CN115355559A - Low-energy-consumption heat pump system based on geothermal water and cross-season energy storage and operation method thereof - Google Patents
Low-energy-consumption heat pump system based on geothermal water and cross-season energy storage and operation method thereof Download PDFInfo
- Publication number
- CN115355559A CN115355559A CN202210951761.XA CN202210951761A CN115355559A CN 115355559 A CN115355559 A CN 115355559A CN 202210951761 A CN202210951761 A CN 202210951761A CN 115355559 A CN115355559 A CN 115355559A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- heat
- cold
- valve
- point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D15/00—Other domestic- or space-heating systems
- F24D15/04—Other domestic- or space-heating systems using heat pumps
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D11/00—Central heating systems using heat accumulated in storage masses
- F24D11/02—Central heating systems using heat accumulated in storage masses using heat pumps
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B30/00—Heat pumps
- F25B30/06—Heat pumps characterised by the source of low potential heat
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28D—HEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
- F28D20/00—Heat storage plants or apparatus in general; Regenerative heat-exchange apparatus not covered by groups F28D17/00 or F28D19/00
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B10/00—Integration of renewable energy sources in buildings
- Y02B10/40—Geothermal heat-pumps
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Other Air-Conditioning Systems (AREA)
Abstract
本发明公开了一种基于地热水和跨季节蓄能的低能耗热泵系统及其运行方法,该系统的地热水开采井、换热器组件的一次侧换热管道及地热水回灌井顺序连通;换热器组件的二次侧换热管道与供冷热用户连通;热泵机组的一端与换热器组件的二次侧换热管道连通,另一端的制冷端和制热端均与供冷热用户连通;高温热泵机组的一端分别与换热器组件的二次侧换热管道及热泵机组的制热端连通,另一端通过跨季节蓄热槽与供冷热用户连通;跨季节蓄冷槽与热泵机组的制冷端连通,另一端与供冷热用户连通;冷却塔与跨季节蓄冷槽连通。本发明能够在夏季利用跨季节蓄冷槽和热泵机组联合供冷策略,冬季采用换热器组件、热泵机组及跨季节蓄热槽联合供暖策略。
The invention discloses a low-energy heat pump system based on geothermal water and inter-seasonal energy storage and its operation method. The geothermal water exploitation well of the system, the primary side heat exchange pipe of the heat exchanger assembly and the geothermal water recharge The wells are sequentially connected; the secondary side heat exchange pipe of the heat exchanger assembly is connected with the cooling and heating users; one end of the heat pump unit is connected with the secondary side heat exchange pipe of the heat exchanger assembly, and the cooling end and heating end of the other end are both connected. It is connected with cooling and heating users; one end of the high-temperature heat pump unit is respectively connected with the secondary side heat exchange pipe of the heat exchanger assembly and the heating end of the heat pump unit, and the other end is connected with the cooling and heating users through the cross-season heat storage tank; The seasonal cold storage tank is connected with the refrigeration end of the heat pump unit, and the other end is connected with the cooling and heating users; the cooling tower is connected with the cross-season cold storage tank. The present invention can utilize the combined cooling strategy of the cross-season cold storage tank and the heat pump unit in summer, and adopt the combined heating strategy of the heat exchanger assembly, the heat pump unit and the cross-season heat storage tank in winter.
Description
技术领域technical field
本发明属于热泵供热供冷技术领域,具体涉及一种基于地热水和跨季节蓄能的低能耗热泵系统及其运行方法。The invention belongs to the technical field of heat pump heating and cooling, and in particular relates to a low-energy heat pump system based on geothermal water and inter-seasonal energy storage and an operating method thereof.
背景技术Background technique
目前我国积极推动双碳战略的实施落地,各部门都在严格制定相应的措施来进行减碳。在建筑领域,暖通空调能耗占建筑总能耗的比例最大,因此降低暖通空调能耗是建筑运行过程中降碳的重要抓手;随着人民生活水平的提高,国内供热供冷需求的区域不断扩大,供热供冷系统种类不一,出现了系统运行效率低、暖通空调能耗浪费严重的情况,因此急需一种供暖供冷系统来提高能源的利用效率;同时近年来,北方大部分地区由于冬季供暖污染严重,大规模的进行了煤改电、煤改气计划安排,使得电力、天然气资源一度紧缺,无法满足居民的日常使用,给电力、天然气部门带来了巨大压力,因此开发其他类型清洁能源供暖供冷系统迫在眉睫。At present, my country is actively promoting the implementation of the dual-carbon strategy, and various departments are strictly formulating corresponding measures to reduce carbon emissions. In the field of construction, HVAC energy consumption accounts for the largest proportion of the total energy consumption of buildings, so reducing HVAC energy consumption is an important starting point for reducing carbon during building operation; with the improvement of people's living standards, domestic heating and cooling The area of demand continues to expand, the types of heating and cooling systems are different, the system operating efficiency is low, and the energy consumption of HVAC is seriously wasted. Therefore, a heating and cooling system is urgently needed to improve energy utilization efficiency; at the same time in recent years Due to the serious heating pollution in winter in most parts of the north, large-scale coal-to-electricity and coal-to-gas plans were implemented, which caused a shortage of electricity and natural gas resources, which could not meet the daily needs of residents, and brought huge losses to the power and natural gas sectors. Therefore, it is imminent to develop other types of clean energy heating and cooling systems.
目前,地热水梯级利用系统一般应用于北方供暖,无法同时应用于夏季制冷,同时地热水利用效率低,供暖中期过分依赖地源热泵系统提温,使系统能耗增加,运行效率降低。如发明专利《无干扰中深层地热资源梯级利用供暖系统》(CN109931651A)中提到了一种通过换热器、高温热泵以及低温热泵将地热水中高、中、低品位部分进行吸收利用的梯级利用供暖系统,但此系统仅仅适用于冬季供暖,无法在夏季进行供冷,同时此系统没有对热泵机组的冷凝热进行储存,且热泵机组在供暖季开启时间长,导致耗电量增加;发明专利《跨季节蓄冷蓄热系统》(CN107525180B)中提到了一种利用冰源热泵机组实现跨季节蓄冷蓄热的供暖供冷系统,但此系统中提到的冰源热泵机组运行时会消耗大量的电量,运行成本高,且系统运行时调试复杂,很难达到用户侧供暖供冷需求。发明专利《竖式地热蓄能空调系统》(CN1137352C)中提到了一种适用于居住建筑的换热以及蓄热系统,但此系统使用范围比较小,仅适合小范围利用,地热水没有进行梯级利用即进行回灌,地热水利用率低,且大部分设备均处于地下,设备可操作性低,导致供热供冷效果不好;发明专利《一种季节蓄能地源热泵系统》(CN103277939B)中提到一种将工业余热积蓄在岩土体基温层用于冬季供暖的系统,此系统主要应用于工业领域,同时需要设置一定规模的岩土基温层,建设成本高,且蓄热效果差,夏季向基温层排热时需要消耗大量电能,不符合减碳策略;发明专利《综合可再生能源供冷供热系统》(CN104864447B)中提到了一种综合利用深层地热、浅层地热以及淡化海水热能的系统,此系统只是简单将上述单元并联进行供热,没有考虑系统效率问题,因此仍存在浪费热能的问题。发明专利《低成本运行的地热供暖-储能一体化系统及应用》(CN113531630A)中提到一种将地热水的热量利用储能单元储存起来供暖的系统,该系统只能用于冬季供暖,储热单元储热量受地热水温度的影响,同时调峰能力有限;发明专利《低成本运行的地热供暖-储能一体化系统及应用》(CN113531630A)中提到一种将间歇式能源所产生的的热量存储起来与地热水联合供暖的系统,此系统出要求充足的地热水资源外还需充足的间歇能源,难以平衡各地区的供暖需求,因此应用范围受限。At present, the cascade utilization system of geothermal water is generally used for heating in the north, and cannot be used for cooling in summer at the same time. At the same time, the utilization efficiency of geothermal water is low. In the middle stage of heating, it relies too much on the ground source heat pump system to raise the temperature, which increases the energy consumption of the system and reduces the operating efficiency. For example, the invention patent "Heating System for Cascade Utilization of Medium and Deep Geothermal Resources without Interference" (CN109931651A) mentions a cascade utilization of high, medium and low grade parts of geothermal water through heat exchangers, high temperature heat pumps and low temperature heat pumps. Heating system, but this system is only suitable for heating in winter and cannot provide cooling in summer. At the same time, this system does not store the condensation heat of the heat pump unit, and the heat pump unit is turned on for a long time in the heating season, resulting in increased power consumption; invention patent "Cross-seasonal cold storage and heat storage system" (CN107525180B) mentioned a heating and cooling system that utilizes ice-source heat pump units to realize inter-seasonal cold storage and heat storage, but the ice-source heat pump units mentioned in this system consume a large amount of energy during operation. The electricity and operating costs are high, and the debugging of the system is complicated during operation, so it is difficult to meet the heating and cooling needs of the user side. The invention patent "Vertical Geothermal Energy Storage Air Conditioning System" (CN1137352C) mentions a heat exchange and heat storage system suitable for residential buildings, but this system has a relatively small range of use and is only suitable for small-scale utilization, and geothermal water has not been used. Cascade utilization means recharging, the utilization rate of geothermal water is low, and most of the equipment is underground, and the operability of the equipment is low, resulting in poor heating and cooling effects; the invention patent "a seasonal energy storage ground source heat pump system" (CN103277939B) mentions a system for storing industrial waste heat in the rock-soil base temperature layer for heating in winter. This system is mainly used in the industrial field, and a certain scale of rock-soil base temperature layer needs to be set at the same time, and the construction cost is high. Moreover, the heat storage effect is poor, and a large amount of electric energy is required to discharge heat to the base temperature layer in summer, which is not in line with the carbon reduction strategy; the invention patent "Comprehensive Renewable Energy Cooling and Heating System" (CN104864447B) mentions a comprehensive utilization of deep geothermal , shallow geothermal and desalinated seawater heat energy systems, this system simply connects the above units in parallel for heat supply, without considering the system efficiency, so there is still the problem of wasting heat energy. Invention patent "Geothermal Heating-Energy Storage Integrated System and Application with Low Cost Operation" (CN113531630A) mentions a system that stores the heat of geothermal water with an energy storage unit for heating. This system can only be used for heating in winter , the heat storage unit is affected by the temperature of geothermal water, and the peak shaving capacity is limited at the same time; the invention patent "Geothermal Heating-Energy Storage Integrated System and Application of Low-cost Operation" (CN113531630A) mentions a kind of intermittent energy The generated heat is stored and combined with geothermal water for heating. This system requires sufficient intermittent energy in addition to sufficient geothermal water resources. It is difficult to balance the heating needs of various regions, so the scope of application is limited.
发明内容Contents of the invention
有鉴于此,本发明提供了一种基于地热水和跨季节蓄能的低能耗热泵系统及其运行方法,能够在夏季利用跨季节蓄冷槽和热泵机组联合供冷的策略,冬季采用一级换热器、二级换热器、热泵机组及跨季节蓄热槽联合供暖策略,最大程度降低热泵机组的开启时间,降低系统能耗,提高系统运行效率。In view of this, the present invention provides a low-energy heat pump system based on geothermal water and cross-seasonal energy storage and its operation method, which can use the combined cooling strategy of cross-seasonal cold storage tanks and heat pump units in summer, and adopt the first-level heat pump system in winter The combined heating strategy of heat exchangers, secondary heat exchangers, heat pump units and cross-season heat storage tanks minimizes the start-up time of heat pump units, reduces system energy consumption, and improves system operating efficiency.
本发明是通过下述技术方案实现的:The present invention is achieved through the following technical solutions:
一种基于地热水和跨季节蓄能的低能耗热泵系统,包括地热水开采井、地热水回灌井、换热器组件、热泵机组、高温热泵机组、跨季节蓄热槽、冷却塔、跨季节蓄冷槽及供冷热用户;A low-energy heat pump system based on geothermal water and inter-season energy storage, including geothermal water recovery wells, geothermal water recharge wells, heat exchanger components, heat pump units, high-temperature heat pump units, inter-season heat storage tanks, cooling towers, cross-season cold storage tanks, and cooling and heating users;
所述地热水开采井、换热器组件的一次侧换热管道及地热水回灌井顺序连通;换热器组件的二次侧换热管道与供冷热用户连通,用于为供冷热用户供热;The geothermal water production well, the heat exchange pipe on the primary side of the heat exchanger assembly and the geothermal water recharge well are sequentially connected; the heat exchange pipe on the secondary side of the heat exchanger assembly is connected with the cooling and heating users for Heating for hot and cold users;
所述热泵机组的一端与换热器组件的二次侧换热管道连通,另一端分为制冷端和制热端,且制冷端和制热端均与供冷热用户连通,制冷端用于为供冷热用户供冷,制热端用于为供冷热用户供热;One end of the heat pump unit communicates with the heat exchange pipe on the secondary side of the heat exchanger assembly, and the other end is divided into a cooling end and a heating end, and both the cooling end and the heating end are connected to the cooling and heating users, and the cooling end is used for Provide cooling for hot and cold users, and the heating end is used to provide heat for cold and hot users;
所述高温热泵机组的一端分别与换热器组件的二次侧换热管道及热泵机组的制热端连通,另一端通过跨季节蓄热槽与供冷热用户连通,高温热泵机组用于给跨季节蓄热槽蓄热,跨季节蓄热槽用于为供冷热用户供热;One end of the high-temperature heat pump unit is connected with the secondary side heat exchange pipe of the heat exchanger assembly and the heating end of the heat pump unit, and the other end is connected with the cooling and heating users through the cross-season heat storage tank. The high-temperature heat pump unit is used to supply Heat storage in cross-season heat storage tanks, which are used to provide heat for cooling and heating users;
所述跨季节蓄冷槽与热泵机组的制冷端连通,另一端与供冷热用户连通,跨季节蓄冷槽用于为供冷热用户供冷;冷却塔与跨季节蓄冷槽连通,用于对跨季节蓄冷槽蓄冷。The cross-season cold storage tank is connected with the cooling end of the heat pump unit, and the other end is connected with the cooling and heating users, and the cross-season cold storage tank is used to provide cooling for the cooling and heating users; the cooling tower is connected with the cross-season cold storage tank for cooling across the season. Seasonal cold storage tank for cold storage.
进一步的,所述热泵系统还包括定压罐和生活热水用户;Further, the heat pump system also includes a constant pressure tank and domestic hot water users;
所述定压罐内储存有生活用水,定压罐的输入端与外部的水源连通,定压罐的输出端与生活热水用户连通,外部的水源通过定压罐为生活热水用户提供生活用水;Domestic water is stored in the constant pressure tank, the input end of the constant pressure tank is connected with the external water source, the output end of the constant pressure tank is connected with the domestic hot water user, and the external water source provides domestic hot water users with the constant pressure tank. water;
所述定压罐与换热器组件的二次侧换热管道换热,换热器组件的二次侧换热管道对定压罐内的生活用水加热;所述定压罐与跨季节蓄热槽换热,跨季节蓄热槽对定压罐内的生活用水进一步加热。The constant pressure tank exchanges heat with the secondary side heat exchange pipe of the heat exchanger assembly, and the secondary side heat exchange pipe of the heat exchanger assembly heats the domestic water in the constant pressure tank; the constant pressure tank and the cross-season storage The heat tank is used for heat exchange, and the cross-season heat storage tank further heats the domestic water in the constant pressure tank.
进一步的,所述热泵系统还包括阀门组,阀门组包括:阀门一、阀门二、阀门三、阀门四、阀门五、阀门六、阀门七、阀门八、阀门九、阀门十、阀门十一及阀门十二;Further, the heat pump system further includes a valve group, and the valve group includes: valve one, valve two, valve three, valve four, valve five, valve six, valve seven, valve eight, valve nine, valve ten, valve eleven and valve twelve;
所述换热器组件包括一级换热器和二级换热器;The heat exchanger assembly includes a primary heat exchanger and a secondary heat exchanger;
所述热泵机组的制冷端为蒸发器,制热端为冷凝器;The cooling end of the heat pump unit is an evaporator, and the heating end is a condenser;
所述地热水开采井通过管路与一级换热器的一次侧换热管道的输入端连通,一级换热器的一次侧换热管道的输出端通过管路与二级换热器的一次侧换热管道的输入端连通,二级换热器的一次侧换热管道的输出端通过管路与地热水回灌井连通;The geothermal water production well communicates with the input end of the primary heat exchange pipe of the primary heat exchanger through a pipeline, and the output end of the primary heat exchange pipe of the primary heat exchanger communicates with the secondary heat exchanger through a pipeline. The input end of the heat exchange pipe on the primary side of the secondary heat exchanger is connected, and the output end of the heat exchange pipe on the primary side of the secondary heat exchanger is connected with the geothermal water reinjection well through the pipe;
所述供冷热用户的输出端通过管路c与一级换热器的二次侧换热通道的输入端连通,一级换热器的二次侧换热通道的输出端通过管路b与供冷热用户的输入端连通;The output end of the cooling and heating user is connected to the input end of the secondary side heat exchange channel of the primary heat exchanger through the pipeline c, and the output end of the secondary side heat exchange channel of the primary heat exchanger is connected through the pipeline b Connected with the input end for cooling and heating users;
二级换热器的二次侧换热管道的输出端通过管路e与管路b相通,且管路e与管路b交汇处为G点;二级换热器的二次侧换热管道的输入端通过管路f与管路c连通,且管路c与管路f交汇处为H点;The output end of the secondary side heat exchange pipe of the secondary heat exchanger communicates with the pipeline b through the pipeline e, and the intersection of the pipeline e and the pipeline b is point G; the secondary side heat exchange of the secondary heat exchanger The input end of the pipeline communicates with pipeline c through pipeline f, and the junction of pipeline c and pipeline f is point H;
热泵机组的蒸发器的第一输入端通过管路a与管路e连通,且管路a与管路e交汇处为I点,蒸发器的第一输出端与管路f连通;蒸发器的第二输入端通过管路g与管路c连通,且管路g与管路c交汇处为K点,蒸发器的第二输出端通过管路d与管路b连通,管路d与管路b的交汇处为J点;The first input end of the evaporator of the heat pump unit communicates with the pipeline e through the pipeline a, and the junction of the pipeline a and the pipeline e is point I, and the first output terminal of the evaporator communicates with the pipeline f; The second input end communicates with the pipeline c through the pipeline g, and the junction of the pipeline g and the pipeline c is point K, the second output terminal of the evaporator communicates with the pipeline b through the pipeline d, and the pipeline d connects with the pipeline The intersection of road b is point J;
热泵机组的冷凝器的输出端通过管路h与管路b连通,且管路h与管路b交汇处为L点,冷凝器的输入端通过管路i与管路c连通,且管路i与管路c交汇处为M点;The output end of the condenser of the heat pump unit communicates with the pipeline b through the pipeline h, and the intersection of the pipeline h and the pipeline b is point L, the input end of the condenser communicates with the pipeline c through the pipeline i, and the pipeline The intersection of i and pipeline c is point M;
跨季节蓄热槽的供热出口通过管路k与管路b连通,管路k与管路b的交汇处为A点;跨季节蓄热槽的供热回口通过管路l与管路c连通,管路l与管路c的交汇处为P点;The heat supply outlet of the cross-season heat storage tank is connected to the pipeline b through the pipeline k, and the intersection of the pipeline k and the pipeline b is point A; the heat supply return port of the cross-season heat storage tank passes through the pipeline l and the pipeline c is connected, and the intersection of pipeline l and pipeline c is point P;
跨季节蓄热槽的蓄热出口与高温热泵机组的第一输入端连通;高温热泵机组的第一输出端通过管路m与管路c连通,管路m与管路c的交汇处为Q点;高温热泵机组的第二输入端通过管路j与管路b连通,管路j与管路b的交汇处为N点,高温热泵机组的第二输出端与跨季节蓄热槽的蓄热入口连通;The heat storage outlet of the cross-season heat storage tank is connected to the first input end of the high-temperature heat pump unit; the first output end of the high-temperature heat pump unit is connected to the pipeline c through the pipeline m, and the intersection of the pipeline m and the pipeline c is Q point; the second input end of the high-temperature heat pump unit communicates with the pipeline b through the pipeline j, and the junction of the pipeline j and the pipeline b is point N, and the second output end of the high-temperature heat pump unit is connected with the storage tank of the cross-season heat storage tank thermal inlet connection;
跨季节蓄冷槽的供冷出口通过管路s与管路b连通,管路s与管路b的交汇处为U点,跨季节蓄冷槽的供冷回口通过管路r与管路c连通,且管路r与管路c的交汇处为T点;The cooling outlet of the cross-seasonal cold storage tank is connected to the pipeline b through the pipeline s, the intersection of the pipeline s and the pipeline b is point U, and the cooling return port of the cross-seasonal cold storage tank is connected with the pipeline c through the pipeline r , and the intersection of pipeline r and pipeline c is point T;
跨季节蓄冷槽的蓄冷出口通过管路q与管路g连通,跨季节蓄冷槽的蓄冷入口通过管路p与管路d连通,且管路p与管路d交汇处为S点;同时,管路q通过支路n与管路h连通,且支路n与管路h的交汇处为R点,支路n与管路q的交汇处为X点;管路p通过支路o与管路i连通,且支路o与管路p的交汇处为B点;The cold storage outlet of the cross-seasonal cold storage tank is connected with the pipeline g through the pipeline q, the cold storage inlet of the cross-seasonal cold storage tank is connected with the pipeline d through the pipeline p, and the intersection of the pipeline p and the pipeline d is point S; at the same time, Pipeline q communicates with pipeline h through branch n, and the intersection of branch n and pipeline h is point R, and the intersection of branch n and pipeline q is point X; pipeline p passes through branch o and Pipeline i is connected, and the junction of branch o and pipeline p is point B;
冷却塔通过管路w分别与支路n和支路o连通,即管路w的一端与支路o连通,管路w的另一端与支路n连通,且管路w与支路n的交汇处为Y点;管路w的中部流经冷却塔,冷却塔对管路w中的热水进行降温冷却;The cooling tower communicates with the branch n and the branch o through the pipeline w, that is, one end of the pipeline w communicates with the branch o, the other end of the pipeline w communicates with the branch n, and the pipeline w connects with the branch n The intersection is point Y; the middle part of the pipeline w flows through the cooling tower, and the cooling tower cools down the hot water in the pipeline w;
管路j与管路n通过支路t连通,且管路n与支路t的交汇处为V点,管路j与支路t的交汇处为W点;管路m与管路o通过支路u连通;Pipeline j and pipeline n are connected through branch t, and the intersection of pipeline n and branch t is point V, and the intersection of pipeline j and branch t is point W; pipeline m and pipeline o pass through The branch u is connected;
所述阀门一安装在管路b上,并位于N点和J点之间;阀门二位于管路j上,并位于N点和W点之间;阀门三位于管路e上,并位于G点与I点之间;阀门四位于管路a上,阀门五位于管路d上,并位于S点和J点之间;阀门六位于管路h上,并位于R点和L点之间;阀门七、阀门九和阀门十均位于管路n上,阀门七位于R点和V点之间,阀门九位于V点和Y点之间,阀门十位于Y点与X点之间;阀门八位于管路p上,并位于S点和B点之间;阀门十一位于管路k上,并位于Z点与A点之间;阀门十二位于管路s上。The first valve is installed on the pipeline b, and is located between points N and J; the second valve is located on the pipeline j, and is located between the points N and W; the third valve is located on the pipeline e, and is located at G Between point and point I; valve four is located on pipeline a, valve five is located on pipeline d, and is located between point S and point J; valve six is located on pipeline h, and is located between point R and point L ;Valve 7,
进一步的,所述阀门组还包括阀门十三;所述换热器组件还包括三级换热器;Further, the valve group also includes valve thirteen; the heat exchanger assembly also includes a three-stage heat exchanger;
所述三级换热器的一次侧换热管道串联在二级换热器的一次侧换热管道与地热水回灌井之间,即二级换热器的一次侧换热管道的输出端通过管路与三级换热器的一次侧换热管道的输入端连通,三级换热器的一次侧换热管道的输出端通过管路与地热水回灌井连通;The primary side heat exchange pipe of the tertiary heat exchanger is connected in series between the primary side heat exchange pipe of the secondary heat exchanger and the geothermal water recharge well, that is, the output of the primary side heat exchange pipe of the secondary heat exchanger The end is connected with the input end of the primary side heat exchange pipe of the three-stage heat exchanger through the pipeline, and the output end of the primary side heat exchange pipe of the three-stage heat exchanger is connected with the geothermal water recharge well through the pipeline;
所述三级换热器的二次侧换热管道的输出端通过管路z与三级换热器的二次侧换热管道的输入端连通,且管路z流经定压罐,从三级换热器的二次侧换热管道流出的水通过管路z对定压罐内的生活用水加热;The output end of the secondary side heat exchange pipe of the tertiary heat exchanger communicates with the input end of the secondary side heat exchange pipe of the tertiary heat exchanger through the pipeline z, and the pipeline z flows through the constant pressure tank, from The water flowing out of the heat exchange pipe on the secondary side of the three-stage heat exchanger heats the domestic water in the constant pressure tank through the pipe z;
所述管路k和管路l分别通过管路y与定压罐进行换热,即管路y的一端与管路k连通,管路y与管路k交汇处为Z点,管路y的另一端与管路l连通,管路y流经定压罐,从跨季节蓄热槽流出的热水通过管路y对定压罐内的生活用水进一步加热;所述阀门十三位于管路y上。The pipeline k and the pipeline l exchange heat with the constant pressure tank respectively through the pipeline y, that is, one end of the pipeline y is connected with the pipeline k, and the junction of the pipeline y and the pipeline k is point Z, and the pipeline y The other end of the pipe is connected with the pipeline l, the pipeline y flows through the constant pressure tank, and the hot water flowing out from the cross-season heat storage tank further heats the domestic water in the constant pressure tank through the pipeline y; the
进一步的,所述换热器组件采用固定管板式换热器或U形管板式换热器。Further, the heat exchanger assembly adopts a fixed tube-sheet heat exchanger or a U-shaped tube-sheet heat exchanger.
一种基于地热水和跨季节蓄能的低能耗热泵系统的运行方法,基于上述低能耗热泵系统,该运行方法包括两种运行模式,分别为夏季运行模式和冬季运行模式,通过切换阀门组内的阀门的开关,即可实现夏季运行模式和冬季运行模式的切换。An operation method of a low-energy heat pump system based on geothermal water and cross-seasonal energy storage. Based on the above-mentioned low-energy heat pump system, the operation method includes two operation modes, namely summer operation mode and winter operation mode. By switching the valve group The switch of the valve inside can realize the switching between summer operation mode and winter operation mode.
进一步的,在夏季运行模式下,进行蓄热供冷,供冷初始时,所有阀门均处于关闭状态,首先开启阀门十二,跨季节蓄冷槽内的供冷出口到供冷回口的管段、管路s、管路r、管路b上的U点到供冷热用户之间的管段及管路c上的T点到供冷热用户之间的管段组成的供冷循环回路一接通,使用跨季节蓄冷槽中的冷量给供冷热用户供冷;Further, in the summer operation mode, heat storage and cooling are carried out. At the beginning of the cooling, all valves are closed, and
当跨季节蓄冷槽中的冷量无法满足用冷需求时,关闭阀门十二,开启热泵机组及打开阀门五,热泵机组内蒸发器的第二输入端和第二输出端的管段、管路d、管路g、管路b上的J点到供冷热用户之间的管段及管路c上的K点到供冷热用户之间的管段组成的供冷循环回路二接通,利用热泵机组的蒸发器产生的冷量给供冷热用户供冷;When the cooling capacity in the cross-season cold storage tank cannot meet the cold demand,
在夏季蓄热时,在采用热泵机组供冷的基础上,开启高温热泵机组、阀门二、阀门七和阀门九,将热泵机组的冷凝器流出的热水与从一级换热器的二次侧换热管道流出的热水在高温热泵机组内混合后,经高温热泵机组提温,与跨季节蓄热槽连通,对跨季节蓄热槽进行蓄热;该方式同时回收了热泵机组的冷凝器的热量,和提取了地热水开采井的地热水中的部分热量;当跨季节蓄热槽达到蓄热极限后,蓄热热泵机组内冷凝器产生的多余热量通过冷却塔排出;During heat storage in summer, on the basis of using the heat pump unit for cooling, open the high-temperature heat pump unit,
在夏季蓄热供冷的整个过程中,地热水从地热水开采井流出,依次经一级换热器、二级换热器、三级换热器换热降温后流入地热水回灌井;During the whole process of heat storage and cooling in summer, the geothermal water flows out from the geothermal water extraction well, passes through the primary heat exchanger, the secondary heat exchanger, and the tertiary heat exchanger in turn for heat exchange and cooling, and then flows into the geothermal water return system. fill the well;
当需要给生活热水用户提供生活用水时,三级换热器的二次侧换热管道流出的水通过管路z对定压罐中的生活用水加热,当定压罐中的生活用水的温度达到设定温度后,输出给生活热水用户提供设定温度的生活用水;当仅靠三级换热器无法将定压罐中的生活用水加热到设定温度时,打开阀门十三,定压罐中的生活用水与跨季节蓄热槽的供热出口排出的热水混合进一步提温后,输出给生活热水用户提供设定温度的生活用水。When it is necessary to provide domestic hot water users with domestic water, the water flowing out of the heat exchange pipe on the secondary side of the three-stage heat exchanger passes through the pipeline z to heat the domestic water in the constant pressure tank, when the domestic water in the constant pressure tank After the temperature reaches the set temperature, it will output domestic hot water users with the set temperature; when the domestic water in the constant pressure tank cannot be heated to the set temperature only by the three-stage heat exchanger,
进一步的,当采用热泵机组供冷时,在用电谷段开启阀门八,热泵机组内的蒸发器的第二输入端和第二输出端的管段、管路p、管路q及跨季节蓄冷槽内的蓄冷入口和蓄冷出口之间的管段组成的蓄冷回路连通;热泵机组的蒸发器产生的冷量对跨季节蓄冷槽进行蓄冷;在用电高峰段关闭热泵机组,打开阀门十二,仅利用跨季节蓄冷槽进行供冷。Further, when the heat pump unit is used for cooling, the valve eight is opened in the valley section of electricity consumption, and the pipe sections, pipeline p, pipeline q and cross-season cold storage tank of the second input end and second output end of the evaporator in the heat pump unit The cold storage circuit formed by the pipe section between the cold storage inlet and the cold storage outlet in the heat pump unit is connected; the cold generated by the evaporator of the heat pump unit stores cold for the cross-season cold storage tank; the heat pump unit is turned off during the peak period of electricity consumption, and the
进一步的,在冬季运行模式下,进行蓄冷供热,在冬季进行供热时,将用户负荷分为个负荷等级,在供暖初期为一级负荷,当室外温度降低、供暖负荷升高时,为二级负荷;当室外温度进一步降低、供暖负荷再次升高时,为三级负荷;当供暖负荷达到峰值时,为四级负荷;供热的具体操作流程如下:Furthermore, in the winter operation mode, cold storage and heat supply are carried out. When heating in winter, the user load is divided into load levels. In the initial stage of heating, it is the first-level load. When the outdoor temperature decreases and the heating load increases, it is Secondary load; when the outdoor temperature drops further and the heating load rises again, it is a third-level load; when the heating load reaches its peak value, it is a fourth-level load; the specific operation process of heating is as follows:
供热初始时,所有阀门均处于关闭状态,在一级负荷时,开启阀门一,利用一级换热器直供供暖,即一级换热器的二次侧换热管道、管路b、管路c及供冷热用户之间组成的供热循环回路一接通,一级换热器通过与地热水开采井流出的地热水的换热,实现对供冷热用户的直接供热;同时开启高温热泵机组和阀门二,利用地热水给跨季节蓄热槽蓄热;At the beginning of heat supply, all valves are closed. When the primary load is applied,
在二级负荷时,开启阀门三,采用一级换热器和二级换热器联合供暖的方式,即一级换热器的二次侧换热管道、管路b、管路c及供冷热用户之间组成的供热循环回路一接通,二级换热器的二次侧换热管道、管路e、管路f、管路b上的G点到供冷热用户之间的管段及管路c上的H点到供冷热用户之间的管段组成的供热循环回路二接通,一级换热器和二级换热器分别通过与地热水开采井流出的地热水的换热,实现对供冷热用户的联合供热;In the secondary load, open the
在三级负荷时,开启阀门十一,关闭阀门二,采用地热水与跨季节蓄热槽联合供暖模式,即一级换热器的二次侧换热管道、管路b、管路c及供冷热用户之间组成的供热循环回路一接通,二级换热器的二次侧换热管道、管路e、管路f、管路b上的G点到供冷热用户之间的管段及管路c上的H点到供冷热用户之间的管段组成的供热循环回路二接通,跨季节蓄热槽内的供热出口和供热回口之间的管段、管路k、管路l、管路b上的A点到供冷热用户之间的管段及管路c上的P点到到供冷热用户之间的管段组成的供热循环回路三接通,一级换热器和二级换热器分别通过与地热水开采井流出的地热水的换热、及跨季节蓄热槽提供的热量,实现对供冷热用户的联合供热;In the third-level load,
在四级负荷时,开启阀门四和阀门六,此时热泵机组开始运行,利用地热水直供+跨季节蓄热槽+热泵机组联合供暖模式,即一级换热器的二次侧换热管道、管路b、管路c及供冷热用户之间组成的供热循环回路一接通,二级换热器的二次侧换热管道、管路e、管路f、管路b上的G点到供冷热用户之间的管段及管路c上的H点到供冷热用户之间的管段组成的供热循环回路二接通,跨季节蓄热槽内的供热出口和供热回口之间的管段、管路k、管路l、管路b上的A点到供冷热用户之间的管段及管路c上的P点到到供冷热用户之间的管段组成的供热循环回路三接通,热泵机组的冷凝器、管路i、管路h、管路b上的L点到供冷热用户之间的管段及管路c上的M点到到供冷热用户之间的管段组成的供热循环回路四接通,一级换热器和二级换热器分别通过与地热水开采井流出的地热水的换热、跨季节蓄热槽提供的热量及热泵机组的冷凝器提供的热量,实现对供冷热用户的联合供热;At the fourth level of load, open valve four and valve six, and the heat pump unit starts to run at this time, using the combined heating mode of geothermal water direct supply + cross-season heat storage tank + heat pump unit, that is, the secondary side exchange of the primary heat exchanger As soon as the heat supply circulation circuit composed of the heat pipe, pipeline b, pipeline c and the cooling and heating users is connected, the secondary side heat exchange pipeline, pipeline e, pipeline f, and pipeline of the secondary heat exchanger The heat supply circulation circuit composed of point G on b to the pipe section between the cooling and heating users and the H point on the pipeline c to the pipe section between the cooling and heating users is connected, and the heat supply in the cross-season heat storage tank The pipeline section between the outlet and the heating return port, pipeline k, pipeline l, point A on pipeline b to the pipeline section between the cooling and heating users, and point P on the pipeline c to the cooling and heating users The heat supply circulation circuit composed of the pipe sections among them is connected three times, the condenser of the heat pump unit, pipeline i, pipeline h, point L on the pipeline b to the pipeline section between the cooling and heating users and M on the pipeline c The heat supply circulation loop composed of the pipe sections between the point and the cooling and heating users is connected four times. The heat provided by the seasonal heat storage tank and the heat provided by the condenser of the heat pump unit realizes the combined heat supply for cooling and heating users;
在冬季蓄冷时,开启阀门十,将冷却塔与跨季节蓄冷槽连接,且在冷却塔和跨季节蓄冷槽组成的回路循环介质中添加防冻剂;冷却塔收集外界空气的冷量,并将该冷量传输给跨季节蓄冷槽进行蓄冷,用于夏季供冷使用;When storing cold in winter, open the valve ten, connect the cooling tower with the cross-seasonal cold storage tank, and add antifreeze to the circulating medium of the loop composed of the cooling tower and the cross-seasonal cold storage tank; the cooling tower collects the cooling capacity of the outside air, and The cold energy is transferred to the cross-season cold storage tank for cold storage, which is used for cooling in summer;
在冬季蓄冷供热的整个过程中,地热水从地热水开采井流出,依次经一级换热器、二级换热器、三级换热器换热降温后流入地热水回灌井;During the whole process of cold storage and heat supply in winter, geothermal water flows out from the geothermal water exploitation well, passes through the primary heat exchanger, secondary heat exchanger, and tertiary heat exchanger in turn for heat exchange and cooling, and then flows into the geothermal water for recharge. well;
当需要给生活热水用户提供生活用水时,三级换热器的二次侧换热管道流出的水通过管路z对定压罐中的生活用水加热,当定压罐中的生活用水的温度达到设定温度后,输出给生活热水用户提供设定温度的生活用水;当仅靠三级换热器无法将定压罐中的生活用水加热到设定温度时,打开阀门十三,定压罐中的生活用水与跨季节蓄热槽的供热出口排出的热水混合进一步提温后,输出给生活热水用户提供设定温度的生活用水。When it is necessary to provide domestic hot water users with domestic water, the water flowing out of the heat exchange pipe on the secondary side of the three-stage heat exchanger passes through the pipeline z to heat the domestic water in the constant pressure tank, when the domestic water in the constant pressure tank After the temperature reaches the set temperature, it will output domestic hot water users with the set temperature; when the domestic water in the constant pressure tank cannot be heated to the set temperature only by the three-stage heat exchanger,
进一步的,当采用热泵机组供热时,在用电谷段开启阀门七,将热泵机组的冷凝器与跨季节蓄热槽连通,热泵机组的冷凝器产生的热量对跨季节蓄热槽进行蓄热。Further, when the heat pump unit is used for heat supply, the
有益效果:Beneficial effect:
(1)本发明的热泵系统能充分利用地热水、跨季节蓄能槽以及热泵机组进行供热或供冷,即在夏季利用跨季节蓄冷槽和热泵机组联合供冷的策略,冬季采用一级换热器、二级换热器、热泵机组以及跨季节储热槽联合供暖策略,最大程度降低热泵机组的开启时间,降低系统能耗,提高系统运行效率;同时达到了充分利用清洁能源进行供暖供冷的目的,且本发明使用方便,便于运行操作,稳定性好,适用范围广,可靠性高。(1) The heat pump system of the present invention can make full use of geothermal water, cross-seasonal energy storage tanks and heat pump units for heating or cooling, that is, in summer, the strategy of using cross-seasonal cold storage tanks and heat pump units for joint cooling is adopted, and in winter a combination of cold storage tanks and heat pump units is used. The combined heating strategy of first-stage heat exchangers, second-stage heat exchangers, heat pump units, and cross-seasonal heat storage tanks minimizes the start-up time of heat pump units, reduces system energy consumption, and improves system operating efficiency; at the same time, it achieves the goal of fully utilizing clean energy. The purpose of heating and cooling, and the present invention is convenient to use, easy to run and operate, good in stability, wide in scope of application and high in reliability.
(2)本发明不仅能够实现对用户的供冷供热,还能实现为生活热水用户提供生活用水,并对生活用水进行提温加热,提高使用生活用水的便利性和舒适性。(2) The present invention can not only provide cooling and heating for users, but also provide domestic water for domestic hot water users, and heat the domestic water to improve the convenience and comfort of using domestic water.
(3)本发明的换热器组件内的一级换热器、二级换热器及三级换热器均采用固定管板式换热器或U形管板式换热器,提高了地热水与其他部件的换热效果。(3) The primary heat exchanger, secondary heat exchanger and tertiary heat exchanger in the heat exchanger assembly of the present invention all adopt fixed tube-sheet heat exchanger or U-shaped tube-sheet heat exchanger, which improves the geothermal energy Heat exchange effect between water and other components.
(4)本发明提出了系统在冬夏季供暖供冷工况不同负荷下的运行策略,通过切换阀门组内的阀门的开关,实现夏季运行模式和冬季运行模式的切换,极大地降低了系统运行能耗,提高了系统运行效率。(4) The present invention proposes an operation strategy for the system under different loads of heating and cooling conditions in winter and summer. By switching the valves in the valve group, the switch between the summer operation mode and the winter operation mode is realized, which greatly reduces the system operation time. energy consumption and improve system operating efficiency.
(5)本发明结合了地热水、地热水梯级换热通道、热泵机组及跨季节蓄能槽,实现了既能供暖又能供冷的功能;系统各设备间采用分时段联合供暖供冷模式,大大减少了热泵机组在冬季供暖以及夏季制冷时的开启时间,有效提高了系统的运行效率,大大减少了电力、天然气等高品位能源的消耗,符合清洁能源供暖政策,有力推动了双碳战略的实施落地。(5) The present invention combines geothermal water, geothermal water cascade heat exchange channels, heat pump units and cross-season energy storage tanks to realize the function of both heating and cooling; the system adopts joint heating and supply in different periods The cold mode greatly reduces the turn-on time of the heat pump unit for heating in winter and cooling in summer, effectively improves the operating efficiency of the system, and greatly reduces the consumption of high-grade energy such as electricity and natural gas. It conforms to the clean energy heating policy and strongly promotes the dual Implementation of the carbon strategy.
(6)本发明在夏季供冷时,在用电谷段开启热泵机组,热泵机组的蒸发器产生的冷量对跨季节蓄冷槽进行蓄冷;在冬季供热时,在用电谷段开启热泵机组,热泵机组的冷凝器产生的热量对跨季节蓄热槽进行蓄热;实现了在供暖供冷时,利用跨季节蓄能槽将系统余冷、余热量回收存储并跨季节使用,减少了暖通空调能耗量,降低了整个系统的供暖供冷运行成本;一方面在夏季,利用跨季节蓄热槽回收了热泵机组的冷凝器侧的废热以及吸收了地热水的热量,另一方面在冬季,利用冬季天然冷源将冷量储存起来用于夏季供冷使用,能够有效降低热泵机组的制冷开启时间,降低系统能耗;在夏季供冷时,先用冬季不消耗电量储存起来的冷量进行供冷,蓄冷槽的冷量不足后,再开启热泵机组制冷,这样在夏季制冷时就节约了电量,同时热泵机组制冷时,必不可少的会产生热量(40-50℃),高于夏季温度,将该热量储存起来用于冬季供热,同时地热水在夏季也可以用来储存,将跨季节蓄热槽蓄满,用于冬季使用,降低冬季制热能耗;冬季供暖时,优先使用地热水供暖,负荷升高一二级板换联合供暖,负荷再次升高采用地热水和蓄热槽联合供暖,负荷达到峰值时,开启热泵机组供暖,最大限度的减少热泵机组开启时间,同时利用冬季天然冷源蓄冷,减少夏季制冷能耗。(6) When the present invention is cooling in summer, the heat pump unit is turned on in the valley section of electricity consumption, and the cooling capacity generated by the evaporator of the heat pump unit is used to store cold in the cross-season cold storage tank; when heating is supplied in winter, the heat pump is turned on in the valley section of electricity consumption The heat generated by the condenser of the unit and the heat pump unit stores heat in the inter-season heat storage tank; when heating and cooling, the inter-season energy storage tank is used to recover and store the system's residual cold and waste heat for use across seasons, reducing The energy consumption of HVAC reduces the heating and cooling operation cost of the whole system; on the one hand, in summer, the waste heat on the condenser side of the heat pump unit and the heat absorbed by the geothermal water are recovered by using the cross-season heat storage tank; On the one hand, in winter, using natural cold sources in winter to store cold energy for cooling in summer can effectively reduce the cooling start-up time of the heat pump unit and reduce system energy consumption; When the cooling capacity of the cold storage tank is insufficient, turn on the heat pump unit for cooling, which saves electricity during cooling in summer. At the same time, when the heat pump unit is cooling, it will inevitably generate heat (40-50 ℃) , higher than the summer temperature, the heat is stored for heating in winter, and geothermal water can also be used for storage in summer, and the cross-season heat storage tank is fully stored for use in winter, reducing heating energy consumption in winter; When heating, give priority to the use of geothermal water for heating. When the load rises, the combined heating of the primary and secondary boards is replaced. When the load rises again, the combined heating of geothermal water and heat storage tanks is used. When the load reaches the peak, the heat pump unit is turned on for heating to minimize The heat pump unit is turned on at the same time, and the natural cold source is used to store cold in winter to reduce the energy consumption of cooling in summer.
综上所述,本发明的地热水开采井依次连通一级换热器、二级换热器、三级换热器,最后将地热水回灌至地热水回灌井;一级换热器二次侧换热管道与冷热用户连通,同时在非供暖以及供暖低负荷期可与热泵机组冷凝侧混合后,经高温热泵机组连通进行蓄热,实现回收+储热功能;所述二级换热器二次侧换热管道与热泵机组连通,为冬季供暖提供热源,同时在供暖负荷低时,可实现以一级换热器与二级换热器联合供暖,减少系统耗电;所述冷却塔在冬季与跨季节蓄冷槽连通,进行跨季节蓄冷;三级换热器与跨季节蓄热槽经过定压罐混水,产生50-60℃的生活热水;所述热泵机组蒸发器侧与用户连通,用于夏季供冷,同时在供冷负荷低时可与跨季节蓄冷槽连通,进行调峰蓄冷;所述热泵机组冷凝器侧在夏季与高温热泵机组连通进行跨季节蓄热,当蓄热槽达到最大容量后,热泵机组冷凝器侧与冷却塔连通,向室外排热;本发明利用地热水耦合跨季节蓄能槽实现了冷热量的跨季节使用,使传统地热水梯级利用系统实现了冷热同供,同时利用谷电储能起到了平稳电网负荷的作用;充分回收了热泵机组冷凝侧热量以及冬季室外天然冷量,大大降低了热泵机组的电耗,大大提高了地热水的利用率以及整个系统的运行效率;因此,本发明所述系统与现有技术相比,适用范围广,该系统在消耗较少电量情况下,能同时满足不同类型用户下的供冷、供暖以及生活热水需求。In summary, the geothermal water recovery well of the present invention is connected to the first-stage heat exchanger, the second-stage heat exchanger, and the third-stage heat exchanger in turn, and finally recharges the geothermal water to the geothermal water recharge well; The heat exchange pipe on the secondary side of the heat exchanger is connected to the cold and hot users. At the same time, it can be mixed with the condensation side of the heat pump unit during the non-heating and heating low-load periods, and then connected to the high-temperature heat pump unit for heat storage, realizing the function of recovery + heat storage; The heat exchange pipe on the secondary side of the secondary heat exchanger is connected with the heat pump unit to provide heat source for heating in winter. At the same time, when the heating load is low, the combined heating of the primary heat exchanger and the secondary heat exchanger can be realized to reduce system consumption. Electricity; the cooling tower communicates with the cross-seasonal cold storage tank in winter for cross-seasonal cold storage; the three-stage heat exchanger and the cross-seasonal heat storage tank are mixed with water through a constant pressure tank to generate domestic hot water at 50-60°C; The evaporator side of the heat pump unit is connected to the user for cooling in summer, and at the same time, it can be connected to the cross-season cold storage tank when the cooling load is low for peak-shaving cold storage; the condenser side of the heat pump unit is connected to the high-temperature heat pump unit for cooling in summer. Cross-season heat storage, when the heat storage tank reaches the maximum capacity, the condenser side of the heat pump unit is connected to the cooling tower, and heat is discharged to the outside; the invention uses geothermal water to couple the cross-season energy storage tank to realize the cross-season use of cold and heat , so that the traditional geothermal water cascade utilization system realizes the same supply of cold and heat, and at the same time uses the valley electricity energy storage to stabilize the load of the power grid; fully recovers the heat of the condensation side of the heat pump unit and the natural cooling capacity of the outdoor in winter, which greatly reduces the energy consumption of the heat pump unit. power consumption, greatly improving the utilization rate of geothermal water and the operating efficiency of the whole system; Meet the cooling, heating and domestic hot water needs of different types of users.
附图说明Description of drawings
图1为本发明的结构组成示意图;Fig. 1 is the structural composition schematic diagram of the present invention;
图2为本发明的地热水出水温度为55℃的示意图;Fig. 2 is the schematic diagram that the geothermal water outlet temperature of the present invention is 55 ℃;
图3为本发明的夏季运行工况的示意图;Fig. 3 is the schematic diagram of the summer operating condition of the present invention;
图4为本发明的冬季运行工况的示意图。Fig. 4 is a schematic diagram of the winter operating conditions of the present invention.
其中,1-地热水开采井,2-地热水回灌井,3-一级换热器,4-二级换热器,5-三级换热器,6-热泵机组,7-高温热泵机组,8-跨季节蓄热槽,9-冷却塔,10-跨季节蓄冷槽,11-定压罐,12-供冷热用户,13-生活热水用户,14-阀门一,15-阀门二,16-阀门三,17-阀门四,18-阀门五,19-阀门六,20-阀门七,21-阀门八,22-阀门九,23-阀门十,24-阀门十一,25-阀门十二,26-阀门十三。Among them, 1- geothermal water recovery well, 2- geothermal water recharge well, 3- primary heat exchanger, 4- secondary heat exchanger, 5- tertiary heat exchanger, 6- heat pump unit, 7- High temperature heat pump unit, 8-cross-season heat storage tank, 9-cooling tower, 10-cross-season cold storage tank, 11-constant pressure tank, 12-cooling and heating users, 13-domestic hot water users, 14-valve one, 15 -Valve Two, 16-Valve Three, 17-Valve Four, 18-Valve Five, 19-Valve Six, 20-Valve Seven, 21-Valve Eight, 22-Valve Nine, 23-Valve Ten, 24-Valve Eleven, 25-valve twelve, 26-valve thirteen.
具体实施方式Detailed ways
下面结合附图并举实施例,对本发明进行详细描述。The present invention will be described in detail below with reference to the accompanying drawings and examples.
实施例1:Example 1:
本实施例提供了一种基于地热水和跨季节蓄能的低能耗热泵系统,参见附图1-2,包括地热水开采井1、地热水回灌井2、一级换热器3、二级换热器4、三级换热器5、热泵机组6、高温热泵机组7、跨季节蓄热槽8、冷却塔9、跨季节蓄冷槽10、定压罐11、供冷热用户12、生活热水用户13及阀门组;其中,跨季节蓄热槽8和跨季节蓄冷槽10统称为跨季节蓄能槽;This embodiment provides a low-energy heat pump system based on geothermal water and inter-season energy storage, see Figure 1-2, including geothermal water recovery well 1, geothermal water recharge well 2, and a
所述阀门组包括:阀门一14、阀门二15、阀门三16、阀门四17、阀门五18、阀门六19、阀门七20、阀门八21、阀门九22、阀门十23、阀门十一24、阀门十二25及阀门十三26;The valve group includes: valve one 14, valve two 15, valve three 16, valve four 17, valve five 18, valve six 19, valve seven 20, valve eight 21, valve nine 22, valve ten 23, valve eleven 24 ,
所述一级换热器3、二级换热器4及三级换热器5内均设有两个换热管道,两个换热管道分别为一次侧换热管道和二次侧换热管道;The first-
所述热泵机组6由蒸发器和冷凝器组成;The
所述热泵系统的整体连接关系如下:The overall connection relationship of the heat pump system is as follows:
所述地热水开采井1通过管路与一级换热器3的一次侧换热管道的输入端连通,一级换热器3的一次侧换热管道的输出端通过管路与二级换热器4的一次侧换热管道的输入端连通,二级换热器4的一次侧换热管道的输出端通过管路与三级换热器5的一次侧换热管道的输入端连通,三级换热器5的一次侧换热管道的输出端通过管路与地热水回灌井2连通,地热水开采井1、一级换热器3、二级换热器4、三级换热器5、地热水回灌井2及之间连接的管路组成地热水梯级换热通道;The geothermal
所述定压罐11内储存有生活用水,所述定压罐11的输入端通过管路与外部的水源连通,定压罐11的输出端通过管路与生活热水用户13连通,外部的水源通过定压罐11为生活热水用户13提供生活用水;Domestic water is stored in the
所述三级换热器5的二次侧换热管道的输出端通过管路z与三级换热器5的二次侧换热管道的输入端连通,且管路z流经定压罐11,从三级换热器5的二次侧换热管道流出的水通过管路z对定压罐11内的生活用水加热;The output end of the secondary side heat exchange pipe of the
所述供冷热用户12的输出端通过管路c与一级换热器3的二次侧换热通道的输入端连通,一级换热器3的二次侧换热通道的输出端通过管路b与供冷热用户12的输入端连通;The output end of the cooling and
所述二级换热器4的二次侧换热管道的输出端通过管路e与管路b相通,且管路e与管路b交汇处为G点;所述二级换热器4的二次侧换热管道的输入端通过管路f与所述管路c连通,且管路c与管路f交汇处为H点;The output end of the secondary side heat exchange pipeline of the
所述热泵机组6的蒸发器的第一输入端通过管路a与管路e连通,且管路a与管路e交汇处为I点,蒸发器的第一输出端与管路f连通;蒸发器的第二输入端通过管路g与管路c连通,且管路g与管路c交汇处为K点,蒸发器的第二输出端通过管路d与管路b连通,管路d与管路b的交汇处为J点;The first input end of the evaporator of the
所述热泵机组6的冷凝器的输出端通过管路h与管路b连通,且管路h与管路b交汇处为L点,冷凝器的输入端通过管路i与管路c连通,且管路i与管路c交汇处为M点;The output end of the condenser of the
所述跨季节蓄热槽8的供热出口通过管路k与管路b连通,管路k与管路b的交汇处为A点;跨季节蓄热槽8的供热回口通过管路l与管路c连通,管路l与管路c的交汇处为P点;所述管路k和管路l分别通过管路y与所述定压罐11进行换热,即管路y的一端与管路k连通,管路y与管路k交汇处为Z点,管路y的另一端与管路l连通,管路y流经定压罐11,从跨季节蓄热槽8流出的热水通过管路y对定压罐11内的生活用水加热;The heat supply outlet of the cross-season
所述跨季节蓄热槽8的蓄热出口与高温热泵机组7的第一输入端连通;高温热泵机组7的第一输出端通过管路m与管路c连通,管路m与管路c的交汇处为Q点;高温热泵机组7的第二输入端通过管路j与管路b连通,管路j与管路b的交汇处为N点,高温热泵机组7的第二输出端与跨季节蓄热槽8的蓄热入口连通;The heat storage outlet of the cross-season
所述跨季节蓄冷槽10的供冷出口通过管路s与管路b连通,管路s与管路b的交汇处为U点,跨季节蓄冷槽10的供冷回口通过管路r与管路c连通,且管路r与管路c的交汇处为T点;The cooling outlet of the cross-season
所述跨季节蓄冷槽10的蓄冷出口通过管路q与管路g连通,跨季节蓄冷槽10的蓄冷入口通过管路p与管路d连通,且管路p与管路d交汇处为S点;同时,管路q通过支路n与管路h连通,且支路n与管路h的交汇处为R点,支路n与管路q的交汇处为X点;管路p通过支路o与管路i连通,且支路o与管路p的交汇处为B点;The cold storage outlet of the cross-season
所述冷却塔9通过管路w分别与支路n和支路o连通,即管路w的一端与支路o连通,管路w的另一端与支路n连通,且管路w与支路n的交汇处为Y点;管路w的中部流经冷却塔9,冷却塔9对管路w中的热水进行降温冷却;The
所述管路j与管路n通过支路t连通,且管路n与支路t的交汇处为V点,管路j与支路t的交汇处为W点;所述管路m与管路o通过支路u连通;The pipeline j and the pipeline n are connected through the branch t, and the junction of the pipeline n and the branch t is a point V, and the junction of the pipeline j and the branch t is a point W; the pipeline m and the The pipeline o is connected through the branch u;
其中,在管路b上,G点、N点、J点、L点、A点及U点沿一级换热器3到供冷热用户12的方向顺序设置,在管路c上,T点、P点、M点、K点、Q点及H点沿供冷热用户12到一级换热器3的方向顺序设置;Among them, on the pipeline b, points G, N, J, L, A and U are arranged sequentially along the direction from the
所述阀门一14安装在管路b上,并位于N点和J点之间;所述阀门二15位于管路j上,并位于N点和W点之间;阀门三16位于管路e上,并位于G点与I点之间;阀门四17位于管路a上,阀门五18位于管路d上,并位于S点和J点之间;阀门六19位于管路h上,并位于R点和L点之间;阀门七20、阀门九22和阀门十23均位于管路n上,阀门七20位于R点和V点之间,阀门九22位于V点和Y点之间,阀门十23位于Y点与X点之间;阀门八21位于管路p上,并位于S点和B点之间;阀门十一24位于管路k上,并位于Z点与A点之间;阀门十二25位于管路s上;阀门十三26位于管路y上;The valve one 14 is installed on the pipeline b, and is located between points N and J; the valve two 15 is located on the pipeline j, and is located between the points N and W; the valve three 16 is located on the pipeline e on, and located between point G and I; valve four 17 is located on pipeline a, valve five 18 is located on pipeline d, and is located between point S and point J; valve six 19 is located on pipeline h, and Located between point R and point L; valve seven 20, valve nine 22 and valve ten 23 are all located on pipeline n, valve seven 20 is located between point R and point V, valve nine 22 is located between point V and point Y , valve ten 23 is located between point Y and point X; valve eight 21 is located on pipeline p, between point S and point B; valve eleven 24 is located on pipeline k, and is located between point Z and point A Between; valve twelve 25 is located on the pipeline s; valve thirteen 26 is located on the pipeline y;
本实施例的热泵系统的跨季节蓄热槽8、跨季节蓄冷槽10的容量可根据用户需要进一步调整,其中的蓄冷、蓄热介质包括但不限于水、导热油、熔盐、石蜡、复合相变材料等;The capacity of the cross-seasonal
本实施例的热泵系统的跨季节蓄热槽8、跨季节蓄冷槽10中设有换热盘管,换热盘管中的换热介质为处理过的水;The cross-season
本实施例的热泵系统的跨季节蓄冷槽8、跨季节蓄冷槽10的外表面设有高效隔热保温材料;The outer surfaces of the cross-season
本实施例的热泵系统的热泵机组6内循环为制冷剂循环;The internal circulation of the
本实施例的热泵系统的一级换热器3、二级换热器4及三级换热器5均为板式换热器,其中包括但不限于固定管板式换热器、U形管板式换热器等;The
本实施例的热泵系统的供冷热用户12可为散热器、地暖及风机盘管系统等。The cooling and
实施例2:Example 2:
本实施例在实施例1的基础上,提供了一种基于地热水和跨季节蓄能的低能耗热泵系统的运行方法,该运行方法包括两种运行模式,分别为夏季运行模式和冬季运行模式,通过切换阀门组内的阀门的开关,即可实现夏季运行模式和冬季运行模式的切换:On the basis of Example 1, this embodiment provides an operation method of a low-energy heat pump system based on geothermal water and cross-seasonal energy storage. The operation method includes two operation modes, namely summer operation mode and winter operation mode Mode, by switching the switch of the valves in the valve group, the switching between summer operation mode and winter operation mode can be realized:
在夏季运行模式下,进行蓄热供冷,参见附图3,关闭阀门一14、阀门三16、阀门四17、阀门六19、阀门十23及阀门十一24;不同时打开阀门二15、阀门五18、阀门七20、阀门八21、阀门九22、阀门十二25及阀门十三26;In the summer operation mode, heat storage and cooling are carried out, see attached drawing 3, close valve one 14, valve three 16, valve four 17, valve six 19, valve ten 23 and valve eleven 24; do not open valve two 15, Valve five 18, valve seven 20, valve eight 21, valve nine 22, valve twelve 25 and valve thirteen 26;
供冷初始时,所有阀门均处于关闭状态,首先开启阀门十二25,跨季节蓄冷槽10内的供冷出口到供冷回口的管段、管路s、管路r、管路b上的U点到供冷热用户12之间的管段及管路c上的T点到供冷热用户12之间的管段组成的供冷循环回路一接通,使用跨季节蓄冷槽10中的冷量给供冷热用户12供冷;At the beginning of the cold supply, all valves are in the closed state, first open the
当跨季节蓄冷槽10中的冷量无法满足用冷需求时,关闭阀门十二25,开启热泵机组6及打开阀门五18,热泵机组6内蒸发器的第二输入端和第二输出端的管段、管路d、管路g、管路b上的J点到供冷热用户12之间的管段及管路c上的K点到供冷热用户12之间的管段组成的供冷循环回路二接通,利用热泵机组6的蒸发器产生的冷量给供冷热用户12供冷;When the cooling capacity in the cross-season
其中,当采用热泵机组6供冷时,在电网削峰填谷阶段,即在用电谷段开启阀门八21,热泵机组6内的蒸发器的第二输入端和第二输出端的管段、管路p、管路q及跨季节蓄冷槽10内的蓄冷入口和蓄冷出口之间的管段组成的蓄冷回路连通;热泵机组6的蒸发器产生的冷量对跨季节蓄冷槽10进行蓄冷;在用电高峰段关闭热泵机组6,打开阀门十二25,仅利用跨季节蓄冷槽10进行供冷;Wherein, when the
在夏季蓄热时,在采用热泵机组6供冷的基础上,开启高温热泵机组7、阀门二15、阀门七20和阀门九22,将热泵机组6的冷凝器流出的热水与从一级换热器3的二次侧换热管道流出的热水在高温热泵机组7内混合后,经高温热泵机组7提温,与跨季节蓄热槽8连通,对跨季节蓄热槽8进行蓄热;该方式同时回收了热泵机组6的冷凝器的热量,和提取了地热水开采井1的地热水中的部分热量;当跨季节蓄热槽8达到蓄热极限后,蓄热热泵机组6内冷凝器产生的多余热量通过冷却塔9排出;When storing heat in summer, on the basis of using the
在夏季蓄热供冷的整个过程中,地热水从地热水开采井1流出,依次经一级换热器3、二级换热器4、三级换热器5换热降温后流入地热水回灌井2;During the whole process of heat storage and cooling in summer, the geothermal water flows out from the geothermal water exploitation well 1, passes through the
当需要给生活热水用户13提供生活用水时,三级换热器4的二次侧换热管道流出的水通过管路z对定压罐11中的生活用水加热,当定压罐11中的生活用水的温度达到设定温度后,输出给生活热水用户13提供设定温度的生活用水;当仅靠三级换热器4无法将定压罐11中的生活用水加热到设定温度时,打开阀门十三26,定压罐11中的生活用水与跨季节蓄热槽8的供热出口排出的热水混合进一步提温后,输出给生活热水用户13提供设定温度的生活用水;所述设定温度为50-60℃。When domestic
在冬季运行模式下,进行蓄冷供热,参见附图4,关闭阀门五18、阀门八21、阀门九22及阀门十二25;不同时打开阀门一14、阀门二15、阀门三16、阀门四17、阀门六19、阀门七20、阀门十23、阀门十一24及阀门十三26;In the winter operation mode, cold storage and heat supply are carried out, see attached drawing 4, close valve five 18, valve eight 21, valve nine 22 and valve twelve 25; do not open valve one 14, valve two 15, valve three 16, valve Four 17, valve six 19, valve seven 20, valve ten 23, valve eleven 24 and valve thirteen 26;
在冬季进行供暖时,将用户负荷分为4个负荷等级,在供暖初期为一级负荷,当室外温度降低、供暖负荷升高时,为二级负荷;当室外温度进一步降低、供暖负荷再次升高时,为三级负荷;当供暖负荷达到峰值时,为四级负荷;本实施例优先使用地热水的梯级利用进行供暖,即在一级负荷时,仅适用地热水进行供暖,当负荷等级升高后,开启跨季节蓄热槽8,达到负荷峰值时,开启热泵机组6,供暖的具体操作流程如下:When heating in winter, the user load is divided into four load levels. In the initial stage of heating, it is the first-level load. When the outdoor temperature drops and the heating load increases, it is the second-level load; When the load is high, it is the third-level load; when the heating load reaches the peak value, it is the fourth-level load; in this embodiment, the cascade utilization of geothermal water is used for heating, that is, when the first-level load is used, only geothermal water is used for heating. After the load level increases, the cross-season
供热初始时,所有阀门均处于关闭状态,在供暖初期(一级负荷),开启阀门一14,利用一级换热器3直供供暖,即一级换热器3的二次侧换热管道、管路b、管路c及供冷热用户12之间组成的供热循环回路一接通,一级换热器3通过与地热水开采井1流出的地热水的换热,实现对供冷热用户12的直接供热;同时开启高温热泵机组7和阀门二15,利用地热水给跨季节蓄热槽8蓄热;At the beginning of heating, all valves are closed, and at the initial stage of heating (primary load),
当室外温度降低时,供暖负荷升高(二级负荷),开启阀门三16,采用一级换热器3和二级换热器4联合供暖的方式,即一级换热器3的二次侧换热管道、管路b、管路c及供冷热用户12之间组成的供热循环回路一接通,二级换热器4的二次侧换热管道、管路e、管路f、管路b上的G点到供冷热用户12之间的管段及管路c上的H点到供冷热用户12之间的管段组成的供热循环回路二接通,一级换热器3和二级换热器4分别通过与地热水开采井1流出的地热水的换热,实现对供冷热用户12的联合供热;When the outdoor temperature drops, the heating load increases (secondary load), open the valve three 16, and adopt the combined heating method of the
当供暖负荷再次升高时(三级负荷),开启阀门十一24,关闭阀门二15,采用地热水与跨季节蓄热槽8联合供暖模式,即一级换热器3的二次侧换热管道、管路b、管路c及供冷热用户12之间组成的供热循环回路一接通,二级换热器4的二次侧换热管道、管路e、管路f、管路b上的G点到供冷热用户12之间的管段及管路c上的H点到供冷热用户12之间的管段组成的供热循环回路二接通,跨季节蓄热槽8内的供热出口和供热回口之间的管段、管路k、管路l、管路b上的A点到供冷热用户12之间的管段及管路c上的P点到到供冷热用户12之间的管段组成的供热循环回路三接通,一级换热器3和二级换热器4分别通过与地热水开采井1流出的地热水的换热、及跨季节蓄热槽8提供的热量,实现对供冷热用户12的联合供热;When the heating load increases again (three-stage load), open valve eleven 24, close valve two 15, and adopt the combined heating mode of geothermal water and cross-season
当供暖负荷达到峰值后(四级负荷),开启阀门四17和阀门六19,此时热泵机组6开始运行,利用地热水直供+跨季节蓄热槽8+热泵机组6联合供暖模式,即一级换热器3的二次侧换热管道、管路b、管路c及供冷热用户12之间组成的供热循环回路一接通,二级换热器4的二次侧换热管道、管路e、管路f、管路b上的G点到供冷热用户12之间的管段及管路c上的H点到供冷热用户12之间的管段组成的供热循环回路二接通,跨季节蓄热槽8内的供热出口和供热回口之间的管段、管路k、管路l、管路b上的A点到供冷热用户12之间的管段及管路c上的P点到到供冷热用户12之间的管段组成的供热循环回路三接通,热泵机组6的冷凝器、管路i、管路h、管路b上的L点到供冷热用户12之间的管段及管路c上的M点到到供冷热用户12之间的管段组成的供热循环回路四接通,一级换热器3和二级换热器4分别通过与地热水开采井1流出的地热水的换热、跨季节蓄热槽8提供的热量及热泵机组6的冷凝器提供的热量,实现对供冷热用户12的联合供热;When the heating load reaches the peak value (
同时,当采用热泵机组6供热时,在电网削峰填谷阶段,即在用电谷段开启阀门七20,将热泵机组6的冷凝器与跨季节蓄热槽8连通,热泵机组6的冷凝器产生的热量对跨季节蓄热槽8进行蓄热,起到调峰的目的;At the same time, when the
在冬季蓄冷时,开启阀门十23,将冷却塔9与跨季节蓄冷槽10连接,且在冷却塔9和跨季节蓄冷槽19组成的回路循环介质中添加防冻剂;冷却塔9收集外界空气的冷量,并将该冷量传输给跨季节蓄冷槽10进行蓄冷,用于夏季供冷使用;When storing cold in winter, open the valve ten 23, the
在冬季蓄冷供热的整个过程中,地热水从地热水开采井1流出,依次经一级换热器3、二级换热器4、三级换热器5换热降温后流入地热水回灌井2;During the whole process of cold storage and heat supply in winter, the geothermal water flows out from the geothermal water exploitation well 1, passes through the
当需要给生活热水用户13提供生活用水时,三级换热器4的二次侧换热管道流出的水通过管路z对定压罐11中的生活用水加热,当定压罐11中的生活用水的温度达到设定温度后,输出给生活热水用户13提供设定温度的生活用水;当仅靠三级换热器4无法将定压罐11中的生活用水加热到设定温度时,打开阀门十三26,定压罐11中的生活用水与跨季节蓄热槽8的供热出口排出的热水混合进一步提温后,输出给生活热水用户13提供设定温度的生活用水;所述设定温度为50-60℃。When domestic
所述一级换热器3与二级换热器4联合供暖模式,是指在一级换热器3无法满足供暖需求时,同时开启一级换热器3和二级换热器4,将一级换热器3和二级换热器4的二次侧换热管道内的供水混合后,供给供冷热用户12(实验显示,在特定地区,室外温度低于9℃时,一级换热器3直供无法满足供暖需求,此时开启一级换热器3与二级换热器4联合供暖模式,能满足室外温度在6-9℃时的供暖需求,以此减少热泵机组6的开启时间)。The joint heating mode of the
本实施例的热泵系统适用于地热水温度在55摄氏度以上的地区,地热水温度越高,系统的能源消耗越低,效率越高;The heat pump system of this embodiment is suitable for areas where the temperature of the geothermal water is above 55 degrees Celsius. The higher the temperature of the geothermal water, the lower the energy consumption of the system and the higher the efficiency;
本实施例的热泵系统适用于地热水资源丰富的公共建筑以及楼房居住建筑的供暖供冷。The heat pump system of this embodiment is suitable for heating and cooling of public buildings rich in geothermal water resources and residential buildings.
综上所述,以上仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。To sum up, the above are only preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210951761.XA CN115355559B (en) | 2022-08-09 | 2022-08-09 | Low-energy-consumption heat pump system based on geothermal water and cross-season energy storage and operation method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210951761.XA CN115355559B (en) | 2022-08-09 | 2022-08-09 | Low-energy-consumption heat pump system based on geothermal water and cross-season energy storage and operation method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN115355559A true CN115355559A (en) | 2022-11-18 |
| CN115355559B CN115355559B (en) | 2025-10-31 |
Family
ID=84033798
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202210951761.XA Active CN115355559B (en) | 2022-08-09 | 2022-08-09 | Low-energy-consumption heat pump system based on geothermal water and cross-season energy storage and operation method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115355559B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116358174A (en) * | 2023-03-06 | 2023-06-30 | 中国建设基础设施有限公司 | Integrated energy supply system using prefabricated ground connection wall coupled with shallow geothermal energy |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20110104579A (en) * | 2010-03-17 | 2011-09-23 | (주) 삼영이엔지 | Binary geothermal heat pump system |
| CN104315629A (en) * | 2014-09-30 | 2015-01-28 | 山东中瑞新能源科技有限公司 | Buried pipe ground source heat pump system and method using peak power for assisting cold/heat storage |
| CN108895715A (en) * | 2018-09-04 | 2018-11-27 | 南京工业大学 | Cold and heat balance concept-based energy storage ground source heat pump system suitable for southern China |
| CN208859929U (en) * | 2018-06-25 | 2019-05-14 | 北京华清荣昊新能源开发有限责任公司 | A kind of GEOTHERMAL WATER heat gradient utilization system |
| CN110454867A (en) * | 2019-08-23 | 2019-11-15 | 中国科学院广州能源研究所 | An energy storage geothermal heating system for absorbing intermittent energy |
| KR102083950B1 (en) * | 2019-07-25 | 2020-03-03 | 주식회사 반다이앤에스 | A Load Responsive Geothermal Heat Pump System using Bypass of Heat Medium |
| CN210624669U (en) * | 2019-07-18 | 2020-05-26 | 天津鑫新源节能科技有限公司 | Multifunctional complementary integrated energy system |
| CN214333102U (en) * | 2021-03-09 | 2021-10-01 | 河南工程学院 | Cascade utilization system for series connection of intermediate-deep geothermal water and heat pump |
-
2022
- 2022-08-09 CN CN202210951761.XA patent/CN115355559B/en active Active
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20110104579A (en) * | 2010-03-17 | 2011-09-23 | (주) 삼영이엔지 | Binary geothermal heat pump system |
| CN104315629A (en) * | 2014-09-30 | 2015-01-28 | 山东中瑞新能源科技有限公司 | Buried pipe ground source heat pump system and method using peak power for assisting cold/heat storage |
| CN208859929U (en) * | 2018-06-25 | 2019-05-14 | 北京华清荣昊新能源开发有限责任公司 | A kind of GEOTHERMAL WATER heat gradient utilization system |
| CN108895715A (en) * | 2018-09-04 | 2018-11-27 | 南京工业大学 | Cold and heat balance concept-based energy storage ground source heat pump system suitable for southern China |
| CN210624669U (en) * | 2019-07-18 | 2020-05-26 | 天津鑫新源节能科技有限公司 | Multifunctional complementary integrated energy system |
| KR102083950B1 (en) * | 2019-07-25 | 2020-03-03 | 주식회사 반다이앤에스 | A Load Responsive Geothermal Heat Pump System using Bypass of Heat Medium |
| CN110454867A (en) * | 2019-08-23 | 2019-11-15 | 中国科学院广州能源研究所 | An energy storage geothermal heating system for absorbing intermittent energy |
| CN214333102U (en) * | 2021-03-09 | 2021-10-01 | 河南工程学院 | Cascade utilization system for series connection of intermediate-deep geothermal water and heat pump |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116358174A (en) * | 2023-03-06 | 2023-06-30 | 中国建设基础设施有限公司 | Integrated energy supply system using prefabricated ground connection wall coupled with shallow geothermal energy |
Also Published As
| Publication number | Publication date |
|---|---|
| CN115355559B (en) | 2025-10-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102679624B (en) | Solar energy and heat source tower heat pump combined triple supply air-conditioning system | |
| CN101270933B (en) | Ground source heat pump air conditioning/refrigeration composite system | |
| CN101403521B (en) | Solar energy absorption type refrigeration and ground source heat pump coupling combined supplying system | |
| CN101358784A (en) | Combined system of solar heat storage and ground source heat pump | |
| CN113790469B (en) | Heat supply reactor cold and heat combined supply system with heat storage and peak regulation functions and operation method thereof | |
| CN104197396B (en) | Method and system for cross-season utilization of waste heat of thermal power plants | |
| CN107218643A (en) | The heating and cooling system of solar cross-season heat-storage heat release is realized using electric heat pump | |
| CN211977002U (en) | Single heating ground source heat pump system | |
| WO2002014750A1 (en) | Liquid air conditioner of ground energy type | |
| CN107504547A (en) | A kind of heating system based on deep geothermal heat energy | |
| CN201163124Y (en) | Air-solar-ground energy three heat source compound heat pump device | |
| Sun et al. | Novel solar-driven low temperature district heating and cooling system based on distributed half-effect absorption heat pumps with lithium bromide | |
| CN106931674A (en) | A kind of solar energy combines the double heat source heat pump and across season energy-storage system of energy supply with soil source | |
| CN108870598A (en) | A kind of separate heat pipe energy-storage air conditioner system | |
| CN114322037A (en) | Energy-saving industrial energy station utilizing waste heat recovery and clean energy and operation control method | |
| CN206131520U (en) | Complemental confession warm air conditioner system in multipotency source | |
| CN100427851C (en) | Energy-saving air conditioner driven by combined solar energy and natural gas | |
| CN106802024A (en) | A kind of heat pump air conditioner and domestic hot-water's association system based on phase-change accumulation energy | |
| CN219368033U (en) | Novel middle-deep geothermal energy lithium bromide absorption heat pump system | |
| CN210663011U (en) | Solar energy and air source heat pump combined heating system suitable for office building schools | |
| CN117308507A (en) | Combined cooling, heating and power supply system and method driven by medium and low temperature geothermal combined with energy storage peak shaving | |
| CN204421418U (en) | A kind of solar association combined type circulating cold accumulation system | |
| CN115355559B (en) | Low-energy-consumption heat pump system based on geothermal water and cross-season energy storage and operation method thereof | |
| CN106839217B (en) | Combined heat pump air conditioning system capable of independently operating in de-electrification mode and control method thereof | |
| CN219607196U (en) | Phase-change heat-accumulating type efficient clean energy heating system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |
