CN115573484A - Arc-shaped steel plate-wrapped concrete shear wall with welded combined shear keys - Google Patents
Arc-shaped steel plate-wrapped concrete shear wall with welded combined shear keys Download PDFInfo
- Publication number
- CN115573484A CN115573484A CN202211196021.6A CN202211196021A CN115573484A CN 115573484 A CN115573484 A CN 115573484A CN 202211196021 A CN202211196021 A CN 202211196021A CN 115573484 A CN115573484 A CN 115573484A
- Authority
- CN
- China
- Prior art keywords
- arc
- steel plate
- shaped
- shear wall
- welding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/48—Dowels, i.e. members adapted to penetrate the surfaces of two parts and to take the shear stresses
- E04B1/483—Shear dowels to be embedded in concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
- E04B2/86—Walls made by casting, pouring, or tamping in situ made in permanent forms
- E04B2/8623—Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers and at least one form leaf being monolithic
- E04B2/8629—Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers and at least one form leaf being monolithic with both form leaves and spacers being monolithic
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/062—Forms for curved walls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Description
技术领域technical field
本发明属于建筑技术领域,具体涉及一种焊接组合剪力键的弧形外包钢板混凝土剪力墙及制造方法。The invention belongs to the technical field of construction, and in particular relates to an arc-shaped outsourcing steel plate concrete shear wall with welded composite shear keys and a manufacturing method thereof.
背景技术Background technique
随着经济发展和城市化进程的不断推进,高层及超高层建筑数量不断增长,在高层及超高层结构体系中,剪力墙是重要的抗侧力构件。剪力墙具有良好的竖向和水平承载能力,且抗侧刚度大,能有效地减小结构侧移,抵抗地震作用力,还能增加建筑内部使用空间,因此被广泛使用。With the continuous advancement of economic development and urbanization, the number of high-rise and super high-rise buildings continues to increase. In high-rise and super high-rise structural systems, shear walls are important lateral force-resistant components. Shear walls have good vertical and horizontal bearing capacity, and high lateral stiffness, which can effectively reduce structural lateral movement, resist earthquake force, and increase the internal use space of buildings, so they are widely used.
传统现浇混凝土剪力墙具有刚度大,抗震性能较好,造价较低的特点,但混凝土剪力墙容易发生脆性破坏,延性较低,变形能力和耗能能力较差,不利于高层建筑的抗震性能。此外,随着建筑高度的逐渐增高,其底部剪力墙受到竖向荷载作用也逐步提高,现浇混凝土剪力墙会大大增加建筑结构自重和建造成本,降低建筑空间使用率。The traditional cast-in-place concrete shear wall has the characteristics of high rigidity, good seismic performance and low cost, but the concrete shear wall is prone to brittle failure, low ductility, poor deformation capacity and energy dissipation capacity, which is not conducive to the construction of high-rise buildings. Anti-seismic performance. In addition, as the height of the building gradually increases, the vertical load on the bottom shear wall also gradually increases. The cast-in-place concrete shear wall will greatly increase the self-weight and construction cost of the building structure, and reduce the utilization rate of building space.
发明内容Contents of the invention
为了克服上述现有技术的缺点,本发明的目的在于提供一种焊接组合剪力键的弧形外包钢板混凝土剪力墙,采用栓钉和对拉螺杆的组合剪力键,具有良好的延性和抗疲劳性能,组合剪力键加强钢板与夹层混凝土的协同工作能力,提高剪力墙的稳定性能和抗震性能。In order to overcome the above-mentioned shortcoming of the prior art, the object of the present invention is to provide a kind of arc-shaped outsourcing steel plate concrete shear wall of welded combined shear key, adopt the combined shear key of stud and tension screw rod, have good ductility and Anti-fatigue performance, the combined shear key strengthens the cooperative work ability of the steel plate and the interlayer concrete, and improves the stability and seismic performance of the shear wall.
为了实现上述目的,本发明采用的技术方案是:In order to achieve the above object, the technical scheme adopted in the present invention is:
一种焊接组合剪力键的弧形外包钢板混凝土剪力墙,包括剪力墙壳体和设置于壳体内的夹层混凝土;An arc-shaped outsourcing steel plate concrete shear wall with welded combined shear keys, comprising a shear wall shell and interlayer concrete arranged in the shell;
所述剪力墙壳体包括弧形外钢板、弧形内钢板、左侧板和右侧板;The shear wall shell includes an arc-shaped outer steel plate, an arc-shaped inner steel plate, a left side plate and a right side plate;
所述弧形外钢板内侧和弧形内钢板外侧设置有栓钉连接件,所述左侧板和右侧板内侧设置有PBL连接件,所述弧形外钢板内侧设置有对拉螺杆,所述弧形外钢板和弧形内钢板通过对拉螺杆连接成整体。The inner side of the arc-shaped outer steel plate and the outer side of the arc-shaped inner steel plate are provided with stud connectors, the inner side of the left side plate and the right side plate are provided with PBL connectors, and the inner side of the arc-shaped outer steel plate is provided with pull screws. The arc-shaped outer steel plate and the arc-shaped inner steel plate are connected as a whole by means of tension screws.
作为本发明的进一步改进,所述对拉螺杆包括高强螺杆、焊接螺母和安装螺母;所述高强螺杆的长度大于剪力墙壳体的厚度。As a further improvement of the present invention, the tension screw includes a high-strength screw, a welding nut and an installation nut; the length of the high-strength screw is greater than the thickness of the shear wall shell.
作为本发明的进一步改进,所述弧形内钢板上设置对应高强螺杆穿过的预留孔,所述预留孔孔径大于高强螺杆直径。As a further improvement of the present invention, the arc-shaped inner steel plate is provided with a reserved hole corresponding to the passage of the high-strength screw, and the diameter of the reserved hole is larger than the diameter of the high-strength screw.
作为本发明的进一步改进,所述高强螺杆一端焊接于弧形外钢板内侧,另一端穿过弧形内钢板的预留孔,焊接螺母和安装螺母分别置于弧形内钢板的内侧和外侧;As a further improvement of the present invention, one end of the high-strength screw is welded to the inner side of the arc-shaped outer steel plate, the other end passes through the reserved hole of the arc-shaped inner steel plate, and the welding nut and the mounting nut are respectively placed on the inner side and outer side of the arc-shaped inner steel plate;
或者,所述高强度螺杆两端分别焊接于弧形外钢板内侧与弧形内钢板外侧;Alternatively, the two ends of the high-strength screw are respectively welded to the inner side of the arc-shaped outer steel plate and the outer side of the arc-shaped inner steel plate;
或者所述高强度螺杆两端的螺纹部分分别穿过弧形外钢板与弧形内钢板,安装螺母设置于弧形外钢板外侧与弧形内钢板内侧。Or the threaded parts at both ends of the high-strength screw pass through the arc-shaped outer steel plate and the arc-shaped inner steel plate respectively, and the mounting nuts are arranged on the outer side of the arc-shaped outer steel plate and the inner side of the arc-shaped inner steel plate.
作为本发明的进一步改进,所述左侧板和右侧板分别焊接于弧形外钢板和弧形内钢板两侧。As a further improvement of the present invention, the left side plate and the right side plate are respectively welded to both sides of the arc-shaped outer steel plate and the arc-shaped inner steel plate.
作为本发明的进一步改进,所述PBL连接件沿剪力墙高度方向等间距布置,PBL连接件的长度取剪力墙壳体厚度的一半,且PBL连接件中心位置开有光圆孔。As a further improvement of the present invention, the PBL connectors are arranged at equal intervals along the height direction of the shear wall, the length of the PBL connectors is half the thickness of the shear wall shell, and a light circular hole is opened in the center of the PBL connectors.
作为本发明的进一步改进,所述对拉螺杆的布置方式采用正方形布置或梅花形布置,对拉螺杆布置间距与钢板厚度的比值为30-75。As a further improvement of the present invention, the arrangement of the tensioning screws adopts a square arrangement or a quincunx arrangement, and the ratio of the spacing between the tensioning screws to the thickness of the steel plate is 30-75.
作为本发明的进一步改进,所述栓钉连接件沿剪力墙的宽度方向和高度方向均与对拉螺杆相间且均匀布置。As a further improvement of the present invention, the stud connectors are alternately and evenly arranged with the tension screws along the width direction and the height direction of the shear wall.
作为本发明的进一步改进,所述栓钉连接件直径小于对拉螺杆直径,栓钉连接件高度小于剪力墙壳体厚度的一半。As a further improvement of the present invention, the diameter of the stud connector is smaller than the diameter of the pull screw, and the height of the stud connector is less than half the thickness of the shear wall shell.
一种焊接组合剪力键的弧形外包钢板混凝土剪力墙的施工方法,包括:A construction method for arc-shaped outsourcing steel plate concrete shear walls welded with combined shear keys, comprising:
将钢板卷弯成弧形外钢板和弧形内钢板,在PBL连接件中心位置开设光圆孔,将焊接螺母焊接在高强螺杆上;Bend the steel plate into an arc-shaped outer steel plate and an arc-shaped inner steel plate, open a smooth hole in the center of the PBL connector, and weld the welding nut to the high-strength screw;
在弧形外钢板内侧焊接相间均匀布置的高强螺杆,弧形内钢板上完成对应高强螺杆的预留孔的加工,在弧形外钢板内侧和弧形内钢板外侧焊接与高强螺杆相间均匀布置的栓钉,左侧板和右侧板内侧焊接沿剪力墙高度方向等间距布置的PBL连接件;The high-strength screws evenly arranged on the inner side of the arc-shaped outer steel plate are welded, and the reserved holes corresponding to the high-strength screws are processed on the arc-shaped inner steel plate. Studs, PBL connectors arranged at equal intervals along the height direction of the shear wall are welded on the inside of the left and right panels;
高强螺杆穿过弧形内钢板的预留孔并完成螺母的安装,将弧形外钢板和弧形内钢板连接成整体,左侧板和右侧板分别焊接于弧形外钢板和弧形内钢板两侧,在内外钢板间浇筑夹层混凝土。The high-strength screw goes through the reserved hole of the arc-shaped inner steel plate and completes the installation of the nut. The arc-shaped outer steel plate and the arc-shaped inner steel plate are connected as a whole. The left side plate and the right side plate are respectively welded to the arc-shaped outer steel plate and the arc-shaped inner plate. On both sides of the steel plate, interlayer concrete is poured between the inner and outer steel plates.
与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
1.施工方便1. Convenient construction
外包钢板混凝土剪力墙采用对拉螺杆连接内外钢板,增强剪力墙壳体的整体性。内外钢板在施工时可作为浇筑混凝土的模板,提高施工效率,采用栓钉和对拉螺杆的组合剪力键,替代通长焊接的加劲肋,减小焊接变形。所有组成部件均在工厂批量化生产,施工速度快,生产效率高。The external steel plate concrete shear wall adopts the pull screw to connect the inner and outer steel plates to enhance the integrity of the shear wall shell. The inner and outer steel plates can be used as templates for pouring concrete during construction to improve construction efficiency. The combined shear key of studs and tension screws is used to replace the stiffeners welded through the length to reduce welding deformation. All components are mass-produced in the factory, with fast construction speed and high production efficiency.
2.性能优越2. Superior performance
外包钢板混凝土剪力墙采用栓钉和对拉螺杆的组合剪力键,具有良好的延性和抗疲劳性能,组合剪力键能增强内外钢板与夹层混凝土的协同工作能力,同时夹层混凝土防止内外钢板失稳,钢板避免混凝土发生脆性破坏,提高剪力墙承载力和延性,增强结构整体抗震性能。与传统钢筋混凝土剪力墙相比,外包混凝土组合剪力墙具有承载能力高,抗侧刚度大,变形能力好等优点。The outer steel plate concrete shear wall adopts the combined shear key of studs and pull screws, which has good ductility and fatigue resistance. The combined shear key can enhance the cooperative work ability of the inner and outer steel plates and the sandwich concrete, and the sandwich concrete prevents the inner and outer steel plates from Instability, the steel plate avoids brittle failure of concrete, improves the bearing capacity and ductility of the shear wall, and enhances the overall seismic performance of the structure. Compared with the traditional reinforced concrete shear wall, the external concrete composite shear wall has the advantages of high bearing capacity, high lateral stiffness and good deformation capacity.
3.经济效益好3. Good economic benefits
外包钢板混凝土剪力墙充分发挥钢材和混凝土的材料性能,承载能力高,截面尺寸小,可以减小剪力墙厚度,减轻结构自重,增加建筑使用空间,具有良好的经济效益。Outsourcing steel plate concrete shear walls give full play to the material properties of steel and concrete, high bearing capacity, small cross-sectional size, can reduce the thickness of the shear wall, reduce the weight of the structure, increase the building space, and have good economic benefits.
总体来讲,外包钢板混凝土剪力墙采用栓钉和对拉螺杆的组合剪力键,具有良好的延性和抗疲劳性能,组合剪力键能增强内外钢板与夹层混凝土的协同工作能力,提升剪力墙的承载能力和变形能力,所有部件均在工厂批量化生产,显著提高施工效率,能有效解决传统钢筋混凝土剪力墙延性差、抗震性能不足和施工构造复杂等问题,可以广泛应用于高层及超高层建筑,也可拓展至其他领域,如塔架、风机塔筒等高耸结构,具有重要的工程实践意义和社会经济效益。Generally speaking, the steel plate concrete shear wall adopts the combined shear key of studs and tension screws, which has good ductility and fatigue resistance. The bearing capacity and deformation capacity of the force wall, all components are mass-produced in the factory, which significantly improves the construction efficiency, and can effectively solve the problems of poor ductility, insufficient seismic performance and complex construction structure of traditional reinforced concrete shear walls, and can be widely used in high-rise buildings And super high-rise buildings, it can also be extended to other fields, such as high-rise structures such as towers and fan towers, which have important engineering practical significance and social and economic benefits.
附图说明Description of drawings
图1是本发明的焊接组合剪力键的弧形外包钢板混凝土剪力墙的整体示意图;Fig. 1 is the overall schematic diagram of the arc-shaped outsourcing steel plate concrete shear wall of the welding combination shear key of the present invention;
图2是本发明的焊接组合剪力键的弧形外包钢板混凝土剪力墙的截面示意图;Fig. 2 is the schematic cross-sectional view of the arc-shaped outsourcing steel plate concrete shear wall of the welded combination shear key of the present invention;
图标:1-剪力墙壳体;2-夹层混凝土;3-弧形外钢板;4-弧形内钢板;5-左侧板;6-右侧板;7-栓钉连接件;8-PBL连接件;9-对拉螺杆;10-高强螺杆;11-焊接螺母;12-安装螺母;13-预留孔;14-第二种对拉螺杆;15-第三种对拉螺杆。Icons: 1-shear wall shell; 2-sandwich concrete; 3-curved outer steel plate; 4-curved inner steel plate; 5-left side plate; 6-right side plate; 7-bolt connector; 8- PBL connectors; 9- pull screw; 10- high-strength screw; 11- welding nut; 12- installation nut; 13- reserved hole; 14- the second pull screw; 15- the third pull screw.
具体实施方式detailed description
为使本申请实施例的目的、技术方案和优点更加清楚,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本申请一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本申请实施例的组件可以以各种不同的配置来布置和设计。In order to make the purposes, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments It is a part of the embodiments of this application, not all of them. The components of the embodiments of the application generally described and illustrated in the figures herein may be arranged and designed in a variety of different configurations.
因此,以下对在附图中提供的本申请的实施例的详细描述并非旨在限制要求保护的本申请的范围,而是仅仅表示本申请的选定实施例。基于本申请中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。Accordingly, the following detailed description of the embodiments of the application provided in the accompanying drawings is not intended to limit the scope of the claimed application, but merely represents selected embodiments of the application. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of this application.
应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。It should be noted that like numerals and letters denote similar items in the following figures, therefore, once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.
本申请的实施例提出一种焊接组合剪力键的弧形外包钢板混凝土剪力墙及制造方法,如图1至图2所示,包括:剪力墙壳体1和设置于壳体内的夹层混凝土2。剪力墙壳体1包括弧形外钢板3、弧形内钢板4、左侧板5和右侧板6。The embodiment of the present application proposes an arc-shaped outsourcing steel plate concrete shear wall with welded combined shear keys and its manufacturing method, as shown in Figures 1 to 2, including: a
弧形外钢板3内侧和弧形内钢板4外侧设置有栓钉连接件7,左侧板5和右侧板6内侧设置有PBL连接件8,弧形外钢板3内侧设置有对拉螺杆9,弧形外钢板3和弧形内钢板4通过对拉螺杆9连接成整体。The inner side of the arc-shaped
所述的对拉螺杆9包括高强螺杆10、焊接螺母11和安装螺母12。其中,高强螺杆10的长度大于剪力墙壳体1的厚度。弧形内钢板4需设置对应高强螺杆10的预留孔13,所述预留孔13孔径大于高强螺杆10直径。The
所述的高强螺杆10一端焊接于弧形外钢板3内侧,另一端穿过弧形内钢板2的预留孔13,焊接螺母11和安装螺母12分别置于弧形内钢板2的内侧和外侧。左侧板5和右侧板6分别焊接于弧形外钢板3和弧形内钢板4两侧。One end of the high-
所述的PBL连接件8沿剪力墙高度方向等间距布置,PBL连接件8的长度取剪力墙壳体厚度1的一半,且PBL连接件8中心位置开有光圆孔。The
所述的对拉螺杆9的布置方式可采用正方形布置或梅花形布置,对拉螺杆9布置间距与钢板厚度的比值的取值范围建议为30-75。The arrangement of the parallel pulling
所述的栓钉7沿剪力墙的宽度方向和高度方向与对拉螺杆9相间均匀布置。栓钉7直径小于对拉螺杆9直径,栓钉7高度小于剪力墙壳体厚度1的一半。The
所述高强度螺杆10,也可两端分别焊接于弧形外钢板3内侧与弧形内钢板4外侧,或两端的螺纹部分分别穿过弧形外钢板3与弧形内钢板4,安装螺母设置于弧形外钢板3外侧与弧形内钢板4内侧。The high-
所述的夹层混凝土2为自密实混凝土。The
本发明具体施工方法为:Concrete construction method of the present invention is:
1)将钢板卷弯成弧形外钢板3和弧形内钢板4,在PBL连接件8中心位置开设光圆孔,将焊接螺母11焊接在高强螺杆10上,焊接位置依据夹层混凝土2的预设置厚度确定;1) Bend the steel plate into an arc-shaped
2)在弧形外钢板3内侧焊接相间均匀布置的高强螺杆10,弧形内钢板4上完成对应高强螺杆10的预留孔13的加工,在弧形外钢板3内侧和弧形内钢板4外侧焊接与高强螺杆10相间均匀布置的栓钉7,左侧板5和右侧板6内侧焊接沿剪力墙高度方向等间距布置的PBL连接件8;2) On the inner side of the arc-shaped
3)高强螺杆10穿过弧形内钢板4的预留孔13并完成螺母12的安装,将弧形外钢板3和弧形内钢板4连接成整体,左侧板5和右侧板6分别焊接于弧形外钢板3和弧形内钢板4两侧,在内外钢板间浇筑夹层混凝土2。3) The high-
综上,本发明提出一种焊接组合剪力键的弧形外包钢板混凝土剪力墙,包括剪力墙壳体和设置于壳体内的夹层混凝土。所述剪力墙壳体由弧形内钢板,弧形外钢板,左侧板和右侧板围成。本发明采用栓钉和对拉螺杆的组合剪力键,具有良好的延性和抗疲劳性能,组合剪力键能增强内外钢板与夹层混凝土的协同工作能力,提升剪力墙的承载能力和变形能力,所有部件均在工厂批量化生产,显著提高施工效率,能有效解决传统钢筋混凝土剪力墙延性差、抗震性能不足和施工构造复杂等问题,可以广泛应用于高层及超高层建筑,也可拓展至其他领域,如塔架、风机塔筒等高耸结构,具有重要的工程实践意义和社会经济效益。To sum up, the present invention proposes an arc-shaped outer-clad steel plate concrete shear wall with welded combined shear keys, which includes a shear wall shell and interlayer concrete arranged in the shell. The shear wall shell is surrounded by an arc-shaped inner steel plate, an arc-shaped outer steel plate, a left side plate and a right side plate. The present invention adopts the combined shear key of stud and pull screw, which has good ductility and anti-fatigue performance. The combined shear key can enhance the cooperative working ability of inner and outer steel plates and interlayer concrete, and improve the bearing capacity and deformation capacity of the shear wall , all components are mass-produced in the factory, which significantly improves construction efficiency and can effectively solve the problems of poor ductility, insufficient seismic performance and complex construction structures of traditional reinforced concrete shear walls. It can be widely used in high-rise and super high-rise buildings, and can also be expanded It has important engineering practical significance and social and economic benefits.
以上仅为本申请的优选实施例而已,并不用于限制本申请,对于本领域的技术人员来说,本申请可以有各种更改和变化。凡在本申请的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本申请的保护范围之内。The above are only preferred embodiments of the present application, and are not intended to limit the present application. For those skilled in the art, there may be various modifications and changes in the present application. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of this application shall be included within the protection scope of this application.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211196021.6A CN115573484A (en) | 2022-09-27 | 2022-09-27 | Arc-shaped steel plate-wrapped concrete shear wall with welded combined shear keys |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211196021.6A CN115573484A (en) | 2022-09-27 | 2022-09-27 | Arc-shaped steel plate-wrapped concrete shear wall with welded combined shear keys |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN115573484A true CN115573484A (en) | 2023-01-06 |
Family
ID=84582368
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211196021.6A Pending CN115573484A (en) | 2022-09-27 | 2022-09-27 | Arc-shaped steel plate-wrapped concrete shear wall with welded combined shear keys |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115573484A (en) |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20130044855A (en) * | 2011-10-25 | 2013-05-03 | 한국철도기술연구원 | Precast panel, wall structure using such precast panel, and constructing method thereof |
| KR101338890B1 (en) * | 2012-08-28 | 2013-12-09 | 경희대학교 산학협력단 | Wall system with frame pannel and method for fabricating and constructing the wall system |
| CN108560823A (en) * | 2018-03-28 | 2018-09-21 | 攀枝花学院 | PBL puts more energy into type open steel box-concrete combination beam and construction method |
| CN109235702A (en) * | 2018-10-19 | 2019-01-18 | 刘凯 | A kind of assembled double steel plate combined shear wall construction and its construction method with ribbing |
| CN109898706A (en) * | 2019-03-28 | 2019-06-18 | 中冶赛迪工程技术股份有限公司 | A kind of steel plate combined shear wall and its construction method of built-in Screw arbor with nut at both-ends |
| CN209760597U (en) * | 2019-02-15 | 2019-12-10 | 姚攀峰 | Precast concrete shear connector and self-supporting precast member thereof |
-
2022
- 2022-09-27 CN CN202211196021.6A patent/CN115573484A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20130044855A (en) * | 2011-10-25 | 2013-05-03 | 한국철도기술연구원 | Precast panel, wall structure using such precast panel, and constructing method thereof |
| KR101338890B1 (en) * | 2012-08-28 | 2013-12-09 | 경희대학교 산학협력단 | Wall system with frame pannel and method for fabricating and constructing the wall system |
| CN108560823A (en) * | 2018-03-28 | 2018-09-21 | 攀枝花学院 | PBL puts more energy into type open steel box-concrete combination beam and construction method |
| CN109235702A (en) * | 2018-10-19 | 2019-01-18 | 刘凯 | A kind of assembled double steel plate combined shear wall construction and its construction method with ribbing |
| CN209760597U (en) * | 2019-02-15 | 2019-12-10 | 姚攀峰 | Precast concrete shear connector and self-supporting precast member thereof |
| CN109898706A (en) * | 2019-03-28 | 2019-06-18 | 中冶赛迪工程技术股份有限公司 | A kind of steel plate combined shear wall and its construction method of built-in Screw arbor with nut at both-ends |
Non-Patent Citations (2)
| Title |
|---|
| 刘阳冰;杨庆年;刘晶波;廖元鑫;: "双钢板-混凝土剪力墙轴心受压性能试验研究", 四川大学学报(工程科学版), no. 02, 31 March 2016 (2016-03-31), pages 83 - 90 * |
| 赵春风等: ""弧形双钢板混凝土组合板抗爆性能数值研究*"", 《爆炸与冲击》, vol. 42, no. 2, 5 February 2022 (2022-02-05), pages 1 - 14 * |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102444224A (en) | Concrete Composite Shear Wall | |
| CN105544865B (en) | Prestress assembly type combined special-shaped column | |
| CN102505781A (en) | Energy dissipating and shock absorbing system having dense reinforcement structure | |
| CN108532794B (en) | An Assembled Steel Tube Concrete Diagonal Brace Steel Plate Shear Wall | |
| CN106869567A (en) | A kind of energy-dissipating type cold-formed thin-walled steel pipe concrete Lateral Resistant System | |
| CN105780967A (en) | Web waveform rib tie force riffled plate concrete composite prefabricated wall | |
| CN201539029U (en) | A corrugated steel plate shear wall | |
| CN111456235A (en) | Bolt connection joint of square steel tube concrete column-steel beam outer ring casing plate | |
| CN205399824U (en) | Prestress assembly type combined special-shaped column | |
| CN218562664U (en) | Assembled profiled steel sheet-concrete shear force wall | |
| CN114687479B (en) | Built-in batten type lattice column type double-steel-plate shear wall with wall-beam node domain | |
| CN204174839U (en) | Honeycomb connecting steel plate-double-limb steel pipe concrete combined column | |
| CN215977847U (en) | Steel pipe shear wall | |
| CN108547396B (en) | Prefabricated truss light steel frame-reinforced mesh-foamed concrete composite wall | |
| CN115573484A (en) | Arc-shaped steel plate-wrapped concrete shear wall with welded combined shear keys | |
| CN115492283A (en) | A curved double steel plate-concrete shear wall and its manufacturing method | |
| CN109914656B (en) | Thin-wall steel plate PEC combined shear wall structure with PBL shear keys | |
| CN2747302Y (en) | Stee skeleton-pipe concrete column | |
| CN209837402U (en) | Thin-wall steel plate PEC combined shear wall structure with PBL shear keys | |
| CN114687478B (en) | A built-in lattice column double steel plate shear wall with shear wall-beam joint areas | |
| CN205637234U (en) | Compound prefabricated wall of web wave form muscle drawknot checkered steel plate concrete | |
| CN204098355U (en) | H-shaped section combined column with honeycomb steel web-steel pipe concrete flange | |
| CN215978060U (en) | Steel pipe column | |
| CN204401829U (en) | RPC compound shear wall is filled out in a kind of encased steel plate | |
| CN209874152U (en) | A cold-formed thick-walled steel frame-buckling-restrained slotted steel plate shear wall system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |