CN115162579B - Three-dimensional adjustable installation structure and installation method of heavy-duty fabricated concrete exterior wall hanging panels - Google Patents

Three-dimensional adjustable installation structure and installation method of heavy-duty fabricated concrete exterior wall hanging panels Download PDF

Info

Publication number
CN115162579B
CN115162579B CN202210741342.3A CN202210741342A CN115162579B CN 115162579 B CN115162579 B CN 115162579B CN 202210741342 A CN202210741342 A CN 202210741342A CN 115162579 B CN115162579 B CN 115162579B
Authority
CN
China
Prior art keywords
shaped
wallboard
wall panel
wall
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210741342.3A
Other languages
Chinese (zh)
Other versions
CN115162579A (en
Inventor
苏川
徐文龙
贺飞
宋芃
王惠朝
戴超
王丹
赵云鹏
罗宏
彭思渊
韩旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Bureau Group Co Ltd
Original Assignee
China Construction Third Bureau Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Construction Engineering Co Ltd filed Critical China Construction Third Bureau Construction Engineering Co Ltd
Priority to CN202210741342.3A priority Critical patent/CN115162579B/en
Publication of CN115162579A publication Critical patent/CN115162579A/en
Application granted granted Critical
Publication of CN115162579B publication Critical patent/CN115162579B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/885Curtain walls comprising a supporting structure for flush mounted glazing panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/90Curtain walls comprising panels directly attached to the structure
    • E04B2/94Concrete panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • E04G21/185Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a three-dimensional adjusting and installing structure and an installing method of a heavy assembly type concrete outer wall hanging plate. When heavy assembled concrete wallboard joins externally and installs construction, if meet wallboard hoist and mount and accomplish the back positioning deviation, roughness all do not accord with the standard requirement, adopt vertical thrustor cooperation to push away the connecting piece and carry out vertical direction fine setting, adopt the horizontal thrustor of installation buries the piece position to carry out wallboard and to outdoor direction fine setting, adopt drawknot device and anchor ring subassembly mutual traction mode to carry out wallboard and to indoor direction, horizontal left and right directions fine setting, loosen and fasten through the nut of wallboard upper portion L type screw rod and carry out wallboard roughness fine setting, solve heavy wallboard three-dimensional fine setting technical problem, improve wallboard installation accuracy, guaranteed concrete wallboard installation effectiveness.

Description

重型装配式混凝土外墙挂板三维调节安装结构及安装方法Three-dimensional adjustable installation structure and installation method of heavy-duty fabricated concrete exterior wall hanging panels

技术领域technical field

本发明涉及到建筑施工技术领域,具体涉及到一种重型装配式混凝土外墙挂板三维调节安装结构及安装方法。The invention relates to the technical field of building construction, in particular to a three-dimensional adjustment installation structure and installation method of a heavy-duty assembled concrete exterior wall hanging board.

背景技术Background technique

在我国当前的现代化建设中,建筑装配式是推动建筑建造水平和建筑品质,带动建筑业转型升级和高质量发展的重要举措。清水混凝土预制构件作为装配式建筑组成部分,因混凝土表面不再有任何涂装、贴瓷砖、贴石材等材料,直接表现混凝土原成型效果,展现了一种建筑自然,朴实的美感,越来越得到大众的认可。混凝土外挂墙板重量大,安装完成后构件定位、平整度不符合规范要求时,需对构件进行三维方向微调,常规利用塔吊微调方式尺寸偏差较大,较难满足混凝土墙板安装要求。In my country's current modernization drive, prefabricated buildings are an important measure to promote the level of construction and quality of buildings, and drive the transformation and upgrading of the construction industry and high-quality development. As a component of prefabricated buildings, fair-faced concrete prefabricated components no longer have any coatings, tiles, stones and other materials on the surface of the concrete, directly expressing the original molding effect of the concrete, showing a natural and simple aesthetic feeling of the building, which is becoming more and more be recognized by the public. Concrete external wall panels are heavy, and when the positioning and flatness of components do not meet the specification requirements after installation, it is necessary to fine-tune the components in three dimensions. The conventional fine-tuning method using tower cranes has large dimensional deviations, and it is difficult to meet the installation requirements of concrete wall panels.

发明内容Contents of the invention

本发明的目的是针对现有技术存在的问题,提供一种重型装配式混凝土外墙挂板三维调节安装结构及安装方法,解决现有墙板施工技术进度慢、施工质量不易控制的缺陷。The purpose of the present invention is to solve the problems existing in the prior art, to provide a three-dimensional adjustment installation structure and installation method of heavy-duty assembled concrete exterior wall hanging panels, and to solve the defects of slow construction technology and difficult control of construction quality of existing wall panels.

为实现上述目的,本发明采用的技术方案是:In order to achieve the above object, the technical scheme adopted in the present invention is:

重型装配式混凝土外墙挂板三维调节安装结构,包括楼板,以及设置在上下层所述楼板之间的墙板,所述墙板的下侧分别预埋有至少两个L型钢埋件,上侧预埋连接有L型螺杆,所述L型钢埋件和所述L型螺杆的水平端均伸出所述墙板;The three-dimensional adjustment and installation structure of the heavy-duty prefabricated concrete exterior wall hanging panel includes a floor slab and a wall panel arranged between the upper and lower floors. L-shaped screw rods are embedded in the side, and the horizontal ends of the L-shaped steel embedded parts and the L-shaped screw rods protrude from the wallboard;

上下层的所述楼板下方边缘分别设有钢梁,所述楼板靠近所述墙板处分别设有容纳凹槽,所述容纳凹槽位于所述钢梁上侧翼的上方,所述钢梁的上侧翼和下侧翼上分别通过设有螺杆,所述螺杆穿过所述L型钢埋件并通过紧固连接件临时固定,上层所述钢梁的下侧翼处还连接有L型连接件,所述L型螺杆的水平端穿过并连接所述L型连接件;The lower edges of the floors on the upper and lower floors are respectively provided with steel beams, and the floors are respectively provided with accommodating grooves near the wall panels, and the accommodating grooves are located above the upper wings of the steel beams. The upper and lower flanks are respectively provided with screw rods. The screw rods pass through the L-shaped steel embedded parts and are temporarily fixed by fastening connectors. The lower flanks of the steel beams on the upper layer are also connected with L-shaped connectors. The horizontal end of the L-shaped screw passes through and connects to the L-shaped connector;

所述容纳凹槽内还设有竖向顶推装置和横向顶推装置,所述竖向顶推装置的一端设置在所述钢梁的上侧翼上、另一端顶在与所述墙板连接的顶推连接件上,所述横向顶推装置的一端抵接在所述容纳凹槽处的所述楼板的侧壁上、另一端抵接所述墙板;The accommodating groove is also provided with a vertical pushing device and a horizontal pushing device, one end of the vertical pushing device is arranged on the upper flank of the steel beam, and the other end is pushed against the wall connected to the wall panel. One end of the horizontal pushing device abuts against the side wall of the floor at the receiving groove, and the other end abuts against the wallboard;

所述墙板和所述楼板上还分别至少设有一对锚环组件,两个方向的所述锚环组件之间连接有拉结装置。At least one pair of anchor ring assemblies are respectively provided on the wall board and the floor board, and tie devices are connected between the anchor ring assemblies in two directions.

本三维调节安装结构能够实现墙板的多向调节,为墙板的准确安装提供有利帮助;在重型装配式混凝土墙板外挂安装施工时,若遇到墙板吊装完成后定位偏差、平整度均不符合规范要求时,采用竖向顶推装置配合顶推连接件进行垂直方向微调,采用安装埋件位置的水平横向顶推装置进行墙板向室外方向微调,采用拉结装置与锚环组件相互牵引方式进行墙板向室内方向、水平左右方向微调,通过墙板上部L型螺杆的螺帽放松与紧固进行墙板平整度微调,解决重型墙板三维微调技术问题,提高墙板安装精度,确保了混凝土墙板安装效果。The three-dimensional adjustment installation structure can realize the multi-directional adjustment of the wall panel, and provide favorable help for the accurate installation of the wall panel; during the installation and construction of the heavy-duty prefabricated concrete wall panel, if the positioning deviation and flatness of the wall panel are uneven after the hoisting is completed If it does not meet the requirements of the specification, use the vertical jacking device to cooperate with the jacking connector for fine-tuning in the vertical direction, use the horizontal and horizontal jacking device at the position of the embedded part to fine-tune the wallboard to the outdoor direction, and use the tie device and the anchor ring assembly to interact with each other. The traction method is used to fine-tune the wallboard to the indoor direction, the horizontal left-right direction, and the flatness of the wallboard is fine-tuned by loosening and tightening the nut of the L-shaped screw on the upper part of the wallboard to solve the technical problem of three-dimensional fine-tuning of the heavy-duty wallboard and improve the installation accuracy of the wallboard. Ensure the installation effect of concrete wall panels.

在所述墙板的上下侧分别预设所述L型钢埋件和所述L型螺杆,并在所述楼板的钢梁上设置与所述L型钢埋件配合的螺杆,与所述L型螺杆配合的L型连接件,使得当所述墙板在吊装时就能够一次性快速预连接,提升了连接安装速度,而且不需要持续吊装所述墙板,降低吊装操作难度;在预连接后所述L型钢埋件和所述L型螺杆还能够分别参与到高度和平整度的调节中,使其充分发挥连接调节作用。The L-shaped steel embedment and the L-shaped screw are respectively preset on the upper and lower sides of the wall panel, and a screw that matches the L-shaped steel embedment is set on the steel beam of the floor, and the L-shaped The L-shaped connector fitted with the screw makes it possible to quickly pre-connect the wallboard at one time during hoisting, which improves the speed of connection and installation, and does not require continuous hoisting of the wallboard, reducing the difficulty of hoisting operation; after pre-connection The L-shaped steel embedded part and the L-shaped screw can also participate in the adjustment of height and flatness respectively, so that they can fully play the role of connection adjustment.

所述楼板在所述墙板的L型钢埋件处分别开始所述容纳凹槽,一方面提供了操作空间,便于松紧紧固连接件和增减钢垫片;另一方面提供了容纳空间,能够在该处设置多个顶推装置,而且顶推装置在使用后均能够顺利取出。The floor slab respectively starts the accommodation grooves at the L-shaped steel embedded parts of the wall panels, on the one hand, it provides an operating space, which is convenient for elastically fastening the connectors and adding or removing steel gaskets; on the other hand, it provides accommodation space, A plurality of pushing devices can be arranged there, and all the pushing devices can be taken out smoothly after use.

竖向顶推装置能够利用与所述墙板连接的顶推连接件在墙的侧面将墙板抬升,而不用设置在墙板的正下方,横向顶推装置的两端则直接顶在墙板和楼板上,直接进行顶推工作,总的来说能够方便设置和操作;多个所述竖向顶推装置或者多个所述横向顶推装置的设置,能够在各自方向调节时提供较大且平衡的推力。The vertical pushing device can use the pushing connector connected with the wall panel to lift the wall panel on the side of the wall instead of being placed directly below the wall panel, and the two ends of the horizontal pushing device directly push against the wall panel and on the floor, the jacking work can be carried out directly, which is generally convenient for setting and operation; the setting of a plurality of said vertical jacking devices or a plurality of said horizontal jacking devices can provide a larger and balanced thrust.

多组所述锚环组件的设置,能够根据需要直连或者斜连所述拉结装置,产生不同方向的拉力,实现不同方向的调节;而且所述锚环组件在墙板安装成功后均能够无损拆卸,以便重复使用。Multiple sets of the anchor ring components can be directly connected or obliquely connected to the tie-drawing device according to the needs, so as to generate pulling forces in different directions and realize adjustment in different directions; Non-destructive disassembly for reuse.

进一步的,同一层所述楼板处设置的所述L型钢埋件对称设置,上下层同侧的所述L型钢埋件、L型螺杆和L型连接件位于同一安装平面上,既能够平衡受力、也方便调节;所述L型连接件的竖向端上设有插孔,所述L型螺杆的水平端穿过所述插孔后连接有调节螺母。Further, the L-shaped steel embedded parts set at the floor of the same floor are arranged symmetrically, and the L-shaped steel embedded parts, L-shaped screw rods and L-shaped connectors on the same side of the upper and lower floors are located on the same installation plane, which can not only balance the affected The force is also convenient to adjust; the vertical end of the L-shaped connector is provided with a jack, and the horizontal end of the L-shaped screw passes through the jack and is connected with an adjusting nut.

通过拧紧或者拧松所述调节螺母就能够改变所述L型螺杆与所述L型连接件配合的紧密程度,从而能够调整所述墙板的倾斜程度,使所述墙板与所述楼板垂直。By tightening or loosening the adjusting nut, the degree of tightness between the L-shaped screw rod and the L-shaped connector can be changed, so that the inclination of the wall panel can be adjusted so that the wall panel is perpendicular to the floor .

进一步的,所述钢梁的上侧翼和下侧翼上分别焊接有埋件板,所述螺杆的端部与所述埋件板焊接连接,下侧翼上的所述埋件板与所述钢梁之间还焊接有加劲板;所述螺杆与所述L型钢埋件之间设有若干不同尺寸的钢垫片,用以调节所述墙板的竖向高度。Further, the upper and lower flanks of the steel beam are respectively welded with embedded parts, the end of the screw rod is welded to the embedded parts, and the embedded part on the lower side of the wing is connected to the steel beam. Stiffeners are also welded between them; steel gaskets of different sizes are provided between the screw and the L-shaped steel embedded parts to adjust the vertical height of the wall panels.

进一步的,所述紧固连接件包括连接垫片和松紧螺母,所述连接垫片上设有内径大于所述螺杆外径的连接孔。Further, the fastening connector includes a connection washer and a loose nut, and the connection washer is provided with a connection hole whose inner diameter is larger than the outer diameter of the screw.

进一步的,所述横向顶推装置和所述竖向顶推装置分别为千斤顶,同一所述容纳凹槽内的所述横向顶推装置和所述竖向顶推装置分设在所述螺杆的两侧,以充分利用所述容纳凹槽内的空间。Further, the horizontal pushing device and the vertical pushing device are respectively jacks, and the horizontal pushing device and the vertical pushing device in the same accommodating groove are respectively arranged on two sides of the screw rod. side, so as to make full use of the space in the accommodating groove.

进一步的,所述顶推连接件包括插设在所述墙板中的一对圆杆,以及与一对所述圆杆勾连的梯形挂钩,所述竖向顶推装置的输出端顶在所述梯形挂钩的横杆中部。Further, the pushing connector includes a pair of round rods inserted in the wallboard, and a trapezoidal hook connected with the pair of round rods, and the output end of the vertical pushing device is pushed against the The middle part of the crossbar of the trapezoidal hook.

所述竖向顶推装置顶升所述梯形挂钩,能够带动所述墙板上升;一对所述圆杆的设置方便在墙体外连接所述梯形挂钩,所述梯形挂钩通过挂设连接的方式方便其拆卸和调整位置。The vertical pushing device lifts the trapezoidal hook, which can drive the wallboard to rise; a pair of the round rods are arranged to facilitate the connection of the trapezoidal hook outside the wall, and the trapezoidal hook is connected by hanging. The method is convenient for its disassembly and adjustment of position.

进一步的,所述梯形挂钩包括一对平行的横杆,一对所述横杆的端部之间分别活动连接有斜杆,所述斜杆的端部设有挂钩,所述挂钩与所述圆杆勾连。Further, the trapezoidal hook includes a pair of parallel cross bars, and a diagonal bar is movably connected between the ends of the pair of cross bars, and a hook is provided at the end of the diagonal bar, and the hook and the Round rod hook.

采用这种结构的梯形挂钩,一对所述斜杆能够绕一对所述横杆之间转动,使其能够调整一对所述斜杆的倾斜角度,以便连接不同间距的圆杆,而且在顶升过程中,一对所述斜杆之间的夹角也会跟谁微动。With the trapezoidal hook of this structure, a pair of said diagonal bars can be rotated around a pair of said cross bars, so that it can adjust the inclination angle of a pair of said diagonal bars so as to connect round bars with different spacings. During the jacking process, the included angle between a pair of said oblique rods will also slightly move accordingly.

进一步的,所述锚环组件包括锚环安装板,所述锚环安装板上设有U型锚环;所述锚环安装板通过螺栓与所述楼板或者所述墙板连接,所述U型锚环通过钢丝绳与所述拉结装置连接,所述拉结装置为电动葫芦。Further, the anchor ring assembly includes an anchor ring installation plate, and a U-shaped anchor ring is arranged on the anchor ring installation plate; The type anchor ring is connected with the knot-drawing device through a wire rope, and the knot-drawing device is an electric hoist.

至少四组所述U型锚环的设置,能够形成直拉、斜拉等多种拉结方式,直拉能够向室内调整所述墙板,两个方向的斜拉能够调整墙板的水平左右位置。The arrangement of at least four sets of U-shaped anchor rings can form a variety of tie methods such as straight pull and oblique pull. The straight pull can adjust the wallboard indoors, and the oblique pull in two directions can adjust the horizontal Location.

一种重型装配式混凝土外墙挂板三维调节安装方法,包括如下步骤:A method for three-dimensional adjustment and installation of heavy-duty fabricated concrete exterior wall hanging panels, comprising the following steps:

S1:预制墙板,在所述墙板的下侧分别预埋两块L型钢埋件,在上侧预埋连接有L型螺杆,所述L型钢埋件和所述L型螺杆的水平端分别伸出所述墙板;S1: Prefabricated wall panels, two L-shaped steel embedded parts are pre-embedded on the lower side of the wall panels, and L-shaped screw rods are pre-embedded on the upper side, and the horizontal ends of the L-shaped steel embedded parts and the L-shaped screw rods are pre-embedded. protrude respectively from said wall panels;

S2:连接件安装,在楼板的钢梁的上侧翼和下侧翼上分别焊装埋件板,所述埋件板上焊接螺杆,并在所述螺杆上设置紧固连接件;在上层楼板的钢梁下侧翼焊接安装L型连接件;S2: Installation of connectors, respectively welding embedded parts boards on the upper and lower flanks of the steel beams of the floor, welding screw rods on the embedded parts boards, and setting fastening connectors on the screw rods; on the upper floor Weld and install L-shaped connectors on the lower flank of the steel beam;

S3:墙板安装施工,其中,S3: Installation and construction of wall panels, among which,

S3a:墙板吊装,将所述墙板吊装运输至所述楼板处,将所述墙板上的L型钢埋件与所述螺杆连接,并通过所述紧固连接件与紧固,所述L型螺杆的水平端穿过所述L型连接件后连接有调节螺母,每个所述L型钢埋件和L型螺杆分别连接完成后,松脱吊装;并在所述楼板的容纳凹槽处设置竖向千斤顶和横向千斤顶,所述墙板上设置与竖向千斤顶配合使用的顶推连接件,还在所述楼板和所述墙板上分别设置多个锚环组件,锚环组件之间设置电动葫芦;S3a: hoisting the wallboard, hoisting and transporting the wallboard to the floor, connecting the L-shaped steel embedded part on the wallboard to the screw, and fastening it through the fastening connector, the The horizontal end of the L-shaped screw rod passes through the L-shaped connector and is connected with an adjusting nut. After each of the L-shaped steel embedded parts and the L-shaped screw rod are respectively connected, they are loosely hoisted; and in the receiving groove of the floor slab A vertical jack and a horizontal jack are arranged at the place, and a push connector used in conjunction with the vertical jack is arranged on the wall plate, and a plurality of anchor ring assemblies are respectively arranged on the floor plate and the wall plate, and between the anchor ring assemblies Set electric hoist between;

S3b:墙板垂直方向调整,利用所述竖向千斤顶向上顶推所述顶推连接件,带动所述墙板垂直向上移动,在墙板下侧的与所述L型钢埋件套设连接的螺杆上增设钢垫片或者减少钢垫片,然后卸载竖向千斤顶,即可完成所述墙板的向上微调或者向下微调;S3b: Adjust the vertical direction of the wallboard, use the vertical jack to push the pushing connecting piece upwards, drive the wallboard to move vertically upwards, and set and connect the L-shaped steel embedded parts on the lower side of the wallboard Add or reduce the steel gasket on the screw rod, and then unload the vertical jack to complete the upward fine-tuning or downward fine-tuning of the wallboard;

S3c:墙板向室外方向调整,利用横向千斤顶向外顶推墙板,即可完成墙板向室外方向微调;S3c: Adjust the wall panel to the outdoor direction, use the horizontal jack to push the wall panel outward, and then complete the fine adjustment of the wall panel to the outdoor direction;

S3d:墙板向室内方向调整,将所述电动葫芦连接在楼板和墙板同侧上的所述锚环组件上,通过电动葫芦拉动所述墙板,即可完成墙板向内方向微调;S3d: Adjust the wall panel to the indoor direction, connect the electric hoist to the anchor ring assembly on the same side of the floor and the wall panel, and pull the wall panel by the electric hoist to complete the fine adjustment of the wall panel inward;

S3e:墙板水平方向左右调整,将所述电动葫芦连接在楼板和墙板异侧上的所述锚环组件上,形成斜拉结构,通过电动葫芦斜向拉动所述墙板,即可完成墙板水平左右方向的微调;S3e: The horizontal direction of the wall panel is adjusted left and right, the electric hoist is connected to the anchor ring assembly on the opposite side of the floor and wall panels to form a cable-stayed structure, and the wall panel is pulled obliquely by the electric hoist to complete Fine-tuning of the horizontal left and right direction of the wall panel;

S3f:墙板平整度调整,利用墙板上侧L型连接件和L型螺杆进行调整,所述L型螺杆的螺母放松与紧固进行墙板平整度内外倾斜微调;S3f: adjust the flatness of the wallboard, use the L-shaped connector on the upper side of the wallboard and the L-shaped screw to adjust, loosen and tighten the nut of the L-shaped screw to fine-tune the flatness of the wallboard inside and outside;

S4:墙板紧固施工,墙板调整完成后,在节点处进行高强螺栓紧固固定。S4: Wall panel fastening construction. After the wall panel adjustment is completed, high-strength bolts are fastened and fixed at the nodes.

进一步的,在S1的步骤中,所述墙板为在预制加工厂进行预制加工生产的装配式混凝土墙板;在S2的步骤中,根据工程图纸定位,利用全站仪、经纬仪,从测量基线网上引出中心控制线和标高控制线,并复核校正连接件安装位置;在S3a的步骤中,安装前通过测量仪器复核同一水平面、垂直面连接件位置是否符合要求,通过在埋件板上设置钢垫片进行调节连接件的平整度与垂直度。Further, in the step of S1, the wall panel is a prefabricated concrete wall panel produced in a prefabricated processing factory; in the step of S2, according to the positioning of the engineering drawing, using a total station and theodolite, from the measurement baseline Lead out the central control line and the elevation control line online, and check and correct the installation position of the connector; in the step of S3a, check whether the position of the connector on the same horizontal plane and vertical plane meets the requirements through the measuring instrument before installation, and set the steel plate on the embedded part board. Gaskets are used to adjust the flatness and verticality of the joints.

与现有技术相比,本发明的有益效果是:1、本三维调节安装结构能够实现墙板的多向调节,为墙板的准确安装提供有利帮助;在重型装配式混凝土墙板外挂安装施工时,若遇到墙板吊装完成后定位偏差、平整度均不符合规范要求时,采用竖向顶推装置配合顶推连接件进行垂直方向微调,采用安装埋件位置的水平横向顶推装置进行墙板向室外方向微调,采用拉结装置与锚环组件相互牵引方式进行墙板向室内方向、水平左右方向微调,通过墙板上部L型螺杆的螺帽放松与紧固进行墙板平整度微调,解决重型墙板三维微调技术问题,提高墙板安装精度,确保了混凝土墙板安装效果;2、预设所述L型钢埋件和所述L型螺杆,能够提升墙板一次性快速预连接速度,在预连接后所述L型钢埋件和所述L型螺杆还能够分别参与到高度和平整度的调节中,使其充分发挥连接调节作用;3、所述楼板在所述墙板的L型钢埋件处分别开始所述容纳凹槽,一方面提供了操作空间,便于松紧紧固连接件和增减钢垫片;另一方面提供了容纳空间,能够在该处设置多个顶推装置,而且顶推装置在使用后均能够顺利取出;4、多组所述锚环组件的设置,能够根据需要直连或者斜连所述拉结装置,产生不同方向的拉力,实现不同方向的调节;而且所述锚环组件在墙板安装成功后均能够无损拆卸,以便重复使用。Compared with the prior art, the beneficial effects of the present invention are: 1. The three-dimensional adjustment installation structure can realize the multi-directional adjustment of the wall panels, and provide favorable assistance for the accurate installation of the wall panels; If the positioning deviation and flatness of the wallboard after the hoisting are completed do not meet the requirements of the specification, use the vertical jacking device to cooperate with the jacking connector to fine-tune the vertical direction, and use the horizontal and horizontal jacking device to install the embedded parts. The wall panel is fine-tuned to the outdoor direction, and the wall panel is fine-tuned to the indoor direction, horizontal left and right direction by means of mutual traction between the tie device and the anchor ring assembly, and the wall panel flatness is fine-tuned by loosening and tightening the nut of the L-shaped screw on the top of the wall panel , to solve the technical problem of three-dimensional fine-tuning of heavy-duty wall panels, improve the installation accuracy of wall panels, and ensure the installation effect of concrete wall panels; 2. Preset the L-shaped steel embedded parts and the L-shaped screw, which can enhance the one-time rapid pre-connection of the wall panels After the pre-connection, the L-shaped steel embedded parts and the L-shaped screw can also participate in the adjustment of height and flatness, so that they can fully play the role of connection adjustment; The L-shaped steel embedded parts respectively start the accommodating grooves. On the one hand, it provides an operating space, which is convenient for elastically fastening the connectors and adding or removing steel gaskets; on the other hand, it provides an accommodating space where multiple pushers can be set device, and the pushing device can be taken out smoothly after use; 4. The setting of multiple sets of anchor ring components can be directly connected or obliquely connected to the tie device according to needs, so as to generate pulling forces in different directions and realize different directions. adjustment; and the anchor ring assembly can be disassembled without damage after the wallboard is successfully installed, so as to be reused.

附图说明Description of drawings

图1为本发明重型装配式混凝土外墙挂板三维调节安装结构的正面立体结构示意图;Fig. 1 is the front three-dimensional structural schematic diagram of the three-dimensional adjustment and installation structure of the heavy-duty assembled concrete exterior wall hanging board of the present invention;

图2为本发明重型装配式混凝土外墙挂板三维调节安装结构的背面透视立体结构示意图;Fig. 2 is the back perspective three-dimensional structural schematic diagram of the three-dimensional adjustment and installation structure of the heavy-duty assembled concrete exterior wall hanging board of the present invention;

图中:1、墙板;2、楼板;3、钢梁;4、L型钢埋件;5、L型螺杆;6、埋件板;7、螺杆;8、紧固连接件;9、竖向千斤顶;10、横向千斤顶;11、顶推连接件;1101、圆杆;1102、横杆;1103、斜杆;12、锚环组件;1201、锚环安装板;1202、U型锚环;13、电动葫芦;14、L型连接件;15、加劲板。In the figure: 1. Wall panel; 2. Floor slab; 3. Steel beam; 4. L-shaped steel embedded part; 5. L-shaped screw; 6. Embedded part plate; 7. Screw; 10, horizontal jack; 11, push connector; 1101, round bar; 1102, cross bar; 1103, inclined bar; 12, anchor ring assembly; 1201, anchor ring mounting plate; 13. Electric hoist; 14. L-shaped connector; 15. Stiffener.

具体实施方式Detailed ways

下面将结合本发明中的附图,对本发明的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动条件下所获得的所有其它实施例,都属于本发明保护的范围。The technical solutions of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

在本发明的描述中,需要说明的是,术语“中间”、“上”、“下”、“左”、“右”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”等仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present invention, it should be noted that the orientations or positional relationships indicated by the terms "middle", "upper", "lower", "left", "right", "inner" and "outer" are based on the attached The orientation or positional relationship shown in the figure is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be construed as a reference to this invention. Invention Limitations. In addition, the terms "first", "second", etc. are used for descriptive purposes only, and should not be construed as indicating or implying relative importance.

实施例一:Embodiment one:

如图1和图2所示,一种重型装配式混凝土外墙挂板三维调节安装结构,包括楼板2,以及设置在上下层所述楼板2之间的墙板1,所述墙板1的下侧分别预埋有两个L型钢埋件4,上侧预埋连接有L型螺杆5,所述L型钢埋件4和所述L型螺杆5的水平端均伸出所述墙板1;As shown in Figures 1 and 2, a three-dimensional adjustment and installation structure of a heavy-duty fabricated concrete exterior wall hanging panel includes a floor 2, and a wall panel 1 arranged between the floor panels 2 on the upper and lower floors. Two L-shaped steel embedded parts 4 are pre-embedded on the lower side, and L-shaped screw rods 5 are pre-embedded on the upper side, and the horizontal ends of the L-shaped steel embedded parts 4 and the L-shaped screw rods 5 both protrude from the wall panel ;

上下层的所述楼板2下方边缘分别设有钢梁3,所述楼板2靠近所述墙板1处分别设有容纳凹槽,所述容纳凹槽位于所述钢梁3上侧翼的上方,所述钢梁3的上侧翼和下侧翼上分别通过设有螺杆7,所述螺杆7穿过所述L型钢埋件4的水平端并通过紧固连接件8临时固定,上层所述钢梁3的下侧翼处还连接有L型连接件14,所述L型螺杆5的水平端穿过并连接所述L型连接件14;Steel beams 3 are respectively provided on the lower edge of the floor 2 of the upper and lower floors, and the floor 2 is respectively provided with accommodating grooves near the wall panels 1, and the accommodating grooves are located above the upper wings of the steel beams 3, The upper and lower flanks of the steel beam 3 are respectively provided with screw rods 7, and the screw rods 7 pass through the horizontal end of the L-shaped steel embedded part 4 and are temporarily fixed by fastening connectors 8. The steel beam on the upper layer The lower flank of 3 is also connected with an L-shaped connector 14, and the horizontal end of the L-shaped screw 5 passes through and connects with the L-shaped connector 14;

所述容纳凹槽内还设有竖向千斤顶9和横向千斤顶10,所述竖向千斤顶9的一端设置在所述钢梁3的上侧翼上、另一端顶在与所述墙板1连接的顶推连接件11上,所述横向千斤顶10的一端抵接在所述容纳凹槽处的所述楼板2的侧壁上、另一端抵接所述墙板1;A vertical jack 9 and a horizontal jack 10 are also provided in the receiving groove, one end of the vertical jack 9 is arranged on the upper flank of the steel beam 3, and the other end is pushed against the wall connected to the wall panel 1. On the jacking connector 11, one end of the transverse jack 10 abuts against the side wall of the floor 2 at the receiving groove, and the other end abuts against the wall panel 1;

所述墙板1和所述楼板2上还分别设有两对锚环组件12,两个方向的所述锚环组件12之间连接有拉结装置。Two pairs of anchor ring assemblies 12 are respectively provided on the wall panel 1 and the floor slab 2, and tie devices are connected between the anchor ring assemblies 12 in two directions.

在所述墙板1的上下侧分别预设所述L型钢埋件4和所述L型螺杆5,并在所述楼板2的钢梁3上设置与所述L型钢埋件4配合的螺杆7,与所述L型螺杆5配合的L型连接件14,使得当所述墙板1在吊装时就能够一次性快速预连接,提升了连接安装速度,而且不需要持续吊装所述墙板,降低吊装操作难度;在预连接后所述L型钢埋件4和所述L型螺杆5还能够分别参与到高度和平整度的调节中,使其充分发挥连接调节作用。The L-shaped steel embedment 4 and the L-shaped screw 5 are respectively preset on the upper and lower sides of the wall panel 1, and a screw that matches the L-shaped steel embedment 4 is set on the steel beam 3 of the floor 2 7. The L-shaped connector 14 matched with the L-shaped screw 5 enables the wall panel 1 to be quickly pre-connected at one time during hoisting, which improves the speed of connection and installation, and does not require continuous hoisting of the wall panel , to reduce the difficulty of hoisting operation; after the pre-connection, the L-shaped steel embedded part 4 and the L-shaped screw 5 can also participate in the adjustment of height and flatness respectively, so that they can fully play the role of connection adjustment.

所述楼板2在靠近所述墙板1的L型钢埋件4处分别开始所述容纳凹槽,一方面提供了操作空间,便于松紧紧固连接件和增减钢垫片;另一方面提供了容纳空间,能够在该处设置多个千斤顶,而且千斤顶在使用后均能够顺利取出。The floor slab 2 respectively starts the receiving grooves at the L-shaped steel embedded parts 4 close to the wall panel 1. On the one hand, it provides an operating space, which is convenient for elastically fastening the connectors and adding or removing steel gaskets; on the other hand, it provides In order to increase the accommodation space, multiple jacks can be set there, and the jacks can be taken out smoothly after use.

竖向千斤顶9能够利用与所述墙板1连接的顶推连接件11在墙的侧面将墙板抬升,而不用设置在墙板的正下方,横向千斤顶10的两端则直接顶在墙板1和楼板2上,直接进行顶推工作,总的来说能够方便设置和操作;多个所述竖向千斤顶9或者多个所述横向千斤顶10的设置,能够在各自方向调节时提供较大且平衡的推力。The vertical jack 9 can use the push connector 11 connected to the wall panel 1 to lift the wall panel on the side of the wall, instead of being arranged directly below the wall panel, and the two ends of the horizontal jack 10 are directly pressed against the wall panel 1 and floor 2, the jacking work can be carried out directly, which can facilitate setting and operation in general; the setting of a plurality of said vertical jacks 9 or a plurality of said horizontal jacks 10 can provide greater and balanced thrust.

多组所述锚环组件12的设置,能够根据需要直连或者斜连所述拉结装置,产生不同方向的拉力,实现不同方向的调节;而且所述锚环组件12在墙板安装成功后均能够无损拆卸,以便重复使用。Multiple sets of anchor ring assemblies 12 can be arranged to directly or obliquely connect the tie-drawing device according to needs, so as to generate pulling forces in different directions and realize adjustment in different directions; and the anchor ring assemblies 12 can All can be disassembled without damage for repeated use.

进一步的,同一层所述楼板2处设置的所述L型钢埋件4对称设置,上下层同侧的所述L型钢埋件4、L型螺杆5和L型连接件14位于同一安装平面上,既能够平衡受力、也方便调节;所述L型连接件14的竖向端上设有插孔,所述L型螺杆5的水平端穿过所述插孔后连接有调节螺母。Further, the L-shaped steel embedded parts 4 provided at the floor 2 on the same floor are arranged symmetrically, and the L-shaped steel embedded parts 4, L-shaped screw rods 5 and L-shaped connectors 14 on the same side of the upper and lower floors are located on the same installation plane , can not only balance the force, but also facilitate adjustment; the vertical end of the L-shaped connector 14 is provided with a socket, and the horizontal end of the L-shaped screw 5 passes through the socket and is connected with an adjusting nut.

通过拧紧或者拧松所述调节螺母就能够改变所述L型螺杆5与所述L型连接件14配合的紧密程度,从而能够调整所述墙板的倾斜程度,使所述墙板与所述楼板垂直。By tightening or unscrewing the adjusting nut, the tightness of the L-shaped screw rod 5 and the L-shaped connector 14 can be changed, so that the inclination of the wallboard can be adjusted, so that the wallboard and the The floor is vertical.

进一步的,所述钢梁3的上侧翼和下侧翼上分别焊接有埋件板6,所述螺杆7的端部与所述埋件板6焊接连接,下侧翼上的所述埋件板6与所述钢梁3之间还焊接有加劲板15;所述螺杆7与所述L型钢埋件4之间设有若干不同尺寸的钢垫片,用以调节所述墙板1的竖向高度。Further, the upper and lower flanks of the steel beam 3 are respectively welded with embedded parts 6, the end of the screw 7 is welded to the embedded parts 6, and the embedded parts 6 on the lower side A stiffening plate 15 is also welded between the steel beam 3; several steel gaskets of different sizes are provided between the screw 7 and the L-shaped steel embedded part 4 to adjust the vertical direction of the wall panel 1. high.

进一步的,所述紧固连接件8包括连接垫片和松紧螺母,所述连接垫片上设有内径大于所述螺杆7外径的连接孔。Further, the fastening connector 8 includes a connection washer and a loose nut, and the connection washer is provided with a connection hole whose inner diameter is larger than the outer diameter of the screw rod 7 .

进一步的,所述横向千斤顶10和所述竖向千斤顶9分别为液压千斤顶,同一所述容纳凹槽内的所述横向千斤顶10和所述竖向千斤顶9分设在所述螺杆7的两侧,以充分利用所述容纳凹槽内的空间。Further, the horizontal jack 10 and the vertical jack 9 are respectively hydraulic jacks, and the horizontal jack 10 and the vertical jack 9 in the same accommodating groove are respectively arranged on both sides of the screw 7, In order to make full use of the space in the accommodating groove.

进一步的,所述顶推连接件11包括插设在所述墙板1中的一对圆杆1101,以及与一对所述圆杆1101勾连的梯形挂钩,所述竖向千斤顶9的输出端顶在所述梯形挂钩的横杆中部。Further, the push connector 11 includes a pair of round rods 1101 inserted in the wall panel 1, and a trapezoidal hook connected with the pair of round rods 1101, the output end of the vertical jack 9 Top the middle part of the cross bar of the trapezoidal hook.

所述竖向千斤顶9顶升所述梯形挂钩,能够带动所述墙板1上升;一对所述圆杆1101的设置方便在墙板1外侧连接所述梯形挂钩,所述梯形挂钩通过挂设连接的方式方便其拆卸和调整位置。The vertical jack 9 lifts the trapezoidal hook, which can drive the wallboard 1 to rise; a pair of the round rods 1101 are conveniently connected to the trapezoidal hook on the outside of the wallboard 1, and the trapezoidal hook is set by hanging The way of connection is convenient for its disassembly and adjustment of position.

进一步的,所述梯形挂钩包括一对平行的横杆1102,一对所述横杆1102的端部之间分别活动连接有斜杆1103,所述斜杆1103的端部设有挂钩,所述挂钩与所述圆杆1101勾连。Further, the trapezoidal hook includes a pair of parallel cross bars 1102, the ends of the pair of cross bars 1102 are respectively movably connected with oblique rods 1103, the ends of the oblique rods 1103 are provided with hooks, the The hook is connected with the round rod 1101 .

采用这种结构的梯形挂钩,一对所述斜杆1103能够绕一对所述横杆1102之间转动,使其能够调整一对所述斜杆1103的倾斜角度,以便连接不同间距的圆杆1101,而且在顶升过程中,一对所述斜杆1103之间的夹角也会跟谁微动。With the trapezoidal hook of this structure, a pair of said diagonal bars 1103 can rotate around a pair of said cross bars 1102, so that it can adjust the inclination angle of a pair of said inclined bars 1103, so as to connect round bars with different spacings 1101, and during the jacking process, the included angle between the pair of inclined rods 1103 will also move slightly.

进一步的,所述锚环组件12包括锚环安装板1201,所述锚环安装板1201上设有U型锚环1202;所述锚环安装板1201通过螺栓与所述楼板2或者所述墙板1连接,所述U型锚环1202通过钢丝绳与所述拉结装置连接,所述拉结装置为电动葫芦13。Further, the anchor ring assembly 12 includes an anchor ring installation plate 1201, on which a U-shaped anchor ring 1202 is arranged; the anchor ring installation plate 1201 is connected to the floor 2 or the wall through bolts. The plate 1 is connected, and the U-shaped anchor ring 1202 is connected with the knot-drawing device through a wire rope, and the knot-drawing device is an electric hoist 13 .

墙板1和楼板2上分别设置2个所述U型锚环1202,共4组锚环组件12,能够形成直拉、斜拉等多种拉结方式,直拉能够向室内调整所述墙板1,两个方向的斜拉能够调整墙板1的水平左右位置。Two U-shaped anchor rings 1202 are arranged on the wall panel 1 and the floor slab 2 respectively, and there are 4 sets of anchor ring assemblies 12 in total, which can form various tie methods such as straight pull and cable pull, and the straight pull can adjust the wall to the interior. As for the board 1 , the oblique pull in two directions can adjust the horizontal left and right positions of the wall board 1 .

实施例二:Embodiment two:

一种重型装配式混凝土外墙挂板三维调节安装方法,包括如下步骤:A method for three-dimensional adjustment and installation of heavy-duty fabricated concrete exterior wall hanging panels, comprising the following steps:

S1:预制墙板1,在所述墙板1的下侧分别预埋两块L型钢埋件4,在上侧预埋连接有L型螺杆5,所述L型钢埋件4和所述L型螺杆5的水平端分别伸出所述墙板1;S1: Prefabricated wall panels 1, two L-shaped steel embedded parts 4 are pre-embedded on the lower side of the wall panel 1, and L-shaped screw rods 5 are pre-embedded on the upper side, and the L-shaped steel embedded parts 4 and the L-shaped The horizontal end of type screw rod 5 stretches out described wallboard 1 respectively;

S2:各种连接件安装,在楼板2的钢梁3的上侧翼和下侧翼上分别焊装埋件板6,所述埋件板6上焊接螺杆7,并在所述螺杆7上设置紧固连接件8;在上层楼板的钢梁下侧翼焊接安装L型连接件14;S2: Installing various connectors, respectively welding embedded parts 6 on the upper and lower sides of the steel beam 3 of the floor 2, welding the screw 7 on the embedded part 6, and setting the tightening screw 7 on the screw 7. Fixed connector 8; L-shaped connector 14 is welded and installed on the lower flank of the steel beam of the upper floor;

S3:墙板安装施工,其中,S3: Installation and construction of wall panels, among which,

S3a:墙板吊装,将所述墙板1吊装运输至所述楼板2处,将所述墙板1上的L型钢埋件4与所述螺杆7连接,并通过所述紧固连接件8与紧固,所述L型螺杆5的水平端穿过所述L型连接件14后连接有调节螺母,每个所述L型钢埋件4和L型螺杆5分别连接完成后,松脱吊装,此时墙板与楼板之间有一定稳定的连接关系,但是位置可能存在偏差,操作工人站在人字梯上并系好安全带,安全带与防坠器相连;在所述楼板2的容纳凹槽处设置竖向千斤顶9和横向千斤顶10,所述墙板1上设置与竖向千斤顶9配合使用的顶推连接件11,还在所述楼板2和所述墙板1上分别设置两个锚环组件12,锚环组件12之间设置电动葫芦13;S3a: wall panel hoisting, hoisting and transporting the wall panel 1 to the floor 2, connecting the L-shaped steel embedded part 4 on the wall panel 1 with the screw 7, and passing through the fastening connector 8 and fastening, the horizontal end of the L-shaped screw 5 passes through the L-shaped connector 14 and is connected with an adjusting nut, and after each of the L-shaped steel embedded parts 4 and the L-shaped screw 5 is respectively connected, they are loosened and hoisted , there is a certain stable connection relationship between the wallboard and the floor at this time, but there may be deviations in the position, the operator stands on the ladder and fastens the safety belt, and the safety belt is connected with the fall arrester; A vertical jack 9 and a horizontal jack 10 are arranged at the receiving groove, and a push connector 11 used in conjunction with the vertical jack 9 is arranged on the wall panel 1 , and is also arranged on the floor 2 and the wall panel 1 respectively. Two anchor ring assemblies 12, an electric hoist 13 is arranged between the anchor ring assemblies 12;

S3b:墙板垂直方向调整,利用所述竖向千斤顶9向上顶推所述顶推连接件11,带动所述墙板1垂直向上移动,在墙板1下侧的与所述L型钢埋件4套设连接的螺杆7上增设钢垫片或者减少钢垫片,然后卸载竖向千斤顶9,再拧紧所述紧固连接件8,即可完成所述墙板的向上微调或者向下微调;S3b: Adjust the vertical direction of the wall panel, use the vertical jack 9 to push the pushing connector 11 upwards, drive the wall panel 1 to move vertically upward, and the L-shaped steel embedded parts on the lower side of the wall panel 1 4. Add or reduce steel gaskets on the screw rod 7 that is set to connect, then unload the vertical jack 9, and then tighten the fastening connector 8 to complete the upward fine-tuning or downward fine-tuning of the wallboard;

S3c:墙板向室外方向调整,利用横向千斤顶10向外顶推墙板1,即可完成墙板1向室外方向微调;S3c: Adjust the wall panel to the outdoor direction, use the horizontal jack 10 to push the wall panel 1 outward, and then complete the fine adjustment of the wall panel 1 to the outdoor direction;

S3d:墙板向室内方向调整,将所述电动葫芦13连接在楼板2和墙板1同侧(左侧和右侧分别连接)上的所述锚环组件12上,通过电动葫芦13拉动所述墙板1,即可完成墙板向内方向微调;S3d: Adjust the wall panel to the indoor direction, connect the electric hoist 13 to the anchor ring assembly 12 on the same side of the floor 2 and the wall panel 1 (the left side and the right side are respectively connected), and pull the electric hoist 13 The wallboard 1 can be used to complete the inward fine-tuning of the wallboard;

S3e:墙板水平方向左右调整,将所述电动葫芦13连接在楼板2和墙板1异侧(比如楼板左侧的锚环组件和墙板右侧的锚环组件之间)上的所述锚环组件12上,形成斜拉结构,通过电动葫芦13斜向拉动所述墙板1,即可完成墙板水平左右方向的微调;S3e: Adjust the horizontal direction of the wall panel left and right, and connect the electric hoist 13 to the other side of the floor 2 and the wall panel 1 (such as between the anchor ring assembly on the left side of the floor board and the anchor ring assembly on the right side of the wall board). On the anchor ring assembly 12, a cable-stayed structure is formed, and the wallboard 1 is pulled obliquely by the electric hoist 13, so that the fine adjustment of the horizontal direction of the wallboard can be completed;

S3f:墙板平整度调整,利用墙板1上侧L型连接件14和L型螺杆5进行调整,所述L型螺杆5的调节螺母放松与紧固进行墙板平整度内外倾斜微调;S3f: adjust the flatness of the wallboard, use the L-shaped connector 14 on the upper side of the wallboard 1 and the L-shaped screw 5 to adjust, loosen and fasten the adjustment nut of the L-shaped screw 5 to fine-tune the flatness of the wallboard inside and outside;

S4:墙板紧固施工,墙板调整完成后,在节点处进行高强螺栓紧固固定。S4: Wall panel fastening construction. After the wall panel adjustment is completed, high-strength bolts are fastened and fixed at the nodes.

进一步的,在S1的步骤中,所述墙板1为在预制加工厂进行预制加工生产的装配式混凝土墙板;在S2的步骤中,根据工程图纸定位,利用全站仪、经纬仪,从测量基线网上引出中心控制线和标高控制线,并复核校正连接件安装位置;在S3a的步骤中,安装前通过测量仪器复核同一水平面、垂直面连接件位置是否符合要求,通过在埋件板上设置钢垫片进行调节连接件的平整度与垂直度,其中连接件指本申请中需要确定位置的各种连接件。Further, in the step of S1, the wall panel 1 is a prefabricated concrete wall panel produced in a prefabricated processing factory; in the step of S2, according to the positioning of the engineering drawing, the total station and theodolite are used to measure Lead out the center control line and elevation control line on the baseline net, and check the installation position of the calibration connector; in the step of S3a, check whether the position of the connector on the same horizontal plane and vertical plane meets the requirements through the measuring instrument before installation. Steel gaskets are used to adjust the flatness and verticality of the connecting parts, where the connecting parts refer to various connecting parts that need to be positioned in this application.

本三维调节安装方法能够实现墙板的多向调节,在重型装配式混凝土墙板外挂安装施工时,若遇到墙板吊装完成后定位偏差、平整度均不符合规范要求时,采用竖向千斤顶9配合顶推连接件11进行垂直方向微调,采用安装埋件位置的水平横向千斤顶10进行墙板向室外方向微调,采用拉结装置与锚环组件相互牵引方式进行墙板向室内方向、水平左右方向微调,通过墙板上部L型螺杆的螺帽放松与紧固进行墙板平整度微调,解决重型墙板三维微调技术问题,提高墙板安装精度,确保了混凝土墙板安装效果。This three-dimensional adjustment and installation method can realize the multi-directional adjustment of the wall panel. During the installation and construction of the heavy-duty fabricated concrete wall panel, if the positioning deviation and flatness of the wall panel after the hoisting are completed do not meet the specification requirements, use the vertical jack 9 Cooperate with the jacking connector 11 to fine-tune the vertical direction, use the horizontal horizontal jack 10 at the position of the embedded part to fine-tune the wallboard to the outdoor direction, and use the pulling device and the anchor ring assembly to pull the wallboard to the indoor direction and horizontally The direction is fine-tuned, and the flatness of the wall panel is fine-tuned by loosening and tightening the nut of the L-shaped screw on the upper part of the wall panel, which solves the technical problem of three-dimensional fine-tuning of the heavy-duty wall panel, improves the installation accuracy of the wall panel, and ensures the installation effect of the concrete wall panel.

本调节安装方法操作简单,安全可靠,能够快速的对未达标的墙板进行三维微调,调节的方式灵活多变,调节准确度和方向指向性较好,而且在微调过程中无需吊装墙板。This adjustment and installation method is easy to operate, safe and reliable, and can quickly perform three-dimensional fine-tuning on the wall panels that do not meet the standards.

尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes, modifications and substitutions can be made to these embodiments without departing from the principle and spirit of the present invention. and modifications, the scope of the invention is defined by the appended claims and their equivalents.

Claims (10)

1.重型装配式混凝土外墙挂板三维调节安装结构,包括楼板,以及设置在上下层所述楼板之间的墙板,其特征在于,所述墙板的下侧分别预埋有至少两个L型钢埋件,上侧预埋连接有L型螺杆,所述L型钢埋件和所述L型螺杆的水平端均伸出所述墙板;1. The three-dimensional adjustment and installation structure of the heavy-duty prefabricated concrete exterior wall hanging panel, including the floor slab, and the wall panel arranged between the upper and lower floor slabs, it is characterized in that at least two L-shaped steel embedded parts, the upper side is pre-embedded with L-shaped screw rods, and the horizontal ends of the L-shaped steel embedded parts and the L-shaped screw rods protrude from the wallboard; 上下层的所述楼板下方边缘分别设有钢梁,所述楼板靠近所述墙板处分别设有容纳凹槽,所述容纳凹槽位于所述钢梁上侧翼的上方,所述钢梁的上侧翼和下侧翼上分别通过设有螺杆,所述螺杆穿过所述L型钢埋件并通过紧固连接件临时固定,上层所述钢梁的下侧翼处还连接有L型连接件,所述L型螺杆的水平端穿过并连接所述L型连接件;The lower edges of the floors on the upper and lower floors are respectively provided with steel beams, and the floors are respectively provided with accommodating grooves near the wall panels, and the accommodating grooves are located above the upper wings of the steel beams. The upper and lower flanks are respectively provided with screw rods. The screw rods pass through the L-shaped steel embedded parts and are temporarily fixed by fastening connectors. The lower flanks of the steel beams on the upper layer are also connected with L-shaped connectors. The horizontal end of the L-shaped screw passes through and connects to the L-shaped connector; 所述容纳凹槽内还设有竖向顶推装置和横向顶推装置,所述竖向顶推装置的一端设置在所述钢梁的上侧翼上、另一端顶在与所述墙板连接的顶推连接件上,所述横向顶推装置的一端抵接在所述容纳凹槽处的所述楼板的侧壁上、另一端抵接所述墙板;The accommodating groove is also provided with a vertical pushing device and a horizontal pushing device, one end of the vertical pushing device is arranged on the upper flank of the steel beam, and the other end is pushed against the wall connected to the wall panel. One end of the horizontal pushing device abuts against the side wall of the floor at the receiving groove, and the other end abuts against the wallboard; 所述墙板和所述楼板上还分别至少设有一对锚环组件,两个方向的所述锚环组件之间连接有拉结装置。At least one pair of anchor ring assemblies are respectively provided on the wall board and the floor board, and tie devices are connected between the anchor ring assemblies in two directions. 2.根据权利要求1所述的重型装配式混凝土外墙挂板三维调节安装结构,其特征在于,同一层所述楼板处设置的所述L型钢埋件对称设置,上下层同侧的所述L型钢埋件、L型螺杆和L型连接件位于同一安装平面上;所述L型连接件的竖向端上设有插孔,所述L型螺杆的水平端穿过所述插孔后连接有调节螺母。2. The three-dimensional adjustment and installation structure of heavy-duty prefabricated concrete exterior wall hanging panels according to claim 1, wherein the L-shaped steel embedded parts arranged at the floor of the same floor are symmetrically arranged, and the said L-shaped steel embedded parts on the same side of the upper and lower floors are arranged symmetrically. The L-shaped steel embedded parts, the L-shaped screw and the L-shaped connector are located on the same installation plane; the vertical end of the L-shaped connector is provided with a socket, and the horizontal end of the L-shaped screw passes through the socket. Attached with adjusting nut. 3.根据权利要求1所述的重型装配式混凝土外墙挂板三维调节安装结构,其特征在于,所述钢梁的上侧翼和下侧翼上分别焊接有埋件板,所述螺杆的端部与所述埋件板焊接连接,下侧翼上的所述埋件板与所述钢梁之间还焊接有加劲板;所述螺杆与所述L型钢埋件之间设有若干不同尺寸的钢垫片,用以调节所述墙板的竖向高度。3. The three-dimensional adjustment and installation structure of heavy-duty fabricated concrete exterior wall hanging panels according to claim 1, wherein the upper and lower wings of the steel beam are respectively welded with embedded parts, and the ends of the screws are It is welded and connected with the embedded part plate, and a stiffening plate is welded between the embedded part plate on the lower wing and the steel beam; several steel plates of different sizes are arranged between the screw rod and the L-shaped steel embedded part Spacers are used to adjust the vertical height of the wall panels. 4.根据权利要求1所述的重型装配式混凝土外墙挂板三维调节安装结构,其特征在于,所述紧固连接件包括连接垫片和松紧螺母,所述连接垫片上设有内径大于所述螺杆外径的连接孔。4. The three-dimensional adjustment and installation structure of the heavy-duty fabricated concrete exterior wall hanging board according to claim 1, wherein the fastening connector includes a connecting gasket and a loose nut, and the connecting gasket is provided with an inner diameter larger than The connecting hole of the outer diameter of the screw. 5.根据权利要求1所述的重型装配式混凝土外墙挂板三维调节安装结构,其特征在于,所述横向顶推装置和所述竖向顶推装置分别为千斤顶,同一所述容纳凹槽内的所述横向顶推装置和所述竖向顶推装置分设在所述螺杆的两侧。5. The three-dimensional adjustment and installation structure of heavy-duty prefabricated concrete exterior wall hanging panels according to claim 1, wherein the horizontal pushing device and the vertical pushing device are respectively jacks, the same as the receiving groove The horizontal pushing device and the vertical pushing device inside are respectively arranged on both sides of the screw rod. 6.根据权利要求1所述的重型装配式混凝土外墙挂板三维调节安装结构,其特征在于,所述顶推连接件包括插设在所述墙板中的一对圆杆,以及与一对所述圆杆勾连的梯形挂钩,所述竖向顶推装置的输出端顶在所述梯形挂钩的横杆中部。6. The three-dimensional adjustment and installation structure of the heavy-duty fabricated concrete exterior wall hanging panel according to claim 1, wherein the pushing connector includes a pair of round rods inserted in the wall panel, and a For the trapezoidal hook connected to the round bar, the output end of the vertical pushing device pushes against the middle part of the cross bar of the trapezoidal hook. 7.根据权利要求6所述的重型装配式混凝土外墙挂板三维调节安装结构,其特征在于,所述梯形挂钩包括一对平行的横杆,一对所述横杆的端部之间分别活动连接有斜杆,所述斜杆的端部设有挂钩,所述挂钩与所述圆杆勾连。7. The three-dimensional adjustment and installation structure of the heavy-duty fabricated concrete exterior wall hanging board according to claim 6, wherein the trapezoidal hook comprises a pair of parallel cross bars, and the ends of the pair of cross bars are respectively An oblique rod is movably connected, and a hook is provided at the end of the oblique rod, and the hook is connected with the round rod. 8.根据权利要求1所述的重型装配式混凝土外墙挂板三维调节安装结构,其特征在于,所述锚环组件包括锚环安装板,所述锚环安装板上设有U型锚环;所述锚环安装板通过螺栓与所述楼板或者所述墙板连接,所述U型锚环通过钢丝绳与所述拉结装置连接,所述拉结装置为电动葫芦。8. The three-dimensional adjustment and installation structure of heavy-duty fabricated concrete exterior wall hanging panels according to claim 1, wherein the anchor ring assembly includes an anchor ring installation plate, and a U-shaped anchor ring is arranged on the anchor ring installation plate The anchor ring installation plate is connected to the floor or the wall board through bolts, the U-shaped anchor ring is connected to the knot-drawing device through a wire rope, and the knot-drawing device is an electric hoist. 9.重型装配式混凝土外墙挂板三维调节安装方法,其特征在于,包括如下步骤:9. The method for three-dimensional adjustment and installation of heavy-duty prefabricated concrete exterior wall hanging panels is characterized in that it includes the following steps: S1:预制墙板,在所述墙板的下侧分别预埋两块L型钢埋件,在上侧预埋连接有L型螺杆,所述L型钢埋件和所述L型螺杆的水平端分别伸出所述墙板;S1: Prefabricated wall panels, two L-shaped steel embedded parts are pre-embedded on the lower side of the wall panels, and L-shaped screw rods are pre-embedded on the upper side, and the horizontal ends of the L-shaped steel embedded parts and the L-shaped screw rods are pre-embedded. protrude respectively from said wall panels; S2:连接件安装,在楼板的钢梁的上侧翼和下侧翼上分别焊装埋件板,所述埋件板上焊接螺杆,并在所述螺杆上设置紧固连接件;在上层楼板的钢梁下侧翼焊接安装L型连接件;S2: Installation of connectors, respectively welding embedded parts boards on the upper and lower flanks of the steel beams of the floor, welding screw rods on the embedded parts boards, and setting fastening connectors on the screw rods; on the upper floor Weld and install L-shaped connectors on the lower flank of the steel beam; S3:墙板安装施工,其中,S3: Installation and construction of wall panels, among which, S3a:墙板吊装,将所述墙板吊装运输至所述楼板处,将所述墙板上的L型钢埋件与所述螺杆连接,并通过所述紧固连接件与紧固,所述L型螺杆的水平端穿过所述L型连接件后连接有调节螺母,每个所述L型钢埋件和L型螺杆分别连接完成后,松脱吊装;并在所述楼板的容纳凹槽处设置竖向千斤顶和横向千斤顶,所述墙板上设置与竖向千斤顶配合使用的顶推连接件,还在所述楼板和所述墙板上分别设置多个锚环组件,锚环组件之间设置电动葫芦;S3a: hoisting the wallboard, hoisting and transporting the wallboard to the floor, connecting the L-shaped steel embedded part on the wallboard to the screw, and fastening it through the fastening connector, the The horizontal end of the L-shaped screw rod passes through the L-shaped connector and is connected with an adjusting nut. After each of the L-shaped steel embedded parts and the L-shaped screw rod are respectively connected, they are loosely hoisted; and in the receiving groove of the floor slab A vertical jack and a horizontal jack are arranged at the place, and a push connector used in conjunction with the vertical jack is arranged on the wall plate, and a plurality of anchor ring assemblies are respectively arranged on the floor plate and the wall plate, and between the anchor ring assemblies Set up electric hoist between; S3b:墙板垂直方向调整,利用所述竖向千斤顶向上顶推所述顶推连接件,带动所述墙板垂直向上移动,在墙板下侧的与所述L型钢埋件套设连接的螺杆上增设钢垫片或者减少钢垫片,然后卸载竖向千斤顶,即可完成所述墙板的向上微调或者向下微调;S3b: Adjust the vertical direction of the wallboard, use the vertical jack to push the pushing connecting piece upwards, drive the wallboard to move vertically upwards, and set and connect the L-shaped steel embedded parts on the lower side of the wallboard Add or reduce the steel gasket on the screw rod, and then unload the vertical jack to complete the upward fine-tuning or downward fine-tuning of the wallboard; S3c:墙板向室外方向调整,利用横向千斤顶向外顶推墙板,即可完成墙板向室外方向微调;S3c: Adjust the wall panel to the outdoor direction, use the horizontal jack to push the wall panel outward, and then complete the fine adjustment of the wall panel to the outdoor direction; S3d:墙板向室内方向调整,将所述电动葫芦连接在楼板和墙板同侧上的所述锚环组件上,通过电动葫芦拉动所述墙板,即可完成墙板向内方向微调;S3d: Adjust the wall panel to the indoor direction, connect the electric hoist to the anchor ring assembly on the same side of the floor and the wall panel, and pull the wall panel by the electric hoist to complete the fine adjustment of the wall panel inward; S3e:墙板水平方向左右调整,将所述电动葫芦连接在楼板和墙板异侧上的所述锚环组件上,形成斜拉结构,通过电动葫芦斜向拉动所述墙板,即可完成墙板水平左右方向的微调;S3e: The horizontal direction of the wall panel is adjusted left and right, the electric hoist is connected to the anchor ring assembly on the opposite side of the floor and wall panels to form a cable-stayed structure, and the wall panel is pulled obliquely by the electric hoist to complete Fine-tuning of the horizontal left and right direction of the wall panel; S3f:墙板平整度调整,利用墙板上侧L型连接件和L型螺杆进行调整,所述L型螺杆的螺母放松与紧固进行墙板平整度内外倾斜微调;S3f: adjust the flatness of the wallboard, use the L-shaped connector on the upper side of the wallboard and the L-shaped screw to adjust, loosen and tighten the nut of the L-shaped screw to fine-tune the flatness of the wallboard inside and outside; S4:墙板紧固施工,墙板调整完成后,在节点处进行高强螺栓紧固固定。S4: Wall panel fastening construction. After the wall panel adjustment is completed, high-strength bolts are fastened and fixed at the nodes. 10.根据权利要求9所述的重型装配式混凝土外墙挂板三维调节安装方法,其特征在于,在S1的步骤中,所述墙板为在预制加工厂进行预制加工生产的装配式混凝土墙板;在S2的步骤中,根据工程图纸定位,利用全站仪、经纬仪,从测量基线网上引出中心控制线和标高控制线,并复核校正连接件安装位置;在S3a的步骤中,安装前通过测量仪器复核同一水平面、垂直面连接件位置是否符合要求,通过在埋件板上设置钢垫片进行调节连接件的平整度与垂直度。10. The method for three-dimensional adjustment and installation of heavy-duty prefabricated concrete exterior wall hanging panels according to claim 9, characterized in that, in the step of S1, the wall panels are prefabricated concrete walls produced in prefabricated processing plants In the step of S2, according to the positioning of the engineering drawing, use the total station and theodolite to draw the central control line and the elevation control line from the survey baseline network, and check and correct the installation position of the connecting piece; in the step of S3a, pass the The measuring instrument checks whether the position of the connectors on the same horizontal plane and vertical plane meets the requirements, and adjusts the flatness and verticality of the connectors by setting steel gaskets on the embedded parts plate.
CN202210741342.3A 2022-06-28 2022-06-28 Three-dimensional adjustable installation structure and installation method of heavy-duty fabricated concrete exterior wall hanging panels Active CN115162579B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210741342.3A CN115162579B (en) 2022-06-28 2022-06-28 Three-dimensional adjustable installation structure and installation method of heavy-duty fabricated concrete exterior wall hanging panels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210741342.3A CN115162579B (en) 2022-06-28 2022-06-28 Three-dimensional adjustable installation structure and installation method of heavy-duty fabricated concrete exterior wall hanging panels

Publications (2)

Publication Number Publication Date
CN115162579A CN115162579A (en) 2022-10-11
CN115162579B true CN115162579B (en) 2023-05-02

Family

ID=83486871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210741342.3A Active CN115162579B (en) 2022-06-28 2022-06-28 Three-dimensional adjustable installation structure and installation method of heavy-duty fabricated concrete exterior wall hanging panels

Country Status (1)

Country Link
CN (1) CN115162579B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863275A (en) * 2016-04-08 2016-08-17 中国建筑第七工程局有限公司 Construction method for assembly type annular reinforcement buckling concrete shear wall system
CN110258815A (en) * 2019-05-31 2019-09-20 南京长江都市建筑设计股份有限公司 Rotary precast concrete out-hung panel connecting joint structure and construction method in steel construction
CN110424598A (en) * 2019-08-09 2019-11-08 中国水利水电第八工程局有限公司 A kind of assembling frame out-hung panel technical system and its construction method
CN210263418U (en) * 2019-06-14 2020-04-07 南京长江都市建筑设计股份有限公司 Translation formula precast concrete externally-hung wallboard and girder steel are connected translation node structure
JP2021085270A (en) * 2019-11-29 2021-06-03 株式会社竹中工務店 Construction method of wall panel

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080313982A1 (en) * 2007-06-20 2008-12-25 Thornton-Termohlen Group Corporation Curtain Wall Systems and Methods
AU2022340472A1 (en) * 2021-08-30 2024-04-11 True Corners, Llc Wallboard-fastening device for securing wallboards in an outside-corner configuration

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863275A (en) * 2016-04-08 2016-08-17 中国建筑第七工程局有限公司 Construction method for assembly type annular reinforcement buckling concrete shear wall system
CN110258815A (en) * 2019-05-31 2019-09-20 南京长江都市建筑设计股份有限公司 Rotary precast concrete out-hung panel connecting joint structure and construction method in steel construction
CN210263418U (en) * 2019-06-14 2020-04-07 南京长江都市建筑设计股份有限公司 Translation formula precast concrete externally-hung wallboard and girder steel are connected translation node structure
CN110424598A (en) * 2019-08-09 2019-11-08 中国水利水电第八工程局有限公司 A kind of assembling frame out-hung panel technical system and its construction method
JP2021085270A (en) * 2019-11-29 2021-06-03 株式会社竹中工務店 Construction method of wall panel

Also Published As

Publication number Publication date
CN115162579A (en) 2022-10-11

Similar Documents

Publication Publication Date Title
CN105863275B (en) Assembled ring muscle fastens concrete shear wall system construction method
CN110512719B (en) Construction method of large-span interval corridor high-altitude formwork steel platform for high-rise residence
CN111731986B (en) Shaped adjustable lifting appliance for lifting prefabricated composite slab and construction method thereof
CN110562868B (en) Hoisting construction method for unit type glass curtain wall of super high-rise building
CN102733545A (en) Section steel column for high-rise building section steel concrete combination structure, and construction method thereof
CN217027510U (en) Accurate adjusting device is used in steel column butt joint
CN210685444U (en) Quick leveling, mounting and supporting device for prefabricated external wall panel
CN110093977A (en) Prefabricated component mounting structure and its installation method
CN116145957B (en) A building construction process
CN117888671A (en) A construction method of GRG integrated ceiling assembly module system
CN115162579B (en) Three-dimensional adjustable installation structure and installation method of heavy-duty fabricated concrete exterior wall hanging panels
CN215969285U (en) Mould for manufacturing concrete fence plate
CN110735530A (en) external wall steel formwork and internal wall aluminum formwork combination system and operation method thereof
CN211447765U (en) Prefabricated superimposed sheet installation adjusting device
CN114439242B (en) Assembly type cantilever complex component optimization and hoisting reinforcement construction method
CN218090947U (en) A transfer beam pouring formwork system
JP4027170B2 (en) External scaffold device and construction method of external scaffold device
CN108842952A (en) A kind of motorization assembly formula curtain wall construction system and construction method
CN116837824A (en) An integrated formwork device suitable for pit forming in foundation pits and its use method
CN115929050A (en) Installation method of vertical arc steel structure
CN110118014B (en) Exterior wall template system free of exterior scaffold and construction method thereof
CN220036212U (en) Elevator shaft safety protection platform
CN223880628U (en) An integrated control tool for basement floor elevation and steel mesh height
CN115898038B (en) A method for installing steel structure stairs
CN216157149U (en) Aluminum alloy formwork support system of coincide floor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant