- CN115559505B CN115559505B CN202211455463.8A CN202211455463A CN115559505B CN 115559505 B CN115559505 B CN 115559505B CN 202211455463 A CN202211455463 A CN 202211455463A CN 115559505 B CN115559505 B CN 115559505B
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- bottom plate
- rod
- sliding
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G1/152—Platforms made of metal or with metal-supporting frame
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/18—Scaffolds primarily resting on the ground adjustable in height
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Movable Scaffolding (AREA)
Abstract
本发明涉及建筑施工设备技术领域,具体的说是一种活动板房施工用脚手架,包括支撑架,所述支撑架的顶侧固定连接有台板,所述支撑架的底侧连接有移动结构,所述移动结构内部设有定位结构,所述台板上安装有抬升结构,所述抬升结构连接有翻转结构,所述支撑架的侧面安装有输送结构,所述输送结构与移动结构之间连接有驱动结构;通过所述抬升结构可以方进一步对脚手架的可用高度进行增加,通过翻转结构可以方便施工人员对工具或者小零件进行放置和取用,通过输送结构可以方便向施工人员进行建筑板材等的传递,通过驱动结构可以省力的进行物料传递。
The invention relates to the technical field of building construction equipment, in particular to a scaffold for the construction of a prefabricated house, including a support frame, the top side of the support frame is fixedly connected with a platform, and the bottom side of the support frame is connected with a mobile structure , the inside of the mobile structure is provided with a positioning structure, a lifting structure is installed on the platen, the lifting structure is connected with a flipping structure, a conveying structure is installed on the side of the support frame, and the distance between the conveying structure and the moving structure is It is connected with a driving structure; through the lifting structure, the usable height of the scaffold can be further increased; by turning over the structure, it is convenient for construction workers to place and take tools or small parts; Etc., through the drive structure can save effort for material transfer.
Description
技术领域technical field
本发明涉及建筑施工设备技术领域,具体的说是一种活动板房施工用脚手架。The invention relates to the technical field of building construction equipment, in particular to a scaffold for the construction of a prefab house.
背景技术Background technique
脚手架是为了保证各施工过程顺利进行而搭设的工作平台,按搭设的位置分为外脚手架、里脚手架;按材料不同可分为木脚手架、竹脚手架、钢管脚手架;按构造形式分为立杆式脚手架、桥式脚手架、门式脚手架、悬吊式脚手架、挂式脚手架、挑式脚手架、爬式脚手架,能够帮助施工人员更好的进行施工建设;对于不同的施工场景,需要使用到的脚手架类型也不尽相同。Scaffolding is a work platform set up to ensure the smooth progress of each construction process. It can be divided into outer scaffolding and inner scaffolding according to the erection position; it can be divided into wooden scaffolding, bamboo scaffolding, and steel pipe scaffolding according to different materials; it can be divided into vertical pole type according to the structure. Scaffolding, bridge scaffolding, portal scaffolding, suspended scaffolding, hanging scaffolding, picking scaffolding, and climbing scaffolding can help construction workers better carry out construction; for different construction scenarios, the types of scaffolding that need to be used Not all are the same.
然而,在进行活动板房这类较为低矮的建筑进行施工时,传统的脚手架可能存在搭建复杂或者结构单一的缺点,活动板房需要使用的建材通常具有体积大,重量相对较轻的特点,传统的脚手架由于可站立面积小,使得施工人员在进行建材的传递时较为麻烦,并且不方便施工人员进行器材工具的取用和存放,同时传统的脚手架虽然可以通过加装滑轮的方式提升灵活性,同时也使得整体稳定性可能降低。However, when constructing relatively low buildings such as prefabricated houses, traditional scaffolding may have the disadvantages of complex construction or single structure. The building materials required for prefabricated houses are usually large in size and relatively light in weight. Due to the small standing area of traditional scaffolding, it is troublesome for construction workers to transfer building materials, and it is inconvenient for construction workers to take and store equipment and tools. At the same time, traditional scaffolding can improve flexibility by adding pulleys. , but also makes the overall stability may decrease.
发明内容Contents of the invention
针对现有技术中的问题,本发明提供了一种活动板房施工用脚手架。Aiming at the problems in the prior art, the invention provides a scaffold for the construction of a prefabricated house.
本发明解决其技术问题所采用的技术方案是:一种活动板房施工用脚手架,包括支撑架,所述支撑架的顶侧固定连接有台板,所述支撑架的底侧连接有移动结构,所述移动结构内部设有定位结构,所述台板上安装有抬升结构,所述抬升结构连接有翻转结构,所述支撑架的侧面安装有输送结构,所述输送结构与移动结构之间连接有驱动结构。The technical solution adopted by the present invention to solve the technical problem is: a scaffolding for the construction of a prefabricated house, including a support frame, the top side of the support frame is fixedly connected with a platform, and the bottom side of the support frame is connected with a mobile structure , the inside of the moving structure is provided with a positioning structure, a lifting structure is installed on the platen, the lifting structure is connected with a flipping structure, a conveying structure is installed on the side of the support frame, and the distance between the conveying structure and the moving structure A driving structure is connected.
具体的,所述移动结构包括第一底板,所述支撑架的两侧呈“八”字形排列,所述支撑架的底侧固定连接有第一底板,所述第一底板的底侧固定连接有支撑脚,所述第一底板的底侧滑动连接有第二底板,所述第二底板的底侧安装有万向轮,所述第二底板上开设有转换槽,所述支撑脚通过转换槽贯穿第二底板。Specifically, the moving structure includes a first bottom plate, the two sides of the support frame are arranged in a “eight” shape, the bottom side of the support frame is fixedly connected with the first bottom plate, and the bottom side of the first bottom plate is fixedly connected There are support feet, the bottom side of the first bottom plate is slidably connected with a second bottom plate, universal wheels are installed on the bottom side of the second bottom plate, a conversion slot is opened on the second bottom plate, and the support legs pass through the conversion The groove runs through the second bottom plate.
具体的,所述第一底板侧面转动连接有丝杆,所述丝杆上螺纹连接有斜面块,所述斜面块的底侧滑动连接有顶起块,所述斜面块与顶起块的侧面均与第一底板的内侧滑动连接,所述顶起块的底侧固定于第二底板。Specifically, the side of the first bottom plate is rotatably connected with a screw rod, the screw rod is screwed with an inclined block, the bottom side of the inclined block is slidably connected with a jacking block, and the inclined block and the side surface of the jacking block Both are slidingly connected to the inner side of the first bottom plate, and the bottom side of the jacking block is fixed to the second bottom plate.
具体的,所述定位结构包括螺纹环,所述支撑脚上转动连接有螺纹环,所述支撑脚的内侧滑动连接有螺纹支撑杆,所述螺纹支撑杆的侧面与螺纹环的内侧螺纹连接,所述螺纹支撑杆的端部固定连接有脚垫。Specifically, the positioning structure includes a threaded ring, the supporting foot is rotatably connected with a threaded ring, the inner side of the supporting foot is slidably connected with a threaded support rod, the side of the threaded support rod is threaded with the inner side of the threaded ring, The end of the threaded support rod is fixedly connected with a foot pad.
具体的,所述抬升结构包括承载框,所述台板中部设有承载框,所述承载框的两端分别垂直固定连接有抬升滑杆,所述抬升滑杆的侧面开设有第一定位槽,所述台板的内侧滑动连接有滑动套,所述滑动套的侧面固定连接有卡合板,所述卡合板通过第一定位槽与抬升滑杆相卡合,所述抬升滑杆的底端抵触有复位架,所述复位架的两侧与支撑架之间固定连接。Specifically, the lifting structure includes a bearing frame, the middle part of the table is provided with a bearing frame, the two ends of the bearing frame are vertically fixedly connected with lifting sliders, and the side of the lifting slider is provided with a first positioning groove , the inner side of the platen is slidably connected with a sliding sleeve, and the side of the sliding sleeve is fixedly connected with a locking plate, and the locking plate is engaged with the lifting sliding rod through the first positioning groove, and the bottom end of the lifting sliding rod There is a reset frame in the collision, and the two sides of the reset frame are fixedly connected with the support frame.
具体的,所述滑动套的一端与台板之间固定连接有第一弹簧,所述滑动套的内侧转动连接有控制杆,所述控制杆呈“L”形结构,所述台板上开设有嵌合槽,所述嵌合槽呈“F”型结构,所述控制杆端部设于嵌合槽内部。Specifically, a first spring is fixedly connected between one end of the sliding sleeve and the platen, and a control rod is rotatably connected to the inner side of the sliding sleeve, and the control rod is in an “L” shape. There is a fitting groove, the fitting groove has an "F" shape structure, and the end of the control rod is arranged inside the fitting groove.
具体的,所述翻转结构包括翻转盒,所述承载框的中部设有翻转盒,所述翻转盒的两端固定连接有转轴,所述转轴的侧面转动连接有限位杆,所述限位杆与承载框之间滑动连接,所述转轴的端部固定连接有滑动卡块,所述承载框上开设有卡槽,所述滑动卡块通过卡槽与承载框滑动连接,所述翻转盒的内侧固定连接有呈“十”字形的隔板。Specifically, the overturning structure includes an overturning box, the middle part of the bearing frame is provided with an overturning box, the two ends of the overturning box are fixedly connected with a rotating shaft, and the side of the rotating shaft is connected with a stop rod, and the stop bar Slidingly connected with the bearing frame, the end of the rotating shaft is fixedly connected with a sliding block, and a slot is opened on the bearing frame, and the sliding block is slidably connected with the carrying frame through the slot, and the flip box The inner side is fixedly connected with a partition in the shape of a "ten".
具体的,所述输送结构包括滑轨,所述台板的底侧固定连接有两个滑轨,两个所述滑轨互相平行设置,所述滑轨之间滑动连接有升降座,所述升降座的中部固定连接有牵引绳,所述台板的底侧固定连接有定滑轮,所述牵引绳的端部贯穿定滑轮,所述升降座上设有放置杆。Specifically, the conveying structure includes slide rails, two slide rails are fixedly connected to the bottom side of the table, and the two slide rails are arranged parallel to each other, and a lifting seat is slidingly connected between the slide rails, and the The middle part of the lifting seat is fixedly connected with a traction rope, and the bottom side of the platform is fixedly connected with a fixed pulley, and the end of the traction rope runs through the fixed pulley, and the lifting seat is provided with a placement rod.
具体的,所述升降座的两端分别滑动连接有一个放置杆,两个所述放置杆之间互相平行设置,所述放置杆的端部垂直固定连接有挡板,所述第一底板内侧开设有两个收纳孔,且两个所述收纳孔之间的距离等于两个放置杆之间的距离。Specifically, two ends of the lifting seat are slidingly connected with a placing rod respectively, and the two placing rods are arranged parallel to each other, and the end of the placing rod is vertically fixedly connected with a baffle, and the inner side of the first bottom plate There are two storage holes, and the distance between the two storage holes is equal to the distance between the two placing rods.
具体的,所述放置杆的内侧开设有第二定位槽,两个放置杆之间设有调节杆,所述调节杆的端部固定连接有抵触块,所述抵触块的底侧滑动连接有滑套,且所述抵触块与滑套之间固定连接有第二弹簧,所述滑套与放置杆之间滑动连接。Specifically, a second positioning groove is provided on the inner side of the placement rod, and an adjustment rod is provided between the two placement rods. a sliding sleeve, and a second spring is fixedly connected between the collision block and the sliding sleeve, and the sliding sleeve is slidably connected to the placement rod.
具体的,所述驱动结构包括卷收辊,所述第一底板上转动连接有卷收辊,所述卷收辊的侧面与牵引绳的一端固定连接,所述卷收辊的一端固定连接有摇杆,所述摇杆与第一底板之间转动连接,所述摇杆上固定连接有棘轮,所述第一底板的内侧滑动连接有安装套,所述安装套内侧滑动连接有卡齿,所述卡齿与安装套之间固定连接有第三弹簧,所述卡齿的端部与棘轮相啮合,所述安装套的顶端转动连接有调节螺杆,所述调节螺杆与第一底板之间转动连接。Specifically, the drive structure includes a take-up roller, a take-up roller is rotatably connected to the first bottom plate, the side of the take-up roller is fixedly connected to one end of the traction rope, and one end of the take-up roller is fixedly connected to a Rocker, the rocker is rotationally connected with the first bottom plate, the rocker is fixedly connected with a ratchet, the inner side of the first bottom plate is slidably connected with a mounting sleeve, and the inner side of the installation sleeve is slidably connected with locking teeth, A third spring is fixedly connected between the bayonet and the installation sleeve, the end of the bayonet meshes with the ratchet, and the top of the installation sleeve is rotatably connected with an adjustment screw, and the adjustment screw is connected to the first bottom plate. Turn to connect.
本发明的有益效果是:The beneficial effects of the present invention are:
(1)本发明所述的一种活动板房施工用脚手架,所述支撑架的底侧连接有移动结构,所述移动结构内部设有定位结构,通过移动结构可以根据需要对脚手架整体进行移动或者固定,同时保证自身的稳定性,通过定位结构可以提升脚手架整体的稳定性,提升使用时的安全性;即:首先,为了方便施工人员对脚手架进行移动,位于第二底板的底侧安装有万向轮,当需要通过万向轮对脚手架进行移动时,转动位于第一底板侧面的丝杆,使得斜面块在第一底板的内侧发生水平方向的移动,由于斜面块与顶起块之间的斜面作用,使得第一底板以及第一底板顶侧的部分被向顶侧抬升,此时第一底板底侧的支撑脚离开地面,同时脚手架整体由第二底板底侧的万向轮进行支撑,此时施工人员即可通过万向轮对脚手架进行移动,方便脚手架的部署,由于建筑工地的地面可能存在坑洼的现象,如果第一底板底侧的支撑脚难以对脚手架整体进行平稳支撑,使用者可以在第一底板抬起的同时,转动位于支撑脚侧面的螺纹环,螺纹环转动时会带动内侧的螺纹支撑杆进行纵向的移动,从而方便使用者根据脚手架放置的位置进行各个支撑脚支撑高度的调整,保证脚手架整体的平稳放置,保障施工人员的安全。(1) A scaffold for the construction of a prefabricated house according to the present invention, the bottom side of the support frame is connected with a moving structure, and a positioning structure is provided inside the moving structure, and the whole scaffold can be moved as required through the moving structure Or fixed, while ensuring its own stability, the overall stability of the scaffold can be improved through the positioning structure, and the safety during use can be improved; that is: first, in order to facilitate the construction personnel to move the scaffold, a Universal wheels, when it is necessary to move the scaffold through the universal wheels, turn the screw on the side of the first bottom plate, so that the inclined block moves horizontally on the inner side of the first bottom plate, due to the gap between the inclined block and the jacking block The action of the slope makes the first bottom plate and the top side of the first bottom plate lifted to the top side. At this time, the supporting feet on the bottom side of the first bottom plate leave the ground, and the whole scaffold is supported by the universal wheels on the bottom side of the second bottom plate. At this time, the construction personnel can move the scaffold through the universal wheels to facilitate the deployment of the scaffold. Since there may be potholes on the ground of the construction site, if the supporting feet on the bottom side of the first base plate are difficult to support the scaffold as a whole, The user can rotate the threaded ring located on the side of the support leg while the first bottom plate is lifted, and the threaded ring will drive the inner threaded support rod to move longitudinally when the threaded ring rotates, so that the user can adjust each support leg according to the position of the scaffolding. The adjustment of the support height ensures the stable placement of the overall scaffolding and the safety of the construction personnel.
(2)本发明所述的一种活动板房施工用脚手架,所述台板上安装有抬升结构,所述抬升结构连接有翻转结构,通过所述抬升结构可以方进一步对脚手架的可用高度进行增加,方便不同的施工环境进行操作,通过翻转结构可以方便施工人员对工具或者小零件进行放置和取用;即:在实际施工操作时,可能会出现现有脚手架的高度不满足需求的情况,此时使用者可以转动位于台板两侧的两个控制杆,而后将控制杆嵌入嵌合槽的端的“L”型槽中,此时所述滑动套侧面的卡合板与抬升滑杆上的第一定位槽错开,使用者即可将承载框由台板处提起,当提起承载框至适当高度后,分别将两只控制杆复位,此时卡合板重新与抬升滑杆对齐,并嵌入相应高度的第一定位槽中,实现对此时承载框高度的固定,此时施工人员即可通过承载框进行更高处位置的工作,而在无需抬升高度时,抬升滑杆由底侧的复位架进行支撑,同时复位架还可以提升支撑架整体的稳定性,在进行施工的过程中,施工人员往往会用到一些工具以及小零件,为了方便进行取用,使用者可以首先将承载框抬升至适当的高度,而后将承载框中部的翻转盒抬起,此时转轴端部的滑动卡块脱离卡槽,将翻转盒翻转180°,而后重新将翻转盒置入承载框内部,使用者即可通过完成翻转的翻转盒进行零件以及工具的放置,避免发生掉落,同时翻转盒内侧设置的隔板在起到对放置物进行分类存放的同时,在通过翻转盒进行施工人员承载的同时也能加强翻转盒的强度。(2) A scaffolding for the construction of a prefabricated house according to the present invention, a lifting structure is installed on the platform, and the lifting structure is connected with an overturning structure, and the usable height of the scaffold can be further improved through the lifting structure. It is convenient to operate in different construction environments. By flipping the structure, it is convenient for construction workers to place and take tools or small parts; that is, in actual construction operations, the height of existing scaffolding may not meet the requirements. At this time, the user can rotate the two control levers located on both sides of the platen, and then insert the control levers into the "L" groove at the end of the fitting groove. When the first positioning slot is staggered, the user can lift the load-bearing frame from the platen. When the load-bearing frame is lifted to an appropriate height, the two control levers are respectively reset. In the first positioning groove of the height, the height of the bearing frame is fixed at this time. At this time, the construction personnel can work at a higher position through the bearing frame. When there is no need to raise the height, the lifting slide bar is reset from the bottom side At the same time, the reset frame can also improve the overall stability of the support frame. During the construction process, construction personnel often use some tools and small parts. In order to facilitate access, the user can first lift the bearing frame to an appropriate height, and then lift the flip box in the middle of the bearing frame. At this time, the sliding block at the end of the shaft breaks away from the slot, flip the flip box 180°, and then put the flip box inside the load frame again. Parts and tools can be placed through the overturned overturning box to avoid falling. At the same time, the partition set inside the overturning box can classify and store the placed objects, and carry the construction personnel through the overturning box. It can strengthen the strength of the turning box.
(3)本发明所述的一种活动板房施工用脚手架,所述支撑架的侧面安装有输送结构,所述输送结构与移动结构之间连接有驱动结构,通过输送结构可以方便向施工人员进行建筑板材等的传递,提升工作效率,通过驱动结构可以省力的进行物料的传递,同时可以对物料的悬吊高度进行固定,方便材料的取用;即:由于脚手架顶端的空间有限,使用者可以通过侧面设置的升降座进行板材等建筑材料的抬升,当进行板材的传递时,为了防止板材在运输过程中发生滑动,使用者可以按压两只放置杆之间的调节杆,使得调节杆脱离第二定位槽顶侧的齿状部分,同时滑动调节杆至适当位置,保证板材的底端部分可以被抵触块的杆状部分所阻挡,配合放置杆端部的挡板避免滑落,而后释放调节杆,在第二弹簧的推动下,此时调节杆重新与第二定位槽顶侧的齿状部分卡合,保证运输过程中抵触块的位置保持不变,完成板材的放置后,通过穿过定滑轮的牵引绳即可在地面向位于脚手架上的施工人员进行材料的传递,而在不使用时,为了避免对操作造成影响,使用者可以将升降座降至第一底板侧面,即可将放置杆滑入收纳孔内,为了使得使用者较为省力地通过牵引绳完成物料地抬升,牵引绳地另一端固定于卷收辊,同时卷收辊通过摇杆进行驱动,从而达到省力地对牵引绳进行卷收地效果,同时摇杆上固定有棘轮,当使用者转动调节螺杆推动安装套使得卡齿与棘轮发生啮合时,此时摇杆进行进行单向地转动,放置卷收辊发生回滚地同时,当升降座升至顶部时也可以对位置进行固定,方便施工人员进行取用,同时反向转动调节螺杆即可解除卡齿与棘轮地啮合,方便对升降座地高度进行下降。(3) A scaffolding for the construction of a prefabricated house according to the present invention, a conveying structure is installed on the side of the supporting frame, and a driving structure is connected between the conveying structure and the moving structure. Carry out the transfer of building boards, etc. to improve work efficiency, and the material can be transferred through the driving structure in a labor-saving manner. At the same time, the suspension height of the material can be fixed to facilitate the access of the material; that is: due to the limited space at the top of the scaffold, the user The lifting seat on the side can be used to lift building materials such as boards. When transferring boards, in order to prevent the boards from slipping during transportation, the user can press the adjustment rod between the two placing rods to make the adjustment rod disengage. The tooth-shaped part on the top side of the second positioning groove, slide the adjustment rod to the appropriate position at the same time, ensure that the bottom part of the plate can be blocked by the rod-shaped part of the collision block, cooperate with the baffle at the end of the rod to prevent slipping, and then release the adjustment Under the push of the second spring, the adjustment rod engages with the tooth-shaped part on the top side of the second positioning groove again to ensure that the position of the collision block remains unchanged during transportation. After the plate is placed, pass through The traction rope of the fixed pulley can transfer the material to the construction personnel on the scaffold on the ground, and when not in use, in order to avoid affecting the operation, the user can lower the lifting seat to the side of the first bottom plate, and then the The placement rod slides into the storage hole. In order to allow the user to lift the material through the traction rope with less effort, the other end of the traction rope is fixed to the take-up roller, and the take-up roller is driven by the rocker, so as to achieve labor-saving traction. At the same time, the ratchet is fixed on the rocker. When the user turns the adjusting screw to push the installation sleeve to make the teeth mesh with the ratchet, the rocker rotates unidirectionally at this time, and the winding roller is placed back. At the same time of rolling, when the lifting seat rises to the top, the position can also be fixed, which is convenient for construction personnel to access. At the same time, the reverse rotation of the adjusting screw can release the engagement of the locking teeth and the ratchet, which is convenient for lowering the height of the lifting seat.
附图说明Description of drawings
下面结合附图和实施例对本发明进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
图1为本发明提供的一种活动板房施工用脚手架的一种较佳实施例的整体结构的结构示意图;Fig. 1 is the structural representation of the overall structure of a kind of preferred embodiment of the scaffolding of a kind of prefabricated house construction provided by the present invention;
图2为图1所示的支撑架与台板的连接结构示意图;Fig. 2 is a schematic diagram of the connection structure between the support frame and the platen shown in Fig. 1;
图3为图2所示的第一底板和顶起块的连接结构示意图;Fig. 3 is a schematic diagram of the connecting structure of the first bottom plate and jacking block shown in Fig. 2;
图4为图2所示的支撑脚的结构示意图;Fig. 4 is a structural schematic diagram of the supporting foot shown in Fig. 2;
图5为图2所示的台板和翻转盒的连接结构示意图;Fig. 5 is a schematic diagram of the connection structure of the platen and the turnover box shown in Fig. 2;
图6为图5所示的A部放大结构示意图;Fig. 6 is a schematic diagram of the enlarged structure of part A shown in Fig. 5;
图7为图5所示的翻转盒和承载框的连接结构示意图;Fig. 7 is a schematic diagram of the connection structure between the flip box and the bearing frame shown in Fig. 5;
图8为图1所示的台板的结构示意图,Fig. 8 is a schematic structural diagram of the platen shown in Fig. 1,
图9为图8所示的牵引绳的结构示意图,Fig. 9 is a structural schematic diagram of the traction rope shown in Fig. 8,
图10为图9所示的第一底板和摇杆的连接结构示意图,Fig. 10 is a schematic diagram of the connection structure between the first bottom plate and the rocker shown in Fig. 9,
图11为图8所示的牵引绳和升降座的连接结构示意图,Fig. 11 is a schematic diagram of the connection structure of the traction rope and the lifting seat shown in Fig. 8,
图12为图11所示的放置杆的结构示意图。FIG. 12 is a schematic structural view of the placement rod shown in FIG. 11 .
图中:1、支撑架;2、台板;3、移动结构;301、第一底板;302、支撑脚;303、第二底板;304、万向轮;305、顶起块;306、斜面块;307、丝杆;4、抬升结构;401、复位架;402、抬升滑杆;403、第一定位槽;404、控制杆;405、滑动套;406、第一弹簧;407、卡合板;408、嵌合槽;409、承载框;5、翻转结构;501、翻转盒;502、隔板;503、转轴;504、限位杆;505、滑动卡块;506、卡槽;6、输送结构;601、挡板;602、牵引绳;603、定滑轮;604、滑轨;605、升降座;606、放置杆;607、第二定位槽;608、调节杆;609、抵触块;610、第二弹簧;611、滑套;612、收纳孔;7、驱动结构;701、卷收辊;702、摇杆;703、棘轮;704、卡齿;705、安装套;706、第三弹簧;707、调节螺杆;8、定位结构;801、螺纹环;802、螺纹支撑杆;803、脚垫。In the figure: 1, support frame; 2, platform; 3, mobile structure; 301, first base plate; 302, support foot; 303, second base plate; 304, universal wheel; 305, jacking block; 306, slope Block; 307, screw mandrel; 4, lifting structure; 401, reset frame; 402, lifting slide bar; 403, first positioning groove; 404, control rod; 405, sliding sleeve; 406, first spring; 407, snap plate ; 408, fitting groove; 409, bearing frame; 5, overturning structure; 501, overturning box; 502, clapboard; 503, rotating shaft; 504, limit rod; Conveying structure; 601, baffle; 602, traction rope; 603, fixed pulley; 604, slide rail; 605, lifting seat; 606, placing rod; 607, second positioning slot; 608, adjusting rod; 610, second spring; 611, sliding sleeve; 612, storage hole; 7, driving structure; 701, retracting roller; 702, rocker; 703, ratchet; Spring; 707, adjusting screw rod; 8, positioning structure; 801, thread ring; 802, thread support rod; 803, foot pad.
具体实施方式Detailed ways
为了使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施方式,进一步阐述本发明。In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific embodiments.
如图1-图12所示,本发明所述的一种活动板房施工用脚手架,包括支撑架1,所述支撑架1的顶侧固定连接有台板2,所述支撑架1的底侧连接有移动结构3,所述移动结构3内部设有定位结构8,所述台板2上安装有抬升结构4,所述抬升结构4连接有翻转结构5,所述支撑架1的侧面安装有输送结构6,所述输送结构6与移动结构3之间连接有驱动结构7。As shown in Fig. 1-Fig. 12, a scaffolding for the construction of a prefabricated house according to the present invention includes a
具体的,所述移动结构3包括第一底板301,所述支撑架1的两侧呈“八”字形排列,所述支撑架1的底侧固定连接有第一底板301,所述第一底板301的底侧固定连接有支撑脚302,所述第一底板301的底侧滑动连接有第二底板303,所述第二底板303的底侧安装有万向轮304,所述第二底板303上开设有转换槽,所述支撑脚302通过转换槽贯穿第二底板303,所述第一底板301侧面转动连接有丝杆307,所述丝杆307上螺纹连接有斜面块306,所述斜面块306的底侧滑动连接有顶起块305,所述斜面块306与顶起块305的侧面均与第一底板301的内侧滑动连接,所述顶起块305的底侧固定于第二底板303;通过移动结构3可以根据需要对脚手架整体进行移动或者固定,同时保证自身的稳定性,即:首先,为了方便施工人员对脚手架进行移动,位于第二底板303的底侧安装有万向轮304,当需要通过万向轮304对脚手架进行移动时,转动位于第一底板301侧面的丝杆307,使得斜面块306在第一底板301的内侧发生水平方向的移动,由于斜面块306与顶起块305之间的斜面作用,使得第一底板301以及第一底板301顶侧的部分被向顶侧抬升,此时第一底板301底侧的支撑脚302离开地面,同时脚手架整体由第二底板303底侧的万向轮304进行支撑,此时施工人员即可通过万向轮304对脚手架进行移动,方便脚手架的部署。Specifically, the
具体的,所述定位结构8包括螺纹环801,所述支撑脚302上转动连接有螺纹环801,所述支撑脚302的内侧滑动连接有螺纹支撑杆802,所述螺纹支撑杆802的侧面与螺纹环801的内侧螺纹连接,所述螺纹支撑杆802的端部固定连接有脚垫803;通过定位结构8可以提升脚手架整体的稳定性,提升使用时的安全性,即:由于建筑工地的地面可能存在坑洼的现象,如果第一底板301底侧的支撑脚302难以对脚手架整体进行平稳支撑,使用者可以在第一底板301抬起的同时,转动位于支撑脚302侧面的螺纹环801,螺纹环801转动时会带动内侧的螺纹支撑杆802进行纵向的移动,从而方便使用者根据脚手架放置的位置进行各个支撑脚302支撑高度的调整,保证脚手架整体的平稳放置,保障施工人员的安全。Specifically, the
具体的,所述抬升结构4包括承载框409,所述台板2中部设有承载框409,所述承载框409的两端分别垂直固定连接有抬升滑杆402,所述抬升滑杆402的侧面开设有第一定位槽403,所述台板2的内侧滑动连接有滑动套405,所述滑动套405的侧面固定连接有卡合板407,所述卡合板407通过第一定位槽403与抬升滑杆402相卡合,所述抬升滑杆402的底端抵触有复位架401,所述复位架401的两侧与支撑架1之间固定连接,所述滑动套405的一端与台板2之间固定连接有第一弹簧406,所述滑动套405的内侧转动连接有控制杆404,所述控制杆404呈“L”形结构,所述台板2上开设有嵌合槽408,所述嵌合槽408呈“F”型结构,所述控制杆404端部设于嵌合槽408内部;通过所述抬升结构4可以方进一步对脚手架的可用高度进行增加,方便不同的施工环境进行操作,即:在实际施工操作时,可能会出现现有脚手架的高度不满足需求的情况,此时使用者可以转动位于台板2两侧的两个控制杆404,而后将控制杆404嵌入嵌合槽408的端的“L”型槽中,此时所述滑动套405侧面的卡合板407与抬升滑杆402上的第一定位槽403错开,使用者即可将承载框409由台板2处提起,当提起承载框409至适当高度后,分别将两只控制杆404复位,此时卡合板407重新与抬升滑杆402对齐,并嵌入相应高度的第一定位槽403中,实现对此时承载框409高度的固定,此时施工人员即可通过承载框409进行更高处位置的工作,而在无需抬升高度时,抬升滑杆402由底侧的复位架401进行支撑,同时复位架401还可以提升支撑架1整体的稳定性。Specifically, the lifting
具体的,所述翻转结构5包括翻转盒501,所述承载框409的中部设有翻转盒501,所述翻转盒501的两端固定连接有转轴503,所述转轴503的侧面转动连接有限位杆504,所述限位杆504与承载框409之间滑动连接,所述转轴503的端部固定连接有滑动卡块505,所述承载框409上开设有卡槽506,所述滑动卡块505通过卡槽506与承载框409滑动连接,所述翻转盒501的内侧固定连接有呈“十”字形的隔板502;通过翻转结构5可以方便施工人员对工具或者小零件进行放置和取用,即:在进行施工的过程中,施工人员往往会用到一些工具以及小零件,为了方便进行取用,使用者可以首先将承载框409抬升至适当的高度,而后将承载框409中部的翻转盒501抬起,此时转轴503端部的滑动卡块505脱离卡槽506,将翻转盒501翻转180°,而后重新将翻转盒501置入承载框409内部,使用者即可通过完成翻转的翻转盒501进行零件以及工具的放置,避免发生掉落,同时翻转盒501内侧设置的隔板502在起到对放置物进行分类存放的同时,在通过翻转盒501进行施工人员承载的同时也能加强翻转盒501的强度。Specifically, the turning
具体的,所述输送结构6包括滑轨604,所述台板2的底侧固定连接有两个滑轨604,两个所述滑轨604互相平行设置,所述滑轨604之间滑动连接有升降座605,所述升降座605的中部固定连接有牵引绳602,所述台板2的底侧固定连接有定滑轮603,所述牵引绳602的端部贯穿定滑轮603,所述升降座605上设有放置杆606,所述升降座605的两端分别滑动连接有一个放置杆606,两个所述放置杆606之间互相平行设置,所述放置杆606的端部垂直固定连接有挡板601,所述第一底板301内侧开设有两个收纳孔612,且两个所述收纳孔612之间的距离等于两个放置杆606之间的距离,所述放置杆606的内侧开设有第二定位槽607,两个放置杆606之间设有调节杆608,所述调节杆608的端部固定连接有抵触块609,所述抵触块609的底侧滑动连接有滑套611,且所述抵触块609与滑套611之间固定连接有第二弹簧610,所述滑套611与放置杆606之间滑动连接;通过输送结构6可以方便向施工人员进行建筑板材等的传递,提升工作效率,即:由于脚手架顶端的空间有限,使用者可以通过侧面设置的升降座605进行板材等建筑材料的抬升,当进行板材的传递时,为了防止板材在运输过程中发生滑动,使用者可以按压两只放置杆606之间的调节杆608,使得调节杆608脱离第二定位槽607顶侧的齿状部分,同时滑动调节杆608至适当位置,保证板材的底端部分可以被抵触块609的杆状部分所阻挡,配合放置杆606端部的挡板601避免滑落,而后释放调节杆608,在第二弹簧610的推动下,此时调节杆608重新与第二定位槽607顶侧的齿状部分卡合,保证运输过程中抵触块609的位置保持不变,完成板材的放置后,通过穿过定滑轮603的牵引绳602即可在地面向位于脚手架上的施工人员进行材料的传递,而在不使用时,为了避免对操作造成影响,使用者可以将升降座605降至第一底板301侧面,即可将放置杆606滑入收纳孔612内。Specifically, the conveying
具体的,所述驱动结构7包括卷收辊701,所述第一底板301上转动连接有卷收辊701,所述卷收辊701的侧面与牵引绳602的一端固定连接,所述卷收辊701的一端固定连接有摇杆702,所述摇杆702与第一底板301之间转动连接,所述摇杆702上固定连接有棘轮703,所述第一底板301的内侧滑动连接有安装套705,所述安装套705内侧滑动连接有卡齿704,所述卡齿704与安装套705之间固定连接有第三弹簧706,所述卡齿704的端部与棘轮703相啮合,所述安装套705的顶端转动连接有调节螺杆707,所述调节螺杆707与第一底板301之间转动连接;通过驱动结构7可以省力的进行物料的传递,同时可以对物料的悬吊高度进行固定,方便材料的取用,即:为了使得使用者较为省力地通过牵引绳602完成物料地抬升,牵引绳602地另一端固定于卷收辊701,同时卷收辊701通过摇杆702进行驱动,从而达到省力地对牵引绳602进行卷收地效果,同时摇杆702上固定有棘轮703,当使用者转动调节螺杆707推动安装套705使得卡齿704与棘轮703发生啮合时,此时摇杆702进行进行单向地转动,放置卷收辊701发生回滚地同时,当升降座605升至顶部时也可以对位置进行固定,方便施工人员进行取用,同时反向转动调节螺杆707即可解除卡齿704与棘轮703地啮合,方便对升降座605地高度进行下降。Specifically, the driving
本发明在使用时,首先,为了方便施工人员对脚手架进行移动,位于第二底板303的底侧安装有万向轮304,当需要通过万向轮304对脚手架进行移动时,转动位于第一底板301侧面的丝杆307,使得斜面块306在第一底板301的内侧发生水平方向的移动,由于斜面块306与顶起块305之间的斜面作用,使得第一底板301以及第一底板301顶侧的部分被向顶侧抬升,此时第一底板301底侧的支撑脚302离开地面,同时脚手架整体由第二底板303底侧的万向轮304进行支撑,此时施工人员即可通过万向轮304对脚手架进行移动,方便脚手架的部署,由于建筑工地的地面可能存在坑洼的现象,如果第一底板301底侧的支撑脚302难以对脚手架整体进行平稳支撑,使用者可以在第一底板301抬起的同时,转动位于支撑脚302侧面的螺纹环801,螺纹环801转动时会带动内侧的螺纹支撑杆802进行纵向的移动,从而方便使用者根据脚手架放置的位置进行各个支撑脚302支撑高度的调整,保证脚手架整体的平稳放置,保障施工人员的安全,在实际施工操作时,可能会出现现有脚手架的高度不满足需求的情况,此时使用者可以转动位于台板2两侧的两个控制杆404,而后将控制杆404嵌入嵌合槽408的端的“L”型槽中,此时滑动套405侧面的卡合板407与抬升滑杆402上的第一定位槽403错开,使用者即可将承载框409由台板2处提起,当提起承载框409至适当高度后,分别将两只控制杆404复位,此时卡合板407重新与抬升滑杆402对齐,并嵌入相应高度的第一定位槽403中,实现对此时承载框409高度的固定,此时施工人员即可通过承载框409进行更高处位置的工作,而在无需抬升高度时,抬升滑杆402由底侧的复位架401进行支撑,同时复位架401还可以提升支撑架1整体的稳定性,在进行施工的过程中,施工人员往往会用到一些工具以及小零件,为了方便进行取用,使用者可以首先将承载框409抬升至适当的高度,而后将承载框409中部的翻转盒501抬起,此时转轴503端部的滑动卡块505脱离卡槽506,将翻转盒501翻转180°,而后重新将翻转盒501置入承载框409内部,使用者即可通过完成翻转的翻转盒501进行零件以及工具的放置,避免发生掉落,同时翻转盒501内侧设置的隔板502在起到对放置物进行分类存放的同时,在通过翻转盒501进行施工人员承载的同时也能加强翻转盒501的强度,由于脚手架顶端的空间有限,使用者可以通过侧面设置的升降座605进行板材等建筑材料的抬升,当进行板材的传递时,为了防止板材在运输过程中发生滑动,使用者可以按压两只放置杆606之间的调节杆608,使得调节杆608脱离第二定位槽607顶侧的齿状部分,同时滑动调节杆608至适当位置,保证板材的底端部分可以被抵触块609的杆状部分所阻挡,配合放置杆606端部的挡板601避免滑落,而后释放调节杆608,在第二弹簧610的推动下,此时调节杆608重新与第二定位槽607顶侧的齿状部分卡合,保证运输过程中抵触块609的位置保持不变,完成板材的放置后,通过穿过定滑轮603的牵引绳602即可在地面向位于脚手架上的施工人员进行材料的传递,而在不使用时,为了避免对操作造成影响,使用者可以将升降座605降至第一底板301侧面,即可将放置杆606滑入收纳孔612内,为了使得使用者较为省力地通过牵引绳602完成物料地抬升,牵引绳602地另一端固定于卷收辊701,同时卷收辊701通过摇杆702进行驱动,从而达到省力地对牵引绳602进行卷收地效果,同时摇杆702上固定有棘轮703,当使用者转动调节螺杆707推动安装套705使得卡齿704与棘轮703发生啮合时,此时摇杆702进行进行单向地转动,放置卷收辊701发生回滚地同时,当升降座605升至顶部时也可以对位置进行固定,方便施工人员进行取用,同时反向转动调节螺杆707即可解除卡齿704与棘轮703地啮合,方便对升降座605地高度进行下降。When the present invention is in use, at first, in order to facilitate the construction personnel to move the scaffold, a
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the invention is not limited to the details of the above-described exemplary embodiments, but that the invention can be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. Accordingly, the embodiments should be regarded in all points of view as exemplary and not restrictive, the scope of the invention being defined by the appended claims rather than the foregoing description, and it is therefore intended that the scope of the invention be defined by the appended claims rather than by the foregoing description. All changes within the meaning and range of equivalents of the elements are embraced in the present invention. Any reference sign in a claim should not be construed as limiting the claim concerned.
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only contains an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211455463.8A CN115559505B (en) | 2022-11-21 | 2022-11-21 | Scaffolding for the construction of a prefabricated house |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211455463.8A CN115559505B (en) | 2022-11-21 | 2022-11-21 | Scaffolding for the construction of a prefabricated house |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN115559505A CN115559505A (en) | 2023-01-03 |
| CN115559505B true CN115559505B (en) | 2023-03-10 |
Family
ID=84770693
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211455463.8A Active CN115559505B (en) | 2022-11-21 | 2022-11-21 | Scaffolding for the construction of a prefabricated house |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115559505B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117211501A (en) * | 2023-08-07 | 2023-12-12 | 浙江省东阳市南方建筑工程有限公司 | Building construction structure and building construction method |
| CN117287020B (en) * | 2023-11-27 | 2024-04-30 | 河北长云建筑装饰工程有限公司 | Portable scaffold for interior decoration engineering |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106958344A (en) * | 2017-05-10 | 2017-07-18 | 西安市建设工程质量安全监督站 | A kind of cycle operation elevating scaffold |
| CN112112409A (en) * | 2020-10-14 | 2020-12-22 | 毛爱芬 | Can stabilize height-adjusting and mobilizable construction frame |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN216810853U (en) * | 2022-01-27 | 2022-06-24 | 广东领航智慧建造科技有限公司 | Safe type scaffold frame for construction |
| CN217151120U (en) * | 2022-04-25 | 2022-08-09 | 标力建设集团有限公司 | Novel engineering construction scaffold is built in room |
-
2022
- 2022-11-21 CN CN202211455463.8A patent/CN115559505B/en active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106958344A (en) * | 2017-05-10 | 2017-07-18 | 西安市建设工程质量安全监督站 | A kind of cycle operation elevating scaffold |
| CN112112409A (en) * | 2020-10-14 | 2020-12-22 | 毛爱芬 | Can stabilize height-adjusting and mobilizable construction frame |
Also Published As
| Publication number | Publication date |
|---|---|
| CN115559505A (en) | 2023-01-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7424932B1 (en) | Lifting hoist assembly | |
| US3797672A (en) | Apparatus attachable to a truck body or the like for use for hoisting or lifting, or as an elevated support | |
| CN115559505A (en) | Scaffold for prefabricated house construction | |
| CN113550604B (en) | Movable ALC light partition board installation device | |
| CN214062280U (en) | Carrying frame is built in room | |
| US20050039984A1 (en) | Scaffold lift system | |
| KR20080102922A (en) | Lift aerial workbench | |
| CN206784884U (en) | Curved-surface building climbing device | |
| CN220432133U (en) | Curtain wall material hoisting device | |
| US8424884B1 (en) | Panel transport, lift and positioning device | |
| CN212201195U (en) | Scaffold for construction | |
| CN112392235A (en) | Intelligent construction equipment of architectural decoration engineering | |
| US20080209850A1 (en) | Device for holding and positioning construction materials | |
| JP2007023702A (en) | Scaffold construction method and disassembling method for multistory building | |
| CN215291292U (en) | A lifting device for building construction | |
| CN214659903U (en) | A cat ladder for safety engineering | |
| CN222991113U (en) | Low-space-occupation assembled telescopic overhanging operation platform | |
| JPH0319567Y2 (en) | ||
| CN110541554B (en) | Single-double layer interconversion type assembled building external protection frame | |
| CN211169700U (en) | Support for house building engineering | |
| CN209293376U (en) | A scaffolding platform for high-altitude and efficient construction | |
| CN210888003U (en) | Movable lifting steel pipe frame operating platform device | |
| CN211172989U (en) | A general construction tripod platform for outdoor architecture and interior decoration | |
| CN209853627U (en) | Indoor building material lifting device | |
| CN223397375U (en) | Building engineering hoist device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20251022 Address after: 841000 Xinjiang Uygur Autonomous Region Bayingol Mongolian Autonomous Prefecture Korla City Wenhua Road 20 Building 4 Unit 3 Room 302 Patentee after: Zhou Yingbin Country or region after: China Address before: No. 026, Building Materials Industrial Park, Shunhe Town, Feng County, Xuzhou City, Jiangsu Province, 221700 Patentee before: Jiangsu Zhongyu Lvjian Building Materials Technology Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20251107 Address after: 841000 Xinjiang Uygur Autonomous Region Bayingol Mongolian Autonomous Prefecture Korla City Yan'an Road 37 Xingwang Jia Yuan 39 Building 3rd Floor 27th Number Patentee after: Xinjiang Xinyuheng Construction Engineering Co.,Ltd. Country or region after: China Address before: 841000 Xinjiang Uygur Autonomous Region Bayingol Mongolian Autonomous Prefecture Korla City Wenhua Road 20 Building 4 Unit 3 Room 302 Patentee before: Zhou Yingbin Country or region before: China |