CN115162335A - Deep foundation pit supporting structure - Google Patents

Deep foundation pit supporting structure Download PDF

Info

Publication number
CN115162335A
CN115162335A CN202210787836.5A CN202210787836A CN115162335A CN 115162335 A CN115162335 A CN 115162335A CN 202210787836 A CN202210787836 A CN 202210787836A CN 115162335 A CN115162335 A CN 115162335A
Authority
CN
China
Prior art keywords
fixed mounting
steel sheet
shaped steel
sheet pile
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210787836.5A
Other languages
Chinese (zh)
Other versions
CN115162335B (en
Inventor
刘刚
王佳佳
戚大峰
宋印章
于立岳
申亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202210787836.5A priority Critical patent/CN115162335B/en
Publication of CN115162335A publication Critical patent/CN115162335A/en
Application granted granted Critical
Publication of CN115162335B publication Critical patent/CN115162335B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

深基坑支护结构Deep foundation pit support structure

技术领域technical field

本发明涉及钢板桩技术领域,更具体地说,本发明涉及深基坑支护结构。The present invention relates to the technical field of steel sheet piles, and more particularly, to a deep foundation pit support structure.

背景技术Background technique

深基坑是指开挖深度超过5米(含5米),或深度虽未超过5米,但地质条件和周围环境及地下管线特别复杂的工程,基坑工程是由地面向下开挖一个地下空间,深基坑四周一般设置垂直的挡土围护结构,围护结构一般是在开挖面基底下有一定插入深度的板(桩)墙结构;板(桩)墙有悬臂式、单撑式、多撑式,支撑结构是为了减小围护结构的变形,控制墙体的弯矩,分为内撑和外锚两种,我国地下铁道施工中多用U形钢板桩,其沉放和拔除方法、使用的机械均与工字钢桩相同,但其构成方法则可分为单层钢板桩围堰、双层钢板桩围堰及屏幕等。由于地铁施工时基坑较深,为保证其垂直度且方便施工,并使其能封闭合龙,多采用帷幕式构造。Deep foundation pit refers to the excavation depth of more than 5 meters (including 5 meters), or although the depth does not exceed 5 meters, but the geological conditions, surrounding environment and underground pipelines are particularly complex projects. In underground space, vertical earth retaining enclosures are generally arranged around the deep foundation pit. The enclosures are generally plate (pile) wall structures with a certain depth of insertion under the base of the excavation surface; plate (pile) walls have cantilevered, single Support type and multi-support type. The support structure is to reduce the deformation of the enclosure structure and control the bending moment of the wall. It is divided into two types: inner support and external anchor. The removal method and the machinery used are the same as those of the I-beam pile, but the construction method can be divided into single-layer steel sheet pile cofferdam, double-layer steel sheet pile cofferdam and screen. Due to the deep foundation pit during subway construction, in order to ensure its verticality and facilitate construction, and to enable it to be closed and closed, a curtain-type structure is often used.

U形钢板桩通常都是使用起吊机吊高,然后将U形钢板桩吊至插桩点,和静压桩机配合将U形钢板桩插入,由于在插桩时必须要U形钢板桩呈竖直状态,所以采用的是单点吊运的方法,这样的方法使得U形钢板桩的一端在刚被吊起时,较低的另一端在容易与地面发生摩擦碰撞,导致U形钢板桩变形,需要人员对U形钢板桩变形的部位重新修整矫正,从而无法顺利插桩,所以导致了施工进程缓慢,比较耗时耗力,因此针对这个问题,需要我们及时解决。U-shaped steel sheet piles are usually lifted by a crane, and then the U-shaped steel sheet piles are hoisted to the insertion point, and the U-shaped steel sheet piles are inserted in cooperation with the static pile driver. In the vertical state, the single-point hoisting method is adopted. This method makes one end of the U-shaped steel sheet pile just hoisted, and the other lower end is prone to friction and collision with the ground, resulting in the U-shaped steel sheet pile. Deformation requires personnel to re-treat and correct the deformed part of the U-shaped steel sheet pile, so that the pile cannot be inserted smoothly, which leads to a slow construction process, which is time-consuming and labor-intensive. Therefore, we need to solve this problem in time.

发明内容SUMMARY OF THE INVENTION

为了克服现有技术的上述缺陷,本发明的实施例提供深基坑支护结构,通过连接绳收卷将承重块拖回,使得对应型储油箱跟随移动,推动滑动套在加固型缆绳表面滑动,使得起吊机缆绳跟随活动支撑臂移动,起吊机缆绳在移动时,加固型缆绳的受力点发生改变,使得U型钢板桩的一端受到重力惯性产生倾斜,从而U型钢板桩在空中转变成竖直状态以解决上述背景技术中提出的问题。In order to overcome the above-mentioned defects of the prior art, the embodiment of the present invention provides a deep foundation pit support structure, and the load-bearing block is pulled back through the rewinding of the connecting rope, so that the corresponding oil storage tank moves with it, and the sliding sleeve is pushed to slide on the surface of the reinforced cable. , so that the crane cable moves with the movable support arm. When the crane cable moves, the force point of the reinforced cable changes, so that one end of the U-shaped steel sheet pile is inclined by the gravitational inertia, so that the U-shaped steel sheet pile is transformed into a vertical state to solve the problems raised in the background art above.

为实现上述目的,本发明提供如下技术方案:深基坑支护结构,包括U 型钢板桩,所述U型钢板桩的一端开设有圆孔,所述圆孔的内侧设有活动限位柱,所述活动限位柱的外侧设有橡胶密封圈,所述橡胶密封圈的外侧固定安装有第一夹板,所述第一夹板的一侧固定安装有第二夹板,所述第二夹板的一侧固定安装有机箱,所述机箱的内侧设有正反转电机,所述正反转电机的输出端转动连接有齿轮,所述齿轮的外侧啮合有带齿型转筒,所述带齿型转筒的外侧绕接有连接绳,所述连接绳的一端固定连接有承重块,所述承重块的一侧固定安装有对应型储油箱,所述对应型储油箱的顶部固定安装有限位包覆箱,所述限位包覆箱的顶部固定安装有第一圆环,所述第一圆环的内侧套接有第一锁扣,所述第一锁扣的一端固定连接有加固型缆绳,所述加固型缆绳的一端固定连接有第二锁扣,所述第二锁扣的内侧套接有第二圆环,所述限位包覆箱的一侧固定安装有圆形限位座,所述圆形限位座的内部插接有伸缩杆,所述伸缩杆的一端固定安装有活动支撑臂,所述活动支撑臂的顶端插接有金属夹板,所述金属夹板的一侧卡接有滑动套,所述滑动套的外侧固定连接有第三圆环,所述第三圆环的内侧套接有起吊机缆绳。In order to achieve the above purpose, the present invention provides the following technical solutions: the deep foundation pit support structure includes a U-shaped steel sheet pile, one end of the U-shaped steel sheet pile is provided with a circular hole, and the inner side of the circular hole is provided with a movable limit column. , the outer side of the movable limit post is provided with a rubber sealing ring, the outer side of the rubber sealing ring is fixedly installed with a first clamping plate, one side of the first clamping plate is fixedly installed with a second clamping plate, and the second clamping plate is fixed on one side. A case is fixedly installed on one side, a forward and reverse rotation motor is arranged on the inner side of the case, the output end of the forward and reverse rotation motor is rotatably connected with a gear, and the outer side of the gear is meshed with a toothed rotating drum, and the toothed drum is engaged with the gear. A connecting rope is wound around the outside of the type rotating drum, one end of the connecting rope is fixedly connected with a bearing block, one side of the bearing block is fixedly installed with a corresponding type oil storage tank, and the top of the corresponding type oil storage tank is fixedly installed with a limited position A wrapping box, a first ring is fixedly installed on the top of the limit wrapping box, a first lock is sleeved on the inner side of the first ring, and one end of the first lock is fixedly connected with a reinforced type A cable, one end of the reinforced cable is fixedly connected with a second lock, the inner side of the second lock is sleeved with a second ring, and one side of the limit wrapping box is fixedly installed with a circular limit A telescopic rod is inserted inside the circular limit seat, a movable support arm is fixedly installed at one end of the telescopic rod, and a metal splint is inserted into the top of the movable support arm, and one side of the metal splint is inserted. A sliding sleeve is clamped and connected, the outer side of the sliding sleeve is fixedly connected with a third ring, and the inner side of the third ring is sleeved with a hoist cable.

采用上述进一步方案的有益效果是:将U型钢板桩用电钻开采出圆孔,将第一夹板与第二夹板卡接在U型钢板桩的两侧,再将活动限位柱插入第一夹板内,利用橡胶密封圈将活动限位柱固定,然后将对应型储油箱卡入U型钢板桩的另一端,通过将滑动套滑动至加固型缆绳的中心处,使得U型钢板桩的两端保持平稳,然后掰开金属夹板卡接在滑动套的外侧,把起吊机缆绳套接在第三圆环的外侧,当起吊机开始起吊时将U型钢板桩整体吊起,U型钢板桩在完全离开地面时,通过启动正反转电机,使得齿轮转动,从而带动带齿型转筒转动,使得连接绳收卷,连接绳在收卷时,从而将承重块拖回,使得对应型储油箱跟随移动,从而带动活动支撑臂在移动时,推动滑动套在加固型缆绳表面滑动,使得起吊机缆绳跟随活动支撑臂移动,起吊机缆绳在移动时,加固型缆绳的受力点发生改变,使得U型钢板桩的一端受到重力惯性产生倾斜,从而U型钢板桩在空中转变成竖直状态,伸缩杆在与第一夹板的一侧接触时产生回缩,从而减少占地空间,使得对应型储油箱能与第一夹板尽量靠拢,从而使得U型钢板桩能成竖直状,U型钢板桩在变成竖直状时,通过活动限位柱对U型钢板桩固定限位,防止U型钢板桩脱落。The beneficial effects of adopting the above-mentioned further scheme are as follows: the U-shaped steel sheet pile is drilled with an electric drill to drill a circular hole, the first plywood and the second plywood are clamped on both sides of the U-shaped steel sheet pile, and then the movable limit post is inserted into the first plywood Inside, use the rubber sealing ring to fix the movable limit post, then snap the corresponding oil storage tank into the other end of the U-shaped steel sheet pile, and slide the sliding sleeve to the center of the reinforced cable, so that both ends of the U-shaped steel sheet pile are Keep it stable, then break the metal splint and clamp it on the outside of the sliding sleeve, and connect the crane cable to the outside of the third ring. When the crane starts to lift, lift the U-shaped steel sheet pile as a whole. When it completely leaves the ground, start the forward and reverse motor to make the gear rotate, thereby driving the toothed drum to rotate, so that the connecting rope is reeled. Follow the movement, so as to drive the movable support arm to move, push the sliding sleeve to slide on the surface of the reinforced cable, so that the hoist cable moves with the movable support arm. When the hoist cable moves, the force point of the reinforced cable changes, making One end of the U-shaped steel sheet pile is inclined by the gravitational inertia, so that the U-shaped steel sheet pile is transformed into a vertical state in the air, and the telescopic rod retracts when it contacts with one side of the first splint, thereby reducing the floor space and making the corresponding type The oil storage tank can be as close as possible to the first splint, so that the U-shaped steel sheet pile can be vertical. The sheet pile fell off.

在一个优选地实施方式中,所述承重块的内部插接有横置支撑杆,所述横置支撑杆的两端均转动连接有车轮。In a preferred embodiment, a transverse support rod is inserted into the inside of the load-bearing block, and wheels are rotatably connected to both ends of the transverse support rod.

采用上述进一步方案的有益效果是:当连接绳在收卷时,通过车轮在U 型钢板桩的表面滚动,使得对应型储油箱更顺畅的移动。The beneficial effect of adopting the above-mentioned further solution is that when the connecting rope is being reeled, the wheels roll on the surface of the U-shaped steel sheet pile, so that the corresponding type of oil storage tank can move more smoothly.

在一个优选地实施方式中,所述对应型储油箱的内腔固定安装有球形座,所述球形座的内侧转动连接有滚珠。In a preferred embodiment, a spherical seat is fixedly installed in the inner cavity of the corresponding oil storage tank, and a ball is rotatably connected to the inner side of the spherical seat.

采用上述进一步方案的有益效果是:对应型储油箱在移动过程中,滚珠在U型钢板桩表面滚动,从而把对应型储油箱内腔的润滑油涂抹在U型钢板桩的表面。The beneficial effect of adopting the above-mentioned further scheme is: during the movement of the corresponding oil storage tank, the balls roll on the surface of the U-shaped steel sheet pile, so that the lubricating oil in the cavity of the corresponding oil storage tank is smeared on the surface of the U-shaped steel sheet pile.

在一个优选地实施方式中,所述球形座与滚珠的数量设置为多个,多个所述球形座与滚珠关于U型钢板桩的外侧呈路径阵列依次排布设置。In a preferred embodiment, the number of the spherical seats and the balls is set in multiples, and the plurality of the spherical seats and the balls are sequentially arranged in a path array with respect to the outer side of the U-shaped steel sheet pile.

采用上述进一步方案的有益效果是:通过多个球形座与滚珠的设置,从而能将润滑油更加均匀的涂抹在U型钢板桩的表面。The beneficial effect of adopting the above-mentioned further solution is that the lubricating oil can be applied more evenly on the surface of the U-shaped steel sheet pile through the arrangement of a plurality of spherical seats and balls.

在一个优选地实施方式中,所述限位包覆箱的内侧放置有配重块,所述对应型储油箱的顶部固定安装有螺纹边框,所述螺纹边框的内侧螺纹连接有螺纹盖。In a preferred embodiment, a counterweight is placed on the inner side of the limit wrapping box, a threaded frame is fixedly installed on the top of the corresponding oil storage tank, and a threaded cover is threadedly connected to the inner side of the threaded frame.

采用上述进一步方案的有益效果是:通过将螺纹盖拧开,从而将润滑油从螺纹边框处倒入对应型储油箱内腔,再将螺纹盖与螺纹盖拧紧,从而将润滑油密封在对应型储油箱内。The beneficial effect of adopting the above-mentioned further scheme is: by unscrewing the threaded cover, the lubricating oil is poured into the inner cavity of the corresponding type of oil storage tank from the threaded frame, and then the threaded cover and the threaded cover are tightened to seal the lubricating oil in the corresponding type. inside the fuel tank.

在一个优选地实施方式中,所述第二夹板的一侧固定安装有圆形限位筒,所述活动限位柱的底端固定安装有第四圆环,所述第四圆环的外侧套接有尼龙绳。In a preferred embodiment, a circular limiting cylinder is fixedly mounted on one side of the second clamping plate, a fourth circular ring is fixedly mounted on the bottom end of the movable limiting column, and the outer side of the fourth circular ring is fixedly mounted. Sleeve with nylon cord.

采用上述进一步方案的有益效果是:当U型钢板桩呈竖直状态时,通过静压桩机将U型钢板桩固定,工作人员在地面抓住尼龙绳向后拖动,从而将活动限位柱拖出圆孔内,使得活动限位柱与U型钢板桩不再贴合,然后起吊机起吊,将本装置拖出即可。The beneficial effect of adopting the above-mentioned further scheme is: when the U-shaped steel sheet pile is in a vertical state, the U-shaped steel sheet pile is fixed by a static pile driver, and the staff grabs the nylon rope on the ground and drags it backward, thereby limiting the movable position. The column is pulled out of the round hole, so that the movable limit column and the U-shaped steel sheet pile no longer fit, and then the hoist is lifted, and the device can be pulled out.

在一个优选地实施方式中,所述金属夹板为可塑性材质,所述金属夹板与滑动套呈夹持卡接状设置,所述滑动套与加固型缆绳呈滑动连接状设置。In a preferred embodiment, the metal splint is made of a plastic material, the metal splint and the sliding sleeve are arranged in a clamping and snapping shape, and the sliding sleeve and the reinforced cable are arranged in a sliding connection shape.

采用上述进一步方案的有益效果是:通过金属夹板夹持滑动套,使得连接绳在收卷时,带动活动支撑臂移动,从而带动滑动套在加固型缆绳外侧滑动。The beneficial effect of the above-mentioned further solution is that the sliding sleeve is clamped by the metal splint, so that when the connecting rope is reeled, the movable support arm is driven to move, thereby driving the sliding sleeve to slide outside the reinforced cable.

本发明的技术效果和优点:Technical effects and advantages of the present invention:

1、当起吊机将U型钢板桩整体吊起时,U型钢板桩在完全离开地面时,通过启动正反转电机,使得齿轮转动,从而带动带齿型转筒转动,使得连接绳收卷,连接绳在收卷时,从而将承重块拖回,使得对应型储油箱跟随移动,承重块在移动时带动车轮在U型钢板桩的表面转动,也使得活动支撑臂在移动时,推动滑动套在加固型缆绳表面滑动,使得起吊机缆绳跟随活动支撑臂移动,起吊机缆绳在移动时,加固型缆绳的受力点发生改变,使得U型钢板桩的一端受到重力惯性产生倾斜,从而U型钢板桩在空中转变成竖直状态,从而避免了单点起吊将U型钢板桩碰撞变形,且使得U型钢板桩在空中转换成竖直形态,方便了静压桩机的操作,因此提升了稳定性与便捷性;1. When the hoist lifts the U-shaped steel sheet pile as a whole, when the U-shaped steel sheet pile completely leaves the ground, the gear rotates by starting the forward and reverse rotation motor, thereby driving the toothed drum to rotate, so that the connecting rope is wound up , when the connecting rope is reeled, the load-bearing block is dragged back, so that the corresponding oil storage tank moves with it, the load-bearing block drives the wheel to rotate on the surface of the U-shaped steel sheet pile when it moves, and also makes the movable support arm move. The sleeve slides on the surface of the reinforced cable, so that the crane cable moves with the movable support arm. When the crane cable moves, the force point of the reinforced cable changes, so that one end of the U-shaped steel sheet pile is inclined by the gravitational inertia, so that the U The U-shaped steel sheet pile is transformed into a vertical state in the air, thereby avoiding the collision and deformation of the U-shaped steel sheet pile by single-point lifting, and the U-shaped steel sheet pile is converted into a vertical state in the air, which facilitates the operation of the static pile driver. stability and convenience;

2、连接绳在收卷时带动对应型储油箱在U型钢板桩的表面移动,通过滚珠在U型钢板桩表面滚动,从而把对应型储油箱内腔的润滑油涂抹在U型钢板桩的表面,使得静压桩机在将U型钢板桩插入地里时更加顺畅,因此提升了便捷性。2. The connecting rope drives the corresponding oil storage tank to move on the surface of the U-shaped steel sheet pile during winding, and rolls on the surface of the U-shaped steel sheet pile through the balls, so that the lubricating oil in the corresponding oil storage tank is smeared on the surface of the U-shaped steel sheet pile. The surface makes the static pile driver smoother when inserting the U-shaped steel sheet pile into the ground, thus improving the convenience.

附图说明Description of drawings

图1为本发明的整体结构示意图。FIG. 1 is a schematic diagram of the overall structure of the present invention.

图2为本发明的结构剖视图。FIG. 2 is a cross-sectional view of the structure of the present invention.

图3为本发明图2的A部结构放大图。FIG. 3 is an enlarged view of the structure of part A of FIG. 2 of the present invention.

图4为本发明图2的B部结构放大图。FIG. 4 is an enlarged view of the structure of part B of FIG. 2 of the present invention.

图5为本发明对应型储油箱的结构剖视图。FIG. 5 is a structural cross-sectional view of a corresponding type of oil storage tank of the present invention.

图6为本发明图5的C部结构放大图。FIG. 6 is an enlarged view of the structure of part C of FIG. 5 of the present invention.

图7为本发明机箱的结构剖视图。FIG. 7 is a cross-sectional view of the structure of the chassis of the present invention.

附图标记为:1、U型钢板桩;2、圆孔;3、活动限位柱;4、橡胶密封圈; 5、第一夹板;6、第二夹板;7、机箱;8、正反转电机;9、齿轮;10、带齿型转筒;11、连接绳;12、承重块;13、对应型储油箱;14、限位包覆箱; 15、第一圆环;16、第一锁扣;17、加固型缆绳;18、第二锁扣;19、第二圆环;20、圆形限位座;21、伸缩杆;22、活动支撑臂;23、滑动套;24、第三圆环;25、起吊机缆绳;26、横置支撑杆;27、车轮;28、球形座;29、滚珠;30、配重块;31、螺纹边框;32、螺纹盖;33、圆形限位筒;34、第四圆环;35、尼龙绳;36、金属夹板。The reference signs are: 1. U-shaped steel sheet pile; 2. Round hole; 3. Active limit post; 4. Rubber sealing ring; 5. The first plywood; 6. The second plywood; Rotary motor; 9. Gear; 10. Toothed drum; 11. Connecting rope; 12. Load-bearing block; 13. Corresponding oil storage tank; 14. Limit wrapping box; 15. The first ring; 16. The first a lock; 17, reinforced cable; 18, a second lock; 19, a second ring; 20, a circular limit seat; 21, a telescopic rod; 22, a movable support arm; 23, a sliding sleeve; 24, The third ring; 25, hoist cable; 26, horizontal support rod; 27, wheel; 28, spherical seat; 29, ball; 30, counterweight; 31, threaded frame; 32, threaded cover; 33, circle 34, the fourth ring; 35, nylon rope; 36, metal splint.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

实施例1:深基坑支护结构,如图1所示,包括U型钢板桩1,如图3所示,U型钢板桩1的一端开设有圆孔2,圆孔2的内侧设有活动限位柱3,通过活动限位柱3插接进圆孔2内,对U型钢板桩1起到固定限位的作用,活动限位柱3的外侧设有橡胶密封圈4,通过橡胶密封圈4的设置,当活动限位柱3插入第一夹板5内腔时,对橡胶密封圈4进行挤压,橡胶密封圈4通过自身的回弹力对活动限位柱3进行包裹限位,对活动限位柱3起到限位的作用,且防止活动限位柱3滑落,橡胶密封圈4的外侧固定安装有第一夹板5,第一夹板5的一侧固定安装有第二夹板6,通过第一夹板5与第二夹板6贴合在U型钢板桩1的两侧,使得U型钢板桩1在被吊起时,对U型钢板桩1起到平稳支撑的作用,第二夹板6的一侧固定安装有用于固定限位的机箱7,如图7所示,机箱7的内侧设有正反转电机8,正反转电机8可选用正反转三相异步电动机YPZ4508-6型号,正反转电机8的输出端转动连接有齿轮9,齿轮 9的外侧啮合有带齿型转筒10,带齿型转筒10的外侧绕接有连接绳11,通过齿轮9与带齿型转筒10啮合的设置,当启动正反转电机8时,带动齿轮9转动,从而带动带齿型转筒10转动,使得连接绳11可以伸长与收紧,如图4 所示,连接绳11的一端固定连接有承重块12,通过承重块12与U型钢板桩 1的底部贴合,从而对U型钢板桩1起到稳定支撑的作用,承重块12的一侧固定安装有对应型储油箱13,通过对应型储油箱13卡接在U型钢板桩1的外侧,对U型钢板桩1起到限位支撑的作用,对应型储油箱13的顶部固定安装有用于固定限位的限位包覆箱14,限位包覆箱14的顶部固定安装有第一圆环 15,如图2所示,第一圆环15的内侧套接有用于与第一圆环15固定的第一锁扣16,第一锁扣16的一端固定连接有加固型缆绳17,加固型缆绳17的一端固定连接有第二锁扣18,第二锁扣18的内侧套接有第二圆环19,如图4 所示,限位包覆箱14的一侧固定安装有圆形限位座20,圆形限位座20的内部插接有伸缩杆21,通过圆形限位座20对伸缩杆21起到限位支撑的作用,防止伸缩杆21脱落,如图2所示,伸缩杆21的一端固定安装有活动支撑臂 22,如图1所示,活动支撑臂22的顶端插接有金属夹板36,金属夹板36的一侧卡接有滑动套23,金属夹板36为可塑性材质,金属夹板36与滑动套23 呈夹持卡接状设置,滑动套23与加固型缆绳17呈滑动连接状设置,通过金属夹板36夹持滑动套23,使得连接绳11在收卷时,带动活动支撑臂22移动,从而带动滑动套23在加固型缆绳17外侧滑动,滑动套23的外侧固定连接有第三圆环24,第三圆环24的内侧套接有起吊机缆绳25,通过起吊机缆绳25 与第三圆环24固定,从而将U型钢板桩1吊起,承重块12的内部插接有横置支撑杆26,横置支撑杆26的两端均转动连接有车轮27,通过车轮27的设置,当连接绳11在收卷时,通过车轮27在U型钢板桩1的表面滚动,使得对应型储油箱13更顺畅的移动。Example 1: The deep foundation pit support structure, as shown in Figure 1, includes a U-shaped steel sheet pile 1, as shown in Figure 3, one end of the U-shaped steel sheet pile 1 is provided with a circular hole 2, and the inner side of the circular hole 2 is provided with a circular hole 2. The movable limit column 3 is inserted into the circular hole 2 through the movable limit column 3 to play a fixed limit role for the U-shaped steel sheet pile 1. The outer side of the movable limit column 3 is provided with a rubber sealing ring 4, which passes through the rubber The setting of the sealing ring 4, when the movable limit post 3 is inserted into the inner cavity of the first splint 5, the rubber sealing ring 4 is squeezed, and the rubber sealing ring 4 wraps and limits the movable limit post 3 through its own resilience. It plays a role in limiting the movable limit post 3 and prevents the movable limit post 3 from slipping. The outer side of the rubber sealing ring 4 is fixedly installed with a first clamp plate 5, and one side of the first clamp plate 5 is fixedly installed with a second clamp plate 6. , the first splint 5 and the second splint 6 are attached to both sides of the U-shaped steel sheet pile 1, so that when the U-shaped steel sheet pile 1 is hoisted, it plays a stable supporting role for the U-shaped steel sheet pile 1, and the second One side of the splint 6 is fixedly installed with a chassis 7 for fixing the limit. As shown in Figure 7, the inner side of the chassis 7 is provided with a forward and reverse rotation motor 8. Model 6, the output end of the forward and reverse motor 8 is rotatably connected with a gear 9, the outer side of the gear 9 is meshed with a toothed drum 10, and a connecting rope 11 is wound around the outer side of the toothed drum 10. The setting of the toothed drum 10 is engaged, when the forward and reverse motor 8 is started, the gear 9 is driven to rotate, thereby driving the toothed drum 10 to rotate, so that the connecting rope 11 can be stretched and tightened, as shown in Figure 4, One end of the connecting rope 11 is fixedly connected with a bearing block 12, and the bearing block 12 is attached to the bottom of the U-shaped steel sheet pile 1, so as to play a stable supporting role for the U-shaped steel sheet pile 1. One side of the bearing block 12 is fixedly installed with a The corresponding type oil storage tank 13 is clamped to the outside of the U-shaped steel sheet pile 1 through the corresponding type oil storage tank 13, so as to play the role of limit support for the U-shaped steel sheet pile 1. The top of the corresponding type oil storage tank 13 is fixedly installed with a fixed limit A first ring 15 is fixedly installed on the top of the limit covering box 14 , as shown in FIG. 2 , the inner side of the first ring 15 is sleeved with the first ring 15 for fixing One end of the first lock 16 is fixedly connected with a reinforced cable 17, one end of the reinforced cable 17 is fixedly connected with a second lock 18, and the inner side of the second lock 18 is sleeved with a second circle Ring 19 , as shown in FIG. 4 , a circular limiting seat 20 is fixedly installed on one side of the limiting wrapping box 14 , and a telescopic rod 21 is inserted into the circular limiting seat 20 . The telescopic rod 21 plays a role of limiting support to prevent the telescopic rod 21 from falling off. As shown in FIG. 2 , a movable support arm 22 is fixedly installed at one end of the telescopic rod 21 . As shown in FIG. 1 , the top end of the movable support arm 22 is inserted A metal splint 36 is connected, and one side of the metal splint 36 is clamped with a sliding sleeve 23. The metal splint 36 is made of plastic material. sliding connection Setting, the sliding sleeve 23 is clamped by the metal splint 36, so that when the connecting rope 11 is reeled, the movable support arm 22 is driven to move, thereby driving the sliding sleeve 23 to slide outside the reinforced cable 17, and the outer side of the sliding sleeve 23 is fixedly connected with a first Three rings 24, the inner side of the third ring 24 is sleeved with a hoist cable 25, which is fixed with the third ring 24 by the hoist cable 25, so that the U-shaped steel sheet pile 1 is hoisted, and the inner part of the bearing block 12 is inserted There are transverse support rods 26, and both ends of the transverse support rods 26 are rotatably connected with wheels 27. Through the setting of the wheels 27, when the connecting rope 11 is being wound up, the wheels 27 roll on the surface of the U-shaped steel sheet pile 1, The corresponding type oil storage tank 13 is made to move more smoothly.

针对以上技术方案需要说明的是,当实际使用本装置时,将U型钢板桩1 用电钻开采出圆孔2,将第一夹板5与第二夹板6卡接在U型钢板桩1的两侧,再将活动限位柱3插入第一夹板5内,利用橡胶密封圈4将活动限位柱3固定,然后将对应型储油箱13卡入U型钢板桩1的另一端,通过将滑动套23 滑动至加固型缆绳17的中心处,使得U型钢板桩1的两端保持平稳,然后掰开金属夹板36卡接在滑动套23的外侧,把起吊机缆绳25套接在第三圆环24 的外侧,当起吊机开始起吊时将U型钢板桩1整体吊起,U型钢板桩1在完全离开地面时,通过启动正反转电机8,使得齿轮9转动,从而带动带齿型转筒 10转动,使得连接绳11收卷,连接绳11在收卷时,从而将承重块12拖回,使得对应型储油箱13跟随移动,承重块12在移动时带动车轮27在U型钢板桩1的表面转动,也使得活动支撑臂22在移动时,推动滑动套23在加固型缆绳17表面滑动,使得起吊机缆绳25跟随活动支撑臂22移动,起吊机缆绳 25在移动时,加固型缆绳17的受力点发生改变,使得U型钢板桩1的一端受到重力惯性产生倾斜,从而U型钢板桩1在空中转变成竖直状态,伸缩杆21 在与第一夹板5的一侧接触时产生回缩,从而减少占地空间,使得对应型储油箱13能与第一夹板5尽量靠拢,从而使得U型钢板桩1能成竖直状,U型钢板桩1在变成竖直状时,通过活动限位柱3对U型钢板桩1固定限位,防止U型钢板桩1脱落。It should be noted that for the above technical solution, when the device is actually used, the U-shaped steel sheet pile 1 is drilled with an electric drill to dig out the circular hole 2, and the first clamp plate 5 and the second clamp plate 6 are clamped on the two sides of the U-shaped steel sheet pile 1. Then insert the movable limit post 3 into the first splint 5, use the rubber sealing ring 4 to fix the movable limit post 3, and then snap the corresponding type oil storage tank 13 into the other end of the U-shaped steel sheet pile 1, by sliding the sliding The sleeve 23 is slid to the center of the reinforced cable 17, so that the two ends of the U-shaped steel sheet pile 1 are kept stable, then the metal splint 36 is broken off and clamped to the outside of the sliding sleeve 23, and the hoist cable 25 is sleeved on the third circle. On the outside of the ring 24, when the hoist starts to lift the U-shaped steel sheet pile 1 as a whole, when the U-shaped steel sheet pile 1 completely leaves the ground, the gear 9 rotates by starting the forward and reverse rotation motor 8, thereby driving the toothed type. The rotating drum 10 rotates, so that the connecting rope 11 is reeled. When the connecting rope 11 is reeled, the load-bearing block 12 is dragged back, so that the corresponding type of oil storage tank 13 follows the movement. The rotation of the surface of the pile 1 also makes the movable support arm 22 move, pushing the sliding sleeve 23 to slide on the surface of the reinforced cable 17, so that the hoist cable 25 moves with the movable support arm 22. When the hoist cable 25 moves, the reinforced cable 25 moves. The force point of the cable 17 changes, so that one end of the U-shaped steel sheet pile 1 is inclined by the gravitational inertia, so that the U-shaped steel sheet pile 1 is transformed into a vertical state in the air, and the telescopic rod 21 is in contact with one side of the first splint 5 . When retracted, the floor space is reduced, so that the corresponding oil storage tank 13 can be as close to the first splint 5 as possible, so that the U-shaped steel sheet pile 1 can be vertical, and when the U-shaped steel sheet pile 1 becomes vertical , The U-shaped steel sheet pile 1 is fixed and limited by the movable limit column 3 to prevent the U-shaped steel sheet pile 1 from falling off.

实施例2:如图6所示,对应型储油箱13的内腔固定安装有球形座28,球形座28的一侧设有通孔,使得对应型储油箱13内的润滑油可以排出,球形座28的内侧转动连接有滚珠29,球形座28与滚珠29的数量设置为多个,多个球形座28与滚珠29关于U型钢板桩1的外侧呈路径阵列依次排布设置,如图5所示,限位包覆箱14的内侧放置有配重块30,通过配重块30的设置,使得U型钢板桩1的两端重量均衡,从而更加平稳被吊起,对应型储油箱13 的顶部固定安装有螺纹边框31,螺纹边框31的内侧螺纹连接有螺纹盖32。Embodiment 2: As shown in FIG. 6 , a spherical seat 28 is fixedly installed in the inner cavity of the corresponding type oil storage tank 13, and one side of the spherical seat 28 is provided with a through hole, so that the lubricating oil in the corresponding type oil storage tank 13 can be discharged. The inner side of the seat 28 is rotatably connected with the balls 29, the number of the ball seats 28 and the balls 29 is set to be multiple, and the plurality of the ball seats 28 and the balls 29 are arranged in a path array in order with respect to the outer side of the U-shaped steel sheet pile 1, as shown in Figure 5 As shown in the figure, a counterweight block 30 is placed on the inner side of the limit cladding box 14, and the weight of both ends of the U-shaped steel sheet pile 1 is balanced by the setting of the counterweight block 30, so that it can be hoisted more smoothly. The corresponding type of oil storage tank 13 A threaded frame 31 is fixedly installed on the top of the threaded frame 31 , and a threaded cover 32 is threadedly connected to the inner side of the threaded frame 31 .

针对以上技术方案需要说明的是,当实际使用本装置时,通过将螺纹盖 32拧开,从而将润滑油从螺纹边框31处倒入对应型储油箱13内腔,再将螺纹盖32与螺纹盖32拧紧,当对应型储油箱13在移动过程中,滚珠29在U 型钢板桩1表面滚动,从而把对应型储油箱13内腔的润滑油涂抹在U型钢板桩1的表面。It should be noted for the above technical solutions that, when the device is actually used, the threaded cover 32 is unscrewed, so that the lubricating oil is poured from the threaded frame 31 into the inner cavity of the corresponding type of oil storage tank 13, and then the threaded cover 32 and the threaded When the cover 32 is tightened, when the corresponding type oil storage tank 13 is moving, the balls 29 roll on the surface of the U-shaped steel sheet pile 1, so as to apply the lubricating oil in the corresponding type oil storage tank 13 on the surface of the U-shaped steel sheet pile 1.

实施例3:如图2所示,第二夹板6的一侧固定安装有圆形限位筒33,活动限位柱3的底端固定安装有第四圆环34,第四圆环34的外侧套接有尼龙绳35。Embodiment 3: As shown in FIG. 2 , a circular limiting cylinder 33 is fixedly installed on one side of the second clamping plate 6 , and a fourth annular ring 34 is fixedly installed at the bottom end of the movable limiting column 3 . Nylon rope 35 is sleeved on the outside.

针对以上技术方案需要说明的是,当实际使用本装置时,当U型钢板桩1 呈竖直状态时,通过静压桩机将U型钢板桩1固定,工作人员在地面抓住尼龙绳35向后拖动,从而将活动限位柱3拖出圆孔2内,使得活动限位柱3与 U型钢板桩1不再贴合,然后起吊机起吊,将本装置拖出即可。It should be noted that for the above technical solution, when the device is actually used, when the U-shaped steel sheet pile 1 is in a vertical state, the U-shaped steel sheet pile 1 is fixed by a static pile driver, and the worker grabs the nylon rope 35 on the ground. Drag backwards to pull the movable limit post 3 out of the circular hole 2, so that the movable limit post 3 and the U-shaped steel sheet pile 1 are no longer in contact, and then the hoist lifts and pulls the device out.

最后应说明的几点是:首先,在本申请的描述中,需要说明的是,除非另有规定和限定,术语“安装”、“相连”、“连接”应做广义理解,可以是机械连接或电连接,也可以是两个元件内部的连通,可以是直接相连,“上”、“下”、“左”、“右”等仅用于表示相对位置关系,当被描述对象的绝对位置改变,则相对位置关系可能发生改变;The last points to be noted are: First of all, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, and may be mechanical connection. or electrical connection, or internal communication between two components, or direct connection, "up", "down", "left", "right", etc. are only used to indicate relative positional relationship, when the absolute position of the object being described changes, the relative positional relationship may change;

其次:本发明公开实施例附图中,只涉及到与本公开实施例涉及到的结构,其他结构可参考通常设计,在不冲突情况下,本发明同一实施例及不同实施例可以相互组合;Secondly: in the drawings of the disclosed embodiments of the present invention, only the structures involved in the embodiments of the present disclosure are involved, other structures can refer to the general design, and the same embodiment and different embodiments of the present invention can be combined with each other under the condition of no conflict;

最后:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。Finally: the above is only the preferred embodiment of the present invention, and is not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the present invention. within the scope of protection.

Claims (7)

1. Deep basal pit supporting construction, including U shaped steel sheet pile (1), its characterized in that: round hole (2) have been seted up to the one end of U shaped steel sheet pile (1), the inboard of round hole (2) is equipped with activity spacing post (3), the outside of activity spacing post (3) is equipped with rubber seal (4), the outside fixed mounting of rubber seal (4) has first splint (5), one side fixed mounting of first splint (5) has second splint (6), one side fixed mounting of second splint (6) has quick-witted case (7), the inboard of quick-witted case (7) is equipped with just reverse motor (8), the output of just reverse motor (8) rotates and is connected with gear (9), the outside meshing of gear (9) has tooth type rotary drum (10), the outside round trip of tooth type rotary drum (10) has connection rope (11), the one end fixedly connected with reinforcing block (12) of connection rope (11), one side fixed mounting of bearing block (12) has corresponding type batch oil tank (13), the top fixed mounting of corresponding type batch oil tank (13) has spacing cladding case (14), the top fixed mounting of spacing cladding case (14) has first ring reinforcing ring (15), first bearing ring (15) fixed mounting has first hawser (17) first hasp (17), first hasp (17) fixed mounting has reinforcing block (17), and second hasp (17) has first hawser (17) The utility model discloses a locking device, second ring (19) have been cup jointed to the inboard of second hasp (18), one side fixed mounting of spacing cladding case (14) has circular spacing seat (20), the inside of circular spacing seat (20) is pegged graft and is had telescopic link (21), the one end fixed mounting of telescopic link (21) has movable support arm (22), peg graft on the top of movable support arm (22) has metal splint (36), one side joint of metal splint (36) has slip cap (23), the outside fixedly connected with third ring (24) of slip cap (23), crane hawser (25) have been cup jointed to the inboard of third ring (24).
2. The deep foundation pit supporting structure according to claim 1, wherein: the bearing block (12) is internally inserted with a transverse supporting rod (26), and two ends of the transverse supporting rod (26) are rotatably connected with wheels (27).
3. The deep foundation pit supporting structure according to claim 1, wherein: the inner cavity of the corresponding oil storage tank (13) is fixedly provided with a spherical seat (28), and the inner side of the spherical seat (28) is rotatably connected with a ball (29).
4. The deep foundation pit supporting structure according to claim 3, wherein: spherical seat (28) and ball (29) quantity sets up to a plurality ofly, and is a plurality of spherical seat (28) and ball (29) are the route array and arrange the setting in proper order about the outside of U shaped steel sheet pile (1).
5. The deep foundation pit supporting structure according to claim 3, wherein: balancing weight (30) have been placed to the inboard of spacing cladding case (14), the top fixed mounting that corresponds type batch oil tank (13) has screw thread frame (31), the inboard threaded connection of screw thread frame (31) has screw thread lid (32).
6. The deep foundation pit supporting structure according to claim 1, wherein: one side fixed mounting of second splint (6) has circular spacing section of thick bamboo (33), the bottom fixed mounting of activity spacing post (3) has fourth ring (34), nylon rope (35) have been cup jointed in the outside of fourth ring (34).
7. The deep foundation pit supporting structure according to claim 1, wherein: metal splint (36) are the plasticity material, metal splint (36) are centre gripping joint form setting with slip cap (23), slip cap (23) are the sliding connection form setting with reinforcement type hawser (17).
CN202210787836.5A 2022-07-06 2022-07-06 Deep foundation pit supporting structure Active CN115162335B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210787836.5A CN115162335B (en) 2022-07-06 2022-07-06 Deep foundation pit supporting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210787836.5A CN115162335B (en) 2022-07-06 2022-07-06 Deep foundation pit supporting structure

Publications (2)

Publication Number Publication Date
CN115162335A true CN115162335A (en) 2022-10-11
CN115162335B CN115162335B (en) 2024-01-26

Family

ID=83491567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210787836.5A Active CN115162335B (en) 2022-07-06 2022-07-06 Deep foundation pit supporting structure

Country Status (1)

Country Link
CN (1) CN115162335B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08269958A (en) * 1995-03-31 1996-10-15 Nippon Sharyo Seizo Kaisha Ltd Elevation device for working platform for pile constructing machine
EP2327620A2 (en) * 2009-11-27 2011-06-01 Sany Electric Co., Ltd. Piling barge
CN109113060A (en) * 2018-08-30 2019-01-01 中交二航局第二工程有限公司 A kind of heavy type casing turns over piling method
WO2019044939A1 (en) * 2017-09-04 2019-03-07 Giken Ltd. Pile press-in apparatus and pile press-in method
CN111648257A (en) * 2020-06-02 2020-09-11 盾构及掘进技术国家重点实验室 Construction method for underpinning pile foundation of viaduct
CN214423431U (en) * 2021-03-12 2021-10-19 中天科技集团海洋工程有限公司 Turning device that pile sinking monitoring platform used
CN114538270A (en) * 2022-03-29 2022-05-27 中建三局集团有限公司 Anchor clamps of precast pile hoist and mount

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08269958A (en) * 1995-03-31 1996-10-15 Nippon Sharyo Seizo Kaisha Ltd Elevation device for working platform for pile constructing machine
EP2327620A2 (en) * 2009-11-27 2011-06-01 Sany Electric Co., Ltd. Piling barge
WO2019044939A1 (en) * 2017-09-04 2019-03-07 Giken Ltd. Pile press-in apparatus and pile press-in method
CN109113060A (en) * 2018-08-30 2019-01-01 中交二航局第二工程有限公司 A kind of heavy type casing turns over piling method
CN111648257A (en) * 2020-06-02 2020-09-11 盾构及掘进技术国家重点实验室 Construction method for underpinning pile foundation of viaduct
CN214423431U (en) * 2021-03-12 2021-10-19 中天科技集团海洋工程有限公司 Turning device that pile sinking monitoring platform used
CN114538270A (en) * 2022-03-29 2022-05-27 中建三局集团有限公司 Anchor clamps of precast pile hoist and mount

Also Published As

Publication number Publication date
CN115162335B (en) 2024-01-26

Similar Documents

Publication Publication Date Title
CN110668291B (en) Hoisting device for house construction engineering
CN113003433B (en) Segmental beam lifting device
CN115162335A (en) Deep foundation pit supporting structure
CN112227718B (en) Concrete placement construction prevents discrete device
CN111661770A (en) Mechanical transfer device for mechanical lifting type engineering
CN1666948A (en) Inside climbing tower crane with multi-hook and deep well winch
CN119160797A (en) A synchronous lifting frame for hoisting large-span steel structure beams in photovoltaic glass all-oxygen kiln
CN219079024U (en) Mounting platform of large-tonnage prefabricated pipe pile
CN204873610U (en) Formula derrick is pulled to fibre
CN210393496U (en) Building outer wall hoisting equipment
CN114772440A (en) Lifting appliance for lifting ultralong reinforcement cage with bending deformation resistance
CN212562562U (en) Plumb line convenient to fix for construction engineering construction
CN115838112B (en) Building hoisting device and application method thereof
CN221836624U (en) Hoisting equipment
CN219058351U (en) Elevator for building engineering construction
CN212953893U (en) Cable reel lifting device
CN216971760U (en) Heavy high stability drilling is filled operation and is used tower crane
CN219259358U (en) Electric garbage grab bucket crane
KR101894743B1 (en) Structure of crane that is easy to mount and dismount hoist
CN220723430U (en) A cement hoist for construction
CN220011956U (en) A stable lifting mechanism
CN216405388U (en) Major diameter that can avoid deviation digs bored concrete pile structure soon
CN223534688U (en) Stable high steel structure box girder hoisting device
CN219078949U (en) Low headroom European type lifting mechanism of heavy hoist
CN219885484U (en) A kind of electric equipment installation and hoisting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant