CN115722059A - Method and equipment for purifying smelting flue gas and removing arsenic by wet method - Google Patents
Method and equipment for purifying smelting flue gas and removing arsenic by wet method Download PDFInfo
- Publication number
- CN115722059A CN115722059A CN202211396827.XA CN202211396827A CN115722059A CN 115722059 A CN115722059 A CN 115722059A CN 202211396827 A CN202211396827 A CN 202211396827A CN 115722059 A CN115722059 A CN 115722059A
- Authority
- CN
- China
- Prior art keywords
- flue gas
- reverse
- reverse spray
- plate
- arsenic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Treating Waste Gases (AREA)
Abstract
Description
技术领域technical field
本发明涉及冶炼烟气治理领域,尤其涉及一种用于净化冶炼烟气湿法除砷的方法及设备。The invention relates to the field of smelting flue gas treatment, in particular to a method and equipment for purifying smelting flue gas and removing arsenic by wet method.
背景技术Background technique
硫酸是一种最活泼的二元无机强酸,能和绝大多数金属发生反应。高浓度的硫酸有强烈吸水性,可用作脱水剂,碳化木材、纸张、棉麻织物及生物皮肉等含碳水化合物的物质。中国专利公开了一种利用冶炼烟气中低浓度波动型SO2制取硫酸的装置(公开号:CN204891580U),其利用冶炼烟气中低浓度SO2制取硫酸的装置将离子液脱硫技术与冶炼烟气制酸技术结合,其包括包括离子吸收塔、再生塔、硫酸干燥塔、转化塔、硫酸吸收塔和循环槽。但是这种硫酸生产时,烟气中的含砷较高、生产过程中经焙烧炉、电收尘器后以骤冷塔+布袋收尘器进行除砷收尘,处理过程中经常阻塞净化设备,使装置不能长周期运行,同时大量的砷被带入净化污水中,增加了污水处理的难度,使生产企业面临巨大的环保压力,工作效率较低,为此,我们提出了一种用于净化冶炼烟气湿法除砷的方法及设备来解决上述问题。Sulfuric acid is the most active binary inorganic strong acid, which can react with most metals. High-concentration sulfuric acid has strong water absorption and can be used as a dehydrating agent to carbonize carbohydrate-containing substances such as wood, paper, cotton and linen fabrics, and biological flesh. The Chinese patent discloses a device for producing sulfuric acid by using low-concentration fluctuating SO2 in smelting flue gas (publication number: CN204891580U). Combination of gas acid production technology, which includes ion absorption tower, regeneration tower, sulfuric acid drying tower, conversion tower, sulfuric acid absorption tower and circulation tank. However, when this kind of sulfuric acid is produced, the arsenic content in the flue gas is relatively high. During the production process, the arsenic is removed by the roasting furnace and the electrostatic precipitator, and then the quenching tower + bag filter is used to remove the arsenic. During the process, the purification equipment is often blocked. , so that the device cannot run for a long period of time, and at the same time a large amount of arsenic is brought into the purified sewage, which increases the difficulty of sewage treatment, makes the production enterprise face huge environmental protection pressure, and the work efficiency is low. Therefore, we propose a method for The method and equipment for purifying smelting flue gas and removing arsenic by wet method can solve the above problems.
发明内容Contents of the invention
本发明的目的是为了克服现在硫酸生产时,烟气中的含砷较高、生产过程中经焙烧炉、电收尘器后以骤冷塔+布袋收尘器进行除砷收尘,处理过程中经常阻塞净化设备,使装置不能长周期运行,同时大量的砷被带入净化污水中,增加了污水处理的难度,使生产企业面临巨大的环保压力的不足,而提出的一种用于净化冶炼烟气湿法除砷的方法及设备。The purpose of the present invention is to overcome the high arsenic content in the flue gas during the current sulfuric acid production, and the arsenic removal and dust collection are carried out with the quench tower+bag filter after the roasting furnace and the electrostatic precipitator in the production process. The purification equipment is often blocked in the process, so that the device cannot be operated for a long period of time. At the same time, a large amount of arsenic is brought into the purified sewage, which increases the difficulty of sewage treatment and makes the production enterprises face huge environmental protection pressure. A method and equipment for wet arsenic removal from smelting flue gas.
为了实现上述目的,本发明采用了如下技术方案:In order to achieve the above object, the present invention adopts the following technical solutions:
一种用于净化冶炼烟气湿法除砷的方法,A method for purifying smelting flue gas and removing arsenic by wet method,
第一步:将待处理的冶炼烟气,通过不锈钢烟道,送至除尘系统区域;The first step: Send the smelting flue gas to be processed to the dust removal system area through the stainless steel flue;
第二步:通过双流体喷嘴A和双流体喷嘴B将冶炼烟气,利用压缩空气将工艺水雾化,加快冶炼烟气的蒸发降温,烟气温度由280~350℃降温至60℃-125℃;Step 2: The smelting flue gas is sprayed through the dual-fluid nozzle A and the dual-fluid nozzle B, and the process water is atomized by compressed air to speed up the evaporation and cooling of the smelting flue gas. ℃;
第三步:降温后的烟气送至逆喷淋管内,逆喷淋管冲洗采用逆向喷洗的方式;Step 3: The cooled flue gas is sent to the reverse spray pipe, and the reverse spray pipe is flushed by reverse spraying;
第四步:经过逆喷淋冲洗的烟气,再进入塔内,塔体直径:逆喷管直径=2~10:1;Step 4: The flue gas washed by the reverse spray enters the tower again, the diameter of the tower body: the diameter of the reverse nozzle=2~10:1;
第五步:在循环液在不停地洗涤烟气时,通过板式换热器,将循环液的温度降至20℃-40℃;Step 5: When the circulating fluid is continuously washing the flue gas, the temperature of the circulating fluid is reduced to 20°C-40°C through the plate heat exchanger;
第六步:通过废水排出泵,循环槽的循环液达到15%-30%的质量浓度后,通过排出泵送至沉淀池,沉淀后产生的砷泥由渣浆泵送至板框压滤机压滤;Step 6: After the circulating liquid in the circulation tank reaches a mass concentration of 15%-30% through the wastewater discharge pump, it is pumped to the sedimentation tank through the discharge pump, and the arsenic sludge generated after precipitation is pumped from the slurry to the plate and frame filter press filter press;
第七步:压滤后的清液至压滤清液池内,通过清液泵返回洗涤系统,循环使用;Step 7: The clear liquid after press filtration is sent to the press filter clear liquid pool, and returned to the washing system through the clear liquid pump for recycling;
第八步:烟气流通过连接管送入电除雾器内,通过高压电源对烟气流进行电除雾,使得烟气中的颗粒物<50mg/Nm3;Step 8: The flue gas flow is sent into the electric demister through the connecting pipe, and the flue gas flow is electrically demisted through a high-voltage power supply, so that the particulate matter in the flue gas is <50mg/Nm3;
第九步:通过风机将处理后的净化烟气进行排出。Step 9: Discharge the treated and purified flue gas through the fan.
优选的,一种用于净化冶炼烟气湿法除砷的设备,包括逆喷淋塔,所述的逆喷淋塔一侧连接有逆喷淋管,所述的逆喷淋管上安装有第一降温机构,所述的逆喷淋管内安装有喷洗机构,所述的逆喷淋管与逆喷淋塔上共同连接有第二降温机构,所述的逆喷淋塔另一侧连接有沉淀池,所述的沉淀池一端连接有板框压滤机,所述的板框压滤机一端连接有压滤清液池,所述的压滤清液池一端通过连接管连接有电除雾器。Preferably, a device for purifying smelting flue gas by wet arsenic removal includes a reverse spray tower, one side of the reverse spray tower is connected with a reverse spray pipe, and the reverse spray pipe is installed with The first cooling mechanism, a spray washing mechanism is installed in the reverse spray pipe, the second cooling mechanism is connected to the reverse spray pipe and the reverse spray tower, and the other side of the reverse spray tower is connected There is a sedimentation tank, one end of the sedimentation tank is connected to a plate-and-frame filter press, one end of the plate-and-frame filter press is connected to a pressure filtration liquid pool, and one end of the pressure filtration liquid pool is connected to a power supply through a connecting pipe. defogger.
优选的,所述的第一降温机构包括安装在逆喷淋管上的双流体喷嘴A,所述的双流体喷嘴A一侧安装有双流体喷嘴B,所述的双流体喷嘴A和双流体喷嘴B内均装有雾化工艺水,便于对冶炼烟气进行初步的降温。Preferably, the first cooling mechanism includes a dual-fluid nozzle A installed on the reverse spray pipe, a dual-fluid nozzle B is installed on one side of the dual-fluid nozzle A, and the dual-fluid nozzle A and the dual-fluid nozzle Nozzle B is equipped with atomized process water, which is convenient for preliminary cooling of smelting flue gas.
优选的,所述的喷洗机构包括安装在逆喷淋管内的大口径逆喷头,所述的大口径逆喷头上设有储液罐,所述的储液罐一端连接有固定板,所述的固定板上对称设有两个分体喷头,所述的储液罐底部设有连接衬套,所述的连接衬套上连接有连接嘴,便于对送入的烟气进行再次降温。Preferably, the spray cleaning mechanism includes a large-diameter reverse spray head installed in the reverse spray pipe, the large-diameter reverse spray head is provided with a liquid storage tank, and one end of the liquid storage tank is connected to a fixing plate, and the Two split nozzles are arranged symmetrically on the fixed plate, and a connection bush is arranged at the bottom of the liquid storage tank, and a connection nozzle is connected to the connection bush, so as to facilitate the re-cooling of the incoming flue gas.
优选的,所述的连接嘴上连接有连接盘,所述的连接盘顶部连接有信号收发器,所述的连接盘底部装有安装台,所述的安装台底部安装有安装板,所述的安装板与安装台之间装有3个固定销,所述的安装板安装在逆喷淋管内,便于固定分体喷头使用。Preferably, a connection plate is connected to the connection nozzle, a signal transceiver is connected to the top of the connection plate, a mounting platform is installed at the bottom of the connection plate, and a mounting plate is installed at the bottom of the mounting platform. There are 3 fixing pins installed between the mounting plate and the mounting table, and the mounting plate is installed in the reverse spray pipe, which is convenient for fixing the split nozzle.
优选的,所述的第二降温机构包括逆喷淋管与逆喷淋塔上共同连接的板式换热器,所述的板式换热器一端连接有废水排出泵,所述的逆喷淋塔与沉淀池之间连接有逆喷循环泵,便于进行烟气的降温时候用。Preferably, the second cooling mechanism includes a plate heat exchanger connected to the reverse spray pipe and the reverse spray tower, one end of the plate heat exchanger is connected to a waste water discharge pump, and the reverse spray tower There is a reverse injection circulation pump connected to the sedimentation tank, which is convenient for cooling the flue gas.
优选的,所述的沉淀池与板框压滤机之间连接有渣浆泵,所述的板框压滤机底部设有回收池,便于将沉淀后的砷泥由渣浆泵送至板框压滤机压滤,固体滤饼作副产品外卖。Preferably, a slurry pump is connected between the sedimentation tank and the plate-and-frame filter press, and a recovery tank is provided at the bottom of the plate-and-frame filter press to facilitate pumping the settled arsenic sludge from the slurry to the plate and frame filter press. Frame filter press filter, solid filter cake as a by-product takeaway.
优选的,所述的压滤清液池与连接管之间安装有清液泵,所述的压滤清液池内排出有烟气流,便于压滤后的清液至压滤清液池内,通过清液泵返回洗涤系统,循环使用。Preferably, a clear liquid pump is installed between the filter press clear liquid pool and the connecting pipe, and there is a flue gas flow discharged from the filter press clear liquid pool, so that the clear liquid after the press filter can enter the filter press clear liquid pool, Return to the washing system through the clear liquid pump for recycling.
优选的,所述的电除雾器上连接有高压电源,所述的高压电源工作功率为5KW-20KW,便于电除雾后增加除尘效果,使烟气中的颗粒物<50mg/Nm3。Preferably, the electric demister is connected with a high-voltage power supply, and the working power of the high-voltage power supply is 5KW-20KW, which is convenient for increasing the dust removal effect after the electric demisting, so that the particulate matter in the flue gas is <50mg/Nm3.
优选的,所述的电除雾器上安装有风机,所述的风机内排出有净化烟气,便于烟气的排出。Preferably, a fan is installed on the electric demister, and the fan discharges purified flue gas to facilitate the exhaust of the flue gas.
与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
1、逆喷洗涤作为新型烟气净化技术,能同时完成烟道气急冷,脱除酸性气体,脱除固体粉尘等多种功能,可用于多个工业领域,如烧结厂、冶金工业的炉窑、电厂、水泥厂、工业废物焚烧、钛白粉厂、炼焦厂、炼油厂、锅炉等;1. As a new flue gas purification technology, reverse spray washing can simultaneously complete flue gas quenching, remove acid gas, remove solid dust and other functions, and can be used in many industrial fields, such as sintering plants and kilns in the metallurgical industry , power plants, cement plants, industrial waste incineration, titanium dioxide plants, coking plants, oil refineries, boilers, etc.;
2、逆喷淋洗涤技术,原理是采用逆向喷淋的方式,在逆喷管内部形成泡沫区域,从而增加了烟气与循环液的接触,更有利于对烟气的吸收和洗涤;2. Reverse spray washing technology, the principle is to use the reverse spray method to form a foam area inside the reverse nozzle, thereby increasing the contact between the flue gas and the circulating fluid, which is more conducive to the absorption and washing of the flue gas;
3、逆喷洗涤配备无堵塞大口径逆喷喷头,能满足系统负荷在50~120%范围内波动,烟气波动较大时系统效率不受影响,其独特的逆喷管及泡沫区的运行,在烟气的波动时能进行自动调节,从而保证装置在不同负荷情况下能稳定正常运行。逆喷洗涤系统在设计参数条件下可实现烟气达标排放,并达到总量控制的要求;3. Reverse spray washing is equipped with non-clogging large-diameter reverse spray nozzles, which can meet the system load fluctuations in the range of 50~120%, and the system efficiency will not be affected when the flue gas fluctuates greatly. Its unique reverse nozzle and the operation of the foam area , It can be automatically adjusted when the flue gas fluctuates, so as to ensure the stable and normal operation of the device under different load conditions. Under the conditions of design parameters, the reverse spray washing system can realize the discharge of flue gas up to the standard, and meet the requirements of total amount control;
4、烟气经逆喷管后进入逆喷塔内,在塔内预留的一段反应(沉积)时间作用下,大部分烟气中的液滴会凝结团聚后自由落下,在塔内配制一层简易式除雾器,进一步的去除烟气中的雾滴和较大颗粒物;4. The flue gas enters the reverse spray tower after passing through the reverse nozzle. Under the action of a period of reaction (deposition) time reserved in the tower, most of the droplets in the flue gas will condense and reunite and then fall freely. One-layer simple demister to further remove mist and larger particles in the flue gas;
5、焙烧炉出口烟气中砷主要是三价氧化物As2O3,以气体形式存在,熔点315℃,沸点457.3℃,经电除尘器后烟气仍有280~350℃,经喷雾急冷+逆喷淋洗涤,烟气温度降低至60℃以下,此时烟气中99.99%的砷由气态转变为固态。溶解于循环液中,随着循环液温度的降低和稀酸浓度的增加,As2O3的溶解度也降低,根据这原理将溶解于稀酸中的As2O3逐步析出,经压滤后收集;5. The arsenic in the flue gas at the outlet of the roaster is mainly the trivalent oxide As2O3, which exists in the form of gas, with a melting point of 315°C and a boiling point of 457.3°C. After passing through the electrostatic precipitator, the flue gas is still at 280-350°C. After being quenched by spray + reverse spray After leaching and washing, the temperature of the flue gas is reduced to below 60°C, at which time 99.99% of the arsenic in the flue gas changes from gaseous to solid. Dissolved in the circulating fluid, as the temperature of the circulating fluid decreases and the concentration of the dilute acid increases, the solubility of As2O3 also decreases. According to this principle, the As2O3 dissolved in the dilute acid is gradually precipitated and collected after pressure filtration;
6、通过急冷降温后的烟气中含有的气态砷含量<37mg/Nm3,气体中的As2O3微粒较小,属于微末级、亚微末级凝聚态微粒,一般的气固分离设备很难捕集。当该烟气进入湿式电除雾器,可将烟气中酸雾和As2O3悬浮粒子95%捕集下来;6. The content of gaseous arsenic contained in the flue gas after rapid cooling is less than 37mg/Nm3, and the As2O3 particles in the gas are small, belonging to the micro-end and submicro-end condensed particles, which are difficult to capture by general gas-solid separation equipment. When the flue gas enters the wet electric demister, it can capture 95% of the acid mist and As2O3 suspended particles in the flue gas;
7、含砷溶液经过压滤处理,可得到纯度大于90%(不计水)As2O3副产品;7. After the arsenic-containing solution is processed by pressure filtration, the by-product of As2O3 with a purity greater than 90% (excluding water) can be obtained;
综上所述,本发明能同时完成烟道气急冷,脱除酸性气体,脱除固体粉尘等多种功能,可用于多个工业领域,通过逆喷淋洗涤技术,原理是采用逆向喷淋的方式,在逆喷管内部形成泡沫区域,从而增加了烟气与循环液的接触,更有利于对烟气的吸收和洗涤,提高工作效率,避免处理过程中经常阻塞净化设备,使装置不能长周期运行,同时大量的砷被带入净化污水中,增加了污水处理的难度,使生产企业面临巨大的环保压力的问题。In summary, the present invention can simultaneously complete multiple functions such as rapid cooling of flue gas, removal of acid gas, removal of solid dust, etc., and can be used in many industrial fields. Through reverse spray washing technology, the principle is to use reverse spray The foam area is formed inside the reverse nozzle, which increases the contact between the flue gas and the circulating liquid, which is more conducive to the absorption and washing of the flue gas, improves the work efficiency, and avoids frequent blockage of the purification equipment during the treatment process, so that the device cannot be used for a long time. At the same time, a large amount of arsenic is brought into the purified sewage, which increases the difficulty of sewage treatment and makes the production enterprises face huge environmental pressure.
附图说明Description of drawings
图1为本发明提出的一种用于净化冶炼烟气湿法除砷的方法及设备的整体流程图;Fig. 1 is a kind of overall flow chart that is used for purifying smelting flue gas wet arsenic removal method and equipment that the present invention proposes;
图2为本发明提出的一种用于净化冶炼烟气湿法除砷的方法及设备的大口径逆喷头及连接部件结构图;Fig. 2 is a large-diameter reverse nozzle and a structural diagram of connecting parts of a method and equipment for purifying smelting flue gas wet arsenic removal proposed by the present invention;
图3为本发明提出的一种用于净化冶炼烟气湿法除砷的方法及设备的安装台及连接部件结构图;Fig. 3 is a structural diagram of the installation platform and connecting parts of the method and equipment for purifying smelting flue gas wet arsenic removal proposed by the present invention;
图4为本发明提出的一种用于净化冶炼烟气湿法除砷的方法及设备的分体喷头及连接部件结构图。Fig. 4 is a structure diagram of a separate nozzle and connecting parts of a method and equipment for wet arsenic removal of purification and smelting flue gas proposed by the present invention.
图中:1、双流体喷嘴A;2、双流体喷嘴B;3、逆喷淋管;4、大口径逆喷头;5、板式换热器;6、逆喷淋塔;7、逆喷循环泵;8、沉淀池;9、渣浆泵;10、板框压滤机;11、回收池;12、压滤清液池;13、清液泵;14、烟气流;15、连接管;16、电除雾器;17、高压电源;18、风机;19、净化烟气;20、安装台;21、固定销;22、信号收发器;23、连接盘;24、连接嘴;25、安装板;26、连接衬套;27、储液罐;28、固定板;29、分体喷头。In the figure: 1. Dual-fluid nozzle A; 2. Dual-fluid nozzle B; 3. Reverse spray pipe; 4. Large-diameter reverse nozzle; 5. Plate heat exchanger; 6. Reverse spray tower; 7. Reverse spray cycle Pump; 8. Sedimentation tank; 9. Slurry pump; 10. Plate and frame filter press; 11. Recovery tank; 12. Press filter clear liquid pool; 13. Clear liquid pump; 14. Flue gas flow; 15. Connecting pipe ;16, electric defogger; 17, high-voltage power supply; 18, fan; 19, purifying flue gas; 20, installation table; 21, fixed pin; 22, signal transceiver; 23, connecting plate; , Mounting plate; 26, Connecting bushing; 27, Liquid storage tank; 28, Fixed plate; 29, Split nozzle.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention.
参照图1-4,一种用于净化冶炼烟气湿法除砷的设备,包括逆喷淋塔6,逆喷淋塔6一侧连接有逆喷淋管3,逆喷淋塔6另一侧连接有沉淀池8,降温后的烟气送至逆喷淋管3内,逆喷淋管3冲洗采用逆向喷洗的方式,利用其产生的泡沫区,进行强化传质,通过烟气泡沫液膜的不断接触,达到吸收和去除微末级、亚微末级凝聚态微粒目的,通过逆喷管的洗涤后,可有效去除95%的气态砷以及颗粒物,经过逆喷淋冲洗的烟气,再进入塔内,塔体直径:逆喷管直径=2~10:1,烟气入塔后流速明显变缓,有效去除烟气中加大的较大液滴和颗粒物,使逆喷淋洗涤塔出口的颗粒物浓度<400mg/Nm3。Referring to Figures 1-4, a device for purifying smelting flue gas by wet arsenic removal includes a reverse spray tower 6, a reverse spray pipe 3 is connected to one side of the reverse spray tower 6, and the other side of the reverse spray tower 6 The side is connected with a sedimentation tank 8, and the cooled flue gas is sent to the reverse spray pipe 3, and the reverse spray pipe 3 is flushed by reverse spray washing, and the foam area generated by it is used to enhance mass transfer. The continuous contact of the liquid film achieves the purpose of absorbing and removing micro-end and sub-micro-end condensed particles. After washing through the reverse nozzle, it can effectively remove 95% of gaseous arsenic and particulate matter. After entering the tower, the diameter of the tower body: the diameter of the reverse nozzle = 2 to 10:1, the flow velocity of the flue gas slows down significantly after entering the tower, effectively removing the larger droplets and particles in the flue gas, and making the reverse spray scrubber The concentration of particulate matter at the outlet is <400mg/Nm3.
在本发明中,逆喷淋管3上安装有第一降温机构,第一降温机构包括安装在逆喷淋管3上的双流体喷嘴A1,双流体喷嘴A1一侧安装有双流体喷嘴B2,双流体喷嘴A1和双流体喷嘴B2内均装有雾化工艺水,电除尘器后烟气,通过不锈钢烟道,送至除尘系统区域,首先在烟道的竖直段,设置喷雾急冷系统,采用双流体喷嘴,利用压缩空气将工艺水雾化,加快蒸发降温,通过急冷降温后的烟气中含有的气态砷含量<37mg/Nm3,其余的砷以颗粒物或酸雾的形式存在于烟气中,气体中的As2O3微粒较小,属于微末级、亚微末级凝聚态微粒,一般的气固分离设备很难捕集。In the present invention, a first cooling mechanism is installed on the reverse spray pipe 3, and the first cooling mechanism includes a dual-fluid nozzle A1 installed on the reverse spray pipe 3, and a dual-fluid nozzle B2 is installed on one side of the dual-fluid nozzle A1. Both the double-fluid nozzle A1 and the double-fluid nozzle B2 are equipped with atomized process water, and the flue gas after the electrostatic precipitator is sent to the dust removal system area through the stainless steel flue. First, a spray quenching system is installed on the vertical section of the flue. A two-fluid nozzle is used to atomize the process water with compressed air to speed up evaporation and cooling. The content of gaseous arsenic contained in the flue gas after rapid cooling and cooling is less than 37mg/Nm3, and the remaining arsenic exists in the flue gas in the form of particles or acid mist. Among them, the As2O3 particles in the gas are relatively small, belonging to the micro-end and sub-micro-end condensed particles, which are difficult to capture by general gas-solid separation equipment.
在本发明中,逆喷淋管3内安装有喷洗机构,喷洗机构包括安装在逆喷淋管3内的大口径逆喷头4,大口径逆喷头4上设有储液罐27,储液罐27一端连接有固定板28,固定板28上对称设有两个分体喷头29,进行喷液使用,储液罐27底部设有连接衬套26,连接衬套26上连接有连接嘴24,连接嘴24上连接有连接盘23,连接盘23顶部连接有信号收发器22,用于接收和传递喷液的信号,连接盘23内装有配套控制阀门,通过信号收发器22使用,进行调节喷液的质量,连接盘23底部装有安装台20,安装台20底部安装有安装板25,安装板25与安装台20之间装有3个固定销21,安装板25安装在逆喷淋管3内,通过安装板25上的配套螺孔连接螺栓,将大口径逆喷头4安装在逆喷淋管3的内壁上,进行烟气的净化使用。In the present invention, a spray cleaning mechanism is installed in the reverse spray pipe 3, and the spray cleaning mechanism includes a large-diameter
在本发明中,逆喷淋管3与逆喷淋塔6上共同连接有第二降温机构,第二降温机构包括逆喷淋管3与逆喷淋塔6上共同连接的板式换热器5,板式换热器5一端连接有废水排出泵,逆喷淋塔6与沉淀池8之间连接有逆喷循环泵7,循环液在不停地洗涤烟气时,烟气温度由125℃降至约60℃以下。在洗涤喷淋泵的总管上,设置一台板式换热器5,板式换热器5类型为石墨改性聚丙烯换热器,将循环液的温度降至40℃左右。In the present invention, the reverse spray pipe 3 and the reverse spray tower 6 are jointly connected with a second cooling mechanism, and the second cooling mechanism includes a plate heat exchanger 5 that is commonly connected with the reverse spray pipe 3 and the reverse spray tower 6 One end of the plate heat exchanger 5 is connected with a waste water discharge pump, and a reverse spray circulation pump 7 is connected between the reverse spray tower 6 and the sedimentation tank 8. When the circulating fluid continuously washes the flue gas, the temperature of the flue gas will drop from 125°C to below about 60°C. On the main pipe of the washing spray pump, a plate heat exchanger 5 is installed. The type of the plate heat exchanger 5 is a graphite-modified polypropylene heat exchanger to reduce the temperature of the circulating fluid to about 40°C.
沉淀池8一端连接有板框压滤机10,沉淀池8与板框压滤机10之间连接有渣浆泵9,板框压滤机10底部设有回收池11,循环槽的循环液达到一定浓度后20%的质量浓度,通过排出泵送至沉淀池8。通过沉淀后的砷泥由渣浆泵9送至板框压滤机10压滤,固体滤饼作副产品外卖。压滤后的清液至压滤清液池12内,通过清液泵13返回洗涤系统,循环使用A plate and frame filter press 10 is connected to one end of the sedimentation tank 8, a slurry pump 9 is connected between the sedimentation tank 8 and the plate and frame filter press 10, a recovery tank 11 is provided at the bottom of the plate and frame filter press 10, and the circulating fluid in the circulation tank After reaching a certain concentration, the mass concentration of 20% is sent to the sedimentation tank 8 through the discharge pump. The precipitated arsenic mud is sent to the plate and frame filter press 10 by the slurry pump 9 for pressure filtration, and the solid filter cake is sold as a by-product. The clear liquid after press filtration enters the press filter clear liquid pool 12, returns to the washing system through the clear liquid pump 13, and is recycled
在本发明中,板框压滤机10一端连接有压滤清液池12,压滤清液池12一端通过连接管15连接有电除雾器16,压滤清液池12与连接管15之间安装有清液泵13,压滤清液池12内排出有烟气流14,电除雾器16上连接有高压电源17,高压电源17工作功率为5KW-20KW,经过逆喷塔的烟气送至湿式电除雾器16,电除雾配制高频恒流电源。通过电除雾后高效的除尘效果,使烟气中的颗粒物<50mg/Nm3,电除雾器16上安装有风机18,风机18内排出有净化烟气19。In the present invention, one end of the plate and frame filter press 10 is connected with a pressure filter liquid pool 12, and one end of the pressure filter liquid pool 12 is connected with an electric demister 16 through a connecting pipe 15, and the pressure filter liquid pool 12 and the connecting pipe 15 A clear liquid pump 13 is installed between them, and a
在本发明中,一种用于净化冶炼烟气湿法除砷的方法,In the present invention, a method for purifying smelting flue gas and removing arsenic by wet method,
第一步:将待处理的冶炼烟气,通过不锈钢烟道,送至除尘系统区域;The first step: Send the smelting flue gas to be processed to the dust removal system area through the stainless steel flue;
第二步:通过双流体喷嘴A1和双流体喷嘴B2将冶炼烟气,利用压缩空气将工艺水雾化,加快冶炼烟气的蒸发降温,烟气温度由280~350℃降温至60℃-125℃;The second step: the smelting flue gas is sprayed through the dual-fluid nozzle A1 and the dual-fluid nozzle B2, and the process water is atomized with compressed air to speed up the evaporation and cooling of the smelting flue gas. ℃;
第三步:降温后的烟气送至逆喷淋管3内,逆喷淋管3冲洗采用逆向喷洗的方式;Step 3: The cooled flue gas is sent to the reverse spray pipe 3, and the reverse spray pipe 3 is flushed by reverse spraying;
第四步:经过逆喷淋冲洗的烟气,再进入塔内,塔体直径:逆喷管直径=2~10:1;Step 4: The flue gas washed by the reverse spray enters the tower again, the diameter of the tower body: the diameter of the reverse nozzle=2~10:1;
第五步:在循环液在不停地洗涤烟气时,通过板式换热器5,将循环液的温度降至20℃-40℃;Step 5: When the circulating fluid is continuously washing the flue gas, the temperature of the circulating fluid is reduced to 20°C-40°C through the plate heat exchanger 5;
第六步:通过废水排出泵,循环槽的循环液达到15%-30%的质量浓度后,通过排出泵送至沉淀池8,沉淀后产生的砷泥由渣浆泵9送至板框压滤机10压滤;Step 6: After the waste water is discharged from the pump, the circulating liquid in the circulation tank reaches a mass concentration of 15%-30%, and then it is pumped to the sedimentation tank 8 through the discharge pump, and the arsenic sludge generated after precipitation is sent to the plate and frame press by the slurry pump 9. filter machine 10 pressure filtration;
第七步:压滤后的清液至压滤清液池12内,通过清液泵13返回洗涤系统,循环使用;Step 7: The clear liquid after press filtration is transferred to the press filter clear liquid pool 12, and returned to the washing system through the clear liquid pump 13 for recycling;
第八步:烟气流14通过连接管15送入电除雾器16内,通过高压电源17对烟气流14进行电除雾,使得烟气中的颗粒物<50mg/Nm3;Step 8: The
第九步:通过风机18将处理后的净化烟气19进行排出。。Step 9: Discharge the treated and purified flue gas 19 through the fan 18 . .
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。The above is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto, any person familiar with the technical field within the technical scope disclosed in the present invention, according to the technical solution of the present invention Any equivalent replacement or change of the inventive concepts thereof shall fall within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211396827.XA CN115722059A (en) | 2022-11-09 | 2022-11-09 | Method and equipment for purifying smelting flue gas and removing arsenic by wet method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211396827.XA CN115722059A (en) | 2022-11-09 | 2022-11-09 | Method and equipment for purifying smelting flue gas and removing arsenic by wet method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN115722059A true CN115722059A (en) | 2023-03-03 |
Family
ID=85294945
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211396827.XA Pending CN115722059A (en) | 2022-11-09 | 2022-11-09 | Method and equipment for purifying smelting flue gas and removing arsenic by wet method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115722059A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117547949A (en) * | 2023-11-10 | 2024-02-13 | 昆明理工大学 | A resource purification treatment process for smelting acid flue gas |
| CN117815876A (en) * | 2024-01-11 | 2024-04-05 | 浙江思创环保科技有限公司 | Energy-saving and environmentally friendly flue gas desulfurization system and desulfurization method thereof |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107224864A (en) * | 2017-07-21 | 2017-10-03 | 北京哈宜节能环保科技开发股份有限公司 | The device and its application method of combined pollutant in a kind of removing fire coal boiler fume |
| CN113230831A (en) * | 2021-05-11 | 2021-08-10 | 云南皓普工程技术有限公司 | System and method for washing, arsenic removal and purification of nonferrous smelting flue gas through adiabatic evaporation and cooling |
-
2022
- 2022-11-09 CN CN202211396827.XA patent/CN115722059A/en active Pending
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107224864A (en) * | 2017-07-21 | 2017-10-03 | 北京哈宜节能环保科技开发股份有限公司 | The device and its application method of combined pollutant in a kind of removing fire coal boiler fume |
| CN113230831A (en) * | 2021-05-11 | 2021-08-10 | 云南皓普工程技术有限公司 | System and method for washing, arsenic removal and purification of nonferrous smelting flue gas through adiabatic evaporation and cooling |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117547949A (en) * | 2023-11-10 | 2024-02-13 | 昆明理工大学 | A resource purification treatment process for smelting acid flue gas |
| CN117815876A (en) * | 2024-01-11 | 2024-04-05 | 浙江思创环保科技有限公司 | Energy-saving and environmentally friendly flue gas desulfurization system and desulfurization method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104437046B (en) | Catalytic cracking flue gas desulfurization and dust collecting process and device thereof | |
| CN105214465A (en) | The apparatus and method of integration wet process of FGD dedusting | |
| CN101496986A (en) | Method for simultaneously removing PM2.5 granules, SO2 and NOx from flue gas and recycling by-product | |
| CN202164342U (en) | Impact type atomized spray wet-process dust-collecting device for zinc oxide volatilized dust | |
| CN102949906B (en) | Tail gas treatment device for sulfonation reaction and its application | |
| CN102974188A (en) | Device and method for processing high temperature selenium-containing flue gas | |
| CN113230831A (en) | System and method for washing, arsenic removal and purification of nonferrous smelting flue gas through adiabatic evaporation and cooling | |
| CN115282759B (en) | Acidification roasting flue gas treatment method and system | |
| CN209481174U (en) | Hydrochloride waste regenerative system | |
| CN202962208U (en) | High-temperature selenium-containing flue gas treatment device | |
| CN112919418B (en) | Preparation method of hydrofluoric acid | |
| CN206715344U (en) | A kind of drying device of coking desulfurization sulphur foam and desulfurization waste liquor | |
| CN101554558B (en) | Dynamic wave wet dust collection technology of non-ferrous metallurgical furnace | |
| CN109529566A (en) | Novel fume cleaning method and apparatus | |
| CN104803416B (en) | A method for collecting arsenic from flue gas containing arsenic | |
| CN219050762U (en) | Equipment for purifying smelting flue gas and removing arsenic by wet method | |
| CN214486294U (en) | System for co-processing multiple pollutants in acid making flue gas | |
| CN209577022U (en) | Wet type cyclone electrostatic precipitator | |
| CN1266033C (en) | Recovery and use for dilute acid in boiling furnace mixing-burning sulphur production installation | |
| CN214552212U (en) | Wet-type ultralow waste gas dust remover | |
| CN212017262U (en) | Hot stove slag dust pelletizing system | |
| CN210584229U (en) | Electrolysis tombarthite smoke and dust gas clean system | |
| CN220750843U (en) | Flue gas purifying system | |
| CN202427181U (en) | Waste acid purification hot air concentrating tower | |
| CN111992004A (en) | Water-saving and white-removing device and method for removing sulfur dioxide in flue gas by using zinc oxide |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20230303 |