CN115354830A - House acoustic celotex board construction equipment with automatically, spout gluey function - Google Patents

House acoustic celotex board construction equipment with automatically, spout gluey function Download PDF

Info

Publication number
CN115354830A
CN115354830A CN202210869198.1A CN202210869198A CN115354830A CN 115354830 A CN115354830 A CN 115354830A CN 202210869198 A CN202210869198 A CN 202210869198A CN 115354830 A CN115354830 A CN 115354830A
Authority
CN
China
Prior art keywords
fixedly connected
block
screw
sound insulation
insulation board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210869198.1A
Other languages
Chinese (zh)
Other versions
CN115354830B (en
Inventor
潘伯梯
姜乐真
叶方杰
袁伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhanyi Construction Engineering Co ltd
Original Assignee
Zhejiang Zhanyi Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhanyi Construction Engineering Co ltd filed Critical Zhejiang Zhanyi Construction Engineering Co ltd
Priority to CN202210869198.1A priority Critical patent/CN115354830B/en
Publication of CN115354830A publication Critical patent/CN115354830A/en
Application granted granted Critical
Publication of CN115354830B publication Critical patent/CN115354830B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/023Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls for applying adhesive, e.g. glue or mortar, on the covering elements, in particular tiles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/10Cleaning by methods involving the use of tools characterised by the type of cleaning tool
    • B08B1/12Brushes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B5/00Cleaning by methods involving the use of air flow or gas flow
    • B08B5/02Cleaning by the force of jets, e.g. blowing-out cavities

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

本发明公开了一种具有自动喷胶功能的房屋隔音板施工装置,包括底座,支撑板,万向滑轮,支撑板顶部固定安装有第一电机。本发明通过丝杆螺母套筒、螺纹杆以及挡料块的配合使用,使得用户在对隔音板的侧壁进行喷胶时,设备能够根据隔音板侧壁大小进行调节,从而减少原材料的浪费,当用户将出料口与隔音板侧壁校准完毕后,此时用户打开第一电机以及第二电机能够自动完成对隔音板的涂胶,从而实现隔音板的自动涂胶,同时在喷胶的过程中,用户可以通过对万向滑轮进行固定,从而使得用户能够在远离喷胶设备的情况下进行喷胶,从而减少有害气体对人体的影响,进而保证人体的健康,同时也能够减少因人工失误导致的喷胶不均匀。

Figure 202210869198

The invention discloses a house sound insulation board construction device with the function of automatic glue spraying, which comprises a base, a support plate, a universal pulley, and a first motor is fixedly installed on the top of the support plate. The present invention uses the screw nut sleeve, the threaded rod and the stopper block together, so that when the user sprays glue on the side wall of the sound insulation board, the equipment can be adjusted according to the size of the side wall of the sound insulation board, thereby reducing the waste of raw materials. After the user has calibrated the discharge port and the side wall of the sound insulation board, the user turns on the first motor and the second motor to automatically complete the glue coating on the sound insulation board, thereby realizing the automatic glue coating of the sound insulation board, and at the same time during the glue spraying process During the process, the user can fix the universal pulley, so that the user can spray the glue away from the glue spraying equipment, thereby reducing the impact of harmful gases on the human body, thereby ensuring the health of the human body, and reducing the risk of artificial Uneven application of glue due to mistakes.

Figure 202210869198

Description

一种具有自动喷胶功能的房屋隔音板施工装置A house sound insulation board construction device with automatic glue spraying function

技术领域technical field

本发明涉及房屋装修技术领域,具体为一种具有自动喷胶功能的房屋隔音板施工装置。The invention relates to the technical field of house decoration, in particular to a house sound insulation board construction device with automatic glue spraying function.

背景技术Background technique

隔音板是一种作用于隔音效果的板块,一般的物体都具有隔音效果,但是我们把平均隔声量(在无限大的空间中,声源与被测点之间放一张无限大的材料)超过30dB的板材才称作隔音板。隔音板一般为低密度材料。目前房屋装修的过程中,为了减少室外进入屋内的噪声,通常会在墙体内部安装隔音板,隔音板需要根据房屋的墙体面积进行测量切割,从而配备与房屋相适配的隔音板,从而保证隔音的质量。The sound insulation board is a plate that acts on the sound insulation effect. General objects have sound insulation effects, but we take the average sound insulation (in an infinite space, an infinite material is placed between the sound source and the measured point) The board with more than 30dB is called a sound insulation board. Acoustic panels are generally low density materials. In the current house decoration process, in order to reduce the noise entering the house from the outside, sound insulation panels are usually installed inside the walls. The sound insulation panels need to be measured and cut according to the wall area of the house, so as to equip the sound insulation panels that match the house, so Guarantee the quality of sound insulation.

为了保证隔音板隔音的质量,隔音板在安装的过程中会在连接处喷上密封胶,目前密封胶的喷涂通常是由工作人员手持喷胶枪进行喷涂,然而人工在喷涂的过程中容易出现因人工失误导致的喷胶量不均衡,从而影响隔音的质量,并且喷涂的过程中,由于人体距离喷枪距离过近,导致工作人员会吸入大量的有害气体,从而影响人体健康。In order to ensure the quality of the sound insulation of the sound insulation board, the sound insulation board will be sprayed with sealant on the connection during the installation process. At present, the spraying of the sealant is usually carried out by the staff with a spray gun. However, it is easy to appear artificially during the spraying process. The amount of glue sprayed due to human error is uneven, which affects the quality of sound insulation, and during the spraying process, because the human body is too close to the spray gun, the staff will inhale a large amount of harmful gas, which will affect human health.

发明内容Contents of the invention

本发明的目的在于提供一种具有自动喷胶功能的房屋隔音板施工装置,以解决上述背景技术中提出的问题。The object of the present invention is to provide a house sound insulation board construction device with automatic glue spraying function to solve the problems raised in the background technology above.

为了解决上述技术问题,本发明提供如下技术方案:一种具有自动喷胶功能的房屋隔音板施工装置,包括底座,支撑板,固定连接于所述底座顶部,且所述支撑板形状为L型,万向滑轮,固定连接于所述底座底部四周,所述支撑板顶部固定安装有第一电机,所述第一电机输出端固定连接有第一滚珠丝杆,所述第一滚珠丝杆外部套设有相适配的丝杆螺母安装块,所述丝杆螺母安装块内部固定安装有第二电机,所述第二电机输出端固定连接有第二滚珠丝杆,所述第二滚珠丝杆外部套设有相适配的丝杆螺母套筒,所述丝杆螺母安装块内部开设有放置槽,所述丝杆螺母安装块一端固定连接有出料管,所述出料管另一端固定连接有连接块,所述连接块表面开设有出料口。In order to solve the above-mentioned technical problems, the present invention provides the following technical solutions: a house sound insulation panel construction device with automatic glue spraying function, including a base and a support plate fixedly connected to the top of the base, and the shape of the support plate is L-shaped , a universal pulley, fixedly connected around the bottom of the base, a first motor is fixedly installed on the top of the support plate, a first ball screw is fixedly connected to the output end of the first motor, and the outside of the first ball screw A matching screw nut mounting block is sleeved, and a second motor is fixedly installed inside the screw nut mounting block, and a second ball screw is fixedly connected to the output end of the second motor, and the second ball screw A matching screw nut sleeve is set on the outside of the rod, and a placement slot is opened inside the screw nut mounting block. One end of the screw nut mounting block is fixedly connected with a discharge pipe, and the other end of the discharge pipe is A connection block is fixedly connected, and a discharge port is opened on the surface of the connection block.

进一步的,所述支撑板一端开设有与丝杆螺母安装块相适配的第一滑槽,所述丝杆螺母安装块通过第一滑槽与支撑板滑动连接,所述第一滚珠丝杆底部与底座转动连接,所述丝杆螺母安装块内部开设有收纳槽,所述收纳槽内壁尺寸与丝杆螺母套筒外壁尺寸相适配,所述丝杆螺母套筒远离第二电机的一端固定连接有挤压块,所述丝杆螺母安装块顶部铰接有挡板,通过第一滑槽能够保证丝杆螺母安装块平稳地进行移动,通过丝杆螺母套筒与挤压块地配合使用,使得挤压块能够在平稳的挤压放置槽内部的密封胶袋。Further, one end of the support plate is provided with a first chute compatible with the screw nut installation block, the screw nut installation block is slidably connected with the support plate through the first chute, and the first ball screw The bottom is rotatably connected to the base, and a storage groove is provided inside the screw nut mounting block, the size of the inner wall of the storage groove matches the size of the outer wall of the screw nut sleeve, and the end of the screw nut sleeve is far away from the second motor The extrusion block is fixedly connected, and the top of the screw nut installation block is hinged with a baffle plate, which can ensure the smooth movement of the screw nut installation block through the first chute, and is used in conjunction with the extrusion block through the screw nut sleeve , so that the extrusion block can be squeezed smoothly to place the sealed plastic bag inside the groove.

进一步的,所述丝杆螺母安装块内部开设有与挤压块相适配的第二滑槽,所述挤压块通过第二滑槽与丝杆螺母安装块滑动连接,通过挤压块与第二滑槽之间的滑动连接能够使得丝杆螺母套筒进行平稳的移动,从而保证密封胶袋出液量。Further, the inside of the screw nut mounting block is provided with a second chute matching the extruding block, the extruding block is slidingly connected with the screw nut mounting block through the second chute, and the extruding block and the screw nut mounting block are slidably connected. The sliding connection between the second chute can enable the screw nut sleeve to move smoothly, thereby ensuring the liquid output of the sealing plastic bag.

进一步的,所述挡板底部对称固定连接有两个定位环,两个所述定位环内壁均周向等距固定连接有多个第一弹簧,多个所述第一弹簧另一端均固定连接有第一限位块,通过第一弹簧与第一限位块的配合使用能够对多种不同型号的密封胶袋进行限位固定,从而保证挤压块挤压的质量。Further, the bottom of the baffle is fixedly connected with two positioning rings symmetrically, and the inner walls of the two positioning rings are fixedly connected with a plurality of first springs equidistant in the circumferential direction, and the other ends of the plurality of first springs are fixedly connected There is a first limit block, and through the cooperation of the first spring and the first limit block, various types of sealing plastic bags can be limited and fixed, thereby ensuring the extrusion quality of the extrusion block.

进一步的,所述连接块远离出料管的一端转动连接有滑轮,所述连接块内部开设有凹槽,所述凹槽与出料管相连通,所述连接块内部开设有多个与凹槽相连通的分料槽,所述分料槽与出料口相连通,通过分料槽以及出料口的配合使用,使得胶体在挤出时能够扩大出胶面积,从而方便用户根据隔音板侧壁的厚度进行调节,进而扩大设备的实用性。Further, the end of the connection block away from the discharge pipe is rotatably connected with a pulley, and a groove is opened inside the connection block, and the groove communicates with the discharge pipe. The distributing chute is connected with the trough, and the distributing chute is connected with the discharge port. Through the cooperation of the distribution trough and the discharge port, the colloid can expand the area of the glue when it is extruded, so that it is convenient for the user to use the sound insulation board according to the sound insulation board. The thickness of the side wall can be adjusted, thereby expanding the practicability of the device.

进一步的,所述连接块一端螺纹连接有螺纹杆,所述螺纹杆一端贯穿且延伸至出料口内部,所述螺纹杆一端转动连接有与出料口相适配的挡料块,通过螺纹杆以及出料口的配合使用,使得用户能够根据隔音板侧壁的厚度对出料口进行调节,从而扩大设备的实用性。Further, one end of the connection block is threadedly connected with a threaded rod, one end of the threaded rod penetrates and extends to the inside of the discharge port, one end of the threaded rod is rotatably connected with a stopper block that is compatible with the discharge port, through the thread The combined use of the rod and the discharge port enables the user to adjust the discharge port according to the thickness of the side wall of the sound insulation board, thus expanding the practicability of the equipment.

进一步的,所述第一电机输出端外壁固定连接有第一齿轮,所述第一齿轮外壁啮合有链条,所述丝杆螺母安装块内部转动连接有第一转轴,所述第一转轴外壁固定连接有第二齿轮,所述第一转轴一端贯穿且延伸至丝杆螺母安装块外部,所述第一转轴一端固定连接有第一锥齿轮,所述丝杆螺母安装块一端固定连接有固定块,所述固定块靠近第一锥齿轮的一端固定连接有定位杆,所述定位杆另一端转动连接有与第一锥齿轮啮合的第二锥齿轮,所述第二锥齿轮外壁周向等距固定连接有多个清洁刷,所述固定块内部对称开设有两个安装槽,通过清洁刷能够在设备对隔音板喷胶前对其表面的灰尘进行处理,从而保证胶体与隔音板接触的面积,从而保证胶体与隔音板之间连接的质量。Further, the outer wall of the output end of the first motor is fixedly connected with a first gear, the outer wall of the first gear is meshed with a chain, and the inside of the screw nut mounting block is rotatably connected with a first rotating shaft, and the outer wall of the first rotating shaft is fixed A second gear is connected, one end of the first rotating shaft penetrates and extends to the outside of the screw nut mounting block, one end of the first rotating shaft is fixedly connected with a first bevel gear, and one end of the screw nut mounting block is fixedly connected with a fixed block , one end of the fixed block close to the first bevel gear is fixedly connected with a positioning rod, and the other end of the positioning rod is rotatably connected with a second bevel gear meshing with the first bevel gear, and the outer wall of the second bevel gear is equidistant in the circumferential direction A plurality of cleaning brushes are fixedly connected, and two installation grooves are symmetrically opened inside the fixed block, and the dust on the surface of the sound insulation board can be treated by the cleaning brush before the equipment sprays glue on the sound insulation board, so as to ensure the contact area between the glue and the sound insulation board , so as to ensure the quality of the connection between the colloid and the sound insulation board.

进一步的,所述第一齿轮通过链条与第二齿轮传动连接,所述第一转轴外壁转动连接有支撑块,所述支撑块与丝杆螺母安装块固定连接,通过支撑块能够保证第一转轴的稳定性,通过第一齿轮与第二齿轮之间的传动连接,使得设备在喷胶的过程中能够对隔音板侧壁的灰尘进行处理,从而保证喷胶的质量。Further, the first gear is connected to the second gear through a chain, and the outer wall of the first rotating shaft is rotatably connected to a support block, and the support block is fixedly connected to the screw nut mounting block, and the support block can ensure that the first rotating shaft The stability, through the transmission connection between the first gear and the second gear, enables the equipment to process the dust on the side wall of the sound insulation board during the glue spraying process, thus ensuring the quality of the glue spraying.

进一步的,所述第二锥齿轮靠近定位杆的一端固定连接有第一磁铁,所述固定块靠近第二锥齿轮的一端对称固定连接有两个气囊,两个所述气囊另一端均固定连接有第二磁铁,所述固定块外壁固定连接有气管,所述固定块内部开设有与气囊相连通的气槽,所述气槽与气管相连通,所述第二磁铁一端固定连接有活动杆,所述活动杆外壁套设有第二弹簧,所述活动杆外部固定连接有第二限位块,所述第二弹簧一端与第二限位块固定连接,所述第二弹簧另一端与固定块固定连接,所述活动杆贯穿于固定块,通过第一磁铁以及第二磁铁之间的配合使用,使得气囊能够间歇循环地对隔音板侧壁的灰尘进行处理,从而防止灰尘堆积在隔音板侧壁,从而保证喷胶的质量。Further, the end of the second bevel gear close to the positioning rod is fixedly connected with the first magnet, the end of the fixed block close to the second bevel gear is symmetrically fixedly connected with two airbags, and the other ends of the two airbags are fixedly connected There is a second magnet, the outer wall of the fixed block is fixedly connected with a trachea, the inside of the fixed block is provided with an air groove communicating with the air bag, the air groove is connected with the trachea, and one end of the second magnet is fixedly connected with a movable rod , the outer wall of the movable rod is provided with a second spring, and the outer wall of the movable rod is fixedly connected with a second limit block, one end of the second spring is fixedly connected with the second limit block, and the other end of the second spring is connected with the second limit block. The fixed block is fixedly connected, and the movable rod runs through the fixed block. Through the cooperation between the first magnet and the second magnet, the air bag can intermittently process the dust on the side wall of the sound insulation board, thereby preventing dust from accumulating on the sound insulation board. The side wall of the board, so as to ensure the quality of spray glue.

进一步的,所述第一磁铁与第二磁铁均为钕磁铁,所述第一磁铁与第二磁铁互斥,通过第一磁铁与第二磁铁之间的互斥,使得第一磁铁与第二词语互斥时,气囊能够改变形态,从而便于将气囊内部的气体喷出,从而实现除灰的目的,从而保证喷胶的质量。Further, both the first magnet and the second magnet are neodymium magnets, the first magnet and the second magnet repel each other, and through the mutual repulsion between the first magnet and the second magnet, the first magnet and the second magnet are mutually repelled. When the words are mutually exclusive, the airbag can change its shape, so that it is convenient to eject the gas inside the airbag, so as to achieve the purpose of dust removal and ensure the quality of glue spraying.

与现有技术相比,本发明所达到的有益效果是:Compared with the prior art, the beneficial effects achieved by the present invention are:

1、本发明通过丝杆螺母套筒、挤压块、螺纹杆以及挡料块的配合使用,使得用户在对隔音板的侧壁进行喷胶时,通过旋转螺纹杆能够带动挡料块进行移动,从而能够使得挡料块对分料槽进行阻挡,从而使得设备能够根据隔音板侧壁大小进行调节,从而减少原材料的浪费,当用户将出料口与隔音板侧壁校准完毕后,此时用户打开第一电机以及第二电机能够自动完成对隔音板的涂胶,从而实现隔音板的自动涂胶,同时在喷胶的过程中,用户可以通过对万向滑轮进行固定,从而使得用户能够在远离喷胶设备的情况下进行喷胶,从而减少有害气体对人体的影响,进而保证人体的健康,同时也能够减少因人工失误导致的喷胶不均匀。1. The present invention uses the screw nut sleeve, the extruding block, the threaded rod and the stopper block together, so that the user can drive the stopper block to move by rotating the threaded rod when spraying glue on the side wall of the sound insulation board , so that the material blocking block can block the distribution chute, so that the equipment can be adjusted according to the size of the side wall of the sound insulation board, thereby reducing the waste of raw materials. After the user has calibrated the discharge port and the side wall of the sound insulation board, The user turns on the first motor and the second motor to automatically complete the gluing of the sound insulation board, thereby realizing the automatic gluing of the sound insulation board. At the same time, during the glue spraying process, the user can fix the universal pulley, so that the user can The glue is sprayed away from the glue spraying equipment, so as to reduce the impact of harmful gases on the human body, thereby ensuring the health of the human body, and can also reduce the uneven glue spraying caused by manual errors.

2、本发明通过清洁刷、第一磁铁、气囊、第二磁铁以及气管的配合使用,使得用户能够在对隔音板进行喷胶前对隔音板侧壁的灰尘进行处理,随着第二锥齿轮旋转带动清洁刷,使得清洁刷在下降的过程中能够对隔音板的侧壁进行清洁处理,同时当第一磁铁与第二磁铁互斥时,此时气囊能够将内部对气体通过气管喷向隔音板的侧壁,从而进一步提高清洁灰尘的效率,从而保证胶体与隔音板连接的质量,从而方便后续隔音板的连接。2. The present invention uses the cleaning brush, the first magnet, the air bag, the second magnet and the trachea together, so that the user can process the dust on the side wall of the sound insulation board before spraying glue on the sound insulation board. With the second bevel gear The rotation drives the cleaning brush, so that the cleaning brush can clean the side wall of the sound insulation panel in the process of descending. At the same time, when the first magnet and the second magnet repel each other, the airbag can spray the internal air to the sound insulation panel through the trachea. The side wall of the board, so as to further improve the efficiency of cleaning dust, so as to ensure the quality of the connection between the colloid and the sound insulation board, so as to facilitate the connection of the subsequent sound insulation board.

附图说明Description of drawings

附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。在附图中:The accompanying drawings are used to provide a further understanding of the present invention, and constitute a part of the description, and are used together with the embodiments of the present invention to explain the present invention, and do not constitute a limitation to the present invention. In the attached picture:

图1是本发明的整体结构示意图;Fig. 1 is the overall structural representation of the present invention;

图2是图1的A处结构放大图;Figure 2 is an enlarged view of the structure at A in Figure 1;

图3是图1的B处结构放大图;Fig. 3 is an enlarged view of the structure at B of Fig. 1;

图4是本发明挤压块的外观结构示意图;Fig. 4 is a schematic diagram of the appearance structure of the extruded block of the present invention;

图5是本发明连接块的俯视剖面结构示意图;Fig. 5 is a top view sectional structural schematic diagram of the connection block of the present invention;

图6是本发明定位环的侧视结构示意图;Fig. 6 is a side view structural schematic diagram of the positioning ring of the present invention;

图7是图1的C处结构放大图;Figure 7 is an enlarged view of the structure at C in Figure 1;

图8是本发明固定块内部气槽的俯视剖面结构示意图;Fig. 8 is a top view sectional structure schematic diagram of the air groove inside the fixed block of the present invention;

图9是本发明固定块内部安装槽的俯视剖面结构示意图。Fig. 9 is a top view sectional structural schematic diagram of the installation groove inside the fixing block of the present invention.

图中:1、底座;2、支撑板;3、万向滑轮;4、第一电机;5、第一滚珠丝杆;6、丝杆螺母安装块;7、第二电机;8、第二滚珠丝杆;9、丝杆螺母套筒;10、放置槽;11、出料管;12、连接块;13、出料口;14、第一滑槽;15、收纳槽;16、挤压块;17、挡板;18、第二滑槽;19、定位环;20、第一弹簧;21、第一限位块;22、滑轮;23、凹槽;24、分料槽;25、螺纹杆;26、挡料块;27、第一齿轮;28、链条;29、第一转轴;30、第二齿轮;31、第一锥齿轮;32、固定块;33、定位杆;34、第二锥齿轮;35、清洁刷;36、安装槽;37、支撑块;38、第一磁铁;39、气囊;40、第二磁铁;41、气管;42、气槽;43、活动杆;44、第二弹簧;45、第二限位块。In the figure: 1. base; 2. support plate; 3. universal pulley; 4. first motor; 5. first ball screw; 6. screw nut mounting block; 7. second motor; 8. second Ball screw; 9. Screw nut sleeve; 10. Placement groove; 11. Discharge pipe; 12. Connecting block; 13. Discharge port; 14. First chute; 15. Storage groove; 16. Extrusion Block; 17, baffle plate; 18, the second chute; 19, positioning ring; 20, the first spring; 21, the first limit block; 22, pulley; 23, groove; 24, distribution chute; 25, Threaded rod; 26, material block; 27, the first gear; 28, chain; 29, the first rotating shaft; 30, the second gear; 31, the first bevel gear; 32, fixed block; 33, positioning rod; 34, The second bevel gear; 35, the cleaning brush; 36, the installation groove; 37, the support block; 38, the first magnet; 39, the air bag; 40, the second magnet; 41, the air pipe; 44, the second spring; 45, the second limit block.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

请参阅图1-图6,本发明提供技术方案:一种具有自动喷胶功能的房屋隔音板施工装置,包括底座1,支撑板2,固定连接于底座1顶部,且支撑板2形状为L型,支撑板2一端开设有与丝杆螺母安装块6相适配的第一滑槽14,丝杆螺母安装块6通过第一滑槽14与支撑板2滑动连接,第一滚珠丝杆5底部与底座1转动连接,丝杆螺母安装块6内部开设有收纳槽15,收纳槽15内壁尺寸与丝杆螺母套筒9外壁尺寸相适配,丝杆螺母套筒9远离第二电机7的一端固定连接有挤压块16,丝杆螺母安装块6顶部铰接有挡板17,挡板17底部对称固定连接有两个定位环19,两个定位环19内壁均周向等距固定连接有多个第一弹簧20,多个第一弹簧20另一端均固定连接有第一限位块21,万向滑轮3,固定连接于底座1底部四周,支撑板2顶部固定安装有第一电机4,第一电机4输出端固定连接有第一滚珠丝杆5,第一滚珠丝杆5外部套设有相适配的丝杆螺母安装块6,丝杆螺母安装块6内部开设有与挤压块16相适配的第二滑槽18,挤压块16通过第二滑槽18与丝杆螺母安装块6滑动连接,丝杆螺母安装块6内部固定安装有第二电机7,第二电机7输出端固定连接有第二滚珠丝杆8,第二滚珠丝杆8外部套设有相适配的丝杆螺母套筒9,丝杆螺母安装块6内部开设有放置槽10,丝杆螺母安装块6一端固定连接有出料管11,出料管11另一端固定连接有连接块12,连接块12表面开设有出料口13,连接块12远离出料管11的一端转动连接有滑轮22,连接块12内部开设有凹槽23,凹槽23与出料管11相连通,连接块12内部开设有多个与凹槽23相连通的分料槽24,分料槽24与出料口13相连通,连接块12一端螺纹连接有螺纹杆25,螺纹杆25一端贯穿且延伸至出料口13内部,螺纹杆25一端转动连接有与出料口13相适配的挡料块26。Please refer to Fig. 1-Fig. 6, the present invention provides a technical solution: a house sound insulation panel construction device with automatic glue spraying function, including a base 1, a support plate 2, fixedly connected to the top of the base 1, and the shape of the support plate 2 is L type, one end of the support plate 2 is provided with a first chute 14 matching the screw nut mounting block 6, the screw nut mounting block 6 is slidably connected with the support plate 2 through the first chute 14, and the first ball screw 5 The bottom is rotatably connected with the base 1, and the inside of the screw nut mounting block 6 is provided with a storage groove 15. The size of the inner wall of the storage groove 15 matches the size of the outer wall of the screw nut sleeve 9, and the screw nut sleeve 9 is far away from the second motor 7. One end is fixedly connected with an extruding block 16, the top of the screw nut mounting block 6 is hinged with a baffle 17, and the bottom of the baffle 17 is symmetrically fixedly connected with two positioning rings 19, and the inner walls of the two positioning rings 19 are all circumferentially equidistant and fixedly connected with A plurality of first springs 20, the other ends of the plurality of first springs 20 are fixedly connected with a first limit block 21, a universal pulley 3, fixedly connected around the bottom of the base 1, and a first motor 4 is fixedly installed on the top of the support plate 2 , the output end of the first motor 4 is fixedly connected with the first ball screw 5, the outside of the first ball screw 5 is provided with a matching screw nut mounting block 6, and the inside of the screw nut mounting block 6 is provided with an extruding The second chute 18 that fits the block 16, the extruding block 16 is slidably connected with the screw nut mounting block 6 through the second chute 18, the screw nut mounting block 6 is fixedly installed with the second motor 7 inside, and the second motor 7 The output end is fixedly connected with a second ball screw 8, the second ball screw 8 is provided with a matching screw nut sleeve 9 outside, the screw nut mounting block 6 is provided with a placement slot 10 inside, and the screw nut One end of the installation block 6 is fixedly connected with a discharge pipe 11, the other end of the discharge pipe 11 is fixedly connected with a connection block 12, the surface of the connection block 12 is provided with a discharge port 13, and the end of the connection block 12 away from the discharge pipe 11 is rotatably connected with a pulley 22. There is a groove 23 inside the connection block 12, and the groove 23 is connected with the discharge pipe 11. There are a plurality of distribution grooves 24 connected with the groove 23 inside the connection block 12, and the distribution groove 24 is connected with the discharge pipe 11. The port 13 is connected, one end of the connecting block 12 is threadedly connected with a threaded rod 25, one end of the threaded rod 25 penetrates and extends to the inside of the discharge port 13, and one end of the threaded rod 25 is rotatably connected with a stopper block 26 that matches the discharge port 13 .

实施方式具体为:当用户需要对墙体上的隔音板进行喷胶时,此时用户推动支撑板2,使得底座1通过万向滑轮3移动设备整体,用户将出料口13的一端与隔音板的侧壁校准,然后此时用户可以根据隔音板侧壁的厚度对出料口13的大小进行调整,此时用户可以通过旋转出料管11带动挡料块26进行移动,从而使得挡料块26对分料槽24进行阻挡,从而使得用户能够根据隔音板的尺寸对出料口13进行调节,从而减少原材料的浪费,当出料口13调节完毕后,此时用户可以通过打开挡板17,然后将软质的密封胶袋放入放置槽10内部,然后将密封胶袋的尖端插入出料管11内部,然后此时用户关闭挡板17,此时挡板17带动定位环19底部的第一弹簧20以及第一限位块21挤压密封胶袋,从而通过第一弹簧20以及第一限位块21的配合使用对密封胶袋的位置进行限位,此时用户可以通过打开第二电机7带动第二滚珠丝杆8进行旋转,第二滚珠丝杆8旋转的过程中带动丝杆螺母套筒9和挤压块16进行运动,此时挤压块16沿着第二滑槽18进行平稳的移动,此时挤压块16挤压放置槽10内部的密封胶袋,此时密封胶袋内部的密封胶通过出料管11进入凹槽23内部,随着丝杆螺母套筒9的继续移动,此时凹槽23内部的密封胶逐渐增多,此时密封胶通过分料槽24进入出料口13内部,从而对隔音板的侧壁进行涂胶,此时用户可以打开第一电机4带动第一滚珠丝杆5进行旋转,此时第一滚珠丝杆5随着旋转带动丝杆螺母安装块6平稳地向下移动,此时滑轮22沿着墙壁向下滑动,从而防止刮花连接块12,同时保证连接块12向下运动的稳定性,从而保证涂胶的质量,同时用户在喷胶的过程中可以对万向滑轮3进行固定,从而使得用户远离喷胶时设备,从而减少有害气体的吸入,从而减少有害气体对人体造成伤害。The implementation method is as follows: when the user needs to spray glue on the sound insulation board on the wall, the user pushes the support plate 2 at this time, so that the base 1 moves the whole device through the universal pulley 3, and the user connects one end of the discharge port 13 to the sound insulation board. The side wall of the board is calibrated, and then the user can adjust the size of the discharge port 13 according to the thickness of the side wall of the sound insulation board. At this time, the user can drive the material stopper 26 to move by rotating the discharge pipe 11, so that the material stopper The block 26 blocks the distribution chute 24, so that the user can adjust the discharge port 13 according to the size of the sound insulation board, thereby reducing the waste of raw materials. After the discharge port 13 is adjusted, the user can open the baffle 17. Then put the soft sealing plastic bag into the placement groove 10, then insert the tip of the sealing plastic bag into the discharge pipe 11, and then the user closes the baffle 17 at this time, and the baffle 17 drives the bottom of the positioning ring 19 The first spring 20 and the first stop block 21 squeeze the sealing plastic bag, so that the position of the sealing plastic bag can be limited by the cooperation of the first spring 20 and the first stop block 21. At this time, the user can open the The second motor 7 drives the second ball screw 8 to rotate. During the rotation of the second ball screw 8, it drives the screw nut sleeve 9 and the extruding block 16 to move. At this time, the extruding block 16 moves along the second slide. The groove 18 moves smoothly. At this time, the extrusion block 16 squeezes the sealant bag inside the groove 10. At this time, the sealant inside the sealant bag enters the inside of the groove 23 through the discharge pipe 11. As the barrel 9 continues to move, the sealant inside the groove 23 gradually increases. At this time, the sealant enters the inside of the discharge port 13 through the distribution tank 24, thereby applying glue to the side wall of the sound insulation board. At this time, the user can open the The first motor 4 drives the first ball screw 5 to rotate. At this time, the first ball screw 5 drives the screw nut mounting block 6 to move down steadily along with the rotation. At this time, the pulley 22 slides downward along the wall, thereby Prevent the connecting block 12 from being scratched, and at the same time ensure the stability of the downward movement of the connecting block 12, thereby ensuring the quality of glue application. At the same time, the user can fix the universal pulley 3 during the glue spraying process, so that the user is far away from the glue spraying Equipment, thereby reducing the inhalation of harmful gases, thereby reducing the harm caused by harmful gases to the human body.

请参阅图1、图7、图8和图9,本发明提供技术方案:一种具有自动喷胶功能的房屋隔音板施工装置,另外第一电机4输出端外壁固定连接有第一齿轮27,第一齿轮27外壁啮合有链条28,丝杆螺母安装块6内部转动连接有第一转轴29,第一转轴29外壁固定连接有第二齿轮30,第一转轴29一端贯穿且延伸至丝杆螺母安装块6外部,第一转轴29一端固定连接有第一锥齿轮31,丝杆螺母安装块6一端固定连接有固定块32,固定块32靠近第一锥齿轮31的一端固定连接有定位杆33,定位杆33另一端转动连接有与第一锥齿轮31啮合的第二锥齿轮34,第二锥齿轮34外壁周向等距固定连接有多个清洁刷35,固定块32内部对称开设有两个安装槽36,第一齿轮27通过链条28与第二齿轮30传动连接,第一转轴29外壁转动连接有支撑块37,支撑块37与丝杆螺母安装块6固定连接,第二锥齿轮34靠近定位杆33的一端固定连接有第一磁铁38,固定块32靠近第二锥齿轮34的一端对称固定连接有两个气囊39,两个气囊39另一端均固定连接有第二磁铁40,固定块32外壁固定连接有气管41,固定块32内部开设有与气囊39相连通的气槽42,气槽42与气管41相连通,第二磁铁40一端固定连接有活动杆43,活动杆43外壁套设有第二弹簧44,活动杆43外部固定连接有第二限位块45,第二弹簧44一端与第二限位块45固定连接,第二弹簧44另一端与固定块32固定连接,活动杆43贯穿于固定块32,第一磁铁38与第二磁铁40均为钕磁铁,第一磁铁38与第二磁铁40互斥。Referring to Fig. 1, Fig. 7, Fig. 8 and Fig. 9, the present invention provides a technical solution: a house sound insulation board construction device with automatic glue spraying function, in addition, a first gear 27 is fixedly connected to the outer wall of the output end of the first motor 4, The outer wall of the first gear 27 is meshed with a chain 28 , the screw nut mounting block 6 is internally connected with a first rotating shaft 29 , the outer wall of the first rotating shaft 29 is fixedly connected with a second gear 30 , and one end of the first rotating shaft 29 runs through and extends to the screw nut Outside the mounting block 6, one end of the first rotating shaft 29 is fixedly connected with the first bevel gear 31, one end of the screw nut mounting block 6 is fixedly connected with a fixed block 32, and one end of the fixed block 32 close to the first bevel gear 31 is fixedly connected with a positioning rod 33 The other end of the positioning rod 33 is rotatably connected with a second bevel gear 34 meshing with the first bevel gear 31. The outer wall of the second bevel gear 34 is equidistantly fixedly connected with a plurality of cleaning brushes 35. The inside of the fixed block 32 is symmetrically provided with two a mounting slot 36, the first gear 27 is connected with the second gear 30 by a chain 28, the first rotating shaft 29 outer wall is rotatably connected with a support block 37, the support block 37 is fixedly connected with the screw nut mounting block 6, and the second bevel gear 34 One end close to the positioning rod 33 is fixedly connected with a first magnet 38, and one end of the fixed block 32 close to the second bevel gear 34 is symmetrically fixedly connected with two airbags 39, and the other ends of the two airbags 39 are fixedly connected with a second magnet 40. The outer wall of the block 32 is fixedly connected with a trachea 41, and the inside of the fixed block 32 is provided with an air groove 42 that communicates with the air bag 39. A second spring 44 is sleeved, and the movable rod 43 is fixedly connected with a second limiting block 45 outside. One end of the second spring 44 is fixedly connected with the second limiting block 45, and the other end of the second spring 44 is fixedly connected with the fixed block 32. The movable rod 43 runs through the fixed block 32 , the first magnet 38 and the second magnet 40 are neodymium magnets, and the first magnet 38 and the second magnet 40 repel each other.

实施方式具体为:当用户需要对隔音板进行喷胶时,为了减少灰尘对喷胶质量的影响,当用户对隔音板进行喷胶时,随着第二电机7的输出端带动第一齿轮27进行旋转,此时第一齿轮27带动链条28进行旋转,然后链条28带动第二齿轮30以及第一转轴29进行旋转,随后第一转轴29带动第一锥齿轮31进行旋转,第一锥齿轮31旋转的过程中带动第二锥齿轮34进行旋转,第二锥齿轮34带动清洁刷35进行旋转,从而使得清洁刷35通过旋转对隔音板侧壁的灰尘进行清洁,从而保证喷胶的质量,并且第二锥齿轮34旋转的过程中会带动第一磁铁38进行旋转,当第一磁铁38旋转靠近第二磁铁40时,此时第一磁铁38通过与第二磁铁40之间的斥力推动第二磁铁40挤压气囊39,此时气囊39将内部的气体通过气槽42输入至气管41内部,然后气体通过气管41吹向隔音板的侧壁,从而进一步清除隔音板侧壁的灰尘,从而保证喷胶的质量,同时第二磁铁40在移动的过程中会带动活动杆43进行移动,此时活动杆43带动第二限位块45挤压第二弹簧44,从而使得第二弹簧44处于收缩状态,当第一磁铁38随着旋转不再靠近第二磁铁40时,此时第二弹簧44受到的压力减少开始回弹,此时活动杆43拉动第二磁铁40进行复位,第二磁铁40在复位的过程中同时拉动气囊39进行扩大,气囊39在扩大的过程中通过气槽42以及气管41进行抽气,从而便于气管41下次对隔音板侧壁的灰尘进行处理,从而保证喷胶的质量,同时减轻工作人员清理灰尘的负担。The implementation is specifically: when the user needs to spray glue on the sound insulation board, in order to reduce the influence of dust on the quality of the glue spray, when the user sprays glue on the sound insulation board, the output end of the second motor 7 drives the first gear 27 Rotate, now the first gear 27 drives the chain 28 to rotate, then the chain 28 drives the second gear 30 and the first rotating shaft 29 to rotate, then the first rotating shaft 29 drives the first bevel gear 31 to rotate, the first bevel gear 31 During the rotation, the second bevel gear 34 is driven to rotate, and the second bevel gear 34 drives the cleaning brush 35 to rotate, so that the cleaning brush 35 cleans the dust on the side wall of the sound insulation board by rotation, thereby ensuring the quality of glue spraying, and During the rotation process of the second bevel gear 34, the first magnet 38 will be driven to rotate. The magnet 40 squeezes the airbag 39, at this time the airbag 39 inputs the internal gas into the air pipe 41 through the air groove 42, and then the gas blows to the side wall of the sound insulation board through the air pipe 41, thereby further removing the dust on the side wall of the sound insulation board, thereby ensuring At the same time, the second magnet 40 will drive the movable rod 43 to move during the movement. At this time, the movable rod 43 drives the second limit block 45 to squeeze the second spring 44, so that the second spring 44 is in contraction state, when the first magnet 38 is no longer close to the second magnet 40 as it rotates, the pressure on the second spring 44 decreases and begins to rebound. At this time, the movable rod 43 pulls the second magnet 40 to reset, and the second magnet 40 During the reset process, the airbag 39 is pulled to expand at the same time. During the expansion process, the airbag 39 draws air through the air groove 42 and the air pipe 41, so that the air pipe 41 can process the dust on the side wall of the sound insulation board next time, so as to ensure glue spraying. quality, while reducing the burden on the staff to clean up the dust.

本发明的工作原理:Working principle of the present invention:

参照图1-图6,通过丝杆螺母套筒9、挤压块16、螺纹杆25以及挡料块26的配合使用,使得用户在对隔音板的侧壁进行喷胶时,通过旋转螺纹杆25能够带动挡料块26进行移动,从而能够使得挡料块26对分料槽24进行阻挡,从而使得设备能够根据隔音板侧壁大小进行调节,从而减少原材料的浪费,当用户将出料口13与隔音板侧壁校准完毕后,此时用户打开第一电机4以及第二电机7能够自动完成对隔音板的涂胶,从而实现隔音板的自动涂胶,同时在喷胶的过程中,用户可以通过对万向滑轮3进行固定,从而使得用户能够在远离喷胶设备的情况下进行喷胶,从而减少有害气体对人体的影响,进而保证人体的健康,同时也能够减少因人工失误导致的喷胶不均匀。Referring to Fig. 1-Fig. 6, through the cooperative use of the screw nut sleeve 9, the extruding block 16, the threaded rod 25 and the stopper block 26, the user can rotate the threaded rod when spraying glue on the side wall of the sound insulation board. 25 can drive the material blocking block 26 to move, so that the material blocking block 26 can block the material distribution groove 24, so that the equipment can be adjusted according to the size of the side wall of the sound insulation board, thereby reducing the waste of raw materials. 13 After the calibration with the side wall of the sound insulation board is completed, the user turns on the first motor 4 and the second motor 7 to automatically complete the glue coating on the sound insulation board, so as to realize the automatic glue coating of the sound insulation board. At the same time, during the glue spraying process, The user can fix the universal pulley 3, so that the user can spray glue away from the glue spraying equipment, thereby reducing the impact of harmful gases on the human body, thereby ensuring the health of the human body, and at the same time reducing the risk of damage caused by human errors. The spray glue is uneven.

进一步的,参照说明书附图1、图7、图8和图9、通过清洁刷35、第一磁铁38、气囊39、第二磁铁40以及气管41的配合使用,使得用户能够在对隔音板进行喷胶前对隔音板侧壁的灰尘进行处理,随着第二锥齿轮34旋转带动清洁刷35,使得清洁刷35在下降的过程中能够对隔音板的侧壁进行清洁处理,同时当第一磁铁38与第二磁铁40互斥时,此时气囊39能够将内部对气体通过气管41喷向隔音板的侧壁,从而进一步提高清洁灰尘的效率,从而保证胶体与隔音板连接的质量,从而方便后续隔音板的连接。Further, with reference to the accompanying drawings 1, 7, 8 and 9 of the specification, through the cooperative use of the cleaning brush 35, the first magnet 38, the air bag 39, the second magnet 40 and the air pipe 41, the user can clean the sound insulation board Before glue spraying, the dust on the side wall of the sound insulation board is processed, and the cleaning brush 35 is driven by the rotation of the second bevel gear 34, so that the cleaning brush 35 can clean the side wall of the sound insulation board in the process of descending, and at the same time, when the first When the magnet 38 and the second magnet 40 repel each other, the air bag 39 can spray the internal gas to the side wall of the sound insulation board through the air pipe 41, thereby further improving the efficiency of cleaning dust, thereby ensuring the quality of the connection between the colloid and the sound insulation board, thereby It is convenient for the connection of the sound insulation board in the future.

最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。Finally, it should be noted that: the above is only a preferred embodiment of the present invention, and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, it still The technical solutions recorded in the foregoing embodiments may be modified, or some technical features thereof may be equivalently replaced. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.

Claims (10)

1. A house sound insulation board construction device with an automatic glue spraying function comprises a base (1);
the supporting plate (2) is fixedly connected to the top of the base (1), and the supporting plate (2) is L-shaped;
the universal pulley (3) is fixedly connected to the periphery of the bottom of the base (1);
the method is characterized in that:
backup pad (2) top fixed mounting has first motor (4), first motor (4) output end fixed connection has first ball screw (5), first ball screw (5) outside cover is equipped with screw-nut installation piece (6) of looks adaptation, the inside fixed mounting of screw-nut installation piece (6) has second motor (7), second motor (7) output end fixed connection has second ball screw (8), the outside cover of second ball screw (8) is equipped with screw-nut sleeve (9) of looks adaptation, standing groove (10) have been seted up to screw-nut installation piece (6) inside, screw-nut installation piece (6) one end fixed connection has discharging pipe (11), discharging pipe (11) other end fixed connection has connecting block (12), discharge gate (13) have been seted up on connecting block (12) surface.
2. The building acoustic celotex board construction equipment with spout gluey function automatically of claim 1 characterized in that: first spout (14) with screw-nut installation piece (6) looks adaptation are seted up to backup pad (2) one end, screw-nut installation piece (6) are through first spout (14) and backup pad (2) sliding connection, first ball screw (5) bottom is rotated with base (1) and is connected, screw-nut installation piece (6) inside has been seted up and has been accomodate groove (15), accomodate groove (15) inner wall size and screw-nut sleeve (9) outer wall size looks adaptation, the one end fixedly connected with extrusion piece (16) of second motor (7) are kept away from in screw-nut sleeve (9), screw-nut installation piece (6) top articulates there is baffle (17).
3. The building acoustic celotex board construction equipment with spout gluey function automatically of claim 2 characterized in that: a second sliding groove (18) matched with the extrusion block (16) is formed in the lead screw nut mounting block (6), and the extrusion block (16) is connected with the lead screw nut mounting block (6) in a sliding mode through the second sliding groove (18).
4. The building acoustic celotex board construction equipment with spout gluey function automatically of claim 2 characterized in that: two holding rings (19), two of baffle (17) bottom symmetry fixedly connected with the equal circumference equidistance fixedly connected with a plurality of first springs (20) of holding ring (19) inner wall, it is a plurality of the first stopper (21) of the equal fixedly connected with of first spring (20) other end.
5. The building acoustic celotex board construction equipment with spout gluey function automatically of claim 1 which characterized in that: one end of the connecting block (12) far away from the discharge pipe (11) is rotatably connected with a pulley (22), a groove (23) is formed in the connecting block (12), the groove (23) is communicated with the discharge pipe (11), a plurality of distributing grooves (24) communicated with the groove (23) are formed in the connecting block (12), and the distributing grooves (24) are communicated with the discharge hole (13).
6. The building acoustic celotex board construction equipment with spout gluey function automatically of claim 1 characterized in that: connecting block (12) one end threaded connection has threaded rod (25), threaded rod (25) one end is run through and is extended to inside discharge gate (13), threaded rod (25) one end is rotated and is connected with fender material piece (26) with discharge gate (13) looks adaptation.
7. The building acoustic celotex board construction equipment with spout gluey function automatically of claim 1 which characterized in that: first motor (4) output end outer wall fixedly connected with first gear (27), first gear (27) outer wall meshing has chain (28), screw-nut installation piece (6) inside rotation is connected with first pivot (29), first pivot (29) outer wall fixedly connected with second gear (30), first pivot (29) one end is run through and is extended to screw-nut installation piece (6) outside, first pivot (29) one end fixedly connected with first bevel gear (31), screw-nut installation piece (6) one end fixedly connected with fixed block (32), fixed block (32) are close to one end fixedly connected with locating lever (33) of first bevel gear (31), locating lever (33) other end rotates and is connected with second bevel gear (34) with first bevel gear (31) meshing, a plurality of cleaning brushes (35) of second bevel gear (34) outer wall circumference equidistance fixedly connected with, two mounting grooves (36) have been seted up to fixed block (32) inside symmetry.
8. The building acoustic celotex board construction equipment with spout gluey function automatically of claim 7 characterized in that: the first gear (27) is in transmission connection with the second gear (30) through a chain (28), the outer wall of the first rotating shaft (29) is rotatably connected with a supporting block (37), and the supporting block (37) is fixedly connected with the lead screw nut mounting block (6).
9. The construction device of the building acoustic panel with the automatic glue spraying function according to claim 7, characterized in that: second bevel gear (34) are close to first magnet of one end fixedly connected with (38) of locating lever (33), two gasbag (39) of one end symmetry fixedly connected with, two of fixed block (32) are close to second bevel gear (34) the equal fixedly connected with second magnet (40) of gasbag (39) other end, fixed block (32) outer wall fixedly connected with trachea (41), inside air pocket (42) of seting up and being linked together with gasbag (39) of fixed block (32), air pocket (42) are linked together with trachea (41), second magnet (40) one end fixedly connected with movable rod (43), movable rod (43) outer wall cover is equipped with second spring (44), outside fixedly connected with second stopper (45) of movable rod (43), second spring (44) one end and second stopper (45) fixed connection, second spring (44) other end and fixed block (32) fixed connection, movable rod (43) run through in fixed block (32).
10. The building acoustic celotex board construction equipment with spout gluey function automatically of claim 9, characterized in that: the first magnet (38) and the second magnet (40) are both neodymium magnets, and the first magnet (38) and the second magnet (40) are mutually exclusive.
CN202210869198.1A 2022-07-22 2022-07-22 A construction device for house sound insulation board with automatic glue spraying function Active CN115354830B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210869198.1A CN115354830B (en) 2022-07-22 2022-07-22 A construction device for house sound insulation board with automatic glue spraying function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210869198.1A CN115354830B (en) 2022-07-22 2022-07-22 A construction device for house sound insulation board with automatic glue spraying function

Publications (2)

Publication Number Publication Date
CN115354830A true CN115354830A (en) 2022-11-18
CN115354830B CN115354830B (en) 2024-06-28

Family

ID=84032099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210869198.1A Active CN115354830B (en) 2022-07-22 2022-07-22 A construction device for house sound insulation board with automatic glue spraying function

Country Status (1)

Country Link
CN (1) CN115354830B (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107863209A (en) * 2017-12-27 2018-03-30 海宁善能制冷科技有限公司 A kind of insulator for power delivery circuit installation
CN207576003U (en) * 2017-12-05 2018-07-06 赤峰博大氧化锌有限公司 A kind of dust arrester installation of sulfuric acid rotary kiln tail portion
JP6535908B1 (en) * 2018-05-04 2019-07-03 天台深藍智能科技有限公司 Wall surface polishing equipment for interior
CN110417425A (en) * 2019-08-29 2019-11-05 邱晨霞 A kind of Internet of Things reception signal terminal shell dust guard pollution abatement equipment
CN110409766A (en) * 2019-07-06 2019-11-05 广东宏骏建筑工程有限公司 Wall painting device
CN212168000U (en) * 2020-01-15 2020-12-18 杭州长命印刷有限公司 Novel PUR spouts gluey device convenient to control spouts gluey scope
JP2021030046A (en) * 2019-08-27 2021-03-01 呉剛 Cleaning device of old decoration of indoor wall surface
CN112436798A (en) * 2020-09-15 2021-03-02 江苏悦阳光伏科技有限公司 A belt cleaning device for photovoltaic power plant subassembly
CN112502404A (en) * 2020-11-26 2021-03-16 成艳秋 Processing system is used in construction of building outer wall heat insulation wall structure
CN113389359A (en) * 2021-08-17 2021-09-14 南通东泓建筑装饰工程有限公司 Rubber coating device is used in construction equipment engineering construction
CN214917329U (en) * 2021-03-31 2021-11-30 天津星月欧瑞门业有限公司 Self-adaptive balance hanger device of security door
CN114047809A (en) * 2021-11-22 2022-02-15 王德才 Computer cloud platform based on big data analysis
CN216173866U (en) * 2021-10-18 2022-04-05 江苏乾靓新材料有限公司 High transparency car protection film adhesive device in surface coating surface
CN216810808U (en) * 2021-12-14 2022-06-24 中国建筑第八工程局有限公司 Automatic wall coating device for house construction

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207576003U (en) * 2017-12-05 2018-07-06 赤峰博大氧化锌有限公司 A kind of dust arrester installation of sulfuric acid rotary kiln tail portion
CN107863209A (en) * 2017-12-27 2018-03-30 海宁善能制冷科技有限公司 A kind of insulator for power delivery circuit installation
JP6535908B1 (en) * 2018-05-04 2019-07-03 天台深藍智能科技有限公司 Wall surface polishing equipment for interior
CN110409766A (en) * 2019-07-06 2019-11-05 广东宏骏建筑工程有限公司 Wall painting device
JP2021030046A (en) * 2019-08-27 2021-03-01 呉剛 Cleaning device of old decoration of indoor wall surface
CN110417425A (en) * 2019-08-29 2019-11-05 邱晨霞 A kind of Internet of Things reception signal terminal shell dust guard pollution abatement equipment
CN212168000U (en) * 2020-01-15 2020-12-18 杭州长命印刷有限公司 Novel PUR spouts gluey device convenient to control spouts gluey scope
CN112436798A (en) * 2020-09-15 2021-03-02 江苏悦阳光伏科技有限公司 A belt cleaning device for photovoltaic power plant subassembly
CN112502404A (en) * 2020-11-26 2021-03-16 成艳秋 Processing system is used in construction of building outer wall heat insulation wall structure
CN214917329U (en) * 2021-03-31 2021-11-30 天津星月欧瑞门业有限公司 Self-adaptive balance hanger device of security door
CN113389359A (en) * 2021-08-17 2021-09-14 南通东泓建筑装饰工程有限公司 Rubber coating device is used in construction equipment engineering construction
CN216173866U (en) * 2021-10-18 2022-04-05 江苏乾靓新材料有限公司 High transparency car protection film adhesive device in surface coating surface
CN114047809A (en) * 2021-11-22 2022-02-15 王德才 Computer cloud platform based on big data analysis
CN216810808U (en) * 2021-12-14 2022-06-24 中国建筑第八工程局有限公司 Automatic wall coating device for house construction

Also Published As

Publication number Publication date
CN115354830B (en) 2024-06-28

Similar Documents

Publication Publication Date Title
CN205587394U (en) Tube cleaning device for biological teaching
CN113289836B (en) Environment-friendly building material coating system applicable to plates of different shapes
CN115354830A (en) House acoustic celotex board construction equipment with automatically, spout gluey function
CN115532007A (en) Dust fall equipment is used in green construction in building site
CN218485555U (en) Dust fall dust collecting device is used in production of environmental protection powder coating
CN206642950U (en) A kind of ceramics application device
CN217664210U (en) Durable film type coating agent coating device
CN103977987B (en) Glass coating film inlet adsorption device
CN222000570U (en) Vacuum glass secondary seal gluing device
CN116896228A (en) A fast sliding door servo motor device
CN208664377U (en) A kind of High temperature-resistanadhesive adhesive tape automatic waste discharge material mold
CN212596872U (en) A kind of spraying equipment with angle adjustment structure for interior and exterior wall paint
CN211190640U (en) Electrostatic powder spraying equipment
CN110629981B (en) Ceiling putty powder obliterator
CN218323712U (en) A ceiling putty powder applicator
CN222140600U (en) Sagging-preventing wall coating device
CN222535348U (en) A rubber coating ware for electronic product maintenance
CN208082730U (en) A kind of aluminium alloy door's spray-painting plant
CN220487179U (en) A wall repair device
CN221823465U (en) Device is paintd with surface layer to outer wall maintenance
CN217782741U (en) Apparatus for plastering and brushing exterior walls for housing construction
CN220882725U (en) Panel rubber coating device with even function of paining
CN222686047U (en) A paint brushing device for interior decoration
CN218707587U (en) Winding mechanism for producing cold compress patch coating machine
CN218423611U (en) Metal surface flattening and paint spraying device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20251013

Granted publication date: 20240628

PP01 Preservation of patent right