CN115271672A - Project management platform - Google Patents

Project management platform Download PDF

Info

Publication number
CN115271672A
CN115271672A CN202210928459.2A CN202210928459A CN115271672A CN 115271672 A CN115271672 A CN 115271672A CN 202210928459 A CN202210928459 A CN 202210928459A CN 115271672 A CN115271672 A CN 115271672A
Authority
CN
China
Prior art keywords
project
layer
task
user
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210928459.2A
Other languages
Chinese (zh)
Inventor
王晓虎
肖启川
黄露苹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Geely Holding Group Co Ltd
Guangyu Mingdao Digital Technology Co Ltd
Original Assignee
Zhejiang Geely Holding Group Co Ltd
Guangyu Mingdao Digital Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Geely Holding Group Co Ltd, Guangyu Mingdao Digital Technology Co Ltd filed Critical Zhejiang Geely Holding Group Co Ltd
Priority to CN202210928459.2A priority Critical patent/CN115271672A/en
Publication of CN115271672A publication Critical patent/CN115271672A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/62Protecting access to data via a platform, e.g. using keys or access control rules
    • G06F21/6218Protecting access to data via a platform, e.g. using keys or access control rules to a system of files or objects, e.g. local or distributed file system or database
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Databases & Information Systems (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • Bioethics (AREA)
  • General Health & Medical Sciences (AREA)
  • Computer Hardware Design (AREA)
  • Computer Security & Cryptography (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application discloses a project management platform and relates to the technical field of industrial internet. The system comprises a capability layer, a flow layer and a presentation layer; the presentation layer is an operation inlet of all users and is used for displaying data of each project task and transmitting interactive data of the users and the platform to the capability layer so that the capability layer can process the interactive data and then transmit the processed interactive data back to the presentation layer and the process layer; the flow layer is used for managing the life cycle of the whole project and controlling the stage flow direction of the project task; the capability layer is used for providing basic services required by the presentation layer and the process layer, wherein the basic services at least comprise authority management, online editing, task assignment, task tracking and risk early warning. In the platform, data in a service scene and interactive data between a user and the platform can be displayed through the presentation layer, so that the visualization of project data is realized, and the management efficiency is improved; and the basic service provided by the capability layer realizes the cooperation in the project process, and improves the delivery efficiency of the project.

Description

Project management platform
Technical Field
The application relates to the technical field of industrial internet, in particular to a project management platform.
Background
As the industrial internet enters the 4.0 stage, a large number of industrial bases, industrial platforms, and industrial applications are emerging in the large framework of the industrial internet, and a number of excellent best practices are precipitated in the large number of applications, and a great number of products and projects are promoted accordingly. How to manage the life cycle of a project in a visual mode and how to deal with short, frequent and quick project delivery are topics and problems worth thinking and solving by each project manager and manager.
Disclosure of Invention
The project management platform is used for visually managing the life cycle of a project and improving the project delivery efficiency.
In order to solve the technical problem, the application provides a project management platform, which comprises an ability layer, a flow layer and a presentation layer;
the presentation layer is an operation entry of all users and is used for displaying data of each project task and transmitting interaction data of the users and the platform to the capability layer so that the capability layer can process the interaction data and then transmit the interaction data back to the presentation layer and the process layer;
the flow layer is used for managing the whole project life cycle and controlling the stage flow direction of the project task;
the capability layer is used for providing basic services required by the presentation layer and the flow layer and receiving and processing requests of all the users; the basic service at least comprises authority management, online editing, task assignment, task tracking and risk early warning.
Preferably, the project management members comprise a first user, a second user and a third user;
the capability layer is used for providing the basic service of the authority management required by the presentation layer and the process layer, and comprises the following steps:
acquiring a user requirement pool created by the first user, and acquiring the project task from the user requirement pool;
after receiving an instruction sent by the second user, the project task is issued to a third user;
obtaining a document sent by the third user; the document is obtained by editing the related data of the project task by the third user;
and when a request for accessing the document is received and the authority corresponding to the request meets the condition, opening the corresponding authority for operating the document.
Preferably, the file authority at least comprises an updating editing authority, a viewing authority, a downloading authority and a deleting authority; and the authority for operating the document is at least obtained according to the importance level of the project task and the classification setting of the user accessing the document.
Preferably, the basic service for providing the task assignment required by the presentation layer and the flow layer by the capability layer comprises:
establishing a first data transmission link with a communication service;
pushing a message characterizing the project task to be performed to the third user through the communication service using the first data transfer link;
and issuing the project task to the third user according to the preset node information corresponding to the project task and the delivery rule to be produced by the project task.
Preferably, the basic service of the capability layer for providing the risk pre-warning required by the presentation layer and the flow layer includes:
under the condition that the project task is completed within a preset time length, acquiring actual working hours and estimated working hours corresponding to each node; acquiring a first node of which the actual working hours exceed the expected working hours; carrying out overdue early warning on the first node;
under the condition that the project task is not completed within the preset time length, respectively acquiring the completed nodes and the uncompleted nodes in the project task; when the node is the finished node, acquiring the actual working hours and the estimated working hours corresponding to the node, acquiring a second node of which the actual working hours exceed the estimated working hours, and performing out-of-date early warning on the second node; and when the node is the unfinished node, performing to-do early warning on the unfinished node.
Preferably, the project task has a refund plan, and the basic service of the risk early warning required by the capability layer and the flow layer includes:
acquiring a planned refund amount and a current refund amount of the project task;
judging whether the current refund amount is smaller than the planned refund amount;
and if so, early warning the refund of the project task.
Preferably, the base service further comprises: personalized configuration; the capability layer is used for providing the personalized configured basic service required by the representation layer and the flow layer and comprises the following steps:
acquiring the type of the project task;
setting corresponding rules for each stage in the whole project life cycle according to the type of the project task; wherein the rules include at least a delivery rule to be produced by the project task.
Preferably, the base service further comprises: BI large screen; the capability layer is used for providing basic services of the BI large screen required by the presentation layer and the flow layer, and comprises the following steps:
establishing a second data transmission link with the BI large screen;
acquiring a working hour report, an overdue early warning condition, a to-be-handled list and a task tracking condition of the project task;
and displaying the working hour report, the overdue early warning condition, the to-be-done list and the task tracking condition on the BI large screen through the second data transmission link.
Preferably, the presentation layer contains task changes; wherein the task change at least comprises a state change of the project task and a change of a person in charge of the project task.
Preferably, the presentation layer comprises a problem closed loop; the presentation layer for providing the problem closed loop comprises:
all problems generated in the whole project life cycle are obtained and solved;
if the problem is not solved, analyzing the reason of the problem through the risk early warning provided by the capability layer and solving the problem according to the reason.
The project management platform comprises an ability layer, a flow layer and a presentation layer; the presentation layer is an operation entry of all users and is used for displaying data of each project task and transmitting interaction data of the users and the platform to the capability layer so that the capability layer can process the interaction data and then return the interaction data to the presentation layer and the process layer; the flow layer is used for managing the life cycle of the whole project and controlling the stage flow direction of the project task; the capability layer is used for providing basic services required by the presentation layer and the flow layer and receiving and processing the requests of all users; the basic service at least comprises authority management, online editing, task assignment, task tracking and risk early warning. In the project management platform provided by the application, the capability layer is used as a support for the presentation layer and the flow layer, so that data in a service scene and interactive data between a user and the platform can be displayed through the presentation layer, that is, the visualization of project data is realized, and the management efficiency is improved; the cooperation in the project process is realized through online editing, authority management, task assignment and task tracking in the capability layer; risk and weak links in the project process can be known by the user through risk early warning, and then the risk and the weak links in the project task can be solved by the user in time, so that the project can be rapidly delivered.
Drawings
In order to more clearly illustrate the embodiments of the present application, the drawings required for the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and that other drawings may be obtained by those skilled in the art without inventive effort.
Fig. 1 is a schematic diagram of a project management platform according to an embodiment of the present application;
fig. 2 is a schematic diagram of project collaborative management according to an embodiment of the present application.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all the embodiments. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments in the present application without any creative effort belong to the protection scope of the present application.
The core of the application is to provide a project management platform which is used for visually managing the life cycle of a project and improving the project delivery efficiency.
With the industrial internet, projects with different technologies emerge according to different scenes, and different degrees of relation and personnel interweaving exist among the projects, so that how to enable project members to cooperate with each other in each project management process and check delivery matters or weak points lacking different nodes in the project process; the whole project process is managed in a visualized mode, how node data possibly having risks are output to a manager, different tasks are issued aiming at different problems, and the whole task is tracked and managed; when some steps of project process management needing three parties are met, how to synchronize the minimized permission collection to the process of project management needing three parties through the thought of permission management and control is achieved. According to the project management method and system, rapid delivery of projects is achieved by constructing a project management platform which comprises an ability layer, a flow layer and a presentation layer.
In order that those skilled in the art will better understand the disclosure, the following detailed description will be given with reference to the accompanying drawings. Fig. 1 is a schematic diagram of a project management platform according to an embodiment of the present application, and as shown in fig. 1, the platform includes a capability layer 1, a flow layer 2, and a presentation layer 3;
the presentation layer 3 is an operation entry of all users and is used for displaying data of each project task and transmitting interaction data of the users and the platform to the capability layer 1 so that the capability layer 1 processes the interaction data and then transmits the interaction data back to the presentation layer 3 and the process layer 2;
the process layer 2 is used for managing the whole project life cycle and controlling the stage flow direction of the project task;
the capability layer 1 is used for providing basic services required by the presentation layer 3 and the flow layer 2 and receiving and processing requests of all users; the basic service at least comprises authority management, online editing, task assignment, task tracking and risk early warning.
In the process layer, the whole project cycle is divided into pre-sale, project establishment, requirement, research and development, delivery, sale, reimbursement and post-sale, and for the life cycle of the project, some capabilities need to be provided to realize project collaborative management, so that a capability layer needs to be established.
The capability layer is a capability support of the whole platform, and mainly realizes task disassembly and cooperation and process progress tracking through online editing, task assignment and task tracking, and leaves a trace in the process and falls into a library; the authority management of the minimum granularity is realized through the authority management and control, so that the leakage of important information is avoided; the member can be quickly searched through instant messaging, and the authority of the member is set by combining authority control; various types of project scenes are met through personalized configuration, and requirements such as deliverables required by different nodes can be set for each project; the risk early warning and Business Intelligence (BI) large screen can be combined to quickly see the item with risk and the risk reason, so that a project manager can follow up the processing in time. Of course, the stage of the current project and the task completion condition can be clearly seen from the BI large screen; the difference between the actual man-hour input amount of tasks at each stage of each project and the estimated man-hour can be clearly recorded through the man-hour budget, and the cost of the project is calculated; user data isolation is achieved through Software-as-a-Service (SaaS).
In order to visually manage the project, a presentation layer is required to be provided to display the data. The presentation layer is an operation entrance of all users, displays data of each project task, transmits interaction data of the users and the platform to the capability layer, and the capability layer processes the interaction data and then transmits the interaction data back to the presentation layer and the process layer.
The project management platform provided by the embodiment comprises an ability layer, a flow layer and a presentation layer; the presentation layer is an operation entrance of all users and is used for displaying data of each project task; the interactive data of the user and the platform are transmitted to the capability layer so that the capability layer can process the interactive data and then transmit the processed interactive data back to the presentation layer and the flow layer; the process layer is used for managing the life cycle of the whole project and controlling the stage flow direction of the project; the capability layer is used for providing basic services required by the presentation layer and the flow layer and receiving and processing the requests of all users; the basic service at least comprises authority management, online editing, task assignment, task tracking and risk early warning. In the platform, the capability layer is used as a support for the presentation layer and the process layer, so that data in a service scene and interactive data between a user and the platform can be displayed through the presentation layer, that is, visualization of project data is realized, and management efficiency is improved; the cooperation in the project process is realized through online editing, authority management, task assignment and task tracking in the capability layer; risk and weak links in the project process can be known by the user through risk early warning, and then the risk and the weak links in the project task can be solved by the user in time, so that the project can be rapidly delivered.
In implementation, the basic services used by the capability layer to provide rights management required by the presentation layer and the flow layer include:
acquiring a user requirement pool created by a first user, and acquiring a project task from the user requirement pool;
after receiving an instruction sent by a second user, issuing the project task to a third user;
acquiring a document sent by a third user; the document is obtained by editing the related data of the project task by a third user;
and when a request for accessing the document is received and the authority corresponding to the request meets the condition, opening the corresponding authority of the operation document.
Different members associated with the project manage different services throughout the project lifecycle. In this embodiment, the first user, the second user, and the third user refer to persons related to the item. The first user is typically referred to as a pre-sales person, the second user is typically referred to as an administrator or project manager, and the third user is typically referred to as a project member (developer). The first user, namely the pre-sale personnel, feeds back and establishes project information in the project management system after setting up projects according to project setting rules through communicating with customers, mining, guiding, promoting, expanding and landing user requirements. Since a project usually includes multiple parties, and all parties of the project may present demands, in this embodiment, a user demand pool is established to register all demands, so as to avoid missing any one demand as much as possible. When the project task needs to be executed, the project task can be obtained from the user requirement pool. It should be noted that, in practice, in addition to the pre-sale user creating the demand pool, the administrator or project manager may also create the user demand pool.
When a project task needs to be executed, a second user, namely a manager or a project manager, generally assigns a task, and after receiving an instruction of issuing the project task from the second user, the project task is sent to a third user, namely a project member. The time for issuing the project task to the third user is not limited, and the project task may be issued to the third user immediately after receiving an instruction issued by the second user, or may be issued to the third user after a preset time after receiving an instruction issued by the second user. In order to improve the delivery efficiency of the project task, the project task is preferably sent to the third user immediately or after waiting for a short time after receiving the instruction from the second user.
And the third user receives the project task, starts to complete the project task, and can record the work output in the document in the process of completing the project task. The working output comprises the actual working output and also comprises the projected working output. The actual work output refers to data related to a project, such as the state of the project task, the man-hour data of the project task, the node information of the project task, the delivery of the project task, and the like, generated in the process of executing the project task. Work outputs such as estimated man-hours to perform project tasks, estimated cost man-hours, etc. are estimated. And editing the related data of the project task by a third user to obtain a document. In implementation, data related to the project may be archived according to a specified requirement or format for ease of managing and viewing the document. In addition, a third user can edit the document online, and can also upload the document after editing the document offline.
If the document recorded with the data related to the project is obtained, any person can operate the current document if the document is not provided with the authority, and although the document is convenient for the personnel related to the project to check, the personnel unrelated to the project can steal the data of the project, so that the safety of the project is affected. Therefore, the security of the document is improved by setting the rights to the document here. The rights to the document are not limited. The file authority at least comprises an updating editing authority, a viewing authority, a downloading authority and a deleting authority. If the authority is satisfied, all the authorities (such as updating editing authority, viewing authority, downloading authority and the like) are opened, which may cause some project-related members to randomly tamper with data related to the project, and when other project-related members access the document, wrong data information may be obtained. Therefore, in order to improve the security of the document and ensure the accuracy of the data in the document as much as possible, in the implementation, the authority can be minimized, that is, when the corresponding authority is requested to meet the condition, the corresponding authority of the operation document is opened. The operation document here includes at least update edit document, view document, download document, delete document. Meanwhile, in practice, corresponding permissions can be opened according to the importance degree of the document and the classification of the user accessing the document. If the corresponding authority is requested to update the editing document, if the authority capable of updating the editing document is satisfied, the authority for updating the editing document is opened. And determining the specific open authority according to the actual situation. If the authority for updating the edited document is provided, the authority for viewing the document is necessarily provided, so that when the edited document is required to be updated, the corresponding authority required to be updated can comprise the updating editing authority and the authority for viewing the document, and when the updating editing authority and the authority for viewing the document meet the conditions, the authority for viewing the document and the updating editing authority are opened; the authority corresponding to the request can only contain the updating editing authority, and then when the authority corresponding to the operation document is opened, the updating editing authority and the viewing authority are opened as long as the updating editing authority meets the condition. The order of opening the permissions is not limited, the two permissions can be opened at the same time, or the editing permission can be opened and updated after the viewing permission is opened first.
The capability layer provided by the embodiment is used for rights management in the provided basic service, and comprises the following steps: acquiring a user requirement pool created by a first user, and acquiring a project task from the user requirement pool; after receiving an instruction sent by a second user, issuing the project task to a third user; acquiring a document sent by a third user; the document is obtained by editing related data of the project task by a third user; and when a request for accessing the document is received and the authority corresponding to the request meets the condition, opening the corresponding authority of the operation document. In the authority management provided by the embodiment, when the authority corresponding to the request meets the condition, the corresponding authority of the operation document is opened, the safety of data in the document is ensured as much as possible, and compared with the traditional mode of managing a form by one person, the authority management provided by the embodiment has the advantages that the user request meeting the authority can operate the document, so that the user knows the condition of project task, the project is cooperatively managed by each user, and the project delivery efficiency is improved.
In implementation, the basic services used by the capability layer to provide task assignments required by the presentation layer and the flow layer include:
establishing a first data transmission link with a communication service;
pushing a message representing a project task to be executed to a third user through a communication service by utilizing a first data transmission link;
and issuing the project task to a third user according to the node information corresponding to the preset project task and the deliverable rule to be produced by the project task.
Communication services refer to chat tools such as WeChat, etc. An output transmission link is established between the platform and the WeChat, a message containing the project task to be executed is sent to the WeChat, and the third user can obtain the project task to be executed by checking the WeChat. Node information of project tasks, and rules of delivered goods to be produced are generally determined according to specific projects. And the projects are different, and the node information of the projects, the rules of the delivered goods to be produced and the like are different. The node information set by the project task, the rules of the delivered goods to be produced, and the like are not limited and are determined according to actual conditions.
The calling communication service provided by the embodiment pushes the project task message to the relevant members, and according to the prompt message, the third user can timely know the project task to be executed and process the project task, so that the delivery efficiency of the project task is improved; and sending the project task containing the node information of the project and the to-be-produced object rule of the project to a third user, so that the third user can analyze the progress of the actual project to be executed according to the predicted data in the project execution process and know the difference between the data in the actual execution process and the data in the predicted execution process.
In implementation, the basic service used by the capability layer to provide risk early warning required by the presentation layer and the process layer includes:
under the condition that the project task is completed within a preset time length, acquiring actual working hours and estimated working hours corresponding to each node; acquiring a first node of which the actual working hours exceed the expected working hours; carrying out overtime early warning on the first node;
under the condition that the project task is not completed within the preset time length, respectively acquiring a completed node and an uncompleted node in the project task; when the node is a finished node, acquiring actual working hours and expected working hours corresponding to the node, acquiring a second node of which the actual working hours exceed the expected working hours, and performing out-of-date early warning on the second node; and when the node is an unfinished node, carrying out to-do early warning on the unfinished node.
The preset duration is not limited and is determined according to a specific project task. In the risk early warning method provided by this embodiment, for a project task that has been completed within a preset duration, a node whose actual man-hour is greater than the expected man-hour is early warned, so that a user can know an overdue node existing in the project; and performing overdue early warning on completed nodes with actual working hours larger than expected working hours in project tasks which are not completed within a preset time length, and performing to-do early warning on uncompleted nodes. The pre-warning mode, frequency and the like are not limited. If the overdue early warning can be marked on the display screen in a red font, the to-do early warning can be marked on the display screen in a green font, and a user can know the progress condition of the project task according to different early warning prompts.
In the above embodiment, the risk existing in the project process is pre-warned according to the completion condition and the working hour condition of the node task, and in practice, the existing risk can be pre-warned even when the project task has a money return plan. In a preferred embodiment, the basic service used by the capability layer to provide risk warning required by the presentation layer and the process layer includes:
acquiring a planned refund amount and a current refund amount of a project task;
judging whether the current refund amount is smaller than the planned refund amount;
and if so, early warning the refund of the project task.
Some project tasks have a refund plan and require to complete the refund amount in the refund plan within a preset time, so that in the embodiment, by comparing the relationship between the planned refund amount and the current refund amount, if the current refund amount is smaller than the planned refund amount, the project task is not completed with the refund plan, and the refund of the project task is warned. Similarly, the mode of the refund warning is not limited. Through the early warning of the money return plan, the user can intuitively know the money return condition of the task.
It should be noted that, in the above embodiments and the present embodiments, the early warning is performed according to the completion condition, the labor hour condition, and the money return condition of the node task, in practice, the early warning may be performed for the risks existing in the project task, for example, delivery documents are not dropped according to the regulations, and the actual labor hour has a large difference and exceeds the cost and labor hour. In order to distinguish different risks, different early warning modes can be set for different risks, the user can know the risks existing in the project task through early warning, and the user can visually analyze the places where the risks exist according to the early warning modes by carrying out early warning in different modes on different risks, so that the risks existing in the project task can be found quickly, the risks can be processed in time, and the delivery efficiency of the project is improved.
In practice, the project management platform may need to manage multiple projects, and the processing procedures, processing requirements, and the like of different projects may be different, so in order to meet various types of project scenarios, a preferred embodiment is that the basic service further includes: personalized configuration; the capability layer is used for providing basic services of personalized configuration required by the presentation layer and the flow layer, and comprises the following steps:
acquiring the type of a project task;
setting corresponding rules for each stage in the whole project life cycle according to the type of the project task; wherein the rules include at least delivery rules to be produced by the project task.
The personalized configuration can configure general rule requirements for delivery type and research and development type projects, and can also configure partial special projects. For example, the delivery of the whole project life cycle core can set the output standard for different stages and milestones, project a needs to output standing reports, version plans and the like in the project standing stage, but project B may also need to output financial measurement tables in the project standing stage.
The basic service provided by the capability layer provided by the embodiment includes personalized configuration, so that different types of project tasks can be processed, and the requirements of the different types of project tasks are met.
In order to facilitate the user to know the real-time information of the project, the risk of the project and the overall situation, in the implementation, a preferred implementation is that the basic service further includes: BI large screen; the basic services of the capability layer for providing the BI large screen required by the presentation layer and the flow layer include:
establishing a second data transmission link between the BI large screen and the mobile terminal;
acquiring a working hour report, an overdue early warning condition, a to-be-handled list and a task tracking condition of a project task;
and displaying the working hour report, the overdue early warning condition, the to-do list and the task tracking condition on a BI large screen through a second data transmission link.
The platform and the BI large screen can directly output data or indirectly output data. If the platform transmits the data to the intermediate medium, then the intermediate medium transmits the data to the BI large screen, and the platform transmits the data to the BI large screen through wireless communication.
The basic service provided by the capability layer provided by the embodiment further comprises a BI large screen, and relevant data, early warning and the like of project tasks can be displayed through the BI large screen, so that a user can conveniently know the stage of the current project, the task completion condition, the project with risks and the reason for analyzing the risk.
In practice, there may be changes in the project task, and in order to be able to understand the change situation of the project task, the preferred embodiment is that the presentation layer includes task changes; wherein the task change at least comprises the state change of the project task and the change of a person in charge of the project task.
The task change includes a state change of a project task, a change of a person responsible for the project task, and the like. In implementation, the initial states of the tasks are all 'to be processed'; if the responsible person receives the task, the state is changed to 'processing'; after the task is completed, the state changes to "completed". Similarly, the originally assigned person in charge of the task is member a, and when receiving the task, member a finds that the task is actually to be processed by member B, then the person in charge of the task needs to be modified to member B. When the information of the task is changed, an operation log needs to be recorded, so that the task can be traced back conveniently through the operation log. The task change is provided in the presentation layer, so that a user can intuitively know the condition of the project task.
Throughout the project cycle, there may be a variety of problems for which it is necessary to keep track of the link conditions it produces to the end, while requiring that each problem be solved. Therefore, a preferred embodiment is that the presentation layer contains a problem closed loop; the presentation layer is used for providing a problem closed loop and comprises:
acquiring all problems generated in the life cycle of the whole project and solving the problems;
and if the problem is not solved, analyzing the reason of the problem through the risk early warning provided by the capability layer and solving the problem according to the reason.
For the problem of not closing, the current state can be clearly seen through the presentation layer. For example, if a project is at risk due to a common delay of the development progress, it is necessary to register a reason, a solution, and a solution result for clearly causing the delay of the development progress.
In order to make those skilled in the art better understand the technical solution of the present application, the present application is further described in detail below with reference to fig. 2. Fig. 2 is a schematic diagram of project collaborative management according to an embodiment of the present application. As shown in the figure 2 of the drawings,
the pre-sales personnel feed back the user requirements and create a user requirement pool, the administrator or the project manager checks and updates the content of the requirement pool in time, the node information of the project and the delivery rule required to be produced are configured according to the reasonable scheduling of the productivity of the team, and the project task is assigned to the relevant members of the project to be completed.
When the task is issued, the instant communication service is called, and the task message is pushed to related personnel. If the task needs to be completed in cooperation with the project members, the task can be split and assigned to other members.
In the process of completing the task, project members can archive work products according to specified requirements or formats by means of online editing and online cooperation, and can set updating editing rights, viewing rights, downloading rights and deleting rights of specific delivery material documents. And for the document with higher privacy degree, whether the document can be checked or downloaded after being checked by an administrator can be set. Of course, third party personnel may also configure rights at this point if they want to access the document.
The whole process depends on the man-hour estimation capability, and the estimated input man-hour of the task is calculated. And project members need to register actual working hours in the system, so that the estimated working hours, the cost working hours and the difference between the actual working hours can be calculated conveniently, and the generation reasons can be analyzed conveniently.
After the administrator or the project manager configures the early warning rules, risks in the whole process can be automatically identified and early warning notifications can be sent out. After receiving the early warning, the project member needs to process the early warning at a specified time, and the early warning notice can be sent out when the project member is not processed. The early warning range comprises various scenes that the node task is not finished, the delivery document does not fall into the warehouse according to the regulation, the actual working hours have large difference or exceed the cost working hours, the project money return plan is not finished, and the like, and corresponding early warning prompts are made to inform relevant personnel to process in time.
If the project has a refund plan, the project also needs to be registered in the system, the risk early warning module can automatically judge whether the planned refund amount is finished or not in the planned completion time, and for the unfinished project, early warning prompt can be carried out.
A manager or a project manager can obtain real-time information of the project only through task tracking, to-do early warning, overdue early warning and a working hour report in a BI large screen, and can know risks and the overall situation of the project. More of project members or other three-party personnel pay attention to the to-do list, the to-do early warning and the overdue early warning in the BI large screen, and know about the work tasks required to be processed.
Therefore, online editing, minimization of permission collection, classification of plan change and different classification are introduced in the embodiment, different roles in the project are required to complete examination and approval, project personnel investment is combined with personnel working hours, collaboration in the project process is solved, and the delivery efficiency of the project is improved; the delivery and the quantity required by each stage of different project processes are configured through the background, and the project members and managers are warned by early warning of the contents after the time period is exceeded, so that the problem of embodying risks and weak links in the project process is solved, the project process management is visualized, the management efficiency is improved, and the management reporting cost is reduced; by means of minimizing authority management authorization to project related members and third-party users, the problem of how to keep project management and control and ensure the safety of project data when third-party project members participate in projects is solved.
A project management platform provided by the present application is described in detail above. The embodiments are described in a progressive manner in the specification, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other. The device disclosed in the embodiment corresponds to the method disclosed in the embodiment, so that the description is simple, and the relevant points can be referred to the description of the method part. It should be noted that, for those skilled in the art, it is possible to make several improvements and modifications to the present application without departing from the principle of the present application, and such improvements and modifications also fall within the scope of the claims of the present application.
It should also be noted that, in this specification, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrases "comprising a," "8230," "8230," or "comprising" does not exclude the presence of additional like elements in a process, method, article, or apparatus that comprises the element.

Claims (10)

1. A project management platform is characterized by comprising an ability layer, a flow layer and a presentation layer;
the presentation layer is an operation entrance of all users and is used for displaying data of each project task and transmitting interaction data of the users and the platform to the capability layer so that the capability layer processes the interaction data and then transmits the interaction data back to the presentation layer and the process layer;
the flow layer is used for managing the whole project life cycle and controlling the stage flow direction of the project task;
the ability layer is used for providing basic services required by the presentation layer and the flow layer and receiving and processing requests of all the users; the basic service at least comprises authority management, online editing, task assignment, task tracking and risk early warning.
2. The project management platform of claim 1, wherein the project management members comprise a first user, a second user, and a third user;
the capability layer is used for providing the basic service of the authority management required by the presentation layer and the process layer, and comprises the following steps:
acquiring a user requirement pool created by the first user, and acquiring the project task from the user requirement pool;
after receiving an instruction sent by the second user, issuing the project task to a third user;
obtaining a document sent by the third user; the document is obtained by editing the related data of the project task by the third user;
and when a request for accessing the document is received and the authority corresponding to the request meets the condition, opening the corresponding authority for operating the document.
3. The project management platform of claim 2, wherein the rights of the document include at least an update edit right, a view right, a download right, a delete right; and the authority for operating the document is at least obtained according to the importance level of the project task and the classification setting of the user accessing the document.
4. The project management platform of claim 3, wherein the capabilities layer is configured to provide basic services of the task assignments required by the presentation layer and the flow layer, comprising:
establishing a first data transmission link with a communication service;
pushing a message characterizing the project task to be performed to the third user through the communication service using the first data transfer link;
and issuing the project task to the third user according to the preset node information corresponding to the project task and the delivery rule to be output of the project task.
5. The project management platform of any one of claims 1 to 4, wherein the basic services of the capability layer for providing the risk pre-warning required by the presentation layer and the flow layer comprise:
under the condition that the project task is completed within a preset time length, acquiring actual working hours and estimated working hours corresponding to the nodes; acquiring a first node of which the actual working hours exceed the expected working hours; carrying out overdue early warning on the first node;
under the condition that the project task is not completed within the preset time length, the completed nodes and the incomplete nodes in the project task are respectively obtained; when the node is the finished node, acquiring the actual working hours and the estimated working hours corresponding to the node, acquiring a second node of which the actual working hours exceed the estimated working hours, and performing overdue early warning on the second node; and when the node is the unfinished node, performing to-do early warning on the unfinished node.
6. The project management platform of claim 5, wherein the project task has a repayment plan, and wherein the basic services used by the capability layer to provide the risk pre-warning required by the presentation layer and the process layer comprise:
acquiring a planned refund amount and a current refund amount of the project task;
judging whether the current refund amount is smaller than the planned refund amount;
and if so, early warning the refund of the project task.
7. The project management platform of claim 6, wherein the base service further comprises: personalized configuration; the capability layer is used for providing the personalized configured basic service required by the representation layer and the flow layer and comprises the following steps:
acquiring the type of the project task;
setting corresponding rules for each stage in the whole project life cycle according to the type of the project task; wherein the rules include at least a deliverable rule to be produced by the project task.
8. The project management platform of claim 7, wherein the base service further comprises: BI large screen; the capability layer is used for providing basic services of the BI large screen required by the presentation layer and the flow layer, and comprises the following steps:
establishing a second data transmission link with the BI large screen;
acquiring a working hour report, an overdue early warning condition, a to-be-done list and a task tracking condition of the project task;
and displaying the working hour report, the overdue early warning condition, the to-be-handled list and the task tracking condition on the BI large screen through the second data transmission link.
9. The project management platform of claim 1, wherein task changes are included in the presentation layer; wherein the task change at least comprises a state change of the project task and a change of a person in charge of the project task.
10. The project management platform of claim 1, wherein the presentation layer comprises a closed loop of questions; the presentation layer for providing the problem closed loop comprises:
all problems generated in the whole project life cycle are obtained and solved;
if the problem is not solved, analyzing the reason of the problem through the risk early warning provided by the capability layer and solving the problem according to the reason.
CN202210928459.2A 2022-08-03 2022-08-03 Project management platform Pending CN115271672A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210928459.2A CN115271672A (en) 2022-08-03 2022-08-03 Project management platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210928459.2A CN115271672A (en) 2022-08-03 2022-08-03 Project management platform

Publications (1)

Publication Number Publication Date
CN115271672A true CN115271672A (en) 2022-11-01

Family

ID=83749960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210928459.2A Pending CN115271672A (en) 2022-08-03 2022-08-03 Project management platform

Country Status (1)

Country Link
CN (1) CN115271672A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117670262A (en) * 2024-01-31 2024-03-08 成都双流建工建设集团有限公司 Project management system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117670262A (en) * 2024-01-31 2024-03-08 成都双流建工建设集团有限公司 Project management system and method
CN117670262B (en) * 2024-01-31 2024-04-26 成都双流建工建设集团有限公司 Project management system and method

Similar Documents

Publication Publication Date Title
CN105303306B (en) Electric power material dispatching platform system
US20050021348A1 (en) Business solution management (BSM)
Alirezaei et al. BIM-augmented reality integrated approach to risk management
US20170337501A1 (en) System and method for coordinating and controlling production processes and inter-related decision making processes
KR20040070443A (en) Method and system for managing project program change
CN107146143B (en) Advanced manufacturing e-commerce platform
US20240232762A1 (en) Systems and methods for workflow and practice management
CN111353787A (en) Equipment comprehensive guarantee system based on cloud platform
CN115271672A (en) Project management platform
CN115049269A (en) Client credit management system applied to building material industry
US20220058067A1 (en) System and method for transforming a digital calendar into a strategic tool
US20240176602A1 (en) Dependency management in software development
CN110782198A (en) Webpage end rail transit equipment monitoring information control platform and implementation method thereof
JPWO2007105698A1 (en) Cost calculation system, cost data input system, program thereof, data structure, and recording medium recording them
US20230316197A1 (en) Collaborative, multi-user platform for data integration and digital content sharing
CN104408568A (en) Method and device for processing task information of owner project department
CN114283037A (en) Training and engagement system, electronic equipment and storage medium
US20210334718A1 (en) System for managing enterprise dataflows
KR102180345B1 (en) A On-Line Total Process Management System With Total Quality Management Solution And A Operation Method With The Total Process Management System With Total Quality Management Solution Thereof
Fleischmann et al. Coherent task modeling and execution based on subject-oriented representations
US11842034B2 (en) System and method for implementing an interactive roadmap portal
CN118333586A (en) Method, system and storage medium for managing progress of digital intelligent project
Jowett et al. Field BIM: Establishing a Requirements Framework for Mobile BIM Technologies
US20230368089A1 (en) Systems and/or methods for configuring and/or conducting scenarios for providing training exercises and/or testing equipment capabilities and/or limitations
US20210334753A1 (en) System for managing enterprise dataflows

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication