CN115626567A - A hoisting device for super-high-rise variable-section unit glass curtain walls - Google Patents
A hoisting device for super-high-rise variable-section unit glass curtain walls Download PDFInfo
- Publication number
- CN115626567A CN115626567A CN202211105674.9A CN202211105674A CN115626567A CN 115626567 A CN115626567 A CN 115626567A CN 202211105674 A CN202211105674 A CN 202211105674A CN 115626567 A CN115626567 A CN 115626567A
- Authority
- CN
- China
- Prior art keywords
- pulley
- track
- glass curtain
- cylinder
- rise
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C11/00—Trolleys or crabs, e.g. operating above runways
- B66C11/08—Trolleys or crabs, e.g. operating above runways with turntables
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/06—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/08—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
- B66C13/085—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions electrical
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C19/00—Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C5/00—Base supporting structures with legs
- B66C5/02—Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C7/00—Runways, tracks or trackways for trolleys or cranes
- B66C7/02—Runways, tracks or trackways for trolleys or cranes for underhung trolleys or cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C7/00—Runways, tracks or trackways for trolleys or cranes
- B66C7/08—Constructional features of runway rails or rail mountings
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C9/00—Travelling gear incorporated in or fitted to trolleys or cranes
- B66C9/02—Travelling gear incorporated in or fitted to trolleys or cranes for underhung trolleys or cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D3/00—Portable or mobile lifting or hauling appliances
- B66D3/18—Power-operated hoists
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/162—Handles to carry construction blocks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
Description
技术领域technical field
本发明属于建筑幕墙施工技术领域,具体涉及一种用于超高层变截面单元式玻璃幕墙的吊装设备。The invention belongs to the technical field of building curtain wall construction, and in particular relates to a hoisting device for a super high-rise variable-section unit glass curtain wall.
背景技术Background technique
玻璃幕墙因其美观新颖的结构,常常用来装饰超高层建筑;在安装玻璃幕墙时,需要用到吊装设备,现有技术中,通常在超高层建筑中的较高楼层上安装环形轨道,并配合卷扬机和电动葫芦来安装玻璃幕墙;由于高度越高,风速越大,将玻璃幕墙用绳索从低层向高层运输时,玻璃幕墙易发生摇晃,导致玻璃幕墙容易与超高层建筑的外墙发生碰撞,使得玻璃幕墙容易损毁。Because of its beautiful and novel structure, glass curtain walls are often used to decorate super high-rise buildings; when installing glass curtain walls, hoisting equipment is needed. In the prior art, ring tracks are usually installed on the upper floors of super high-rise buildings, and Cooperate with hoist and electric hoist to install the glass curtain wall; because the higher the height, the greater the wind speed, when the glass curtain wall is transported from the lower floor to the upper floor with ropes, the glass curtain wall is easy to shake, causing the glass curtain wall to easily collide with the outer wall of the super high-rise building , making the glass curtain wall easily damaged.
发明内容Contents of the invention
有鉴于此,本发明的目的在于提供一种用于超高层变截面单元式玻璃幕墙的吊装设备,以解决在吊装过程中遇到不同变截面的玻璃幕墙安装时,需要拆卸并重新安装环形轨道进行吊装的技术问题。In view of this, the object of the present invention is to provide a hoisting device for super-high-rise variable-section unit glass curtain walls to solve the problem of dismantling and reinstalling the circular track when encountering different variable-section glass curtain walls during the hoisting process. Technical issues with hoisting.
为达到上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:
本发明提供一种用于超高层变截面单元式玻璃幕墙的吊装设备,包括可拆卸设于超高层建筑四周的四个支撑件;每个支撑件上沿竖向均滑动设置有移动单元;移动单元上可拆卸连接有环绕于超高层建筑外的环形轨道;环形轨道上设有通过第一电机驱动的第一滑轮;环形轨道与支撑件之间有间隙;第一滑轮下方设有电动葫芦;第一滑轮与电动葫芦之间通过角度调整单元连接;第一滑轮能够在角度调整单元上移动。The invention provides a hoisting device for a super high-rise variable cross-section unit glass curtain wall, which includes four detachable supporting parts arranged around the super high-rise building; each supporting part is slidably provided with a mobile unit along the vertical direction; The unit is detachably connected with a circular track that surrounds the super high-rise building; the circular track is provided with a first pulley driven by a first motor; there is a gap between the circular track and the support; an electric hoist is provided under the first pulley; The first pulley is connected with the electric hoist through an angle adjustment unit; the first pulley can move on the angle adjustment unit.
进一步,所述角度调整单元包括吊装轨道、加固板、滑动设置于环形轨道上的第二滑轮和第三滑轮;第二滑轮和第三滑轮分别位于第一滑轮的两侧;加固板可拆卸连接在吊装轨道上端;吊装轨道与第一滑轮之间设有连接轴;连接轴的一端与第一滑轮固定连接,其另一端与加固板转动连接;加固板上沿竖向连接有第一气缸;第二滑轮下表面开有方槽;方槽侧壁设有与第一气缸垂直的第二气缸;第一气缸的伸缩轴上开有通孔;第二气缸的伸缩轴穿过通孔且与方槽侧壁抵紧;第三滑轮下方可拆卸连接有弧形轨道;加固板上沿竖向可拆卸连接有滑动轴;滑动轴远离加固板的一端滑动设置于弧形轨道内;弧形轨道远离弧形轨道的一端与第一气缸有间隙;弧形轨道的另一端与支撑件有间隙;弧形轨道的上表面低于第二滑轮的下表面。Further, the angle adjustment unit includes a hoisting track, a reinforcing plate, a second pulley and a third pulley slidingly arranged on the circular track; the second pulley and the third pulley are respectively located on both sides of the first pulley; the reinforcing plate is detachably connected On the upper end of the hoisting track; a connecting shaft is provided between the hoisting track and the first pulley; one end of the connecting shaft is fixedly connected to the first pulley, and the other end is rotatably connected to the reinforcement plate; the first cylinder is vertically connected to the reinforcement plate; The lower surface of the second pulley has a square groove; the side wall of the square groove is provided with a second cylinder perpendicular to the first cylinder; the telescopic shaft of the first cylinder has a through hole; the telescopic shaft of the second cylinder passes through the through hole and is connected with the first cylinder. The side wall of the square groove is pressed tightly; the arc track is detachably connected under the third pulley; the sliding shaft is detachably connected vertically on the reinforcing plate; the end of the sliding shaft away from the reinforcing plate is slidingly arranged in the arc track; the arc track The end away from the arc track has a gap with the first cylinder; the other end of the arc track has a gap with the supporting member; the upper surface of the arc track is lower than the lower surface of the second pulley.
进一步,还包括可拆卸设于超高层建筑外墙的稳定吊装单元;稳定吊装单元包括可拆卸设于超高层建筑内墙的若干固定架;固定架伸出室外,且沿超高层建筑外墙的水平方向可拆卸连接有辅助轨道;辅助轨道上滑动连接有第四滑轮;第四滑轮上开有贯穿于第四滑轮侧壁的转动槽;转动槽的侧壁上转动连接有转动柱;转动柱的侧壁开有垂直于辅助轨道的连接孔;加固板的侧壁开有开槽;开槽内通过第四电机转动连接有与第一气缸垂直连接的转动轴;第一气缸的伸缩轴能与连接孔连接。Further, it also includes a stable hoisting unit that can be detachably arranged on the outer wall of a super high-rise building; the stable hoisting unit includes a number of fixing frames that can be detachably arranged on the inner wall of a super high-rise building; The auxiliary track is detachably connected in the horizontal direction; the fourth pulley is slidably connected to the auxiliary track; the fourth pulley is provided with a rotation groove that runs through the side wall of the fourth pulley; the side wall of the rotation groove is connected with a rotation column; the rotation column There is a connection hole perpendicular to the auxiliary track on the side wall of the reinforcement plate; a slot is opened on the side wall of the reinforcing plate; a rotating shaft vertically connected to the first cylinder is connected to the slot through the fourth motor rotation; the telescopic shaft of the first cylinder can Connect with connection hole.
进一步,每个移动单元均包括与支撑件滑动连接的移动板;移动板上可拆卸设有第三电机;第三电机同轴设有齿轮;支撑件的侧壁上沿竖向设有若干能够与齿轮啮合的齿条;移动板上设有防坠件。Further, each moving unit includes a moving plate slidingly connected to the support; a third motor is detachably arranged on the moving plate; gears are coaxially arranged on the third motor; Rack meshing with gear; fall arrester on moving plate.
进一步,所述防坠件包括可拆卸设置于移动板上的第三气缸;支撑件上与齿条相邻的侧壁沿竖向开有若干与第三气缸伸缩轴配合的防坠孔。Further, the anti-falling part includes a third air cylinder detachably arranged on the moving plate; the side wall adjacent to the rack on the supporting part is vertically opened with a number of anti-falling holes that cooperate with the telescopic shaft of the third air cylinder.
进一步,所述支撑件包括若干拼接而成的立柱;立柱的上端通过连接架与超高层建筑可拆卸连接;立柱下端与地面连接。Further, the supporting member includes several spliced uprights; the upper end of the uprights is detachably connected to the super high-rise building through a connecting frame; the lower end of the uprights is connected to the ground.
进一步,所述吊装轨道的两端可拆卸连接有挡板。Further, both ends of the hoisting track are detachably connected with baffles.
本发明的有益效果在于:The beneficial effects of the present invention are:
1、通过在超高层建筑外围设置支撑件,并在支撑件上设置位于超高层建筑外侧的环形轨道,在移动单元的作用下,带动环形轨道和玻璃幕墙一同向上移动,在该过程中,玻璃幕墙与环形轨道之间的绳索长度极大的缩小了,能够极大减小玻璃幕墙在移动过程中的摆动幅度,防止玻璃幕墙在吊装过程中与建筑之间发生碰撞;且环形轨道距离超高层建筑外墙有一定距离,即使发生摇晃,当摆动幅度较小,玻璃幕墙更不会与超高层建筑外墙发生碰撞,从而避免玻璃幕墙发生损坏。1. By setting up supports on the periphery of the super high-rise building, and setting a circular track on the outside of the super high-rise building on the support, under the action of the mobile unit, the circular track and the glass curtain wall are driven to move upward together. During this process, the glass The length of the rope between the curtain wall and the circular track is greatly reduced, which can greatly reduce the swing range of the glass curtain wall during the moving process and prevent the glass curtain wall from colliding with the building during hoisting; and the distance between the circular track and the super high-rise There is a certain distance from the outer wall of the building. Even if it shakes, when the swing is small, the glass curtain wall will not collide with the outer wall of the super high-rise building, so as to avoid damage to the glass curtain wall.
2、角度调整单元的设置,能够改变吊装轨道的角度,能够根据超高层建筑外墙需要不规则面的安装位置而调整吊装轨道的角度,从而使玻璃幕墙更好的安装。2. The setting of the angle adjustment unit can change the angle of the hoisting track, and can adjust the angle of the hoisting track according to the installation position of the irregular surface of the outer wall of the super high-rise building, so that the glass curtain wall can be installed better.
3、辅助轨道的设置,与环形轨道相配合,一同对吊装轨道提供拉力,使吊装轨道由第一滑轮、第二滑轮的两点支撑变为第四滑轮、第一滑轮以及第二滑轮的三点支撑,对吊装轨道远离第一滑轮的一端提供了拉力,使吊装轨道的重心不会发生降低,使吊装轨道与玻璃幕墙不会发生倾斜,从而当电动葫芦带动玻璃幕墙运动时,玻璃幕墙的最低端不会低于安装位置。3. The setting of the auxiliary track cooperates with the ring track to provide tension to the hoisting track together, so that the hoisting track changes from the two-point support of the first pulley and the second pulley to the three-point support of the fourth pulley, the first pulley and the second pulley. Point support provides a pulling force to the end of the hoisting track away from the first pulley, so that the center of gravity of the hoisting track will not be lowered, so that the hoisting track and the glass curtain wall will not tilt, so that when the electric hoist drives the glass curtain wall to move, the glass curtain wall The lowest end will not be lower than the installation position.
本发明的其他优点、目标和特征将在随后的说明书中进行阐述,并且在某种程度上对本领域技术人员而言是显而易见的,或者本领域技术人员可以从本发明的实践中得到教导。本发明的目标和其他优点可以通过下面的说明书来实现和获得。Other advantages, objects and features of the present invention will be set forth in the following description, and to some extent will be obvious to those skilled in the art, or can be taught by the practice of the present invention to those skilled in the art. The objects and other advantages of the invention may be realized and attained by the following specification.
附图说明Description of drawings
为了使本发明的目的、技术方案和有益效果更加清楚,本发明提供如下附图进行说明:In order to make the purpose, technical scheme and beneficial effect of the present invention clearer, the present invention provides the following drawings for illustration:
图1为本发明的三维图;Fig. 1 is a three-dimensional diagram of the present invention;
图2为本发明吊装轨道的三维图;Fig. 2 is the three-dimensional figure of hoisting track of the present invention;
图3为本发明第一气缸和第二气缸的连接三维图;Fig. 3 is the connection three-dimensional diagram of the first cylinder and the second cylinder of the present invention;
图4为本发明辅助轨道安装在超高层建筑内的局部三维图;Fig. 4 is the local three-dimensional figure that auxiliary track of the present invention is installed in super high-rise building;
图5为本发明支撑件和移动单元的连接三维图。Fig. 5 is a three-dimensional view of the connection between the support and the mobile unit of the present invention.
附图中标记如下:支撑件1、移动单元2、移动板21、第三电机22、第二齿轮23、环形轨道3、第一滑轮4、吊装轨道5、电动葫芦6、连接轴7、第二电机8、角度调整单元9、加固板91、第二滑轮92、第三滑轮93、第一气缸94、方槽11、第二气缸12、弧形轨道13、滑动轴14、稳定吊装单元15、固定架151、辅助轨道152、第四滑轮153、连接孔154、开槽16、转动轴17、防坠件24、第三气缸241、防坠孔242、立柱25、挡板26、转动槽27、转动柱28。The marks in the drawings are as follows: support 1, mobile unit 2, mobile plate 21,
具体实施方式Detailed ways
如图1~5所示,本发明提供一种用于超高层变截面单元式玻璃幕墙的吊装设备,包括可拆卸设于超高层建筑四周的四个支撑件1;每个支撑件1上沿竖向均滑动设置有移动单元2;移动单元2上可拆卸连接有环绕于超高层建筑外的环形轨道3,环形轨道3由若干轨道拼接而成;环形轨道3上滑动设置有通过第一电机(图中未示出)驱动的第一滑轮4;环形轨道3与支撑件1之间有间隙,当第一滑轮4在环形轨道3上滑动时不会与支撑件1碰撞;第一滑轮4下方设有电动葫芦6;第一滑轮4与电动葫芦6之间通过角度调整单元9连接;第一滑轮4能够在角度调整单元9上移动。As shown in Figures 1 to 5, the present invention provides a hoisting device for a super high-rise variable-section unit glass curtain wall, which includes four support members 1 detachably arranged around the super high-rise building; the upper edge of each support member 1 The mobile unit 2 is slidingly arranged vertically; the mobile unit 2 is detachably connected with a circular track 3 that surrounds the super high-rise building, and the circular track 3 is formed by splicing several tracks; (not shown in the figure) the first pulley 4 of driving; There is a gap between the ring track 3 and the support 1, when the first pulley 4 slides on the ring track 3, it will not collide with the support 1; the first pulley 4 An electric hoist 6 is arranged below; the first pulley 4 is connected to the electric hoist 6 through an angle adjustment unit 9 ; the first pulley 4 can move on the angle adjustment unit 9 .
上述技术方案的原理及效果:The principle and effect of the above-mentioned technical scheme:
利用电动葫芦6吊装玻璃幕墙,通过四个支撑件1上的移动单元2共同带动环形轨道3向上移动到达预定高度后,利用角度调整单元9调整电动葫芦6上玻璃幕墙的位置,然后通过电动葫芦6在角度调整单元9上移动从而带动玻璃幕墙靠近安装位置,从而完成安装。Use the electric hoist 6 to hoist the glass curtain wall. After the moving unit 2 on the four supports 1 jointly drives the circular track 3 to move up to a predetermined height, use the angle adjustment unit 9 to adjust the position of the glass curtain wall on the electric hoist 6, and then pass the electric hoist. 6 moves on the angle adjustment unit 9 to drive the glass curtain wall close to the installation position, thereby completing the installation.
对于超高层建筑中不存在变截面而安装玻璃幕墙时,现有技术中通常将环形轨道3安装在较高的楼层处,再通过电动葫芦6对玻璃幕墙进行吊装,由于高度较高,吊装过程中绳索的长度过长,容易发生摆动,一旦风速过高,则玻璃幕墙容易与超高层建筑发生碰撞,从而造成玻璃幕墙的损坏;而在本申请中,通过在超高层建筑外围设置支撑件1,并在支撑件1上设置位于超高层建筑外侧的环形轨道3,通过电动葫芦6吊装玻璃幕墙,并在移动单元2的作用下,使玻璃幕墙与环形轨道3一同向上移动,在该过程中,玻璃幕墙与环形轨道3之间的绳索长度极大的缩小了,能够极大减小玻璃幕墙在移动过程中的摆动幅度,防止玻璃幕墙在吊装过程中与建筑之间发生碰撞;且环形轨道3距离超高层建筑外墙有一定距离,即使发生摇晃,当摆动幅度较小,玻璃幕墙更不会与超高层建筑外墙发生碰撞,从而避免玻璃幕墙发生损坏。When installing glass curtain walls without variable cross-sections in super high-rise buildings, the circular track 3 is usually installed on a higher floor in the prior art, and then the glass curtain walls are hoisted by the electric hoist 6. Due to the high height, the hoisting process If the length of the middle rope is too long, it is easy to swing. Once the wind speed is too high, the glass curtain wall will easily collide with the super high-rise building, thereby causing damage to the glass curtain wall; , and set the ring track 3 located on the outside of the super high-rise building on the support 1, and lift the glass curtain wall through the electric hoist 6, and under the action of the mobile unit 2, the glass curtain wall and the ring track 3 move upward together. , the length of the rope between the glass curtain wall and the circular track 3 is greatly reduced, which can greatly reduce the swing range of the glass curtain wall during the moving process, and prevent the glass curtain wall from colliding with the building during the hoisting process; and the circular track 3 There is a certain distance from the outer wall of the super high-rise building. Even if it shakes, when the swing is small, the glass curtain wall will not collide with the outer wall of the super high-rise building, thereby avoiding damage to the glass curtain wall.
本实施例中,如图2所示,角度调整单元9包括吊装轨道5、加固板91、滑动设置于环形轨道3上的第二滑轮92和第三滑轮93;第二滑轮92和第三滑轮93分别位于第一滑轮4的两侧;加固板91可拆卸连接在吊装轨道5上端;第一滑轮4下表面连接有连接轴7;加固板91上开有与连接轴7同轴的圆槽;连接轴7的下端转动连接在圆槽底部;圆槽侧壁同轴固定连接有齿圈;第一滑轮4下表面竖向连接有第二电机8,其动力端连接有第一齿轮;第一齿轮的一侧与齿圈啮合,其另一侧与连接轴7有间隙;加固板91上沿竖向连接有第一气缸94;如图3所示,第二滑轮92下表面开有方槽11;第一气缸94的伸缩轴抵紧方槽11顶壁;方槽11内设有与第一气缸94垂直的第二气缸12;第一气缸94的伸缩轴上开有通孔(图中未标注);第二气缸12的伸缩轴穿过通孔且与方槽11侧壁抵紧;如图2所示,第三滑轮93下表面通过四个第一加强杆可拆卸连接有弧形轨道13;第一滑轮4前侧壁与弧形轨道13之间可拆卸连接有第二加强杆;加固板91上沿竖向可拆卸连接有滑动轴14;滑动轴14的上端滑动设置于弧形轨道13内;滑动轴14与连接轴7之间的距离等于弧形轨道13的半径;弧形轨道13的左端与第一气缸94之间有间隙,避免影响第一气缸94的正常工作;弧形轨道13的右端与支撑件1有间隙,避免在环形轨道3上滑动时与支撑件1碰撞;弧形轨道13的上表面低于第二滑轮92的下表面。In this embodiment, as shown in Figure 2, the angle adjustment unit 9 includes a
上述技术方案的原理及效果:The principle and effect of the above-mentioned technical scheme:
在吊装玻璃幕墙之前,控制第一滑轮4、第二滑轮92以及第三滑轮93在环形轨道3上移动到与超高层建筑对应需要安装玻璃幕墙的外墙一侧,然后控制第一气缸94的伸缩轴向上抵紧方槽11顶壁,并使第二气缸12的伸缩轴穿过第一气缸94伸缩轴上的通孔并抵紧方槽11的侧壁,使弧形轨道13通过四个第一加强杆和一个第二加强杆分别可拆卸连接在第三滑轮93的下表面以及第一滑轮4的前侧壁,完成弧形轨道13的固定,同时使滑动轴14的上端滑动设置在弧形轨道13内,使滑动轴14的下端连接可拆卸连接在加固板91上表面;此时,第一滑轮4、第二滑轮92以及第三滑轮93仅在与超高层建筑对应需要安装玻璃幕墙的外墙一侧的环形轨道3上滑动,根据需要的安装位置,然后开始吊装;到达预定高度后,控制第二气缸12的伸缩轴缩回,然后控制第一气缸94伸缩轴缩回,利用第二电机8控制吊装轨道5顺时针转动,调整吊装轨道5的角度,然后控制电动葫芦6在吊装轨道5上移动后,安装玻璃幕墙。Before the glass curtain wall is hoisted, the first pulley 4, the
由于超高层建筑外观多样化,使超高层建筑的外墙上存在不规则的平面,因此在安装玻璃幕墙时,需要调整玻璃幕墙的角度,从而使玻璃幕墙在安装位置时与不规则的平面匹配,便于玻璃幕墙的安装;第二电机8控制吊装轨道5通过滑动轴14在弧形轨道13内滑动,能够使吊装轨道5绕连接轴7旋转,从而改变吊装轨道5的角度,能够根据超高层建筑外墙需要不规则面的安装位置而调整吊装轨道5的角度,从而使玻璃幕墙更好的安装。Due to the diverse appearance of super high-rise buildings, there are irregular planes on the outer walls of super high-rise buildings. Therefore, when installing glass curtain walls, it is necessary to adjust the angle of the glass curtain walls so that the glass curtain walls match the irregular planes at the installation position. , to facilitate the installation of the glass curtain wall; the
本实施例中,如图4所示,还包括可拆卸设于超高层建筑外墙的稳定吊装单元15;稳定吊装单元15包括可拆卸设于超高层建筑内墙的若干固定架151;固定架151伸出室外,且沿超高层建筑外墙的方向可拆卸连接有辅助轨道152;辅助轨道152上滑动连接有第四滑轮153;第四滑轮153的右侧壁开有连通至第四滑轮153前后侧壁的转动槽27;转动槽27的上下侧壁上转动连接有转动柱28;转动柱28的侧壁开有垂直于辅助轨道152的连接孔154;加固板91的左侧壁开有开槽16(如图2所示);开槽16前后内壁转动连接有转动轴17;第一气缸94垂直连接在转动轴17上;开槽16前后内壁连接有第四电机;第四电机带动转动轴17转动;第一气缸94通过伸缩轴能与第四滑轮153上的连接孔154连接。In the present embodiment, as shown in Figure 4, also comprise the
上述技术方案的原理及效果:The principle and effect of the above-mentioned technical scheme:
控制第二气缸12的伸缩轴缩回,然后控制第一气缸94伸缩轴缩回,控制第四电机通过转动轴17带动第一气缸94向左转动90°,通过第二电机8控制吊装轨道5顺时针旋转90°,由于连接孔154与辅助轨道152垂直,控制第一滑轮4移动,当第一气缸94与连接孔154同轴时,控制第一气缸94伸缩轴伸出并保持一直插入第四滑轮153的连接孔154内,此时,第一滑轮4、第二滑轮92以及第三滑轮93仅在与超高层建筑对应需要安装玻璃幕墙的外墙一侧的环形轨道3上滑动,控制电动葫芦6在吊装轨道5上移动从而带动玻璃幕墙移动到安装位置。Control the retraction of the telescopic shaft of the
未设置辅助轨道152时,吊装轨道5远离超高层建筑的一端由弧形轨道13提供拉力,但其另一端缺少拉力,当控制电动葫芦6靠近超高层建筑移动时,由于靠近超高层建筑的一端缺少拉力,电动葫芦6带动玻璃幕墙移动时,其重心靠近缺少拉力的一端,会导致吊装轨道5向下倾斜,而使玻璃幕墙的最低端低于安装位置,继续移动会与最低端发生碰撞,也不能使玻璃幕墙很好的定位,为了对玻璃幕墙进行定位,需要再次启动移动单元2带动环形轨道3向上移动,以此解决玻璃幕墙的最低端低于安装位置的问题,但是由于吊装轨道5已经旋转,吊装轨道5与玻璃幕墙均过于靠近超高层建筑外墙,若继续带动环形轨道3上移,吊装轨道5和玻璃幕墙二者容易与超高层建筑外墙碰撞生碰撞;因此,为了解决这一问题,在本方案中通过设置辅助轨道152和第四滑轮153,辅助轨道152的设置,与环形轨道3相配合,一同对吊装轨道5提供拉力,使吊装轨道5由第一滑轮4、第二滑轮92的两点支撑变为第四滑轮153、第一滑轮4以及第二滑轮92的三点支撑,提高了对吊装轨道5的拉力,吊装轨道5的重心不会发生降低,使吊装轨道5与玻璃幕墙不会发生倾斜,从而当电动葫芦6带动玻璃幕墙运动时,玻璃幕墙的最低端不会低于安装位置,从而使玻璃幕墙更好的安装定位;由于转动柱28转动连接在转动槽27的上下侧壁之间,当第一气缸94的伸缩轴插入连接孔154内后,第一气缸94的伸缩轴一直保持插入连接孔154内,能够配合弧形轨道13辅助调整吊装轨道5的角度,从而更好实现玻璃幕墙的定位安装。When the
本实施例中,如图5所示,每个移动单元2均包括与支撑件1滑动连接的移动板21;移动板21上可拆卸设有第三电机22;第三电机22同轴连接有第二齿轮23;支撑件1的侧壁上沿竖向设有若干能够与第二齿轮23啮合的齿条;移动板21上设有防坠件24。In this embodiment, as shown in FIG. 5 , each mobile unit 2 includes a mobile plate 21 slidingly connected to the support member 1; a
上述技术方案的原理及效果:The principle and effect of the above-mentioned technical scheme:
由于第二齿轮23与齿条啮合,第三电机22可拆卸设置在移动板21上,当驱动第三电机22动力端旋转时,通过第二齿轮23在齿条上移动能够带动移动板21在支撑件1上移动,从而带动与移动板21连接的环形轨道3移动。Because the
本实施例中,如图5所示,每个支撑件1上设有两个防坠件24,两个防坠件24分别对称设置于支撑件1的左右侧壁上,每个防坠件24均包括可拆卸设置于移动板21上的第三气缸241;支撑件1上与齿条相邻的侧壁沿竖向开有若干与第三气缸241伸缩轴配合的防坠孔242。In this embodiment, as shown in Figure 5, two anti-falling parts 24 are provided on each supporting member 1, and the two anti-falling parts 24 are arranged symmetrically on the left and right side walls of the supporting part 1 respectively, and each anti-falling part 24 each includes a
上述技术方案的原理及效果:The principle and effect of the above-mentioned technical scheme:
当环形轨道3到达预定高度时,控制第三气缸241伸缩轴伸出插入防坠孔242,实现固定,防止第三电机22因故障而导致环形轨道3坠落,保证安全。When the ring track 3 reaches a predetermined height, the telescopic shaft of the
本实施例中,如图1所示,支撑件1包括若干拼接而成的立柱25;立柱25的上端通过连接架(图中未示出)与超高层建筑可拆卸连接;在地面浇筑钢筋混凝土基座(图中未示出),立柱25的下端与钢筋混凝土基座可拆卸连接。In this embodiment, as shown in Figure 1, the support member 1 includes a number of spliced
上述技术方案的原理及效果:The principle and effect of the above-mentioned technical scheme:
拼接而成的立柱25方便安装与拆卸,连接架和钢筋混凝土基座的设置,提供立柱25的强度,提供移动板21移动时的稳定性。The
本实施例中,如图2所示,吊装轨道5的两端可拆卸连接有挡板26。In this embodiment, as shown in FIG. 2 , baffles 26 are detachably connected to both ends of the hoisting
上述技术方案的原理及效果:The principle and effect of the above-mentioned technical scheme:
挡板26的设置,避免电动葫芦6滑出吊装轨道5掉落,保证安全。The setting of
最后说明的是,以上优选实施例仅用以说明本发明的技术方案而非限制,尽管通过上述优选实施例已经对本发明进行了详细的描述,但本领域技术人员应当理解,可以在形式上和细节上对其作出各种各样的改变,而不偏离本发明权利要求书所限定的范围。Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that it can be described in terms of form and Various changes may be made in the details without departing from the scope of the invention defined by the claims.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211105674.9A CN115626567B (en) | 2022-09-09 | 2022-09-09 | A hoisting device for super high-rise variable-section unitized glass curtain wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211105674.9A CN115626567B (en) | 2022-09-09 | 2022-09-09 | A hoisting device for super high-rise variable-section unitized glass curtain wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN115626567A true CN115626567A (en) | 2023-01-20 |
| CN115626567B CN115626567B (en) | 2025-05-13 |
Family
ID=84902800
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211105674.9A Active CN115626567B (en) | 2022-09-09 | 2022-09-09 | A hoisting device for super high-rise variable-section unitized glass curtain wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115626567B (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116902788A (en) * | 2023-08-30 | 2023-10-20 | 合肥市春华起重机械有限公司 | Ring crane with power rail passing function |
| CN117404583A (en) * | 2023-11-06 | 2024-01-16 | 嘉善三思光电技术有限公司 | An attitude adjustment device for opening and closing docking display screens in the air |
| CN117759039A (en) * | 2023-11-23 | 2024-03-26 | 中国建筑装饰集团有限公司 | A unit plate transfer track system and construction method |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002147023A (en) * | 2000-11-13 | 2002-05-22 | Shimizu Corp | Terha erection structure |
| RU138933U1 (en) * | 2013-11-13 | 2014-03-27 | Геннадий Юрьевич Яворский | RACK WINDOW LIFT |
| CN104358336A (en) * | 2014-11-10 | 2015-02-18 | 福建省九龙建设集团有限公司 | Unit type curtain wall installation system and installation method thereof |
| CN112537721A (en) * | 2020-11-10 | 2021-03-23 | 中建深圳装饰有限公司 | Glass curtain wall is with cyclic annular double track lifting device |
| CN215364455U (en) * | 2021-08-09 | 2021-12-31 | 中建一局集团建设发展有限公司 | Unit curtain wall hoisting construction device |
-
2022
- 2022-09-09 CN CN202211105674.9A patent/CN115626567B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002147023A (en) * | 2000-11-13 | 2002-05-22 | Shimizu Corp | Terha erection structure |
| RU138933U1 (en) * | 2013-11-13 | 2014-03-27 | Геннадий Юрьевич Яворский | RACK WINDOW LIFT |
| CN104358336A (en) * | 2014-11-10 | 2015-02-18 | 福建省九龙建设集团有限公司 | Unit type curtain wall installation system and installation method thereof |
| CN112537721A (en) * | 2020-11-10 | 2021-03-23 | 中建深圳装饰有限公司 | Glass curtain wall is with cyclic annular double track lifting device |
| CN215364455U (en) * | 2021-08-09 | 2021-12-31 | 中建一局集团建设发展有限公司 | Unit curtain wall hoisting construction device |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116902788A (en) * | 2023-08-30 | 2023-10-20 | 合肥市春华起重机械有限公司 | Ring crane with power rail passing function |
| CN117404583A (en) * | 2023-11-06 | 2024-01-16 | 嘉善三思光电技术有限公司 | An attitude adjustment device for opening and closing docking display screens in the air |
| CN117759039A (en) * | 2023-11-23 | 2024-03-26 | 中国建筑装饰集团有限公司 | A unit plate transfer track system and construction method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN115626567B (en) | 2025-05-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN115626567A (en) | A hoisting device for super-high-rise variable-section unit glass curtain walls | |
| CN114382296B (en) | Adjustable tooling for truss installation and construction method thereof | |
| CN116588819A (en) | A hoisting device for a glass curtain wall plate and its construction method | |
| CN116838119A (en) | Building assembled wallboard mounting machine | |
| WO2023184882A1 (en) | Material lifting device | |
| CN112919361B (en) | Pipeline vertical hoisting device | |
| CN214834620U (en) | Supporting platform for lighting well | |
| CN216190569U (en) | Assembled wall body installation auxiliary device | |
| CN117864944B (en) | A kind of anti-drop frame for lifting PC board components of assembled buildings | |
| CN118289625B (en) | Hoisting clamping device for bridge construction | |
| CN118289624B (en) | Bridge construction traction and lifting device | |
| CN113585705A (en) | Construction hanging flower basket is built in room | |
| CN117108036B (en) | An adjustable indoor building decoration operation platform | |
| CN113548583B (en) | Main drive hoisting tool of escalator and operation method | |
| CN216613816U (en) | A quick hoisting device for a universal curtain wall and its components | |
| CN216040730U (en) | Width-adjustable hanging basket for bridge tower construction | |
| CN218205646U (en) | Connecting mechanism between climbing frame and wall | |
| CN209723559U (en) | An adjustable building construction platform | |
| CN115285836A (en) | Factory assembly type building machine | |
| JP3161159U (en) | Twin pillar elevator | |
| CN223150225U (en) | Safe hovering platform for installing air pipe in vertical shaft | |
| CN219259391U (en) | Three-upright-column material hanging machine special for indoor construction | |
| CN217732600U (en) | Operation panel of can encorbelmenting | |
| CN217602048U (en) | An operation device for plastering construction in a well with high safety | |
| CN221370277U (en) | Lifting equipment for building well installation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |