CN115354847A - Template for casting construction of shear wall between adjacent buildings and construction method - Google Patents
Template for casting construction of shear wall between adjacent buildings and construction method Download PDFInfo
- Publication number
- CN115354847A CN115354847A CN202211063208.9A CN202211063208A CN115354847A CN 115354847 A CN115354847 A CN 115354847A CN 202211063208 A CN202211063208 A CN 202211063208A CN 115354847 A CN115354847 A CN 115354847A
- Authority
- CN
- China
- Prior art keywords
- template
- screw rod
- templates
- building
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000010276 construction Methods 0.000 title claims abstract description 43
- 238000005266 casting Methods 0.000 title claims abstract description 20
- 230000002093 peripheral effect Effects 0.000 claims abstract description 8
- 238000009415 formwork Methods 0.000 claims description 31
- 230000003014 reinforcing effect Effects 0.000 claims description 5
- 230000002457 bidirectional effect Effects 0.000 claims description 3
- 238000000034 method Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 4
- 230000002349 favourable effect Effects 0.000 description 7
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 3
- 229910052782 aluminium Inorganic materials 0.000 description 3
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 239000000956 alloy Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 239000011800 void material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/005—Strips for covering joints between form sections, e.g. to avoid burring or spilling of laitance
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/04—Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements
- E04G17/042—Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements being tensioned by threaded elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/065—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
- E04G17/0655—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G19/00—Auxiliary treatment of forms, e.g. dismantling; Cleaning devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G9/00—Forming or shuttering elements for general use
- E04G9/08—Forming boards or similar elements, which are collapsible, foldable, or able to be rolled up
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G2011/067—Integrated forms comprising shuttering skin, bracing or strutting arrangements, workplatforms and railings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention discloses a template for casting construction of a shear wall between adjacent buildings and a construction method, wherein the template comprises two first templates and two second templates, the two first templates and the two second templates surround a casting area with a closed peripheral side, and two sides of the first templates are respectively abutted against the inner sides of the two second templates; a plurality of screw rods are arranged on the outer side of the first template; a plurality of connecting pieces are arranged on the outer side of the second template; the connecting pieces are provided with gaps for the end parts of the screws to penetrate through, the connecting pieces are provided with threaded locking pieces in threaded fit with the end parts of the screws, and when the templates are in place, the second template is positioned in the gap close to the building; when the templates are installed, two ends of the screw respectively penetrate through gaps of the connecting pieces at the same height on two sides, and the adjacent first template and the second template are locked with the screw in a counter-pulling mode through the threaded locking pieces; when the templates are disassembled, the first template moves towards the direction far away from the building, and the screw rod horizontally slides out of the gap of the connecting piece. The invention has the effect of facilitating the assembly and disassembly of the template.
Description
Technical Field
The invention relates to the field of shear wall construction, in particular to a template and a construction method for casting construction of a shear wall between adjacent buildings.
Background
Along with the development of cities, the space development in urban areas is more and more limited, the connected buildings are more and more in condition, the traditional connected buildings are constructed by adopting a wood formwork construction process, a concrete wall body is easy to deform after the wall construction is finished, the form removal is not easy, and meanwhile, along with the rapid development of house building assembling type, the construction process of an aluminum formwork and an assembling type component on a construction site is more and more applied.
In the related technology, the minimum distance required by reinforcing the wall body supporting system by adopting the aluminum formwork is 240mm (the thickness of the 40mm aluminum formwork is plus the thickness of the 80mm back ridge plus the thickness of the 20mm buckle board plus the exposed length of the 100mm screw), the construction requirement of the connected buildings with the distance larger than 250mm can be met, but the distance between the two connected buildings is reduced to 150mm along with the limitation of the space of the connected house, the space is narrower, the construction difficulty is also caused on how to install the connected buildings in the narrow space and how to remove the connected buildings after the wall body is poured, and therefore, the improvement space is still remained.
Disclosure of Invention
In order to facilitate the assembly and disassembly of the template in a narrow space, the invention provides the template for the pouring construction of the shear wall between adjacent buildings and a construction method.
The invention provides a template for casting construction of a shear wall between adjacent buildings and a construction method, which adopt the following technical scheme:
a template for casting construction of a shear wall between adjacent buildings comprises two first templates which are opposite to each other and two second templates which are opposite to each other, wherein the two first templates and the two second templates surround a casting area with a closed peripheral side, and two sides of the first templates are respectively abutted against the inner sides of the two second templates; a plurality of screw rods are arranged on the outer side of the first template and are vertically distributed, and two ends of each screw rod respectively protrude out of two sides of the first template; a plurality of connecting pieces are arranged on the outer side of the second template and are vertically distributed, and two ends of each connecting piece respectively protrude out of two sides of the second template; the connecting pieces are provided with gaps for the end parts of the screws to penetrate through, the connecting pieces are provided with threaded locking pieces in threaded fit with the end parts of the screws, and when the templates are in place, the second template is positioned in the gap close to the building; when the templates are installed, two ends of the screw respectively penetrate through gaps of connecting pieces at the same height on two sides, and the adjacent first template and the second template are locked in a counter-pulling mode through threaded locking pieces and the screw; when the templates are disassembled, the first template moves towards the direction far away from the building, and the screw rod horizontally slides out of the gap of the connecting piece.
Through adopting above-mentioned technical scheme, set up the screw rod outside first template, and when the installation template, the second template is arranged in and is close to building room, first template is located the building outside, and set up the space at the connecting piece of first template, so that can pass with the screw rod, and realize the locking of drawing to adjacent first template and second template through the screw retaining member, the length that exposes of screw rod has been reduced, adaptable in carrying out the template construction of putting up between the next-door neighbour building room, in addition, when dismantling the template, through removing screw retaining member and screw rod after being connected, directly remove first template toward the direction of keeping away from building, thereby accomplish the operation of template drawing of patterns, need not to excise the screw rod, be favorable to improving the template and install and remove efficiency.
Preferably, the outside level of first template is provided with a plurality of back of the body stupefied, and is a plurality of the stupefied vertical distribution of back of the body, it is a plurality of the stupefied and a plurality of screw rod one-to-one of the back of the body, the screw rod sets up in the stupefied inside of the corresponding back of the body, just the screw rod both ends respectively bulge with back of the body stupefied both ends.
Through adopting above-mentioned technical scheme, the stupefied effect of strengthening first template bulk strength of the back of the body is favorable to reducing the deformation probability of template, in addition, with the screw rod setting in the stupefied inside of the back of the body, is favorable to improving the steadiness of screw rod, reduces the probability that the screw rod breaks away from first template.
Preferably, sliding chambers are arranged at two ends of the back edge, openings of the sliding chambers are arranged, and the openings of the sliding chambers are communicated with the end part of the back edge; the sliding cavity is internally and slidably connected with a sliding block, the sliding block is slidably connected in the sliding cavity, the screw is a bidirectional screw, the screw is rotatably connected to the back edge, and two ends of the screw penetrate through the two sliding blocks respectively; when the template is disassembled, the screw rod is rotated to drive the two sliding blocks to move towards the opening direction of the corresponding sliding cavity, and the sliding blocks push the connecting piece.
Because the second template is located between next-door neighbour building, the narrow space makes the drawing of patterns operation degree of difficulty big, through adopting above-mentioned technical scheme, orders about two sliders through rotating the screw rod and removes towards corresponding slip cavity opening direction for the slider pushes away the connecting piece, and then removes the second template toward the direction of keeping away from building, so that accomplish the drawing of patterns operation of second template, is favorable to improving the efficiency of construction.
Preferably, one side of the back edge, which is far away from the first template, is provided with an operation groove, and the middle part of the screw rod is exposed in the operation groove.
Through adopting above-mentioned technical scheme to constructor carries out the screw rod rotation operation in operation groove department, so that accomplish the drawing of patterns operation of second template.
Preferably, the outer peripheral surface of the screw is fixedly sleeved with a hexagonal nut, and the hexagonal nut is positioned in the operation groove.
Through adopting above-mentioned technical scheme to constructor rotates the screw rod through instrument such as wrench and hexagon nut cooperation, and then is convenient for accomplish the drawing of patterns operation.
Preferably, the peripheral surface of the screw is sleeved with a gasket, and the gasket is clamped between the threaded locking member and the connecting member.
Through adopting above-mentioned technical scheme, equally divide in two connecting pieces through the gasket with the locking force of screw thread retaining member, be favorable to improving the locking effect.
Preferably, reinforcing ribs are arranged on the outer side of the first template and the outer side of the second template.
By adopting the technical scheme, the overall strength of the first template and the second template is further improved, and the template deformation probability is favorably reduced.
A construction method of a template for casting construction of a shear wall adjacent to a building room comprises the following steps:
s1: building a scaffold: building scaffolds on two outer sides of the building, wherein the scaffolds extend along the distribution direction of the building;
s2: hoisting a first template: hoisting a first template, hoisting the first template to a construction position through a winch, positioning the first template between the outer side of a building and the inner side of a scaffold, and fixing the first template on the inner side of the scaffold through a connecting member after the two first templates are in place;
s3: hoisting a second template: then hoisting a second template, hoisting the second template to the same height as the first template, positioning the second template in the gap between adjacent buildings, and aligning the screw rods to the gaps of the connecting pieces positioned at the same height after the second template is in place;
s4: connecting adjacent first and second templates: horizontally moving the second template towards the building direction, enabling the end part of the screw rod to penetrate through the gap of the connecting piece at the same height, then sleeving the gasket at the end part of the screw rod, and locking the gasket through a threaded locking piece;
s5: pouring the shear wall;
s6: demolding the template: and rotating the screw rod at the operation groove, driving the two slide blocks to move towards the two ends of the back ridge respectively by the screw rod, pushing the connecting piece by the slide blocks, driving the second template to be separated from the concrete structure of the building, releasing the connection between the first template and the scaffold, moving towards the direction of the concrete structure far away from the building, horizontally moving out the screw rod from the gap of the connecting piece, and completing the step of disassembling the template.
Through adopting above-mentioned technical scheme, when dismantling the template, through removing the connection back of screw retaining member and screw rod, directly toward the direction removal first template of keeping away from building to accomplish the operation of template drawing of patterns, need not to amputate the screw rod, be favorable to improving the template and install and remove efficiency.
Drawings
FIG. 1 is a schematic overall structure diagram of a formwork for casting construction of a shear wall between adjacent buildings according to an embodiment of the application.
Fig. 2 is an enlarged schematic view at a in fig. 1.
Description of reference numerals: 1. a first template; 2. a second template; 3. an inner template; 4. reinforcing ribs; 5. lifting lugs; 6. building; 7. back corrugation; 71. a screw; 711. a hexagonal nut; 72. a sliding chamber; 73. an operation slot; 74. a slider; 8. a connecting member; 81. a cross bar; 82. a void; 9. a threaded locking member; 10. and (7) a gasket.
Detailed Description
The present invention is described in further detail below with reference to FIGS. 1-2.
The embodiment of the invention discloses a template and a construction method for casting construction of a shear wall between adjacent buildings. Referring to fig. 1, the formwork for casting construction of the shear wall between adjacent buildings comprises two first formworks 1 and two second formworks 2, wherein the first formworks 1 and the second formworks 2 are made of aluminum alloy materials, and reinforcing ribs 4 are uniformly distributed on the outer sides of the first formworks 1 and the second formworks 2 so as to improve the overall strength of the first formworks 1 and the second formworks 2 and reduce the probability of deformation of the formworks when the shear wall is cast.
A plurality of back ridges 7 are welded on the outer side of the first template 1, the back ridges 7 are distributed at equal intervals along the height direction of the template, and two ends of the back ridges 7 respectively extend towards two sides of the first template 1 horizontally. The screw rod 71 is arranged in the back ridge 7, the length direction of the screw rod 71 is consistent with that of the back ridge 7, and two ends of the screw rod 71 respectively protrude out of two ends of the back ridge 7. And the screw rod 71 is rotationally connected inside the back edge 7, so that the sliding condition between the screw rod 71 and the back edge 7 is avoided.
The back arris 7 both ends all are provided with slip cavity 72, and the setting of slip cavity 72 opening, and the opening of slip cavity 72 communicates in the stupefied 7 tip of back. The sliding block 74 is connected in the sliding chamber 72 in a sliding mode, the screw 71 is a bidirectional screw 71, the two ends of the screw 71 respectively penetrate through the two sliding blocks 74, and the two sliding blocks 74 can be driven to move towards the opening direction of the corresponding sliding chamber 72 by rotating the screw 71.
In order to facilitate the operation of a constructor, an operation groove 73 is formed in one side of the back edge 7, which is far away from the first formwork 1, the middle of the screw 71 is exposed in the operation groove 73, a hexagonal nut 711 is fixedly sleeved on the outer peripheral surface of the screw 71, and the hexagonal nut 711 is located in the operation groove 73, so that the constructor can rotate the screw 71 by matching tools such as a wrench and the hexagonal nut 711.
A plurality of connecting pieces 8 are welded and fixed on the outer side of the second template 2, and the connecting pieces 8 are distributed at equal intervals along the height direction of the second template 2. Two ends of the connecting piece 8 respectively extend towards two sides of the first template 1 horizontally and respectively protrude out of two sides of the first template 1. The connecting member 8 comprises two cross bars 81, and a gap 82 for the screw 71 to pass through is formed between the two cross bars 81 so as to realize the subsequent connection of the first template 1 and the second template 2.
When the templates are installed, the two first templates 1 are arranged oppositely, the two second templates 2 are arranged oppositely, the two sides of the first templates 1 are respectively abutted against the inner sides of the two second templates 2, and the second templates 2 are located in the gap between the adjacent buildings 6. After first template 1 and second template 2 all take one's place, through towards building 6 direction horizontal migration second template 2, each screw rod 71 passes the space 82 between two horizontal poles 81 of each corresponding height simultaneously, and the pot head is equipped with gasket 10 at screw rod 71 end, gasket 10 is located the one side that horizontal pole 81 deviates from second template 2, screw rod 71 tip threaded connection has screw retaining member 9, screw retaining member 9 specifically is the nut, gasket 10 presss from both sides tightly between screw retaining member 9 and horizontal pole 81, divide equally in two horizontal poles 81 with screw retaining member 9's locking force through gasket 10, be favorable to improving locking effect.
In addition, lifting lugs 5 are arranged on the top of the first formwork 1 and the top of the second formwork 2, so that connecting points are provided for lifting equipment, and lifting construction can be carried out conveniently.
A construction method of a template for casting construction of a shear wall between adjacent buildings comprises the following steps:
s1: building a scaffold: and (4) building scaffolds on two outer sides of the building 6, wherein the scaffolds extend along the distribution direction of the building 6.
It is emphasized that the first formwork 1 is arranged outside the building 6 and the second formwork 2 is arranged in the immediate vicinity of the gap of the building 6.
S2: hoisting the first template 1: firstly hoisting a first template 1, hoisting the first template 1 to a construction position through a winch, wherein the first template 1 is positioned between the outer side of a building 6 and the inner side of a scaffold, and fixing the first template 1 on the inner side of the scaffold through a connecting member after the two first templates 1 are in place;
s3: hoisting the second template 2: and then hoisting the second template 2, hoisting the second template 2 to the same height as the first template 1, wherein the second template 2 is positioned in the gap of the adjacent building 6, and after the second template 2 is in place, aligning the screw rods 71 with the gaps 82 of the two cross rods 81 at the same height.
S4: connecting adjacent first template 1 and second template 2: the second template 2 is horizontally moved towards the building 6, the end parts of the screw rods 71 penetrate through the gaps 82 of the two cross rods 81 at the same height, and then the gaskets 10 are sleeved on the end parts of the screw rods 71 and are locked by the threaded locking parts 9.
It should be emphasized that, when locking is performed, both ends of one screw rod 71 need to be locked simultaneously to achieve the purpose of locking by pulling.
S5: pouring the shear wall: after the first template 1 and the second template 2 are built, the inner template 3 is built in the building 6, the first template 1, the second template 2 and the inner template 3 enclose a square-shaped structure, and a shear wall pouring chamber is formed so as to pour the shear wall.
S6: demoulding the template: and rotating the screw rod 71 at the operation groove 73, driving the two slide blocks 74 to move towards the two ends of the back ridge 7 respectively by the screw rod 71, pushing the connecting piece 8 by the slide blocks 74, driving the second template 2 to be separated from the concrete structure of the building 6, releasing the connection between the first template 1 and the scaffold, moving the second template to the direction away from the concrete structure of the building 6, horizontally moving the screw rod 71 out of the gap 82 of the connecting piece 8, and completing the template dismounting step.
It should be emphasized that the present application develops the running water construction according to the sequence of "a first and B second" to accomplish the purpose of alternating a and B construction layer by layer.
The above are all preferred embodiments of the present invention, and the protection scope of the present invention is not limited thereby, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.
Claims (8)
1. A template for casting construction of a shear wall between adjacent buildings (6) is characterized in that: the pouring device comprises two first templates (1) which are opposite to each other and two second templates (2) which are opposite to each other, wherein the two first templates (1) and the two second templates (2) enclose a pouring area with a closed peripheral side, and two sides of the first templates (1) are respectively abutted against the inner sides of the two second templates (2); a plurality of screw rods (71) are arranged on the outer side of the first template (1), the screw rods (71) are vertically distributed, and two ends of each screw rod (71) respectively protrude out of two sides of the first template (1); a plurality of connecting pieces (8) are arranged on the outer side of the second template (2), the connecting pieces (8) are vertically distributed, and two ends of each connecting piece (8) respectively protrude out of two sides of the second template (2); the connecting pieces (8) are provided with gaps (82) for the ends of the screw rods (71) to pass through, the connecting pieces (8) are provided with threaded locking pieces (9) in threaded fit with the ends of the screw rods (71), and when the templates are in place, the second template (2) is positioned in a gap close to the building (6); when the templates are installed, two ends of the screw rod (71) respectively penetrate through the gaps (82) of the connecting pieces (8) at the same height on two sides, and the adjacent first template (1) and the second template (2) are locked with the screw rod (71) in a counter-pulling mode through the threaded locking piece (9); when the templates are disassembled, the first template (1) moves away from the building (6), and the screw rod (71) horizontally slides out of the gap (82) of the connecting piece (8).
2. The formwork for casting construction of shear walls between adjacent buildings (6) according to claim 1, characterized in that: the outside level of first template (1) is provided with stupefied (7) of a plurality of backs, and is a plurality of stupefied (7) of the back of the body vertical distribution, it is a plurality of stupefied (7) of the back of the body and a plurality of screw rod (71) one-to-one, screw rod (71) set up in the inside of corresponding the stupefied (7) of the back of the body, just screw rod (71) both ends are salient respectively and are backed on the back stupefied (7) both ends.
3. The formwork for casting shear walls next to a building (6) according to claim 2, wherein: sliding chambers (72) are arranged at two ends of the back edge (7), the sliding chambers (72) are opened, and the openings of the sliding chambers (72) are communicated with the end part of the back edge (7); the sliding block (74) is connected in the sliding chamber (72) in a sliding mode, the screw rod (71) is a bidirectional screw rod (71), the screw rod (71) is connected to the back edge (7) in a rotating mode, and the two ends of the screw rod (71) penetrate through the two sliding blocks (74) respectively; when the template is disassembled, the screw rod (71) is rotated to drive the two sliding blocks (74) to move towards the opening direction of the corresponding sliding cavity (72), and the sliding blocks (74) push the connecting piece (8).
4. The formwork for casting construction of shear walls between adjacent buildings (6) according to claim 3, characterized in that: an operation groove (73) is opened at one side of the back edge (7) deviating from the first template (1), and the middle part of the screw rod (71) is exposed in the operation groove (73).
5. The formwork for casting construction of shear walls between adjacent buildings (6) according to claim 4, characterized in that: the peripheral surface of the screw rod (71) is sleeved with a gasket (10), and the gasket (10) is clamped between the threaded locking piece (9) and the connecting piece (8).
6. The formwork for casting construction of shear walls between adjacent buildings (6) according to claim 1, characterized in that: reinforcing ribs (4) are arranged on the outer side of the first template (1) and the outer side of the second template (2).
7. The formwork for casting shear walls next to a building (6) according to claim 1, wherein: the outer peripheral surface of the screw rod (71) is fixedly sleeved with a hexagonal nut (711), and the hexagonal nut (711) is located in the operation groove (73).
8. A construction method of the form for pouring construction adjacent to a shear wall between buildings according to claim 5, wherein: the method comprises the following steps:
s1: building a scaffold: scaffolds are built on two outer sides of the building (6), and the scaffolds extend along the distribution direction of the building (6);
s2: hoisting the first template (1): hoisting the first formworks (1), hoisting the first formworks (1) to a construction position through a winch, positioning the first formworks (1) between the outer side of a building (6) and the inner side of a scaffold, and fixing the first formworks (1) on the inner side of the scaffold through connecting members after the two first formworks (1) are in place;
s3: hoisting the second template (2): then hoisting a second template (2), hoisting the second template (2) to the same height as the first template (1), wherein the second template (2) is positioned in the gap of the adjacent building (6), and after the second template (2) is in place, aligning the screw rod (71) with the gap (82) of the connecting piece (8) positioned at the same height;
s4: connecting adjacent first (1) and second (2) templates: horizontally moving the second template (2) towards the building (6) to enable the end part of the screw rod (71) to pass through a gap (82) of the connecting piece (8) at the same height, then sleeving the gasket (10) at the end part of the screw rod (71) and locking the gasket through a threaded locking piece (9);
s5: pouring the shear wall;
s6: demoulding the template: the screw rod (71) is rotated at the operating groove (73), the screw rod (71) drives the two sliding blocks (74) to move towards two ends of the back ridge (7) respectively, the sliding blocks (74) push the connecting piece (8) and drive the second template (2) to be separated from the concrete structure of the building (6), the connection between the first template (1) and the scaffold is released, then the second template moves towards the concrete structure far away from the building (6), the screw rod (71) horizontally moves out from a gap (82) of the connecting piece (8), and the template dismounting step is completed.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211063208.9A CN115354847A (en) | 2022-09-01 | 2022-09-01 | Template for casting construction of shear wall between adjacent buildings and construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211063208.9A CN115354847A (en) | 2022-09-01 | 2022-09-01 | Template for casting construction of shear wall between adjacent buildings and construction method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN115354847A true CN115354847A (en) | 2022-11-18 |
Family
ID=84004325
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211063208.9A Withdrawn CN115354847A (en) | 2022-09-01 | 2022-09-01 | Template for casting construction of shear wall between adjacent buildings and construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115354847A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117759002A (en) * | 2024-01-30 | 2024-03-26 | 中建海峡建设发展有限公司 | Deformation joint shear wall formwork structure and formwork support construction method |
-
2022
- 2022-09-01 CN CN202211063208.9A patent/CN115354847A/en not_active Withdrawn
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117759002A (en) * | 2024-01-30 | 2024-03-26 | 中建海峡建设发展有限公司 | Deformation joint shear wall formwork structure and formwork support construction method |
| CN117759002B (en) * | 2024-01-30 | 2026-05-05 | 中建海峡建设发展有限公司 | Expansion Joint Shear Wall Formwork Structure and Formwork Support Construction Method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107740572B (en) | Double-shear wall template device in narrow space and template mounting and dismounting method | |
| WO2023082776A1 (en) | Box-type prefabricated member system and operating method | |
| CN109972655B (en) | Prefabricated pipe gallery mechanical and hydraulic combined type integrally-installed and disassembled steel template and installation method | |
| CN210651217U (en) | Concrete wallboard mould | |
| CN112681162A (en) | Construction method for movable split mounting type light formwork cast-in-situ box culvert | |
| CN110886488A (en) | An intelligent integrated high-rise building machine | |
| CN106113230B (en) | The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need | |
| CN109404010B (en) | Aluminum tunnel mold system and operation method thereof | |
| CN220415352U (en) | Integral lifting die carrier for vertical shaft | |
| CN110777659A (en) | Construction method of box culvert template system | |
| CN215969285U (en) | Mould for manufacturing concrete fence plate | |
| CN106285721A (en) | A kind of railway culvert method of construction based on sliding mode system | |
| CN119615845A (en) | A double-gate slot gate shaft concrete formwork and construction method thereof | |
| KR100361047B1 (en) | Construction mold | |
| CN209082555U (en) | A kind of prefabricated piping lane machinery and Combined hydraulic type, which are integrally pacified, tears steel form open | |
| CN117841151A (en) | Building engineering construction pouring template | |
| CN216740716U (en) | Building engineering template fixing device | |
| CN218205710U (en) | A formwork structure with special-shaped inner corners for stairs | |
| CN217079684U (en) | Split type form removal-free concrete hollow structure | |
| CN211313370U (en) | Intelligent integrated high-rise building machine | |
| CN111195977B (en) | Integral casting inner formwork system for concrete structure bay window frame plate and its installation and disassembly method | |
| CN110118014B (en) | Exterior wall template system free of exterior scaffold and construction method thereof | |
| CN210117921U (en) | Shear Wall Structure Tunnel Formwork | |
| CN210067445U (en) | Cast-in-place constructional column of integral type for elevator track | |
| CN215484660U (en) | U-shaped windowsill formwork structure convenient to combine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WW01 | Invention patent application withdrawn after publication | ||
| WW01 | Invention patent application withdrawn after publication |
Application publication date: 20221118 |