板进行旋转,继而带动固定块进行旋转,实现对施工栏进行偏移旋转;Start the rotating gear, the output end of the rotating gear drives the rotating motor to rotate, the rotating motor drives the driven gear to rotate through the meshing with the driven gear, the driven gear drives the first telescopic rod to rotate, and the first telescopic rod drives the second telescopic rod to rotate The rod rotates, the second telescopic rod drives the third telescopic rod to rotate, the third telescopic rod drives the mounting plate to rotate, and then drives the fixed block to rotate, realizing the offset rotation of the construction column;
S4、推动接近:S4, push close:
启动推动电机,推动电机的输出端带动丝杆进行旋转,丝杆通过与支撑滑块的滑动配合推动支撑滑块进行移动,支撑滑块带动施工栏进行移动,在两个限位槽与两个限位块的滑动配合下,实现对支撑滑块进行引导,同时两个支撑槽与两个支撑块滑动配合,实现对施工栏进行辅助支撑,实现对施工栏与高架平台的倾斜推动接近;Start the push motor, and the output end of the push motor drives the screw to rotate. The screw pushes the support slider to move through the sliding cooperation with the support slider, and the support slider drives the construction bar to move. Under the sliding cooperation of the limit block, the support slider is guided, and at the same time, the two support grooves and the two support blocks slide and cooperate to realize the auxiliary support for the construction fence, and realize the inclined push approach between the construction fence and the elevated platform;
S5、辅助支撑:S5. Auxiliary support:
当施工栏接近高架平台的倾斜侧端时接触时,滚轮与倾斜端滚动贴合,在对整个设备的移动过程中,滚轮防止施工栏产生偏移,用以实现对施工栏的辅助支撑。When the construction fence is close to the inclined side end of the elevated platform, the rollers will roll and stick to the inclined end. During the movement of the entire equipment, the rollers will prevent the construction fence from shifting, so as to realize the auxiliary support for the construction fence.
与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
1、本方案中,启动推动电机,推动电机的输出端带动丝杆进行旋转,丝杆通过与支撑滑块的滑动配合推动支撑滑块进行移动,支撑滑块带动施工栏进行移动,在两个限位槽与两个限位块的滑动配合下,实现对支撑滑块进行引导,同时两个支撑槽与两个支撑块滑动配合,实现对施工栏进行辅助支撑,实现对施工栏与高架平台的倾斜推动接近,使得施工栏的一端与高架平台的侧端相贴近,消除高架桥平台下侧倾斜度产生影响,便于排水管道及其他电力线路等架设,实现近距离施工,提高施工效率。1. In this scheme, start the push motor, and the output end of the push motor drives the screw to rotate. The screw pushes the support slider to move through the sliding cooperation with the support slider, and the support slider drives the construction bar to move. Under the sliding cooperation between the limit groove and the two limit blocks, the support slider can be guided, and at the same time, the two support grooves can slide and cooperate with the two support blocks to realize auxiliary support for the construction fence and realize the support between the construction fence and the elevated platform. The inclination pushes closer, so that one end of the construction column is close to the side end of the elevated platform, eliminating the influence of the inclination of the underside of the viaduct platform, facilitating the erection of drainage pipes and other power lines, realizing close-distance construction and improving construction efficiency.
2、本方案中,启动气动推杆,气动推杆的输出端推动第三伸缩杆进行下降,继而实现第二伸缩杆在多个第一滑块与多个第一容纳槽的滑动配合下进行下降,第三伸缩杆在多个第二容纳槽与多个第二滑块的滑动配合下降,实现对施工栏的升降移动,通过对施工栏的升降移动,便于将施工人员移动至高架平台的倾斜侧端,改变施工人员与推动电机的倾斜侧端位置关系,适应不同的架设需求。2. In this solution, the pneumatic push rod is started, and the output end of the pneumatic push rod pushes the third telescopic rod to descend, and then the second telescopic rod is realized under the sliding cooperation of multiple first sliders and multiple first receiving grooves. Descending, the third telescopic rod slides and descends in a plurality of second receiving slots and a plurality of second sliders to realize the lifting and moving of the construction fence. Through the lifting and moving of the construction fence, it is convenient to move the construction personnel to the height of the elevated platform. The inclined side end can change the positional relationship between the construction personnel and the inclined side end of the driving motor, so as to adapt to different erection requirements.
3、本方案中,启动转动齿轮,转动齿轮的输出端带动旋转电机进行旋转,旋转电机通过与从动齿轮的啮合带动从动齿轮进行旋转,从动齿轮带动第一伸缩杆进行旋转,第一伸缩杆带动第二伸缩杆进行旋转,第二伸缩杆带动第三伸缩杆进行旋转,第三伸缩杆带动安装板进行旋转,继而带动固定块进行旋转,实现对施工栏进行偏移旋转,使得施工栏可进行旋转,便于对施工栏进行偏转,方便适应施工栏的一端与不同高架平台侧端的贴近,便于工作人员对高架平台的侧端进行架设排水管道及其他电力线路等。3. In this scheme, the rotating gear is started, and the output end of the rotating gear drives the rotating motor to rotate. The rotating motor drives the driven gear to rotate through the engagement with the driven gear, and the driven gear drives the first telescopic rod to rotate. The telescopic rod drives the second telescopic rod to rotate, the second telescopic rod drives the third telescopic rod to rotate, the third telescopic rod drives the mounting plate to rotate, and then drives the fixed block to rotate, realizing the offset rotation of the construction column, so that the construction The column can be rotated to facilitate the deflection of the construction column, to adapt to the closeness of one end of the construction column to the side ends of different elevated platforms, and to facilitate the staff to erect drainage pipes and other power lines on the side ends of the elevated platforms.
附图说明Description of drawings
附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。在附图中:The accompanying drawings are used to provide a further understanding of the present invention, and constitute a part of the description, and are used together with the embodiments of the present invention to explain the present invention, and do not constitute a limitation to the present invention. In the attached picture:
图1为本发明基于公路桥梁建设用桥梁外侧施工平台的第一视角演示图;Fig. 1 is the first perspective demonstration figure of the bridge outside construction platform based on highway bridge construction of the present invention;
图2为本发明基于公路桥梁建设用桥梁外侧施工平台的第二视角演示图;Fig. 2 is the second perspective demonstration figure of the present invention based on the bridge outside construction platform of road bridge construction;
图3为本发明基于公路桥梁建设用桥梁外侧施工平台的立体图;Fig. 3 is that the present invention is based on the three-dimensional view of the bridge outside construction platform of highway bridge construction;
图4为本发明基于公路桥梁建设用桥梁外侧施工平台的半剖图;Fig. 4 is the semi-sectional view of the bridge outside construction platform based on highway bridge construction of the present invention;
图5为本发明基于公路桥梁建设用桥梁外侧施工平台的爆炸图;Fig. 5 is the exploded view of the bridge outer construction platform based on the highway bridge construction of the present invention;
图6为本发明基于公路桥梁建设用桥梁外侧施工平台的转动机构;Fig. 6 is the rotation mechanism based on the construction platform on the outside of the bridge for highway bridge construction in the present invention;
图7为本发明基于公路桥梁建设用桥梁外侧施工平台的转动组件;Fig. 7 is the rotating assembly of the bridge outer construction platform based on the highway bridge construction of the present invention;
图8为本发明基于公路桥梁建设用桥梁外侧施工平台的升降组件;Fig. 8 is the lifting assembly based on the construction platform on the outside of the bridge for highway bridge construction in the present invention;
图9为本发明基于公路桥梁建设用桥梁外侧施工平台的推动组件;Fig. 9 is the push assembly based on the construction platform on the outside of the bridge for highway bridge construction in the present invention;
图10为本发明基于公路桥梁建设用桥梁外侧施工平台中施工栏(30)的立体图。Fig. 10 is a perspective view of the construction column (30) in the construction platform on the outside of the bridge for highway bridge construction according to the present invention.
图中:1、转动臂;2、涡轮;3、转动电机;4、蜗杆;5、转动盘;6、支撑筋;7、保护壳;8、旋转电机;9、从动齿轮;10、转动齿轮;11、运行指示灯;12、第一伸缩杆;13、第一容纳槽;14、第二伸缩杆;15、第二容纳槽;16、第一滑块;17、第三伸缩杆;18、第二滑块;19、气动推杆;20、安装板;21、固定块;22、支撑槽;23、滑槽;24、限位槽;25、推动电机;26、丝杆;27、支撑滑块;28、限位块;29、支撑块;30、施工栏;31、固定架;32、操作模板;33、滚轮;34、配重箱;35、高架平台;36、缓冲板;37、移动平台。In the figure: 1. rotating arm; 2. turbine; 3. rotating motor; 4. worm; 5. rotating disc; 6. support rib; 7. protective shell; 8. rotating motor; 9. driven gear; Gear; 11. Operation indicator light; 12. The first telescopic rod; 13. The first storage slot; 14. The second telescopic rod; 15. The second storage slot; 16. The first slider; 17. The third telescopic rod; 18. Second slider; 19. Pneumatic push rod; 20. Mounting plate; 21. Fixed block; 22. Support groove; 23. Slide groove; 24. Limit groove; 25. Pushing motor; 26. Screw rod; 27 , support slider; 28, limit block; 29, support block; 30, construction column; 31, fixed frame; 32, operation template; 33, roller; 34, counterweight box; 35, elevated platform; 36, buffer plate; 37. Mobile platforms.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
实施例Example
参照图1-图10,基于公路桥梁建设用桥梁外侧施工平台,包括:Referring to Figure 1-Figure 10, based on the construction platform on the outside of the bridge for highway bridge construction, it includes:
转动臂1;swivel arm 1;
支撑筋6,支撑筋6固定连接于转动臂1的下侧;The supporting
高架平台35,高架平台35设置于转动臂1的下侧,高架平台35的顶部设置有移动平台37,移动平台37的顶部设置有转动机构,转动机构与转动臂1相连接;
施工栏30,施工栏30设置于高架平台35的一侧,施工栏30的内壁上固定连接有操作模板32;以及A
联动机构,联动机构设置于转动臂1的下侧,联动机构与施工栏30相连接,用以对施工栏30进行移动。The linkage mechanism is arranged on the lower side of the rotating arm 1 , and the linkage mechanism is connected with the
本发明中,支撑筋6用以支撑固定转动臂1,高架平台35用以支撑固定移动平台37,移动平台37用以支撑固定涡轮2,转动机构用以对转动臂1进行旋转,施工栏30用以提供人员施工作业的平台,操作模板32与转动电机3、转动齿轮10、气动推杆19、推动电机25和移动平台37之间电性连接,通过操作模板32对施工栏30进行操作移动,联动机构与施工栏30相连接,用以对施工栏30进行移动。In the present invention, the
联动机构包括偏转组件、伸缩组件和推动组件,偏转组件设置于转动臂1的顶部,伸缩组件设置于转动臂1的底部,伸缩组件与伸缩组件相连接,推动组件设置于施工栏30的侧端,推动组件与伸缩组件相连接。The linkage mechanism includes a deflection assembly, a telescopic assembly and a push assembly, the deflection assembly is arranged on the top of the rotating arm 1, the telescopic assembly is arranged on the bottom of the rotating arm 1, the telescopic assembly is connected with the telescopic assembly, and the pushing assembly is arranged at the side end of the
本发明中,偏转组件用以施工栏30进行旋转,伸缩组件用以对施工栏30进行升降,推动组件用以对施工栏30进行移动。In the present invention, the deflection component is used to rotate the
偏转组件包括保护壳7、旋转电机8、从动齿轮9和转动齿轮10,保护壳7固定连接于转动臂1的顶部,转动齿轮10固定连接于保护壳7的顶部,转动齿轮10的输出端延伸至保护壳7的内壁之间,旋转电机8固定连接于转动齿轮10的输出端,从动齿轮9设置于保护壳7的内壁之间,从动齿轮9与旋转电机8相啮合。The deflection assembly includes a protective case 7, a
本发明中,保护壳7用以保护旋转电机8和从动齿轮9,转动齿轮10用以为旋转电机8的旋转提供动力,继而带动从动齿轮9进行旋转,为施工栏30的偏转提供动力,启动转动齿轮10,转动齿轮10的输出端带动旋转电机8进行旋转,旋转电机8通过与从动齿轮9的啮合带动从动齿轮9进行旋转,从动齿轮9带动第一伸缩杆12进行旋转,第一伸缩杆12带动第二伸缩杆14进行旋转,第二伸缩杆14带动第三伸缩杆17进行旋转,第三伸缩杆17带动安装板20进行旋转,继而带动固定块21进行旋转,实现对施工栏30进行偏移旋转,使得施工栏30可进行旋转,便于对施工栏30进行偏转,方便适应施工栏30的一端与不同高架平台35侧端的贴近,便于工作人员对高架平台35的侧端进行架设排水管道及其他电力线路等。In the present invention, the protective case 7 is used to protect the rotating motor 8 and the driven gear 9, and the rotating gear 10 is used to provide power for the rotation of the rotating motor 8, and then drives the driven gear 9 to rotate, so as to provide power for the deflection of the construction fence 30, Start the rotating gear 10, the output end of the rotating gear 10 drives the rotating motor 8 to rotate, the rotating motor 8 drives the driven gear 9 to rotate through the engagement with the driven gear 9, and the driven gear 9 drives the first telescopic rod 12 to rotate, The first telescopic rod 12 drives the second telescopic rod 14 to rotate, the second telescopic rod 14 drives the third telescopic rod 17 to rotate, the third telescopic rod 17 drives the mounting plate 20 to rotate, and then drives the fixed block 21 to rotate, realizing The construction column 30 is offset and rotated, so that the construction column 30 can be rotated, which is convenient to deflect the construction column 30, and is convenient to adapt to the closeness of one end of the construction column 30 to the side ends of different elevated platforms 35, and is convenient for the staff to check the side ends of the elevated platform 35 Erection of drainage pipes and other power lines, etc.
伸缩组件包括第一伸缩杆12、第一容纳槽13、第二伸缩杆14、第二容纳槽15、第一滑块16、第三伸缩杆17、第二滑块18和气动推杆19,第一伸缩杆12转动连接于转动臂1的底部,第一伸缩杆12的顶部延伸至保护壳7的内壁之间,且第一伸缩杆12的顶部与旋转电机8固定连接,第一容纳槽13设置有多个,多个第一容纳槽13开设于第一伸缩杆12的圆周表面,第二伸缩杆14套设于第一伸缩杆12的圆周表面,第一滑块16设置有多个,多个第一滑块16均固定连接于第二伸缩杆14的圆周内壁上,多个第一滑块16滑动于多个第一容纳槽13内,第二容纳槽15设置有多个,多个第二容纳槽15开设于第二伸缩杆14的圆周表面,第三伸缩杆17滑动于第二伸缩杆14的圆周表面,第二滑块18设置有多个,多个第二滑块18固定连接于第三伸缩杆17的圆周表面,多个第二滑块18滑动于多个第二容纳槽15内,气动推杆19固定连接于第一伸缩杆12的圆周内壁之间,气动推杆19的输出端与第三伸缩杆17的下内壁固定连接。The telescopic assembly includes a first telescopic rod 12, a first receiving slot 13, a second telescopic rod 14, a second receiving slot 15, a first slider 16, a third telescopic rod 17, a second slider 18 and a pneumatic push rod 19, The first telescopic rod 12 is rotatably connected to the bottom of the rotating arm 1, the top of the first telescopic rod 12 extends between the inner walls of the protective shell 7, and the top of the first telescopic rod 12 is fixedly connected with the rotating motor 8, and the first receiving groove 13 is provided with a plurality of, a plurality of first accommodation slots 13 are opened on the circumferential surface of the first telescopic rod 12, the second telescopic rod 14 is sleeved on the circumferential surface of the first telescopic rod 12, and the first slider 16 is provided with a plurality of , a plurality of first sliders 16 are fixedly connected to the circumferential inner wall of the second telescopic rod 14, a plurality of first sliders 16 slide in a plurality of first accommodation grooves 13, and the second accommodation groove 15 is provided with a plurality of, A plurality of second receiving grooves 15 are opened on the peripheral surface of the second telescopic rod 14, the third telescopic rod 17 slides on the peripheral surface of the second telescopic rod 14, and the second slider 18 is provided with multiple, multiple second sliders 18 is fixedly connected to the circumferential surface of the third telescopic rod 17, a plurality of second sliders 18 slide in a plurality of second receiving grooves 15, the pneumatic push rod 19 is fixedly connected between the circumferential inner walls of the first telescopic rod 12, and the pneumatic push rod 19 The output end of the push rod 19 is fixedly connected with the lower inner wall of the third telescopic rod 17 .
本发明中,第一伸缩杆12用以支撑固定第二伸缩杆14,同时第一伸缩杆12用以支撑固定从动齿轮9,多个第一容纳槽13的开设用以容纳多个第一滑块16,第二伸缩杆14用以支撑固定第三伸缩杆17,多个第一滑块16滑动于多个第一容纳槽13内,多个第一滑块16与多个第一容纳槽13滑动配合,实现对第二伸缩杆14的移动进行限定,多个第二容纳槽15的开设用以容纳多个第二滑块18,多个第二容纳槽15与多个第二滑块18滑动配合,实现对第三伸缩杆17的移动进行限定,气动推杆19用以对第三伸缩杆17、第二伸缩杆14进行连续升降,继而带动施工栏30的升降,启动气动推杆19,气动推杆19的输出端推动第三伸缩杆17进行下降,继而实现第二伸缩杆14在多个第一滑块16与多个第一容纳槽13的滑动配合下进行下降,第三伸缩杆17在多个第二容纳槽15与多个第二滑块18的滑动配合下降,实现对施工栏30的升降移动,通过对施工栏30的升降移动,便于将施工人员移动至高架平台35的倾斜侧端,改变施工人员与推动电机25的倾斜侧端位置关系,适应不同的架设需求。In the present invention, the first
推动组件包括安装板20、固定块21、支撑槽22、滑槽23、限位槽24、推动电机25、丝杆26、支撑滑块27、限位块28和支撑块29,安装板20固定连接于第三伸缩杆17的圆周表面,固定块21固定连接于安装板20的侧端,滑槽23开设于支撑槽22的侧端,丝杆26转动连接于滑槽23的内壁之间,推动电机25固定安装于固定块21的侧端,推动电机25的输出端与丝杆26相连接,支撑滑块27套设于丝杆26的圆周表面,支撑滑块27滑动于滑槽23的内壁之间,支撑滑块27与施工栏30的侧端固定连接,限位槽24设置有两个,两个限位槽24开设于滑槽23的内壁上,限位块28设置有两个,两个限位块28固定连接于支撑滑块27的侧端,两个限位块28滑动于两个限位槽24的内壁之间,支撑槽22设置有两个,两个支撑槽22开设于固定块21的侧端,支撑块29设置有两个,两个支撑块29滑动于两个支撑槽22的内壁之间,两个支撑块29均固定连接于施工栏30的侧端。The push assembly includes a mounting plate 20, a fixed block 21, a support groove 22, a chute 23, a limit groove 24, a push motor 25, a screw mandrel 26, a supporting slide block 27, a limit block 28 and a support block 29, and the mounting plate 20 is fixed Connected to the circumferential surface of the third telescopic rod 17, the fixed block 21 is fixedly connected to the side end of the mounting plate 20, the chute 23 is opened at the side end of the support groove 22, and the screw rod 26 is rotatably connected between the inner walls of the chute 23, The push motor 25 is fixedly installed on the side end of the fixed block 21, the output end of the push motor 25 is connected with the screw mandrel 26, the support slider 27 is sleeved on the circumferential surface of the screw mandrel 26, and the support slider 27 slides on the side of the chute 23 Between the inner walls, the support slider 27 is fixedly connected with the side end of the construction column 30, and there are two limiting grooves 24, and the two limiting grooves 24 are opened on the inner wall of the chute 23, and the limiting block 28 is provided with two , two limit blocks 28 are fixedly connected to the side ends of the support slider 27, the two limit blocks 28 slide between the inner walls of the two limit grooves 24, two support grooves 22 are provided, and the two support grooves 22 Set at the side end of the fixed block 21 , there are two support blocks 29 , the two support blocks 29 slide between the inner walls of the two support grooves 22 , and the two support blocks 29 are fixedly connected to the side ends of the construction fence 30 .
本发明中,安装板20用以支撑固定块21,固定块21用以支撑固定推动电机25、支撑滑块27和两个支撑块29,滑槽23的开设用以容纳支撑滑块27,丝杆26通过与支撑滑块27的滑动配合,实现对支撑滑块27进行推动,继而带动施工栏30的移动,推动电机25为丝杆26的旋转提供动力,支撑滑块27用以支撑固定施工栏30和两个限位块28,两个限位槽24的开设用以容纳两个限位块28的滑动,两个限位块28滑动于两个限位槽24内,通过两个限位槽24与两个限位块28的滑动配合,实现对支撑滑块27的移动进行导向限制,两个支撑槽22的开设用以容纳两个支撑块29,两个支撑块29滑动于两个支撑槽22内,实现对施工栏30支撑,启动推动电机25,推动电机25的输出端带动丝杆26进行旋转,丝杆26通过与支撑滑块27的滑动配合推动支撑滑块27进行移动,支撑滑块27带动施工栏30进行移动,在两个限位槽24与两个限位块28的滑动配合下,实现对支撑滑块27进行引导,同时两个支撑槽22与两个支撑块29滑动配合,实现对施工栏30进行辅助支撑,实现对施工栏30与高架平台35的倾斜推动接近,使得施工栏30的一端与高架平台35的侧端相贴近,消除高架桥平台下侧倾斜度产生影响,便于排水管道及其他电力线路等架设,实现近距离施工,提高施工效率。In the present invention, the mounting
转动机构包括转动盘5、涡轮2、转动电机3和蜗杆4,转动盘5安装固定于移动平台37的顶部,涡轮2转动连接于转动盘5的圆周内壁,蜗杆4转动连接于涡轮2的内壁之间,蜗杆4与涡轮2相啮合,转动电机3固定安装于涡轮2的圆周表面,转动电机3的输出端延伸至涡轮2内,且转动电机3的输出端与蜗杆4相连接。The rotating mechanism includes a rotating disk 5, a turbine 2, a rotating motor 3 and a worm screw 4. The rotating disk 5 is installed and fixed on the top of the
本发明中,转动盘5用以容纳涡轮2,涡轮2用以支撑固定转动臂1,蜗杆4通过与涡轮2进行啮合带动涡轮2进行旋转,继而带动转动臂1进行旋转,使得施工栏30改变位置,方便对施工栏30进行移动,转动电机3为蜗杆4的旋转提供动力,启动转动电机3,转动电机3的输出端带动蜗杆4进行旋转,蜗杆4通过与涡轮2相啮合带动涡轮2进行旋转,涡轮2带动转动臂1进行旋转,转动臂1进行旋转带动施工栏30进行旋转,实现对施工栏30进行旋转布置,方便进行施工栏30进行移动。In the present invention, the rotating disk 5 is used to accommodate the turbine 2, and the turbine 2 is used to support and fix the rotating arm 1. The worm 4 drives the turbine 2 to rotate by meshing with the turbine 2, and then drives the rotating arm 1 to rotate, so that the
施工栏30侧端固定连接有固定架31,固定架31的内壁之间通过转轴安装有滚轮33。The side ends of the
本发明中,固定架31用以支撑滚轮33,滚轮33用以贴合高架平台35的倾斜侧端,通过滚轮33与高架平台35的倾斜侧端滚动贴合,当施工栏30接近高架平台35的倾斜侧端时接触时,滚轮33与倾斜端滚动贴合,在对整个设备的移动过程中,滚轮33防止施工栏30产生偏移,用以实现对施工栏30的辅助支撑。In the present invention, the fixed
转动臂1的侧端固定连接有配重箱34,转动臂1的顶部固定安装有运行指示灯11。The side end of the rotating arm 1 is fixedly connected with a
本发明中,配重箱34用以对转动臂1进行配重,避免装置产生倾斜,运行指示灯11用以显示的工作状态。In the present invention, the
移动平台37的顶部固定连接有缓冲板36。A
本发明中,缓冲板36的设置用以消除施工栏30对移动平台37碰撞,避免施工栏30的移动时,产生的碰撞。In the present invention, the setting of the
基于公路桥梁建设用桥梁外侧施工平台的工作方法,包括如下步骤:The working method based on the construction platform on the outside of the bridge for highway bridge construction comprises the following steps:
S1、旋转布置:S1, rotation arrangement:
启动转动电机3,转动电机3的输出端带动蜗杆4进行旋转,蜗杆4通过与涡轮2相啮合带动涡轮2进行旋转,涡轮2带动转动臂1进行旋转,转动臂1进行旋转带动施工栏30进行旋转,实现对施工栏30进行旋转布置;Start the rotating motor 3, the output end of the rotating motor 3 drives the worm 4 to rotate, the worm 4 drives the turbine 2 to rotate by meshing with the turbine 2, the turbine 2 drives the rotating arm 1 to rotate, and the rotating arm 1 rotates to drive the
S2、升降移动:S2. Lifting and moving:
启动气动推杆19,气动推杆19的输出端推动第三伸缩杆17进行下降,继而实现第二伸缩杆14在多个第一滑块16与多个第一容纳槽13的滑动配合下进行下降,第三伸缩杆17在多个第二容纳槽15与多个第二滑块18的滑动配合下降,实现对施工栏30的升降移动;Start the
S3、偏转移动:S3. Deflection movement:
启动转动齿轮10,转动齿轮10的输出端带动旋转电机8进行旋转,旋转电机8通过与从动齿轮9的啮合带动从动齿轮9进行旋转,从动齿轮9带动第一伸缩杆12进行旋转,第一伸缩杆12带动第二伸缩杆14进行旋转,第二伸缩杆14带动第三伸缩杆17进行旋转,第三伸缩杆17带动安装板20进行旋转,继而带动固定块21进行旋转,实现对施工栏30进行偏移旋转;Start the
S4、推动接近:S4, push close:
启动推动电机25,推动电机25的输出端带动丝杆26进行旋转,丝杆26通过与支撑滑块27的滑动配合推动支撑滑块27进行移动,支撑滑块27带动施工栏30进行移动,在两个限位槽24与两个限位块28的滑动配合下,实现对支撑滑块27进行引导,同时两个支撑槽22与两个支撑块29滑动配合,实现对施工栏30进行辅助支撑,实现对施工栏30与高架平台35的倾斜推动接近;Start the
S5、辅助支撑:S5. Auxiliary support:
当施工栏30接近高架平台35的倾斜侧端时接触时,滚轮33与倾斜端滚动贴合,在对整个设备的移动过程中,滚轮33防止施工栏30产生偏移,用以实现对施工栏30的辅助支撑。When the
最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。Finally, it should be noted that: the above is only a preferred embodiment of the present invention, and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, it still The technical solutions recorded in the foregoing embodiments may be modified, or some technical features thereof may be equivalently replaced. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211435069.8A CN115748447B (en) | 2022-11-16 | 2022-11-16 | Construction platform for the outer side of highway bridge construction and its working method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211435069.8A CN115748447B (en) | 2022-11-16 | 2022-11-16 | Construction platform for the outer side of highway bridge construction and its working method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN115748447A true CN115748447A (en) | 2023-03-07 |
| CN115748447B CN115748447B (en) | 2026-04-21 |
Family
ID=85373822
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211435069.8A Active CN115748447B (en) | 2022-11-16 | 2022-11-16 | Construction platform for the outer side of highway bridge construction and its working method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115748447B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116163208A (en) * | 2023-04-26 | 2023-05-26 | 山东建投工程检测鉴定有限公司 | A bridge inspection vehicle |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0134311A2 (en) * | 1983-09-07 | 1985-03-20 | Peter Cramer | Apparatus for the inspection of the underside of a bridge |
| JP2001020224A (en) * | 1999-07-02 | 2001-01-23 | Kawada Kogyo Kk | Underside inspection device for elevated structures |
| CN108914772A (en) * | 2018-09-03 | 2018-11-30 | 沈旭源 | A kind of small safety vehicle of bridge bottom repairing |
| CN211571394U (en) * | 2020-01-06 | 2020-09-25 | 广西正景机械制造有限公司 | Novel bridge inspection construction equipment |
| CN212357977U (en) * | 2020-03-25 | 2021-01-15 | 天铭建设集团有限公司 | Self-adaptive gradient movable hanging basket for bridge maintenance |
| JP6826249B2 (en) * | 2019-07-09 | 2021-02-03 | 温州▲こう▼荷科技有限公司 | Viaduct guard fence cleaning and maintenance equipment |
| CN112942100A (en) * | 2021-04-23 | 2021-06-11 | 温州顺启建筑有限公司 | Bridge detection and maintenance device and use method thereof |
| CN213476620U (en) * | 2020-09-09 | 2021-06-18 | 广东恒大路桥建设有限公司 | Multifunctional bridge operation platform |
| CN216712729U (en) * | 2022-01-20 | 2022-06-10 | 曾维勇 | Bridge outer side construction platform for highway bridge construction |
-
2022
- 2022-11-16 CN CN202211435069.8A patent/CN115748447B/en active Active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0134311A2 (en) * | 1983-09-07 | 1985-03-20 | Peter Cramer | Apparatus for the inspection of the underside of a bridge |
| JP2001020224A (en) * | 1999-07-02 | 2001-01-23 | Kawada Kogyo Kk | Underside inspection device for elevated structures |
| CN108914772A (en) * | 2018-09-03 | 2018-11-30 | 沈旭源 | A kind of small safety vehicle of bridge bottom repairing |
| JP6826249B2 (en) * | 2019-07-09 | 2021-02-03 | 温州▲こう▼荷科技有限公司 | Viaduct guard fence cleaning and maintenance equipment |
| CN211571394U (en) * | 2020-01-06 | 2020-09-25 | 广西正景机械制造有限公司 | Novel bridge inspection construction equipment |
| CN212357977U (en) * | 2020-03-25 | 2021-01-15 | 天铭建设集团有限公司 | Self-adaptive gradient movable hanging basket for bridge maintenance |
| CN213476620U (en) * | 2020-09-09 | 2021-06-18 | 广东恒大路桥建设有限公司 | Multifunctional bridge operation platform |
| CN112942100A (en) * | 2021-04-23 | 2021-06-11 | 温州顺启建筑有限公司 | Bridge detection and maintenance device and use method thereof |
| CN216712729U (en) * | 2022-01-20 | 2022-06-10 | 曾维勇 | Bridge outer side construction platform for highway bridge construction |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116163208A (en) * | 2023-04-26 | 2023-05-26 | 山东建投工程检测鉴定有限公司 | A bridge inspection vehicle |
| CN116163208B (en) * | 2023-04-26 | 2023-08-01 | 山东建投工程检测鉴定有限公司 | A bridge inspection vehicle |
Also Published As
| Publication number | Publication date |
|---|---|
| CN115748447B (en) | 2026-04-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN115748447A (en) | Bridge outer side construction platform for highway bridge construction and working method thereof | |
| CN215594899U (en) | Supporting template for constructional engineering | |
| CN115404903B (en) | Open cut construction method for subway underground station | |
| CN218117299U (en) | Assembly type structure telescopic support frame for civil engineering | |
| CN112855221B (en) | Reinforcement equipment and construction method for tunnels with high ground stress and weak surrounding rock | |
| CN211815617U (en) | U type precast beam hoist and mount positioner | |
| CN221400526U (en) | Large-gradient-adaptive tunnel trolley with variable size | |
| CN220036704U (en) | A kind of vault support device for tunnel excavation | |
| CN210132619U (en) | Special mould is pour to T type roof beam | |
| CN115875061B (en) | A High Pressure Tunnel Support Structure | |
| CN117188313A (en) | A suspended construction device that can move smoothly | |
| CN213653211U (en) | Highway bridge construction support bracket | |
| CN114920187A (en) | A replacement device for road circular manhole cover | |
| CN117051729B (en) | An emergency repair erection device and method for steel-concrete composite bridge | |
| CN211772943U (en) | Guide beam transfer vehicle that can drive the guide beam to expand or retract laterally | |
| CN222499950U (en) | An adjustable steel temporary bridge for tunnel construction | |
| CN223089330U (en) | Longitudinal pouring trolley with variable length and suitable for tunnel gradient | |
| CN118622317A (en) | Tunnel lining trolley | |
| CN221422752U (en) | A scaffolding stacking protection frame for construction engineering | |
| CN116556524B (en) | Multifunctional mobile canopy for municipal engineering | |
| CN221585446U (en) | Maintenance handcart | |
| CN218599490U (en) | Movable lamp bracket | |
| CN222935870U (en) | Maintenance device for road and bridge | |
| CN224133759U (en) | Foundation pit supporting device | |
| CN221142501U (en) | Construction platform for bridge engineering operation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant |