CN115306127A - Installation equipment and method for movable full-hall construction support - Google Patents

Installation equipment and method for movable full-hall construction support Download PDF

Info

Publication number
CN115306127A
CN115306127A CN202210955302.9A CN202210955302A CN115306127A CN 115306127 A CN115306127 A CN 115306127A CN 202210955302 A CN202210955302 A CN 202210955302A CN 115306127 A CN115306127 A CN 115306127A
Authority
CN
China
Prior art keywords
positioning
shell
rod
sliding
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210955302.9A
Other languages
Chinese (zh)
Other versions
CN115306127B (en
Inventor
周亚军
房竹贤
孙文龙
张遵庆
于浩文
邰家乐
韩雪光
张建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Jinan Municipal Engineering Construction Group Co Ltd
Shandong Huitong Construction Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Jinan Municipal Engineering Construction Group Co Ltd
Shandong Huitong Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd, Jinan Municipal Engineering Construction Group Co Ltd, Shandong Huitong Construction Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN202210955302.9A priority Critical patent/CN115306127B/en
Publication of CN115306127A publication Critical patent/CN115306127A/en
Application granted granted Critical
Publication of CN115306127B publication Critical patent/CN115306127B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/02Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means
    • E04G1/04Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses mounting equipment and a method for a movable full-space construction support, wherein the mounting equipment for the movable full-space construction support comprises a support, a shell is fixedly mounted at the bottom of the support, a main board is slidably connected to the inner wall of the shell and extends out of the shell, symmetrically arranged control frames are slidably connected to the bottom of the main board, two control frames are arranged, auxiliary rods are rotatably connected to the sides, far away from each other, of the two control frames, symmetrically arranged pedals are fixedly mounted at the top of the main board, two pressing rods are slidably connected to the inner sides of the two pedals, and the pressing rods are rotatably connected with the auxiliary rods.

Description

Installation equipment and method for movable full-hall construction support
Technical Field
The invention relates to the technical field of full-space construction supports, in particular to installation equipment and a method of a movable full-space construction support.
Background
The construction method of the scaffold with the supporting function, which is densely arranged and erected at certain intervals, is adopted for the full-space support, and the full-space support installation process in the prior art basically needs to completely remove the scaffold before the previous span construction is completed and then install the scaffold again, so that the waste of materials and manpower is caused, the construction progress is influenced, and the construction concept is not consistent with the current economic and efficient construction concept.
Disclosure of Invention
Based on the technical problems that the mounting process of the full-framing support is basically completed in the previous span, the full-framing support is completely dismounted and then mounted again, so that the waste of materials and labor is caused, the construction progress is influenced, and the current economic and efficient construction concept is not met.
The invention provides mounting equipment of a movable full-space construction support, which comprises a support, wherein a shell is fixedly mounted at the bottom of the support, a main board is connected to the inner wall of the shell in a sliding manner, the main board extends out of the shell, symmetrically arranged control frames are connected to the bottom of the main board in a sliding manner, auxiliary rods are rotatably connected to the sides, far away from each other, of the two control frames, symmetrically arranged pedals are fixedly mounted at the top of the main board, the number of the pedals is two, pressing rods are slidably connected to the inner sides of the two pedals, the pressing rods are rotatably connected with the auxiliary rods, rotating columns arranged in a matrix are rotatably connected to the inner wall of the top of the shell, the number of the rotating columns is four, the rotating columns are of a hollow structure, the bottom ends of the four rotating columns all extend out of the shell, rotating wheels are rotatably connected to the bottom ends of the four rotating columns, positioning wheels are fixedly mounted on the front sides of the rotating wheels, symmetrically arranged unlocking mechanisms are arranged in the shell, the number of the unlocking mechanisms are two groups, four connecting mechanisms arranged in the matrix are arranged in the shell, the number of the connecting mechanisms is four, the rotating columns are respectively matched with the main board and the positioning mechanisms, and the rotating wheels are matched with the control frames.
Preferably, coupling mechanism includes round bar, drive frame, reset spring, spring holder, catch bar and inserted bar, round bar and mainboard fixed connection, drive frame sliding connection is on the bottom inner wall of shell, drive frame and reset spring fixed connection, reset spring and spring holder fixed connection, spring holder fixed mounting is on the inner wall of shell, drive frame and inserted bar fixed connection, inserted bar and catch bar fixed connection.
Furthermore, through coupling mechanism, coupling mechanism just can couple together mainboard and rotation post in the shell for the mainboard accessible coupling mechanism fixes a position the rotation post when descending, makes the rotation post can't rotate in the shell.
Preferably, positioning mechanism includes butt joint wheel, sliding closure, connecting block, cooperation piece, sliding tray, locating lever, fixed plate and positioning spring, butt joint wheel fixed mounting is on rotating the top inner wall of post, butt joint wheel's bottom and sliding closure's top fixed connection, the top sliding connection of connecting block is on sliding closure's inner wall, sliding tray sliding connection is on rotating the inner wall of post, the top of sliding tray and the bottom fixed connection of cooperation piece, cooperation piece and connecting block looks adaptation, the bottom of sliding tray respectively with the top fixed connection of locating lever and positioning spring, the locating lever is in positioning spring's inboard, fixed plate fixed mounting is on rotating the inner wall of post, positioning spring's bottom and fixed plate fixed connection, the bottom poling fixed plate of locating lever, the locating lever cooperatees with the positioning wheel, a plurality of rectangular channels of equidistant range have been seted up on the butt joint wheel.
Furthermore, through the positioning mechanism, the positioning mechanism can be matched with the connecting mechanism in the rotating column, so that after the connecting mechanism positions the rotating column, the positioning mechanism can automatically position the rotating wheel in the rotating column, and the rotating wheel cannot rotate in the rotating column.
Preferably, release mechanism includes carriage, fixed block, compression spring, locating rack and laminating piece, the equal sliding connection of carriage and locating rack is on the bottom inner wall of shell, carriage and control frame sliding contact, carriage and locating rack fixed connection, locating rack and locating spring fixed connection, locating spring and fixed block fixed connection, fixed block fixed mounting is on the inner wall of shell, laminating frame and mainboard fixed connection, the laminating piece cooperatees with the locating rack.
Furthermore, through release mechanism, release mechanism and control frame cooperation for the steerable release mechanism of control frame when moving, release mechanism just can carry out the unblock to the mainboard, just can make the mainboard freely move in the shell.
Preferably, equal fixed mounting has auxiliary spring on the left side of slip cap and the right side inner wall, two auxiliary spring all with connecting block fixed connection.
Furthermore, the auxiliary spring is used for resetting the connecting block, so that the connecting block stretches or compresses the auxiliary spring after moving, and after the connecting block is released, the connecting block can reset through the elastic potential energy released by the auxiliary spring.
Preferably, set up a plurality of insertion grooves of equidistant range on the rotation post, insert pole and catch bar all with the inner wall sliding contact of insertion groove, the right-hand member of inserting the pole and the inner wall sliding contact of rectangular channel, catch bar and connecting block sliding contact.
Furthermore, after the insertion rod is respectively inserted into the insertion groove and the rectangular groove, the insertion rod can block the rotation of the rotation column, the rotation column can be positioned in the shell, and the push rod is used for pushing the connecting block to move.
Preferably, a plurality of constant head tanks of equidistant range are all seted up to one side that two cooperation pieces kept away from each other, and the equal fixed mounting in one side that two locating racks are close to each other has a plurality of locating pieces of equidistant range, the outside of locating piece and the inner wall sliding contact of constant head tank.
Furthermore, after the positioning block is inserted into the positioning groove, the positioning block can block the matching block and the main board from moving, and the position of the main board can be positioned.
Preferably, a plurality of matching grooves which are arranged at equal intervals are formed in the outer side of the positioning wheel, and the bottom end of the positioning rod is in sliding contact with the inner walls of the matching grooves.
Furthermore, after the positioning rod is inserted into the matching groove, the insertion rod can block the positioning wheel from rotating so as to realize the positioning of the positioning wheel and the rotating wheel.
The invention also provides a use method of the mounting equipment of the movable full-space construction support, which comprises the following steps:
s1: when the bracket needs to be moved, the shell and the bracket can be directly pushed to move, the rotating wheel rotates on the inner side of the rotating column, the rotating column rotates on the inner wall of the top of the shell, and the rotating wheel and the rotating column form a universal wheel;
s2: when the support moves to a proper position, a pressing rod and a pedal need to be simultaneously stepped on the right side and the left side of the shell, the main board is unlocked by the pressing rod, and then the main board is pressed by the pedal to descend;
s3: the mainboard is fixed a position earlier the post that rotates, fixes a position the runner again for post and the unable rotation of runner rotate, and shell and support can't remove, and the installation is accomplished to shell and support.
The invention has the beneficial effects that:
1. the connecting mechanism can connect the main board and the rotating column in the shell through the connecting mechanism, so that the rotating column can be positioned through the connecting mechanism when the main board descends, and the rotating column cannot rotate in the shell;
2. the positioning mechanism can be matched with the connecting mechanism in the rotating column through the positioning mechanism, so that after the connecting mechanism positions the rotating column, the positioning mechanism can automatically position the rotating wheel in the rotating column, and the rotating wheel cannot rotate in the rotating column;
3. through the unlocking mechanism, the unlocking mechanism is matched with the control frame, so that the control frame can control the unlocking mechanism when moving, the unlocking mechanism can unlock the mainboard, and the mainboard can freely move in the shell;
the shell is pushed to drive the support to move, disassembly and movement are not needed, the positions of the shell and the support can be positioned and installed by treading down the pressing rod and the pedal after the support moves to a proper position, the support is convenient to use, and the working efficiency is greatly improved.
Drawings
Fig. 1 is a schematic structural front view of an installation apparatus and method of a movable full framing construction according to the present invention;
FIG. 2 is a schematic top view of the construction of an apparatus and method for installing a movable full framing construction of the present invention;
FIG. 3 is a schematic bottom view of a structural docking wheel of the apparatus and method for mounting a movable full framing construction of the present invention;
FIG. 4 is a three-dimensional schematic view of a structural sliding cover of the apparatus and method for installing a movable full framing construction according to the present invention;
FIG. 5 is a three-dimensional schematic view of a structural connection block of the installation apparatus and method of the movable full framing construction of the present invention;
FIG. 6 is an enlarged view A of FIG. 1 showing the construction of an apparatus and method for installing a movable full framing construction according to the present invention;
fig. 7 is an enlarged schematic view of B in fig. 1, illustrating the structure of an apparatus and method for installing a movable full framing construction bracket according to the present invention;
fig. 8 is an enlarged schematic view of C in fig. 1, illustrating the structure of an apparatus and method for installing a movable full framing construction bracket according to the present invention;
fig. 9 is an enlarged schematic view D in fig. 1 showing a structure of an installation apparatus and method of a movable full framing construction according to the present invention.
In the figure: 1. a support; 2. a housing; 3. a main board; 4. a control frame; 5. a rotating wheel; 6. positioning wheels; 7. a pedal; 8. an auxiliary lever; 9. pressing the rod; 10. a round bar; 11. driving the frame; 12. a return spring; 13. a spring seat; 14. rotating the column; 15. a docking wheel; 16. a sliding cover; 17. an auxiliary spring; 18. connecting blocks; 19. a matching block; 20. a sliding disk; 21. positioning a rod; 22. a fixing plate; 23. a positioning spring; 24. a push rod; 25. an insertion rod; 26. a carriage; 27. a fixed block; 28. a compression spring; 29. a positioning frame; 30. and (7) fitting the blocks.
Detailed Description
The present invention will be further illustrated with reference to the following specific examples.
Examples
Referring to fig. 1-9, the present embodiment provides a mounting apparatus for a movable full-hall construction support, including a support 1, a housing 2 is fixedly mounted at the bottom of the support 1, a motherboard 3 is slidably connected to an inner wall of the housing 2, the motherboard 3 extends to the outside of the housing 2, a control frame 4 symmetrically disposed is slidably connected to the bottom of the motherboard 3, the number of the control frame 4 is two, one side of the two control frames 4 away from each other is rotatably connected to an auxiliary rod 8, pedals 7 symmetrically disposed are fixedly mounted at the top of the motherboard 3, the number of the pedals 7 is two, pressing rods 9 are slidably connected to inner sides of the two pedals 7, the pressing rods 9 are rotatably connected to the auxiliary rod 8, rotating columns 14 disposed in a matrix are rotatably connected to an inner wall of the top of the housing 2, the number of the rotating columns 14 is four, the rotating columns 14 are of a hollow structure, the bottom ends of the four rotating columns 14 extend to the outside of the housing 2, the bottom ends of the four rotating columns 14 are rotatably connected to a rotating wheel 5, positioning wheels 6 are fixedly mounted at the front side of the rotating wheels 5, an unlocking mechanism symmetrically disposed in the housing 2, two sets of the unlocking mechanism are disposed in the housing 2, the unlocking mechanism and the rotating columns are respectively connected to the rotating control frame 4, and the unlocking mechanism, and the rotating mechanism are matched with the rotating control frame, and the rotating mechanism, and the rotating column connection mechanism, and the rotating mechanism.
The connecting mechanism comprises a round rod 10, a driving frame 11, a reset spring 12, a spring seat 13, a pushing rod 24 and an inserting rod 25, the round rod 10 is fixedly connected with the main board 3, the driving frame 11 is slidably connected onto the inner wall of the bottom of the shell 2, the driving frame 11 is fixedly connected with the reset spring 12, the reset spring 12 is fixedly connected with the spring seat 13, the spring seat 13 is fixedly installed on the inner wall of the shell 2, the driving frame 11 is fixedly connected with the inserting rod 25, the inserting rod 25 is fixedly connected with the pushing rod 24, and through the connecting mechanism, the connecting mechanism can connect the main board 3 with the rotating column 14 in the shell 2, so that the main board 3 can position the rotating column 14 through the connecting mechanism when descending, and the rotating column 14 cannot rotate in the shell 2.
The positioning mechanism comprises a butt joint wheel 15, a sliding cover 16, a connecting block 18, a matching block 19, a sliding disc 20, a positioning rod 21, a fixing plate 22 and a positioning spring 23, the butt joint wheel 15 is fixedly installed on the inner wall of the top of the rotating column 14, the bottom of the butt joint wheel 15 is fixedly connected with the top of the sliding cover 16, the top of the connecting block 18 is slidably connected on the inner wall of the sliding cover 16, the sliding disc 20 is slidably connected on the inner wall of the rotating column 14, the top of the sliding disc 20 is fixedly connected with the bottom of the matching block 19, the matching block 19 is matched with the connecting block 18, the bottom of the sliding disc 20 is respectively fixedly connected with the positioning rod 21 and the top of the positioning spring 23, the positioning rod 21 is located on the inner side of the positioning spring 23, the fixing plate 22 is fixedly installed on the inner wall of the rotating column 14, the bottom end of the positioning spring 23 is fixedly connected with the fixing plate 22, the bottom end of the positioning rod 21 penetrates through the pipe fixing plate 22, the positioning rod 21 is matched with the positioning wheel 6, a plurality of rectangular grooves which are arranged at equal intervals are formed in the butt joint wheel 15, the positioning mechanism can be matched with the connecting mechanism in the rotating column 14 after the connecting mechanism is positioned in the rotating column 14, and the rotating mechanism can automatically position 5 in the rotating column 14, and the rotating column.
Unlocking mechanism includes carriage 26, fixed block 27, compression spring 28, locating rack 29 and laminating piece 30, carriage 26 and the equal sliding connection of locating rack 29 are on the bottom inner wall of shell 2, carriage 26 and 4 sliding contact of control frame, carriage 26 and locating rack 29 fixed connection, locating rack 29 and locating spring 23 fixed connection, locating spring 23 and fixed block 27 fixed connection, fixed block 27 fixed mounting is on the inner wall of shell 2, laminating frame and mainboard 3 fixed connection, laminating piece 30 cooperatees with locating rack 29, through unlocking mechanism, unlocking mechanism and 4 cooperations of control frame, make the steerable unlocking mechanism of control frame 4 when removing, unlocking mechanism just can carry out the unblock to mainboard 3, just can make mainboard 3 freely remove in shell 2.
All fixed mounting has auxiliary spring 17 on the left side of sliding housing 16 and the right side inner wall, and two auxiliary spring 17 all with connecting block 18 fixed connection, and auxiliary spring 17 is used for reseing connecting block 18 for connecting block 18 is earlier tensile or compress auxiliary spring 17 after the removal, and after connecting block 18 was released, connecting block 18 reseed with the elastic potential energy of accessible auxiliary spring 17 release.
The rotating column 14 is provided with a plurality of insertion grooves which are arranged at equal intervals, the insertion rod 25 and the pushing rod 24 are in sliding contact with the inner walls of the insertion grooves, the right end of the insertion rod 25 is in sliding contact with the inner wall of the rectangular groove, the pushing rod 24 is in sliding contact with the connecting block 18, after the insertion rod 25 is respectively inserted into the insertion groove and the rectangular groove, the insertion rod 25 can block the rotating column 14 from rotating, the rotating column 14 can be positioned in the shell 2, and the pushing rod 24 is used for pushing the connecting block 18 to move.
A plurality of constant head tanks of equidistant range are all seted up to one side that two cooperation pieces 19 kept away from each other, and the equal fixed mounting in one side that two locating racks 29 are close to each other has a plurality of locating pieces of equidistant range, the outside of locating piece and the inner wall sliding contact of constant head tank, and back in the locating piece inserted the constant head tank, the locating piece just can block cooperation piece 19 and mainboard 3 and remove, just can realize the location to mainboard 3 position.
A plurality of matching grooves which are arranged at equal intervals are formed in the outer side of the positioning wheel 6, the bottom end of the positioning rod 21 is in sliding contact with the inner walls of the matching grooves, and after the positioning rod 21 is inserted into the matching grooves, the insertion rod 25 can block the positioning wheel 6 from rotating so as to position the positioning wheel 6 and the rotating wheel 5.
The working principle is as follows: when the support 1 needs to be moved, the shell 2 and the support 1 can be directly pushed to move, the rotating wheel 5 rotates on the inner side of the rotating column 14, the rotating column 14 rotates on the inner wall of the top of the shell 2, the rotating wheel 5 and the rotating column 14 form a universal wheel, when the support 1 moves to a proper position, the pressing rod 9 and the pedal 7 need to be simultaneously pressed on the right side and the left side of the shell 2, the pressing rod 9 firstly pushes the pushing rod 24, the two pushing rods 24 then push the two control frames 4 away from each other, the two control frames 4 then drive the two sliding frames 26 to separate from each other, the two sliding frames 26 then drive the two positioning frames 29 to separate from each other and compress the reset spring 12 on the fixed block 27, at this time, the positioning frames 29 can be separated from the matching block 19, the main board 3 can be unlocked, the pedal 7 then presses the main board 3 to descend, the main board 3 firstly drives the four round rods 10 to descend, the round rods 10 firstly can be contacted with the driving frames 11, and the round rods 10 vertically descend, the round bar 10 will push the driving rack 11 to move, the driving rack 11 will then drive the insertion bar 25 to insert into the four rotating columns 14, at the same time, the insertion bar 25 and the fixing bar will enter into the rotating columns 14, the insertion bar 25 will be inserted into the rectangular groove on the docking wheel 15 first, after the insertion bar 25 is inserted into the insertion groove and the rectangular groove respectively, the insertion bar 25 will block the rotating columns 14 from rotating, and the rotating columns 14 will be positioned in the housing 2, the pushing bar 24 will be used to push the connecting block 18 to move, the rotating columns 14 will be positioned first, then when the pushing bar 24 pushes the connecting block 18 to move horizontally, the bottom of the connecting block 18 will push the matching block 19 and the sliding disc 20 downwards first, so that the matching block 19 and the sliding disc 20 will move downwards first, then the sliding disc 20 will drive the positioning bar 21 to insert into the matching groove on the positioning wheel 6 and compress the positioning spring 23, after the locating lever 21 is inserted into the matching groove, the inserting rod 25 can block the locating wheel 6 from rotating, so that the locating wheels 6 and the rotating wheels 5 can be located, the rotating wheels 5 are located, the rotating columns 14 and the rotating wheels 5 can not rotate, the shell 2 and the support 1 can not move at the moment, the shell 2 and the support 1 are installed, the support 1 can be used, and the working efficiency is greatly increased.
The invention also provides a use method of the mounting equipment of the movable full-hall construction support, which comprises the following steps:
s1: when the bracket 1 needs to be moved, the shell 2 and the bracket 1 can be directly pushed to move, the rotating wheel 5 rotates on the inner side of the rotating column 14, the rotating column 14 rotates on the inner wall of the top of the shell 2, and the rotating wheel 5 and the rotating column 14 form a universal wheel;
s2: when the support 1 moves to a proper position, the pressing rod 9 and the pedal 7 need to be simultaneously treaded on the right side and the left side of the shell 2, the mainboard 3 is unlocked by the pressing rod 9, and the mainboard 3 is pressed by the pedal 7 to descend;
s3: the mainboard 3 fixes a position the post 14 earlier, fixes a position runner 5 again for the post 14 can not rotate with runner 5 in the rotation, and shell 2 and support 1 can not remove, and shell 2 and support 1 accomplish the installation.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (9)

1. The utility model provides a mounting equipment of portable full hall construction support, includes support (1), its characterized in that, the bottom fixed mounting of support (1) has shell (2), sliding connection has mainboard (3) on the inner wall of shell (2), mainboard (3) extend outside shell (2), the bottom sliding connection of mainboard (3) has control frame (4) that the symmetry set up, the quantity of control frame (4) is two, and one side that two control frame (4) kept away from each other all rotates and is connected with auxiliary rod (8), the top fixed mounting of mainboard (3) has footboard (7) that the symmetry set up, the quantity of footboard (7) is two, and the equal sliding connection in inboard of two footboard (7) has according to pole (9), according to pole (9) and auxiliary rod (8) rotate and be connected, rotate on the top inner wall of shell (2) and be connected with rotation post (14) that are the matrix arrangement, the quantity of rotation post (14) is four, and rotation post (14) is the cavity structure, and four bottoms that rotate post (14) all extend to shell (2), are equipped with the equal rotating wheel (5) of the side of the unlocking mechanism, rotating wheel (5) is the equal rotating mechanism before the quantity is two sets up, the multifunctional bus bar is characterized in that four connecting mechanisms which are arranged in a matrix mode are arranged in the shell (2), the number of the connecting mechanisms is four, a positioning mechanism is arranged in the rotating column (14), the unlocking mechanism and the connecting mechanisms are matched with the main board (3) and the control frame (4), and the positioning mechanism is matched with the connecting mechanisms and the rotating wheels (5) respectively.
2. The mounting device for the movable full-hall construction support frame as claimed in claim 1, wherein the connecting mechanism comprises a round rod (10), a driving frame (11), a return spring (12), a spring seat (13), a push rod (24) and an inserting rod (25), the round rod (10) is fixedly connected with the main board (3), the driving frame (11) is slidably connected onto the inner wall of the bottom of the shell (2), the driving frame (11) is fixedly connected with the return spring (12), the return spring (12) is fixedly connected with the spring seat (13), the spring seat (13) is fixedly mounted on the inner wall of the shell (2), the driving frame (11) is fixedly connected with the inserting rod (25), and the inserting rod (25) is fixedly connected with the push rod (24).
3. The mounting device of a movable full-framing construction support according to claim 1, wherein the positioning mechanism comprises a docking wheel (15), a sliding cover (16), a connecting block (18), a matching block (19), a sliding disk (20), a positioning rod (21), a fixing plate (22) and a positioning spring (23), the docking wheel (15) is fixedly mounted on the inner wall of the top of the rotating column (14), the bottom of the docking wheel (15) is fixedly connected with the top of the sliding cover (16), the top of the connecting block (18) is slidably connected on the inner wall of the sliding cover (16), the sliding disk (20) is slidably connected on the inner wall of the rotating column (14), the top of the sliding disk (20) is fixedly connected with the bottom of the matching block (19), the matching block (19) is matched with the connecting block (18), the bottom of the sliding disk (20) is respectively fixedly connected with the positioning rod (21) and the top of the positioning spring (23), the positioning rod (21) is located inside the positioning spring (23), the fixing plate (22) is fixedly mounted on the inner wall of the rotating column (14), and the positioning tube (22) is connected with the fixing plate (6), a plurality of rectangular grooves which are arranged at equal intervals are formed in the butting wheel (15).
4. The mounting device of a movable full-framing construction support according to claim 1, wherein the unlocking mechanism comprises a sliding frame (26), a fixed block (27), a compression spring (28), a positioning frame (29) and an attaching block (30), the sliding frame (26) and the positioning frame (29) are both slidably connected to the inner wall of the bottom of the casing (2), the sliding frame (26) is in sliding contact with the control frame (4), the sliding frame (26) is fixedly connected with the positioning frame (29), the positioning frame (29) is fixedly connected with the positioning spring (23), the positioning spring (23) is fixedly connected with the fixed block (27), the fixed block (27) is fixedly mounted on the inner wall of the casing (2), the attaching frame is fixedly connected with the main board (3), and the attaching block (30) is matched with the positioning frame (29).
5. The mounting device of the movable full framing construction according to claim 1, wherein the sliding cover (16) is fixedly provided with auxiliary springs (17) on the inner walls of the left and right sides, and the two auxiliary springs (17) are fixedly connected with the connecting block (18).
6. The mounting device of the movable full hall construction bracket according to claim 1, wherein a plurality of insertion grooves are formed on the rotating column (14) and are arranged at equal intervals, the insertion rod (25) and the pushing rod (24) are in sliding contact with the inner walls of the insertion grooves, the right end of the insertion rod (25) is in sliding contact with the inner walls of the rectangular grooves, and the pushing rod (24) is in sliding contact with the connecting block (18).
7. The mounting equipment for the movable full framing construction bracket according to claim 1, wherein the two fitting blocks (19) are provided with a plurality of positioning slots at equal intervals on the sides far away from each other, the two positioning frames (29) are fixedly provided with a plurality of positioning blocks at equal intervals on the sides near to each other, and the outer sides of the positioning blocks are in sliding contact with the inner walls of the positioning slots.
8. The mounting device for the movable full framing construction according to claim 1, wherein the outside of the positioning wheel (6) is provided with a plurality of matching slots arranged at equal intervals, and the bottom end of the positioning rod (21) is in sliding contact with the inner walls of the matching slots.
9. The use method of the installation equipment of the movable full-hall construction support is characterized by comprising the following steps of:
s1: when the support (1) needs to be moved, the shell (2) and the support (1) can be directly pushed to move, the rotating wheel (5) rotates on the inner side of the rotating column (14), the rotating column (14) rotates on the inner wall of the top of the shell (2), and the rotating wheel (5) and the rotating column (14) form a universal wheel;
s2: when the support (1) moves to a proper position, the pressing rod (9) and the pedal (7) need to be simultaneously treaded on the right side and the left side of the shell (2), the main board (3) is unlocked by the pressing rod (9), and the main board (3) is pressed by the pedal (7) to descend;
s3: mainboard (3) are fixed a position earlier rotation post (14), fix a position runner (5) again for rotation post (14) and runner (5) can't rotate, and shell (2) and support (1) can't remove, and the installation is accomplished in shell (2) and support (1).
CN202210955302.9A 2022-08-10 2022-08-10 Installation equipment and method for movable full-hall construction support Active CN115306127B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210955302.9A CN115306127B (en) 2022-08-10 2022-08-10 Installation equipment and method for movable full-hall construction support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210955302.9A CN115306127B (en) 2022-08-10 2022-08-10 Installation equipment and method for movable full-hall construction support

Publications (2)

Publication Number Publication Date
CN115306127A true CN115306127A (en) 2022-11-08
CN115306127B CN115306127B (en) 2024-04-19

Family

ID=83860368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210955302.9A Active CN115306127B (en) 2022-08-10 2022-08-10 Installation equipment and method for movable full-hall construction support

Country Status (1)

Country Link
CN (1) CN115306127B (en)

Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB851157A (en) * 1958-03-31 1960-10-12 Homa Engineering Co Cosby Ltd Improvements in furniture and like castors
KR20060007579A (en) * 2004-07-20 2006-01-26 호리 엔지니어링 가부시키가이샤 Portable Work Scaffolding
JP2012007372A (en) * 2010-06-24 2012-01-12 Gop Kk Mobile scaffold device
JP2012127132A (en) * 2010-12-16 2012-07-05 Gop Kk Caster for moving type scaffolding device and moving type scaffolding device
CN106963575A (en) * 2017-03-13 2017-07-21 安维车件(厦门)有限公司 It is a kind of to adjust the angle-adjusting mechanism that board mount is ridden on positioner and wheelchair
CN209293389U (en) * 2018-12-25 2019-08-23 任建功 A kind of construction scaffold
CN209429487U (en) * 2018-12-26 2019-09-24 许传喜 A kind of scaffold of architectural engineering
CN210049564U (en) * 2019-05-30 2020-02-11 湖南安华模板脚手架工程有限公司 Scaffold for tunnel construction
CN111749449A (en) * 2020-07-18 2020-10-09 奉剑雄 A convenient combined building shelf
CN212894827U (en) * 2020-06-30 2021-04-06 山东艾德实业有限公司 Quenching furnace discharging device for chain connecting ring
CN112609944A (en) * 2020-12-14 2021-04-06 澧县红似火新型建材有限责任公司 Steel construction scaffold structure that building site used
CN213174709U (en) * 2020-07-07 2021-05-11 中铁一局集团建筑安装工程有限公司 Scaffold for interior decoration
CN113047126A (en) * 2021-03-26 2021-06-29 济南市市政工程建设集团有限公司 Road roller for municipal engineering road construction and construction method thereof
CN213869973U (en) * 2020-12-24 2021-08-03 中交一公局集团有限公司 A ventilation monitoring device for the construction of extra-long tunnels in mountainous plateaus
CN113403926A (en) * 2021-05-24 2021-09-17 闵宇 Terrace removing device for engineering pavement construction
CN214364800U (en) * 2020-11-17 2021-10-08 苏印吉 Scaffold frame that building engineering used
CN214402661U (en) * 2020-11-20 2021-10-15 梁武 High-stability construction frame
CN214785800U (en) * 2021-06-07 2021-11-19 中国能源建设集团安徽电力建设第二工程有限公司 Functional foot rest is used in civil engineering construction
CN113803154A (en) * 2020-06-12 2021-12-17 无锡市众辰汽车配件有限公司 A mounting structure for a turbocharger actuator
CN216383375U (en) * 2021-10-20 2022-04-26 福建省中互生态科技有限公司 Ecological refuse treatment device in internet
CN216641339U (en) * 2021-11-30 2022-05-31 北京忠信博达建设发展有限公司 Civil engineering construction support
CN216740775U (en) * 2021-12-29 2022-06-14 中国建筑第五工程局有限公司 An auxiliary positioning device for prefabricated staircase construction

Patent Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB851157A (en) * 1958-03-31 1960-10-12 Homa Engineering Co Cosby Ltd Improvements in furniture and like castors
KR20060007579A (en) * 2004-07-20 2006-01-26 호리 엔지니어링 가부시키가이샤 Portable Work Scaffolding
JP2012007372A (en) * 2010-06-24 2012-01-12 Gop Kk Mobile scaffold device
JP2012127132A (en) * 2010-12-16 2012-07-05 Gop Kk Caster for moving type scaffolding device and moving type scaffolding device
CN106963575A (en) * 2017-03-13 2017-07-21 安维车件(厦门)有限公司 It is a kind of to adjust the angle-adjusting mechanism that board mount is ridden on positioner and wheelchair
CN209293389U (en) * 2018-12-25 2019-08-23 任建功 A kind of construction scaffold
CN209429487U (en) * 2018-12-26 2019-09-24 许传喜 A kind of scaffold of architectural engineering
CN210049564U (en) * 2019-05-30 2020-02-11 湖南安华模板脚手架工程有限公司 Scaffold for tunnel construction
CN113803154A (en) * 2020-06-12 2021-12-17 无锡市众辰汽车配件有限公司 A mounting structure for a turbocharger actuator
CN212894827U (en) * 2020-06-30 2021-04-06 山东艾德实业有限公司 Quenching furnace discharging device for chain connecting ring
CN213174709U (en) * 2020-07-07 2021-05-11 中铁一局集团建筑安装工程有限公司 Scaffold for interior decoration
CN111749449A (en) * 2020-07-18 2020-10-09 奉剑雄 A convenient combined building shelf
CN214364800U (en) * 2020-11-17 2021-10-08 苏印吉 Scaffold frame that building engineering used
CN214402661U (en) * 2020-11-20 2021-10-15 梁武 High-stability construction frame
CN112609944A (en) * 2020-12-14 2021-04-06 澧县红似火新型建材有限责任公司 Steel construction scaffold structure that building site used
CN213869973U (en) * 2020-12-24 2021-08-03 中交一公局集团有限公司 A ventilation monitoring device for the construction of extra-long tunnels in mountainous plateaus
CN113047126A (en) * 2021-03-26 2021-06-29 济南市市政工程建设集团有限公司 Road roller for municipal engineering road construction and construction method thereof
CN113403926A (en) * 2021-05-24 2021-09-17 闵宇 Terrace removing device for engineering pavement construction
CN214785800U (en) * 2021-06-07 2021-11-19 中国能源建设集团安徽电力建设第二工程有限公司 Functional foot rest is used in civil engineering construction
CN216383375U (en) * 2021-10-20 2022-04-26 福建省中互生态科技有限公司 Ecological refuse treatment device in internet
CN216641339U (en) * 2021-11-30 2022-05-31 北京忠信博达建设发展有限公司 Civil engineering construction support
CN216740775U (en) * 2021-12-29 2022-06-14 中国建筑第五工程局有限公司 An auxiliary positioning device for prefabricated staircase construction

Also Published As

Publication number Publication date
CN115306127B (en) 2024-04-19

Similar Documents

Publication Publication Date Title
CN113293973B (en) Green building curtain wall support installation method
CN111735664B (en) Soil and groundwater mobile sampling device
CN115306127A (en) Installation equipment and method for movable full-hall construction support
CN212400586U (en) Full-automatic drum-type screen process press
CN113021530A (en) Accurate positioning drilling equipment before furniture assembly
CN111746811A (en) Unmanned aerial vehicle photogrammetry mounting platform
CN212480724U (en) Building monitor convenient to dismantle
CN213299262U (en) Supporting and fixing device of computer server
CN218298439U (en) Intelligent circuit board detection device
CN211731684U (en) Central control instrument device of bicycle
CN219290864U (en) Cleaning device for built-in filter screen of refrigeration equipment
CN210831052U (en) Plastic pad foot dismouting structure and cerini dialyser cerini is used in bovine serum albumin production thereof
CN220134079U (en) Air filter for engine
CN222254543U (en) Combined skid-mounted equipment mounting device
CN218492906U (en) Device for installing rotary stairs
CN221947789U (en) Distribution frame
CN219903426U (en) Quick assembly disassembly structure of compound panel of moulding plastics
CN221119120U (en) Firmly assembled scaffold
CN216558439U (en) Novel heat exchange device
CN219307994U (en) Solid phase extraction frame
CN223545176U (en) A chemical pump maintenance bench
CN223813970U (en) Protection mechanism for building engineering safety
CN115163624B (en) Assembled integrated connecting device for construction equipment
CN223664313U (en) Soil collecting device
CN215090353U (en) Reinforcing bar bending device that house construction used

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant