- CN115233881B CN115233881B CN202210976501.8A CN202210976501A CN115233881B CN 115233881 B CN115233881 B CN 115233881B CN 202210976501 A CN202210976501 A CN 202210976501A CN 115233881 B CN115233881 B CN 115233881B
- Authority
- CN
- China
- Prior art keywords
- ceiling
- house
- floor
- transportation
- hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/43—Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/04—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
- E04G21/28—Safety or protective measures preventing damage to building parts or finishing work during construction against unfavourable weather influence
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/24—Structural elements or technologies for improving thermal insulation
- Y02A30/244—Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model provides a house die carrier area ceiling structure, includes the die carrier body, and the die carrier body includes fixed floor and activity floor, has all designed the ceiling in the top of fixed floor and activity floor, and wherein the ceiling of fixed floor top adopts the mill to preset the integration, and the ceiling of activity floor top is the field installation. According to the house die set with the ceiling structure, the ceiling is preset above the fixed floor, so that the top of the house die set is not empty any more, and in the mounting process of the house die set, even if rain suddenly falls, rainwater can be shielded through the preset ceiling, so that the interior of the die set is prevented from being showered; the adaptability of the house mold frame installation is improved; meanwhile, the ceiling hooks are arranged on the lower surface of the movable floor of each house die carrier, and when the movable floor is installed, the ceilings in the lower house die carrier can be quickly hung on the ceiling hooks on the movable floor above, so that the installation speed of ceilings at other positions is higher, and the efficiency is higher.
Description
Technical Field
The invention relates to the technical field of assembled buildings, in particular to a house formwork belt ceiling structure.
Background
The assembled house structure is widely accepted, and compared with the common house structure, the assembled house structure has the advantages of strong environmental adaptability, high construction speed, easy disassembly and the like. The fabricated building structure is generally based on certain standardized unit components and is quickly spliced into buildings with different functions and shapes by a series of flexible combinations of the unit components. In the prior art, a house formwork structure (which can be simply called a house formwork or a formwork) is taken as a unit component of a common assembled house structure, for example, CN214884328U discloses a formwork structure, the formwork comprises a column body, a beam body and corner pieces arranged between the column body and the beam body, a bottom plate is arranged at the bottom of the formwork, a movable plate is arranged at one side of the formwork, and the movable plate can be turned over and used as a floor; the use of a scaffold structure is also involved in another solution such as CN114109087 a. In the technical schemes, the top of the formwork structure is empty, and when the formwork is used for building houses, a ceiling structure is additionally arranged on the top of the formwork, so that the workload of field decoration is increased, the steps of installing ceilings are complex, and the ceiling installation speed is low; in addition, because the top of the existing die carrier is empty, if raining, the inner structure of the die carrier in a house is easy to be wetted by rainwater during installation, so that the die carrier is not suitable for being assembled in rainy and snowy days, and the installation adaptability of the die carrier is reduced to a certain extent.
Therefore, the present application aims to provide a ceiling-mounted house form, which can directly integrate a part of the ceiling onto the top of the house form when the house form is produced in a factory, namely, the ceiling is preassembled on the house form, so that the workload of installing the ceiling on site is reduced, and the ceiling installation efficiency is improved.
Disclosure of Invention
The invention aims to overcome the defects in the prior art and provide a house formwork with a ceiling structure, wherein the ceiling is preset above a fixed floor during factory production; when in field installation, the ceiling can be rapidly installed above the movable floor, so that the workload of subsequently installing the ceiling is reduced, the ceiling is rapidly and conveniently installed, and the assembly efficiency is improved.
The technical scheme of the invention is as follows: the utility model provides a house die carrier area ceiling structure, includes the die carrier body, and the die carrier body includes fixed floor and activity floor, has all designed the ceiling in the top of fixed floor and activity floor, and wherein the ceiling of fixed floor top adopts the mill to preset the integration, and the ceiling of activity floor top is the field installation.
Further, the lower surface of the movable floor is provided with a ceiling seat, and a ceiling hook is hung on the ceiling seat and used for fixing a ceiling.
Further, the upper end of the ceiling hook is connected with the ceiling seat, and the lower end of the ceiling hook is provided with two symmetrical hook parts which are respectively used for fixing two adjacent ceilings; the ceiling hook may be used to secure both a pre-set ceiling and a field-installed ceiling.
Further, the die carrier body comprises a beam body, and a ceiling beam hook for supporting a ceiling is arranged on the beam body.
Further, the ceiling is rectangular, and grooves are formed in two end faces in the length direction of the ceiling and are used for being matched with ceiling hooks or ceiling beam grooves, so that the whole ceiling is fixed.
Further, both end surfaces in the width direction of the ceiling are respectively provided with a convex portion or a concave portion, and the convex portion is adapted to be fitted to the concave portion of the adjacent ceiling, and the concave portion is adapted to be fitted to the convex portion of the adjacent ceiling.
Further, the ceiling is a rock wool sandwich panel structure. The rock wool sandwich board structure is a structure in which rock wool is filled between two layers of metal plates, and has fireproof, heat-preserving and heat-insulating properties.
Further, the ceiling structure further comprises a conveying member, the conveying member is used for fixing and fixing the ceiling above the floor slab when the house die carrier is conveyed or installed, and the conveying member is removed after the house die carrier is installed and closed.
Further, the transportation piece includes transportation horizontal pole and transportation montant, transportation montant perpendicular to fixed floor sets up, and transportation horizontal pole is installed at the top of transportation montant, and transportation horizontal pole is parallel with fixed floor, and the top of transportation horizontal pole bears the ceiling.
Furthermore, a gap of 10-120mm is arranged between the ceiling in one house die carrier and the fixed floor or the movable floor in the other house die carrier right above the ceiling, so that a relative hydropower line can be arranged between the floor and the ceiling, and meanwhile, the gap can reduce noise transmitted by the floor above, so that the noise in a room is smaller, quieter and more comfortable environment is provided.
Compared with the prior art, the invention has the beneficial effects that: the ceiling is preset above the fixed floor, namely, the ceiling is integrated at the top of the die carrier during factory production, so that the top of the die carrier is not empty any more, and the die carrier can shield rainwater through the preset ceiling even if suddenly rained during installation, thereby preventing the interior of the die carrier from being showered; the adaptability of the house mold frame installation is improved; meanwhile, the ceiling hooks are arranged on the lower surface of the movable floor of each house die carrier, and when the movable floor is installed, the ceiling in the lower house die carrier can be quickly hung on the ceiling hooks on the movable floor above, so that the installation speed of the ceiling is high, and the efficiency is high.
Drawings
FIG. 1 is a schematic perspective view of a house frame in embodiment 1 of the present invention;
fig. 2 is a schematic view of the structure of the movable floor of the house frame in embodiment 1 of the present invention when opened;
FIG. 3 is a schematic view showing a three-dimensional structure of the room mold frame in example 1 of the present invention when the room mold frame is assembled;
FIG. 4 is a schematic view of the construction of the atrial frame of FIG. 3 with the second layer omitted;
fig. 5 is a schematic cross-sectional view of the ceiling in embodiment 1 of the present invention, wherein a) is a schematic longitudinal cross-sectional view, and b) is a schematic transverse cross-sectional view;
fig. 6 is a schematic view of the structure of the embodiment 1 of the present invention when two adjacent ceilings are spliced;
FIG. 7 is a schematic view of the ceiling in example 1 of the present invention when the ceiling is fixed to a fixed floor or a movable floor by a ceiling hook;
fig. 8 is a schematic view of the ceiling board in example 1 of the present invention when connected to a girder in a formwork by a ceiling girder hook;
in the figure: 1-fixed floors, 2-movable floors, 3-ceilings, 31-preset ceilings, 32-movable ceilings, 301-grooves, 302-concave parts, 303-convex parts, 4-long beams, 5-short beams, 6-upright posts, 7-transportation cross bars, 8-transportation vertical bars, 9-ceiling seats, 10-ceiling hooks, 11-ceiling beam hooks and 12-sealant; 101-103 are all fixed floors, 201-203 are all movable floors, and 401-403 are all long beams.
Detailed Description
The present invention will be described in further detail with reference to specific examples, wherein methods or functional elements not specifically described are prior art.
Example 1
As shown in fig. 1-8, the present embodiment is a house formwork with ceiling structure, comprising a formwork body, the formwork body comprises a fixed floor slab 1 and a movable floor slab 2, and ceilings are designed above the fixed floor slab 1 and the movable floor slab 2, wherein the ceiling above the fixed floor slab 1 is a preset ceiling 31, which is integrated by factory preset, and the ceiling above the movable floor slab 2 is a movable ceiling 32, which is installed on site.
In this embodiment, a ceiling base 9 is disposed on the lower surface of the movable floor 2, and a ceiling hook 10 is hung on the ceiling base 9, where the ceiling hook 10 is used for fixing a ceiling. The upper end of the ceiling hook 10 is connected with the ceiling seat 9, and the lower end is provided with two symmetrical hook parts which can be used for fixing or connecting the preset ceiling 31 and the movable ceiling 32 at the same time.
In this embodiment, the formwork body includes a column 6 and a beam body, wherein the beam body includes a long beam 4 and a short beam 5, and a ceiling beam hook 11 for supporting a ceiling is provided on the beam body. The upright posts 6 are arranged in parallel in a rectangular shape, and two ends of the long beam 4 and the short beam 5 are respectively and fixedly connected to the upright posts 6, so that the die carrier is in a cube shape. The fixed floor 1 sets up in the lower surface of cube, presets the ceiling 31 and fixes the upper surface at the cube, and movable floor 2 is located one side of cube, and the downside and the die carrier of movable floor 2 are articulated for movable floor 2 can overturn outside, and movable floor 2 after the upset can be with fixed floor 1 parallel and level.
In this embodiment, the movable ceilings 32 and the preset ceilings 31 are formed by splicing a plurality of rectangular flat plates, specifically, the ceilings adopt a rock wool sandwich plate structure, and the rock wool sandwich plate structure is a structure in which rock wool is filled between two layers of metal plates, and has fireproof, heat-insulating and heat-insulating properties. As shown in fig. 5, in each ceiling, grooves 301 are provided on both end surfaces in the longitudinal direction (longitudinal direction), and the grooves 301 are used for being matched with the hooks 10 or the furrows to fix the whole ceiling; the convex portion 303 or the concave portion 302 is provided on both end surfaces in the width direction (lateral direction) of the ceiling. As shown in fig. 6, the convex portion 303 of one ceiling is adapted to be coupled with the concave portion 302 of an adjacent ceiling, and the concave portion 302 of one ceiling is adapted to be coupled with the convex portion 303 of an adjacent ceiling, thereby achieving lateral arrangement of the ceilings. Sealant 12 may be filled at the connection structure of two adjacent ceilings to increase the insulation effect.
In this embodiment, the ceiling structure further includes a transporting member, which plays a role in fixing the preset ceiling 31 during transportation or installation of the house frame, and is removed after the house frame is installed and closed. The transportation piece includes transportation horizontal pole 7 and transportation montant 8, transportation montant 8 perpendicular to fixed floor 1 sets up, and transportation horizontal pole 7 is installed at the top of transportation montant 8, and transportation horizontal pole 7 is parallel with fixed floor 1, and the top of transportation horizontal pole 7 bears the ceiling. The transportation piece is adopted because when only one house die carrier is arranged, one end of the preset ceiling 31 can be fixed on the long beam 4 on one side of the house die carrier through the ceiling beam hook 11, but the house die carrier is not provided with the long beam 4 on the other corresponding side, so that the other end of the preset ceiling 31 can not be fixed, and only the transportation piece can be arranged to temporarily fix the preset ceiling 31. As shown in fig. 3, when a plurality of house die frames are assembled, a second house die frame is arranged right above a first house die frame, a third house die frame is arranged on the left side of the first house die frame, after the movable floor 2 of the second house die frame is overturned and installed, ceiling boards in the first house die frame can be fixed by using ceiling bases 9 and ceiling hooks 10 on the upper movable floor 2, and at the moment, the transportation cross bars 7 and the transportation vertical bars 8 can be removed.
The specific connection modes of the movable ceilings 32 and the preset ceilings 31 with the house die frames are specifically described below, for convenience of description, the fixed floor slabs 1 in the first house die frame, the second house die frame and the third house die frame are respectively marked as 101, 102 and 103, the movable floor slabs 2 in the first house die frame, the second house die frame and the third house die frame are respectively marked as 201, 202 and 203, and the long beams 4 in the first house die frame, the second house die frame and the third house die frame are respectively marked as 401, 402 and 403. The specific structure that the adjacent ends of the movable ceiling 32 and the preset ceiling 31 are fixed through the ceiling base 9 and the ceiling hook 10 is shown in fig. 7, the movable floor 202 of the second house die frame is provided with the ceiling base 9, the ceiling hook 10 is hung on the ceiling base 9, the lower end of the ceiling hook 10 is provided with two symmetrical hook parts, one hook part is matched with a groove 301 on one side of the preset ceiling 31, the other hook part is matched with the groove 301 on one side of the movable ceiling 32, and a gap between the preset ceiling 31 and the movable ceiling 32 is filled through sealant 12. The concrete connection structure of one side of the preset ceiling 31 or the movable ceiling 32 and the long beam 4 in the house frame is shown in fig. 8, the long beam 44 is provided with a ceiling beam hook 11, the ceiling beam hook 11 is a metal sheet with a plurality of bends, one end of the metal is fixed with the long beam 4, and the other end of the metal can extend into a groove 301 at the side of the preset ceiling 31 or the movable ceiling 32 and support the corresponding ceiling.
In this embodiment, by setting the length of the ceiling hook 10, a gap of about 100mm exists between the ceiling in the first house frame and the fixed floor 1 or the movable floor 2 located directly above it. The water and electricity lines can be arranged between the floor and the ceiling, and the ceiling can also block uneven structures (such as joists and the like) on the lower surface of the floor, so that when a user observes from the room, the whole ceiling is smoother, the user feels more comfortable, meanwhile, the gap can reduce noise transmitted by the floor above, the noise in a room below is smaller, and the living comfort is improved.
The above is only a part of embodiments of the present invention, and it is not intended to limit the present invention, and it is obvious to those skilled in the art that the present invention can be combined and modified in various technical features, and it is intended to include the present invention in the scope of the present invention without departing from the spirit and scope of the present invention.
Claims (7)
1. The utility model provides a room die carrier takes ceiling structure, includes the die carrier body, and the die carrier body includes fixed floor and activity floor, its characterized in that: the ceilings above the fixed floor and the movable floor are preset in a factory, and the ceilings above the movable floor are installed on site;
the lower surface of the movable floor slab is provided with a ceiling seat, a ceiling hook is hung on the ceiling seat, and the ceiling hook is used for fixing a ceiling;
the upper end of the ceiling hook is connected with the ceiling seat, and the lower end of the ceiling hook is provided with two symmetrical hook parts which are respectively used for fixing two adjacent ceilings;
the die carrier body comprises a beam body, and a ceiling beam hook for supporting a ceiling is arranged on the beam body.
2. The atrial frame ceiling structure of claim 1 wherein: the ceiling is rectangular, grooves are formed in two end faces of the length direction of the ceiling, and the grooves are used for being matched with ceiling hooks or ceiling beam grooves to fix the ceiling.
3. The atrial frame ceiling structure of claim 1 wherein: the two end surfaces of the width direction of the ceilings are respectively provided with a convex part or a concave part, the convex parts are used for being matched and connected with the concave parts of the adjacent ceilings, and the concave parts are used for being matched and connected with the convex parts of the adjacent ceilings.
4. A house mould frame ceiling structure according to any one of claims 1-3, characterized in that: the ceiling is of a rock wool sandwich board structure.
5. The atrial frame ceiling structure of claim 1 wherein: the house formwork is characterized by further comprising a conveying piece, wherein the conveying piece is used for fixing a ceiling above the fixed floor when the house formwork is conveyed or installed, and the conveying piece is removed after the installation is completed.
6. The atrial frame ceiling structure of claim 5 wherein: the transportation piece includes transportation horizontal pole and transportation montant, transportation montant perpendicular to fixed floor, transportation horizontal pole are installed at the top of transportation montant, and transportation horizontal pole is parallel with fixed floor, and the top of transportation horizontal pole bears the ceiling.
7. The atrial frame ceiling structure of claim 1 wherein: a gap of 10-120mm is arranged between the ceiling in one house mould frame and the fixed floor or the movable floor in the other house mould frame right above the ceiling.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210976501.8A CN115233881B (en) | 2022-08-15 | 2022-08-15 | House mould frame with ceiling structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210976501.8A CN115233881B (en) | 2022-08-15 | 2022-08-15 | House mould frame with ceiling structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN115233881A CN115233881A (en) | 2022-10-25 |
| CN115233881B true CN115233881B (en) | 2023-06-20 |
Family
ID=83679598
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202210976501.8A Active CN115233881B (en) | 2022-08-15 | 2022-08-15 | House mould frame with ceiling structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115233881B (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20250121579A (en) * | 2023-10-31 | 2025-08-12 | 브로드 호론 컴퍼니 리미티드 | The overall structure, assembly, and on-site installation of a modular house |
Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2929016Y (en) * | 2006-06-09 | 2007-08-01 | 钟光健 | Easy mounting and dimantling new ceiling |
| WO2013120136A1 (en) * | 2012-02-17 | 2013-08-22 | Lifting Point Pty Ltd | Preformed formwork for forming concrete floor slab for a height adjustable shipping container building structure |
| CN203782958U (en) * | 2014-03-10 | 2014-08-20 | 林汉 | Lay-in and double hook-in type T-shaped keel ceiling |
| CN204645371U (en) * | 2015-05-11 | 2015-09-16 | 汤溪蔚 | A kind of extension takes formula smallpox and ceiling system |
| KR101943552B1 (en) * | 2018-04-04 | 2019-01-29 | 이호준 | Movable building |
| CN209494044U (en) * | 2018-09-17 | 2019-10-15 | 中建集成房屋有限公司 | A kind of reassembling type die carrier structure house |
| KR20190127408A (en) * | 2018-05-04 | 2019-11-13 | 김효상 | Container-typed booth for indoor and outdoor exhibition |
| CN112814421A (en) * | 2020-11-27 | 2021-05-18 | 中国十七冶集团有限公司 | Assembled container house convenient to assemble and disassemble and construction method thereof |
| CN112962858A (en) * | 2021-02-19 | 2021-06-15 | 深圳市千福新材料科技有限公司 | Quick ceiling mounting structure and ceiling mounting method |
| CN113863499A (en) * | 2021-10-12 | 2021-12-31 | 张跃 | Connecting structure of end frame and member |
| CN215977743U (en) * | 2021-10-12 | 2022-03-08 | 张跃 | Die carrier movable floor connection structure |
| US11276323B1 (en) * | 2016-10-18 | 2022-03-15 | Jahnke & Sons Construction, Inc. | Modular building fire fighting simulator |
-
2022
- 2022-08-15 CN CN202210976501.8A patent/CN115233881B/en active Active
Patent Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2929016Y (en) * | 2006-06-09 | 2007-08-01 | 钟光健 | Easy mounting and dimantling new ceiling |
| WO2013120136A1 (en) * | 2012-02-17 | 2013-08-22 | Lifting Point Pty Ltd | Preformed formwork for forming concrete floor slab for a height adjustable shipping container building structure |
| CN203782958U (en) * | 2014-03-10 | 2014-08-20 | 林汉 | Lay-in and double hook-in type T-shaped keel ceiling |
| CN204645371U (en) * | 2015-05-11 | 2015-09-16 | 汤溪蔚 | A kind of extension takes formula smallpox and ceiling system |
| US11276323B1 (en) * | 2016-10-18 | 2022-03-15 | Jahnke & Sons Construction, Inc. | Modular building fire fighting simulator |
| KR101943552B1 (en) * | 2018-04-04 | 2019-01-29 | 이호준 | Movable building |
| KR20190127408A (en) * | 2018-05-04 | 2019-11-13 | 김효상 | Container-typed booth for indoor and outdoor exhibition |
| CN209494044U (en) * | 2018-09-17 | 2019-10-15 | 中建集成房屋有限公司 | A kind of reassembling type die carrier structure house |
| CN112814421A (en) * | 2020-11-27 | 2021-05-18 | 中国十七冶集团有限公司 | Assembled container house convenient to assemble and disassemble and construction method thereof |
| CN112962858A (en) * | 2021-02-19 | 2021-06-15 | 深圳市千福新材料科技有限公司 | Quick ceiling mounting structure and ceiling mounting method |
| CN113863499A (en) * | 2021-10-12 | 2021-12-31 | 张跃 | Connecting structure of end frame and member |
| CN215977743U (en) * | 2021-10-12 | 2022-03-08 | 张跃 | Die carrier movable floor connection structure |
Also Published As
| Publication number | Publication date |
|---|---|
| CN115233881A (en) | 2022-10-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203393894U (en) | Thin-wall profile steel compounded external wallboard | |
| CN104947788A (en) | DGC modular fabricated building system and building method thereof | |
| CN111236496A (en) | Assembled decorates integrative sound insulation fire wall body design structure | |
| US20040040234A1 (en) | Constructional element, building system and method of construction | |
| CN104179250A (en) | Light-board house system and construction method thereof | |
| CN115233881B (en) | House mould frame with ceiling structure | |
| CN110080457B (en) | External wall panel and vertical connection structure | |
| CN207633813U (en) | Assembled workshop | |
| CN107217783A (en) | A kind of overall Side fascia of assembled | |
| CN110792194B (en) | An inorganic keel purlin assembled exterior wall | |
| CN113356424A (en) | Construction method for prefabricating external wall panel | |
| JPH07216980A (en) | Method of assembling bamboo unit house | |
| CN205637264U (en) | Integral prefabricated floor plate of large tracts of land and sub -assembly thereof | |
| CN217379363U (en) | Fabricated building wall system | |
| CN2931627Y (en) | Frame and wall plate combined building | |
| CN211949058U (en) | Design structure of a prefabricated decorative integrated sound insulation firewall body | |
| CN215670511U (en) | Prefabricated internal partition board | |
| CN204343536U (en) | One can light load-bearing lumber and assembled wall board thereof and house | |
| CN210976300U (en) | Prefabricated heat preservation wallboard of assembly type structure | |
| KR101320565B1 (en) | Module unit for modular building and manufactureing method thereof | |
| RU76042U1 (en) | FRONT BLOCK | |
| CN1279324A (en) | Technology for building house by in-situ making foamed cement structures | |
| CN222878966U (en) | Assembled antidetonation wall structure | |
| CN215442880U (en) | Prefabricated external wallboard connected node structure | |
| CN206707118U (en) | A kind of assembled entirety Side fascia |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20240403 Address after: 414600 Office Building B9, Kejiancheng, Yuanda Road, Wenxing Street, Xiangyin County, Yueyang City, Hunan Province Patentee after: Yuanda Huolou Co.,Ltd. Country or region after: China Address before: Shugang Road, Lingang Industrial Zone, Wenxing Town, Xiangyin County, Yueyang City, Hunan Province Patentee before: BROAD SUSTAINABLE BUILDING CO. Country or region before: China |