CN115626567A - A hoisting device for super-high-rise variable-section unit glass curtain walls - Google Patents

A hoisting device for super-high-rise variable-section unit glass curtain walls Download PDF

Info

Publication number
CN115626567A
CN115626567A CN202211105674.9A CN202211105674A CN115626567A CN 115626567 A CN115626567 A CN 115626567A CN 202211105674 A CN202211105674 A CN 202211105674A CN 115626567 A CN115626567 A CN 115626567A
Authority
CN
China
Prior art keywords
pulley
track
glass curtain
cylinder
rise
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211105674.9A
Other languages
Chinese (zh)
Other versions
CN115626567B (en
Inventor
韩宇琪
陈起建
罗齐鸣
张文
王伟龙
张晓林
张根旺
方碧锋
傅义铁
王强
崔文涛
李源
赵亚鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Construction and Installation Engineering Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Construction and Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, China Railway 11th Bureau Group Construction and Installation Engineering Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN202211105674.9A priority Critical patent/CN115626567B/en
Publication of CN115626567A publication Critical patent/CN115626567A/en
Application granted granted Critical
Publication of CN115626567B publication Critical patent/CN115626567B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C11/00Trolleys or crabs, e.g. operating above runways
    • B66C11/08Trolleys or crabs, e.g. operating above runways with turntables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/06Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • B66C13/085Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions electrical
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C7/00Runways, tracks or trackways for trolleys or cranes
    • B66C7/02Runways, tracks or trackways for trolleys or cranes for underhung trolleys or cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C7/00Runways, tracks or trackways for trolleys or cranes
    • B66C7/08Constructional features of runway rails or rail mountings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C9/00Travelling gear incorporated in or fitted to trolleys or cranes
    • B66C9/02Travelling gear incorporated in or fitted to trolleys or cranes for underhung trolleys or cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/18Power-operated hoists
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses hoisting equipment for a super high-rise variable cross-section unit type glass curtain wall, which belongs to the technical field of building curtain wall construction and comprises four supporting pieces; each support piece is provided with a moving unit in a sliding manner along the vertical direction; the mobile unit is detachably connected with an annular track surrounding the outside of the super high-rise building; a first pulley driven by a first motor is arranged on the annular track; a gap is reserved between the annular track and the supporting piece; an electric hoist is arranged below the first pulley; the first pulley is connected with the electric hoist through an angle adjusting unit; first pulley can remove on angle adjustment unit, and this application is through setting up support piece and looped rail in the super high-rise building periphery, because looped rail is located the super high-rise building outside, has the certain distance apart from the super high-rise building outer wall, and glass curtain wall can not collide with the variable cross section of not equidimension in the transportation.

Description

一种用于超高层变截面单元式玻璃幕墙的吊装设备A hoisting device for super-high-rise variable-section unit glass curtain walls

技术领域technical field

本发明属于建筑幕墙施工技术领域,具体涉及一种用于超高层变截面单元式玻璃幕墙的吊装设备。The invention belongs to the technical field of building curtain wall construction, and in particular relates to a hoisting device for a super high-rise variable-section unit glass curtain wall.

背景技术Background technique

玻璃幕墙因其美观新颖的结构,常常用来装饰超高层建筑;在安装玻璃幕墙时,需要用到吊装设备,现有技术中,通常在超高层建筑中的较高楼层上安装环形轨道,并配合卷扬机和电动葫芦来安装玻璃幕墙;由于高度越高,风速越大,将玻璃幕墙用绳索从低层向高层运输时,玻璃幕墙易发生摇晃,导致玻璃幕墙容易与超高层建筑的外墙发生碰撞,使得玻璃幕墙容易损毁。Because of its beautiful and novel structure, glass curtain walls are often used to decorate super high-rise buildings; when installing glass curtain walls, hoisting equipment is needed. In the prior art, ring tracks are usually installed on the upper floors of super high-rise buildings, and Cooperate with hoist and electric hoist to install the glass curtain wall; because the higher the height, the greater the wind speed, when the glass curtain wall is transported from the lower floor to the upper floor with ropes, the glass curtain wall is easy to shake, causing the glass curtain wall to easily collide with the outer wall of the super high-rise building , making the glass curtain wall easily damaged.

发明内容Contents of the invention

有鉴于此,本发明的目的在于提供一种用于超高层变截面单元式玻璃幕墙的吊装设备,以解决在吊装过程中遇到不同变截面的玻璃幕墙安装时,需要拆卸并重新安装环形轨道进行吊装的技术问题。In view of this, the object of the present invention is to provide a hoisting device for super-high-rise variable-section unit glass curtain walls to solve the problem of dismantling and reinstalling the circular track when encountering different variable-section glass curtain walls during the hoisting process. Technical issues with hoisting.

为达到上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:

本发明提供一种用于超高层变截面单元式玻璃幕墙的吊装设备,包括可拆卸设于超高层建筑四周的四个支撑件;每个支撑件上沿竖向均滑动设置有移动单元;移动单元上可拆卸连接有环绕于超高层建筑外的环形轨道;环形轨道上设有通过第一电机驱动的第一滑轮;环形轨道与支撑件之间有间隙;第一滑轮下方设有电动葫芦;第一滑轮与电动葫芦之间通过角度调整单元连接;第一滑轮能够在角度调整单元上移动。The invention provides a hoisting device for a super high-rise variable cross-section unit glass curtain wall, which includes four detachable supporting parts arranged around the super high-rise building; each supporting part is slidably provided with a mobile unit along the vertical direction; The unit is detachably connected with a circular track that surrounds the super high-rise building; the circular track is provided with a first pulley driven by a first motor; there is a gap between the circular track and the support; an electric hoist is provided under the first pulley; The first pulley is connected with the electric hoist through an angle adjustment unit; the first pulley can move on the angle adjustment unit.

进一步,所述角度调整单元包括吊装轨道、加固板、滑动设置于环形轨道上的第二滑轮和第三滑轮;第二滑轮和第三滑轮分别位于第一滑轮的两侧;加固板可拆卸连接在吊装轨道上端;吊装轨道与第一滑轮之间设有连接轴;连接轴的一端与第一滑轮固定连接,其另一端与加固板转动连接;加固板上沿竖向连接有第一气缸;第二滑轮下表面开有方槽;方槽侧壁设有与第一气缸垂直的第二气缸;第一气缸的伸缩轴上开有通孔;第二气缸的伸缩轴穿过通孔且与方槽侧壁抵紧;第三滑轮下方可拆卸连接有弧形轨道;加固板上沿竖向可拆卸连接有滑动轴;滑动轴远离加固板的一端滑动设置于弧形轨道内;弧形轨道远离弧形轨道的一端与第一气缸有间隙;弧形轨道的另一端与支撑件有间隙;弧形轨道的上表面低于第二滑轮的下表面。Further, the angle adjustment unit includes a hoisting track, a reinforcing plate, a second pulley and a third pulley slidingly arranged on the circular track; the second pulley and the third pulley are respectively located on both sides of the first pulley; the reinforcing plate is detachably connected On the upper end of the hoisting track; a connecting shaft is provided between the hoisting track and the first pulley; one end of the connecting shaft is fixedly connected to the first pulley, and the other end is rotatably connected to the reinforcement plate; the first cylinder is vertically connected to the reinforcement plate; The lower surface of the second pulley has a square groove; the side wall of the square groove is provided with a second cylinder perpendicular to the first cylinder; the telescopic shaft of the first cylinder has a through hole; the telescopic shaft of the second cylinder passes through the through hole and is connected with the first cylinder. The side wall of the square groove is pressed tightly; the arc track is detachably connected under the third pulley; the sliding shaft is detachably connected vertically on the reinforcing plate; the end of the sliding shaft away from the reinforcing plate is slidingly arranged in the arc track; the arc track The end away from the arc track has a gap with the first cylinder; the other end of the arc track has a gap with the supporting member; the upper surface of the arc track is lower than the lower surface of the second pulley.

进一步,还包括可拆卸设于超高层建筑外墙的稳定吊装单元;稳定吊装单元包括可拆卸设于超高层建筑内墙的若干固定架;固定架伸出室外,且沿超高层建筑外墙的水平方向可拆卸连接有辅助轨道;辅助轨道上滑动连接有第四滑轮;第四滑轮上开有贯穿于第四滑轮侧壁的转动槽;转动槽的侧壁上转动连接有转动柱;转动柱的侧壁开有垂直于辅助轨道的连接孔;加固板的侧壁开有开槽;开槽内通过第四电机转动连接有与第一气缸垂直连接的转动轴;第一气缸的伸缩轴能与连接孔连接。Further, it also includes a stable hoisting unit that can be detachably arranged on the outer wall of a super high-rise building; the stable hoisting unit includes a number of fixing frames that can be detachably arranged on the inner wall of a super high-rise building; The auxiliary track is detachably connected in the horizontal direction; the fourth pulley is slidably connected to the auxiliary track; the fourth pulley is provided with a rotation groove that runs through the side wall of the fourth pulley; the side wall of the rotation groove is connected with a rotation column; the rotation column There is a connection hole perpendicular to the auxiliary track on the side wall of the reinforcement plate; a slot is opened on the side wall of the reinforcing plate; a rotating shaft vertically connected to the first cylinder is connected to the slot through the fourth motor rotation; the telescopic shaft of the first cylinder can Connect with connection hole.

进一步,每个移动单元均包括与支撑件滑动连接的移动板;移动板上可拆卸设有第三电机;第三电机同轴设有齿轮;支撑件的侧壁上沿竖向设有若干能够与齿轮啮合的齿条;移动板上设有防坠件。Further, each moving unit includes a moving plate slidingly connected to the support; a third motor is detachably arranged on the moving plate; gears are coaxially arranged on the third motor; Rack meshing with gear; fall arrester on moving plate.

进一步,所述防坠件包括可拆卸设置于移动板上的第三气缸;支撑件上与齿条相邻的侧壁沿竖向开有若干与第三气缸伸缩轴配合的防坠孔。Further, the anti-falling part includes a third air cylinder detachably arranged on the moving plate; the side wall adjacent to the rack on the supporting part is vertically opened with a number of anti-falling holes that cooperate with the telescopic shaft of the third air cylinder.

进一步,所述支撑件包括若干拼接而成的立柱;立柱的上端通过连接架与超高层建筑可拆卸连接;立柱下端与地面连接。Further, the supporting member includes several spliced uprights; the upper end of the uprights is detachably connected to the super high-rise building through a connecting frame; the lower end of the uprights is connected to the ground.

进一步,所述吊装轨道的两端可拆卸连接有挡板。Further, both ends of the hoisting track are detachably connected with baffles.

本发明的有益效果在于:The beneficial effects of the present invention are:

1、通过在超高层建筑外围设置支撑件,并在支撑件上设置位于超高层建筑外侧的环形轨道,在移动单元的作用下,带动环形轨道和玻璃幕墙一同向上移动,在该过程中,玻璃幕墙与环形轨道之间的绳索长度极大的缩小了,能够极大减小玻璃幕墙在移动过程中的摆动幅度,防止玻璃幕墙在吊装过程中与建筑之间发生碰撞;且环形轨道距离超高层建筑外墙有一定距离,即使发生摇晃,当摆动幅度较小,玻璃幕墙更不会与超高层建筑外墙发生碰撞,从而避免玻璃幕墙发生损坏。1. By setting up supports on the periphery of the super high-rise building, and setting a circular track on the outside of the super high-rise building on the support, under the action of the mobile unit, the circular track and the glass curtain wall are driven to move upward together. During this process, the glass The length of the rope between the curtain wall and the circular track is greatly reduced, which can greatly reduce the swing range of the glass curtain wall during the moving process and prevent the glass curtain wall from colliding with the building during hoisting; and the distance between the circular track and the super high-rise There is a certain distance from the outer wall of the building. Even if it shakes, when the swing is small, the glass curtain wall will not collide with the outer wall of the super high-rise building, so as to avoid damage to the glass curtain wall.

2、角度调整单元的设置,能够改变吊装轨道的角度,能够根据超高层建筑外墙需要不规则面的安装位置而调整吊装轨道的角度,从而使玻璃幕墙更好的安装。2. The setting of the angle adjustment unit can change the angle of the hoisting track, and can adjust the angle of the hoisting track according to the installation position of the irregular surface of the outer wall of the super high-rise building, so that the glass curtain wall can be installed better.

3、辅助轨道的设置,与环形轨道相配合,一同对吊装轨道提供拉力,使吊装轨道由第一滑轮、第二滑轮的两点支撑变为第四滑轮、第一滑轮以及第二滑轮的三点支撑,对吊装轨道远离第一滑轮的一端提供了拉力,使吊装轨道的重心不会发生降低,使吊装轨道与玻璃幕墙不会发生倾斜,从而当电动葫芦带动玻璃幕墙运动时,玻璃幕墙的最低端不会低于安装位置。3. The setting of the auxiliary track cooperates with the ring track to provide tension to the hoisting track together, so that the hoisting track changes from the two-point support of the first pulley and the second pulley to the three-point support of the fourth pulley, the first pulley and the second pulley. Point support provides a pulling force to the end of the hoisting track away from the first pulley, so that the center of gravity of the hoisting track will not be lowered, so that the hoisting track and the glass curtain wall will not tilt, so that when the electric hoist drives the glass curtain wall to move, the glass curtain wall The lowest end will not be lower than the installation position.

本发明的其他优点、目标和特征将在随后的说明书中进行阐述,并且在某种程度上对本领域技术人员而言是显而易见的,或者本领域技术人员可以从本发明的实践中得到教导。本发明的目标和其他优点可以通过下面的说明书来实现和获得。Other advantages, objects and features of the present invention will be set forth in the following description, and to some extent will be obvious to those skilled in the art, or can be taught by the practice of the present invention to those skilled in the art. The objects and other advantages of the invention may be realized and attained by the following specification.

附图说明Description of drawings

为了使本发明的目的、技术方案和有益效果更加清楚,本发明提供如下附图进行说明:In order to make the purpose, technical scheme and beneficial effect of the present invention clearer, the present invention provides the following drawings for illustration:

图1为本发明的三维图;Fig. 1 is a three-dimensional diagram of the present invention;

图2为本发明吊装轨道的三维图;Fig. 2 is the three-dimensional figure of hoisting track of the present invention;

图3为本发明第一气缸和第二气缸的连接三维图;Fig. 3 is the connection three-dimensional diagram of the first cylinder and the second cylinder of the present invention;

图4为本发明辅助轨道安装在超高层建筑内的局部三维图;Fig. 4 is the local three-dimensional figure that auxiliary track of the present invention is installed in super high-rise building;

图5为本发明支撑件和移动单元的连接三维图。Fig. 5 is a three-dimensional view of the connection between the support and the mobile unit of the present invention.

附图中标记如下:支撑件1、移动单元2、移动板21、第三电机22、第二齿轮23、环形轨道3、第一滑轮4、吊装轨道5、电动葫芦6、连接轴7、第二电机8、角度调整单元9、加固板91、第二滑轮92、第三滑轮93、第一气缸94、方槽11、第二气缸12、弧形轨道13、滑动轴14、稳定吊装单元15、固定架151、辅助轨道152、第四滑轮153、连接孔154、开槽16、转动轴17、防坠件24、第三气缸241、防坠孔242、立柱25、挡板26、转动槽27、转动柱28。The marks in the drawings are as follows: support 1, mobile unit 2, mobile plate 21, third motor 22, second gear 23, circular track 3, first pulley 4, hoisting track 5, electric hoist 6, connecting shaft 7, the first Second motor 8, angle adjustment unit 9, reinforcing plate 91, second pulley 92, third pulley 93, first cylinder 94, square groove 11, second cylinder 12, arc track 13, sliding shaft 14, stable hoisting unit 15 , fixed frame 151, auxiliary track 152, fourth pulley 153, connecting hole 154, slot 16, rotating shaft 17, anti-falling part 24, the third cylinder 241, anti-falling hole 242, column 25, baffle plate 26, rotating groove 27, rotating column 28.

具体实施方式Detailed ways

如图1~5所示,本发明提供一种用于超高层变截面单元式玻璃幕墙的吊装设备,包括可拆卸设于超高层建筑四周的四个支撑件1;每个支撑件1上沿竖向均滑动设置有移动单元2;移动单元2上可拆卸连接有环绕于超高层建筑外的环形轨道3,环形轨道3由若干轨道拼接而成;环形轨道3上滑动设置有通过第一电机(图中未示出)驱动的第一滑轮4;环形轨道3与支撑件1之间有间隙,当第一滑轮4在环形轨道3上滑动时不会与支撑件1碰撞;第一滑轮4下方设有电动葫芦6;第一滑轮4与电动葫芦6之间通过角度调整单元9连接;第一滑轮4能够在角度调整单元9上移动。As shown in Figures 1 to 5, the present invention provides a hoisting device for a super high-rise variable-section unit glass curtain wall, which includes four support members 1 detachably arranged around the super high-rise building; the upper edge of each support member 1 The mobile unit 2 is slidingly arranged vertically; the mobile unit 2 is detachably connected with a circular track 3 that surrounds the super high-rise building, and the circular track 3 is formed by splicing several tracks; (not shown in the figure) the first pulley 4 of driving; There is a gap between the ring track 3 and the support 1, when the first pulley 4 slides on the ring track 3, it will not collide with the support 1; the first pulley 4 An electric hoist 6 is arranged below; the first pulley 4 is connected to the electric hoist 6 through an angle adjustment unit 9 ; the first pulley 4 can move on the angle adjustment unit 9 .

上述技术方案的原理及效果:The principle and effect of the above-mentioned technical scheme:

利用电动葫芦6吊装玻璃幕墙,通过四个支撑件1上的移动单元2共同带动环形轨道3向上移动到达预定高度后,利用角度调整单元9调整电动葫芦6上玻璃幕墙的位置,然后通过电动葫芦6在角度调整单元9上移动从而带动玻璃幕墙靠近安装位置,从而完成安装。Use the electric hoist 6 to hoist the glass curtain wall. After the moving unit 2 on the four supports 1 jointly drives the circular track 3 to move up to a predetermined height, use the angle adjustment unit 9 to adjust the position of the glass curtain wall on the electric hoist 6, and then pass the electric hoist. 6 moves on the angle adjustment unit 9 to drive the glass curtain wall close to the installation position, thereby completing the installation.

对于超高层建筑中不存在变截面而安装玻璃幕墙时,现有技术中通常将环形轨道3安装在较高的楼层处,再通过电动葫芦6对玻璃幕墙进行吊装,由于高度较高,吊装过程中绳索的长度过长,容易发生摆动,一旦风速过高,则玻璃幕墙容易与超高层建筑发生碰撞,从而造成玻璃幕墙的损坏;而在本申请中,通过在超高层建筑外围设置支撑件1,并在支撑件1上设置位于超高层建筑外侧的环形轨道3,通过电动葫芦6吊装玻璃幕墙,并在移动单元2的作用下,使玻璃幕墙与环形轨道3一同向上移动,在该过程中,玻璃幕墙与环形轨道3之间的绳索长度极大的缩小了,能够极大减小玻璃幕墙在移动过程中的摆动幅度,防止玻璃幕墙在吊装过程中与建筑之间发生碰撞;且环形轨道3距离超高层建筑外墙有一定距离,即使发生摇晃,当摆动幅度较小,玻璃幕墙更不会与超高层建筑外墙发生碰撞,从而避免玻璃幕墙发生损坏。When installing glass curtain walls without variable cross-sections in super high-rise buildings, the circular track 3 is usually installed on a higher floor in the prior art, and then the glass curtain walls are hoisted by the electric hoist 6. Due to the high height, the hoisting process If the length of the middle rope is too long, it is easy to swing. Once the wind speed is too high, the glass curtain wall will easily collide with the super high-rise building, thereby causing damage to the glass curtain wall; , and set the ring track 3 located on the outside of the super high-rise building on the support 1, and lift the glass curtain wall through the electric hoist 6, and under the action of the mobile unit 2, the glass curtain wall and the ring track 3 move upward together. , the length of the rope between the glass curtain wall and the circular track 3 is greatly reduced, which can greatly reduce the swing range of the glass curtain wall during the moving process, and prevent the glass curtain wall from colliding with the building during the hoisting process; and the circular track 3 There is a certain distance from the outer wall of the super high-rise building. Even if it shakes, when the swing is small, the glass curtain wall will not collide with the outer wall of the super high-rise building, thereby avoiding damage to the glass curtain wall.

本实施例中,如图2所示,角度调整单元9包括吊装轨道5、加固板91、滑动设置于环形轨道3上的第二滑轮92和第三滑轮93;第二滑轮92和第三滑轮93分别位于第一滑轮4的两侧;加固板91可拆卸连接在吊装轨道5上端;第一滑轮4下表面连接有连接轴7;加固板91上开有与连接轴7同轴的圆槽;连接轴7的下端转动连接在圆槽底部;圆槽侧壁同轴固定连接有齿圈;第一滑轮4下表面竖向连接有第二电机8,其动力端连接有第一齿轮;第一齿轮的一侧与齿圈啮合,其另一侧与连接轴7有间隙;加固板91上沿竖向连接有第一气缸94;如图3所示,第二滑轮92下表面开有方槽11;第一气缸94的伸缩轴抵紧方槽11顶壁;方槽11内设有与第一气缸94垂直的第二气缸12;第一气缸94的伸缩轴上开有通孔(图中未标注);第二气缸12的伸缩轴穿过通孔且与方槽11侧壁抵紧;如图2所示,第三滑轮93下表面通过四个第一加强杆可拆卸连接有弧形轨道13;第一滑轮4前侧壁与弧形轨道13之间可拆卸连接有第二加强杆;加固板91上沿竖向可拆卸连接有滑动轴14;滑动轴14的上端滑动设置于弧形轨道13内;滑动轴14与连接轴7之间的距离等于弧形轨道13的半径;弧形轨道13的左端与第一气缸94之间有间隙,避免影响第一气缸94的正常工作;弧形轨道13的右端与支撑件1有间隙,避免在环形轨道3上滑动时与支撑件1碰撞;弧形轨道13的上表面低于第二滑轮92的下表面。In this embodiment, as shown in Figure 2, the angle adjustment unit 9 includes a hoisting track 5, a reinforcing plate 91, a second pulley 92 and a third pulley 93 that are slidably arranged on the circular track 3; the second pulley 92 and the third pulley 93 are respectively located on both sides of the first pulley 4; the reinforcing plate 91 is detachably connected to the upper end of the hoisting rail 5; the lower surface of the first pulley 4 is connected with the connecting shaft 7; the reinforcing plate 91 is provided with a circular groove coaxial with the connecting shaft 7 The lower end of the connecting shaft 7 is rotatably connected to the bottom of the circular groove; the side wall of the circular groove is coaxially fixedly connected with a ring gear; the lower surface of the first pulley 4 is vertically connected with a second motor 8, and its power end is connected with a first gear; One side of a gear meshes with the ring gear, and the other side has a gap with the connecting shaft 7; the reinforcing plate 91 is vertically connected with a first cylinder 94; as shown in Figure 3, the second pulley 92 lower surface has a square Slot 11; the telescopic shaft of the first cylinder 94 is against the square groove 11 top wall; the square groove 11 is provided with the second cylinder 12 perpendicular to the first cylinder 94; the telescopic shaft of the first cylinder 94 has a through hole (Fig. not marked in); the telescopic shaft of the second cylinder 12 passes through the through hole and is pressed against the side wall of the square groove 11; as shown in Figure 2, the lower surface of the third pulley 93 is detachably connected with an arc through four first reinforcing rods Shaped track 13; The first pulley 4 front side walls and the arc track 13 are detachably connected with a second reinforcement bar; Reinforcing plate 91 is vertically detachably connected with a sliding shaft 14; The upper end of the sliding shaft 14 is slidably arranged on In the arc track 13; the distance between the sliding shaft 14 and the connecting shaft 7 is equal to the radius of the arc track 13; there is a gap between the left end of the arc track 13 and the first cylinder 94, so as to avoid affecting the normal operation of the first cylinder 94 The right end of the arc track 13 has a gap with the support member 1 to avoid collision with the support member 1 when sliding on the circular track 3; the upper surface of the arc track 13 is lower than the lower surface of the second pulley 92.

上述技术方案的原理及效果:The principle and effect of the above-mentioned technical scheme:

在吊装玻璃幕墙之前,控制第一滑轮4、第二滑轮92以及第三滑轮93在环形轨道3上移动到与超高层建筑对应需要安装玻璃幕墙的外墙一侧,然后控制第一气缸94的伸缩轴向上抵紧方槽11顶壁,并使第二气缸12的伸缩轴穿过第一气缸94伸缩轴上的通孔并抵紧方槽11的侧壁,使弧形轨道13通过四个第一加强杆和一个第二加强杆分别可拆卸连接在第三滑轮93的下表面以及第一滑轮4的前侧壁,完成弧形轨道13的固定,同时使滑动轴14的上端滑动设置在弧形轨道13内,使滑动轴14的下端连接可拆卸连接在加固板91上表面;此时,第一滑轮4、第二滑轮92以及第三滑轮93仅在与超高层建筑对应需要安装玻璃幕墙的外墙一侧的环形轨道3上滑动,根据需要的安装位置,然后开始吊装;到达预定高度后,控制第二气缸12的伸缩轴缩回,然后控制第一气缸94伸缩轴缩回,利用第二电机8控制吊装轨道5顺时针转动,调整吊装轨道5的角度,然后控制电动葫芦6在吊装轨道5上移动后,安装玻璃幕墙。Before the glass curtain wall is hoisted, the first pulley 4, the second pulley 92 and the third pulley 93 are controlled to move on the circular track 3 to the outer wall side corresponding to the super high-rise building where the glass curtain wall needs to be installed, and then the first cylinder 94 is controlled. The telescoping shaft presses against the top wall of the square groove 11 upwards, and the telescopic shaft of the second cylinder 12 passes through the through hole on the telescopic shaft of the first cylinder 94 and presses against the side wall of the square groove 11, so that the arc track 13 passes through the four A first reinforcing rod and a second reinforcing rod are detachably connected to the lower surface of the third pulley 93 and the front side wall of the first pulley 4 respectively, so as to complete the fixing of the arc track 13, and simultaneously make the upper end of the sliding shaft 14 slide and set In the arc track 13, the lower end of the sliding shaft 14 is detachably connected to the upper surface of the reinforcing plate 91; at this time, the first pulley 4, the second pulley 92 and the third pulley 93 only need to be installed corresponding to the super high-rise building. Slide on the ring track 3 on the side of the outer wall of the glass curtain wall, and then start hoisting according to the required installation position; after reaching the predetermined height, control the retraction of the telescopic shaft of the second cylinder 12, and then control the retraction of the telescopic shaft of the first cylinder 94 Utilize the second motor 8 to control the hoisting track 5 to rotate clockwise, adjust the angle of the hoisting track 5, then control the electric hoist 6 to move on the hoisting track 5, and then install the glass curtain wall.

由于超高层建筑外观多样化,使超高层建筑的外墙上存在不规则的平面,因此在安装玻璃幕墙时,需要调整玻璃幕墙的角度,从而使玻璃幕墙在安装位置时与不规则的平面匹配,便于玻璃幕墙的安装;第二电机8控制吊装轨道5通过滑动轴14在弧形轨道13内滑动,能够使吊装轨道5绕连接轴7旋转,从而改变吊装轨道5的角度,能够根据超高层建筑外墙需要不规则面的安装位置而调整吊装轨道5的角度,从而使玻璃幕墙更好的安装。Due to the diverse appearance of super high-rise buildings, there are irregular planes on the outer walls of super high-rise buildings. Therefore, when installing glass curtain walls, it is necessary to adjust the angle of the glass curtain walls so that the glass curtain walls match the irregular planes at the installation position. , to facilitate the installation of the glass curtain wall; the second motor 8 controls the hoisting track 5 to slide in the arc track 13 through the sliding shaft 14, so that the hoisting track 5 can rotate around the connecting shaft 7, thereby changing the angle of the hoisting track 5. The exterior wall of the building requires an installation position on an irregular surface and the angle of the hoisting track 5 is adjusted, so that the glass curtain wall can be installed better.

本实施例中,如图4所示,还包括可拆卸设于超高层建筑外墙的稳定吊装单元15;稳定吊装单元15包括可拆卸设于超高层建筑内墙的若干固定架151;固定架151伸出室外,且沿超高层建筑外墙的方向可拆卸连接有辅助轨道152;辅助轨道152上滑动连接有第四滑轮153;第四滑轮153的右侧壁开有连通至第四滑轮153前后侧壁的转动槽27;转动槽27的上下侧壁上转动连接有转动柱28;转动柱28的侧壁开有垂直于辅助轨道152的连接孔154;加固板91的左侧壁开有开槽16(如图2所示);开槽16前后内壁转动连接有转动轴17;第一气缸94垂直连接在转动轴17上;开槽16前后内壁连接有第四电机;第四电机带动转动轴17转动;第一气缸94通过伸缩轴能与第四滑轮153上的连接孔154连接。In the present embodiment, as shown in Figure 4, also comprise the stable hoisting unit 15 that detachable is located at super high-rise building outer wall; 151 stretches out of the room, and is detachably connected with an auxiliary track 152 along the direction of the outer wall of a super high-rise building; the auxiliary track 152 is slidably connected with a fourth pulley 153; The rotation groove 27 of front and back side wall; Rotation is connected with rotation post 28 on the upper and lower side wall of rotation groove 27; The side wall of rotation post 28 has the connection hole 154 that is perpendicular to auxiliary track 152; Slotting 16 (as shown in Figure 2); Slotting 16 front and rear inner walls are rotatably connected with rotating shaft 17; First cylinder 94 is vertically connected on the rotating shaft 17; Slotting 16 front and rear inner walls are connected with the fourth motor; The fourth motor drives The rotating shaft 17 rotates; the first cylinder 94 can be connected with the connecting hole 154 on the fourth pulley 153 through the telescopic shaft.

上述技术方案的原理及效果:The principle and effect of the above-mentioned technical scheme:

控制第二气缸12的伸缩轴缩回,然后控制第一气缸94伸缩轴缩回,控制第四电机通过转动轴17带动第一气缸94向左转动90°,通过第二电机8控制吊装轨道5顺时针旋转90°,由于连接孔154与辅助轨道152垂直,控制第一滑轮4移动,当第一气缸94与连接孔154同轴时,控制第一气缸94伸缩轴伸出并保持一直插入第四滑轮153的连接孔154内,此时,第一滑轮4、第二滑轮92以及第三滑轮93仅在与超高层建筑对应需要安装玻璃幕墙的外墙一侧的环形轨道3上滑动,控制电动葫芦6在吊装轨道5上移动从而带动玻璃幕墙移动到安装位置。Control the retraction of the telescopic shaft of the second cylinder 12, then control the retraction of the telescopic shaft of the first cylinder 94, control the fourth motor to drive the first cylinder 94 to rotate 90° to the left through the rotating shaft 17, and control the hoisting track through the second motor 8 5 Rotate clockwise 90°, since the connection hole 154 is perpendicular to the auxiliary rail 152, control the movement of the first pulley 4, when the first cylinder 94 is coaxial with the connection hole 154, control the expansion shaft of the first cylinder 94 to extend and keep inserted In the connecting hole 154 of the fourth pulley 153, at this moment, the first pulley 4, the second pulley 92 and the third pulley 93 only slide on the ring track 3 on the outer wall side of the glass curtain wall corresponding to the super high-rise building, Control the electric hoist 6 to move on the hoisting track 5 so as to drive the glass curtain wall to move to the installation position.

未设置辅助轨道152时,吊装轨道5远离超高层建筑的一端由弧形轨道13提供拉力,但其另一端缺少拉力,当控制电动葫芦6靠近超高层建筑移动时,由于靠近超高层建筑的一端缺少拉力,电动葫芦6带动玻璃幕墙移动时,其重心靠近缺少拉力的一端,会导致吊装轨道5向下倾斜,而使玻璃幕墙的最低端低于安装位置,继续移动会与最低端发生碰撞,也不能使玻璃幕墙很好的定位,为了对玻璃幕墙进行定位,需要再次启动移动单元2带动环形轨道3向上移动,以此解决玻璃幕墙的最低端低于安装位置的问题,但是由于吊装轨道5已经旋转,吊装轨道5与玻璃幕墙均过于靠近超高层建筑外墙,若继续带动环形轨道3上移,吊装轨道5和玻璃幕墙二者容易与超高层建筑外墙碰撞生碰撞;因此,为了解决这一问题,在本方案中通过设置辅助轨道152和第四滑轮153,辅助轨道152的设置,与环形轨道3相配合,一同对吊装轨道5提供拉力,使吊装轨道5由第一滑轮4、第二滑轮92的两点支撑变为第四滑轮153、第一滑轮4以及第二滑轮92的三点支撑,提高了对吊装轨道5的拉力,吊装轨道5的重心不会发生降低,使吊装轨道5与玻璃幕墙不会发生倾斜,从而当电动葫芦6带动玻璃幕墙运动时,玻璃幕墙的最低端不会低于安装位置,从而使玻璃幕墙更好的安装定位;由于转动柱28转动连接在转动槽27的上下侧壁之间,当第一气缸94的伸缩轴插入连接孔154内后,第一气缸94的伸缩轴一直保持插入连接孔154内,能够配合弧形轨道13辅助调整吊装轨道5的角度,从而更好实现玻璃幕墙的定位安装。When the auxiliary track 152 was not provided, the hoisting track 5 was provided with pulling force by the arc track 13 at one end away from the super high-rise building, but its other end lacked pulling force. In the absence of pulling force, when the electric hoist 6 drives the glass curtain wall to move, its center of gravity is close to the end lacking pulling force, which will cause the hoisting track 5 to tilt downward, so that the lowest end of the glass curtain wall is lower than the installation position, and if it continues to move, it will collide with the lowest end. It also cannot make the glass curtain wall well positioned. In order to position the glass curtain wall, it is necessary to start the mobile unit 2 again to drive the circular track 3 to move upwards, so as to solve the problem that the lowest end of the glass curtain wall is lower than the installation position, but because the hoisting track 5 Already rotated, the hoisting track 5 and the glass curtain wall are all too close to the outer wall of the super high-rise building. If the circular track 3 continues to move upward, the hoisting track 5 and the glass curtain wall are likely to collide with the outer wall of the super high-rise building; therefore, in order to solve This problem, in this program, by arranging auxiliary track 152 and the 4th pulley 153, the setting of auxiliary track 152 cooperates with annular track 3, provides pulling force to hoisting track 5 together, makes hoisting track 5 by first pulley 4, The two-point support of the second pulley 92 becomes the three-point support of the fourth pulley 153, the first pulley 4, and the second pulley 92, which improves the pulling force on the hoisting track 5, and the center of gravity of the hoisting track 5 will not be lowered, so that the hoisting The track 5 and the glass curtain wall will not be inclined, so that when the electric hoist 6 drives the glass curtain wall to move, the lowest end of the glass curtain wall will not be lower than the installation position, so that the glass curtain wall can be better installed and positioned; Between the upper and lower side walls of the rotating groove 27, when the telescopic shaft of the first cylinder 94 is inserted into the connection hole 154, the telescopic shaft of the first cylinder 94 is always inserted into the connection hole 154, which can cooperate with the arc track 13 to assist in adjusting the hoisting track 5 angle, so as to better realize the positioning and installation of the glass curtain wall.

本实施例中,如图5所示,每个移动单元2均包括与支撑件1滑动连接的移动板21;移动板21上可拆卸设有第三电机22;第三电机22同轴连接有第二齿轮23;支撑件1的侧壁上沿竖向设有若干能够与第二齿轮23啮合的齿条;移动板21上设有防坠件24。In this embodiment, as shown in FIG. 5 , each mobile unit 2 includes a mobile plate 21 slidingly connected to the support member 1; a third motor 22 is detachably provided on the mobile plate 21; the third motor 22 is coaxially connected with The second gear 23; the side wall of the support member 1 is vertically provided with several racks capable of meshing with the second gear 23; the moving plate 21 is provided with an anti-falling member 24.

上述技术方案的原理及效果:The principle and effect of the above-mentioned technical scheme:

由于第二齿轮23与齿条啮合,第三电机22可拆卸设置在移动板21上,当驱动第三电机22动力端旋转时,通过第二齿轮23在齿条上移动能够带动移动板21在支撑件1上移动,从而带动与移动板21连接的环形轨道3移动。Because the second gear 23 is engaged with the rack, the third motor 22 is detachably arranged on the moving plate 21. When the power end of the third motor 22 is driven to rotate, the moving plate 21 can be driven by the second gear 23 moving on the rack. The supporting member 1 moves, thereby driving the circular track 3 connected with the moving plate 21 to move.

本实施例中,如图5所示,每个支撑件1上设有两个防坠件24,两个防坠件24分别对称设置于支撑件1的左右侧壁上,每个防坠件24均包括可拆卸设置于移动板21上的第三气缸241;支撑件1上与齿条相邻的侧壁沿竖向开有若干与第三气缸241伸缩轴配合的防坠孔242。In this embodiment, as shown in Figure 5, two anti-falling parts 24 are provided on each supporting member 1, and the two anti-falling parts 24 are arranged symmetrically on the left and right side walls of the supporting part 1 respectively, and each anti-falling part 24 each includes a third cylinder 241 detachably arranged on the moving plate 21; the side wall adjacent to the rack on the support 1 is vertically provided with a number of anti-drop holes 242 that cooperate with the telescopic shaft of the third cylinder 241.

上述技术方案的原理及效果:The principle and effect of the above-mentioned technical scheme:

当环形轨道3到达预定高度时,控制第三气缸241伸缩轴伸出插入防坠孔242,实现固定,防止第三电机22因故障而导致环形轨道3坠落,保证安全。When the ring track 3 reaches a predetermined height, the telescopic shaft of the third cylinder 241 is controlled to stretch out and insert into the anti-fall hole 242 to realize fixing, so as to prevent the third motor 22 from falling due to a failure of the ring track 3 and ensure safety.

本实施例中,如图1所示,支撑件1包括若干拼接而成的立柱25;立柱25的上端通过连接架(图中未示出)与超高层建筑可拆卸连接;在地面浇筑钢筋混凝土基座(图中未示出),立柱25的下端与钢筋混凝土基座可拆卸连接。In this embodiment, as shown in Figure 1, the support member 1 includes a number of spliced columns 25; the upper end of the column 25 is detachably connected with the super high-rise building through a connecting frame (not shown in the figure); pouring reinforced concrete on the ground The base (not shown in the figure), the lower end of the column 25 is detachably connected with the reinforced concrete base.

上述技术方案的原理及效果:The principle and effect of the above-mentioned technical scheme:

拼接而成的立柱25方便安装与拆卸,连接架和钢筋混凝土基座的设置,提供立柱25的强度,提供移动板21移动时的稳定性。The column 25 formed by splicing is convenient for installation and disassembly, and the setting of the connecting frame and the reinforced concrete base provides the strength of the column 25 and the stability when the mobile plate 21 moves.

本实施例中,如图2所示,吊装轨道5的两端可拆卸连接有挡板26。In this embodiment, as shown in FIG. 2 , baffles 26 are detachably connected to both ends of the hoisting rail 5 .

上述技术方案的原理及效果:The principle and effect of the above-mentioned technical scheme:

挡板26的设置,避免电动葫芦6滑出吊装轨道5掉落,保证安全。The setting of baffle plate 26 prevents electric hoist 6 from slipping out of hoisting track 5 and falls, ensuring safety.

最后说明的是,以上优选实施例仅用以说明本发明的技术方案而非限制,尽管通过上述优选实施例已经对本发明进行了详细的描述,但本领域技术人员应当理解,可以在形式上和细节上对其作出各种各样的改变,而不偏离本发明权利要求书所限定的范围。Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that it can be described in terms of form and Various changes may be made in the details without departing from the scope of the invention defined by the claims.

Claims (7)

1.一种用于超高层变截面单元式玻璃幕墙的吊装设备,其特征在于:包括可拆卸设于超高层建筑四周的四个支撑件;每个支撑件上沿竖向均滑动设置有移动单元;移动单元上可拆卸连接有环绕于超高层建筑外的环形轨道;环形轨道上设有通过第一电机驱动的第一滑轮;环形轨道与支撑件之间有间隙;第一滑轮下方设有电动葫芦;第一滑轮与电动葫芦之间通过角度调整单元连接;第一滑轮能够在角度调整单元上移动。1. A hoisting device for a super-high-rise variable-section unit glass curtain wall, characterized in that: it includes four supports that are detachably arranged around the super-high-rise building; each support is vertically slidably provided with a movable unit; the mobile unit is detachably connected with a circular track that surrounds the super high-rise building; the circular track is provided with a first pulley driven by a first motor; there is a gap between the circular track and the support; there is a An electric hoist; the first pulley is connected to the electric hoist through an angle adjustment unit; the first pulley can move on the angle adjustment unit. 2.根据权利要求1所述的一种用于超高层变截面单元式玻璃幕墙的吊装设备,其特征在于:所述角度调整单元包括吊装轨道、加固板、滑动设置于环形轨道上的第二滑轮和第三滑轮;第二滑轮和第三滑轮分别位于第一滑轮的两侧;加固板可拆卸连接在吊装轨道上端;吊装轨道与第一滑轮之间设有连接轴;连接轴的一端与第一滑轮固定连接,其另一端与加固板转动连接;加固板上沿竖向连接有第一气缸;第二滑轮下表面开有方槽;方槽侧壁设有与第一气缸垂直的第二气缸;第一气缸的伸缩轴上开有通孔;第二气缸的伸缩轴穿过通孔且与方槽侧壁抵紧;第三滑轮下方可拆卸连接有弧形轨道;加固板上沿竖向可拆卸连接有滑动轴;滑动轴远离加固板的一端滑动设置于弧形轨道内;弧形轨道远离弧形轨道的一端与第一气缸有间隙;弧形轨道的另一端与支撑件有间隙;弧形轨道的上表面低于第二滑轮的下表面。2. A hoisting device for super-high-rise variable-section unit glass curtain walls according to claim 1, characterized in that: the angle adjustment unit includes a hoisting track, a reinforcing plate, and a second rail that is slidably arranged on the circular track. pulley and the third pulley; the second pulley and the third pulley are located on both sides of the first pulley; The first pulley is fixedly connected, and its other end is connected to the reinforcement plate in rotation; the reinforcement plate is vertically connected with the first cylinder; the lower surface of the second pulley is provided with a square groove; the side wall of the square groove is provided with a second cylinder vertical to the first cylinder Two cylinders; a through hole is opened on the telescopic shaft of the first cylinder; the telescopic shaft of the second cylinder passes through the through hole and is pressed against the side wall of the square groove; an arc track is detachably connected under the third pulley; A sliding shaft is vertically detachably connected; the end of the sliding shaft away from the reinforcing plate is slidably arranged in the arc track; the end of the arc track away from the arc track has a gap with the first cylinder; the other end of the arc track has a gap with the support member Clearance; the upper surface of the arc track is lower than the lower surface of the second pulley. 3.根据权利要求2所述的一种用于超高层变截面单元式玻璃幕墙的吊装设备,其特征在于:还包括可拆卸设于超高层建筑外墙的稳定吊装单元;稳定吊装单元包括可拆卸设于超高层建筑内墙的若干固定架;固定架伸出室外,且沿超高层建筑外墙的水平方向可拆卸连接有辅助轨道;辅助轨道上滑动连接有第四滑轮;第四滑轮上开有贯穿于第四滑轮侧壁的转动槽;转动槽的侧壁上转动连接有转动柱;转动柱的侧壁开有垂直于辅助轨道的连接孔;加固板的侧壁开有开槽;开槽内通过第四电机转动连接有与第一气缸垂直连接的转动轴;第一气缸的伸缩轴能与连接孔连接。3. A kind of hoisting equipment for super high-rise variable cross-section unit glass curtain wall according to claim 2, characterized in that: it also includes a detachable stable hoisting unit located on the outer wall of a super high-rise building; the stable hoisting unit includes a Dismantling several fixing frames arranged on the inner wall of super high-rise buildings; the fixing frames protrude outdoors, and are detachably connected with auxiliary rails along the horizontal direction of the outer walls of super high-rise buildings; the auxiliary rails are slidably connected with fourth pulleys; There is a rotating groove running through the side wall of the fourth pulley; the side wall of the rotating groove is connected with a rotating column; the side wall of the rotating column is provided with a connection hole perpendicular to the auxiliary track; the side wall of the reinforcing plate is provided with a slot; A rotating shaft vertically connected to the first cylinder is connected to the slot through the fourth motor; the telescopic shaft of the first cylinder can be connected to the connecting hole. 4.根据权利要求3所述的一种用于超高层变截面单元式玻璃幕墙的吊装设备,其特征在于:每个移动单元均包括与支撑件滑动连接的移动板;移动板上可拆卸设有第三电机;第三电机同轴设有齿轮;支撑件的侧壁上沿竖向设有若干能够与齿轮啮合的齿条;移动板上设有防坠件。4. A kind of hoisting equipment for super high-rise variable-section unit glass curtain wall according to claim 3, characterized in that: each moving unit includes a moving plate that is slidably connected with the support; There is a third motor; the third motor is coaxially provided with gears; the side wall of the supporting member is vertically provided with several racks capable of meshing with the gears; the moving plate is provided with anti-falling parts. 5.根据权利要求4所述的一种用于超高层变截面单元式玻璃幕墙的吊装设备,其特征在于:所述防坠件包括可拆卸设置于移动板上的第三气缸;支撑件上与齿条相邻的侧壁沿竖向开有若干与第三气缸伸缩轴配合的防坠孔。5. A hoisting device for a super-high-rise variable-section unit glass curtain wall according to claim 4, characterized in that: the anti-falling member includes a third cylinder detachably arranged on the moving plate; The side wall adjacent to the rack is vertically provided with a number of anti-falling holes that cooperate with the telescopic shaft of the third cylinder. 6.根据权利要求5所述的一种用于超高层变截面单元式玻璃幕墙的吊装设备,其特征在于:所述支撑件包括若干拼接而成的立柱;立柱的上端通过连接架与超高层建筑可拆卸连接;立柱下端与地面连接。6. A hoisting device for a super-high-rise variable-section unit glass curtain wall according to claim 5, characterized in that: the support includes a number of spliced columns; the upper end of the column is connected to the super-high-rise The building is detachably connected; the lower end of the column is connected to the ground. 7.根据权利要求6所述的一种用于超高层变截面单元式玻璃幕墙的吊装设备,其特征在于:所述吊装轨道的两端可拆卸连接有挡板。7. The hoisting device for super high-rise variable-section unit glass curtain walls according to claim 6, characterized in that baffles are detachably connected to both ends of the hoisting track.
CN202211105674.9A 2022-09-09 2022-09-09 A hoisting device for super high-rise variable-section unitized glass curtain wall Active CN115626567B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211105674.9A CN115626567B (en) 2022-09-09 2022-09-09 A hoisting device for super high-rise variable-section unitized glass curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211105674.9A CN115626567B (en) 2022-09-09 2022-09-09 A hoisting device for super high-rise variable-section unitized glass curtain wall

Publications (2)

Publication Number Publication Date
CN115626567A true CN115626567A (en) 2023-01-20
CN115626567B CN115626567B (en) 2025-05-13

Family

ID=84902800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211105674.9A Active CN115626567B (en) 2022-09-09 2022-09-09 A hoisting device for super high-rise variable-section unitized glass curtain wall

Country Status (1)

Country Link
CN (1) CN115626567B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116902788A (en) * 2023-08-30 2023-10-20 合肥市春华起重机械有限公司 Ring crane with power rail passing function
CN117404583A (en) * 2023-11-06 2024-01-16 嘉善三思光电技术有限公司 An attitude adjustment device for opening and closing docking display screens in the air
CN117759039A (en) * 2023-11-23 2024-03-26 中国建筑装饰集团有限公司 A unit plate transfer track system and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002147023A (en) * 2000-11-13 2002-05-22 Shimizu Corp Terha erection structure
RU138933U1 (en) * 2013-11-13 2014-03-27 Геннадий Юрьевич Яворский RACK WINDOW LIFT
CN104358336A (en) * 2014-11-10 2015-02-18 福建省九龙建设集团有限公司 Unit type curtain wall installation system and installation method thereof
CN112537721A (en) * 2020-11-10 2021-03-23 中建深圳装饰有限公司 Glass curtain wall is with cyclic annular double track lifting device
CN215364455U (en) * 2021-08-09 2021-12-31 中建一局集团建设发展有限公司 Unit curtain wall hoisting construction device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002147023A (en) * 2000-11-13 2002-05-22 Shimizu Corp Terha erection structure
RU138933U1 (en) * 2013-11-13 2014-03-27 Геннадий Юрьевич Яворский RACK WINDOW LIFT
CN104358336A (en) * 2014-11-10 2015-02-18 福建省九龙建设集团有限公司 Unit type curtain wall installation system and installation method thereof
CN112537721A (en) * 2020-11-10 2021-03-23 中建深圳装饰有限公司 Glass curtain wall is with cyclic annular double track lifting device
CN215364455U (en) * 2021-08-09 2021-12-31 中建一局集团建设发展有限公司 Unit curtain wall hoisting construction device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116902788A (en) * 2023-08-30 2023-10-20 合肥市春华起重机械有限公司 Ring crane with power rail passing function
CN117404583A (en) * 2023-11-06 2024-01-16 嘉善三思光电技术有限公司 An attitude adjustment device for opening and closing docking display screens in the air
CN117759039A (en) * 2023-11-23 2024-03-26 中国建筑装饰集团有限公司 A unit plate transfer track system and construction method

Also Published As

Publication number Publication date
CN115626567B (en) 2025-05-13

Similar Documents

Publication Publication Date Title
CN115626567A (en) A hoisting device for super-high-rise variable-section unit glass curtain walls
CN114382296B (en) Adjustable tooling for truss installation and construction method thereof
CN116588819A (en) A hoisting device for a glass curtain wall plate and its construction method
CN116838119A (en) Building assembled wallboard mounting machine
WO2023184882A1 (en) Material lifting device
CN112919361B (en) Pipeline vertical hoisting device
CN214834620U (en) Supporting platform for lighting well
CN216190569U (en) Assembled wall body installation auxiliary device
CN117864944B (en) A kind of anti-drop frame for lifting PC board components of assembled buildings
CN118289625B (en) Hoisting clamping device for bridge construction
CN118289624B (en) Bridge construction traction and lifting device
CN113585705A (en) Construction hanging flower basket is built in room
CN117108036B (en) An adjustable indoor building decoration operation platform
CN113548583B (en) Main drive hoisting tool of escalator and operation method
CN216613816U (en) A quick hoisting device for a universal curtain wall and its components
CN216040730U (en) Width-adjustable hanging basket for bridge tower construction
CN218205646U (en) Connecting mechanism between climbing frame and wall
CN209723559U (en) An adjustable building construction platform
CN115285836A (en) Factory assembly type building machine
JP3161159U (en) Twin pillar elevator
CN223150225U (en) Safe hovering platform for installing air pipe in vertical shaft
CN219259391U (en) Three-upright-column material hanging machine special for indoor construction
CN217732600U (en) Operation panel of can encorbelmenting
CN217602048U (en) An operation device for plastering construction in a well with high safety
CN221370277U (en) Lifting equipment for building well installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant