CN115370831A - Clamp device for quickly connecting pipelines - Google Patents

Clamp device for quickly connecting pipelines Download PDF

Info

Publication number
CN115370831A
CN115370831A CN202211000308.7A CN202211000308A CN115370831A CN 115370831 A CN115370831 A CN 115370831A CN 202211000308 A CN202211000308 A CN 202211000308A CN 115370831 A CN115370831 A CN 115370831A
Authority
CN
China
Prior art keywords
pipeline
assembly
connection
piece
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211000308.7A
Other languages
Chinese (zh)
Inventor
刘昌良
张生龙
王传铭
杨超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Installation Engineering Co Ltd filed Critical China Construction Fourth Bureau Installation Engineering Co Ltd
Priority to CN202211000308.7A priority Critical patent/CN115370831A/en
Publication of CN115370831A publication Critical patent/CN115370831A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/08Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
    • F16L3/10Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L21/00Joints with sleeve or socket
    • F16L21/06Joints with sleeve or socket with a divided sleeve or ring clamping around the pipe-ends
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/16Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
    • F16L3/20Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention discloses a hoop device for quickly connecting pipelines, which comprises an interval connection supporting piece, wherein the interval connection supporting piece is provided with an initial longitudinal height adjusting component, a connection hoop piece and a building layer assembly terrain adapting component, and the interval connection supporting piece and the connection hoop piece are clamped and assembled through a buckling assembly component; the utility model discloses a high-rise building interval position environment's efficiency of construction is kept, simultaneously because the pipeline is in the support state all the time in the butt joint adjustment process, stability when can improve the transfer effectively reduces the construction risk.

Description

Clamp device for quickly connecting pipelines
Technical Field
The invention relates to the technical field of pipeline construction, in particular to a hoop device for quickly connecting pipelines.
Background
The pipeline connection is commonly seen in the ground construction link, mainly adopt the loop wheel machine to be after the state of lifting by crane with the subtend pipeline, find the butt joint point between the pipelines accurately, then accomplish the fixing between the pipelines through the connecting piece, this kind of connected mode has great operating space to give lifting device a good removal and a holding surface under the link, therefore adaptation is effectual, but when the construction operation face is located the environment in the built on stilts construction face of locating between the building of both ends, because remove and holding surface dwindle, lifting device's portable space reduces, at this moment because there is great fretwork scope in the interval influence between the subtend building, the required time when adjusting the vertical height in the pipeline butt joint and precision receive under the influence, the extension of exposing in this link time can increase the construction risk, therefore the protection security of the above-mentioned operation mode of ground butt joint is not ideal enough, be unfavorable for being located the pre-connection of striding type pipeline pavement between the building. To this end, we propose a clamp device for quick connection of pipes.
Disclosure of Invention
The invention mainly aims to provide a clamp device for quickly connecting pipelines.
In order to achieve the purpose, the invention adopts the technical scheme that: a hoop device for quickly connecting pipelines comprises an interval connection supporting piece, wherein the interval connection supporting piece is provided with an initial longitudinal height adjusting component, a connection hoop piece and a building layer assembly terrain adapting component, the interval connection supporting piece and the connection hoop piece are assembled in a clamping way through a buckling assembly component, the initial longitudinal height adjusting component adjusts the butt joint longitudinal height of a pipeline on the inner side of the connection hoop piece according to the link laying position, one side of the connection hoop piece is provided with an overhead point-to-point connection, the overhead point-to-point connection is used for measuring the alignment accuracy of the bidirectional pipeline after the bidirectional pipeline is arranged, and further calibration during butt joint clamping of the pipeline is realized, the buckling assembly component comprises a stretching locking clamping seat, an adaptive assembly seat, a hoisting connection support lug and a sliding locking connection driving piece, the stretching locking clamping seat is fixedly connected with the connection hoop piece, and the adaptive assembly seat is fixedly connected with the interval connection supporting piece, and then after the pipeline is established to the inboard cover of connection clamp spare, through stretch lock joint solid seat with the adaptation connects the seat and realizes the slip assembly, hoist and mount connection journal stirrup install in the top of adaptation dress joint seat, the slip lock connect the driving piece with hoist and mount connection journal stirrup fixed connection, the slip lock connects the driving piece to be used for stretch lock joint solid seat with it is right after the slip assembly of adaptation dress joint seat the position locking of connection clamp spare, built on stilts counter point connection is including arranging and preventing warping fender bracket, pencil light and jet out the response group and laminating contact sensing unit, laminating contact sensing unit is fixed in arrange and prevent warping the ground of fender bracket survey, pencil light jet out response group fixed mounting in arrange the outer wall of warping prevention fender bracket, arrange and prevent warping the fender bracket block in behind the connection clamp spare outside through laminating contact sensing unit detect the pipeline with arrange and prevent warping the prevention of detection pipeline of contact sensing unit with arrange The laminating degree between the perk support, and then maintain when pencil light jets out the two-way accurate pipeline butt joint levelness of response group school the high position benchmark of the support of proof warp of arranging, arrange the support of proof warp with adaptation dress connection seat sliding connection, and then connect the clamp part cover locate the pipeline outside and accomplish with after the sliding assembly of lock joint assembly subassembly, jet out the pipeline that the response group arranged subtend through pencil light and realize the horizontal alignment and detect, and then supplementary subtend pipeline's high-speed joint.
The invention is further improved in that the initial vertical height adjusting assembly comprises a screw rod transmission set and a vertical adjusting transmission piece, the vertical adjusting transmission piece is connected to the inner side of the interval connecting support piece in a sliding mode and is fixedly connected with the building layer assembly terrain adapting assembly, and the position height of the vertical adjusting transmission piece is adjusted by controlling the screw rod transmission set, so that the adjustment and control of the height of a foundation required to be erected for the building layer assembly terrain adapting assembly and a construction pipeline are completed.
The building layer assembly terrain adaptation assembly is further improved in that the building layer assembly terrain adaptation assembly comprises a triangular lateral support frame, an extension floor connection frame and an anti-tilting weight box, the extension floor connection frame is fixedly connected between the triangular lateral support frame and the anti-tilting weight box, the triangular lateral support frame is fixedly connected with the longitudinal adjusting transmission piece so that the triangular lateral support frame can synchronously move along with the longitudinal adjusting transmission piece to realize the adjustment and control of the vertical height of the construction pipeline erection, and a breakpoint for limiting transverse displacement during butt joint is fixedly connected to the outer side of the triangular lateral support frame and is placed into the opposite plate.
The invention further improves the structure that the assembling frame is erected at the bottom of the pipeline and is used for assisting the bearing support of the pipeline inside the connecting clamp member during the connecting construction.
In a further improvement of the present invention, the beam light emitting sensing set comprises a processing responder, a plurality of beam spot emitting units and a plurality of beam spot receiving units, wherein the plurality of beam spot emitting units or the plurality of beam spot receiving units are arranged in a matrix on the outer side wall of the warping-proof support.
In a further improvement of the present invention, a method of using a clamp device for quick connect pipe work, comprising:
s1, before connecting construction pipelines, controlling a lead screw transmission set to start according to an assembly plan of the height of the pipelines in the current link, driving a longitudinal adjusting transmission piece to drive an extension floor connecting frame to longitudinally adjust and rise along an interval connecting supporting piece, adjusting the interval between the interval connecting supporting piece and a building layer assembly terrain adaptive assembly, enabling a connecting clamp piece to preliminarily adapt to the height required by the pipelines, and further eliminating a large height error during assembly;
s2, after the required height of the pipeline is preliminarily adapted, the pipeline is hung on the inner side of the connecting clamp piece and locked, and then the pipeline is arranged on the bottom side of the pipeline through an assembling frame high arc frame to be pre-supported, so that the arrangement before the pipeline is connected is completed;
and S3, after the operation in the S2 is completed, pushing the warping-proof support to be clamped with the pipeline, enabling the sensing point of the laminating contact sensing unit to be in contact with the outer wall of the pipeline, sending a point-to-point marking light beam through the wire harness light ray emitting sensing group in the two opposite pipeline positions, approving the horizontal positions of the two pipelines through the acquisition and approval coincidence degree of the light beam spot, finely adjusting the positions of the pipelines through the contraction of the connecting clamp piece top extending and locking the clamping seat by jacking the pipeline of the assembly frame high-arc frame, enabling the pipeline to be in a supporting state all the time, keeping the stability during transferring, aligning the two pipelines until the point-to-point marking signals sent by the wire harness light ray emitting sensing group coincide, and finishing the clamping by slidably arranging the connecting clamp piece in the middle position at the butt joint positions of the two pipelines.
Compared with the prior art, when the pipelines at the interval between the opposite high-rise buildings are butted, the interval between the interval connecting supporting piece and the building assembly terrain adaptation assembly is adjusted by driving the longitudinal adjusting transmission piece, so that the connecting clamp piece is preliminarily adapted to the height required by the pipelines, and further, a large height error during assembly is eliminated, then, the point-to-point marking light beams are sent by the wire harness light emitting induction group in the opposite two pipeline positions, the horizontal positions of the two pipelines are approved by collecting and approving the coincidence degree, the longitudinal height fine adjustment is realized by jacking the seven inner side pipelines through the assembling frame high arc frame until the point-to-point marking signals sent by the wire harness light emitting induction group are coincided, namely, the two pipelines are aligned, finally, the connecting clamp piece is slidably arranged at the butt joint position of the two pipelines, the connection of the pipelines is completed, the construction efficiency of the environment at the interval between the high-rise buildings is kept, and meanwhile, the stability during the adjustment can be improved, and the construction risk is effectively reduced because the pipelines are always in the supporting state during the butt joint adjustment.
Drawings
Fig. 1 is a view showing a band assembly for a quick connect pipe according to the present invention.
Fig. 2 is a side view of a clamp assembly for quick connect piping of the present invention.
Fig. 3 is an isometric view of a clamp assembly for quick connect piping of the present invention.
Fig. 4 is a bottom view of a clamp assembly for quick connect piping of the present invention.
In the figure: 1. connecting the supporting pieces at intervals; 2. an initial vertical adjustment assembly; 21. a screw rod transmission set; 22. longitudinally adjusting the transmission member; 3. connecting the clamp members; 4. buckling and assembling the components; 41. a locking and fastening seat is extended; 42. a fitting connection seat is adapted; 43. hoisting and connecting the support lugs; 44. the sliding lock is connected with the driving piece; 5. overhead point-to-point connection; 51. arranging an anti-warping support; 52. the light of the wire harness is emitted out of the sensing group; 53. attaching a contact sensing unit; 6. building layer assembly terrain adaptation components; 61. a triangular lateral support frame; 611. the breakpoint is placed in the opposite plate; 62. extending the floor connecting frame; 63. an anti-tilt weight box; 7. and assembling an overhead arc frame.
Detailed Description
The present invention will be further described with reference to the following detailed description, wherein the drawings are for illustrative purposes only and are not intended to be limiting, wherein certain elements may be omitted, enlarged or reduced in size, and are not intended to represent the actual dimensions of the product, so as to better illustrate the detailed description of the invention.
Example 1
Referring to fig. 1-4, a clamp device for fast connecting pipelines comprises a spacing connection support member 1, the spacing connection support member 1 is provided with an initial vertical height adjusting assembly 2, a connection clamp member 3 and a building layer assembly terrain adapting assembly 6, the spacing connection support member 1 and the connection clamp member 3 are clamped and assembled through a buckling assembly 4, the initial vertical height adjusting assembly 2 adjusts the butt joint vertical height of the pipeline at the inner side of the connection clamp member 3 according to the link layout position, one side of the connection clamp member 3 is provided with an overhead point-to-point connection 5, the overhead point-to-point connection 5 is used for measuring the alignment accuracy of the bidirectional pipeline after the bidirectional pipeline is arranged, so as to realize the calibration when the pipeline is clamped, the buckling assembly 4 comprises a stretching and locking fixing seat 41, an adaptation seat mounting 42, a hoisting connection lug 43 and a sliding locking driving member 44, the stretching and locking fixing seat 41 is fixedly connected with the connection clamp member 3, the adaptation mounting seat 42 is fixedly connected with the spacing connection support member 1, furthermore, after the pipeline is sleeved on the inner side of the connecting clamp member 3, sliding assembly is realized through the extending-locking clamping fixed seat 41 and the adaptive connecting seat 42, the hoisting connecting support lug 43 is installed at the top of the adaptive connecting seat 42, the sliding-locking driving member 44 is fixedly connected with the hoisting connecting support lug 43, the sliding-locking driving member 44 is used for locking the position of the connecting clamp member 3 after the extending-locking clamping fixed seat 41 and the adaptive connecting seat 42 are slidably assembled, the overhead point-to-point connection 5 comprises an arrangement warping-prevention support frame 51, a wiring harness light ray emission sensing group 52 and a laminating contact sensing unit 53, the laminating contact sensing unit 53 is fixed on the ground side of the arrangement warping-prevention support frame 51, the wiring harness light ray emission sensing group 52 is fixedly installed on the outer wall of the arrangement warping-prevention support frame 51, the arrangement warping-prevention support frame 51 is clamped on the outer side of the connecting clamp member 3, and then the laminating contact sensing unit 53 detects the laminating between the pipeline and the warping-prevention support frame 51 through the laminating contact sensing unit 53 The degree, and then the height position benchmark of arranging the anti-warp support 51 when keeping pencil light to jet out response group 52 calibration two-way alignment pipeline butt joint levelness, arrange anti-warp support 51 and adaptation dress connecting seat 42 sliding connection, and then after connecting clamp member 3 cover locates the pipeline outside and accomplishes the sliding fit with lock joint assembly 4, realize the horizontal alignment detection with the pipeline of subtend arrangement through pencil light jets out response group 52, and then supplementary subtend pipeline's high-speed joint.
In the embodiment, before the pipeline construction connection in the high-rise interval link of the building, the whole device is respectively hoisted on two opposite building layers by the hoisting connection support lugs 43, then the screw rod transmission set 21 is controlled to start according to the required pipeline assembly height, so that the longitudinal adjusting transmission piece 22 drives the extension floor connecting frame 62 to longitudinally slide and lift along the interval connection support piece 1, further adjusting the distance between the spacing connection support member 1 and the building layer assembly terrain adaptation component 6 to preliminarily adapt the connection height of the connection clamp member 3 required by the pipeline, so as to fulfill the aim of eliminating a larger height error in assembly, after the height of the connection clamp member 3 is preliminarily adapted to the height required by the pipeline, the pipeline hanger can be placed in the inner side of the connecting clamp piece 3, the pipeline is locked through the connecting clamp piece 3, then the assembling frame arc frame 7 is arranged on the bottom side of the pipeline for pre-supporting, the arrangement before the pipeline connection is completed, at the moment, an operator pushes the arrangement anti-warp support frame 51 which is slidably connected and installed with the adapting assembling adapter 42 to be clamped with the pipeline, the induction point of the attaching contact sensing unit 53 is contacted with the outer wall of the pipeline, after the contact is completed, the point-marking light beam is sent through the wire harness light ray emitting induction group 52 in the opposite two pipeline positions, the operator approves the horizontal positions of the two pipelines through the coincidence degree acquisition of the light beam spots, the pipeline is lifted by the assembly frame high arc frame 7, the fine adjustment of the position of the pipeline is realized by the contraction of the top extension locking clamping seats 41 of the connecting clamping hoop parts 3, the pipeline is always in a supporting state at the moment, the stability during the adjustment is kept until the point alignment marking signals sent by the wire harness light ray ejection induction group 52 are superposed, i.e., alignment between two pipes in both directions, the clamp is completed by slidably positioning the connection clamp member 3 at the medial position at the butt point position of the two pipes.
The initial vertical height adjusting assembly 2 comprises a screw rod transmission set 21 and a vertical adjusting transmission piece 22, the vertical adjusting transmission piece 22 is connected to the inner side of the interval connection supporting piece 1 in a sliding mode, the vertical adjusting transmission piece 22 is fixedly connected with the building layer assembly terrain adaptation assembly 6, the position height of the vertical adjusting transmission piece 22 is adjusted by controlling the screw rod transmission set 21, and then the adjustment and control of the height of a foundation required to be erected between the building layer assembly terrain adaptation assembly 6 and a construction pipeline are completed; the screw rod transmission group 21 is composed of a driving motor and a screw rod installed on the driving motor, wherein the screw rod penetrates through the longitudinal adjusting transmission part 22 and is in threaded connection with the longitudinal adjusting transmission part 22, the driving motor in the screw rod transmission group 21 drives the screw rod to be in threaded fit with the longitudinal adjusting transmission part 22, so that the longitudinal adjusting transmission part 22 drives the longitudinal adjusting transmission part 22 to move along a sliding groove path of the interval connection support part 1 under the limiting action of the interval connection support part 1, the interval height between the building layer assembly terrain adaptation component 6 and the connection clamp part 3 is adjusted, and the correction of the reference height before the pipeline is in butt joint in advance is completed.
The building layer assembly terrain adaptation assembly 6 comprises a triangular lateral support frame 61, an extension floor connecting frame 62 and an anti-tilting weight box 63, the extension floor connecting frame 62 is fixedly connected between the triangular lateral support frame 61 and the anti-tilting weight box 63, the triangular lateral support frame 61 is fixedly connected with a longitudinal adjusting transmission piece 22 so as to enable the triangular lateral support frame 61 to synchronously displace along with the longitudinal adjusting transmission piece 22 to realize the regulation and control of the vertical height of the construction pipeline erection, and the outer side of the triangular lateral support frame 61 is fixedly connected with a breakpoint for limiting transverse displacement during butt joint and placed into the opposite plate 611; triangle side direction support frame 61 and extension connect floor frame 62 to erect behind the building aspect, put into to putting into the space of building aspect interval to board 611 through the breakpoint, make the biggest slide path of triangle side direction support frame 61 put into because of the breakpoint and receive the separation to the contact of board 611 and building aspect contained angle part, avoid connecting pipeline to the inboard hoist and mount in-process triangle side direction support frame 61 of coupling clip 3 owing to receive the contact and produce great displacement, the mode that prevents inclining weight box 63's inside accessible injection water source increases the support counter weight that the extension connects floor frame 62 and triangle side direction support frame 61, and then make and connect behind the collar 3 puts into the pipeline, triangle side direction support frame 61 and extension connect floor frame 62 to produce because of the influence of the inboard pipeline weight of coupling clip 3 and lean forward, keep the assembly stability.
The assembly frame high arc frame 7 is erected at the bottom of the pipeline and is used for assisting in connecting a bearing support of the pipeline inside the hoop member 3 during connection construction; the assembly frame elevated arc frame 7 is by the ground connection support, the arc push pedal and heighten the screw rod and constitute, it rises to drive the arc support through heightening the screw rod, make the inboard pipeline of erectting the arc push pedal realize rising the fine setting owing to the promotion that the arc support rises, stretch the lock card solid seat 41 owing to be extending structure, and arrange and prevent warping the support 51 and connect the seat 42 slidable mounting with the adaptation, make arrange and prevent warping the support 51 and stretch the lock card solid seat 41 and all can be when the assembly frame elevated arc frame 7 fine-tuning with the pipeline position along with the removal displacement and the shrink of pipeline, separation when can not causing the vertical height adjustment.
The beam light emitting and sensing group 52 comprises a processing responder, a plurality of beam spot emitting units and beam spot receiving units, wherein the beam spot emitting units or the beam spot receiving units are arranged on the outer side wall of the arrangement warping-proof support frame 51 in a matrix manner; the butt joint pipelines are arranged in opposite directions, the two pipelines are respectively sleeved by the two connecting clamp members 3 after being arranged by the interval connecting supporting members 1 adapting to the quantity of the pipelines, until the bottom of the pipeline is supported by the assembly frame high-arc frame 7, the beam spot transmitting unit and the beam spot receiving unit in the two opposite direction arrangement beam ray outgoing induction groups 52 are independently opened, the beam spot transmitting unit transmits a beam signal to the opposite beam spot receiving unit, the signal is processed by the processing responder, namely the beam spot receiving unit at each position receives a marking signal transmitted by the beam spot transmitting unit to judge that alignment is finished, when the beam spot receiving unit at each position does not receive the induction signal, the processing responder transmits the marking signal to a receiving terminal (a smart phone or a computer end) in an image form through a wireless signal to finish feedback, an operator realizes fine adjustment by feeding back information through jacking the assembly frame high-arc frame 7, and the quick connection of the connecting clamp members 3 sleeved between the two opposite direction pipelines is finished.
Example 2
In this embodiment, the difference from embodiment 1 is that the connection clamp member 3 is assembled quickly by installing the extension-lock fastening seat 41 and the adaptation-fastening seat 42, when installed, the extension-lock fastening seat 41 is pushed into the adaptation-fastening seat 42, the extension-lock fastening seat 41 is an i-shaped block, the inner side of the adaptation-fastening seat 42 is provided with a slot adapted to the extension-lock fastening seat 41, the adaptation-fastening seat 42 is provided with a through hole, the extension-lock fastening seat 41 is provided with a slot, after the adaptation-fastening seat 42 is inserted into the extension-lock fastening seat 41 in a sliding manner, the sliding lock member 44 extends to drive the slot inner side of the extension-lock fastening seat 41 to be inserted into the slot inner side of the extension-lock fastening seat 42 through the through hole provided by the adaptation-fastening seat 42 to realize the locking after sliding, and when the connection clamp member 3 is detached and used alone, the sliding lock between the extension-lock fastening seat 41 and the adaptation-fastening seat 42 is released by controlling the sliding lock member 44 to contract, so that the connection clamp member 3 can be detached again and used alone as a pipe connection member.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (10)

1. The utility model provides a clamp device of quick connect pipe, includes interval connection support piece (1), its characterized in that, interval connection support piece (1) is installed and is initially indulged high regulating component (2), is connected clamp piece (3) and building layer assembly topography adaptation subassembly (6), interval connection support piece (1) with connect between clamp piece (3) through lock joint assembly subassembly (4) block assembly, initial height regulating component (2) are laid the position adjustment according to the link connect the butt joint of the inboard pipeline of clamp piece (3) is indulged high, built on stilts to point connection (5) are installed to one side of connecting clamp piece (3), built on stilts to point connection (5) are used for behind the two-way arrangement pipeline survey the counterpoint accuracy of two-way pipeline, and then realize the calibration when the pipeline is to the joint.
2. A clamp device for quick connect piping as claimed in claim 1, wherein: the initial vertical height adjusting assembly (2) comprises a screw rod transmission set (21) and a longitudinal adjusting transmission piece (22), the longitudinal adjusting transmission piece (22) is connected to the inner side of the interval connection supporting piece (1) in a sliding mode, the longitudinal adjusting transmission piece (22) is fixedly connected with the building layer assembly terrain adapting assembly (6), the position height of the longitudinal adjusting transmission piece (22) is adjusted through controlling the screw rod transmission set (21), and then the building layer assembly terrain adapting assembly (6) and a construction pipeline need to erect the height of a foundation to be adjusted and controlled.
3. A clamp device for quick connect piping as claimed in claim 1, wherein: the buckling assembly component (4) comprises an extension locking clamping fixing seat (41), an adaptive assembly fixing seat (42), a hoisting connection support lug (43) and a sliding locking connection driving piece (44), the extension locking clamping fixing seat (41) is fixedly connected with the connection clamp piece (3), the adaptive assembly connecting seat (42) is fixedly connected with the interval connection supporting piece (1), and after a pipeline is sleeved on the inner side of the connection clamp piece (3), sliding assembly is achieved through the extension locking clamping fixing seat (41) and the adaptive assembly connecting seat (42).
4. A clamp device for quick connect piping as claimed in claim 3, wherein: the hoisting connection support lug (43) is arranged at the top of the adaptive assembly connecting seat (42), the sliding locking driving piece (44) is fixedly connected with the hoisting connection support lug (43), and the sliding locking driving piece (44) is used for locking the position of the connecting clamp piece (3) after the sliding assembly of the extension locking clamping seat (41) and the adaptive assembly connecting seat (42).
5. A clamp device for quick connect piping as claimed in claim 1, wherein: overhead counter point is connected (5) including arranging and preventing warping fender bracket (51), pencil light and jets out response group (52) and laminating contact sensing unit (53), laminating contact sensing unit (53) are fixed in arrange and prevent warping the ground survey of fender bracket (51), pencil light jet-out response group (52) fixed mounting in arrange the outer wall of preventing warping fender bracket (51), arrange and prevent warping fender bracket (51) block in connect behind the hoop (3) outside through laminating contact sensing unit (53) detect the pipeline with arrange the laminating degree of preventing between fender bracket (51), and then maintain when pencil light jet-out response group (52) proofreads the pipeline butt joint levelness two-way arrange the high position benchmark of preventing warping fender bracket (51), arrange and warp fender bracket (51) and adaptation dress connection seat (42) sliding connection, and then connect the hoop (3) cover locate the pipeline outside and accomplish with the buckle assembly back of (4), and then realize the supplementary pipeline of the detection of subtend detection of the detection through the slip assembly of pencil light jet-out response group (52).
6. A clamp device for quick connect piping as claimed in claim 1, wherein: building layer assembly topography adaptation subassembly (6) include triangle side direction support frame (61), extension and connect ground plate frame (62) and prevent inclining weight box (63), extension connect ground plate frame (62) fixed connection in triangle side direction support frame (61) with prevent inclining between weight box (63), just triangle side direction support frame (61) with vertical regulation driving medium (22) fixed connection and then make triangle side direction support frame (61) realize the regulation and control of construction pipeline frame erectting vertical height along with vertical regulation driving medium (22) synchronous displacement.
7. The clamp device of claim 6, wherein: the outer side of the triangular lateral supporting frame (61) is fixedly connected with a breakpoint which is limited by transverse displacement during butt joint and is arranged in the opposite plate (611).
8. A clamp device for quick connect piping as claimed in claim 1, wherein: an assembly frame arc frame (7) is arranged on one side of the interval connection supporting piece (1), and the assembly frame arc frame (7) is erected at the bottom of the pipeline and used for assisting in bearing support during pipeline connection construction on the inner side of the connection clamp piece (3).
9. A clamp device for quick connect piping as claimed in claim 5, wherein: pencil light is jetted out response group (52) and is become a plurality of by handling response ware, a plurality of beam spot transmitting element and beam spot receiving element, a plurality of beam spot transmitting element or beam spot receiving element be the matrix arrange in arrange the lateral wall of proof warp support (51).
10. A method of using a clamp device for quick connect pipe work according to any of claims 1-9, comprising:
s1, before connecting construction pipelines, controlling a lead screw transmission group (21) to start according to an assembly plan of the height of the pipelines in the current link, driving a longitudinal adjusting transmission part (22) to drive an extension floor connecting frame (62) to be longitudinally adjusted and lifted along an interval connection supporting part (1), adjusting the interval between the interval connection supporting part (1) and a building layer assembly terrain adaptation component (6), enabling a connection clamp part (3) to preliminarily adapt to the height required by the pipelines, and further eliminating a large height error during assembly;
s2, after the required height of the pipeline is preliminarily adapted, the pipeline is hung on the inner side of the connecting clamp piece (3) and locked, and then the pipeline is arranged on the bottom side of the pipeline for pre-supporting through an assembling frame high arc frame (7), so that the arrangement before the pipeline is connected is completed;
and S3, after the operation in the S2 is completed, the arrangement anti-warping support frame (51) is pushed to be clamped with the pipeline, the sensing point of the attaching contact sensing unit (53) is in contact with the outer wall of the pipeline, then a point-aligning marking light beam is sent to the wire harness light ray emission sensing group (52) in the two pipeline positions, the horizontal positions of the two pipelines are approved by collecting and approving the coincidence degree of coincidence for the light beam spots, the pipeline is jacked up through the assembly frame high-arc frame (7) and is finely adjusted through contraction of the top extension locking clamping seat (41) of the connecting clamping hoop part (3), the pipeline is always in a supporting state at the moment, the stability during adjustment is kept until the point-aligning marking signals sent by the wire harness light ray emission sensing group (52) are coincided, namely the two pipelines are aligned, and the clamping hoop is completed by slidably arranging the connecting clamping hoop part (3) in the middle position at the joint position of the two pipelines.
CN202211000308.7A 2022-08-19 2022-08-19 Clamp device for quickly connecting pipelines Pending CN115370831A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211000308.7A CN115370831A (en) 2022-08-19 2022-08-19 Clamp device for quickly connecting pipelines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211000308.7A CN115370831A (en) 2022-08-19 2022-08-19 Clamp device for quickly connecting pipelines

Publications (1)

Publication Number Publication Date
CN115370831A true CN115370831A (en) 2022-11-22

Family

ID=84065536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211000308.7A Pending CN115370831A (en) 2022-08-19 2022-08-19 Clamp device for quickly connecting pipelines

Country Status (1)

Country Link
CN (1) CN115370831A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116655106A (en) * 2023-06-26 2023-08-29 青岛鑫源环保集团有限公司 Efficient urban sewage treatment device and treatment process adopting MBR (Membrane biological reactor) membrane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116655106A (en) * 2023-06-26 2023-08-29 青岛鑫源环保集团有限公司 Efficient urban sewage treatment device and treatment process adopting MBR (Membrane biological reactor) membrane
CN116655106B (en) * 2023-06-26 2024-02-09 青岛鑫源环保集团有限公司 Efficient urban sewage treatment device and treatment process adopting MBR (Membrane biological reactor) membrane

Similar Documents

Publication Publication Date Title
CN115370831A (en) Clamp device for quickly connecting pipelines
KR20090067295A (en) The off shore pipe line automatic welding device for easy alignment of welding seam
CN113800358B (en) Elevator well is just gentle and is filled up wall mechanism
CN207358452U (en) A kind of steel structures coating that frame precision positioning is always spelled for gusset
CN212350971U (en) Steel pipe group is to rounding device in tunnel
CN210716812U (en) Guide rail device
CN106744509A (en) Workpiece precision hanging apparatus and its method of work
CN218290193U (en) Screw hole positioning device
CN207892334U (en) A kind of EV charging units of no hull formula stereo garage
CN110541523A (en) vertical component positioning detection device in grouting sleeve and use method thereof
CN107512544B (en) A kind of conveying of roller bed skid it is guide locating device provided
JPH10331427A (en) Vibration isolation device installation jig and vibration isolation device installation method using the same
CN112192078B (en) Automatic assembling system for welding frame
KR102126558B1 (en) Jig device for assembling the saddle of the crane, and crane setting and inspection method using the same
CN211392611U (en) AGV tray positioning mechanism
CN210952833U (en) Architectural decoration detects structure
CN206717340U (en) Fork truck inner arm takes the jig of electricity
CN210944413U (en) Monitoring device for steel cable of friction type elevator
CN210636738U (en) Wall leveling component
CN210344758U (en) Novel frock of bar code scanning rifle installation device
CN113585112A (en) Automatic installation equipment and method for highway sound insulation screen
CN216107854U (en) Installation frock of rubber tyer rail guided way
CN201233232Y (en) Passenger transport dedicated line railway foundation pile control network height measurement sign device
CN212360481U (en) Positioning pin penetrating device and rocket transferring, butting and locking device
CN220622994U (en) Pipeline support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination