CN115596452A - Multifunctional impact rock cracking equipment - Google Patents
Multifunctional impact rock cracking equipment Download PDFInfo
- Publication number
- CN115596452A CN115596452A CN202211267816.1A CN202211267816A CN115596452A CN 115596452 A CN115596452 A CN 115596452A CN 202211267816 A CN202211267816 A CN 202211267816A CN 115596452 A CN115596452 A CN 115596452A
- Authority
- CN
- China
- Prior art keywords
- arm
- rock
- arch
- slag
- movable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/003—Machines for drilling anchor holes and setting anchor bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Earth Drilling (AREA)
Abstract
Description
技术领域technical field
本发明涉及隧道工程机械技术领域,具体涉及一种多功能冲击裂岩设备。The invention relates to the technical field of tunnel engineering machinery, in particular to a multifunctional impact rock cracking device.
背景技术Background technique
目前隧道施工主要是有钻爆法和悬臂式隧道掘进机施工方法,钻爆法产生噪音大,污染严重,且在围岩较差的隧道容易造成坍塌问题,在特殊情况下隧道内严禁采用钻爆法,因此机械施工法逐渐取代钻爆法,例如在城市地下隧道施工的时候就必须要使用机械施工法。机械施工法主要有凿岩台车、盾构法及隧道掘进机施工,盾构法施工成本较高,适用于长距离施工,凿岩台车主要用于钻孔,最终还是由炸药进行爆破,因此对于围岩稳定性较差的短小隧道纯机械法施工还是以隧道掘进机为主。At present, the tunnel construction mainly includes the drilling and blasting method and the cantilever tunnel boring machine construction method. The drilling and blasting method produces large noise and serious pollution, and it is easy to cause collapse in tunnels with poor surrounding rock. In special cases, it is strictly forbidden to use drilling. Therefore, the mechanical construction method gradually replaces the drill and blast method. For example, the mechanical construction method must be used in the construction of urban underground tunnels. Mechanical construction methods mainly include rock drilling rigs, shield method and tunnel boring machine construction. The construction cost of shield method is relatively high and it is suitable for long-distance construction. Rock drilling rigs are mainly used for drilling, and finally blasting is carried out by explosives. Therefore, for the construction of short and small tunnels with poor surrounding rock stability, the pure mechanical method is still based on tunnel boring machines.
单纯的隧道掘进机对于围岩稳定性较差的围岩需要更换挖斗进行作业,且在隧道开挖过程中需要退机出渣和切换支护设备进场进行支护作业,存在较大的安全隐患且极大地浪费工作时间,同时也面临进度缓慢、适应性差、断面超欠挖控制难的问题。The simple tunnel boring machine needs to replace the bucket for the surrounding rock with poor stability, and it needs to withdraw the machine to discharge the slag and switch the support equipment to enter the site for support operation during the excavation process of the tunnel. There are potential safety hazards and a great waste of working time. At the same time, it also faces the problems of slow progress, poor adaptability, and difficult control of over- and under-excavation sections.
综上所述,急需一种多功能冲击裂岩设备以解决现有技术中存在的问题。In summary, there is an urgent need for a multi-functional impact rock cracking equipment to solve the problems in the prior art.
发明内容Contents of the invention
本发明目的在于提供一种多功能冲击裂岩设备,集开挖、出渣、立拱、打锚杆等功能于一体,解决了现有隧道开挖施工进度缓慢、更换设备频繁的问题,具体技术方案如下:The purpose of the present invention is to provide a multifunctional impact rock cracking equipment, which integrates the functions of excavation, slag removal, arching, bolting, etc., and solves the problems of slow excavation progress and frequent equipment replacement in existing tunnels. The technical solution is as follows:
一种多功能冲击裂岩设备,包括底盘系统、破碎臂、挖掘臂、出渣系统和拱锚系统,所述底盘系统为移动载体,所述破碎臂、挖掘臂、出渣系统和拱锚系统均设置在所述底盘系统上;A multifunctional impact rock cracking equipment, including a chassis system, a crushing arm, an excavating arm, a slag discharge system and an arch anchor system, the chassis system is a mobile carrier, and the crushing arm, excavation arm, slag discharge system and arch anchor system are all arranged on the chassis system;
其中,所述破碎臂包括活动臂架,所述活动臂架一端通过第一回转底座设置在底盘系统上,另外一端设有破碎机构;Wherein, the crushing arm includes a movable arm frame, one end of the movable arm frame is set on the chassis system through the first rotary base, and the other end is provided with a crushing mechanism;
所述挖掘臂包括工作臂架,所述工作臂架一端通过第二回转底座设置在底盘系统上,另外一端设有挖斗;The excavating arm includes a working boom, one end of the working boom is set on the chassis system through the second slewing base, and the other end is provided with a bucket;
所述出渣系统包括铲斗和渣土输送机,所述铲斗用于收集渣土并将渣土输送到渣土输送机中;The slag discharging system includes a bucket and a slag conveyor, the bucket is used to collect slag and transport the slag to the slag conveyor;
所述拱锚系统包括可滑动式设置在所述底盘系统上的移动座,所述移动座上设有拱架抓手和锚杆机构。The arch anchor system includes a movable seat slidably arranged on the chassis system, and the movable seat is provided with an arch grip and an anchor mechanism.
优选的,所述活动臂架包括主臂、副臂以及功能臂,所述主臂一端铰接设置在第一回转底座上,另外一端设有沿着主臂周向回转的回转机构,所述副臂一端铰接设置在所述回转机构上,另外一端铰接所述功能臂,所述功能臂上设置破碎机构。Preferably, the movable arm frame includes a main arm, an auxiliary arm and a functional arm, one end of the main arm is hingedly arranged on the first revolving base, and the other end is provided with a revolving mechanism that rotates along the circumferential direction of the main arm, and the auxiliary arm One end of the arm is hingedly arranged on the slewing mechanism, the other end is hinged on the functional arm, and the crushing mechanism is arranged on the functional arm.
优选的,所述破碎机构为高频破碎锤。Preferably, the crushing mechanism is a high-frequency crushing hammer.
优选的,所述破碎臂设置在掘进方向的中心位置,且以破碎臂为中心左右对称各设有一个挖掘臂。Preferably, the crushing arm is arranged at the center of the excavation direction, and one excavating arm is provided symmetrically with respect to the center of the crushing arm.
优选的,所述工作臂架通过活动底座连接所述底盘系统,所述活动底座和底盘系统之间设有偏摆油缸,所述工作臂架和活动底座之间设有伸缩油缸。Preferably, the working boom is connected to the chassis system through a movable base, a yaw oil cylinder is arranged between the movable base and the chassis system, and a telescopic oil cylinder is arranged between the working boom and the movable base.
优选的,所述铲斗通过活动铰连接所述底盘系统,所述底盘系统上设有用于调节铲斗俯仰角度的俯仰油缸。Preferably, the bucket is connected to the chassis system through a living hinge, and the chassis system is provided with a pitch cylinder for adjusting the pitch angle of the bucket.
优选的,所述渣土输送机包括刮板输送机和皮带输送机,所述铲斗、刮板输送机和皮带输送机依次连接实现渣土外运。Preferably, the muck conveyor includes a scraper conveyor and a belt conveyor, and the bucket, the scraper conveyor, and the belt conveyor are sequentially connected to realize the outer transportation of the muck.
优选的,所述拱锚系统还包括伸缩臂架、拱锚底座和工作吊篮,所述伸缩臂架设置在移动座上且铰接有拱锚底座,所述拱锚底座上设有拱架抓手、锚杆机构和工作吊篮。Preferably, the arch anchor system also includes a telescopic arm, an arch anchor base and a working basket, the telescopic arm is arranged on the mobile seat and is hinged with the arch anchor base, and the arch anchor base is provided with an arch grip Hand, anchor mechanism and working basket.
优选的,所述底盘系统包括履带底盘总成和设置在履带底盘总成上的主车架,所述破碎臂、挖掘臂、出渣系统和拱锚系统均设置在所述主车架上。Preferably, the chassis system includes a crawler chassis assembly and a main frame arranged on the crawler chassis assembly, and the crushing arm, excavating arm, slag discharge system and arch anchor system are all arranged on the main frame.
优选的,所述主车架下方设有用于支撑所述主车架的支撑件。Preferably, a supporting member for supporting the main frame is provided under the main frame.
应用本发明的技术方案,具有以下有益效果:Applying the technical solution of the present invention has the following beneficial effects:
(1)本发明提出的多功能冲击裂岩设备集开挖、出渣、立拱、打锚杆等功能于一体,加快了隧道施工速度,解决了需要频繁跟换设备的问题;本发明能够针对于岩体破碎、围岩稳定性差的坚硬岩和软岩相结合的复杂围岩进行隧道挖掘作业。本发明中的挖掘臂能够直接开挖软岩,高频破碎锤则能够对无法直接开挖的硬岩进行冲击裂岩,减少更换挖斗所需时间。(1) The multifunctional impact rock cracking equipment proposed by the present invention integrates the functions of excavation, slag removal, vertical arching, and bolting, which speeds up the tunnel construction speed and solves the problem of frequent replacement of equipment; the present invention can Tunnel excavation operations are carried out for complex surrounding rocks with broken rock mass and poor stability of surrounding rocks combined with hard rocks and soft rocks. The excavating arm in the present invention can directly excavate soft rock, and the high-frequency breaker can impact and crack hard rock that cannot be directly excavated, reducing the time required for replacing the bucket.
(2)本发明提出的多功能冲击裂岩设备能够进行采取小进尺、强支护、全断面开挖的施工方式。本发明集开挖、出渣、立拱、打锚杆等功能于一体,开挖后即时支护,且可解决小进尺功法的设备频繁进退场问题,提高施工效率。(2) The multifunctional impact rock cracking equipment proposed by the present invention can carry out the construction mode of small footage, strong support, and full-section excavation. The invention integrates the functions of excavation, slag removal, arching, bolting, etc., supports immediately after excavation, and can solve the problem of frequent entry and exit of equipment for small-footage techniques, and improve construction efficiency.
(3)本发明中的破碎臂通过第一回转底座和回转机构形成二级回转,主臂、副臂以及功能臂形成三级折叠,进而覆盖整个隧道面,减少移动设备所需时间;破碎臂的破碎机构能够与隧道壁贴合,能够实现零超挖,减少超挖所带来的时间、人力和财力的浪费;且破碎臂能够延伸到下部铲斗处,破碎铲斗上无法运输的石块,提高出渣的效率。(3) The crushing arm in the present invention forms a secondary rotation through the first rotary base and the rotary mechanism, and the main arm, auxiliary arm and functional arm form a three-stage folding, thereby covering the entire tunnel surface and reducing the time required for moving equipment; the crushing arm The advanced crushing mechanism can be attached to the tunnel wall to achieve zero over-excavation, reducing the waste of time, manpower and financial resources caused by over-excavation; and the crushing arm can be extended to the lower bucket to crush stones that cannot be transported on the bucket. Block, improve the efficiency of slag.
(4)本发明中的挖掘臂设有活动底座和偏摆油缸,实现了水平转动,伸缩油缸实现了俯仰调节工作方位,且本发明在掘进方向上设有左右各一个挖掘臂进而挖掘臂,能够覆盖整个隧道面;本发明中的挖掘臂即能够挖掘软岩,也能够辅助出渣系统清理地表面的渣土,减少挪车来清理渣土浪费的时间。(4) The excavating arm in the present invention is provided with a movable base and a yaw oil cylinder, which realizes horizontal rotation, and the telescopic oil cylinder realizes the pitch adjustment working orientation, and the present invention is provided with a left and right excavating arm and then an excavating arm in the direction of excavation, It can cover the entire tunnel surface; the excavating arm in the present invention can not only excavate soft rock, but also assist the slag discharge system to clean up the slag on the ground surface, reducing the time wasted in moving the vehicle to clean the slag.
(5)本发明的拱锚系统集立拱和打锚孔于一体,仅需一个臂架就能实现两种功能,极大地减少了材料和空间的浪费。所述移动座可滑动式设置在底盘系统上,与拱架抓手相配合,极大地提升了工作范围,减少了频繁挪车的时间。(5) The arch-anchor system of the present invention integrates the vertical arch and the anchor hole, and only one boom can realize the two functions, which greatly reduces the waste of materials and space. The moving seat is slidably arranged on the chassis system, and cooperates with the arch grip, which greatly improves the working range and reduces the time for frequent vehicle movement.
(6)本发明的支撑件具有较大的支撑底板,能够有效的保证设备施工过程中不发生下陷和左右滑动,提高了工作过程的稳定性。(6) The supporting member of the present invention has a relatively large supporting bottom plate, which can effectively ensure that the equipment does not sink and slide left and right during the construction process, and improves the stability of the working process.
除了上面所描述的目的、特征和优点之外,本发明还有其它的目的、特征和优点。下面将参照图,对本发明作进一步详细的说明。In addition to the objects, features and advantages described above, the present invention has other objects, features and advantages. Hereinafter, the present invention will be described in further detail with reference to the drawings.
附图说明Description of drawings
构成本申请的一部分的附图用来提供对本发明的进一步理解,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:The accompanying drawings constituting a part of this application are used to provide further understanding of the present invention, and the schematic embodiments and descriptions of the present invention are used to explain the present invention, and do not constitute an improper limitation of the present invention. In the attached picture:
图1是多功能冲击裂岩设备的结构示意图;Fig. 1 is the structural schematic diagram of multifunctional impact rock cracking equipment;
图2是破碎臂的结构示意图;Fig. 2 is a schematic structural view of the crushing arm;
图3是拱锚系统的结构示意图;Fig. 3 is the structural representation of arch anchor system;
图4是出渣系统和挖掘臂的结构示意图(侧视);Fig. 4 is the structural representation (side view) of slag discharging system and excavating arm;
图5是出渣系统和挖掘臂的结构示意图(俯视)。Fig. 5 is a structural schematic view (top view) of the slag discharging system and the excavating arm.
其中,1-底盘系统,1.1-履带底盘总成,1.2-主车架,1.3-支撑件,2-破碎臂,2.1-活动臂架,2.11-主臂,2.12-副臂,2.13-功能臂,2.14-回转机构,2.2-第一回转底座,2.3-破碎机构,3-挖掘臂,3.1-工作臂架,3.2-第二回转底座,3.3-挖斗,4-出渣系统,4.1-铲斗,4.2-渣土输送机,4.21-刮板输送机,4.22-皮带输送机,5-拱锚系统,5.1-移动座,5.2-拱架抓手,5.3-锚杆机构,5.4-伸缩臂架,5.5-拱锚底座,5.6-工作吊篮。Among them, 1-chassis system, 1.1-track chassis assembly, 1.2-main frame, 1.3-support, 2-broken arm, 2.1-movable arm frame, 2.11-main arm, 2.12-auxiliary arm, 2.13-functional arm , 2.14-Slewing Mechanism, 2.2-First Swing Base, 2.3-Crushing Mechanism, 3-Excavating Arm, 3.1-Working Boom, 3.2-Second Swing Base, 3.3-Bucket, 4-Slagging System, 4.1-Shovel Bucket, 4.2-slag conveyor, 4.21-scraper conveyor, 4.22-belt conveyor, 5-arch anchor system, 5.1-mobile seat, 5.2-arch gripper, 5.3-bolt mechanism, 5.4-telescopic arm Frame, 5.5-arch anchor base, 5.6-working basket.
具体实施方式detailed description
以下结合附图对本发明的实施例进行详细说明,但是本发明可以根据权利要求限定和覆盖的多种不同方式实施。The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in various ways defined and covered by the claims.
实施例1:Example 1:
参阅图1,本实施例公开了一种多功能冲击裂岩设备,包括底盘系统1、破碎臂2、挖掘臂3、出渣系统4和拱锚系统5,所述底盘系统1为移动载体,所述破碎臂2、挖掘臂3、出渣系统4和拱锚系统5均设置在所述底盘系统1上。所述多功能冲击裂岩设备集成了裂岩、出渣、打孔、设锚、立拱等多种功能,减少了设备在施工作业中的进退场次数,提高了隧道施工效率。Referring to Fig. 1, this embodiment discloses a multi-functional impact rock cracking equipment, including a
具体的,所述破碎臂2包括活动臂架2.1,所述活动臂架2.1一端通过第一回转底座2.2设置在底盘系统1上,另外一端设有用于破碎硬岩的破碎机构2.3。本实施例优选的破碎机构2.3为高频破碎锤。高频破碎锤可针对软硬岩结合的复杂围岩中的硬岩,所述高频破碎锤的工作频率部分能够自动调节运动速度,由1500转/分可在几秒钟内调节到2400转/分,可以对坚硬岩(60~120MPa)进行高效破碎,施工效率是普通破碎锤的2到5倍,具有噪音低,维护少,能耗低,操作简单等优点。Specifically, the crushing
参阅图2,所述活动臂架2.1包括主臂2.11、副臂2.12以及功能臂1.13,所述主臂2.11一端铰接设置在第一回转底座2.2上,另外一端设有沿着主臂2.11周向回转的回转机构2.14,所述副臂2.12一端铰接设置在所述回转机构2.14上,另外一端铰接所述功能臂2.13,所述功能臂2.13上设置破碎机构2.3,所述第一回转底座2.2和主臂2.11之间、主臂2.11和副臂2.12之间以及副臂2.12和功能臂2.13之间均设有伸缩油缸。所述第一回转底座2.2和回转机构2.14形成二级回转,主臂2.11、副臂2.12以及功能臂2.13形成三级折叠,所述活动臂架2.1通过二级回转以及三级折叠实现了对开挖面的全面覆盖且保持斗齿与隧道壁完全贴合,实现零超挖;且高频破碎锤能够延伸到铲斗4.1的位置下方,对位于设备下方的大块无法输送的岩石进行破碎,保证出渣系统的高效运输。Referring to Fig. 2, the movable arm frame 2.1 includes a main arm 2.11, an auxiliary arm 2.12 and a functional arm 1.13. One end of the main arm 2.11 is hingedly arranged on the first rotating base 2.2, and the other end is provided along the circumferential direction of the main arm 2.11. Rotary rotary mechanism 2.14, one end of the auxiliary arm 2.12 is hinged to the rotary mechanism 2.14, the other end is hinged to the functional arm 2.13, the functional arm 2.13 is provided with a crushing mechanism 2.3, the first rotary base 2.2 and Telescopic oil cylinders are arranged between the main arm 2.11, between the main arm 2.11 and the auxiliary arm 2.12, and between the auxiliary arm 2.12 and the functional arm 2.13. The first slewing base 2.2 and the slewing mechanism 2.14 form a two-stage slewing, the main arm 2.11, the auxiliary arm 2.12 and the functional arm 2.13 form a three-stage folding, and the movable boom 2.1 realizes splitting through the two-stage slewing and three-stage folding The full coverage of the excavation surface and the complete fit of the bucket teeth and the tunnel wall can achieve zero over-excavation; and the high-frequency breaker can extend below the position of the bucket 4.1 to break the large rocks that cannot be conveyed under the equipment. Ensure efficient transportation of slag discharge system.
具体的,所述挖掘臂3包括工作臂架3.1,所述工作臂架3.1一端通过第二回转底座3.2设置在底盘系统1上,另外一端设有用于开挖软岩和清理渣土的挖斗3.3;所述工作臂架3.1通过活动底座、偏摆油缸和伸缩油缸连接所述底盘系统1,所述工作臂架3.1设置在活动底座上,所述偏摆油缸可以驱动活动底座转动,进而实现工作臂架3.1转动调节工作方位;所述伸缩油缸设置在工作臂架3.1和活动底座之间,用于调节工作臂架3.1和活动底座之间的夹角,调节工作臂架3.1的工作方位。本实施例优选的工作臂架3.1为二级折叠臂架。Specifically, the excavating
具体的,所述出渣系统4包括铲斗4.1和渣土输送机4.2,所述铲斗4.1用于收集渣土并将渣土输送到渣土输送机4.2中,所述渣土输送机4.2用于转移渣土;所述铲斗4.1通过活动铰连接所述底盘系统1,所述底盘系统1上设有用于调节铲斗4.1俯仰角度的俯仰油缸。进一步地,所述渣土输送机4.2包括刮板输送机4.21和皮带输送机4.22,所述刮板输送机4.21倾斜设置且下部连接铲斗4.1,上部连接所述皮带输送机4.22,所述皮带输送机4.22用于将渣土向后方转移,防止地面渣土堆积影响隧道开挖作业。Specifically, the
参阅图3,为了更好地对软硬岩结合的复杂围岩进行开挖,本实施例将破碎臂2设置在掘进方向的中心位置,且以破碎臂2为中心左右对称各设有一个挖掘臂3,使得用于破碎硬岩的破碎臂2和用于开挖软岩的挖掘臂3能够同时作业且互不干扰,提高工作效率。分布于两侧的挖掘臂3还可以对地面渣土进行清理。Referring to Figure 3, in order to better excavate the complex surrounding rock combined with soft and hard rocks, in this embodiment, the crushing
参阅图4,所述拱锚系统5包括可滑动式设置在所述底盘系统1上的移动座5.1,所述移动座5.1上设有伸缩臂架5.4,所述伸缩臂架5.4铰接有拱锚底座5.5,所述拱锚底座5.5一端设有工作吊篮5.6和拱架抓手5.2,另外一端设有锚杆机构5.3。所述拱架抓手5.2用于抓取拱架,所述锚杆机构5.3用于钻孔并设置锚杆。本实施例优选的移动座5.1设置在底盘系统1两侧的滑轨上,实现可滑动式设置。Referring to Fig. 4, the
本实施例优选的拱架抓手5.2包括支撑臂和伸缩臂,所述支撑臂一端铰接拱锚底座5.5,另外一端铰接伸缩臂,所述伸缩臂远离支撑臂的一端设有用于抓取拱架的卷扬机。所述拱锚底座5.5上设有用于调节拱架抓手方位的偏摆油缸和伸缩油缸,所述拱架抓手5.2通过所述偏摆油缸和伸缩油缸将拱架送到安装位置固定,再由锚杆机构5.3配合完成拱架安装和锚杆锁紧。The preferred arch gripper 5.2 of this embodiment includes a support arm and a telescopic arm, one end of the support arm is hinged to the arch anchor base 5.5, and the other end is hinged to the telescopic arm, and the end of the telescopic arm away from the support arm is provided with a frame for grabbing the arch. hoist. The arch anchor base 5.5 is provided with a yaw oil cylinder and a telescopic oil cylinder for adjusting the orientation of the arch grip, and the arch grip 5.2 sends the arch to the installation position for fixing through the yaw oil cylinder and the telescopic oil cylinder, and then The installation of the arch and the locking of the anchor are completed by the cooperation of the anchor mechanism 5.3.
与底座201通过活动铰相连的可伸缩臂架202、与臂架202通过铰拱锚底座203、拱锚底座203一端安装有工作吊篮206和205抓手、拱架底座203另一端通过回转减速机连接打孔机构204。所述拱锚系统2能够完成立拱和打锚杆功能。The telescopic boom 202 connected to the base 201 through a movable hinge, and the boom 202 through a hinged arch anchor base 203, one end of the arch anchor base 203 is equipped with a working basket 206 and 205 grippers, and the other end of the arch base 203 is decelerated by turning The machine is connected to the punching mechanism 204. The
具体的,所述底盘系统1包括履带底盘总成1.1和设置在履带底盘总成1.1上的主车架1.2,所述破碎臂2、挖掘臂3、出渣系统4和拱锚系统5均设置在所述主车架上。Specifically, the
具体的,所述主车架1.2下方设有用于支撑所述主车架1.2的支撑件1.3。本实施例优选的支撑件1.3包括支撑底板、举升臂和举升油缸,所述支撑底板通过举升臂和举升油缸连接所述主车架1.2,所述支撑底板覆盖所述主车架超出履带底盘总成1.1的部分,对主车架1.2进行最大支撑,确保整体设备不会下陷和侧滑。Specifically, a support member 1.3 for supporting the main frame 1.2 is provided under the main frame 1.2. The preferred supporting member 1.3 of this embodiment includes a supporting base plate, a lifting arm and a lifting cylinder, the supporting base plate is connected to the main frame 1.2 through the lifting arm and the lifting cylinder, and the supporting base plate covers the main frame The part beyond the crawler chassis assembly 1.1 provides maximum support to the main frame 1.2 to ensure that the overall equipment will not sink and slide sideways.
本实施例公开了一种多功能冲击裂岩设备,集开挖、出渣、立拱、打锚杆等功能于一体,开挖后即时支护,为了更好地说明本实施例的优势和目的,下面将结合工作原理阐述本实施例的优势:This embodiment discloses a multi-functional impact rock cracking equipment, which integrates the functions of excavation, slag removal, arching, bolting, etc., and supports immediately after excavation. In order to better illustrate the advantages and disadvantages of this embodiment Purpose, the advantage of this embodiment will be described below in conjunction with working principle:
首先,操作人员将多功能冲击裂岩设备转移到达工作面后,由操作人员通过操作放下支撑底板撑住地面,使设备后部抬高,撑住后根据目前工作面是否可以直接开挖,可直接开挖则用挖掘臂3直接进行开挖,如遇坚硬岩则开启高频破碎锤振动破岩。针对围岩稳定性较差,易产生拱顶掉块、坍塌等,坚硬岩和软岩相结合的复杂围岩,本实施例既能够对可挖掘的围岩进行直接挖掘,又可对硬岩进行振动破碎,减少更换挖斗时间。First of all, after the operator transfers the multi-functional impact rock cracking equipment to the working face, the operator lowers the supporting floor to support the ground through operation, and raises the rear of the equipment. For direct excavation, the
然后,破碎臂2工作时,下方挖掘臂3可以将掉落隧道底的渣石扒到铲斗4.1中,经后方刮板运输机4.21运送至末端皮带运输机4.22,经皮带运输机4.22运送到后方的渣土车运出。挖掘臂3能够配合出渣系统清理地面渣土,破碎臂2能够将铲斗4.1内的大块硬岩进行破碎,本实施例中破碎臂2和挖掘臂3均能配合出渣系统清理地面渣土,提升了出渣系统的出渣效率。Then, when the crushing
最后,工作面开挖结束,由后方拱架抓手5.2将连接好但未紧固的拱架吊起,撑紧到隧道顶部,再由站在工作吊篮5.6的辅助人员将拱架锁紧,最后由锚杆机构5.3进行打锚孔、送锚杆,完成拱架固定锁紧。本实施例将拱架抓手5.2和锚杆机构集成到一个臂架上,极大节省了材料和安装空间,移动座安装在滑轨上,与中间拱架抓手配合,能够在较大范围内立拱和打锚杆,减少挪车次数,提升开挖效率。Finally, when the excavation of the working face is completed, the arch frame that has been connected but not fastened is hoisted by the rear arch gripper 5.2, braced to the top of the tunnel, and then the arch frame is locked by the auxiliary personnel standing on the working basket 5.6 , and finally the anchor hole is drilled and the anchor rod is delivered by the anchor mechanism 5.3 to complete the fixing and locking of the arch. In this embodiment, the arch handle 5.2 and the anchor mechanism are integrated into one arm frame, which greatly saves materials and installation space. Inner vertical arch and bolting can reduce the number of moving vehicles and improve excavation efficiency.
后续循环以上步骤直至完成整个隧道面开挖。The above steps are subsequently repeated until the excavation of the entire tunnel surface is completed.
综上所述,本实施例公开的多功能冲击裂岩设备集开挖、出渣、立拱、打锚杆等功能于一体,开挖后即时支护,可解决小尺寸功法的设备频繁进退场问题,极大地提高了施工效率。To sum up, the multi-functional impact rock cracking equipment disclosed in this embodiment integrates the functions of excavation, slag removal, vertical arching, bolting, etc., supports immediately after excavation, and can solve the frequent The problem of entry and exit has greatly improved the construction efficiency.
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211267816.1A CN115596452A (en) | 2022-10-17 | 2022-10-17 | Multifunctional impact rock cracking equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211267816.1A CN115596452A (en) | 2022-10-17 | 2022-10-17 | Multifunctional impact rock cracking equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN115596452A true CN115596452A (en) | 2023-01-13 |
Family
ID=84846696
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211267816.1A Pending CN115596452A (en) | 2022-10-17 | 2022-10-17 | Multifunctional impact rock cracking equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115596452A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118007693A (en) * | 2024-02-29 | 2024-05-10 | 核工业华南建设工程集团公司 | An excavation method suitable for expanding foundation in hard rock strata |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH06158684A (en) * | 1992-11-25 | 1994-06-07 | Mitsui Miike Mach Co Ltd | Shear loading method and shear loading machine |
| CN201801892U (en) * | 2010-10-05 | 2011-04-20 | 聂家芫 | Multifunctional special engineering machine for disaster rescue or person rescue |
| CN205224134U (en) * | 2015-11-26 | 2016-05-11 | 宜昌长兴机械制造有限公司 | Excavator robotic arm and multi -functional excavator |
| CN106837364A (en) * | 2017-03-14 | 2017-06-13 | 吉林省蛟河煤机制造有限责任公司 | Both arms assembled hydraulic rock drill |
| CN208310787U (en) * | 2018-05-08 | 2019-01-01 | 黄山市徽州安华工程机械有限公司 | Development machine |
| CN110080795A (en) * | 2019-06-03 | 2019-08-02 | 北京市市政四建设工程有限责任公司 | A kind of tunneling subway rapid construction mucking machine |
| CN112963164A (en) * | 2021-05-19 | 2021-06-15 | 山东汉鑫尊新材料有限公司 | Integral type entry driving machine is used in tunnel tunnelling |
| CN214464191U (en) * | 2021-01-28 | 2021-10-22 | 中铁工程装备集团有限公司 | Excavation device and tunnel boring machine using same |
| CN113898365A (en) * | 2021-11-04 | 2022-01-07 | 四川蓝海智能装备制造有限公司 | A kind of multifunctional trolley for tunnel construction and construction method |
-
2022
- 2022-10-17 CN CN202211267816.1A patent/CN115596452A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH06158684A (en) * | 1992-11-25 | 1994-06-07 | Mitsui Miike Mach Co Ltd | Shear loading method and shear loading machine |
| CN201801892U (en) * | 2010-10-05 | 2011-04-20 | 聂家芫 | Multifunctional special engineering machine for disaster rescue or person rescue |
| CN205224134U (en) * | 2015-11-26 | 2016-05-11 | 宜昌长兴机械制造有限公司 | Excavator robotic arm and multi -functional excavator |
| CN106837364A (en) * | 2017-03-14 | 2017-06-13 | 吉林省蛟河煤机制造有限责任公司 | Both arms assembled hydraulic rock drill |
| CN208310787U (en) * | 2018-05-08 | 2019-01-01 | 黄山市徽州安华工程机械有限公司 | Development machine |
| CN110080795A (en) * | 2019-06-03 | 2019-08-02 | 北京市市政四建设工程有限责任公司 | A kind of tunneling subway rapid construction mucking machine |
| CN214464191U (en) * | 2021-01-28 | 2021-10-22 | 中铁工程装备集团有限公司 | Excavation device and tunnel boring machine using same |
| CN112963164A (en) * | 2021-05-19 | 2021-06-15 | 山东汉鑫尊新材料有限公司 | Integral type entry driving machine is used in tunnel tunnelling |
| CN113898365A (en) * | 2021-11-04 | 2022-01-07 | 四川蓝海智能装备制造有限公司 | A kind of multifunctional trolley for tunnel construction and construction method |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118007693A (en) * | 2024-02-29 | 2024-05-10 | 核工业华南建设工程集团公司 | An excavation method suitable for expanding foundation in hard rock strata |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5333937A (en) | Excavation machine having combined impact hammers and static ripper pick | |
| CN102787847B (en) | Roadway tunneling machine | |
| CN106014435B (en) | A kind of efficiently quick stone head development machine | |
| CN107100640B (en) | Crawler belt walking type support drilling and installing machine | |
| CN107130656B (en) | Integrated backhoe loader for underground drilling, anchoring and rock breaking | |
| CN109538224A (en) | A kind of novel coal lane high-speed driving machine | |
| CN110080783A (en) | A kind of tunnel equipment of the foot section brought jumbolter | |
| CN109441468B (en) | A shield excavation surface impact loosening and crushing device and its working method | |
| CN109630123B (en) | Rock tunneller for deep shaft | |
| CN115596452A (en) | Multifunctional impact rock cracking equipment | |
| CN108049877B (en) | Fully hydraulic intelligent drilling, installation and anchoring machine | |
| CN110671120B (en) | Open type outer shield tunneling device and collapse roadway tunneling method | |
| CN218062320U (en) | Tunnel accumulated slag cleaning device for TBM and TBM | |
| CN209494569U (en) | A new type of rapid roadheader for coal roadway | |
| JP2001082071A (en) | Tunnel widening method and equipment | |
| CN208431000U (en) | Deep shaft rock ripper | |
| CN115030661B (en) | Vertical hole drilling machine and construction method thereof | |
| CN109281674A (en) | A kind of hard-rock tunnel driving method using drill loader | |
| CN210003277U (en) | tunnel working device with jumbolter at tail | |
| RU2103507C1 (en) | Method and cutter-loader machine for development of seam deposits of minerals | |
| CN112963164B (en) | An all-in-one roadheader for tunnel excavation | |
| CN209723079U (en) | A kind of sled hair excavates and loads all-in-one machine | |
| CN210066874U (en) | Auxiliary material collecting device for breaking hammer | |
| RU2014452C1 (en) | Stone-splitting machine | |
| CN114893199A (en) | A dig anchor all-in-one and dig anchor system for high gas mine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |