CN115522457A - Construction method of self-resetting assembly type concrete bridge system easy to replace - Google Patents

Construction method of self-resetting assembly type concrete bridge system easy to replace Download PDF

Info

Publication number
CN115522457A
CN115522457A CN202211114948.0A CN202211114948A CN115522457A CN 115522457 A CN115522457 A CN 115522457A CN 202211114948 A CN202211114948 A CN 202211114948A CN 115522457 A CN115522457 A CN 115522457A
Authority
CN
China
Prior art keywords
prefabricated
prestressed
segment
bearing platform
prefabricated pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211114948.0A
Other languages
Chinese (zh)
Other versions
CN115522457B (en
Inventor
叶嘉彬
何岸
蔡健
陈庆军
郑敦聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology
Original Assignee
South China University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology filed Critical South China University of Technology
Priority to CN202211114948.0A priority Critical patent/CN115522457B/en
Publication of CN115522457A publication Critical patent/CN115522457A/en
Application granted granted Critical
Publication of CN115522457B publication Critical patent/CN115522457B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00—Adapting or protecting infrastructure or their operation
    • Y02A30/30—Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种易于更替的自复位装配式混凝土桥梁体系的施工方法,包括以下步骤:采用钢筋笼、定位支架和混凝土浇筑完成承台底座;将预应力锚具安装于承台底座,将预应力筋的一端与预应力锚具连接,预应力筋的另一端探出承台底座外部;预应力筋的另一端依次穿过多段预制桥墩节段,一端预制桥墩节段与承台底座连接,多段预制桥墩节段进行堆叠;将预制盖梁吊至多段预制桥墩节段的上方,预应力筋的另一端穿过预制盖梁并固定,预制桥墩节段与预制盖梁连接;预制盖梁通过多块弹性支座安装于预制盖梁,弹性块体在承台底座的作业空间。本发明实现安装容错度高,施工效率高,便于后续服役过程中受到灾害条件、长期荷载和环境作用后的构件更替。

Figure 202211114948

The invention discloses an easy-to-replace construction method for a self-resetting assembled concrete bridge system, which comprises the following steps: using a steel cage, a positioning bracket and concrete pouring to complete the cap base; installing a prestressed anchor on the cap base, and One end of the prestressed tendon is connected to the prestressed anchorage, and the other end of the prestressed tendon protrudes out of the cap base; the other end of the prestressed tendon passes through multiple prefabricated pier segments in turn, and one end of the prefabricated pier segment is connected to the cap base , the multi-segment prefabricated pier segments are stacked; the prefabricated cover girder is hoisted above the multi-segment prefabricated pier segment, the other end of the prestressed tendon passes through the prefabricated cover girder and fixed, and the prefabricated pier segment is connected with the prefabricated cover girder; the prefabricated cover girder The multi-piece elastic support is installed on the prefabricated cover beam, and the elastic block is in the working space of the platform base. The invention realizes high installation fault tolerance and high construction efficiency, and is convenient for component replacement after being subjected to disaster conditions, long-term loads and environmental effects in the subsequent service process.

Figure 202211114948

Description

一种易于更替的自复位装配式混凝土桥梁体系的施工方法A construction method for an easy-to-replace self-resetting fabricated concrete bridge system

技术领域technical field

本发明涉及桥梁的技术领域,尤其涉及一种易于更替的自复位装配式混凝土桥梁体系的施工方法。The invention relates to the technical field of bridges, in particular to an easy-to-replace construction method for a self-resetting assembled concrete bridge system.

背景技术Background technique

现阶段,装配式桥梁体系正得到大力推广。按抗震性能,通常将预制桥墩体系分为“等同现浇”和“非等同现浇”两类,前者主要依靠套筒灌浆连接、波纹管灌浆连接和承插式连接等方式,后者则主要采用预应力筋实现预应力施加。At this stage, the prefabricated bridge system is being vigorously promoted. According to the seismic performance, the prefabricated pier system is usually divided into two types: "equivalent cast-in-place" and "non-equivalent cast-in-place". The former mainly relies on sleeve grouting connection, bellows grouting Prestressing is achieved by using prestressing tendons.

关于采用预应力连接的自复位装配式混凝土桥梁,目前的技术标准和工程应用正处于起步发展阶段,该类桥梁通常用于少震或中震区域,因其结构构造及性能存在如下不足:①无法实现预制构件全匹配拼装和震后构件更替的灵活性及便利性;②承台处的底部接缝抗剪能力和耗能能力不足。Regarding self-resetting prefabricated concrete bridges with prestressed connections, the current technical standards and engineering applications are in the initial stage of development. This type of bridge is usually used in areas with few or moderate earthquakes, because of its structural structure and performance, there are the following deficiencies: ① The flexibility and convenience of full-matching assembly of prefabricated components and post-earthquake component replacement cannot be realized; ②The shear resistance and energy dissipation capacity of the bottom joint at the cap are insufficient.

发明内容Contents of the invention

本发明的目的是为了克服以上现有技术存在的不足,提供了一种易于更替的自复位装配式混凝土桥梁体系的施工方法。The object of the present invention is to provide an easy-to-replace construction method for a self-resetting assembled concrete bridge system in order to overcome the deficiencies in the prior art above.

本发明的目的通过以下的技术方案实现:一种易于更替的自复位装配式混凝土桥梁体系的施工方法,包括以下步骤:The purpose of the present invention is achieved through the following technical solutions: a construction method for an easily replaceable self-resetting assembled concrete bridge system, comprising the following steps:

S1、采用钢筋笼、定位支架和混凝土浇筑完成承台底座;S1. Use reinforcement cages, positioning brackets and concrete pouring to complete the cap base;

S2、将预应力锚具安装于所述承台底座,将预应力筋的一端与所述预应力锚具连接,所述预应力筋的另一端探出所述承台底座外部;S2. Install the prestressed anchor on the cap base, connect one end of the prestressed tendon to the prestressed anchor, and protrude the other end of the prestressed tendon from the outside of the cap base;

S3、所述预应力筋的另一端依次穿过多段预制桥墩节段,一段所述预制桥墩节段与所述承台底座连接,多段所述预制桥墩节段进行堆叠;S3. The other end of the prestressed tendon passes through multiple sections of prefabricated pier segments sequentially, one section of the prefabricated pier section is connected to the base of the cap, and multiple sections of the prefabricated pier sections are stacked;

S4、将预制盖梁吊至多段所述预制桥墩节段的顶部,所述预应力筋的另一端与所述预制盖梁连接,所述预制桥墩节段与所述预制盖梁连接;S4. Hang the prefabricated cover beam to the top of the multi-section prefabricated pier segments, the other end of the prestressed tendon is connected to the prefabricated cover girder, and the prefabricated pier segment is connected to the prefabricated cover girder;

S5、预制盖梁通过多块弹性支座安装于所述预制盖梁,弹性块体在所述承台底座的作业空间。S5. The prefabricated cover beam is installed on the prefabricated cover beam through a plurality of elastic supports, and the elastic blocks are in the working space of the cap base.

更优的选择,步骤S1包括以下步骤:A more optimal option, step S1 includes the following steps:

S101、固定所述钢筋笼,将所述定位支架与所述钢筋笼连接;S101. Fix the reinforcing cage, and connect the positioning bracket to the reinforcing cage;

S102、在所述钢筋笼外周支设承台模板,所述承台模板设有第一预留孔洞、第一预应力孔道和作业空间;S102. Supporting an abutment formwork on the outer periphery of the reinforcement cage, the abutment formwork is provided with a first reserved hole, a first prestressed channel and a working space;

S103、向所述承台模板内浇筑混凝土,待所述混凝土固化后得到所述承台底座。S103. Pour concrete into the cap formwork, and obtain the cap base after the concrete is cured.

更优的选择,步骤S3包括以下步骤:A more optimal option, step S3 includes the following steps:

S301、将一段所述预制桥墩节段吊至所述承台底座的上方,所述预应力筋穿过一段所述预制桥墩节段,所述承台底座的第一抗剪键安装于一段所述预制桥墩节段的第一预留槽孔;S301. Hang a section of the prefabricated pier section above the base of the cap, the prestressed tendon passes through a section of the prefabricated pier, and the first shear key of the pier is installed on a section of the pier. The first reserved slot hole of the prefabricated pier segment;

S302、将另一段所述预制桥墩节段吊至一段所述预制桥墩节段的上方,所述预应力筋穿过另一段所述预制桥墩节段,另一段所述预制桥墩节段的第二抗剪键安装于一段所述预制桥墩节段的第一预留槽孔;S302. Hang another section of the prefabricated pier segment above a section of the prefabricated pier section, the prestressed tendons pass through the other section of the prefabricated pier section, and the second section of the prefabricated pier section The shear key is installed in the first reserved slot hole of a section of the prefabricated pier segment;

S303、重复步骤S302,完成所有所述预制桥墩节段的堆叠。S303. Step S302 is repeated to complete the stacking of all the prefabricated pier segments.

更优的选择,步骤S1中的所述承台底座包括定位支架和承台方块,所述定位支架设置于承台方块并凸出于承台方块的顶部,所述预应力锚具安装于承台方块,所述预应力筋穿过所述定位支架,所述定位支架与预制桥墩节段连接。More preferably, the platform base in step S1 includes a positioning bracket and a platform block, the positioning bracket is arranged on the platform block and protrudes from the top of the platform block, and the prestressed anchor is installed on the bearing block The platform block, the prestressed tendon passes through the positioning bracket, and the positioning bracket is connected with the prefabricated pier segment.

更优的选择,所述承台方块设有作业空间、第一预留孔洞和第一预应力孔道,所述作业空间设置于定位支架的两侧,所述作业空间通过第一预留孔洞与第一预应力孔道连通,所述定位支架安装于第一预应力孔道。A more optimal option, the platform block is provided with a working space, a first reserved hole and a first prestressed tunnel, the working space is arranged on both sides of the positioning bracket, and the working space is connected with the first reserved hole. The first prestressed tunnel is connected, and the positioning bracket is installed on the first prestressed tunnel.

更优的选择,所述定位支架包括预应力管道、定位板、第一抗剪键和栓钉,所述定位板安装于所述承台方块的内部,所述定位板通过所述预应力管道与所述预应力管道连接,所述预应力筋的一端穿过所述预应力管道,所述第一抗剪键设置于定位板的一面并凸出于所述承台方块的顶部,所述栓钉设置于所述定位板的另一面并安装于承台方块。More optimally, the positioning bracket includes a prestressed pipe, a positioning plate, a first shear key and a peg, the positioning plate is installed inside the platform block, and the positioning plate passes through the prestressed pipe Connected with the prestressed pipeline, one end of the prestressed tendon passes through the prestressed pipeline, the first shear key is arranged on one side of the positioning plate and protrudes from the top of the platform block, the The studs are arranged on the other side of the positioning plate and installed on the platform block.

更优的选择,步骤S3中的所述预制桥墩节段包括第二抗剪键和节段本体,所述节段本体设有中空结构,所述中空结构的四周设有多个贯穿的第二预应力孔道,所述预应力连接组件穿过所述第二预应力孔道,所述第二抗剪键安装于所述节段本体的一端,所述节段本体的另一端设有第一预留槽孔,所述第一预留槽孔分别与第二抗剪键和承台底座相匹配。More optimally, the prefabricated pier segment in step S3 includes a second shear key and a segment body, the segment body is provided with a hollow structure, and a plurality of penetrating second A prestressed tunnel, the prestressed connection assembly passes through the second prestressed tunnel, the second shear key is installed at one end of the segment body, and the other end of the segment body is provided with a first prestressed Slot holes are reserved, and the first reserved slot holes are respectively matched with the second shear key and the platform base.

更优的选择,步骤S4中的所述预制盖梁包括箱梁限制部和箱梁承托部,所述箱梁限制部与所述箱梁承托部的两端连接,所述箱梁承托部的顶部设有多个第二预留孔洞,多个所述第二预留孔洞分别通过第三预应力孔道与所述箱梁承托部的底部连通,所述预应力锚具安装于第二预留孔洞,所述预应力筋穿过第三预应力孔道,所述箱梁承托部的底部设有第二预留槽孔,所述第二预留槽孔与所述预制桥墩节段相匹配。More optimally, the prefabricated cover girder in step S4 includes a box girder restricting portion and a box girder supporting portion, the box girder restricting portion is connected to both ends of the box girder supporting portion, and the box girder supporting portion The top of the supporting part is provided with a plurality of second reserved holes, and the plurality of second reserved holes communicate with the bottom of the box girder supporting part through the third prestressed tunnel respectively, and the prestressed anchor is installed on the The second reserved hole, the prestressed tendons pass through the third prestressed tunnel, the bottom of the box girder supporting part is provided with a second reserved slot, and the second reserved slot is connected with the prefabricated pier Sections match.

更优的选择,步骤S5中的所述弹性块体包括吊环和块体,所述吊环安装于所述块体的顶部,所述块体与所述承台底座相匹配。More preferably, the elastic block in step S5 includes a suspension ring and a block, the suspension ring is installed on the top of the block, and the block matches the platform base.

更优的选择,步骤S1中的所述混凝土为超高性能混凝土。More optimally, the concrete in step S1 is ultra-high performance concrete.

本发明相对现有技术具有以下优点及有益效果:Compared with the prior art, the present invention has the following advantages and beneficial effects:

1、一种易于更替的自复位装配式混凝土桥梁体系的施工方法,实现安装容错度高,施工效率高,便于后续服役过程中受到灾害条件、长期荷载和环境作用后的构件更替。1. An easy-to-replace construction method for a self-resetting prefabricated concrete bridge system, which achieves high installation fault tolerance and high construction efficiency, and is convenient for component replacement after being subjected to disaster conditions, long-term loads and environmental effects during subsequent service.

2、本发明通过预应力管道、定位板、第一抗剪键和栓钉,解决传统承台在桥位处现场浇筑,难以实现与预制桥墩节段的匹配安装问题,保证现场安装的定位精度,同时提高底部区域抗剪能力。2. The present invention uses prestressed pipes, positioning plates, first shear keys and pegs to solve the problem that traditional caps are poured at the bridge site, and it is difficult to achieve matching installation with prefabricated pier segments, ensuring the positioning accuracy of on-site installation , while improving the shear capacity of the bottom area.

3、本发明通过第二抗剪键和节段本体,形成凹凸剪力键进行咬合,实现工厂生产的匹配安装,保证节段结合度的同时,提高了其抗剪能力。3. The present invention uses the second shear key and the segment body to form a concave-convex shear key for occlusal, realizing the matching installation of factory production, ensuring the joint degree of the segment, and improving its shear resistance.

4、本发明通过采用超高性能混凝土,大大提高其在灾害条件(地震、高速车撞、落石冲击等)下的承载能力、耗能能力和延性,可用于高震区,同时避免整体均采用UHPC材料所造成的材料浪费。4. The present invention greatly improves its bearing capacity, energy dissipation capacity and ductility under disaster conditions (earthquake, high-speed vehicle collision, rockfall impact, etc.) Material waste caused by UHPC materials.

附图说明Description of drawings

图1是本发明一种易于更替的自复位装配式混凝土桥梁体系的施工方法的流程示意图;Fig. 1 is a schematic flow sheet of the construction method of a self-resetting assembled concrete bridge system that is easy to replace in the present invention;

图2是本发明一种易于更替的自复位装配式混凝土桥梁体系的施工方法的桥梁结构示意图;Fig. 2 is a bridge structure schematic diagram of a construction method of a self-resetting assembled concrete bridge system that is easy to replace in the present invention;

图3是本发明一种易于更替的自复位装配式混凝土桥梁体系的施工方法的桥梁结构正视图;Fig. 3 is the bridge structure front view of the construction method of a kind of easy to replace self-resetting assembled concrete bridge system of the present invention;

图4是本发明一种易于更替的自复位装配式混凝土桥梁体系的施工方法的桥梁结构侧视图;Fig. 4 is a side view of the bridge structure of the construction method of a self-resetting assembled concrete bridge system that is easy to replace in the present invention;

图5是本发明一种易于更替的自复位装配式混凝土桥梁体系的施工方法的桥梁结构局部放大图;Fig. 5 is a partial enlarged view of the bridge structure of the construction method of a self-resetting assembled concrete bridge system that is easy to replace in the present invention;

图6是本发明一种易于更替的自复位装配式混凝土桥梁体系的施工方法的桥预制桥墩节段示意图;Fig. 6 is a schematic diagram of a bridge prefabricated pier segment of a construction method of an easily replaceable self-resetting assembled concrete bridge system of the present invention;

图7是本发明一种易于更替的自复位装配式混凝土桥梁体系的施工方法的桥预制桥墩节段俯视图;Fig. 7 is a top view of the bridge prefabricated pier segment of the construction method of the self-resetting assembled concrete bridge system that is easy to replace in the present invention;

图8是本发明一种易于更替的自复位装配式混凝土桥梁体系的施工方法的预制盖梁示意图;Fig. 8 is a schematic diagram of a prefabricated cap beam of the construction method of an easily replaceable self-resetting assembled concrete bridge system of the present invention;

图9是本发明一种易于更替的自复位装配式混凝土桥梁体系的施工方法的承台底座正视图;Fig. 9 is a front view of the cap base of an easy-to-replace self-resetting assembled concrete bridge system construction method of the present invention;

图10是本发明一种易于更替的自复位装配式混凝土桥梁体系的施工方法的承台底座剖视图;Fig. 10 is a cross-sectional view of the cap base of the construction method of an easily replaceable self-resetting assembled concrete bridge system of the present invention;

图11是本发明一种易于更替的自复位装配式混凝土桥梁体系的施工方法的定位支架示意图;Fig. 11 is a schematic diagram of a positioning bracket for a construction method of an easily replaceable self-resetting assembled concrete bridge system of the present invention;

图12是本发明一种易于更替的自复位装配式混凝土桥梁体系的施工方法的弹性块体示意图;Fig. 12 is a schematic diagram of an elastic block of the construction method of an easily replaceable self-resetting assembled concrete bridge system of the present invention;

附图中各部件的标记:1-承台底座;11-定位支架;111-栓钉;112-第一抗剪键;113-预应力管道;114-定位板;12-第一预留孔洞;13-第一预应力孔道;14-作业空间;15-承台方块;2-预制桥墩节段;21-第二预应力孔道;22-第二抗剪键;23-第一预留槽孔;24-节段本体;3-预制盖梁;31-第二预留孔洞;32-第三预应力孔道;33-第二预留槽孔;34-箱梁限制部;35-箱梁承托部;4-预制箱梁;5-预应力连接组件;51-预应力锚具;52-预应力筋;6-弹性支座;7-弹性块体;71-吊环;72-弹性方块。The marks of each part in the attached drawings: 1-cap base; 11-positioning bracket; 111-pin; 112-first shear key; 113-prestressed pipe; 114-positioning plate; 12-first reserved hole ;13-the first prestressed tunnel; 14-working space; 15-capped block; 2-prefabricated pier segment; 21-the second prestressed tunnel; 22-the second shear key; 23-the first reserved groove Hole; 24-segment body; 3-prefabricated cover beam; 31-second reserved hole; 32-third prestressed tunnel; 33-second reserved slot hole; 34-box girder limiting part; 35-box girder Supporting part; 4-prefabricated box girder; 5-prestressed connection component; 51-prestressed anchor; 52-prestressed tendon; 6-elastic support; 7-elastic block; .

具体实施方式detailed description

下面结合附图和具体实施例对本发明的发明目的作进一步详细地描述,实施例不能在此一一赘述,但本发明的实施方式并不因此限定于以下实施例。The purpose of the invention of the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments, and the embodiments cannot be repeated here one by one, but the implementation of the present invention is not therefore limited to the following embodiments.

如图1所示,一种易于更替的自复位装配式混凝土桥梁体系的施工方法,包括以下步骤:As shown in Figure 1, an easy-to-replace construction method for a self-resetting prefabricated concrete bridge system includes the following steps:

S1、采用钢筋笼、定位支架11和混凝土浇筑完成承台底座1,该步骤S1包括以下步骤:S1. The cap base 1 is completed by using a reinforcement cage, a positioning bracket 11 and concrete pouring. This step S1 includes the following steps:

S101、通过绑扎钢筋笼进行固定,放置定位支架11(定位支架11的定位板114低于承台底座1的混凝土面约2cm)并与钢筋笼焊接;S101, fix by binding the steel cage, place the positioning bracket 11 (the positioning plate 114 of the positioning bracket 11 is lower than the concrete surface of the cap base 1 by about 2cm) and weld with the steel cage;

S102、在钢筋笼的外围支设承台模板,承台模板内设有第一预留孔洞12、第一预应力孔道13和作业空间14;S102, supporting the platform formwork on the periphery of the reinforcement cage, the platform formwork is provided with a first reserved hole 12, a first prestressed tunnel 13 and a working space 14;

S103、向承台模板内浇筑混凝土,该混凝土为超高性能混凝土(UHPC,Ultra-HighPerformance Concrete),待超高性能混凝土固化后得到承台底座1。S103. Pouring concrete into the cap formwork, the concrete is Ultra-High Performance Concrete (UHPC, Ultra-High Performance Concrete), and the cap base 1 is obtained after the ultra-high performance concrete is solidified.

S2、将预应力锚具51设置于第一预留孔洞12,预应力锚具51与预应力筋52固定连接,预应力筋52穿过定位支架11的预应力管道113探出承台底座1的外部;S2. Set the prestressed anchor 51 in the first reserved hole 12, the prestressed anchor 51 is fixedly connected with the prestressed tendon 52, and the prestressed tendon 52 passes through the prestressed pipe 113 of the positioning bracket 11 and protrudes out of the platform base 1 outside of

S3、预应力筋52依次穿过3段预制桥墩节段2的个第二预应力孔道21,承台底座1与预制桥墩节段2咬合连接,预制桥墩节段2之间通过第一预留槽孔23和第二抗剪键22咬合连接,该步骤S3包括以下步骤:S3. The prestressed tendons 52 pass through the second prestressed tunnel 21 of the three sections of prefabricated pier sections 2 in turn, the cap base 1 is occluded with the prefabricated pier sections 2, and the prefabricated pier sections 2 pass through the first reserved The slotted hole 23 is engaged with the second shear key 22, and this step S3 includes the following steps:

S301、吊装第一段预制桥墩节段2,预应力筋52分别穿过预制桥墩节段2对应的4个第二预应力孔道21进行预应力张拉和锚固,承台底座1顶部的第一抗剪键112嵌入到第一段预制桥墩节段2底部的第一预留槽孔23内;S301. Hoisting the first section of prefabricated pier segment 2, the prestressed tendons 52 respectively pass through the four second prestressed tunnels 21 corresponding to the prefabricated pier segment 2 for prestressing and anchoring. The shear key 112 is embedded in the first reserved slot 23 at the bottom of the first prefabricated pier segment 2;

S302、再吊装第二段预制桥墩节段2到第一段预制桥墩节段2的上方,预应力筋52穿过第二段预制桥墩节段2的第二预应力孔道21,第二段预制桥墩节段2底部的第二抗剪键22嵌入到第一段预制桥墩节段2的第一预留槽孔23内;S302. Hoist the second prefabricated pier segment 2 to the top of the first prefabricated pier segment 2, the prestressed tendons 52 pass through the second prestressed channel 21 of the second prefabricated pier segment 2, and the second prefabricated pier segment 2 The second shear key 22 at the bottom of the pier segment 2 is embedded in the first reserved slot 23 of the first prefabricated pier segment 2;

S303、依次类推,将第三段预制桥墩节段2安装在第二段预制桥墩节段2上。S303 , and so on, install the third prefabricated pier segment 2 on the second prefabricated pier segment 2 .

S4、将预制盖梁3吊装到第三段预制桥墩节段2的上方,预应力筋52依次穿过预制盖梁3的第三预应力孔道32和第二预留孔洞31,第二预留孔洞31内安装有预应力锚具51,预应力筋52与预应力锚具51进行连接,第三段预制桥墩节段22的第二抗剪键22嵌入到预制盖梁3的第二预留槽孔33内;S4. Hoist the prefabricated cover beam 3 above the third prefabricated pier segment 2, and the prestressed tendons 52 pass through the third prestressed tunnel 32 and the second reserved hole 31 of the prefabricated cover beam 3 in sequence, and the second reserved A prestressed anchor 51 is installed in the hole 31, and the prestressed tendon 52 is connected with the prestressed anchor 51. The second shear key 22 of the third prefabricated pier segment 22 is embedded in the second reserved portion of the prefabricated cap beam 3. Inside the slotted hole 33;

S5、在预制盖梁3的顶部放置4块弹性支座6,将预制箱梁4吊装到预制盖梁3的上方,并放置在4块弹性支座6上,将2块弹性块体7放置在承台底座1的作业空间14内。S5. Place 4 pieces of elastic supports 6 on the top of the prefabricated cover beam 3, hoist the prefabricated box girder 4 above the prefabricated cover beam 3, place them on the 4 pieces of elastic supports 6, and place 2 pieces of elastic blocks 7 In the working space 14 of the platform base 1 .

当后续桥梁服役过程中出现的灾害事故导致个别节段块损伤严重或预应力长期损失等问题,可通过抽出弹性块体7、拆除预应力锚具51、预应力筋52卸载、吊装移除完好的预制构件等方式,进行个别损伤构件的更替,以及预应力筋52的重新张拉或更替。When disasters and accidents in the subsequent bridge service process lead to serious damage to individual segments or long-term loss of prestress, etc., it can be removed by pulling out the elastic block 7, removing the prestress anchor 51, unloading the prestress tendons 52, and hoisting. Replacement of individual damaged components, and re-tensioning or replacement of prestressed tendons 52.

如图2-4所示,一种易于更替的自复位装配式混凝土桥梁体系,包括承台底座1、3段预制桥墩节段2、预制盖梁3、4块预制箱梁4、预应力连接组件5、4块弹性支座6和弹性块体7,预应力连接组件5包括4根预应力筋52和8个预应力锚具51,4根预应力筋52垂直地安装在承台底座1上并穿过定位支架11的预应力管道113,4根预应力筋52呈方形布置,3段预制桥墩节段2依次套接在4根预应力筋52上,4段预制桥墩节段2依次叠加,4段预制桥墩节段2的底部均设有第一预留槽孔23,其顶部设有第二抗剪键22,在第二预留槽孔33和第二抗剪键22的相互配合或第一预留槽孔23和第一抗剪键112的相互配合下,实现承台底座1和预制桥墩节段2之间的固定,以及预制桥墩节段2之间的固定。4根预应力筋52穿过预制盖梁3,预制盖梁3底部通过预留槽孔与顶部的预制桥墩节段2的抗剪键固定连接。4块预制箱梁4分别通过橡弹性支座6安装在预制盖梁3的顶部。2块弹性块体7填充在承台底座1的作业空间14内。承台底座1、预制桥墩节段2、预制盖梁3和预制箱梁4均采用超高性能混凝土制成。As shown in Figure 2-4, an easy-to-replace self-resetting assembled concrete bridge system includes cap base 1, 3 prefabricated pier segments 2, prefabricated cover girders 3, 4 prefabricated box girders 4, prestressed connections Assemblies 5, 4 pieces of elastic supports 6 and elastic blocks 7, the prestressed connection assembly 5 includes 4 prestressed tendons 52 and 8 prestressed anchors 51, and the 4 prestressed tendons 52 are vertically installed on the platform base 1 On and through the prestressed pipe 113 of the positioning bracket 11, the four prestressed tendons 52 are arranged in a square shape, the three sections of prefabricated bridge pier segments 2 are sequentially socketed on the four prestressed tendons 52, and the four sections of prefabricated bridge pier sections 2 are sequentially Superposition, the bottoms of the four sections of prefabricated pier segments 2 are provided with first reserved slots 23, and the tops are provided with second shear keys 22, and the mutual connection between the second reserved slots 33 and the second shear keys 22 With the cooperation or the mutual cooperation of the first reserved slot 23 and the first shear key 112 , the fixing between the platform cap base 1 and the prefabricated pier segment 2 , and the fixing between the prefabricated pier segments 2 are realized. Four prestressed tendons 52 pass through the prefabricated cover beam 3, and the bottom of the prefabricated cover beam 3 is fixedly connected with the shear key of the prefabricated pier segment 2 at the top through reserved slots. The four prefabricated box girders 4 are respectively installed on the top of the prefabricated cover beam 3 through rubber elastic bearings 6 . Two elastic blocks 7 are filled in the working space 14 of the platform base 1 . The cap base 1, the prefabricated pier segment 2, the prefabricated cover girder 3 and the prefabricated box girder 4 are all made of ultra-high performance concrete.

承台底座1用于承重固定作用;预制桥墩节段2为钢筋混凝土结构,其内部钢筋构造和混凝土强度根据荷载条件和结构尺寸进行设计确定,对于地震多发区或紧邻高速公路的墩柱,预制桥墩节段2宜采用超高性能混凝土(UHPC,Ultra-High PerformanceConcrete),以增加塑性铰区域的抗压和抗拉能力,防止灾害荷载下脚趾部位的混凝土由于应力集中导致过早出现压碎剥落现象,耗能能力大幅衰退。预制盖梁3为支承、分布和传递预制箱梁4的荷载;预制箱梁4为中空结构,在独立场地预制的箱梁结合架桥机可在下部工程完成后进行架设,可加速工程进度、节约工期;预应力筋52分布于预制桥墩节段2的四个角部位置,使得高烈度地震作用下预制节段左右摇摆时主要依靠预应力筋52来平衡,大大降低了混凝土的受拉应力和开裂损伤,提高桥墩的抗弯能力和自复位能力,易于日常管理维护和替换更新,可有效解决服役过程中预应力损失或失效等问题;弹性支座6采用橡胶制成,起到预制桥墩节段2与预制箱梁4之间的缓冲作用;弹性块体7采用橡胶制成,起到对预制桥墩节段2的侧向约束作用。The cap base 1 is used for load-bearing and fixing; the prefabricated pier section 2 is a reinforced concrete structure, and its internal steel structure and concrete strength are designed and determined according to the load conditions and structural dimensions. Pier section 2 should use ultra-high performance concrete (UHPC, Ultra-High Performance Concrete) to increase the compressive and tensile capacity of the plastic hinge area, and prevent premature crushing and spalling of the concrete at the toe due to stress concentration under disaster loads Phenomenon, the energy consumption capacity declines significantly. The prefabricated cover girder 3 is used to support, distribute and transfer the load of the prefabricated box girder 4; the prefabricated box girder 4 is a hollow structure, and the box girder combined with the bridge erecting machine prefabricated at an independent site can be erected after the completion of the lower part of the project, which can speed up the progress of the project. Save construction time; the prestressed tendons 52 are distributed at the four corners of the prefabricated pier section 2, so that the prefabricated section mainly relies on the prestressed tendons 52 to balance when the prefabricated section sways left and right under the action of a high-intensity earthquake, which greatly reduces the tensile stress of the concrete and cracking damage, improve the bending resistance and self-resetting ability of the bridge pier, facilitate daily management and maintenance, replace and update, and can effectively solve the problems of prestress loss or failure during service; The cushioning function between the segment 2 and the prefabricated box girder 4; the elastic block 7 is made of rubber, which acts as a lateral constraint on the prefabricated pier segment 2 .

如图5和10所示,承台底座1包括定位支架11和承台方块15,定位支架11设置在承台方块15的顶部中央并部分(第一抗剪键112)凸出于承台方块15的表面,定位支架11的定位板114低于承台方块15约2cm,并与周围钢筋焊接固定。定位支架11的两侧设有作业空间14,两个作业空间14的底部内侧设有第一预留孔洞12,第一预留孔洞12通过第一预留应力孔道13与承台方块15的顶部连通。定位支架11预埋于承台方块15的内部并与第一预留孔洞12连通。As shown in Figures 5 and 10, the platform base 1 includes a positioning bracket 11 and a platform block 15, the positioning bracket 11 is arranged at the top center of the platform block 15 and partially (the first shear key 112) protrudes from the platform block 15, the positioning plate 114 of the positioning bracket 11 is lower than the platform block 15 by about 2cm, and is welded with the surrounding reinforcement. The two sides of the positioning bracket 11 are provided with working spaces 14, and the inside of the bottom of the two working spaces 14 is provided with a first reserved hole 12, and the first reserved hole 12 passes through the first reserved stress channel 13 and the top of the platform block 15. connected. The positioning bracket 11 is embedded in the platform block 15 and communicates with the first reserved hole 12 .

定位支架11解决传统承台在桥位处现场浇筑,难以实现与预制桥墩节段2的匹配安装问题,保证现场安装的定位精度,同时提高底部区域抗剪能力;承台方块15起到承重固定的作用;作业空间14作为后续桥梁服役过程中检修维护的技术人员操作空间,进行承台混凝土的浇筑养;第一预留孔洞12用于固定安装预应力锚具;第一预留应力孔道13用于放置预应力管道113。The positioning bracket 11 solves the problem that the traditional cap is poured on site at the bridge position, and it is difficult to realize the matching installation with the prefabricated pier segment 2, ensuring the positioning accuracy of the on-site installation, and at the same time improving the shear resistance of the bottom area; the cap block 15 serves as a load-bearing fixture The role of the work space 14 as the operation space for maintenance technicians in the follow-up bridge service process, and the pouring and maintenance of the cap concrete; the first reserved hole 12 is used to fix and install the prestressed anchor; the first reserved stress channel 13 Used to place the prestressed pipe 113.

如图11所示,定位支架11包括定位板114、4个第一抗剪键112、8颗栓钉111和4根预应力管道113,定位板114的四个角分别与预应力管道113垂直连接,第一抗剪键112设置于相邻的两个预应力管道113之间,定位板对边的第一抗剪键112相互平行,第一抗剪键112与预制桥墩节段2的第一预留槽孔23相匹配,栓钉111安装在定位板114远离第一抗剪键112的一面,2颗栓钉111分别与1个第一抗剪键112两端对应。As shown in Figure 11, the positioning bracket 11 includes a positioning plate 114, 4 first shear keys 112, 8 pegs 111 and 4 prestressed pipes 113, and the four corners of the positioning plate 114 are respectively perpendicular to the prestressed pipes 113 connection, the first shear key 112 is set between two adjacent prestressed pipes 113, the first shear key 112 on the opposite side of the positioning plate is parallel to each other, and the first shear key 112 is connected to the first shear key 112 of the prefabricated pier segment 2 A reserved slot 23 is matched, and the pegs 111 are installed on the side of the positioning plate 114 away from the first shear key 112 , and the two pegs 111 are respectively corresponding to two ends of one first shear key 112 .

定位板114采用钢板制成,用于给预应力筋52进行定位;第一抗剪键112采用钢材制成,可实现与预制桥墩节段2的匹配安装,并存在较大的容差以满足现场作业的精度要求;栓钉111采用钢材制成,可以加强定位板114在混凝土上的连接强度;预应力管道113采用PVC制成,用于穿过预应力筋52。The positioning plate 114 is made of steel plate for positioning the prestressed tendon 52; the first shear key 112 is made of steel, which can be matched with the prefabricated pier segment 2 and has a large tolerance to meet the Accuracy requirements for on-site operations; the studs 111 are made of steel, which can strengthen the connection strength of the positioning plate 114 on the concrete;

如图6和7所示,预制桥墩节段2包括4块第二抗剪键22和节段本体24,为中空的长方体结构,在预制桥墩节段2的四角上均设有贯通预制桥墩节段2两端的第二预应力孔道21,4个第二预应力孔道21相互平行,4块第二抗剪键22设置在节段本体24的顶部,4块第二抗剪键22两两平行设置,并且第二抗剪键22均设置在相邻的两个第二预应力孔道21之间,在节段本体24的底部设有4个第一预留槽孔23,第一预留槽孔23分别设置在相邻的两个第二预应力孔道21之间,相对的两个第一预留槽孔23相互平行。As shown in Figures 6 and 7, the prefabricated pier section 2 includes four second shear keys 22 and the section body 24, which are hollow cuboid structures, and the four corners of the prefabricated pier section 2 are provided with through prefabricated pier sections. The second prestressed tunnels 21 at both ends of the segment 2, the four second prestressed tunnels 21 are parallel to each other, the four second shear keys 22 are arranged on the top of the segment body 24, and the four second shear keys 22 are parallel to each other set, and the second shear keys 22 are set between two adjacent second prestressed tunnels 21, four first reserved slot holes 23 are arranged at the bottom of the segment body 24, and the first reserved slot The holes 23 are respectively arranged between two adjacent second prestressing tunnels 21 , and the two opposite first reserved slot holes 23 are parallel to each other.

节段本体24采用混凝土制成,起到支撑作用;第二抗剪键22和第一预留槽孔23形成凹凸剪力键进行咬合,实现工厂生产的匹配安装,保证节段本体24结合度的同时,提高了其抗剪能力;第二预应力孔道21用于放置预应力筋52形成节段本体24的整体连接;第一预留槽孔23有效改变了传统自复位桥墩拼缝处采用高压水枪凿毛处理的方式,实现全接缝高精度匹配安装的同时,显著提高了水平荷载作用下的抗力性能。The segment body 24 is made of concrete and plays a supporting role; the second shear key 22 and the first reserved slot 23 form a concave-convex shear key for occlusion, which realizes matching installation of factory production and ensures the joint degree of the segment body 24 At the same time, its shear resistance is improved; the second prestressed tunnel 21 is used to place the prestressed tendon 52 to form the overall connection of the segment body 24; the first reserved slot 23 effectively changes the traditional self-resetting bridge piers. The high-pressure water gun chiseling treatment method realizes the high-precision matching installation of all seams, and significantly improves the resistance performance under horizontal load.

如图8和9所示,预制盖梁3包括箱梁限制部34和箱梁承托部35,箱梁限制部34与箱梁承托部35的两端垂直连接,箱梁承托部35的顶部中部位置均匀分布这4个第二预留孔洞31,第二预留孔洞31的底部分别通过第三预应力孔道32与箱梁承托部35的底部连通,箱梁承托部35的底部设有4个第二预留槽孔33,相对的2个第二预留槽孔33相互平行,并且每个第二预留槽孔33位于相邻的两个第三预应力孔道32之间。As shown in Figures 8 and 9, the prefabricated cover beam 3 includes a box girder limiting portion 34 and a box girder supporting portion 35, the box girder limiting portion 34 is vertically connected with the two ends of the box girder supporting portion 35, and the box girder supporting portion 35 The four second reserved holes 31 are evenly distributed in the middle of the top, and the bottoms of the second reserved holes 31 communicate with the bottom of the box girder supporting part 35 respectively through the third prestressed tunnel 32, and the bottom of the box girder supporting part 35 The bottom is provided with 4 second reserved slots 33 , the two opposite second reserved slots 33 are parallel to each other, and each second reserved slot 33 is located between two adjacent third prestressed channels 32 between.

箱梁限制部34用于对预制箱梁4进行限位固定;箱梁承托部35用于承托预制箱梁4第二预留孔洞31用于安装预应力锚具51;第三预应力孔道32用于穿过预应力筋52。第二预留槽孔33有效改变了传统自复位桥墩拼缝处采用高压水枪凿毛处理的方式,实现全接缝高精度匹配安装的同时,显著提高了水平荷载作用下的抗力性能。The box girder limiting part 34 is used to limit and fix the prefabricated box girder 4; the box girder support part 35 is used to support the prefabricated box girder 4; the second reserved hole 31 is used for installing the prestressed anchor 51; the third prestressed anchor The tunnels 32 are used to pass through the prestressing tendons 52 . The second reserved slot 33 has effectively changed the way of using high-pressure water gun chiseling at the joints of traditional self-resetting bridge piers, and achieved high-precision matching installation of all joints, while significantly improving the resistance performance under horizontal loads.

如图12所示,弹性块体7包括2个吊环71和弹性方块72,2个吊环71对称地安装在弹性方块72的顶部,弹性方块72与承台底座1的作业空间14相匹配。吊环71方便维护人员从作业空间14内取出弹性方块72;弹性方块72用于填充作业空间14并对预制桥墩节段2侧向约束。As shown in FIG. 12 , the elastic block 7 includes two suspension rings 71 and an elastic block 72 , the two suspension rings 71 are symmetrically installed on the top of the elastic block 72 , and the elastic block 72 matches the working space 14 of the platform base 1 . The suspension ring 71 is convenient for maintenance personnel to take out the elastic block 72 from the working space 14; the elastic block 72 is used to fill the working space 14 and constrain the prefabricated pier segment 2 laterally.

上述具体实施方式为本发明的优选实施例,并不能对本发明进行限定,其他的任何未背离本发明的技术方案而所做的改变或其它等效的置换方式,都包含在本发明的保护范围之内。The specific implementation described above is a preferred embodiment of the present invention, and does not limit the present invention. Any other changes or other equivalent replacement methods that do not deviate from the technical solution of the present invention are included in the scope of protection of the present invention. within.

Claims (10)

1. A construction method of an easily-replaced self-resetting assembly type concrete bridge system is characterized by comprising the following steps:
s1, pouring a reinforcement cage, a positioning bracket and concrete to complete a bearing platform base;
s2, mounting the prestressed anchorage device on the bearing platform base, connecting one end of a prestressed tendon with the prestressed anchorage device, and extending the other end of the prestressed tendon out of the bearing platform base;
s3, sequentially penetrating the other end of the prestressed tendon through a plurality of prefabricated pier sections, connecting one prefabricated pier section with the bearing platform base, and stacking the prefabricated pier sections;
s4, hoisting a prefabricated capping beam to the top of a plurality of sections of the prefabricated pier sections, wherein the other end of each prestressed tendon is connected with the prefabricated capping beam, and the prefabricated pier sections are connected with the prefabricated capping beam;
and S5, mounting the prefabricated capping beam on the prefabricated capping beam through a plurality of elastic supports, wherein the elastic block is arranged in the operation space of the bearing platform base.
2. The construction method of an easily replaceable self-resetting fabricated concrete bridge system according to claim 1, wherein the step S1 comprises the steps of:
s101, fixing the reinforcement cage, and connecting the positioning bracket with the reinforcement cage;
s102, supporting a bearing platform template on the periphery of the reinforcement cage, wherein the bearing platform template is provided with a first reserved hole, a first pre-stressed duct and an operation space;
s103, pouring concrete into the bearing platform formwork, and obtaining the bearing platform base after the concrete is solidified.
3. The construction method of an easily replaceable self-resetting fabricated concrete bridge system according to claim 1, wherein the step S3 comprises the steps of:
s301, hoisting a section of the prefabricated pier segment above the bearing platform base, wherein the prestressed tendon penetrates through the section of the prefabricated pier segment, and a first shear key of the bearing platform base is installed in a first reserved slotted hole of the section of the prefabricated pier segment;
s302, hoisting the other section of the prefabricated pier segment to the position above the one section of the prefabricated pier segment, enabling the prestressed tendon to penetrate through the other section of the prefabricated pier segment, and installing a second shear key of the other section of the prefabricated pier segment in a first reserved slotted hole of the one section of the prefabricated pier segment;
and S303, repeating the step S302, and finishing the stacking of all the prefabricated pier segments.
4. The construction method of an easily replaceable self-resetting fabricated concrete bridge system according to claim 1, wherein the bearing platform base in the step S1 comprises a positioning bracket and a bearing platform square block, the positioning bracket is arranged on the bearing platform square block and protrudes out of the top of the bearing platform square block, the prestressed anchor is arranged on the bearing platform square block, the prestressed tendon passes through the positioning bracket, and the positioning bracket is connected with the precast bridge pier segment.
5. The construction method of an easily replaceable self-resetting fabricated concrete bridge system according to claim 4, wherein the bearing platform block is provided with a working space, a first reserved hole and a first pre-stressed duct, the working space is arranged at two sides of a positioning bracket, the working space is communicated with the first pre-stressed duct through the first reserved hole, and the positioning bracket is arranged in the first pre-stressed duct.
6. The construction method of the self-resetting fabricated concrete bridge system easy to replace as claimed in claim 4, wherein the positioning bracket comprises a prestressed pipe, a positioning plate, a first shear key and a stud, the positioning plate is installed inside the bearing block, the positioning plate is connected with the prestressed pipe through the prestressed pipe, one end of the prestressed tendon passes through the prestressed pipe, the first shear key is arranged on one surface of the positioning plate and protrudes out of the top of the bearing block, and the stud is arranged on the other surface of the positioning plate and is installed on the bearing block.
7. The construction method of the self-resetting fabricated concrete bridge system easy to replace according to claim 1, wherein the prefabricated bridge pier segment in the step S3 comprises a second shear key and a segment body, the segment body is provided with a hollow structure, a plurality of second through prestressed ducts are arranged around the hollow structure, the prestressed connecting assembly penetrates through the second prestressed ducts, the second shear key is installed at one end of the segment body, the other end of the segment body is provided with a first reserved slotted hole, and the first reserved slotted hole is respectively matched with the second shear key and a bearing platform base.
8. The construction method of an easily replaceable self-resetting fabricated concrete bridge system according to claim 1, wherein the precast capping beam in step S4 comprises a box girder limiting portion and a box girder supporting portion, the box girder limiting portion is connected with both ends of the box girder supporting portion, a plurality of second pre-stressed holes are formed in the top of the box girder supporting portion, the plurality of second pre-stressed holes are respectively communicated with the bottom of the box girder supporting portion through third pre-stressed holes, the pre-stressed anchor is installed in the second pre-stressed holes, the pre-stressed tendons pass through the third pre-stressed holes, a second pre-stressed slot is formed in the bottom of the box girder supporting portion, and the second pre-stressed slot is matched with the precast bridge pier segment.
9. The construction method of an easily replaceable self-resetting fabricated concrete bridge system according to claim 1, wherein the elastic block in the step S5 comprises a hanging ring and a block, the hanging ring is installed on the top of the block, and the block is matched with the bearing platform base.
10. The construction method of the self-resetting fabricated concrete bridge system easy to replace according to claim 1, wherein the concrete in the step S1 is ultra-high performance concrete.
CN202211114948.0A 2022-09-14 2022-09-14 Construction method of self-resetting assembled concrete bridge system easy to replace Active CN115522457B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211114948.0A CN115522457B (en) 2022-09-14 2022-09-14 Construction method of self-resetting assembled concrete bridge system easy to replace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211114948.0A CN115522457B (en) 2022-09-14 2022-09-14 Construction method of self-resetting assembled concrete bridge system easy to replace

Publications (2)

Publication Number Publication Date
CN115522457A true CN115522457A (en) 2022-12-27
CN115522457B CN115522457B (en) 2025-10-17

Family

ID=84698738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211114948.0A Active CN115522457B (en) 2022-09-14 2022-09-14 Construction method of self-resetting assembled concrete bridge system easy to replace

Country Status (1)

Country Link
CN (1) CN115522457B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116377829A (en) * 2023-05-12 2023-07-04 湖南大学 Segmental connection structure and construction method of box-shaped UHPC compression member
CN117822458A (en) * 2024-01-22 2024-04-05 中建三局集团长江有限公司 A kind of assembled cap beam and box beam guiding installation structure and construction process

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN210827084U (en) * 2019-09-24 2020-06-23 苏交科集团股份有限公司 A steel plate connecting prefabricated segmental pier connection structure with an external energy dissipation device
US20210032819A1 (en) * 2018-02-05 2021-02-04 Hengqin Gonge Technology Co., Ltd. A precast segmental pier reinforced with both conventional steel bars and high-strength steel bars
CN212656105U (en) * 2020-04-14 2021-03-05 北京工业大学 Self-resetting prefabricated assembled pier
CN212688679U (en) * 2020-06-23 2021-03-12 陕西省建筑科学研究院有限公司 Pier is assembled to dry joint unbonded prestressing force segment
CN114382005A (en) * 2022-02-28 2022-04-22 南京理工大学 A segmental assembled bridge pier with stepped performance and its construction method
CN114411535A (en) * 2022-03-11 2022-04-29 北京交通大学 Full-prestress double-column type segment assembled pier with external energy dissipation damper and design and construction method thereof
CN218322311U (en) * 2022-09-14 2023-01-17 华南理工大学 A self-resetting prefabricated concrete bridge system that is easy to replace

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20210032819A1 (en) * 2018-02-05 2021-02-04 Hengqin Gonge Technology Co., Ltd. A precast segmental pier reinforced with both conventional steel bars and high-strength steel bars
CN210827084U (en) * 2019-09-24 2020-06-23 苏交科集团股份有限公司 A steel plate connecting prefabricated segmental pier connection structure with an external energy dissipation device
CN212656105U (en) * 2020-04-14 2021-03-05 北京工业大学 Self-resetting prefabricated assembled pier
CN212688679U (en) * 2020-06-23 2021-03-12 陕西省建筑科学研究院有限公司 Pier is assembled to dry joint unbonded prestressing force segment
CN114382005A (en) * 2022-02-28 2022-04-22 南京理工大学 A segmental assembled bridge pier with stepped performance and its construction method
CN114411535A (en) * 2022-03-11 2022-04-29 北京交通大学 Full-prestress double-column type segment assembled pier with external energy dissipation damper and design and construction method thereof
CN218322311U (en) * 2022-09-14 2023-01-17 华南理工大学 A self-resetting prefabricated concrete bridge system that is easy to replace

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116377829A (en) * 2023-05-12 2023-07-04 湖南大学 Segmental connection structure and construction method of box-shaped UHPC compression member
CN116377829B (en) * 2023-05-12 2023-10-20 湖南大学 A segmental connection structure of box-shaped UHPC pressure components and its construction method
CN117822458A (en) * 2024-01-22 2024-04-05 中建三局集团长江有限公司 A kind of assembled cap beam and box beam guiding installation structure and construction process

Also Published As

Publication number Publication date
CN115522457B (en) 2025-10-17

Similar Documents

Publication Publication Date Title
CN110847044B (en) Semi-prefabricated assembled bent cap construction method
CN110396918B (en) An assembled hollow bridge pier system equivalent to cast-in-place and its construction method
CN108505433B (en) Pier structure and construction method thereof
CN111962386A (en) Energy-consuming and shock-absorbing self-resetting prefabricated segmental pier structure and its construction method
CN110792165B (en) Prefabricated assembly type concrete beam column joint connecting device and method
CN109440623B (en) Temporary splicing structure of precast bridge of concrete segment
CN108978434B (en) A bracket-free industrial construction method for steel-concrete composite continuous box girder bridge
WO2019149270A1 (en) Assembled pier for mixed reinforcement of normal steel rebar and finished threaded steel bar
CN114592436B (en) Pier capping beam lower support system and construction method thereof
CN110777661A (en) Flange connection prefabricated assembly pier structure and construction method thereof
CN105970800B (en) The abutment connecting structure and its construction method of monoblock type combination beam is seamless bridge
CN104727441A (en) Prestress assembled concrete beam column joint structure and construction method thereof
CN110359363A (en) Prestressing force assembled Self-resetting bridge pier column node and method are cohered in a kind of part
CN211036679U (en) Socket joint connection structure of prefabricated pier stud of assembled bridge and cushion cap
CN110172869B (en) Assembled ballastless track system and construction method thereof
CN110042741A (en) A kind of casing constraint Precast Concrete Segmental Bridges pier stud and its construction method
CN110184903B (en) A truss-type prefabricated pipe column assembled bridge pier
CN111926690A (en) Novel pier is assembled in prefabrication
CN104594193B (en) Superstructure of a hollow slab girder bridge and its construction method
CN112502714A (en) Assembled shaft barrel structure and design and construction method
CN114541243A (en) Steel supporting hoop type concrete pile-column joint of assembly type bridge pier and construction method
CN114411535A (en) Full-prestress double-column type segment assembled pier with external energy dissipation damper and design and construction method thereof
CN113374073A (en) Prefabricated concrete structure beam column connecting node, connecting method and repairing method
CN109898540B (en) Wet joint structure among bridge pier, bearing platform and pile foundation and construction process thereof
CN210529936U (en) CFST column-I-beam connection node

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant