Steel dome operation platform
Technical Field
The invention relates to the field of building construction, in particular to a steel dome operation platform.
Background
In the process of steel dome construction, workers are inconvenient to operate, a conventional operation platform is time-consuming and labor-consuming to build, the construction period is long, and the safety of some higher dome operation platforms is low.
Disclosure of Invention
Aiming at the problems, the invention provides the steel dome operation platform which has the advantages of convenience in operation and good safety.
The technical scheme of the invention is as follows:
the utility model provides a steel dome operation platform, is including supporting chassis, intermediate bottom plate and operation platform, the top of supporting the chassis is equipped with first telescopic link all around, the top of first telescopic link is located to the intermediate bottom plate, the top of intermediate bottom plate is equipped with the support column all around, operation platform locates the top of support column, operation platform's middle part is equipped with the lift mouth, be equipped with the elevating platform that matches with the size of lift mouth in the lift mouth, the bottom of elevating platform is equipped with the second telescopic link, the bottom of second telescopic link is connected with the top of intermediate bottom plate, be equipped with the rail on the side of operation platform and elevating platform respectively, first telescopic link and second telescopic link are respectively through motor drive.
The working principle of the technical scheme is as follows:
before the construction, first telescopic link and second telescopic link are shrink to the shortest state, constructor climbs up the intermediate bottom plate through supporting the chassis, climb up the elevating platform from the intermediate bottom plate again, the motor of opening the second telescopic link drives the elevating platform and rises to and the operation platform parallel and level, the first telescopic link of motor drive rises, rise to the position that is close to the dome and can be under construction, when the middle part position to the dome is under construction, constructor can get into the elevating platform once more, make things convenient for the constructor to be under construction through the position that promotes the elevating platform alone.
Because the middle height of dome structure is higher than the edge, the accessible is adjusted the altitude of elevating platform and is made things convenient for constructor's construction, and operation platform can only be used for the construction at dome edge, because the altitude mixture control of operation platform and elevating platform is nimble, constructor convenient operation need not frequently to change the posture operation, rail around elevating platform and the operation platform can play the guard action, and constructor climbs operation platform and need not to climb stair many times, has improved the security.
In a further technical scheme, a fence door is arranged at the fence of the lifting platform, so that constructors can conveniently go in and out.
In a further technical scheme, a right-angle stair is arranged at the joint of the second telescopic rod and the middle supporting plate, and therefore the construction personnel can conveniently go up and down.
In a further technical scheme, the lifting platform and the operation platform are respectively provided with a tool placing box, tools can be temporarily placed in the tool placing box, and the tools are prevented from accidentally falling off to hurt people.
In a further technical scheme, be equipped with the rope couple on operation platform's the rail, the rope couple is used for fixed safe rope for the construction occasion that the danger degree is high guarantees constructor's safety.
The beneficial effects of the invention are:
1. because the middle height of the dome structure is higher than the edge, the construction of constructors can be facilitated by adjusting the height of the lifting platform, the operation platform can be only used for constructing the edge of the dome, the operation platform and the lifting platform are flexible in height adjustment, the constructors are convenient to operate, frequent posture change operation is not needed, the fences around the lifting platform and the operation platform can play a protective role, and the constructors can climb the operation platform without climbing stairs for many times, so that the safety is improved;
2. a fence door is arranged at the fence of the lifting platform, so that constructors can conveniently get in and out;
3. a right-angle stair is arranged at the joint of the second telescopic rod and the middle supporting plate, so that a constructor can conveniently go up and down;
4. the lifting platform and the operation platform are respectively provided with a tool placing box, so that tools can be temporarily placed in the tool placing box, and the tools are prevented from accidentally falling to hurt people;
5. be equipped with the rope couple on operation platform's the rail, the rope couple is used for fixed safety rope for the construction occasion that danger degree is high guarantees constructor's safety.
Drawings
FIG. 1 is a schematic cross-sectional structural view of a steel dome operation platform according to an embodiment of the invention;
fig. 2 is a schematic top view of the operation platform and the lifting platform according to the embodiment of the invention.
Description of reference numerals:
1. a support chassis; 2. a middle support plate; 3. an operating platform; 31. a fence; 32. a rope hook; 4. a lifting platform; 41. a fence door; 5. a first telescopic rod; 6. a second telescopic rod; 61. a right-angle stair; 7. a support pillar; 8. a tool placement box; 9. the ladder is climbed.
Detailed Description
The embodiments of the present invention will be further described with reference to the accompanying drawings.
Example (b):
as shown in fig. 1-2, a steel dome operation platform 3, including supporting chassis 1, intermediate support plate 2 and operation platform 3, the top of supporting chassis 1 is equipped with first telescopic link 5 all around, the top of first telescopic link 5 is located to intermediate support plate 2, the top of intermediate support plate 2 is equipped with support column 7 all around, operation platform 3 locates the top of support column 7, operation platform 3's middle part is equipped with the lift mouth, be equipped with the elevating platform 4 that matches with the lift mouth size in the lift mouth, the bottom of elevating platform 4 is equipped with second telescopic link 6, the bottom of second telescopic link 6 is connected with the top of intermediate support plate 2, be equipped with rail 31 on the side of operation platform 3 and elevating platform 4 respectively, first telescopic link 5 and second telescopic link 6 are respectively through motor drive.
The working principle of the technical scheme is as follows:
before the construction, first telescopic link 5 and second telescopic link 6 are shrink to the shortest state, constructor climbs up intermediate support plate 2 through supporting chassis 1, climb up elevating platform 4 from intermediate support plate 2 again, the motor of opening second telescopic link 6 drives elevating platform 4 and rises to 3 parallel and levels with operation platform, motor drive first telescopic link 5 rises, rise to the position that is close to the dome and can be under construction, when the middle part position to the dome is under construction, constructor can get into elevating platform 4 once more, make things convenient for constructor's construction through the position that promotes elevating platform 4 alone.
Because the middle height of dome structure is higher than the edge, the accessible is adjusted the height of elevating platform 4 and is made things convenient for constructor's construction, and operation platform 3 can only be used for the construction at dome edge, because operation platform 3 and elevating platform 4's altitude mixture control is nimble, constructor convenient operation need not frequently to change the posture operation, rail 31 around elevating platform 4 and the operation platform 3 can play the guard action, and constructor climbs operation platform 3 and need not to climb stair many times, has improved the security.
In another embodiment, as shown in fig. 2, a fence door 41 is provided at the fence 31 of the lifting platform 4, so that the constructor can directly open the fence door 41 to enter and exit without crossing the fence 31 when entering and exiting the lifting platform 4.
In another embodiment, as shown in fig. 1, a right-angle stair 61 is arranged at the joint of the second telescopic rod 6 and the middle support plate 2, so that a constructor can conveniently go up and down.
In another embodiment, as shown in fig. 2, the tool storage boxes 8 are respectively disposed on the lifting platform 4 and the operation platform 3, so that tools can be temporarily stored in the tool storage boxes 8, and the tools can be prevented from accidentally falling down and injuring people.
In another embodiment, as shown in fig. 1 and 2, a rope hook 32 is provided on a fence 31 of the operation platform 3, and the rope hook 32 is used for fixing a safety rope for a construction site with a high risk degree to ensure the safety of constructors.
The above examples only express the specific embodiments of the present invention, and the description thereof is more specific and detailed, but not to be construed as limiting the scope of the present invention. It should be noted that various changes and modifications can be made by those skilled in the art without departing from the spirit of the invention, and these changes and modifications are all within the scope of the invention.