CN115584694A - A bridge deck snow removal device for highway bridge engineering - Google Patents

A bridge deck snow removal device for highway bridge engineering Download PDF

Info

Publication number
CN115584694A
CN115584694A CN202211376038.XA CN202211376038A CN115584694A CN 115584694 A CN115584694 A CN 115584694A CN 202211376038 A CN202211376038 A CN 202211376038A CN 115584694 A CN115584694 A CN 115584694A
Authority
CN
China
Prior art keywords
housing
fixedly connected
snow
rod
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211376038.XA
Other languages
Chinese (zh)
Inventor
王昌林
李双霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202211376038.XA priority Critical patent/CN115584694A/en
Publication of CN115584694A publication Critical patent/CN115584694A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H5/00Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice
    • E01H5/12Apparatus or implements specially adapted for breaking, disintegrating, or loosening layers of ice or hard snow with or without clearing or removing ; Roughening ice or hard snow by means of tools
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H5/00Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice
    • E01H5/10Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice by application of heat for melting snow or ice, whether cleared or not, combined or not with clearing or removing mud or water, e.g. burners for melting in situ, heated clearing instruments; Cleaning snow by blowing or suction only
    • E01H5/104Removing devices for dislodging snow or ice; followed by melting the removed material

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Cleaning Of Streets, Tracks, Or Beaches (AREA)

Abstract

本发明涉及桥面除雪技术领域,具体涉及一种公路桥梁工程桥面除雪装置,包括壳体,所述壳体一端开设有矩形槽,且矩形槽内部设置有刮动机构,所述壳体内部设置有收集机构,且壳体相对两侧均转动连接有两个转轴,且四个转轴一端均固定套接有移动轮,所述壳体另一端固定连接有用于与车体连接的连接架。本发明中,通过将连接架与车辆连接,使车辆推动壳体前行,使壳体在移动时自启动压动机构对前方雪冰进行辊压,并同时通过刮动机构将桥面上的积雪与冰层刮动到壳体正前方,而后壳体利用收集机构将冰雪铲入壳体内部进行收集,从而使桥面进行铲雪时可以同步收集积雪与碎冰,从而使积雪与碎冰融化时不易致使桥面湿滑。

Figure 202211376038

The invention relates to the technical field of bridge deck snow removal, in particular to a bridge deck snow removal device for highway bridge engineering, which includes a housing, a rectangular groove is opened at one end of the housing, and a scraping mechanism is arranged inside the rectangular groove. A collection mechanism is provided, and two rotating shafts are rotatably connected to opposite sides of the housing, and one end of the four rotating shafts is fixedly sleeved with moving wheels, and the other end of the housing is fixedly connected to a connecting frame for connecting with the vehicle body. In the present invention, by connecting the connecting frame with the vehicle, the vehicle pushes the casing forward, so that the casing will automatically start the pressing mechanism to roll the snow and ice in front when the casing moves, and at the same time, the scraping mechanism will move the snow and ice on the bridge surface. The snow and ice scrape to the front of the shell, and then the shell uses the collection mechanism to shovel the ice and snow into the shell for collection, so that the snow and ice can be collected synchronously when the bridge deck is shoveling snow, so that the snow It is not easy to cause the bridge deck to be slippery when it melts with crushed ice.

Figure 202211376038

Description

一种公路桥梁工程桥面除雪装置A bridge deck snow removal device for highway bridge engineering

技术领域technical field

本发明涉及桥面除雪技术领域,具体涉及一种公路桥梁工程桥面除雪装置。The invention relates to the technical field of snow removal on bridge decks, in particular to a bridge deck snow removal device for highway bridge engineering.

背景技术Background technique

公路桥梁是重要的交通枢纽,而桥梁,一般指架设在江河湖海上,使车辆行人等能顺利通行的构筑物,在现代也指跨越山涧、不良地质或满足其他交通需要而架设的使通行更加便捷的建筑物,而城市桥梁的平面最理想的设计是直线型,为方便车辆行驶,一般桥梁的桥面基本以直线型设计,较为平直,而现有的除雪车辆,一般由机车推送后借助前端的犁铧除雪器,将积雪推向线路一侧或两侧,车辆的侧面还装有可张开的翼板,以增大除雪面。此外,还有转轮式除雪车,它的前端装有与线路中心线相垂直的转轮,通过车上的动力驱动转轮时,轮上的叶片将积雪刮起抛出线路以外,但是,这些除雪车辆大多将雪和雪层下结冰的冰层移出道路外并未将雪冰集中收集,在气温升高后,桥面可能会因冰雪融化的水而变得湿滑,较为不便,并且,在初春天气时,可能部分地区会产生降温的情况,使冰雪融化的水重新结成薄冰层,致使桥面地面湿滑,影响车辆正常行驶,较为不便。Highway bridges are important transportation hubs, and bridges generally refer to structures erected on rivers, lakes and seas to enable vehicles and pedestrians to pass smoothly. The most ideal design of the plane of urban bridges is linear. In order to facilitate the driving of vehicles, the bridge deck of general bridges is basically designed in a straight line, which is relatively straight. However, the existing snow removal vehicles are generally pushed by locomotives with the aid of The plowshare snow remover at the front pushes the snow to one or both sides of the line, and the side of the vehicle is also equipped with expandable wings to increase the snow removal area. In addition, there is also a wheel-type snow removal vehicle, the front end of which is equipped with a wheel perpendicular to the center line of the line. When the wheel is driven by the power on the car, the blades on the wheel will blow up the snow and throw it out of the line. , most of these snow removal vehicles move the snow and the frozen ice layer under the snow layer out of the road without collecting the snow and ice. After the temperature rises, the bridge deck may become slippery due to the water from the melting ice and snow, which is more inconvenient Moreover, in the early spring weather, the temperature may drop in some areas, causing the water from melting ice and snow to form a thin ice layer again, resulting in wet and slippery bridge decks, affecting the normal driving of vehicles, which is inconvenient.

发明内容Contents of the invention

为了克服上述的技术问题,本发明的目的在于提供一种公路桥梁工程桥面除雪装置,通过将连接架与车辆连接,使车辆推动壳体前行,使壳体在移动时自启动压动机构对前方雪冰进行辊压,并同时通过刮动机构将桥面上的积雪与冰层刮动到壳体正前方,而后壳体利用收集机构将冰雪铲入壳体内部进行收集,从而使桥面进行铲雪时可以同步收集积雪与碎冰,从而使积雪与碎冰融化时不易致使桥面湿滑。In order to overcome the above-mentioned technical problems, the object of the present invention is to provide a bridge deck snow removal device for highway bridge engineering. By connecting the connecting frame with the vehicle, the vehicle pushes the housing forward, so that the housing can automatically activate the pressing mechanism when it moves. Roll the snow and ice in front, and at the same time scrape the snow and ice on the bridge surface to the front of the shell through the scraping mechanism, and then the shell uses the collection mechanism to shovel the ice and snow into the shell for collection, so that When the bridge deck is shoveling snow, it can collect snow and crushed ice simultaneously, so that when the snow and crushed ice melt, it is not easy to cause the bridge deck to be slippery.

本发明的目的可以通过以下技术方案实现:The purpose of the present invention can be achieved through the following technical solutions:

一种公路桥梁工程桥面除雪装置,包括壳体,所述壳体一端开设有矩形槽,且矩形槽内部设置有刮动机构,所述壳体内部设置有收集机构,且壳体相对两侧均转动连接有两个转轴,且四个转轴一端均固定套接有移动轮,所述壳体另一端固定连接有用于与车体连接的连接架,所述壳体底面一端设置有压动机构,通过将连接架利用螺栓与扫雪车的前部进行连接,使车辆位于壳体后面推动壳体前行,使刮动机构将地面积雪与冰面刮动到收集机构前方,并利用压动机构进一步破碎,而后壳体利用移动轮行进时使收集机构自动将前方积雪与碎冰铲入壳体内部进行收集;A bridge deck snow removal device for highway bridge engineering, comprising a housing, one end of the housing is provided with a rectangular groove, and a scraping mechanism is arranged inside the rectangular groove, a collecting mechanism is arranged inside the housing, and the opposite sides of the housing are Two rotating shafts are rotatably connected, and one end of the four rotating shafts is fixedly sleeved with a moving wheel, the other end of the housing is fixedly connected with a connecting frame for connecting with the vehicle body, and one end of the bottom surface of the housing is provided with a pressing mechanism , by connecting the connecting frame to the front of the snowplow with bolts, the vehicle is positioned behind the housing to push the housing forward, so that the scraping mechanism scrapes the snow and ice on the ground to the front of the collecting mechanism, and uses the pressure The moving mechanism is further broken, and then the collecting mechanism automatically shovels the front snow and crushed ice into the interior of the casing for collection when the casing uses the moving wheels to travel;

所述收集机构包括铲板,所述壳体底面开设有连通槽,且铲板顶端与连通槽一端固定连接,所述壳体两相对内侧壁之间转动连接有两个转辊,且两个转辊之间转动套接有输送带,所述输送带位于铲板顶端一侧,所述壳体一内侧壁固定连接有驱动电机,且一个转辊一端贯穿壳体一内侧壁,所述驱动电机的电机轴贯穿壳体一内侧壁并与一个转辊一端之间转动套接有传动带,在壳体被车辆推动时,铲板自动将前方桥面的积雪与冰块铲入壳体,启动驱动电机,通过传动带带动一个转辊转动,使输送带在两个转辊之间转动,而后冰块与积雪进入铲板并被后续铲入铲板的积雪与碎冰挤向输送带而后随输送带转动被运输到壳体内部另一端进行堆积,从而使使用人员可以将地面积雪与碎冰进行收集处理,避免积雪与碎冰融化时使桥面湿滑。The collection mechanism includes a shovel plate, the bottom surface of the housing is provided with a communication groove, and the top end of the shovel plate is fixedly connected to one end of the communication groove, two rotating rollers are rotationally connected between two opposite inner side walls of the housing, and A conveyor belt is rotatably connected between the rollers, and the conveyor belt is located on the top side of the shovel plate. A drive motor is fixedly connected to an inner wall of the housing, and one end of a roller passes through the inner wall of the housing. The motor shaft of the motor runs through the inner wall of the housing and rotates with a transmission belt between one end of a rotating roller. When the housing is pushed by the vehicle, the shovel plate automatically shovels the snow and ice on the bridge in front of the housing into the housing. Start the driving motor, and drive a roller to rotate through the transmission belt, so that the conveyor belt rotates between the two rollers, and then the ice and snow enter the shovel plate and are squeezed to the conveyor belt by the snow and crushed ice that are subsequently shoveled into the shovel plate Then with the rotation of the conveyor belt, it is transported to the other end of the shell for accumulation, so that the user can collect the snow and crushed ice on the ground to avoid slippery bridge deck when the snow and crushed ice melt.

进一步在于:所述壳体另一端开设有排出槽,且输送带一端位于排出槽内部,所述输送带外侧壁开设有多个漏水孔,所述壳体底面位于输送带下方固定连接有集水盒,且集水盒内部与连通槽内部相连通,所述壳体一侧固定连接有抽水泵,且抽水泵抽水端通过软管与集水盒内部相连通,所述壳体另一端位于排出槽上方固定连接有储水盒,所述储水盒内部通过水管与抽水泵排水端相连通,所述壳体两相对内侧壁之间位于输送带上方固定连接有取暖器,在碎冰与积雪被铲入铲板进入输送带时,启动抽水泵与取暖器,取暖器为红外线发热取暖,加热范围小,但升温速度极快,使取暖器照射输送带,融化输送带上的碎冰与积雪,使雪冰融化的水通过漏水孔流入集水盒,并被抽水泵抽入储水盒内部,而积雪与碎冰内部夹杂的杂物则会被输送带带动从排出槽排出壳体内部,从而使积雪与碎冰中的水分被提取出来,从而便于使用人员收集雪冰中的水分,减少桥面湿滑情况。Further, the other end of the casing is provided with a discharge groove, and one end of the conveyor belt is located inside the discharge groove, the outer wall of the conveyor belt is provided with a plurality of water leakage holes, and the bottom surface of the casing is located below the conveyor belt and is fixedly connected with a water collecting device. box, and the interior of the water collection box is connected with the interior of the communication tank. A water pump is fixedly connected to one side of the housing, and the suction end of the water pump is connected to the interior of the water collection box through a hose. The other end of the housing is located at the discharge A water storage box is fixedly connected above the tank, and the inside of the water storage box is connected with the water discharge end of the water pump through a water pipe. When the snow is shoveled into the shovel and enters the conveyor belt, the water pump and the heater are activated. The heater uses infrared heat for heating. The heating range is small, but the heating speed is extremely fast, so that the heater irradiates the conveyor belt and melts the broken ice and ice on the conveyor belt. Snow accumulation, the water that melts the snow and ice flows into the water collection box through the water leakage hole, and is pumped into the water storage box by the water pump, while the sundries mixed in the snow accumulation and crushed ice will be driven by the conveyor belt and discharged from the discharge tank. The inside of the body, so that the moisture in the snow and crushed ice is extracted, so that it is convenient for the user to collect the moisture in the snow and ice, and reduce the slippery condition of the bridge deck.

进一步在于:所述刮动机构包括连接板,且连接板一端固定连接于壳体一端,所述连接板一侧设置有连接杆,且连接杆外侧壁开设有多个卡槽,所述连接杆一端固定连接有L型刮板,且连接杆另一端与连接板之间设置有第一球铰链,所述连接杆外侧壁滑动套接有套环,且套环内侧壁固定连接有滑动卡接于相邻卡槽内部的卡块,所述套环外侧壁固定连接有支杆,所述壳体内底面位于连通槽一侧固定连接有固定板,且固定板一侧开设有导向槽,所述导向槽内部滑动连接有第二电动推杆,且固定板一侧转动连接有第一电动推杆,所述第一电动推杆活动端通过连接环与第二电动推杆外侧壁活动套接,所述第二电动推杆活动端与与支杆一端之间设置有第二球铰链,通过启动第一电动推杆和第二电动推杆,使第二电动推杆伸长时,第一电动推杆回缩,从而使初始位置横置并且一端位于壳体一侧的L型刮板和连接杆因第二电动推杆的推动而在地面上刮动横扫,将地面的冰层挤压破碎并将其与积雪刮动到壳体前方,而后第一电动推杆伸长,第二电动推杆回缩,通过套环将完成横扫的连接杆和L型刮板上提,并在上提的过程中将连接杆和L型刮板扭转,使L型刮板朝向壳体一侧,而后第二电动推杆因L型刮板自重沿着导向槽随连接杆和L型刮板落向壳体一侧地面插入地面冰层内部,使L型刮板和连接杆复位到初始位置,从而通过的第二电动推杆和第一电动推杆的相互配合控制L型刮板往复对地面进行刮动将壳体前方较大范围的积雪与碎冰刮动到壳体正前方,便于铲板将其铲入壳体内部。Further, the scraping mechanism includes a connecting plate, and one end of the connecting plate is fixedly connected to one end of the housing, a connecting rod is provided on one side of the connecting plate, and a plurality of slots are provided on the outer wall of the connecting rod, and the connecting rod One end is fixedly connected with an L-shaped scraper, and a first ball hinge is arranged between the other end of the connecting rod and the connecting plate. For the card block inside the adjacent card slot, the outer wall of the collar is fixedly connected with a strut, the inner bottom surface of the housing is fixedly connected with a fixed plate on one side of the communication groove, and a guide groove is opened on one side of the fixed plate. A second electric push rod is slidably connected to the inside of the guide groove, and a first electric push rod is connected to one side of the fixed plate for rotation, and the movable end of the first electric push rod is movably socketed with the outer wall of the second electric push rod through a connecting ring A second ball hinge is arranged between the movable end of the second electric push rod and one end of the pole. By starting the first electric push rod and the second electric push rod, when the second electric push rod is extended, the first electric push rod The push rod is retracted, so that the L-shaped scraper and the connecting rod, which are horizontally positioned at the initial position and one end is on the side of the housing, scrape and sweep across the ground due to the push of the second electric push rod, squeezing and breaking the ice layer on the ground And scrape it and the snow to the front of the casing, then the first electric push rod is extended, the second electric push rod is retracted, and the connecting rod and L-shaped scraper that complete the sweep are lifted through the collar, and on the upper During the lifting process, twist the connecting rod and the L-shaped scraper so that the L-shaped scraper faces the side of the housing, and then the second electric push rod falls along the guide groove with the connecting rod and the L-shaped scraper due to the self-weight of the L-shaped scraper. Insert the inside of the ground ice layer to the ground on one side of the shell, so that the L-shaped scraper and the connecting rod are reset to the initial position, so that the L-shaped scraper reciprocates against the ground through the mutual cooperation of the second electric push rod and the first electric push rod. Scrape the snow and crushed ice in a large range in front of the shell to the front of the shell, so that the shovel can shovel them into the shell.

进一步在于:所述第一球铰链与第二球铰链均包括转动部与基座部,且第一球铰链与第二球铰链的基座部均开设有多个缺口,所述第一球铰链的转动部一端与连接板另一端顶面转动连接,第一球铰链的基座部一端与连接杆另一端固定连接,所述第一球铰链的转动部另一端与基座部另一端活动卡接,所述第二球铰链的转动部一端与支杆一端固定连接,且第二球铰链的基座部一端与第二电动推杆的活动端固定连接,所述第二球铰链的基座部另一端与转动部另一端活动卡接,第一球铰链和第二球铰链的结构均分为基座部与转动部,两个球铰链的转动部的另一端均为球体,球体可在相对应基座部内部的槽内转动,但转动部难以转动至与基座部底面平行的状态,通过添加缺口,使两个球铰链的转动部与基座部可转动到相邻缺口内部,从而使连接杆可以因第一球铰链的转动部转动至相邻基座部的缺口内部而使连接杆与地面平行,从而便于L型刮板在较为平整的桥面上进行横扫。Further, the first ball hinge and the second ball hinge both include a rotating part and a base part, and the base parts of the first ball hinge and the second ball hinge are provided with a plurality of gaps, and the first ball hinge One end of the rotating part of the first ball hinge is rotatably connected to the top surface of the other end of the connecting plate, one end of the base part of the first ball hinge is fixedly connected to the other end of the connecting rod, and the other end of the rotating part of the first ball hinge is movable with the other end of the base part. One end of the rotating part of the second ball hinge is fixedly connected with one end of the pole, and one end of the base part of the second ball hinge is fixedly connected with the movable end of the second electric push rod. The base of the second ball hinge The other end of the rotating part is flexibly engaged with the other end of the rotating part. The structure of the first ball hinge and the second ball hinge is divided into a base part and a rotating part. Corresponding to the rotation in the groove inside the base part, but it is difficult for the rotating part to rotate to a state parallel to the bottom surface of the base part. By adding a notch, the rotating part and the base part of the two ball hinges can be rotated to the inside of the adjacent notch. Therefore, the connecting rod can be parallel to the ground due to the rotation of the rotating part of the first ball hinge to the inside of the gap of the adjacent base part, thereby facilitating the sweeping of the L-shaped scraper on a relatively flat bridge surface.

进一步在于:所述L型刮板一侧为刃口状结构,使L型刮板和连接杆被第二电动推杆拉起并偏转时,可以使L型刮板刃口状侧壁朝向地面,使L型刮板落向地面时,可以依靠刃口更方便的破开冰层进入冰层内部接触地面,从而提高L型刮板横扫地面对地面的刮动效果。Further, one side of the L-shaped scraper is a blade-shaped structure, so that when the L-shaped scraper and the connecting rod are pulled up and deflected by the second electric push rod, the edge-shaped side wall of the L-shaped scraper can face the ground , when the L-shaped scraper falls to the ground, it can rely on the cutting edge to break through the ice layer more conveniently and enter the interior of the ice layer to contact the ground, thereby improving the scraping effect of the L-shaped scraper sweeping the ground against the ground.

进一步在于:所述导向槽包括直线槽部、斜向槽部与弧线槽部,且第一电动推杆的一端位于弧形槽部的圆心处,使斜向槽部中部靠下的部分离第一电动推杆一端最近,直线槽部一端与斜向槽部顶端与第一电动推杆一端距离相等,使第一电动推杆拉动第二电动推杆移动时进行回拉时,将拉动初始位置位于直线槽部一端的第二电动推杆沿直线槽部移动入斜向槽部,并在斜向槽部内移动部分,改变第一电动推杆的活动端朝向,而后在第一电动推杆活动端推出时,第二电动推杆被改变活动端朝向的第一电动推杆活动端推入斜向槽部顶端,而后因L型刮板的自重而沿弧形槽部滑动回落到直线槽部一端,使第二电动推杆重复环绕导向槽控制L型刮板和连接杆的移动。Further, the guide groove includes a straight groove, an oblique groove and an arc groove, and one end of the first electric push rod is located at the center of the arc groove, so that the lower part of the oblique groove is separated from the center of the arc groove. One end of the first electric push rod is the closest, and the distance between the end of the linear groove and the top of the inclined groove is equal to that of the first end of the first electric push rod, so that when the first electric push rod pulls the second electric push rod and moves back, the initial The second electric push rod located at one end of the linear groove moves into the oblique groove along the linear groove, and moves a part in the oblique groove to change the direction of the movable end of the first electric push rod, and then the first electric push rod When the movable end is pushed out, the second electric push rod is pushed into the top of the inclined groove by the movable end of the first electric push rod that changes the orientation of the movable end, and then slides along the arc groove and falls back to the linear groove due to the self-weight of the L-shaped scraper One end of the head, so that the second electric push rod repeatedly surrounds the guide groove to control the movement of the L-shaped scraper and the connecting rod.

进一步在于:所述壳体一端固定连接有L型竖板,且L型竖板的短臂一端转动连接有推板,所述推板顶端固定连接有多个回弹弹簧,且多个回弹弹簧一端均与L型竖板一侧固定连接,在L型刮板和连接杆完成横扫地面并被第二电动推杆拉起时,连接杆挤压推板,而后待第二电动推杆移动到斜向槽部顶端后,推板因回弹弹簧复位弹力而带动连接杆和L型刮板向壳体一侧地面砸去,利用推板避免L型刮板因晃动等情况而造成向壳体另一侧方向转动,影响L型刮板和连接杆复位。Further, an L-shaped vertical plate is fixedly connected to one end of the housing, and a push plate is rotatably connected to one end of the short arm of the L-shaped vertical plate, and a plurality of rebound springs are fixedly connected to the top of the push plate, and the plurality of rebound springs One end of the spring is fixedly connected to one side of the L-shaped vertical plate. When the L-shaped scraper and the connecting rod complete sweeping the ground and are pulled up by the second electric push rod, the connecting rod squeezes the push plate, and then the second electric push rod moves After reaching the top of the inclined groove, the push plate will drive the connecting rod and the L-shaped scraper to the ground on one side of the shell due to the return force of the rebound spring, and use the push plate to prevent the L-shaped scraper from falling to the shell due to shaking and other conditions. The other side of the body rotates, which affects the reset of the L-shaped scraper and the connecting rod.

进一步在于:所述推板为J型板状结构,使连接杆更易通过推板弧形面部分挤压推板靠向L型竖板一侧。Further, the push plate is a J-shaped plate structure, which makes it easier for the connecting rod to push the push plate toward the side of the L-shaped vertical plate through the arc surface of the push plate.

进一步在于:所述压动机构位于靠近壳体一端的两个转轴之间,且压动机构位于铲板另一侧;Further, the pressing mechanism is located between the two rotating shafts close to one end of the housing, and the pressing mechanism is located on the other side of the shovel;

所述压动机构包括两个圆盘,且两个圆盘分别与两个相邻的转轴外侧壁固定套接,壳体底面位于两个圆盘之间固定连接有两个框体,且两个框体内部均滑动嵌入有滑杆,两个所述滑杆之间固定连接有压辊,两个所述圆盘一侧均均匀固定连接有多个抵杆,抵杆与相邻滑杆一端活动抵触,在壳体移动时,两个圆盘被转动的两个转轴带动转动,使两个圆盘上的抵杆间歇抵触两个滑杆,将两个滑杆连同压辊抬起,在滑杆脱离相邻抵杆后滑杆和压辊将因压辊自重自然下落,使压辊因抵杆间歇抵触而对地面间歇压动,将壳体前方集聚的碎冰和积雪进行压动,使冰块经过碾压后被破碎的更小,从而减少碎冰融化时间,便于取暖器加热融化碎冰。The pressing mechanism includes two discs, and the two discs are respectively fixedly socketed with the outer walls of two adjacent rotating shafts, and the bottom surface of the housing is fixedly connected with two frames between the two discs, and the two Slide bars are slidably embedded inside each frame, and pressure rollers are fixedly connected between the two slide bars, and a plurality of abutment bars are evenly fixedly connected to one side of the two discs, and the abutment bar is connected to the adjacent slide bar. One end moves against each other. When the shell moves, the two discs are driven to rotate by the two rotating shafts, so that the resisting rods on the two discs intermittently touch the two sliding rods, and the two sliding rods together with the pressure roller are lifted up. After the sliding rod separates from the adjacent resisting rod, the sliding rod and the pressing roller will naturally fall due to the weight of the pressing roller, so that the pressing roller will intermittently press against the ground due to the intermittent collision of the resisting rod, and press the crushed ice and snow accumulated in front of the housing. It moves to make the ice cubes smaller after being crushed, thereby reducing the melting time of the crushed ice and making it easier for the heater to heat and melt the crushed ice.

进一步在于:所述抵杆为弧形杆状结构,使抵杆托起滑杆移动时,滑杆在抵杆上移动的更加顺畅。A further feature is that: the resisting rod is an arc-shaped rod-shaped structure, so that when the resisting rod supports the sliding rod to move, the sliding rod moves more smoothly on the resisting rod.

本发明的有益效果:Beneficial effects of the present invention:

1、通过将连接架与车辆连接,使车辆推动壳体前行,使壳体在移动时通过刮动机构将壳体一侧处的积雪与冰层刮动到壳体正前方,而后移动的壳体利用收集机构将碎冰与积雪铲入壳体内部进行收集,并利用压动机构进一步破碎,从而使桥面进行铲雪时可以同步收集积雪与碎冰,不会在桥面上进行堆积,从而使积雪与碎冰融化时不易致使桥面湿滑。1. By connecting the connecting frame with the vehicle, the vehicle pushes the casing forward, so that when the casing moves, the snow and ice layer on one side of the casing is scraped to the front of the casing through the scraping mechanism, and then moves The shell uses the collection mechanism to shovel the crushed ice and snow into the shell for collection, and uses the pressing mechanism to further break it, so that the snow and crushed ice can be collected synchronously when the bridge deck is shoveling snow, and there will be no damage to the bridge deck. The bridge deck is not easy to be slippery when the snow and broken ice melt.

2、通过启动第一电动推杆和第二电动推杆,使第二电动推杆和第一电动推杆配合使用,带动初始位置横置并且一端位于壳体一侧的L型刮板和连接杆因第二电动推杆的推动而在地面上刮动横扫,将地面的冰层挤压破碎并将其与积雪刮动到壳体前方,而后通过操控第一电动推杆和第二电动推杆,将完成横扫的连接杆和L型刮板上提并将其扭转,并挤压推板,使L型刮板朝向壳体一侧,而后第二电动推杆因推板推动以及L型刮板自重而落向壳体一侧地面插入地面冰层内部,使L型刮板和连接杆复位到初始位置,从而通过的第二电动推杆和第一电动推杆的相互配合控制L型刮板往复对地面进行刮动将壳体前方较大范围的积雪与碎冰刮动到壳体正前方,便于铲板将其铲入壳体内部;2. By starting the first electric push rod and the second electric push rod, the second electric push rod and the first electric push rod are used together to drive the L-shaped scraper with the initial position horizontal and one end on the side of the shell and the connection The rod is driven by the second electric push rod to sweep across the ground, crushing the ice layer on the ground and scraping it and snow to the front of the housing, and then by operating the first electric push rod and the second electric push rod The push rod lifts the connecting rod and the L-shaped scraper that have completed the sweep and twists it, and squeezes the push plate so that the L-shaped scraper faces the side of the housing, and then the second electric push rod is pushed by the push plate and the L-shaped scraper The L-shaped scraper falls to the ground on one side of the shell due to its own weight and is inserted into the ice layer on the ground, so that the L-shaped scraper and the connecting rod return to the initial position, so that the L-shaped scraper and the first electric push rod can be controlled through the cooperation of the second electric push rod and the first electric push rod. The type scraper reciprocates on the ground to scrape the snow and crushed ice in a large area in front of the shell to the front of the shell, so that the shovel can shovel them into the shell;

3、壳体被车辆推动时,压动机构自启动,而后铲板自动将前方桥面被压动机构压过的积雪与冰块铲入壳体,启动驱动电机,使输送带在两个转辊之间转动,而后冰块与积雪进入铲板并被后续铲入铲板的积雪与碎冰挤向输送带,继而启动抽水泵与取暖器,使取暖器照射输送带上被压动机构压过的碎冰与积雪,使雪冰融化的水通过漏水孔流入集水盒,并被抽水泵抽入储水盒内部,而积雪与碎冰内部夹杂的杂物则会被输送带带动从排出槽排出壳体内部,从而便于使用人员收集雪冰中的水液,进行循环使用或直接排放,从而减少雪冰融化水流对桥面的影响;3. When the housing is pushed by the vehicle, the pressing mechanism starts automatically, and then the shovel plate automatically shovels the snow and ice that have been pressed by the pressing mechanism on the front bridge into the housing, and starts the drive motor to make the conveyor belt run between the two The rollers rotate, and then the ice cubes and snow enter the shovel plate and are squeezed to the conveyor belt by the snow and crushed ice shoveled into the shovel plate, and then start the water pump and heater, so that the heater irradiates on the conveyor belt and is pressed The crushed ice and snow accumulated by the moving mechanism will make the water melted from the snow and ice flow into the water collection box through the water leakage hole, and be pumped into the water storage box by the water pump, while the sundries mixed in the snow and crushed ice will be pumped into the water storage box. The conveyor belt is driven to discharge the inside of the shell from the discharge groove, so that the user can collect the water in the snow and ice for recycling or direct discharge, thereby reducing the impact of the melting snow and ice on the bridge deck;

4、壳体移动时,两个圆盘被转动的两个转轴带动转动,使两个圆盘上的抵杆间歇抵触两个滑杆,将两个滑杆连同压辊抬起,在滑杆脱离相邻抵杆后滑杆和压辊将因压辊自重自然下落,使压辊因抵杆间歇抵触而对地面间歇压动,将壳体前方集聚的碎冰和积雪进行压动,使冰块经过碾压后被破碎的更小,从而减少碎冰融化时间,便于取暖器加热融化碎冰。4. When the shell moves, the two discs are driven to rotate by the two rotating shafts, so that the resisting rods on the two discs intermittently touch the two sliding rods, and the two sliding rods together with the pressure roller are lifted, After detaching from the adjacent rod, the sliding rod and the pressure roller will naturally fall due to the weight of the roller, causing the pressure roller to intermittently press against the ground due to the intermittent collision of the rod, and press the crushed ice and snow accumulated in front of the shell, so that After the ice cubes are crushed, they are broken into smaller pieces, thereby reducing the melting time of the crushed ice and making it easier for the heater to heat and melt the crushed ice.

附图说明Description of drawings

下面结合附图对本发明作进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings.

图1是本发明整体结构示意图;Fig. 1 is a schematic diagram of the overall structure of the present invention;

图2是本发明中刮动机构与壳体位置关系示意图;Fig. 2 is a schematic diagram of the positional relationship between the scraping mechanism and the housing in the present invention;

图3是本发明中壳体内部结构示意图;Fig. 3 is a schematic diagram of the internal structure of the housing in the present invention;

图4是本发明中刮动机构初始状态示意图;Fig. 4 is a schematic diagram of the initial state of the scraping mechanism in the present invention;

图5是本发明中刮动机构结构爆炸图;Fig. 5 is an exploded view of the structure of the scraping mechanism in the present invention;

图6是本发明中L型刮板刮动形态结构示意图;Fig. 6 is a schematic diagram of the scraping form and structure of the L-shaped scraper in the present invention;

图7是本发明中连接杆上提状态结构示意图;Fig. 7 is a schematic structural diagram of the lifting state of the connecting rod in the present invention;

图8是本发明中压动机构和收集机构结构爆炸图;Figure 8 is an exploded view of the structure of the pressing mechanism and the collecting mechanism in the present invention;

图9是本发明中L型竖板与推板结构示意图。Fig. 9 is a structural schematic diagram of an L-shaped vertical plate and a push plate in the present invention.

图中:100、壳体;101、矩形槽;102、连通槽;103、排出槽;110、连接架;200、移动轮;210、转轴;300、刮动机构;301、缺口;310、连接板;320、连接杆;321、卡槽;330、L型刮板;340、第一球铰链;350、套环;351、卡块;352、支杆;360、固定板;361、导向槽;370、第一电动推杆;380、第二电动推杆;390、第二球铰链;400、收集机构;410、铲板;420、转辊;421、传动带;430、输送带;431、漏水孔;440、驱动电机;450、集水盒;451、抽水泵;460、储水盒;470、取暖器;500、压动机构;510、圆盘;520、抵杆;530、框体;540、滑杆;550、压辊;600、L型竖板;610、推板;620、回弹弹簧。In the figure: 100, shell; 101, rectangular groove; 102, connecting groove; 103, discharge groove; 110, connecting frame; 200, moving wheel; 210, rotating shaft; 300, scraping mechanism; 301, gap; 310, connection Plate; 320, connecting rod; 321, card slot; 330, L-shaped scraper; 340, first ball hinge; 350, collar; 351, block; 352, pole; 360, fixed plate; 361, guide groove ; 370, the first electric push rod; 380, the second electric push rod; 390, the second ball hinge; 400, the collection mechanism; 410, the shovel plate; Leakage hole; 440, drive motor; 450, water collection box; 451, water pump; 460, water storage box; 470, heater; 500, pressing mechanism; 510, disc; ; 540, slide bar; 550, pressure roller; 600, L-shaped vertical plate; 610, push plate; 620, rebound spring.

具体实施方式detailed description

下面将结合本发明实施例,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

请参阅图1-9所示,一种公路桥梁工程桥面除雪装置,包括壳体100,壳体100一端开设有矩形槽101,且矩形槽101内部设置有刮动机构300,壳体100内部设置有收集机构400,且壳体100相对两侧均转动连接有两个转轴210,且四个转轴210一端均固定套接有移动轮200,壳体100另一端固定连接有用于与车体连接的连接架110,壳体100底面一端设置有压动机构500,通过将连接架110利用螺栓与扫雪车的前部进行连接,使车辆位于壳体100后面推动壳体100前行,使刮动机构300将地面积雪与冰面刮动到收集机构400前方,并利用压动机构500进一步破碎,而后壳体100利用移动轮200行进时使收集机构400自动将前方积雪与碎冰铲入壳体100内部进行收集;Please see shown in Fig. 1-9, a kind of bridge deck snow removal device of highway bridge engineering, comprises housing 100, and housing 100 one end is provided with rectangular groove 101, and rectangular groove 101 interior is provided with scraping mechanism 300, and housing 100 interior A collection mechanism 400 is provided, and two rotating shafts 210 are rotatably connected to opposite sides of the casing 100, and one end of the four rotating shafts 210 is fixedly sleeved with a moving wheel 200, and the other end of the casing 100 is fixedly connected with a wheel for connecting with the vehicle body. The connecting frame 110 is provided with a pressing mechanism 500 at one end of the bottom surface of the housing 100. By connecting the connecting frame 110 to the front of the snowplow with bolts, the vehicle is positioned behind the housing 100 and the housing 100 is pushed forward to make the scraper The moving mechanism 300 scrapes the snow and ice on the ground to the front of the collecting mechanism 400, and uses the pressing mechanism 500 to further break it, and then the collecting mechanism 400 automatically shovels the snow and ice in the front when the rear housing 100 uses the moving wheels 200 to move forward. into the housing 100 for collection;

收集机构400包括铲板410,壳体100底面开设有连通槽102,且铲板410顶端与连通槽102一端固定连接,壳体100两相对内侧壁之间转动连接有两个转辊420,且两个转辊420之间转动套接有输送带430,输送带430位于铲板410顶端一侧,壳体100一内侧壁固定连接有驱动电机440,且一个转辊420一端贯穿壳体100一内侧壁,驱动电机440的电机轴贯穿壳体100一内侧壁并与一个转辊420一端之间转动套接有传动带421,在壳体100被车辆推动时,铲板410自动将前方桥面的积雪与冰块铲入壳体100,启动驱动电机440,通过传动带421带动一个转辊420转动,使输送带430在两个转辊420之间转动,而后冰块与积雪进入铲板410并被后续铲入铲板410的积雪与碎冰挤向输送带430而后随输送带430转动被运输到壳体100内部另一端进行堆积,从而使使用人员可以将地面积雪与碎冰进行收集处理,避免积雪与碎冰融化时使桥面湿滑。The collection mechanism 400 includes a shovel plate 410, a communication groove 102 is opened on the bottom surface of the housing 100, and the top end of the shovel plate 410 is fixedly connected to one end of the communication groove 102, and two rotating rollers 420 are rotatably connected between two opposite inner side walls of the housing 100, and A conveyor belt 430 is rotated and socketed between the two rollers 420. The conveyor belt 430 is located on the top side of the shovel plate 410. The inner wall of the housing 100 is fixedly connected with a drive motor 440, and one end of a roller 420 runs through the housing 100. On the inner side wall, the motor shaft of the driving motor 440 runs through the inner side wall of the housing 100 and is connected with a transmission belt 421 between one end of a rotating roller 420. Snow and ice are shoveled into the casing 100, the driving motor 440 is started, and a rotating roller 420 is driven to rotate through the transmission belt 421, so that the conveyor belt 430 is rotated between the two rotating rollers 420, and then the ice and snow enter the shovel plate 410 The snow and crushed ice that are subsequently shoveled into the shovel plate 410 are squeezed toward the conveyor belt 430 and then transported to the other end of the housing 100 for accumulation as the conveyor belt 430 rotates, so that the user can clean the snow and crushed ice on the ground. Collect and process to prevent the bridge deck from being wet and slippery when the snow and crushed ice melt.

壳体100另一端开设有排出槽103,且输送带430一端位于排出槽103内部,输送带430外侧壁开设有多个漏水孔431,壳体100底面位于输送带430下方固定连接有集水盒450,且集水盒450内部与连通槽102内部相连通,壳体100一侧固定连接有抽水泵451,且抽水泵451抽水端通过软管与集水盒450内部相连通,壳体100另一端位于排出槽103上方固定连接有储水盒460,储水盒460内部通过水管与抽水泵451排水端相连通,壳体100两相对内侧壁之间位于输送带430上方固定连接有取暖器470,在碎冰与积雪被铲入铲板410进入输送带430时,启动抽水泵451与取暖器470,取暖器470为红外线发热取暖,加热范围小,但升温速度极快,使取暖器470照射输送带430,融化输送带430上的碎冰与积雪,使雪冰融化的水通过漏水孔431流入集水盒450,并被抽水泵451抽入储水盒460内部,而积雪与碎冰内部夹杂的杂物则会被输送带430带动从排出槽103排出壳体100内部,从而使积雪与碎冰中的水分被提取出来,从而便于使用人员收集雪冰中的水分,减少桥面湿滑情况。The other end of the casing 100 is provided with a discharge groove 103, and one end of the conveyor belt 430 is located inside the discharge groove 103, and the outer wall of the conveyor belt 430 is provided with a plurality of water leakage holes 431, and the bottom surface of the casing 100 is located below the conveyor belt 430 and is fixedly connected with a water collection box. 450, and the interior of the water collection box 450 is connected with the interior of the communication tank 102, the side of the casing 100 is fixedly connected with a water pump 451, and the suction end of the water pump 451 is connected with the interior of the water collection box 450 through a hose, and the casing 100 is connected to the inside of the water collection box 450. One end is located above the discharge tank 103 and is fixedly connected with a water storage box 460. The interior of the water storage box 460 is connected to the drain end of the water pump 451 through a water pipe. The heater 470 is fixedly connected between the two opposite inner walls of the housing 100 above the conveyor belt 430. When crushed ice and snow are shoveled into the shovel plate 410 and enter the conveyor belt 430, the water pump 451 and the heater 470 are started, and the heater 470 uses infrared heat for heating, and the heating range is small, but the heating speed is extremely fast, so that the heater 470 Irradiate the conveyor belt 430 to melt the crushed ice and snow accumulated on the conveyor belt 430, and the water melted by the snow and ice flows into the water collection box 450 through the water leakage hole 431, and is drawn into the water storage box 460 inside by the water pump 451, while the snow and ice melt The sundries contained in the crushed ice will be driven by the conveyor belt 430 to be discharged from the discharge groove 103 to the inside of the housing 100, so that the moisture in the snow and crushed ice can be extracted, so that it is convenient for the user to collect the moisture in the snow and ice, and reduce the Slippery conditions on the bridge deck.

刮动机构300包括连接板310,且连接板310一端固定连接于壳体100一端,连接板310一侧设置有连接杆320,且连接杆320外侧壁开设有多个卡槽321,连接杆320一端固定连接有L型刮板330,且连接杆320另一端与连接板310之间设置有第一球铰链340,连接杆320外侧壁滑动套接有套环350,且套环350内侧壁固定连接有滑动卡接于相邻卡槽321内部的卡块351,套环350外侧壁固定连接有支杆352,壳体100内底面位于连通槽102一侧固定连接有固定板360,且固定板360一侧开设有导向槽361,导向槽361内部滑动连接有第二电动推杆380,且固定板360一侧转动连接有第一电动推杆370,第一电动推杆370活动端通过连接环与第二电动推杆380外侧壁活动套接,第二电动推杆380活动端与与支杆352一端之间设置有第二球铰链390,通过启动第一电动推杆370和第二电动推杆380,使第二电动推杆380伸长时,第一电动推杆370回缩,从而使初始位置横置并且一端位于壳体100一侧的L型刮板330和连接杆320因第二电动推杆380的推动而在地面上刮动横扫,将地面的冰层挤压破碎并将其与积雪刮动到壳体100前方,而后第一电动推杆370伸长,第二电动推杆380回缩,通过套环350将完成横扫的连接杆320和L型刮板330上提,并在上提的过程中将连接杆320和L型刮板330扭转,使L型刮板330朝向壳体100一侧,而后第二电动推杆380因L型刮板330自重沿着导向槽361随连接杆320和L型刮板330落向壳体100一侧地面插入地面冰层内部,使L型刮板330和连接杆320复位到初始位置,从而通过的第二电动推杆380和第一电动推杆370的相互配合控制L型刮板330往复对地面进行刮动将壳体100前方较大范围的积雪与碎冰刮动到壳体100正前方,便于铲板410将其铲入壳体100内部。The scraping mechanism 300 includes a connecting plate 310, and one end of the connecting plate 310 is fixedly connected to one end of the housing 100, a connecting rod 320 is arranged on one side of the connecting plate 310, and a plurality of card slots 321 are provided on the outer wall of the connecting rod 320, and the connecting rod 320 One end is fixedly connected with an L-shaped scraper 330, and a first ball hinge 340 is arranged between the other end of the connecting rod 320 and the connecting plate 310. The outer wall of the connecting rod 320 is slidingly sleeved with a collar 350, and the inner wall of the collar 350 is fixed A block 351 is connected to the inside of the adjacent card slot 321, and the outer wall of the collar 350 is fixedly connected with a support rod 352. The inner bottom of the housing 100 is located on the side of the communication groove 102 and is fixedly connected with a fixed plate 360, and the fixed plate There is a guide groove 361 on one side of the 360, and the second electric push rod 380 is slidably connected to the inside of the guide groove 361, and the first electric push rod 370 is connected to the side of the fixed plate 360 in rotation, and the movable end of the first electric push rod 370 passes through the connecting ring It is movably socketed with the outer wall of the second electric push rod 380, and a second ball hinge 390 is arranged between the movable end of the second electric push rod 380 and one end of the pole 352. By starting the first electric push rod 370 and the second electric push rod Rod 380, when the second electric push rod 380 is extended, the first electric push rod 370 is retracted, so that the L-shaped scraper 330 and the connecting rod 320 and the connecting rod 320 with the initial position lying horizontally and one end on the side of the housing 100 are moved by the second The push of the electric push rod 380 sweeps across the ground, squeezes and breaks the ice layer on the ground and scrapes it and the snow to the front of the housing 100, then the first electric push rod 370 extends, and the second electric push rod 370 stretches. The rod 380 is retracted, and the connecting rod 320 and the L-shaped scraper 330 that have completed the sweep are lifted up through the collar 350, and the connecting rod 320 and the L-shaped scraper 330 are twisted during the lifting process, so that the L-shaped scraper 330 Towards the side of the housing 100, and then the second electric push rod 380 falls to the side of the housing 100 along with the connecting rod 320 and the L-shaped scraper 330 along the guide groove 361 due to the self-weight of the L-shaped scraper 330 and is inserted into the ground ice layer. Return the L-shaped scraper 330 and the connecting rod 320 to the initial position, so that the mutual cooperation of the second electric push rod 380 and the first electric push rod 370 controls the L-shaped scraper 330 to reciprocate and scrape the ground to make the casing 100 The snow and crushed ice in a large area ahead are scraped to the front of the housing 100 , so that the shovel 410 can shovel them into the housing 100 .

第一球铰链340与第二球铰链390均包括转动部与基座部,且第一球铰链340与第二球铰链390的基座部均开设有多个缺口301,第一球铰链340的转动部一端与连接板310另一端顶面转动连接,第一球铰链340的基座部一端与连接杆320另一端固定连接,第一球铰链340的转动部另一端与基座部另一端活动卡接,第二球铰链390的转动部一端与支杆352一端固定连接,且第二球铰链390的基座部一端与第二电动推杆380的活动端固定连接,第二球铰链390的基座部另一端与转动部另一端活动卡接,第一球铰链340和第二球铰链390的结构均分为基座部与转动部,两个球铰链的转动部的另一端均为球体,球体可在相对应基座部内部的槽内转动,但转动部难以转动至与基座部底面平行的状态,通过添加缺口301,使两个球铰链的转动部与基座部可转动到相邻缺口301内部,从而使连接杆320可以因第一球铰链340的转动部转动至相邻基座部的缺口301内部而使连接杆320与地面平行,从而便于L型刮板330在较为平整的桥面上进行横扫。Both the first ball hinge 340 and the second ball hinge 390 include a rotating part and a base part, and the base parts of the first ball hinge 340 and the second ball hinge 390 are provided with a plurality of notches 301, the first ball hinge 340 One end of the rotating part is rotatably connected to the top surface of the other end of the connecting plate 310, one end of the base part of the first ball hinge 340 is fixedly connected to the other end of the connecting rod 320, and the other end of the rotating part of the first ball hinge 340 is movable with the other end of the base part. One end of the rotating part of the second ball hinge 390 is fixedly connected with one end of the pole 352, and one end of the base part of the second ball hinge 390 is fixedly connected with the movable end of the second electric push rod 380. The second ball hinge 390 The other end of the base part is flexibly engaged with the other end of the rotating part. The structures of the first ball hinge 340 and the second ball hinge 390 are equally divided into a base part and a rotating part. The other ends of the rotating parts of the two ball hinges are spherical , the ball can rotate in the groove corresponding to the inside of the base part, but it is difficult for the rotating part to rotate to a state parallel to the bottom surface of the base part. By adding a notch 301, the rotating part and the base part of the two ball hinges can rotate to Adjacent to the inside of the notch 301, so that the connecting rod 320 can be rotated to the inside of the notch 301 of the adjacent base part due to the rotation part of the first ball hinge 340, so that the connecting rod 320 is parallel to the ground, so that the L-shaped scraper 330 is relatively Sweep across the flat bridge surface.

L型刮板330一侧为刃口状结构,使L型刮板330和连接杆320被第二电动推杆380拉起并偏转时,可以使L型刮板330刃口状侧壁朝向地面,使L型刮板330落向地面时,可以依靠刃口更方便的破开冰层进入冰层内部接触地面,从而提高L型刮板330横扫地面对地面的刮动效果。One side of the L-shaped scraper 330 is an edge-shaped structure, so that when the L-shaped scraper 330 and the connecting rod 320 are pulled up and deflected by the second electric push rod 380, the edge-shaped side wall of the L-shaped scraper 330 can face the ground When the L-shaped scraper 330 falls to the ground, it can rely on the cutting edge to break through the ice layer more conveniently and enter the interior of the ice layer to contact the ground, thereby improving the scraping effect of the L-shaped scraper 330 sweeping across the ground.

导向槽361包括直线槽部、斜向槽部与弧线槽部,且第一电动推杆370的一端位于弧形槽部的圆心处,使斜向槽部中部靠下的部分离第一电动推杆370一端最近,直线槽部一端与斜向槽部顶端与第一电动推杆370一端距离相等,使第一电动推杆370拉动第二电动推杆380移动时进行回拉时,将拉动初始位置位于直线槽部一端的第二电动推杆380沿直线槽部移动入斜向槽部,并在斜向槽部内移动部分,改变第一电动推杆370的活动端朝向,而后在第一电动推杆370活动端推出时,第二电动推杆380被改变活动端朝向的第一电动推杆370活动端推入斜向槽部顶端,而后因L型刮板330的自重而沿弧形槽部滑动回落到直线槽部一端,使第二电动推杆380重复环绕导向槽361控制L型刮板330和连接杆320的移动。The guide groove 361 includes a straight groove, an oblique groove and an arc groove, and one end of the first electric push rod 370 is located at the center of the arc groove, so that the lower part of the oblique groove is separated from the first electric push rod. One end of the push rod 370 is the closest, and the distance between one end of the linear groove and the top of the inclined groove is equal to that of the first end of the first electric push rod 370, so that when the first electric push rod 370 pulls the second electric push rod 380 and moves back, it will pull The second electric push rod 380 whose initial position is located at one end of the linear groove moves into the oblique groove along the linear groove, and moves partly in the oblique groove to change the orientation of the movable end of the first electric push rod 370, and then moves in the first When the movable end of the electric push rod 370 is pushed out, the second electric push rod 380 is pushed into the top of the inclined groove by the first electric push rod 370 which changes the orientation of the movable end, and then moves along the arc due to the self-weight of the L-shaped scraper 330. The groove slides back to one end of the linear groove, so that the second electric push rod 380 repeatedly surrounds the guide groove 361 to control the movement of the L-shaped scraper 330 and the connecting rod 320 .

壳体100一端固定连接有L型竖板600,且L型竖板600的短臂一端转动连接有推板610,推板610顶端固定连接有多个回弹弹簧620,且多个回弹弹簧620一端均与L型竖板600一侧固定连接,在L型刮板330和连接杆320完成横扫地面并被第二电动推杆380拉起时,连接杆320挤压推板610,而后待第二电动推杆380移动到斜向槽部顶端后,推板610因回弹弹簧620复位弹力而带动连接杆320和L型刮板330向壳体100一侧地面砸去,利用推板610避免L型刮板330因晃动等情况而造成向壳体100另一侧方向转动,影响L型刮板330和连接杆320复位。One end of the casing 100 is fixedly connected with an L-shaped vertical plate 600, and one end of the short arm of the L-shaped vertical plate 600 is rotatably connected with a push plate 610, and the top of the push plate 610 is fixedly connected with a plurality of rebound springs 620, and the plurality of rebound springs One end of 620 is fixedly connected with one side of the L-shaped vertical plate 600. When the L-shaped scraper 330 and the connecting rod 320 complete sweeping the ground and are pulled up by the second electric push rod 380, the connecting rod 320 squeezes the push plate 610, and then After the second electric push rod 380 moves to the top of the inclined groove, the push plate 610 drives the connecting rod 320 and the L-shaped scraper 330 to the ground on one side of the housing 100 due to the return elastic force of the rebound spring 620. Avoid the rotation of the L-shaped scraper 330 to the other side of the housing 100 due to shaking or the like, which will affect the reset of the L-shaped scraper 330 and the connecting rod 320 .

推板610为J型板状结构,使连接杆320更易通过推板610弧形面部分挤压推板610靠向L型竖板600一侧。The push plate 610 is a J-shaped plate structure, which makes it easier for the connecting rod 320 to push the push plate 610 to the side of the L-shaped vertical plate 600 through the arc surface of the push plate 610 .

压动机构500位于靠近壳体100一端的两个转轴210之间,且压动机构500位于铲板410另一侧;The pressing mechanism 500 is located between the two rotating shafts 210 near one end of the housing 100 , and the pressing mechanism 500 is located on the other side of the blade 410 ;

压动机构500包括两个圆盘510,且两个圆盘510分别与两个相邻的转轴210外侧壁固定套接,壳体100底面位于两个圆盘510之间固定连接有两个框体530,且两个框体530内部均滑动嵌入有滑杆540,两个滑杆540之间固定连接有压辊550,两个圆盘510一侧均均匀固定连接有多个抵杆520,抵杆520与相邻滑杆540一端活动抵触,在壳体100移动时,两个圆盘510被转动的两个转轴210带动转动,使两个圆盘510上的抵杆520间歇抵触两个滑杆540,将两个滑杆540连同压辊550抬起,在滑杆540脱离相邻抵杆520后滑杆540和压辊550将因压辊550自重自然下落,使压辊550因抵杆520间歇抵触而对地面间歇压动,将壳体100前方集聚的碎冰和积雪进行压动,使冰块经过碾压后被破碎的更小,从而减少碎冰融化时间,便于取暖器470加热融化碎冰。The pressing mechanism 500 includes two disks 510, and the two disks 510 are respectively fixedly socketed on the outer walls of two adjacent rotating shafts 210, and the bottom surface of the housing 100 is fixedly connected with two frames between the two disks 510. body 530, and two frame bodies 530 are slidably embedded with sliding rods 540, the two sliding rods 540 are fixedly connected with pressure rollers 550, and one side of the two discs 510 is evenly and fixedly connected with a plurality of resisting rods 520, The resisting rod 520 is movable against one end of the adjacent sliding rod 540. When the housing 100 moves, the two discs 510 are driven to rotate by the rotating shafts 210, so that the resisting rods 520 on the two discs 510 are intermittently in contact with the two. The slide bar 540 lifts the two slide bars 540 together with the pressure roller 550. After the slide bar 540 breaks away from the adjacent contact bar 520, the slide bar 540 and the pressure roller 550 will naturally fall due to the weight of the pressure roller 550, so that the pressure roller 550 will The rod 520 intermittently touches the ground and presses the crushed ice and snow accumulated in front of the housing 100, so that the ice cubes are crushed smaller after being crushed, thereby reducing the melting time of the crushed ice and making it easier for the heater to Heat at 470 to melt crushed ice.

抵杆520为弧形杆状结构,使抵杆520托起滑杆540移动时,滑杆540在抵杆520上移动的更加顺畅。The resisting rod 520 has an arc-shaped rod-shaped structure, so that when the resisting rod 520 supports the sliding rod 540 to move, the sliding rod 540 moves on the resisting rod 520 more smoothly.

工作原理:使用时,首先将壳体100上的连接架110通过螺栓与车辆的前端进行连接,而后由车辆在壳体100后方推动壳体100依靠四个移动轮200在桥面上移动,在壳体100移动时,在固定板360上设置控制器控制第一电动推杆370和第二电动推杆380的启闭,而后启动第一电动推杆370和第二电动推杆380,使第一电动推杆370活动端回拉拉动初始位置位于导向槽361直线槽部一端的第二电动推杆380沿直线槽部移动,并且,此时第二电动推杆380活动端伸出,推动初始位置位于壳体100一侧的L型刮板330和连接杆320以第一球铰链340为中心转动,使L型刮板330转动横扫壳体100一侧地面上的冰层与积雪,将其刮动到壳体100正前方,而后第一电动推杆370活动端继续回缩,将第二电动推杆380拉入斜向槽部内并移动部分,改变第一电动推杆370的活动端朝向,并且,此时第二电动推杆380活动端回缩,通过套环350拉动连接杆320和L型刮板330向上转动并偏转,而后第一电动推杆370活动端伸出,将第二电动推杆380推入斜向槽部顶端,此时L型刮板330因偏转而朝向壳体100一侧,并且,连接杆320挤压推板610上的回弹弹簧620压缩,而后在推板610被多个回弹弹簧620复位弹力带动顶动连接杆320和L型刮板330砸向壳体100一侧地面完成复位,并使连接杆320通过套环350和支杆352拉动第二电动推杆380沿导向槽361弧形槽部复位到直线槽部一端,使L型刮板330和连接杆320往复进行刮动抬起的过程;Working principle: When in use, first connect the connecting frame 110 on the casing 100 to the front end of the vehicle through bolts, and then the vehicle pushes the casing 100 behind the casing 100 to move on the bridge surface by relying on four moving wheels 200. When the housing 100 moves, a controller is set on the fixed plate 360 to control the opening and closing of the first electric push rod 370 and the second electric push rod 380, and then start the first electric push rod 370 and the second electric push rod 380, so that the first electric push rod 370 and the second electric push rod 380 are started. The movable end of an electric push rod 370 pulls back and pulls the second electric push rod 380 whose initial position is located at one end of the linear groove of the guide groove 361 to move along the linear groove. The L-shaped scraper 330 and the connecting rod 320 located on one side of the housing 100 rotate around the first ball hinge 340, so that the L-shaped scraper 330 rotates and sweeps the ice and snow on the ground on the side of the housing 100, and the It scrapes to the front of the housing 100, and then the movable end of the first electric push rod 370 continues to retract, pulls the second electric push rod 380 into the inclined groove and moves the part, changing the movable end of the first electric push rod 370 Towards, and at this time, the movable end of the second electric push rod 380 is retracted, and the connecting rod 320 and the L-shaped scraper 330 are pulled by the collar 350 to rotate upward and deflect, and then the movable end of the first electric push rod 370 is stretched out, and the second electric push rod 370 is stretched out. The second electric push rod 380 is pushed into the top of the inclined groove, at this time, the L-shaped scraper 330 is deflected toward the side of the housing 100, and the connecting rod 320 compresses the rebound spring 620 on the push plate 610 to compress, and then The push plate 610 is driven by the return elastic force of multiple rebound springs 620 to push the connecting rod 320 and the L-shaped scraper 330 to the ground on one side of the housing 100 to complete the reset, and the connecting rod 320 pulls the first connecting rod 320 through the collar 350 and the support rod 352. Second, the electric push rod 380 is reset to one end of the linear groove along the arc groove of the guide groove 361, so that the L-shaped scraper 330 and the connecting rod 320 reciprocate to carry out the scraping and lifting process;

而后在壳体100内部设置多个控制器分别控制驱动电机440、取暖器470和抽水泵451的启闭,启动驱动电机440、取暖器470和抽水泵451,使驱动电机440通过传动带421带动一个转辊420转动,使一个转辊420带动输送带430转动,并使取暖器470照向输送带430顶面,而后冰块与积雪进入铲板410并被后续铲入铲板410的积雪与碎冰挤向输送带430而后冰雪被取暖器470发出的热量融化,雪冰融化的水通过漏水孔431流入集水盒450,并被抽水泵451抽入储水盒460内部,而积雪与碎冰内部夹杂的杂物则会被输送带430带动从排出槽103排出壳体100内部;Then a plurality of controllers are set inside the housing 100 to control the opening and closing of the drive motor 440, the heater 470 and the water pump 451 respectively, and start the drive motor 440, the heater 470 and the water pump 451, so that the drive motor 440 drives a drive motor 440 through the transmission belt 421. Turning roller 420 rotates, and one turning roller 420 drives conveyer belt 430 to rotate, and heater 470 shines on the top surface of conveyer belt 430, then ice cube and accumulated snow enter shovel plate 410 and are subsequently shoveled into the snow accumulation of shovel plate 410 The crushed ice squeezes to the conveyor belt 430 and then the ice and snow are melted by the heat sent by the heater 470. The water that melts the snow and ice flows into the water collection box 450 through the water leakage hole 431, and is drawn into the water storage box 460 by the water pump 451. The debris mixed with the crushed ice will be driven by the conveyor belt 430 to be discharged from the discharge groove 103 to the inside of the casing 100;

在壳体100移动时,四个移动轮200随壳体100移动而同步与地面摩擦转动,两个圆盘510被转动的两个转轴210带动转动,使两个圆盘510上的抵杆520间歇抵触两个滑杆540,将两个滑杆540连同压辊550抬起,在滑杆540脱离相邻抵杆520后滑杆540和压辊550将因压辊550自重自然下落,使压辊550因抵杆520间歇抵触而对地面间歇压动,将壳体100前方集聚的碎冰和积雪进行压动,使冰块经过碾压后被破碎的更小后被铲入铲板410。When the casing 100 moves, the four moving wheels 200 rotate synchronously with the ground friction with the movement of the casing 100, and the two disks 510 are driven to rotate by the two rotating shafts 210, so that the contact rods 520 on the two disks 510 Intermittently touch the two sliding rods 540, lift the two sliding rods 540 together with the pressing roller 550, after the sliding rod 540 breaks away from the adjacent contact rod 520, the sliding rod 540 and the pressing roller 550 will naturally fall due to the weight of the pressing roller 550, making the pressing roller 550 The roller 550 intermittently presses the ground due to the intermittent collision of the contact rod 520, and presses the crushed ice and snow accumulated in front of the casing 100, so that the ice cubes are crushed and crushed into smaller pieces before being shoveled into the shovel plate 410 .

在本说明书的描述中,参考术语“一个实施例”、“示例”、“具体示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本发明的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。In the description of this specification, descriptions with reference to the terms "one embodiment", "example", "specific example" and the like mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment of the present invention. In an embodiment or example. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.

以上内容仅仅是对本发明所作的举例和说明,所属本技术领域的技术人员对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,只要不偏离发明或者超越本权利要求书所定义的范围,均应属于本发明的保护范围。The above content is only an example and description of the present invention. Those skilled in the art will make various modifications or supplements to the described specific embodiments or replace them in similar ways, as long as they do not deviate from the invention or exceed the rights of the present invention. The scope defined in the claims should all belong to the protection scope of the present invention.

Claims (10)

1.一种公路桥梁工程桥面除雪装置,包括壳体(100),其特征在于,所述壳体(100)一端开设有矩形槽(101),且矩形槽(101)内部设置有刮动机构(300),所述壳体(100)内部设置有收集机构(400),且壳体(100)相对两侧均转动连接有两个转轴(210),且四个转轴(210)一端均固定套接有移动轮(200),所述壳体(100)另一端固定连接有用于与车体连接的连接架(110),所述壳体(100)底面一端设置有压动机构(500);1. A bridge deck snow removal device for highway and bridge engineering, comprising a housing (100), characterized in that a rectangular groove (101) is provided at one end of the housing (100), and a scraper is arranged inside the rectangular groove (101). mechanism (300), the casing (100) is provided with a collection mechanism (400), and the opposite sides of the casing (100) are rotatably connected with two rotating shafts (210), and one end of the four rotating shafts (210) is The moving wheel (200) is fixedly sleeved, the other end of the housing (100) is fixedly connected with a connecting frame (110) for connecting with the vehicle body, and a pressing mechanism (500) is provided at one end of the bottom surface of the housing (100). ); 所述收集机构(400)包括铲板(410),所述壳体(100)底面开设有连通槽(102),且铲板(410)顶端与连通槽(102)一端固定连接,所述壳体(100)两相对内侧壁之间转动连接有两个转辊(420),且两个转辊(420)之间转动套接有输送带(430),所述输送带(430)位于铲板(410)顶端一侧,所述壳体(100)一内侧壁固定连接有驱动电机(440),且一个转辊(420)一端贯穿壳体(100)一内侧壁,所述驱动电机(440)的电机轴贯穿壳体(100)一内侧壁并与一个转辊(420)一端之间转动套接有传动带(421)。The collection mechanism (400) includes a shovel plate (410), the bottom surface of the housing (100) is provided with a communication groove (102), and the top end of the shovel plate (410) is fixedly connected to one end of the communication groove (102). Two rotating rollers (420) are rotatably connected between the two opposite inner walls of the body (100), and a conveyor belt (430) is rotatably connected between the two rotating rollers (420), and the conveyor belt (430) is positioned on the On the top side of the plate (410), a driving motor (440) is fixedly connected to an inner wall of the housing (100), and one end of a rotating roller (420) penetrates an inner wall of the housing (100), and the driving motor ( The motor shaft of 440) passes through an inner side wall of the casing (100) and is rotatably connected with a transmission belt (421) between one end of a rotating roller (420). 2.根据权利要求1所述的一种公路桥梁工程桥面除雪装置,其特征在于,所述壳体(100)另一端开设有排出槽(103),且输送带(430)一端位于排出槽(103)内部,所述输送带(430)外侧壁开设有多个漏水孔(431),所述壳体(100)底面位于输送带(430)下方固定连接有集水盒(450),且集水盒(450)内部与连通槽(102)内部相连通,所述壳体(100)一侧固定连接有抽水泵(451),且抽水泵(451)抽水端通过软管与集水盒(450)内部相连通,所述壳体(100)另一端位于排出槽(103)上方固定连接有储水盒(460),所述储水盒(460)内部通过水管与抽水泵(451)排水端相连通,所述壳体(100)两相对内侧壁之间位于输送带(430)上方固定连接有取暖器(470)。2. A bridge deck snow removal device for highway bridge engineering according to claim 1, characterized in that, the other end of the housing (100) is provided with a discharge groove (103), and one end of the conveyor belt (430) is located in the discharge groove Inside (103), the outer wall of the conveyor belt (430) is provided with a plurality of water leakage holes (431), and the bottom surface of the housing (100) is located below the conveyor belt (430) and is fixedly connected with a water collection box (450), and The inside of the water collecting box (450) communicates with the inside of the communication tank (102), and a water pump (451) is fixedly connected to one side of the housing (100), and the suction end of the water pump (451) is connected to the water collecting box through a hose. (450) are connected internally, and the other end of the housing (100) is fixedly connected with a water storage box (460) above the discharge tank (103), and the inside of the water storage box (460) is connected to the water pump (451) through a water pipe. The drain ends are connected, and a heater (470) is fixedly connected between two opposite inner walls of the housing (100) above the conveyor belt (430). 3.根据权利要求1所述的一种公路桥梁工程桥面除雪装置,其特征在于,所述刮动机构(300)包括连接板(310),且连接板(310)一端固定连接于壳体(100)一端,所述连接板(310)一侧设置有连接杆(320),且连接杆(320)外侧壁开设有多个卡槽(321),所述连接杆(320)一端固定连接有L型刮板(330),且连接杆(320)另一端与连接板(310)之间设置有第一球铰链(340),所述连接杆(320)外侧壁滑动套接有套环(350),且套环(350)内侧壁固定连接有滑动卡接于相邻卡槽(321)内部的卡块(351),所述套环(350)外侧壁固定连接有支杆(352),所述壳体(100)内底面位于连通槽(102)一侧固定连接有固定板(360),且固定板(360)一侧开设有导向槽(361),所述导向槽(361)内部滑动连接有第二电动推杆(380),且固定板(360)一侧转动连接有第一电动推杆(370),所述第一电动推杆(370)活动端通过连接环与第二电动推杆(380)外侧壁活动套接,所述第二电动推杆(380)活动端与与支杆(352)一端之间设置有第二球铰链(390)。3. A bridge deck snow removal device for highway bridge engineering according to claim 1, characterized in that the scraping mechanism (300) includes a connecting plate (310), and one end of the connecting plate (310) is fixedly connected to the housing (100), one side of the connecting plate (310) is provided with a connecting rod (320), and the outer wall of the connecting rod (320) is provided with a plurality of slots (321), and one end of the connecting rod (320) is fixedly connected There is an L-shaped scraper (330), and a first ball hinge (340) is provided between the other end of the connecting rod (320) and the connecting plate (310), and a collar is slidably sleeved on the outer wall of the connecting rod (320) (350), and the inner wall of the collar (350) is fixedly connected with a block (351) that slides and engages inside the adjacent slot (321), and the outer wall of the collar (350) is fixedly connected with a strut (352 ), the inner bottom surface of the housing (100) is fixedly connected with a fixed plate (360) on one side of the communication groove (102), and a guide groove (361) is opened on one side of the fixed plate (360), and the guide groove (361 ) is slidingly connected with a second electric push rod (380), and one side of the fixed plate (360) is rotationally connected with a first electric push rod (370), and the movable end of the first electric push rod (370) is connected to the The outer wall of the second electric push rod (380) is flexibly socketed, and a second ball hinge (390) is provided between the movable end of the second electric push rod (380) and one end of the support rod (352). 4.根据权利要求3所述的一种公路桥梁工程桥面除雪装置,其特征在于,所述第一球铰链(340)与第二球铰链(390)均包括转动部与基座部,且第一球铰链(340)与第二球铰链(390)的基座部均开设有多个缺口(301),所述第一球铰链(340)的转动部一端与连接板(310)另一端顶面转动连接,第一球铰链(340)的基座部一端与连接杆(320)另一端固定连接,所述第一球铰链(340)的转动部另一端与基座部另一端活动卡接,所述第二球铰链(390)的转动部一端与支杆(352)一端固定连接,且第二球铰链(390)的基座部一端与第二电动推杆(380)的活动端固定连接,所述第二球铰链(390)的基座部另一端与转动部另一端活动卡接。4. A bridge deck snow removal device for highway bridge engineering according to claim 3, characterized in that, the first ball hinge (340) and the second ball hinge (390) both include a rotating part and a base part, and The bases of the first ball hinge (340) and the second ball hinge (390) are provided with multiple notches (301), one end of the rotating part of the first ball hinge (340) and the other end of the connecting plate (310) The top surface is rotationally connected, one end of the base part of the first ball hinge (340) is fixedly connected with the other end of the connecting rod (320), and the other end of the rotating part of the first ball hinge (340) is movable with the other end of the base part One end of the rotating part of the second ball hinge (390) is fixedly connected with one end of the pole (352), and one end of the base part of the second ball hinge (390) is connected with the movable end of the second electric push rod (380). Fixedly connected, the other end of the base part of the second ball hinge (390) is movably engaged with the other end of the rotating part. 5.根据权利要求3所述的一种公路桥梁工程桥面除雪装置,其特征在于,所述L型刮板(330)一侧为刃口状结构。5. The bridge deck snow removal device for highway and bridge engineering according to claim 3, characterized in that, one side of the L-shaped scraper (330) is an edge-shaped structure. 6.根据权利要求4所述的一种公路桥梁工程桥面除雪装置,其特征在于,所述导向槽(361)包括直线槽部、斜向槽部与弧线槽部,且第一电动推杆(370)的一端位于弧形槽部的圆心处。6. A bridge deck snow removal device for highway bridge engineering according to claim 4, characterized in that, the guide groove (361) includes a straight groove, an oblique groove and an arc groove, and the first electric pusher One end of the rod (370) is located at the center of the arc groove. 7.根据权利要求6所述的一种公路桥梁工程桥面除雪装置,其特征在于,所述壳体(100)一端固定连接有L型竖板(600),且L型竖板(600)的短臂一端转动连接有推板(610),所述推板(610)顶端固定连接有多个回弹弹簧(620),且多个回弹弹簧(620)一端均与L型竖板(600)一侧固定连接。7. A bridge deck snow removal device for highway bridge engineering according to claim 6, characterized in that, one end of the housing (100) is fixedly connected with an L-shaped vertical plate (600), and the L-shaped vertical plate (600) One end of the short arm is rotatably connected with a push plate (610), and the top of the push plate (610) is fixedly connected with a plurality of rebound springs (620), and one end of the plurality of rebound springs (620) is connected to the L-shaped vertical plate ( 600) fixed connection on one side. 8.根据权利要求7所述的一种公路桥梁工程桥面除雪装置,其特征在于,所述推板(610)为J型板状结构。8. The bridge deck snow removal device for highway and bridge engineering according to claim 7, characterized in that the push plate (610) is a J-shaped plate structure. 9.根据权利要求1所述的一种公路桥梁工程桥面除雪装置,其特征在于,所述压动机构(500)位于靠近壳体(100)一端的两个转轴(210)之间,且压动机构(500)位于铲板(410)另一侧;9. The bridge deck snow removal device for highway and bridge engineering according to claim 1, characterized in that the pressing mechanism (500) is located between two rotating shafts (210) close to one end of the casing (100), and The pressing mechanism (500) is located on the other side of the shovel plate (410); 所述压动机构(500)包括两个圆盘(510),且两个圆盘(510)分别与两个相邻的转轴(210)外侧壁固定套接,壳体(100)底面位于两个圆盘(510)之间固定连接有两个框体(530),且两个框体(530)内部均滑动嵌入有滑杆(540),两个所述滑杆(540)之间固定连接有压辊(550),两个所述圆盘(510)一侧均均匀固定连接有多个抵杆(520),抵杆(520)与相邻滑杆(540)一端活动抵触。The pressing mechanism (500) includes two disks (510), and the two disks (510) are respectively fixedly socketed with the outer walls of two adjacent rotating shafts (210), and the bottom surface of the housing (100) is located between the two Two frames (530) are fixedly connected between the two discs (510), and a sliding rod (540) is slidably embedded inside the two frames (530), and the two sliding rods (540) are fixed A pressing roller (550) is connected, and a plurality of resisting rods (520) are evenly and fixedly connected to one side of the two discs (510), and the resisting rods (520) conflict with one end of an adjacent sliding rod (540) in motion. 10.根据权利要求9所述的一种公路桥梁工程桥面除雪装置,其特征在于,所述抵杆(520)为弧形杆状结构。10. The bridge deck snow removal device for highway and bridge engineering according to claim 9, characterized in that the abutment rod (520) is an arc-shaped rod-shaped structure.
CN202211376038.XA 2022-11-04 2022-11-04 A bridge deck snow removal device for highway bridge engineering Pending CN115584694A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211376038.XA CN115584694A (en) 2022-11-04 2022-11-04 A bridge deck snow removal device for highway bridge engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211376038.XA CN115584694A (en) 2022-11-04 2022-11-04 A bridge deck snow removal device for highway bridge engineering

Publications (1)

Publication Number Publication Date
CN115584694A true CN115584694A (en) 2023-01-10

Family

ID=84781975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211376038.XA Pending CN115584694A (en) 2022-11-04 2022-11-04 A bridge deck snow removal device for highway bridge engineering

Country Status (1)

Country Link
CN (1) CN115584694A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912044A (en) * 2015-06-18 2015-09-16 钱尉茂 Marine litter recovery device
CN207176604U (en) * 2017-08-04 2018-04-03 河南森源重工有限公司 A kind of snow scraping plate device
CN207567704U (en) * 2017-08-30 2018-07-03 崔艳辉 A kind of efficient pig house floor cleaning trolley
CN108643111A (en) * 2018-05-25 2018-10-12 朱宏洁 A kind of snow shoveling machine
CN110804986A (en) * 2019-09-26 2020-02-18 潜山县圣峰刷业有限公司 Centralized snow clearing device that floats
CN211228299U (en) * 2019-10-26 2020-08-11 界首市龙之源环境工程有限公司 Ornamental trees and shrubs fallen leaves collection device
KR20210114883A (en) * 2020-03-11 2021-09-24 주식회사 케이엠티엘 Detachable apparatus for removing black ice
CN114561898A (en) * 2022-03-22 2022-05-31 中国市政工程华北设计研究总院有限公司 Municipal administration bridge snow removing device
CN217710525U (en) * 2021-12-09 2022-11-01 安徽省鸿泰建设工程有限公司 Defroster is used in road construction

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912044A (en) * 2015-06-18 2015-09-16 钱尉茂 Marine litter recovery device
CN207176604U (en) * 2017-08-04 2018-04-03 河南森源重工有限公司 A kind of snow scraping plate device
CN207567704U (en) * 2017-08-30 2018-07-03 崔艳辉 A kind of efficient pig house floor cleaning trolley
CN108643111A (en) * 2018-05-25 2018-10-12 朱宏洁 A kind of snow shoveling machine
CN110804986A (en) * 2019-09-26 2020-02-18 潜山县圣峰刷业有限公司 Centralized snow clearing device that floats
CN211228299U (en) * 2019-10-26 2020-08-11 界首市龙之源环境工程有限公司 Ornamental trees and shrubs fallen leaves collection device
KR20210114883A (en) * 2020-03-11 2021-09-24 주식회사 케이엠티엘 Detachable apparatus for removing black ice
CN217710525U (en) * 2021-12-09 2022-11-01 安徽省鸿泰建设工程有限公司 Defroster is used in road construction
CN114561898A (en) * 2022-03-22 2022-05-31 中国市政工程华北设计研究总院有限公司 Municipal administration bridge snow removing device

Similar Documents

Publication Publication Date Title
CN107513977A (en) A kind of multifunction snow removing machine for the deicing that clears the snow
CN205530097U (en) Novel snow removing is opened ice and is cleaned integrative car
CN201400883Y (en) road snow removal vehicle
CN211472366U (en) A device for melting snow and ice on roads
CN115584694A (en) A bridge deck snow removal device for highway bridge engineering
CN114370025A (en) A road snow and ice breaker
CN119980925A (en) A snow removal device for traffic engineering highway
CN204023477U (en) Small-size automatic snow sweeper
CN108118657B (en) A kind of road snow mantle roots out equipment
CN110878543B (en) A device for melting ice and snow on roads
CN118292386A (en) Snow shoveling robot capable of automatically avoiding obstacle
CN216474777U (en) Road and bridge safety defroster
CN212582569U (en) Novel road snow removing for municipal works device
CN118653406B (en) A road and bridge surface deicing device that facilitates material transfer
CN219808320U (en) Frozen pavement cleaning device for municipal works
CN112982267A (en) Winter road surface snow removing device
CN217601321U (en) Snow sweeping vehicle for highway maintenance
CN107653829B (en) A winter bridge surface deicing device
CN219908753U (en) Special vehicle capable of removing various garbage on road
CN220767885U (en) Snow removal device for roads
CN118600906A (en) Road ice removal device
CN222251912U (en) Bridge deicing device
CN222923671U (en) Snow cleaning device for road traffic
CN109778766A (en) A kind of vehicular is swept away snow deicing vehicle
CN217536834U (en) Broken device that helps melt that freezes in municipal administration road surface

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination