CN115370115A - Construction method of support-free cantilever platform - Google Patents

Construction method of support-free cantilever platform Download PDF

Info

Publication number
CN115370115A
CN115370115A CN202210903103.3A CN202210903103A CN115370115A CN 115370115 A CN115370115 A CN 115370115A CN 202210903103 A CN202210903103 A CN 202210903103A CN 115370115 A CN115370115 A CN 115370115A
Authority
CN
China
Prior art keywords
platform
fixed
support
construction
cantilevered
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210903103.3A
Other languages
Chinese (zh)
Inventor
杨培娜
龚小东
张特刚
刘岩
王璐
张鹏
程成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Northwest Construction Investment Group Co ltd
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Northwest Construction Investment Group Co ltd
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Northwest Construction Investment Group Co ltd, Zhongtian Construction Group Co Ltd filed Critical Zhongtian Northwest Construction Investment Group Co ltd
Priority to CN202210903103.3A priority Critical patent/CN115370115A/en
Publication of CN115370115A publication Critical patent/CN115370115A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a construction method of a support-free cantilever platform, which comprises the following steps: firstly, constructing a building main body structure to a position above an elevation of an overhanging platform; step two, setting up an operation platform below the elevation position of the overhanging platform; step three, after the construction of the operation platform is completed, erecting an auxiliary support at the elevation position of the overhanging platform; after the auxiliary support is erected, hoisting a cantilever beam template at the bottom of the auxiliary support, and pouring a cantilever beam; fifthly, after the cantilever beam is poured, fixedly mounting a prefabricated cantilever platform bottom plate on the top of the cantilever beam; and sixthly, after the cantilever platform bottom plate is installed, pouring a floor slab on the cantilever platform bottom plate, after the cantilever platform is constructed, dismantling the operating platform and the auxiliary support, and finishing construction. The invention can meet the bearing requirement of the construction of the ultra-large cantilever platform, simplifies the construction process, saves the construction cost, does not need to build a complex and fussy support frame, and can not damage the structure of the cantilever platform.

Description

一种免支撑悬挑平台施工方法A construction method for a support-free cantilevered platform

技术领域technical field

本发明属于建筑施工技术领域,尤其是一种免支撑悬挑平台施工方法。The invention belongs to the technical field of building construction, in particular to a construction method for a support-free cantilevered platform.

背景技术Background technique

建筑施工中,一些高层建筑上需要搭建悬挑平台,现有的高空悬挑平台施工中通常采用两种支撑方式:一种方法在悬挑平台下方搭设支撑结构,并用钢丝绳对支撑结构进行上拉,再在支撑结构上搭建支撑架,借助支撑架进行支撑,将悬挑平台一体浇筑出来;另一种方法在悬挑平台下方搭设支撑结构,并在支撑结构底部设置下撑,借助支撑结构进行支撑,将悬挑平台一体浇筑出来。During construction, cantilevered platforms need to be built on some high-rise buildings. There are usually two support methods used in the construction of existing high-altitude cantilevered platforms: one method is to build a support structure under the cantilevered platform, and use steel wire ropes to pull up the support structure. , and then build a support frame on the support structure, use the support frame to support, and cast the cantilevered platform in one piece; another method is to build a support structure under the cantilever platform, and set a lower brace at the bottom of the support structure, and use the support structure to carry out Support, cast the cantilevered platform in one piece.

采用上述方法存在以下技术问题:1、第一种方法中,在高空种搭设支撑架难度极高,操作过程十分困难,当悬挑平台面积较大时,为保证承载能力,钢丝绳需要满足一定的斜拉角度,同时为保证支撑架不超高,需要穿过悬挑平台的梁板将钢丝绳锚固在楼房主体结构上,对悬挑平台造成损伤;2、第二种方法中,采用下撑的支撑形式承载能力有限,稳定性差,无法满足超大型悬挑平台的施工需求。The above method has the following technical problems: 1. In the first method, it is extremely difficult to set up a support frame at a high altitude, and the operation process is very difficult. When the area of the cantilevered platform is large, in order to ensure the bearing capacity, the steel wire rope needs to meet certain requirements. At the same time, in order to ensure that the support frame is not super high, it is necessary to anchor the steel wire rope to the main structure of the building through the beam plate of the cantilevered platform, which will cause damage to the cantilevered platform; 2. In the second method, the understayed The support form has limited bearing capacity and poor stability, which cannot meet the construction needs of super-large cantilevered platforms.

发明内容Contents of the invention

本发明提供一种免支撑悬挑平台施工方法,以解决现有技术中所存在的上述问题。The invention provides a support-free cantilevered platform construction method to solve the above-mentioned problems in the prior art.

本发明提供的一种免支撑悬挑平台施工方法,包括以下步骤:A construction method for a support-free cantilevered platform provided by the present invention comprises the following steps:

步骤一、楼房主体结构施工Step 1. Construction of the main structure of the building

将楼房主体结构施工至悬挑平台标高上方位置,预留出后期拉设绳索的高度;Construct the main structure of the building to the position above the elevation of the cantilevered platform, and reserve the height for pulling the rope in the later stage;

步骤二、搭设操作平台Step 2. Set up the operating platform

在悬挑平台标高位置下方搭设操作平台,用于施工人员放置材料及施工作业;Set up an operating platform below the elevation of the cantilevered platform for construction workers to place materials and perform construction operations;

步骤三、搭设辅助支架Step 3: Set up the auxiliary bracket

操作平台施工完成后,在悬挑平台标高位置搭设辅助支架,用于固定悬挑梁模板;After the construction of the operation platform is completed, an auxiliary support is erected at the elevation of the cantilevered platform to fix the formwork of the cantilevered beam;

步骤四、浇筑悬挑梁Step 4. Pouring the cantilever beam

辅助支架搭设完成后,在辅助支架底部吊装悬挑梁模板,浇筑悬挑梁;After the auxiliary support is erected, the cantilever beam formwork is hoisted at the bottom of the auxiliary support, and the cantilever beam is poured;

步骤五、安装悬挑平台底板Step 5. Install the bottom plate of the cantilevered platform

悬挑梁浇筑完成后,在悬挑梁顶部固装预制的悬挑平台底板;After the pouring of the cantilever beam is completed, the prefabricated cantilever platform floor is fixed on the top of the cantilever beam;

步骤六、浇筑楼板Step 6. Pouring the floor slab

悬挑平台底板安装好后,在悬挑平台底板上浇筑楼板,悬挑平台施工完成后,拆除操作平台和辅助支架,施工结束。After the bottom plate of the cantilever platform is installed, the floor slab is poured on the bottom plate of the cantilever platform. After the construction of the cantilever platform is completed, the operation platform and auxiliary support are removed, and the construction is completed.

进一步的,所述步骤二中,所述操作平台包括若干三角支架和若干连接梁,所述三角支架径向均匀间隔固装在所述楼房主体结构上,所述连接梁固装在所述三角支架顶部,用于连接若干所述三角支架;所述三角支架上铺设操作台底板;所述操作平台边缘固装有双排防护围栏;Further, in the step 2, the operation platform includes several triangular supports and several connecting beams, the triangular supports are fixed on the main structure of the building at uniform radial intervals, and the connecting beams are fixed on the triangular The top of the bracket is used to connect several triangular brackets; the bottom plate of the operating platform is laid on the triangular bracket; the edge of the operating platform is fixed with double rows of protective fences;

所述三角支架包括主梁、斜撑和若干腹杆,所述主梁底部固装所述斜撑,所述主梁和所述斜撑之间固装若干所述腹杆。The triangular bracket includes a main beam, a brace and several webs, the bottom of the main beam is fixed with the diagonal brace, and a plurality of webs are fixed between the main beam and the diagonal brace.

进一步的,所述步骤三中,所述辅助支架包括若干水平梁和若干环状梁,若干所述水平梁径向固装在楼房主体结构上,所述水平梁均匀间隔布置,若干所述环状梁沿圆周方向由内向外依次固装在所述水平梁上。Further, in the step 3, the auxiliary support includes several horizontal beams and several ring beams, several of the horizontal beams are radially fixed on the main structure of the building, the horizontal beams are evenly spaced, and several of the ring beams The shape beams are sequentially fixed on the horizontal beams from inside to outside along the circumferential direction.

进一步的,所述水平梁与所述楼房主体结构之间倾斜拉设有若干绳索,若干所述绳索的端部依次固接在所述水平梁的四分之一节点处。Further, several ropes are obliquely drawn between the horizontal beam and the main structure of the building, and the ends of the several ropes are sequentially fixed at quarter nodes of the horizontal beam.

进一步的,所述步骤四中,所述悬挑梁模板通过吊装部件安装在所述辅助支架底部;所述吊装部件包括上固定板、下固定板、若干竖向对拉螺栓、若干主龙骨、若干次龙骨和若干横向对拉螺栓,所述上固定板固装在所述水平梁顶部,所述上固定板下方通过若干所述竖向对拉螺栓固装有所述下固定板;所述下固定板上对称竖直固装两排所述主龙骨,所述悬挑梁模板固装在两排所述主龙骨之间的所述下固定板上,两排所述主龙骨之间通过若干所述横向对拉螺栓固定;所述主龙骨、所述下固定板和所述悬挑梁模板之间均匀铺设有若干横向的所述次龙骨。Further, in the step 4, the cantilever beam formwork is installed on the bottom of the auxiliary bracket through hoisting parts; the hoisting parts include an upper fixing plate, a lower fixing plate, several vertical tension bolts, several main keels, Several secondary keels and several transverse tension bolts, the upper fixing plate is fixed on the top of the horizontal beam, and the lower fixing plate is fixed below the upper fixing plate through several vertical tension bolts; Two rows of said main keels are mounted symmetrically and vertically on the lower fixing plate, said cantilever beam formwork is fixed on said lower fixing plate between the two rows of said main keels, and the two rows of said main keels pass through A number of said transverse tension bolts are fixed; a number of transverse said secondary keels are evenly laid between said main keel, said lower fixing plate and said cantilever beam formwork.

进一步的,所述步骤五中,所述悬挑平台底板由高强桁架板叠合制成。Further, in the fifth step, the bottom plate of the cantilevered platform is made by laminating high-strength truss plates.

进一步的,所述步骤五中,所述悬挑平台底板与所述悬挑梁接缝位置浇筑混凝土固定连接,并安装加固部件或L型卡具进行加固。Further, in the fifth step, the bottom plate of the cantilevered platform is fixedly connected with the joints of the cantilever beams by pouring concrete, and reinforcing components or L-shaped clamps are installed for reinforcement.

进一步的,所述加固部件包括固定横杆和若干固定竖杆,所述固定横杆固装在所述悬挑平台底板底部,所述固定横杆底部间隔固装若干所述固定竖杆,所述固定竖杆固装在所述悬挑梁上。Further, the reinforcement component includes a fixed cross bar and several fixed vertical bars, the fixed cross bar is fixed on the bottom of the cantilever platform floor, and several fixed vertical bars are fixed at the bottom of the fixed cross bar at intervals, so The fixed vertical rod is fixed on the cantilever beam.

进一步的,所述步骤六中,采用从中心向四周辐射的方式浇筑楼板。Further, in the sixth step, the floor slab is poured in a manner of radiating from the center to the surroundings.

进一步的,所述步骤一中,在楼房主体结构上固装用于加固悬挑梁的抗剪键。Further, in the first step, a shear key for strengthening the cantilever beam is fixed on the main structure of the building.

本发明的优点和积极效果是:Advantage and positive effect of the present invention are:

1、本免支撑悬挑平台施工方法,悬挑平台分步施工,通过简单的辅助支架安装吊模浇筑悬挑梁,悬挑梁浇筑完成后,直接在悬挑梁顶部安装预制好的悬挑平台底板即可,通过施工步骤的优化,省去了搭建支撑架结构,减轻了荷载,选取施工材料时选择面更广,适用性强,可应用至超大悬挑结构施工,极大地简化了施工工序,很好地满足了超大型悬挑平台施工的稳定性要求,无需搭建繁琐的支撑结构,不会破坏悬挑平台自身结构,克服了下撑结构体积大、重量大的缺点。1. The construction method of the support-free cantilevered platform, the cantilevered platform is constructed step by step, and the cantilever beam is cast by installing the hanging form through a simple auxiliary bracket. After the cantilever beam is poured, the prefabricated cantilever is directly installed on the top of the cantilever beam The bottom plate of the platform is enough. Through the optimization of the construction steps, it is unnecessary to build a support frame structure and reduce the load. When selecting construction materials, the selection surface is wider and the applicability is strong. It can be applied to the construction of super large cantilever structures, which greatly simplifies the construction. The process satisfies the stability requirements of super-large cantilevered platform construction well, does not need to build cumbersome support structures, does not damage the structure of the cantilevered platform itself, and overcomes the disadvantages of large volume and heavy weight of the lower support structure.

2、本免支撑悬挑平台施工方法中,辅助支架结构简单、易于制作、成本低廉,通过绳索对辅助支架的水平梁进行拉结,提高了辅助支架的稳定性,确保后续悬挑梁的顺利浇筑,克服了水平梁因自身重力产生的扭转和下挠,有效避免水平梁发生形变。2. In the construction method of the support-free cantilevered platform, the auxiliary support structure is simple, easy to manufacture, and low in cost. The horizontal beam of the auxiliary support is tied by ropes, which improves the stability of the auxiliary support and ensures the smooth operation of the subsequent cantilever beam. The pouring overcomes the torsion and downward deflection of the horizontal beam due to its own gravity, and effectively avoids the deformation of the horizontal beam.

3、本免支撑悬挑平台施工方法中,施工过程中设置有操作平台,方便施工人员放置材料和施工作业,操作平台边缘安装有双排防护围栏,确保施工的安全性,杜绝出现高空坠落的安全隐患。3. In the construction method of the support-free cantilevered platform, an operation platform is provided during the construction process, which is convenient for construction personnel to place materials and carry out construction work. Double rows of protective fences are installed on the edge of the operation platform to ensure the safety of construction and prevent the occurrence of falling from high altitudes. Security risks.

4、本免支撑悬挑平台施工方法中,利用辅助支架固定悬挑梁模板,通过简单的结构即可实现悬挑梁模板的牢固固定,操作方法简单便捷,简化了施工过程,提高了施工效率,无需搭建复杂的脚手架结构进行支撑,克服了施工步骤繁琐复杂的问题。4. In the construction method of the support-free cantilevered platform, the auxiliary bracket is used to fix the cantilever beam formwork, and the cantilever beam formwork can be firmly fixed through a simple structure. The operation method is simple and convenient, which simplifies the construction process and improves the construction efficiency , without the need to build complex scaffolding structures for support, which overcomes the problem of cumbersome and complicated construction steps.

5、本免支撑悬挑平台施工方法中,悬挑平台结构分步施工,先浇筑悬挑梁,再安装预制好的悬挑平台底板,以悬挑梁为支撑,底板安装过程中无需额外搭建支撑结构,省去了繁琐的步骤,利用高强桁架板叠合层高强度的特性,确保了悬挑平台底板施工的稳定性,克服了高空搭建支撑架困难的问题。5. In the construction method of the support-free cantilevered platform, the cantilevered platform structure is constructed step by step. The cantilevered beams are poured first, and then the prefabricated cantilevered platform bottom plate is installed. With the cantilevered beams as the support, no additional construction is required during the installation of the bottom plate The support structure saves cumbersome steps and utilizes the high-strength characteristics of the laminated layers of high-strength truss panels to ensure the stability of the construction of the cantilevered platform floor and overcome the difficulty of building support frames at high altitudes.

6、本免支撑悬挑平台施工方法中,悬挑梁与悬挑平台底板连接处通过加固部件或L型卡具进行加固,确保接缝处牢固连接,确保悬挑平台结构的稳固性,给施工质量带来了极大的保障。6. In the construction method of the support-free cantilevered platform, the connection between the cantilever beam and the bottom plate of the cantilevered platform is reinforced by reinforcing parts or L-shaped clamps to ensure that the joints are firmly connected and the stability of the cantilevered platform structure is ensured. The construction quality has brought great guarantee.

7、本发明对悬挑平台进行分步施工,使用简单、易于制作的辅助支架辅助固定进行悬挑梁的浇筑,再借助悬挑梁进行支撑,安装预制好的悬挑平台底板,可满足超大型悬挑平台施工的承载要求,稳定性强,简化了施工工序,节省了施工成本,无需搭建复杂、繁琐的支撑架,不会对悬挑平台自身结构造成损伤。7. The present invention carries out step-by-step construction on the cantilevered platform, uses simple and easy-to-make auxiliary brackets to assist and fix the pouring of the cantilever beam, and then supports it with the help of the cantilever beam, and installs the prefabricated cantilevered platform bottom plate, which can meet the super The load-bearing requirements for the construction of large-scale cantilevered platforms are strong, which simplifies the construction process and saves construction costs. It does not need to build complex and cumbersome support frames, and will not cause damage to the structure of the cantilevered platform itself.

附图说明Description of drawings

图1是本发明的步骤流程图;Fig. 1 is a flow chart of steps of the present invention;

图2是本发明施工结构的示意图(双排防护围栏未示出);Fig. 2 is the schematic diagram of construction structure of the present invention (double row protective fence is not shown);

图3是本发明图2中A部的局部放大图;Fig. 3 is a partial enlarged view of part A in Fig. 2 of the present invention;

图4是本发明辅助支架的结构示意图;Fig. 4 is a schematic structural view of the auxiliary bracket of the present invention;

图5是本发明浇筑悬挑梁的施工结构图;Fig. 5 is the construction structure figure of pouring cantilever beam of the present invention;

图6是本发明加固部件的结构示意图。Fig. 6 is a schematic structural view of the reinforcement component of the present invention.

图中,1为绳索,2为辅助支架,3为悬挑梁模板,4为操作平台,5为楼房主体结构,7为悬挑梁,8为加固部件,21为水平梁,22为环状梁,41为操作台底板,42为主梁,43为斜撑,44为腹杆,61为上固定板,62为竖向对拉螺栓,63为次龙骨,64为主龙骨,65为横向对拉螺栓,66为下固定板,81为固定横杆,82为固定竖杆。In the figure, 1 is the rope, 2 is the auxiliary support, 3 is the formwork of the cantilever beam, 4 is the operation platform, 5 is the main structure of the building, 7 is the cantilever beam, 8 is the reinforcement component, 21 is the horizontal beam, 22 is the ring Beam, 41 is the bottom plate of the operation platform, 42 is the main beam, 43 is the diagonal brace, 44 is the web bar, 61 is the upper fixing plate, 62 is the vertical tension bolt, 63 is the secondary keel, 64 is the main keel, and 65 is the horizontal To pull bolt, 66 is lower fixed plate, and 81 is fixed cross bar, and 82 is fixed vertical bar.

具体实施方式Detailed ways

下面结合附图对本发明作进一步详述。The present invention will be described in further detail below in conjunction with the accompanying drawings.

本发明提供的一种免支撑悬挑平台施工方法,包括以下步骤:A construction method for a support-free cantilevered platform provided by the present invention comprises the following steps:

步骤一、楼房主体结构5施工Step 1, building main structure 5 construction

将楼房主体结构5施工至悬挑平台标高上方位置,预留出后期拉设绳索1的高度;在楼房主体结构5上固装用于加固悬挑梁的抗剪键,以加强楼房主体结构5和悬挑梁7之间的牢固连接;Construct the main structure 5 of the building to the position above the elevation of the cantilevered platform, and reserve the height for pulling the rope 1 in the later stage; fix the shear keys for reinforcing the cantilever beam on the main structure 5 of the building, so as to strengthen the main structure 5 of the building and Strong connection between the cantilever beams 7;

步骤二、搭设操作平台4Step 2. Set up the operating platform 4

在悬挑平台标高位置下方搭设操作平台4,用于施工人员放置材料及施工作业;Set up an operating platform 4 below the elevation of the cantilevered platform for construction workers to place materials and perform construction operations;

所述操作平台4包括若干三角支架和若干连接梁,所述三角支架径向均匀间隔固装在所述楼房主体结构5上,所述连接梁固装在所述三角支架顶部,用于连接若干所述三角支架;所述三角支架上铺设操作台底板41;所述操作平台4边缘固装有双排防护围栏;所述三角支架包括主梁42、斜撑43和若干腹杆44,所述主梁42底部固装所述斜撑43,所述主梁42和所述斜撑43之间固装若干所述腹杆44。所述操作台底板41为脚手板;所述双排防护围栏高1.5m;所述连接梁和所述三角支架均由型钢制成;所述操作平台4通过高强螺栓固装在楼房主体结构5上,施工人员站在操作平台4上进行后续施工;The operating platform 4 includes several triangular brackets and some connecting beams, and the triangular brackets are fixed on the main structure 5 of the building at uniform radial intervals, and the connecting beams are fixed on the top of the triangular brackets for connecting several Described triangular support; laying console floor 41 on the described triangular support; double rows of protective fences are fixedly installed on the edge of the operating platform 4; The bottom of the main girder 42 is fixed with the diagonal brace 43 , and several webs 44 are fixed between the main beam 42 and the diagonal brace 43 . The bottom plate 41 of the operating platform is a scaffolding board; the height of the double-row protective fence is 1.5m; the connecting beam and the triangular bracket are all made of section steel; the operating platform 4 is fixed on the main structure of the building 5 by high-strength bolts On the top, construction workers stand on the operation platform 4 to carry out follow-up construction;

步骤三、搭设辅助支架2Step 3: Set up the auxiliary bracket 2

操作平台4施工完成后,在悬挑平台标高位置搭设辅助支架2,用于固定悬挑梁模板3;辅助支架2用于后续浇筑悬挑梁7时,对悬挑梁模板3进行固定;After the construction of the operation platform 4 is completed, an auxiliary support 2 is erected at the elevation of the cantilevered platform to fix the cantilever beam formwork 3; when the auxiliary support 2 is used for subsequent pouring of the cantilever beam 7, the cantilever beam formwork 3 is fixed;

如图3所示,所述辅助支架2包括若干水平梁21和若干环状梁22,若干所述水平梁21径向固装在楼房主体结构5上,所述水平梁21均匀间隔布置,若干所述环状梁22沿圆周方向由内向外依次固装在所述水平梁21上;安装辅助支架2时,先安装水平梁21,水平梁21围绕楼房主体结构5呈辐射状间隔分布,安装好水平梁21后,再安装若干环状梁22,将若干水平梁21连接成一个整体,水平梁21与环状梁22之间通过高强螺栓固定;水平梁21和环状梁22底端面标高与悬挑平台底板顶端面标高一致;所述水平梁21由工字钢制成,所述环状梁22由型钢制成;As shown in Figure 3, the auxiliary support 2 includes several horizontal beams 21 and several ring beams 22, and several horizontal beams 21 are radially fixed on the building main structure 5, and the horizontal beams 21 are evenly spaced. The ring beam 22 is fixed on the horizontal beam 21 sequentially from the inside to the outside along the circumferential direction; when the auxiliary bracket 2 is installed, the horizontal beam 21 is installed first, and the horizontal beam 21 is distributed radially around the main structure 5 of the building. After the horizontal beam 21 is installed, several ring beams 22 are installed, and several horizontal beams 21 are connected into a whole, and the horizontal beam 21 and the ring beam 22 are fixed by high-strength bolts; Consistent with the elevation of the top surface of the bottom plate of the cantilevered platform; the horizontal beam 21 is made of I-beam, and the ring beam 22 is made of section steel;

上述辅助支架2的形状可适用于在筒状的楼房主体结构5上施工,辅助支架2的形状可根据实际施工中不同的楼体结构进行调整;The shape of the above-mentioned auxiliary support 2 is suitable for construction on the main body structure 5 of a tubular building, and the shape of the auxiliary support 2 can be adjusted according to different building structures in actual construction;

所述水平梁21与所述楼房主体结构5之间倾斜拉设有若干绳索1,若干所述绳索1的端部依次固接在所述水平梁21的四分之一节点处;所述绳索1为钢丝绳;由于水平梁21自重较大,容易产生不利的扭转和下挠,通过绳索1对水平梁21进行拉结,以消除水平梁21重力导致的形变,确保辅助支架2结构牢固稳定,确保后续悬挑梁7的施工顺利进行;Between the horizontal beam 21 and the main structure 5 of the building, several ropes 1 are obliquely drawn, and the ends of several ropes 1 are sequentially fixed at quarter nodes of the horizontal beam 21; 1 is a steel wire rope; due to the heavy weight of the horizontal beam 21, unfavorable torsion and downward deflection are likely to occur. The horizontal beam 21 is tied through the rope 1 to eliminate the deformation caused by the gravity of the horizontal beam 21 and ensure that the structure of the auxiliary support 2 is firm and stable. Ensure that the subsequent construction of the cantilever beam 7 proceeds smoothly;

步骤四、浇筑悬挑梁7Step 4: Pouring cantilever beams 7

辅助支架2搭设完成后,在辅助支架2底部吊装悬挑梁模板3,浇筑悬挑梁7;After the auxiliary support 2 is erected, the cantilever beam template 3 is hoisted at the bottom of the auxiliary support 2, and the cantilever beam 7 is poured;

如图4所示,所述悬挑梁模板3通过吊装部件安装在所述辅助支架2底部;所述吊装部件包括上固定板61、下固定板66、若干竖向对拉螺栓62、若干主龙骨64、若干次龙骨63和若干横向对拉螺栓65,所述上固定板61固装在所述水平梁21顶部,所述上固定板61下方通过若干所述竖向对拉螺栓62固装有所述下固定板66;所述下固定板66上对称竖直固装两排所述主龙骨64,所述悬挑梁模板3固装在两排所述主龙骨64之间的所述下固定板66上,两排所述主龙骨64之间通过若干所述横向对拉螺栓65固定;所述主龙骨64、所述下固定板66和所述悬挑梁模板3之间均匀铺设有若干横向的所述次龙骨63。所述主龙骨由钢管制成,所述上固定板61和所述下固定板66为锚板,所述横向对拉螺栓65和所述竖向对拉螺栓62由圆钢制成;As shown in Figure 4, the cantilever beam formwork 3 is installed on the bottom of the auxiliary support 2 through hoisting parts; The keel 64, several secondary keels 63 and some transverse tension bolts 65, the upper fixing plate 61 is fixed on the top of the horizontal beam 21, and the lower part of the upper fixing plate 61 is fixed by several vertical tension bolts 62 There is the lower fixing plate 66; two rows of the main keels 64 are symmetrically and vertically fixed on the lower fixing plate 66, and the cantilever beam formwork 3 is fixed on the said main keel 64 between the two rows. On the lower fixing plate 66, two rows of said main keels 64 are fixed by a plurality of said transverse tension bolts 65; There are several lateral joists 63 . The main keel is made of steel pipe, the upper fixing plate 61 and the lower fixing plate 66 are anchor plates, and the transverse tension bolt 65 and the vertical tension bolt 62 are made of round steel;

步骤五、安装悬挑平台底板Step 5. Install the bottom plate of the cantilevered platform

悬挑梁7浇筑完成后,在悬挑梁7顶部固装预制的悬挑平台底板;所述悬挑平台底板由高强桁架板叠合制成;高强桁架板叠合层厚度为20mm,由高强度混凝土制成,表面进行拉毛处理,其高强度的特性可实现悬挑平台底板在悬挑梁7上的免支撑安装;高强桁架板拼缝处进行打胶处理,可防止漏浆;After the pouring of the cantilever beam 7 is completed, a prefabricated cantilever platform bottom plate is fixed on the top of the cantilever beam 7; the cantilever platform bottom plate is made of superimposed high-strength truss plates; Made of high-strength concrete, the surface is roughened, and its high-strength characteristics can realize the support-free installation of the cantilevered platform bottom plate on the cantilever beam 7; the joints of the high-strength truss plates are glued to prevent grout leakage;

所述悬挑平台底板与所述悬挑梁7接缝位置浇筑混凝土固定连接,并安装加固部件8或L型卡具进行加固;L型卡具为现有结构,故不做赘述;所述加固部件8包括固定横杆81和若干固定竖杆82,所述固定横杆81固装在所述悬挑平台底板底部,所述固定横杆81底部间隔固装若干所述固定竖杆82,所述固定竖杆82固装在所述悬挑梁7上;The bottom plate of the cantilevered platform is poured with concrete at the joint position of the cantilever beam 7 to be fixedly connected, and a reinforcing part 8 or an L-shaped fixture is installed for reinforcement; the L-shaped fixture is an existing structure, so it will not be described in detail; The reinforcement part 8 includes a fixed cross bar 81 and a plurality of fixed vertical bars 82, the fixed cross bar 81 is fixed on the bottom of the cantilever platform floor, and the bottom of the fixed cross bar 81 is fixed with several fixed vertical bars 82 at intervals, The fixed vertical bar 82 is fixed on the cantilever beam 7;

步骤六、浇筑楼板Step 6. Pouring the floor slab

悬挑平台底板安装好后,在悬挑平台底板上浇筑楼板,悬挑平台施工完成后,拆除操作平台4和辅助支架2,施工结束;施工楼板时,采用从中心向四周辐射的方式进行浇筑,确保浇筑过程中,悬挑平台整体受力均衡。After the bottom plate of the cantilevered platform is installed, the floor slab is poured on the bottom plate of the cantilevered platform. After the construction of the cantilevered platform is completed, the operation platform 4 and the auxiliary support 2 are removed, and the construction is completed; when the floor is constructed, it is poured from the center to the surroundings , to ensure that the overall force on the cantilevered platform is balanced during the pouring process.

本发明对悬挑平台进行分步施工,使用简单、易于制作的辅助支架辅助固定进行悬挑梁的浇筑,再借助悬挑梁进行支撑,安装预制好的悬挑平台底板,可满足超大型悬挑平台施工的承载要求,稳定性强,简化了施工工序,节省了施工成本,无需搭建复杂、繁琐的支撑架,不会对悬挑平台自身结构造成损伤。The invention carries out step-by-step construction on the cantilevered platform, uses simple and easy-to-make auxiliary brackets to assist and fix the pouring of the cantilevered beam, and then uses the cantilevered beam to support and install the prefabricated cantilevered platform bottom plate, which can meet the needs of super large cantilevered platforms. It meets the load-bearing requirements of the platform construction, has strong stability, simplifies the construction process, saves construction costs, does not need to build complex and cumbersome support frames, and will not cause damage to the structure of the cantilevered platform itself.

显然,上述实施例仅是为清楚地说明所作的举例,而并非对实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。而由此所引申出的显而易见的变化或变动仍处于本发明创造的保护范围之中。Apparently, the above-mentioned embodiments are only examples for clear description, rather than limiting the implementation. For those of ordinary skill in the art, other changes or changes in different forms can be made on the basis of the above description. It is not necessary and impossible to exhaustively list all the implementation manners here. However, the obvious changes or changes derived therefrom are still within the scope of protection of the present invention.

Claims (10)

1.一种免支撑悬挑平台施工方法,其特征在于,包括以下步骤:1. A support-free overhanging platform construction method is characterized in that, comprising the following steps: 步骤一、楼房主体结构(5)施工Step 1, building main structure (5) construction 将楼房主体结构(5)施工至悬挑平台标高上方位置,预留出后期拉设绳索(1)的高度;Construct the main structure (5) of the building to the position above the elevation of the cantilevered platform, and reserve the height for pulling the rope (1) in the later stage; 步骤二、搭设操作平台(4)Step 2. Set up the operating platform (4) 在悬挑平台标高位置下方搭设操作平台(4),用于施工人员放置材料及施工作业;Set up an operating platform (4) below the elevation of the cantilevered platform for construction workers to place materials and perform construction operations; 步骤三、搭设辅助支架(2)Step 3. Set up the auxiliary bracket (2) 操作平台(4)施工完成后,在悬挑平台标高位置搭设辅助支架(2),用于固定悬挑梁模板(3);After the construction of the operating platform (4) is completed, an auxiliary support (2) is erected at the elevation of the cantilevered platform to fix the cantilevered beam formwork (3); 步骤四、浇筑悬挑梁(7)Step 4. Pouring cantilever beams (7) 辅助支架(2)搭设完成后,在辅助支架(2)底部吊装悬挑梁模板(3),浇筑悬挑梁(7);After the auxiliary support (2) is set up, the cantilever beam formwork (3) is hoisted at the bottom of the auxiliary support (2), and the cantilever beam (7) is poured; 步骤五、安装悬挑平台底板Step 5. Install the bottom plate of the cantilevered platform 悬挑梁(7)浇筑完成后,在悬挑梁(7)顶部固装预制的悬挑平台底板;After the cantilever beam (7) is poured, a prefabricated cantilever platform bottom plate is fixed on the top of the cantilever beam (7); 步骤六、浇筑楼板Step 6. Pouring the floor slab 悬挑平台底板安装好后,在悬挑平台底板上浇筑楼板,悬挑平台施工完成后,拆除操作平台(4)和辅助支架(2),施工结束。After the bottom plate of the cantilevered platform is installed, the floor slab is poured on the bottom plate of the cantilevered platform. After the construction of the cantilevered platform is completed, the operating platform (4) and the auxiliary support (2) are removed, and the construction is completed. 2.根据权利要求1所述的一种免支撑悬挑平台施工方法,其特征在于,所述步骤二中,所述操作平台(4)包括若干三角支架和若干连接梁,所述三角支架径向均匀间隔固装在所述楼房主体结构(5)上,所述连接梁固装在所述三角支架顶部,用于连接若干所述三角支架;所述三角支架上铺设操作台底板(41);所述操作平台(4)边缘固装有双排防护围栏;2. A kind of support-free cantilevered platform construction method according to claim 1, is characterized in that, in described step 2, described operation platform (4) comprises several triangular brackets and some connecting beams, and described triangular bracket diameter Fixedly installed on the main structure (5) of the building at even intervals, the connecting beam is fixed on the top of the triangular bracket for connecting several triangular brackets; ; The edge of the operating platform (4) is fixed with double rows of protective fences; 所述三角支架包括主梁(42)、斜撑(43)和若干腹杆(44),所述主梁(42)底部固装所述斜撑(43),所述主梁(42)和所述斜撑(43)之间固装若干所述腹杆(44)。Described triangular support comprises main girder (42), diagonal brace (43) and several web bars (44), and described diagonal brace (43) is fixedly installed at the bottom of described main girder (42), and described main girder (42) and Several web bars (44) are fixed between the diagonal braces (43). 3.根据权利要求1所述的一种免支撑悬挑平台施工方法,其特征在于,所述步骤三中,所述辅助支架(2)包括若干水平梁(21)和若干环状梁(22),若干所述水平梁(21)径向固装在楼房主体结构(5)上,所述水平梁(21)均匀间隔布置,若干所述环状梁(22)沿圆周方向由内向外依次固装在所述水平梁(21)上。3. The construction method of a support-free cantilevered platform according to claim 1, characterized in that, in the third step, the auxiliary support (2) includes several horizontal beams (21) and several ring beams (22 ), some of the horizontal beams (21) are radially fixed on the building main structure (5), the horizontal beams (21) are evenly spaced, and some of the annular beams (22) are sequentially arranged from inside to outside along the circumferential direction Be fixed on the described horizontal beam (21). 4.根据权利要求3所述的一种免支撑悬挑平台施工方法,其特征在于,所述水平梁(21)与所述楼房主体结构(5)之间倾斜拉设有若干绳索(1),若干所述绳索(1)的端部依次固接在所述水平梁(21)的四分之一节点处。4. The construction method of a support-free cantilevered platform according to claim 3, characterized in that, a number of ropes (1) are obliquely drawn between the horizontal beam (21) and the main structure of the building (5) , the ends of several of the ropes (1) are sequentially fixed at quarter nodes of the horizontal beam (21). 5.根据权利要求3所述的一种免支撑悬挑平台施工方法,其特征在于,所述步骤四中,所述悬挑梁模板(3)通过吊装部件安装在所述辅助支架(2)底部;所述吊装部件包括上固定板(61)、下固定板(66)、若干竖向对拉螺栓(62)、若干主龙骨(64)、若干次龙骨(63)和若干横向对拉螺栓(65),所述上固定板(61)固装在所述水平梁(21)顶部,所述上固定板(61)下方通过若干所述竖向对拉螺栓(62)固装有所述下固定板(66);所述下固定板(66)上对称竖直固装两排所述主龙骨(64),所述悬挑梁模板(3)固装在两排所述主龙骨(64)之间的所述下固定板(66)上,两排所述主龙骨(64)之间通过若干所述横向对拉螺栓(65)固定;所述主龙骨(64)、所述下固定板(66)和所述悬挑梁模板(3)之间均匀铺设有若干横向的所述次龙骨(63)。5. The construction method of a support-free cantilevered platform according to claim 3, characterized in that, in said step 4, said cantilever beam formwork (3) is installed on said auxiliary support (2) by means of hoisting parts Bottom; the hoisting parts include an upper fixing plate (61), a lower fixing plate (66), several vertical tension bolts (62), some main keels (64), several secondary keels (63) and some transverse tension bolts (65), the upper fixing plate (61) is fixed on the top of the horizontal beam (21), and the lower part of the upper fixing plate (61) is fixed with the described vertical tension bolts (62) below. Lower fixing plate (66); two rows of main keels (64) are symmetrically and vertically fixed on the lower fixing plate (66), and the cantilever beam formwork (3) is fixed on two rows of main keels ( 64) on the lower fixing plate (66), the two rows of main keels (64) are fixed by a number of transverse pull bolts (65); the main keels (64), the lower Between the fixed plate (66) and the cantilever beam template (3), several horizontal secondary keels (63) are evenly laid. 6.根据权利要求1所述的一种免支撑悬挑平台施工方法,其特征在于,所述步骤五中,所述悬挑平台底板由高强桁架板叠合制成。6. The construction method of a support-free cantilevered platform according to claim 1, wherein in the fifth step, the bottom plate of the cantilevered platform is made of superimposed high-strength truss plates. 7.根据权利要求1所述的一种免支撑悬挑平台施工方法,其特征在于,所述步骤五中,所述悬挑平台底板与所述悬挑梁(7)接缝位置浇筑混凝土固定连接,并安装加固部件(8)或L型卡具进行加固。7. The construction method of a support-free cantilevered platform according to claim 1, characterized in that, in the fifth step, the joint position of the cantilevered platform floor and the cantilevered beam (7) is fixed by pouring concrete Connect, and install reinforcement components (8) or L-shaped clamps for reinforcement. 8.根据权利要求7所述的一种免支撑悬挑平台施工方法,其特征在于,所述加固部件(8)包括固定横杆(81)和若干固定竖杆(82),所述固定横杆(81)固装在所述悬挑平台底板底部,所述固定横杆(81)底部间隔固装若干所述固定竖杆(82),所述固定竖杆(82)固装在所述悬挑梁(7)上。8. A construction method for a support-free cantilevered platform according to claim 7, characterized in that, the reinforcement component (8) includes a fixed cross bar (81) and several fixed vertical bars (82), and the fixed horizontal bar The rod (81) is fixed on the bottom of the cantilevered platform floor, and several fixed vertical rods (82) are fixed at the bottom of the fixed horizontal rod (81) at intervals, and the fixed vertical rods (82) are fixed on the bottom of the fixed vertical rod (82). On the cantilever beam (7). 9.根据权利要求1所述的一种免支撑悬挑平台施工方法,其特征在于,所述步骤六中,采用从中心向四周辐射的方式浇筑楼板。9. A construction method for a support-free cantilevered platform according to claim 1, characterized in that, in the sixth step, the floor slab is poured in a manner of radiating from the center to the surroundings. 10.根据权利要求1所述的一种免支撑悬挑平台施工方法,其特征在于,所述步骤一中,在楼房主体结构(5)上固装用于加固悬挑梁(7)的抗剪键。10. A kind of support-free cantilevered platform construction method according to claim 1, is characterized in that, in described step 1, on the building main body structure (5), fix the shear resistance that is used for reinforcing cantilever beam (7) key.
CN202210903103.3A 2022-07-29 2022-07-29 Construction method of support-free cantilever platform Pending CN115370115A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210903103.3A CN115370115A (en) 2022-07-29 2022-07-29 Construction method of support-free cantilever platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210903103.3A CN115370115A (en) 2022-07-29 2022-07-29 Construction method of support-free cantilever platform

Publications (1)

Publication Number Publication Date
CN115370115A true CN115370115A (en) 2022-11-22

Family

ID=84063914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210903103.3A Pending CN115370115A (en) 2022-07-29 2022-07-29 Construction method of support-free cantilever platform

Country Status (1)

Country Link
CN (1) CN115370115A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115788066A (en) * 2022-12-21 2023-03-14 浙江精工钢结构集团有限公司 Unilateral integral lifting construction method for peripheral overhanging structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265417A (en) * 1999-03-12 2000-09-26 Kawaju Koji Kk Moving timbering construction method for bridge floor slab overhang section
CN201339320Y (en) * 2008-12-25 2009-11-04 中建三局第三建设工程有限责任公司 High-altitude overhanging hanging reinforced concrete hanging bracket
CN209468695U (en) * 2018-12-20 2019-10-08 中交二公局第三工程有限公司 A kind of no truss overhanging type corrugated steel web cantilever bridge construction hanging frame device
CN111236604A (en) * 2020-01-23 2020-06-05 山西五建集团有限公司 Safe construction method for cantilever platform on cylinder main body structure
CN211949510U (en) * 2020-01-23 2020-11-17 山西五建集团有限公司 Annular cantilever platform construction supporting system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265417A (en) * 1999-03-12 2000-09-26 Kawaju Koji Kk Moving timbering construction method for bridge floor slab overhang section
CN201339320Y (en) * 2008-12-25 2009-11-04 中建三局第三建设工程有限责任公司 High-altitude overhanging hanging reinforced concrete hanging bracket
CN209468695U (en) * 2018-12-20 2019-10-08 中交二公局第三工程有限公司 A kind of no truss overhanging type corrugated steel web cantilever bridge construction hanging frame device
CN111236604A (en) * 2020-01-23 2020-06-05 山西五建集团有限公司 Safe construction method for cantilever platform on cylinder main body structure
CN211949510U (en) * 2020-01-23 2020-11-17 山西五建集团有限公司 Annular cantilever platform construction supporting system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115788066A (en) * 2022-12-21 2023-03-14 浙江精工钢结构集团有限公司 Unilateral integral lifting construction method for peripheral overhanging structure

Similar Documents

Publication Publication Date Title
CN101886468B (en) Construction method of suspension type template support in high-position conjoined structure
CN101787732B (en) Cable-stayed multi-layer framework structure and construction control method thereof
CN105298100B (en) A kind of cylinder building cast-in-place flare structure of superelevation is encorbelmented the construction method of operation platform
CN104389419A (en) Cantilevered formwork platform installation structure and construction method
CN106759909B (en) A lower hanging and upper bearing structure system and its construction method
JP2010065378A (en) Hanging scaffold and method for erecting the same
CN103147582A (en) Overhead cantilever formwork construction method
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN108222480B (en) A high-altitude cantilevered main truss type steel formwork construction platform
CN207268073U (en) Novel flexible formwork bearing frame
CN215482366U (en) Double-line continuous beam bracket structure
CN102767282B (en) Prefabricated high formwork construction method for cantilever beam of oversized special-shaped conversion layer
CN104831928B (en) High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method
CN111847272A (en) Supporting method of tower crane for renovation of existing buildings
CN111593874A (en) Supporting system for overweight overhung suspended member of super high-rise residential conversion layer and construction method
CN115538678A (en) Construction method for large-angle overhanging landscape platform side small platform
CN111321880B (en) A high-altitude large cantilever cast-in-place structure spanning space combined load-bearing steel platform
CN221567819U (en) Quick construction device for horizontal structure in super high-rise core tube
CN116657875B (en) Cantilever steel structure construction platform with formwork system and construction method
CN216516907U (en) High-altitude convenient cantilever frame
CN108019040B (en) A construction method for the Bailey frame platform of the transfer floor of a high-rise building
CN116043719A (en) A No. 0 Block Support System Combining Triangular Brackets and Floor Steel Pipes and Its Construction Method
CN116122579A (en) Hoisting method for bidirectional bending dome bracket
CN117803168B (en) Large-span steel bar truss floor support plate unsupported concrete pouring system and construction method
CN114790818B (en) Diagonal bracing transition method for accelerating erection of overhanging scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20221122

RJ01 Rejection of invention patent application after publication