CN115162701A - Installation construction method of scaffold upper scaffold board and guide rail connecting structure - Google Patents

Installation construction method of scaffold upper scaffold board and guide rail connecting structure Download PDF

Info

Publication number
CN115162701A
CN115162701A CN202210750105.3A CN202210750105A CN115162701A CN 115162701 A CN115162701 A CN 115162701A CN 202210750105 A CN202210750105 A CN 202210750105A CN 115162701 A CN115162701 A CN 115162701A
Authority
CN
China
Prior art keywords
scaffold
scaffold board
guide rail
rod
tray
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210750105.3A
Other languages
Chinese (zh)
Inventor
杨乾
刘定武
姜坤
刘峥
刘璇
田钦先
张云
覃鹤
魏新山
谢博章
金成�
刘哲睿
李櫪
龙子江
田伟
李勇
程龙
杨庆祝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Original Assignee
No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group filed Critical No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Priority to CN202210750105.3A priority Critical patent/CN115162701A/en
Publication of CN115162701A publication Critical patent/CN115162701A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/28Clips or connections for securing boards

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ladders (AREA)

Abstract

The invention discloses an installation construction method of a scaffold board and guide rail connecting structure on a scaffold, which comprises the step that a tray with a reinforcing sleeve rod penetrates through the hollow interior of the bottom end of an inner vertical rod to form a plurality of fixed connecting points. When the passageway that the scaffold board formed need bear the vertical decurrent gravity of direction, the tray is worn including the hollow inside of pole setting bottom forms a plurality of fixed connection points through the reinforcing loop pole suit, has solved bottom scaffold board and inside and outside pole setting bottom fixed connection point and has had the inside and outside pole setting bottom and the not enough technical problem of bottom scaffold board fixed connection intensity of limited existence.

Description

Installation construction method of scaffold upper scaffold board and guide rail connecting structure
Technical Field
The invention relates to a mounting construction method of a scaffold upper scaffold board and guide rail connecting structure, belonging to the technical field of scaffold construction.
Background
When a high-rise building is built, a lifting scaffold (also called a lifting scaffold) is arranged on the outer vertical surface of the high-rise building to construct a supporting system for construction operation.
In an attached lifting scaffold with a Chinese patent publication number of CN214169871U, the disclosed technology is as follows: bottom scaffold boards are arranged at the bottom ends of the inner and outer vertical rods; although, bottom scaffold board can be connected with the fixed formation of inside and outside pole setting, and general bottom scaffold board thickness is not thick, and bottom scaffold board is limited with inside and outside pole setting bottom fixed connection point, but, the scaffold frame is when using, and the bottom scaffold board generally need bear the vertical decurrent gravity of direction as the important passageway of scaffold frame, has inside and outside pole setting bottom and the not enough technical problem of bottom scaffold board fixed connection intensity.
Disclosure of Invention
In order to solve the technical problem, the invention provides a mounting construction method of a scaffold upper scaffold board and guide rail connecting structure.
The invention is realized by the following technical scheme.
The invention provides a mounting construction method for a scaffold upper scaffold board and guide rail connecting structure, which comprises the step that a tray with a reinforcing sleeve rod penetrates through the hollow interior of the bottom end of an inner vertical rod to form a plurality of fixed connecting points.
Before the step is carried out, the method further comprises the following steps: the method comprises the following steps: the falling protector is matched with the guide rail, the falling protector is placed on the ground, the inner vertical rod is fixedly connected with the guide rail through the connecting rod, and the inner vertical rod is parallel to the ground.
After the step is carried out, the method further comprises the following steps: the set-square and interior pole setting fixed connection, the set-square stretches out in to the intermediate space in the scaffold board, and the scaffold board bottom is installed on the tray and both sides and set-square, limiting plate contact spacing.
Further comprising: the middle layer scaffold board is fixedly connected with the inner upright stanchion through the cross bar.
Further comprising: the two ends of the outer vertical rod are correspondingly and fixedly connected with the cross rod and the limiting plate.
Scaffold board and guide rail connection structure on the scaffold frame includes:
the two ends of the inner vertical rod are communicated with the inside of the hollow inner vertical rod;
tray, tray middle part are fixed with the reinforcement loop bar, and the hollow inside of pole setting bottom forms a plurality of fixed connection points including the reinforcement loop bar suit is worn.
A limiting plate is fixed to the end portion of the tray, and the spacing width between the limiting plate and the reinforcing sleeve rod is used for mounting a scaffold board.
The scaffold board is arranged on the tray between the limiting plate and the reinforcing sleeve rod and is limited by the limiting plate and the reinforcing sleeve rod.
The scaffold is characterized by further comprising a triangular plate, wherein two sides of the triangular plate are correspondingly fixed with the scaffold plate and the inner upright rod.
The set square extends out to the middle space.
The scaffold board is characterized by also comprising a middle-layer scaffold board arranged on the inner upright rod above the scaffold board.
The middle layer scaffold board is fixedly connected with the inner vertical rod through a cross rod.
The cross rod and the limiting plate are fixedly connected in a reinforcing mode through the outer vertical rod.
Still include the guide rail, the guide rail is through connecting rod and interior pole setting fixed connection.
The falling protector is connected with the guide rail in a lifting and falling prevention matching manner.
The invention has the beneficial effects that: when the passageway that the scaffold board formed need bear the vertical decurrent gravity of direction, the tray is worn including the hollow inside of pole setting bottom forms a plurality of fixed connection points through the reinforcing loop pole suit, has solved bottom scaffold board and inside and outside pole setting bottom fixed connection point and has had the inside and outside pole setting bottom and the not enough technical problem of bottom scaffold board fixed connection intensity of limited existence.
Drawings
FIG. 1 is a schematic diagram of the present invention after joining;
FIG. 2 is a schematic view of the position of the present invention during the attachment installation work;
in the figure: 1-a guide rail; 2-a connecting rod; 3-inner vertical rod; 4-scaffold board; 5-a tray; 51-a reinforcing sleeve rod; 52-limiting plate; 6-a set square; 7-middle layer scaffold board; 71-a cross-bar; 72-outer vertical rods; 8-a safety catch; 9-ground.
Detailed Description
The technical solution of the present invention is further described below, but the scope of the claimed invention is not limited to the described.
As shown in fig. 1-2.
The utility model provides a scaffold frame is gone up scaffold board and guide rail connection structure, include:
when in installation, the inner vertical rod 3 is fixedly welded with the guide rail 1 through the connecting rod 2, and the inner vertical rod 3 is square steel with two ends communicated with the inside;
a tray 5 for installing scaffold board 4, tray 5 middle part welded fastening has reinforcing loop bar 51, and reinforcing loop bar 51 suit is worn including 3 hollow insides in bottom of pole setting and is fixed through a plurality of screws and form a plurality of fixed connection points, and tray 5 has carried out the increase with the tie point of interior pole setting 3.
After scaffold board 4 is installed on tray 5, when the passageway that scaffold board 4 formed need bear the vertical decurrent gravity of direction, tray 5 passed including the suit of enhancement loop bar 51 forms a plurality of fixed connection points in the hollow inside in 3 bottoms of pole setting including, has solved bottom scaffold board and the limited technical problem who has inside and outside pole setting bottom and bottom scaffold board fixed connection intensity not enough of pole setting bottom and bottom scaffold board that exists of interior outer pole setting bottom fixed connection point.
A limiting plate 52 is welded and fixed on the end part of the tray 5 far away from the reinforcing sleeve rod 51, and the spacing width between the limiting plate 52 and the reinforcing sleeve rod 51 is used for installing the scaffold board 4.
The scaffold board 4 is arranged on the tray 5 between the limiting board 52 and the reinforcing sleeve rod 51, and the limiting board 52 and the reinforcing sleeve rod 51 limit the scaffold board 4.
Still include set square 6, set square 6 both sides are corresponding fixed through screw and scaffold board 4, interior pole setting 3, and set square 6 is used for adjusting scaffold board 4 and the interval of interior pole setting 3 to set square 6 can regard as friction loss piece. The set-square 6 stretches out in to the intermediate space and hangs, realizes the restriction piece to scaffold board 4 when taking place the displacement, guarantees the stability of scaffold board 4 on tray 5.
The scaffold board is characterized by further comprising a middle-layer scaffold board 7 arranged on the inner vertical rod 3 above the scaffold board 4, and the middle-layer scaffold board 7 is fixedly connected with the inner vertical rod 3 through a cross rod 71 in a welding mode. The cross rod 71 and the limiting plate 52 are reinforced and fixedly connected through the outer vertical rod 72 to form a whole, and the outer vertical rod 72, the cross rod 71 and the limiting plate 52 are fixedly connected through screws or welding.
Still include guide rail 1, guide rail 1 is through connecting rod 2 and interior pole setting 3 fixed connection, 2 both ends of connecting rod distribute with guide rail 1, interior pole setting 3 welded fastening are connected.
The anti-falling device 8 is connected with the guide rail 1 in a lifting and anti-falling matching manner, the anti-falling device 8 is arranged on the outer vertical surface of the high-rise building through expansion screws and the like, and the inner vertical rod 3 is connected with the guide rail 1 in a lifting and anti-falling matching manner through the anti-falling device 8 to drive the whole scaffold body to lift.
A mounting construction method for a scaffold board and guide rail connecting structure on a scaffold comprises the following steps:
the method comprises the following steps: the falling protector 8 is matched with the guide rail 1, the falling protector 8 is placed on the ground 9, the inner vertical rod 3 is fixedly connected with the guide rail 1 through the connecting rod 2, and the inner vertical rod 3 is parallel to the ground.
Step two: after the reinforcing sleeve rod 51 is fixed with the tray 5, the tray 5 with the reinforcing sleeve rod 51 penetrates through the hollow interior at the bottom end of the inner vertical rod 3 and is fixedly connected through a plurality of screws to form a plurality of fixed connection points; when the safety hook 8 is fixedly connected with the outer vertical surface of a high-rise building from the ground, the scaffold board 4 is installed on the tray 5, when a channel formed by the scaffold board 4 needs to bear the vertical downward gravity of the direction, the tray 5 is sleeved by the reinforcing sleeve rods 51 to form a plurality of fixed connection points in the hollow interior of the bottom ends of the inner vertical rods 3, and the technical problem that the fixed connection strength of the bottom scaffold board and the bottom scaffold board is insufficient due to the limited existence of the inner and outer vertical rod bottom fixed connection points is solved.
Step three: set-square 6 and interior pole setting 3 are through screw fixed connection, and set-square 6 stretches out in to the intermediate space in scaffold board 4 and hangs, and scaffold board 4 bottom is installed on tray 5 and both sides and set-square 6, limiting plate 52 contact spacing.
Step four: the middle layer scaffold board 7 is fixedly connected with the inner vertical rod 3 through a cross rod 71 in a welding way.
Step five: two ends of the outer vertical rod 72 are correspondingly fixedly connected with the cross rod 71 and the limiting plate 52 through screws or welding.

Claims (9)

1. A mounting construction method of a scaffold upper scaffold board and guide rail connecting structure is characterized by comprising the step of forming a plurality of fixed connecting points by penetrating and sleeving a tray (5) with a reinforcing sleeve rod (51) in a hollow interior at the bottom end of an inner vertical rod (3).
2. The method for installing and constructing a scaffold board and rail coupling structure according to claim 1, further comprising, before the step of: the method comprises the following steps: the falling protector (8) is matched with the guide rail (1), the falling protector (8) is placed on the ground (9), the inner vertical rod (3) is fixedly connected with the guide rail (1) through the connecting rod (2), and the inner vertical rod (3) is parallel to the ground.
3. The method for installing and constructing a scaffold board and rail coupling structure according to claim 1, further comprising, after the step of: set-square (6) and interior pole setting (3) fixed connection, set-square (6) are stretched out in to the intermediate space in scaffold board (4), and scaffold board (4) bottom is installed on tray (5) and both sides and set-square (6), limiting plate (52) contact spacingly.
4. The method of installing and constructing a scaffold upper scaffold plate and guide rail connection structure according to claim 3, further comprising: the middle layer scaffold board (7) is fixedly connected with the inner upright stanchion (3) through a cross bar (71).
5. The method of installing and constructing a scaffold upper scaffold plate and guide rail connection structure according to claim 4, further comprising: two ends of the outer vertical rod (72) are correspondingly and fixedly connected with the cross rod (71) and the limiting plate (52).
6. The method for installing and constructing the scaffold upper scaffold plate and guide rail connection structure according to claim 1, wherein the scaffold upper scaffold plate and guide rail connection structure comprises:
the two ends of the inner vertical rod (3) are communicated with the inside of the hollow inner vertical rod (3);
tray (5), tray (5) middle part is fixed with reinforcement loop bar (51), and the hollow inside of pole (3) bottom forms a plurality of fixed connection points including reinforcement loop bar (51) suit is worn.
7. The method for installing and constructing scaffold boards and guide rail connection structures according to claim 6, wherein the end of the tray (5) is fixed with a limiting plate (52), and the spacing width between the limiting plate (52) and the reinforcing sleeve rod (51) is used for installing the scaffold boards (4).
8. The mounting construction method of the scaffold upper scaffold board and guide rail connection structure according to claim 7, further comprising a scaffold board (4), wherein the scaffold board (4) is mounted on the tray (5) between the limit plate (52) and the reinforcement loop bar (51) and limited by the limit plate (52) and the reinforcement loop bar (51); the novel scaffold is characterized by further comprising a triangular plate (6), wherein two sides of the triangular plate (6) are correspondingly fixed with the scaffold board (4) and the inner upright rod (3).
9. The scaffolding scaffold board to rail coupling arrangement as claimed in claim 8, wherein the set square (6) is cantilevered inwardly of the intermediate space;
the scaffold board is characterized by also comprising a middle-layer scaffold board (7) arranged on the inner upright rod (3) above the scaffold board (4);
the middle layer scaffold board (7) is fixedly connected with the inner upright stanchion (3) through a cross bar (71);
the cross rod (71) is fixedly connected with the limiting plate (52) in a reinforcing way through the outer vertical rod (72);
the device also comprises a guide rail (1), wherein the guide rail (1) is fixedly connected with the inner vertical rod (3) through a connecting rod (2);
the falling protector is characterized by further comprising a falling protector (8), and the falling protector (8) is connected with the guide rail (1) in a lifting falling prevention matching manner.
CN202210750105.3A 2022-06-29 2022-06-29 Installation construction method of scaffold upper scaffold board and guide rail connecting structure Pending CN115162701A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210750105.3A CN115162701A (en) 2022-06-29 2022-06-29 Installation construction method of scaffold upper scaffold board and guide rail connecting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210750105.3A CN115162701A (en) 2022-06-29 2022-06-29 Installation construction method of scaffold upper scaffold board and guide rail connecting structure

Publications (1)

Publication Number Publication Date
CN115162701A true CN115162701A (en) 2022-10-11

Family

ID=83489407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210750105.3A Pending CN115162701A (en) 2022-06-29 2022-06-29 Installation construction method of scaffold upper scaffold board and guide rail connecting structure

Country Status (1)

Country Link
CN (1) CN115162701A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050072628A1 (en) * 2003-09-18 2005-04-07 Riley D. Paul Hanging scaffold support
CN105401714A (en) * 2015-10-27 2016-03-16 重庆东辰建筑机械安装工程有限公司 Attached lifting scaffold and lifting method
CN210289067U (en) * 2019-01-24 2020-04-10 陕西开友实业有限公司 Robot lifting operation platform
CN210396071U (en) * 2019-06-17 2020-04-24 深圳市焺腾科技发展有限公司 Intelligent all-steel attached lifting scaffold
CN212053664U (en) * 2020-04-08 2020-12-01 北京千引力科技发展有限公司 Scaffold upright rod base
CN114412158A (en) * 2022-02-25 2022-04-29 安徽安鼎智能科技有限公司 Aluminum alloy-steel combined attached lifting scaffold and mounting method thereof
CN216690295U (en) * 2021-11-10 2022-06-07 广东卓辉建设工程有限公司 Length-adjustable climbing frame bottom pocket rod

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050072628A1 (en) * 2003-09-18 2005-04-07 Riley D. Paul Hanging scaffold support
CN105401714A (en) * 2015-10-27 2016-03-16 重庆东辰建筑机械安装工程有限公司 Attached lifting scaffold and lifting method
CN210289067U (en) * 2019-01-24 2020-04-10 陕西开友实业有限公司 Robot lifting operation platform
CN210396071U (en) * 2019-06-17 2020-04-24 深圳市焺腾科技发展有限公司 Intelligent all-steel attached lifting scaffold
CN212053664U (en) * 2020-04-08 2020-12-01 北京千引力科技发展有限公司 Scaffold upright rod base
CN216690295U (en) * 2021-11-10 2022-06-07 广东卓辉建设工程有限公司 Length-adjustable climbing frame bottom pocket rod
CN114412158A (en) * 2022-02-25 2022-04-29 安徽安鼎智能科技有限公司 Aluminum alloy-steel combined attached lifting scaffold and mounting method thereof

Similar Documents

Publication Publication Date Title
CN114908959A (en) Climbing belt type automatic jacking system of construction integrated platform and its use method
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN114439202A (en) Thin-wall ultrahigh wall body double-side template operation platform and adjustable fixing system
CN211736309U (en) Building climbing frame lifting device
CN211736326U (en) Fabricated outer wall climbing frame for building construction
CN217652297U (en) Scaffold upper scaffold board and guide rail connecting structure
CN108678355B (en) Multi-change outer elevation one-step climbing outer frame system of super high-rise building
CN115162701A (en) Installation construction method of scaffold upper scaffold board and guide rail connecting structure
CN202990389U (en) Vertical double-frame guide rail attaching lift scaffold
CN211173007U (en) Novel tripod of encorbelmenting
CN210857952U (en) Novel attached lifting scaffold
CN108678362B (en) Fixed installation method for construction elevator and wall
CN216276814U (en) Building machine walkway plate connecting assembly
CN211647242U (en) Lifting scaffold unit
CN214828592U (en) Assembled material lifting device
CN212926984U (en) Mobile suspended operating platform
CN211622543U (en) Hanging basket control device
CN208280567U (en) The changeable alien invasion of super high-rise building once climbs outrigger system
CN223867615U (en) A high-leg suspended basket device
CN111021702A (en) Lifting Scaffolding Unit
CN220058774U (en) Split heads hanging basket suspension
CN217326377U (en) Support structure of climbing frame
CN223358688U (en) Complex special-shaped large-section ultra-high reinforced concrete inclined column construction structure
CN218338837U (en) Steel construction safety rope mounted frame
CN216276800U (en) Assembly type building external hanging rack

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20221011