CN115251622A - Building engineering cost analytical equipment - Google Patents

Building engineering cost analytical equipment Download PDF

Info

Publication number
CN115251622A
CN115251622A CN202210781589.8A CN202210781589A CN115251622A CN 115251622 A CN115251622 A CN 115251622A CN 202210781589 A CN202210781589 A CN 202210781589A CN 115251622 A CN115251622 A CN 115251622A
Authority
CN
China
Prior art keywords
fixedly connected
plate
spring
slider
chute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210781589.8A
Other languages
Chinese (zh)
Inventor
高朝虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiujiang University
Original Assignee
Jiujiang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiujiang University filed Critical Jiujiang University
Priority to CN202210781589.8A priority Critical patent/CN115251622A/en
Publication of CN115251622A publication Critical patent/CN115251622A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47BTABLES; DESKS; OFFICE FURNITURE; CABINETS; DRAWERS; GENERAL DETAILS OF FURNITURE
    • A47B97/00Furniture or accessories for furniture, not provided for in other groups of this subclass
    • A47B97/04Easels or stands for blackboards or the like
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47BTABLES; DESKS; OFFICE FURNITURE; CABINETS; DRAWERS; GENERAL DETAILS OF FURNITURE
    • A47B91/00Feet for furniture in general
    • A47B91/06Gliders or the like
    • A47B91/066Swivel gliders

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

本发明属于工程造价分析技术领域,尤其为一种建筑工程造价分析装置,包括托板,所述托板的底端固定连接有滑动柱,所述滑动柱的外壁滑动连接在固定套的内壁,本发明中,技术人员在计算时,在固定器、通孔、滑动柱和固定套的搭配使用下,能对使该装置进行的高度进行调节并固定,便于不同身高的技术人员对该装置的使用,同时在把手、限位板、第二弹簧、拉杆、第四弹簧的搭配使用下,能够对不同厚度的分析板本体进行夹持固定,使该装置具有灵活性,在辅助工具的使用下,从而便于技术人员操作使用,在板擦、滑杆、第一滑块、第一弹簧、第二滑槽的搭配使用下,提高了技术人员的工作效率。

Figure 202210781589

The invention belongs to the technical field of engineering cost analysis, in particular to a construction project cost analysis device, comprising a support plate, a bottom end of the support plate is fixedly connected with a sliding column, and the outer wall of the sliding column is slidably connected to the inner wall of a fixed sleeve, In the present invention, when calculating, the technician can adjust and fix the height of the device under the combination of the holder, the through hole, the sliding column and the fixing sleeve, which is convenient for technicians of different heights to use the device. At the same time, with the combined use of the handle, the limit plate, the second spring, the pull rod and the fourth spring, the body of the analysis plate of different thicknesses can be clamped and fixed, making the device flexible, and under the use of auxiliary tools , so that it is convenient for technicians to operate and use, and the working efficiency of technicians is improved under the combined use of the plate wiper, the sliding rod, the first slider, the first spring and the second chute.

Figure 202210781589

Description

一种建筑工程造价分析装置A construction cost analysis device

技术领域technical field

本发明属于工程造价分析技术领域,具体涉及一种建筑工程造价分析装置。The invention belongs to the technical field of engineering cost analysis, and in particular relates to a construction engineering cost analysis device.

背景技术Background technique

工程造价分析是指在各个不同阶段对确定工程造价的估算、概算、预算及决算的分析,用以评论确定的工程造价的经济合理性,并通过分析,寻求降低工程造价的可能与所应采取的措施。Project cost analysis refers to the analysis of the estimation, budgetary estimate, budget and final account of the determined project cost at different stages, to comment on the economic rationality of the determined project cost, and through the analysis, to seek the possibility of reducing the project cost and the measures that should be taken measures.

工程造价分析装置是便于技术人员对工程造价分析的相关数据进行展示或计算的工具,一般来说,技术人员在使用的过程中,不能够对工程造价分析装置的高度进行调节固定,从而不利于不同身高的技术人员进行使用,技术人员在需要辅助工具进行计算时,需要去寻找辅助工具,不便于技术人员的操作使用,并且不能够对不同厚度的分析板本体进行夹持固定,使工程造价分析装置具有一定的局限性,在技术人员使用的过程中,技术人员需要多次擦拭分析板本体上的数据,从而不能对分析板本体上的数据进行快速的消除,降低技术人员的工作效率。The engineering cost analysis device is a tool that is convenient for technicians to display or calculate the relevant data of the engineering cost analysis. Generally speaking, the technicians cannot adjust and fix the height of the engineering cost analysis device during use, which is not conducive to When used by technicians of different heights, technicians need to find auxiliary tools when they need auxiliary tools for calculation. The analysis device has certain limitations. In the process of use by the technicians, the technicians need to wipe the data on the analysis board body many times, so that the data on the analysis board body cannot be quickly eliminated, and the work efficiency of the technicians is reduced.

发明内容Contents of the invention

为解决现有技术中存在的上述问题,本发明提供了一种建筑工程造价分析装置,具有使该装置进行升降,灵活性、便于技术人员的操作、提高工作效率的特点。In order to solve the above-mentioned problems in the prior art, the present invention provides a construction cost analysis device, which has the characteristics of making the device lift, flexible, convenient for technicians to operate, and improving work efficiency.

为实现上述目的,本发明提供如下技术方案:一种建筑工程造价分析装置,包括托板,所述托板的底端固定连接有滑动柱,所述滑动柱的外壁滑动连接在固定套的内壁,所述固定套的上部一侧设置有多个通孔,所述固定套的底端固定连接在移动底座的顶端中部,所述滑动柱靠近通孔的一侧中部设置有槽,槽的内部固定连接有第三弹簧的一端,所述第三弹簧的另一端固定连接在固定器的一端,所述托板的一端开设有第一滑槽,所述第一滑槽的内部设置有拉杆,所述拉杆的一端固定连接有第二滑块,所述拉杆的另一端贯穿托板的一侧,并与限位板固定连接,所述限位板远离托板的一端固定连接有把手,所述第二滑块靠近把手的一端固定连接有第二弹簧,所述第二弹簧的另一端固定连接在第一滑槽靠近把手的一侧,所述拉杆贯穿第二弹簧的内部,所述第二滑块的顶端固定连接有移动板,所述移动板中部靠近把手的一端设置有滑杆,所述移动板的顶部设置有第二滑槽,所述滑杆的第二滑槽的内部进行滑动,所述滑杆远离把手的一端固定连接有第一滑块,所述第一滑块滑动在第二滑槽的底端,所述第一滑块的顶端固定连接有板擦,所述第一滑块的一端固定连接有第一弹簧,所述第一弹簧的另一端固定连接在第二滑槽远离滑杆一侧上,所述托板的顶端远离移动板的一侧设置有固定板,所述固定板和移动板的内侧均连接有分析板本体底部的两侧,所述固定板和移动板的底端两侧分别固定连接有第四弹簧。In order to achieve the above object, the present invention provides the following technical solutions: a construction cost analysis device, including a supporting plate, the bottom end of the supporting plate is fixedly connected with a sliding column, and the outer wall of the sliding column is slidably connected to the inner wall of the fixed sleeve , the upper side of the fixed sleeve is provided with a plurality of through holes, the bottom end of the fixed sleeve is fixedly connected to the middle part of the top of the mobile base, the middle part of the side of the sliding column close to the through hole is provided with a groove, and the inside of the groove One end of the third spring is fixedly connected, the other end of the third spring is fixedly connected to one end of the holder, one end of the supporting plate is provided with a first chute, the inside of the first chute is provided with a pull rod, One end of the pull rod is fixedly connected with a second slider, the other end of the pull rod runs through one side of the supporting plate, and is fixedly connected with the limiting plate, and the end of the limiting plate far away from the supporting plate is fixedly connected with a handle, so One end of the second slider close to the handle is fixedly connected with a second spring, the other end of the second spring is fixedly connected to the side of the first chute close to the handle, the pull rod runs through the inside of the second spring, the first The top of the two sliders is fixedly connected with a moving plate, the middle part of the moving plate is provided with a slide bar near one end of the handle, the top of the moving plate is provided with a second chute, and the inside of the second chute of the slide bar is sliding, the end of the slide bar away from the handle is fixedly connected with a first slider, the first slider slides at the bottom of the second chute, the top of the first slider is fixedly connected with a blackboard eraser, and the first slider One end of a slider is fixedly connected to a first spring, and the other end of the first spring is fixedly connected to the side of the second chute away from the slide bar, and the top of the supporting plate is provided with a fixed plate on the side away from the moving plate , the inner sides of the fixed plate and the moving plate are connected with both sides of the bottom of the analysis plate body, and the bottom sides of the fixed plate and the moving plate are respectively fixedly connected with a fourth spring.

作为本发明的一种建筑工程造价分析装置优选技术方案,所述固定器靠近第三弹簧的一端滑动在滑动柱上的槽内,所述固定器靠近固定套的一端滑动在固定套上的通孔的内部。As a preferred technical solution of the construction cost analysis device of the present invention, the end of the fixer close to the third spring slides in the groove on the sliding column, and the end of the fixer close to the fixed sleeve slides in the channel on the fixed sleeve. the inside of the hole.

作为本发明的一种建筑工程造价分析装置优选技术方案,所述托板顶端远离把手的一侧分别安装有辅助工具,辅助工具包括笔筒和档案夹。As a preferred technical solution of the construction project cost analysis device of the present invention, auxiliary tools are respectively installed on the side of the top of the supporting plate away from the handle, and the auxiliary tools include a pen holder and a file folder.

作为本发明的一种建筑工程造价分析装置优选技术方案,所述第二滑块滑动在第一滑槽上,所述拉杆在第一滑槽上水平移动。As a preferred technical solution of the construction engineering cost analysis device of the present invention, the second sliding block slides on the first chute, and the pull rod moves horizontally on the first chute.

作为本发明的一种建筑工程造价分析装置优选技术方案,所述限位板设置在托板远离第二滑块的一侧,且限位板对拉杆进行限位。As a preferred technical solution of the construction cost analysis device of the present invention, the limiting plate is arranged on the side of the supporting plate away from the second slider, and the limiting plate limits the position of the pull rod.

作为本发明的一种建筑工程造价分析装置优选技术方案,所述第二滑槽和第一滑块以及滑杆均成T型。As a preferred technical solution of the construction engineering cost analysis device of the present invention, the second chute, the first slider and the slider are all T-shaped.

作为本发明的一种建筑工程造价分析装置优选技术方案,所述第四弹簧设置在分析板本体的底端,所述移动板和固定板的内侧在分析板本体的底端分别设置有固定块。As a preferred technical solution of a construction cost analysis device of the present invention, the fourth spring is arranged at the bottom end of the analysis board body, and the inner sides of the moving board and the fixed board are respectively provided with fixed blocks at the bottom end of the analysis board body .

作为本发明的一种建筑工程造价分析装置优选技术方案,所述板擦与分析板本体靠近把手的一侧紧密贴合,所述第一弹簧在第二滑槽的内部。As a preferred technical solution of the construction engineering cost analysis device of the present invention, the eraser is in close contact with the side of the analysis board body close to the handle, and the first spring is inside the second chute.

与现有技术相比,本发明的有益效果是:本发明中,技术人员在计算时,在固定器、通孔、滑动柱和固定套的搭配使用下,能对使该装置进行的高度进行调节并固定,便于不同身高的技术人员对该装置的使用,同时在把手、限位板、第二弹簧、拉杆、第四弹簧的搭配使用下,能够对不同厚度的分析板本体进行夹持固定,使该装置具有灵活性,在辅助工具的使用下,从而便于技术人员操作使用,在板擦、滑杆、第一滑块、第一弹簧、第二滑槽的搭配使用下,提高了技术人员的工作效率。Compared with the prior art, the beneficial effect of the present invention is: in the present invention, when calculating, the technical staff can make the height of the device under the collocation of the use of the fixer, the through hole, the sliding column and the fixing sleeve. It can be adjusted and fixed, which is convenient for technicians of different heights to use the device. At the same time, with the combination of handle, limit plate, second spring, pull rod and fourth spring, it can clamp and fix analysis plate bodies of different thicknesses , so that the device has flexibility, under the use of auxiliary tools, it is convenient for technicians to operate and use, and under the combination of eraser, slide bar, first slider, first spring, and second chute, it improves the technical personnel. work efficiency.

附图说明Description of drawings

附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。在附图中:The accompanying drawings are used to provide a further understanding of the present invention, and constitute a part of the description, and are used together with the embodiments of the present invention to explain the present invention, and do not constitute a limitation to the present invention. In the attached picture:

图1为本发明的立体图;Fig. 1 is a perspective view of the present invention;

图2为本发明中固定板的结构示意图;Fig. 2 is the structural representation of fixed plate among the present invention;

图3为本发明中通孔的结构示意图;Fig. 3 is a schematic structural view of a through hole in the present invention;

图4为本发明中固定套的剖面图;Fig. 4 is the sectional view of fixing sleeve in the present invention;

图5为图1中A处的放大图;Fig. 5 is the enlarged view of place A in Fig. 1;

图6为图3中B处的放大图;Fig. 6 is the enlarged view of place B in Fig. 3;

图7为图4中C处的放大图;Figure 7 is an enlarged view at C in Figure 4;

图8为本发明中固定器的结构示意图;Fig. 8 is a schematic structural view of the fixer in the present invention;

图中:1、移动底座;2、固定套;3、滑动柱;4、第一滑块;5、滑杆;6、板擦;7、分析板本体;8、第一弹簧;9、移动板;10、托板;11、通孔;12、固定器;13、固定板;14、辅助工具;15、拉杆;16、第二弹簧;17、限位板;18、把手;19、第一滑槽;20、第二滑块;21、第三弹簧;22、第二滑槽;23、第四弹簧。In the figure: 1. Mobile base; 2. Fixed sleeve; 3. Sliding column; 4. First slider; 5. Slide bar; 6. Eraser; 7. Analysis board body; 8. First spring; 10, supporting plate; 11, through hole; 12, fixer; 13, fixed plate; 14, auxiliary tool; 15, pull rod; 16, second spring; 17, limit plate; 18, handle; 19, first Chute; 20, the second slide block; 21, the third spring; 22, the second chute; 23, the fourth spring.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

实施例Example

请参阅图1-图8,本发明提供以下技术方案:一种建筑工程造价分析装置,包括托板10,托板10的底端固定连接有滑动柱3,滑动柱3的外壁滑动连接在固定套2的内壁,固定套2的上部一侧设置有多个通孔11,固定套2的底端固定连接在移动底座1的顶端中部,滑动柱3靠近通孔11的一侧中部设置有槽,槽的内部固定连接有第三弹簧21的一端,第三弹簧21的另一端固定连接在固定器12的一端,托板10的一端开设有第一滑槽19,第一滑槽19的内部设置有拉杆15,拉杆15的一端固定连接有第二滑块20,拉杆15的另一端贯穿托板10的一侧,并与限位板17固定连接,限位板17远离托板10的一端固定连接有把手18,第二滑块20靠近把手18的一端固定连接有第二弹簧16,第二弹簧16的另一端固定连接在第一滑槽19靠近把手18的一侧,拉杆15贯穿第二弹簧16的内部,第二滑块20的顶端固定连接有移动板9,移动板9中部靠近把手18的一端设置有滑杆5,移动板9的顶部设置有第二滑槽22,滑杆5的第二滑槽22的内部进行滑动,滑杆5远离把手18的一端固定连接有第一滑块4,第一滑块4滑动在第二滑槽22的底端,第一滑块4的顶端固定连接有板擦6,第一滑块4的一端固定连接有第一弹簧8,第一弹簧8的另一端固定连接在第二滑槽22远离滑杆5一侧上,托板10的顶端远离移动板9的一侧设置有固定板13,固定板13和移动板9的内侧均连接有分析板本体7底部的两侧,固定板13和移动板9的底端两侧分别固定连接有第四弹簧23,本实施方案中,该装置在使用时,通过对固定器12的摁压,使第三弹簧21收缩,能够对滑动柱3的调节,从而使固定器12滑动在固定套2的内壁上,当固定器12滑至到通孔11内后,该装置能够进行固定,能对使该装置进行的高度进行调节并固定,便于不同身高的技术人员对该装置的使用,当拉动把手18时,在把手18的作用下,拉杆15带动第二滑块20在第一滑槽19上滑动,从而使第二弹簧16收缩,第四弹簧23伸开,此时技术人员就可以将不同厚度的分析板本体7放置在移动板9和固定板13的内侧,然后送开把手18,从而能够对不同厚度的分析板本体7进行夹持固定,使该装置具有灵活性,当技术人员计算的过程中,需要使用所需的工具时,直接可以在辅助工具14上拿放,从而便于技术人员操作使用,当技术人员在分析板本体7上进行计算后,需要对计算数据进行擦拭时,技术人员只需用手指将滑杆5从托板10的一端滑至到另一端,使第一滑块4在第二滑槽22内进行滑动,从而使板擦6对分析板本体7上的数据进行擦拭,同时擦拭完毕后,技术人员只需松开滑杆5,从而在第一弹簧8的作用下,使板擦6恢复到原来的位置,并且不影响技术人员对分析板本体7的正常使用,提高了技术人员的工作效率。Please refer to Fig. 1-Fig. 8, the present invention provides the following technical scheme: a kind of construction engineering cost analysis device, comprises supporting plate 10, and the bottom end of supporting plate 10 is fixedly connected with sliding column 3, and the outer wall of sliding column 3 is slidably connected in fixed The inner wall of the cover 2, the upper side of the fixed cover 2 is provided with a plurality of through holes 11, the bottom end of the fixed cover 2 is fixedly connected to the top middle of the mobile base 1, and the middle part of the sliding column 3 near the through hole 11 is provided with a groove , one end of the third spring 21 is fixedly connected to the inside of the groove, and the other end of the third spring 21 is fixedly connected to one end of the fixture 12, and one end of the supporting plate 10 is provided with a first chute 19, and the inside of the first chute 19 A pull rod 15 is provided, one end of the pull rod 15 is fixedly connected with the second slider 20, the other end of the pull rod 15 runs through one side of the supporting plate 10, and is fixedly connected with the limiting plate 17, and the limiting plate 17 is far away from the end of the supporting plate 10 A handle 18 is fixedly connected, and one end of the second slider 20 close to the handle 18 is fixedly connected with a second spring 16, and the other end of the second spring 16 is fixedly connected to the side of the first chute 19 close to the handle 18, and the pull rod 15 runs through the second In the inside of the second spring 16, the top of the second slide block 20 is fixedly connected with a moving plate 9, the middle part of the moving plate 9 is provided with a slide bar 5 near the end of the handle 18, and the top of the moving plate 9 is provided with a second chute 22, the slide bar The inside of the second chute 22 of 5 slides, the end of the slide bar 5 away from the handle 18 is fixedly connected with the first slider 4, the first slider 4 slides on the bottom end of the second chute 22, the first slider 4 The top of the top is fixedly connected with a blackboard eraser 6, and one end of the first slider 4 is fixedly connected with a first spring 8, and the other end of the first spring 8 is fixedly connected with the second chute 22 away from the side of the slide bar 5, the supporting plate 10 The side of the top away from the moving plate 9 is provided with a fixed plate 13, and the inner sides of the fixed plate 13 and the moving plate 9 are connected with both sides of the bottom of the analysis plate body 7, and the two sides of the bottom of the fixed plate 13 and the moving plate 9 are fixedly connected respectively. There is a fourth spring 23. In this embodiment, when the device is in use, the third spring 21 is contracted by pressing the fixer 12, and the sliding column 3 can be adjusted, so that the fixer 12 slides on the fixing sleeve. 2, when the fixer 12 slides into the through hole 11, the device can be fixed, and the height of the device can be adjusted and fixed, which is convenient for technicians of different heights to use the device. When the handle 18 is pulled, under the action of the handle 18, the pull rod 15 drives the second slide block 20 to slide on the first chute 19, so that the second spring 16 shrinks, and the fourth spring 23 stretches out. At this moment, the technician can The analysis plate body 7 of different thickness is placed on the inner side of the moving plate 9 and the fixed plate 13, and then the handle 18 is sent away, so that the analysis plate body 7 of different thickness can be clamped and fixed, so that the device has flexibility. In the process of personnel calculation, when the required tools need to be used, they can be directly placed on the auxiliary tool 14, so as to facilitate the operation and use of the technicians. After the technicians perform calculations on the analysis board body 7, they need to wipe the calculation data , the technician simply slides the slide bar 5 Sliding from one end of the supporting plate 10 to the other end, the first slider 4 slides in the second chute 22, so that the eraser 6 can wipe the data on the analysis board body 7, and after the wiping is completed, the technician It is only necessary to release the slide bar 5, so that under the action of the first spring 8, the eraser 6 can be restored to its original position without affecting the normal use of the analysis board body 7 by the technician, which improves the work efficiency of the technician.

具体的,固定器12靠近第三弹簧21的一端滑动在滑动柱3上的槽内,固定器12靠近固定套2的一端滑动在固定套2上的通孔11的内部,本实施例中,在第三弹簧21的作用下,使技术人员能够通过摁压固定器12,从而能够对该装置的整体高度进行调节。Specifically, the end of the fixer 12 close to the third spring 21 slides in the groove on the sliding column 3, and the end of the fixer 12 close to the fixing sleeve 2 slides inside the through hole 11 on the fixing sleeve 2. In this embodiment, Under the action of the third spring 21 , the technician can adjust the overall height of the device by pressing the fixer 12 .

具体的,托板10顶端远离把手18的一侧分别安装有辅助工具14,辅助工具14包括笔筒和档案夹,本实施例中,便于技术人员在计算的过程中,对所需工具的使用。Specifically, the side of the top of the pallet 10 away from the handle 18 is respectively equipped with auxiliary tools 14. The auxiliary tools 14 include a pen holder and a file folder. In this embodiment, it is convenient for technicians to use the required tools in the calculation process.

具体的,第二滑块20滑动在第一滑槽19上,拉杆15在第一滑槽19上水平移动,本实施例中,有利于使移动板9能够平稳的移动。Specifically, the second sliding block 20 slides on the first sliding groove 19, and the pull rod 15 moves horizontally on the first sliding groove 19. In this embodiment, it is beneficial to enable the moving plate 9 to move smoothly.

具体的,限位板17设置在托板10远离第二滑块20的一侧,且限位板17对拉杆15进行限位,本实施例中,能够使拉杆15在移动的过程中,带动把手18,从而使把手18进入到第一滑槽19的内部。Specifically, the limit plate 17 is arranged on the side of the supporting plate 10 away from the second slider 20, and the limit plate 17 limits the position of the pull rod 15. In this embodiment, the pull rod 15 can drive the handle 18, so that the handle 18 enters the inside of the first sliding groove 19.

具体的,第二滑槽22和第一滑块4以及滑杆5均成T型,本实施例中,能够使第一滑块4和滑杆5稳定在第二滑槽22内滑动,有利于使板擦6能够快速的对分析板本体7上的数据进行擦拭。Specifically, the second sliding groove 22, the first sliding block 4 and the sliding bar 5 are all T-shaped. In this embodiment, the first sliding block 4 and the sliding bar 5 can be stably slid in the second sliding groove 22. It is beneficial to enable the eraser 6 to quickly wipe the data on the analysis board body 7 .

具体的,第四弹簧23设置在分析板本体7的底端,移动板9和固定板13的内侧在分析板本体7的底端分别设置有固定块,本实施例中,当该装置对不同厚度的分析板本体7进行夹持固定时,在第四弹簧23的作用下,能够使该装置对分析板本体7的夹持更加稳定。Specifically, the fourth spring 23 is arranged at the bottom end of the analysis board body 7, and the inner sides of the moving plate 9 and the fixed board 13 are respectively provided with fixed blocks at the bottom end of the analysis board body 7. In this embodiment, when the device is used for different When the thick analysis plate body 7 is clamped and fixed, under the action of the fourth spring 23 , the clamping of the analysis plate body 7 by the device can be made more stable.

具体的,板擦6与分析板本体7靠近把手18的一侧紧密贴合,第一弹簧8在第二滑槽22的内部,本实施例中,有利于使板擦6对分析板本体7上的数据擦拭的更加快速干净。Specifically, the eraser 6 is closely attached to the side of the analysis board body 7 near the handle 18, and the first spring 8 is inside the second chute 22. Data wipes are faster and cleaner.

本发明的工作原理及使用流程:本发明中一种建筑工程造价分析装置,在使用时,技术人员只需将摁压固定器12,使固定器12在第三弹簧21的作用下,能够固定套2的内部进行滑动,当滑动到理想位置后,从而将固定器12滑至到通孔11的内部,就能够使该装置在竖直高度上进行固定,同时将把手18往远离托板10的一端拉动,从而能够使拉杆15带动第二滑块20和移动板9远离固定板13,然后将不同厚度的分析板本体7放置在固定板13和移动板9的内侧中部,从而将把手18松开,在第二弹簧16的作用下,使第二滑块20和移动板9一起向固定板13的一侧滑动,同时在第四弹簧23的作用下,从而能够将分析板本体7固定在固定板13和移动板9的内侧,当技术人员在计算的过程中,需要用到辅助用具时,只需在辅助工具14上进行拿放,当技术人员在计算的过程中,需要对分析板本体7上的数据进行擦拭时,只需拉动滑杆5,从而使第一滑块4在第二滑槽22的内部进行滑动,同时带动板擦6的滑动,并且使第一弹簧8伸长受力,从而使板擦6将分析板本体7上的数据快速的擦拭干净,再擦拭完毕后,只需松开滑杆5,在第一弹簧8的作用下,使第一滑块4带动板擦6恢复至没擦拭前,不影响技术人员对该装置使用的位置。The working principle and application process of the present invention: a construction cost analysis device in the present invention, when in use, the technician only needs to press the retainer 12 so that the retainer 12 can be fixed under the action of the third spring 21 The inside of the cover 2 slides, and when it slides to the ideal position, the fixer 12 is slid to the inside of the through hole 11, so that the device can be fixed on the vertical height, and the handle 18 is moved away from the supporting plate 10 at the same time One end pulls, so that the pull rod 15 can drive the second slider 20 and the moving plate 9 away from the fixed plate 13, and then the analysis plate body 7 of different thickness is placed on the inner middle of the fixed plate 13 and the moving plate 9, so that the handle 18 Unclamp, under the action of the second spring 16, the second slider 20 and the moving plate 9 slide together to one side of the fixed plate 13, and at the same time, under the action of the fourth spring 23, the analysis plate body 7 can be fixed On the inner side of the fixed plate 13 and the moving plate 9, when the technician needs to use the auxiliary tool in the calculation process, he only needs to take and place it on the auxiliary tool 14. When the technician is in the calculation process, he needs to analyze When wiping the data on the board body 7, only the slide bar 5 needs to be pulled, so that the first slider 4 slides inside the second chute 22, and at the same time drives the sliding of the board eraser 6, and makes the first spring 8 stretch Forced, so that the eraser 6 quickly wipes the data on the analysis board body 7 clean, and after wiping, you only need to loosen the slide bar 5, and under the action of the first spring 8, the first slider 4 drives the eraser 6 Restore to the position before wiping, which does not affect the use of the device by technicians.

最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。Finally, it should be noted that: the above is only a preferred embodiment of the present invention, and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, it still The technical solutions recorded in the foregoing embodiments may be modified, or some technical features thereof may be equivalently replaced. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.

Claims (8)

1.一种建筑工程造价分析装置,包括托板(10),其特征在于:所述托板(10)的底端固定连接有滑动柱(3),所述滑动柱(3)的外壁滑动连接在固定套(2)的内壁,所述固定套(2)的上部一侧设置有多个通孔(11),所述固定套(2)的底端固定连接在移动底座(1)的顶端中部,所述滑动柱(3)靠近通孔(11)的一侧中部设置有槽,槽的内部固定连接有第三弹簧(21)的一端,所述第三弹簧(21)的另一端固定连接在固定器(12)的一端,所述托板(10)的一端开设有第一滑槽(19),所述第一滑槽(19)的内部设置有拉杆(15),所述拉杆(15)的一端固定连接有第二滑块(20),所述拉杆(15)的另一端贯穿托板(10)的一侧,并与限位板(17)固定连接,所述限位板(17)远离托板(10)的一端固定连接有把手(18),所述第二滑块(20)靠近把手(18)的一端固定连接有第二弹簧(16),所述第二弹簧(16)的另一端固定连接在第一滑槽(19)靠近把手(18)的一侧,所述拉杆(15)贯穿第二弹簧(16)的内部,所述第二滑块(20)的顶端固定连接有移动板(9),所述移动板(9)中部靠近把手(18)的一端设置有滑杆(5),所述移动板(9)的顶部设置有第二滑槽(22),所述滑杆(5)的第二滑槽(22)的内部进行滑动,所述滑杆(5)远离把手(18)的一端固定连接有第一滑块(4),所述第一滑块(4)滑动在第二滑槽(22)的底端,所述第一滑块(4)的顶端固定连接有板擦(6),所述第一滑块(4)的一端固定连接有第一弹簧(8),所述第一弹簧(8)的另一端固定连接在第二滑槽(22)远离滑杆(5)一侧上,所述托板(10)的顶端远离移动板(9)的一侧设置有固定板(13),所述固定板(13)和移动板(9)的内侧均连接有分析板本体(7)底部的两侧,所述固定板(13)和移动板(9)的底端两侧分别固定连接有第四弹簧(23)。1. A construction cost analysis device, comprising a supporting plate (10), characterized in that: the bottom end of the supporting plate (10) is fixedly connected with a sliding column (3), and the outer wall of the sliding column (3) slides Connected to the inner wall of the fixed sleeve (2), the upper side of the fixed sleeve (2) is provided with a plurality of through holes (11), and the bottom end of the fixed sleeve (2) is fixedly connected to the mobile base (1) In the middle of the top, a groove is provided in the middle of the side of the sliding column (3) close to the through hole (11), and one end of the third spring (21) is fixedly connected to the inside of the groove, and the other end of the third spring (21) Fixedly connected to one end of the fixer (12), the first chute (19) is opened at one end of the support plate (10), and the inside of the first chute (19) is provided with a pull rod (15), the One end of the pull rod (15) is fixedly connected with the second slider (20), and the other end of the pull rod (15) passes through one side of the supporting plate (10) and is fixedly connected with the limiting plate (17). A handle (18) is fixedly connected to the end of the bit plate (17) away from the supporting plate (10), and a second spring (16) is fixedly connected to the end of the second slider (20) close to the handle (18). The other end of the second spring (16) is fixedly connected to the side of the first chute (19) close to the handle (18), the pull rod (15) runs through the inside of the second spring (16), and the second slider ( 20) is fixedly connected with a moving plate (9), the end of the middle of the moving plate (9) close to the handle (18) is provided with a slide bar (5), and the top of the moving plate (9) is provided with a second slide slot (22), the inside of the second chute (22) of the slider (5) slides, and the end of the slider (5) away from the handle (18) is fixedly connected with the first slider (4), The first slider (4) slides on the bottom end of the second chute (22), and the top end of the first slider (4) is fixedly connected with an eraser (6), and the first slider (4) One end of the first spring (8) is fixedly connected to the first spring (8), and the other end of the first spring (8) is fixedly connected to the side of the second chute (22) away from the slide bar (5), and the supporting plate (10) A fixed plate (13) is provided on the side away from the top of the moving plate (9), and the inside of the fixed plate (13) and the moving plate (9) are connected to both sides of the bottom of the analysis plate body (7). Fourth springs (23) are fixedly connected to both sides of the bottom ends of the fixed plate (13) and the movable plate (9). 2.根据权利要求1所述的一种建筑工程造价分析装置,其特征在于:所述固定器(12)靠近第三弹簧(21)的一端滑动在滑动柱(3)上的槽内,所述固定器(12)靠近固定套(2)的一端滑动在固定套(2)上的通孔(11)的内部。2. A construction cost analysis device according to claim 1, characterized in that: the end of the fixer (12) close to the third spring (21) slides in the groove on the sliding column (3), so The end of the retainer (12) close to the fixed sleeve (2) slides inside the through hole (11) on the fixed sleeve (2). 3.根据权利要求2所述的一种建筑工程造价分析装置,其特征在于:所述托板(10)顶端远离把手(18)的一侧分别安装有辅助工具(14),辅助工具(14)包括笔筒和档案夹。3. A construction cost analysis device according to claim 2, characterized in that auxiliary tools (14) are respectively installed on the side of the top of the supporting plate (10) away from the handle (18), and the auxiliary tools (14 ) including pen holder and file holder. 4.根据权利要求3所述的一种建筑工程造价分析装置,其特征在于:所述第二滑块(20)滑动在第一滑槽(19)上,所述拉杆(15)在第一滑槽(19)上水平移动。4. A construction cost analysis device according to claim 3, characterized in that: the second slider (20) slides on the first chute (19), and the pull rod (15) is on the first Move horizontally on the chute (19). 5.根据权利要求4所述的一种建筑工程造价分析装置,其特征在于:所述限位板(17)设置在托板(10)远离第二滑块(20)的一侧,且限位板(17)对拉杆(15)进行限位。5. A construction cost analysis device according to claim 4, characterized in that: the limiting plate (17) is set on the side of the supporting plate (10) away from the second slider (20), and limits The position plate (17) limits the pull rod (15). 6.根据权利要求5所述的一种建筑工程造价分析装置,其特征在于:所述第二滑槽(22)和第一滑块(4)以及滑杆(5)均成T型。6 . The construction cost analysis device according to claim 5 , characterized in that: the second chute ( 22 ), the first slider ( 4 ) and the slider ( 5 ) are all T-shaped. 7.根据权利要求6所述的一种建筑工程造价分析装置,其特征在于:所述第四弹簧(23)设置在分析板本体(7)的底端,所述移动板(9)和固定板(13)的内侧在分析板本体(7)的底端分别设置有固定块。7. A construction cost analysis device according to claim 6, characterized in that: the fourth spring (23) is set at the bottom of the analysis board body (7), and the moving board (9) and the fixed The inner side of the board (13) is respectively provided with fixing blocks at the bottom end of the analysis board body (7). 8.根据权利要求7所述的一种建筑工程造价分析装置,其特征在于:所述板擦(6)与分析板本体(7)靠近把手(18)的一侧紧密贴合,所述第一弹簧(8)在第二滑槽(22)的内部。8. A construction cost analysis device according to claim 7, characterized in that: the eraser (6) is in close contact with the side of the analysis board body (7) close to the handle (18), and the first The spring (8) is inside the second chute (22).
CN202210781589.8A 2022-07-05 2022-07-05 Building engineering cost analytical equipment Pending CN115251622A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210781589.8A CN115251622A (en) 2022-07-05 2022-07-05 Building engineering cost analytical equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210781589.8A CN115251622A (en) 2022-07-05 2022-07-05 Building engineering cost analytical equipment

Publications (1)

Publication Number Publication Date
CN115251622A true CN115251622A (en) 2022-11-01

Family

ID=83763668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210781589.8A Pending CN115251622A (en) 2022-07-05 2022-07-05 Building engineering cost analytical equipment

Country Status (1)

Country Link
CN (1) CN115251622A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN210295838U (en) * 2019-10-31 2020-04-10 姬桂珍 Data panel that building engineering cost was used
CN211106579U (en) * 2019-12-09 2020-07-28 吕效国 A construction project cost analysis device
CN214705372U (en) * 2021-06-08 2021-11-12 刘鹏 Building engineering cost analytical equipment
CN215583572U (en) * 2021-08-05 2022-01-21 康伟 Building engineering cost analytical equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN210295838U (en) * 2019-10-31 2020-04-10 姬桂珍 Data panel that building engineering cost was used
CN211106579U (en) * 2019-12-09 2020-07-28 吕效国 A construction project cost analysis device
CN214705372U (en) * 2021-06-08 2021-11-12 刘鹏 Building engineering cost analytical equipment
CN215583572U (en) * 2021-08-05 2022-01-21 康伟 Building engineering cost analytical equipment

Similar Documents

Publication Publication Date Title
CN115251622A (en) Building engineering cost analytical equipment
CN112773089B (en) Indoor design drawing assistor
CN120063931A (en) A cell-phone screen compressive resistance testing arrangement for cell-phone screen
CN206147172U (en) A glass slide that is convenient to fix for blood testing
CN211454981U (en) A kind of English teaching auxiliary device
CN210944707U (en) A new type of mobile lifting device
CN218014383U (en) Cleaning device for solar photovoltaic equipment
CN214493892U (en) Dyeing kit
CN209813536U (en) Multimode english teaching device of english teaching
CN216253429U (en) High-precision epoxy chip mounter convenient to overhaul
CN221958475U (en) Slide rail screen with accurate positioning control of slide rail
CN218875402U (en) Automobile maintenance equipment management cabinet with dustproof function
CN216830990U (en) Belt type orthogonal manipulator with horizontal movement of X axis and vertical movement of Z axis
CN114871959A (en) Rotary positioning frame for medical equipment maintenance
CN221715249U (en) A cleaning fixture for optical glass of electronic equipment
CN111990941A (en) Hand-washing-free mop squeezing barrel set
CN219370270U (en) A book inquiry device
CN219115974U (en) Equipment frame protection holding mechanism
CN221493391U (en) A projection screen
CN217529039U (en) A sensor inner core side needle looper device
CN218364726U (en) Instrument is got to horizontal lens clamp
CN217994505U (en) Bridge load stability test recorder
CN221835176U (en) Blackboard eraser convenient for scrubbing blackboard
CN217371752U (en) Frock of thickness of polishing convenient to adjust
CN224072954U (en) Mobile phone backlight source with dustproof function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20221101

RJ01 Rejection of invention patent application after publication