CN115162171A - Sectional installation method and installation system for suspension bridge steel pull rod anchoring system - Google Patents

Sectional installation method and installation system for suspension bridge steel pull rod anchoring system Download PDF

Info

Publication number
CN115162171A
CN115162171A CN202210678572.XA CN202210678572A CN115162171A CN 115162171 A CN115162171 A CN 115162171A CN 202210678572 A CN202210678572 A CN 202210678572A CN 115162171 A CN115162171 A CN 115162171A
Authority
CN
China
Prior art keywords
section
anchoring
tensioning
connecting sleeve
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210678572.XA
Other languages
Chinese (zh)
Inventor
李明欢
扆飞
胡维东
周龙
程琳刚
尚敏
李云
李芳军
伍艺
李德坤
魏家旭
刘斌
李�杰
杨振生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
8th Engineering Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
8th Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, 8th Engineering Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN202210678572.XA priority Critical patent/CN115162171A/en
Publication of CN115162171A publication Critical patent/CN115162171A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A sectional installation method and a sectional installation system of a suspension bridge steel pull rod anchoring system relate to the technical field of bridge construction, the steel pull rod comprises an anchoring section and a tensioning section, and the installation method comprises the following steps: and erecting a support system at a preset assembly site. Respectively assembling the anchoring section and the tensioning section by using a bracket system; and respectively hoisting the assembled anchoring section and the assembled tensioning section to a preset butt joint field. And butting the anchoring section and the tensioning section by using a butting system to form the steel pull rod. This application embodiment divide into anchor section and stretch-draw section with the steel pull rod earlier to hoist anchor section and stretch-draw section respectively to the support system and assemble respectively, hoist the anchor section and the stretch-draw section that the equipment was accomplished respectively to predetermineeing the butt joint place, utilize butt joint system with stretch-draw section and anchor section butt joint, effectively solved the length of steel pull rod, the big problem that is difficult to hoist of weight.

Description

一种悬索桥钢拉杆锚固系统的分段安装方法及安装系统A segmented installation method and installation system of a suspension bridge steel tie rod anchorage system

技术领域technical field

本申请涉及桥梁施工技术领域,特别涉及一种悬索桥钢拉杆锚固系统的分段安装方法及安装系统。The present application relates to the technical field of bridge construction, and in particular, to a segmented installation method and installation system of a steel tie rod anchoring system for a suspension bridge.

背景技术Background technique

随着大跨径桥梁技术的发展,悬索桥在大江大河上广泛应用。悬索桥也称吊桥,是指利用主缆和吊索作为加劲梁的悬挂体系,将荷载作用传递到桥塔、锚碇的桥梁。相关技术中,主缆的锚固系统多采用钢拉杆,钢拉杆的长度较长,重量较大,使得吊装难度大。With the development of long-span bridge technology, suspension bridges are widely used on large rivers. Suspension bridges, also known as suspension bridges, refer to bridges that use main cables and suspension cables as a suspension system for stiffening beams to transfer loads to pylons and anchorages. In the related art, the anchoring system of the main cable mostly adopts steel tie rods, which are long in length and heavy in weight, making hoisting difficult.

发明内容SUMMARY OF THE INVENTION

本申请实施例提供一种悬索桥钢拉杆锚固系统的分段安装方法及安装系统,以解决悬索桥锚固系统的钢拉杆的长度长、重量大,导致其吊装难度大的问题。Embodiments of the present application provide a method and an installation system for segmented installation of a steel tie rod anchoring system for a suspension bridge, so as to solve the problems of long length and heavy weight of the steel tie rod of the suspension bridge anchorage system, which make it difficult to hoist.

一种悬索桥钢拉杆锚固系统的分段安装方法,所述钢拉杆包括锚固段和张拉段,安装方法包括如下步骤:A segmented installation method of a steel tie rod anchoring system for a suspension bridge, wherein the steel tie rod includes an anchoring section and a tension section, and the installation method includes the following steps:

在预设组装场地架设支架系统;Erection of support systems at preset assembly sites;

利用支架系统将锚固段和张拉段分别进行组装;Assemble the anchoring section and the tensioning section separately by using the bracket system;

将组装后的锚固段和张拉段分别吊装至预设对接场地;Lift the assembled anchoring section and tensioning section to the preset docking site respectively;

利用对接系统将锚固段与张拉段对接形成钢拉杆。The anchoring section and the tensioning section are butted by the docking system to form a steel tie rod.

进一步的,所述利用支架系统将锚固段和张拉段分别进行组装包括:Further, the use of the support system to assemble the anchoring section and the tensioning section respectively includes:

在支架系统上设置锚垫板,锚垫板为竖向且可拆卸;An anchor plate is set on the support system, and the anchor plate is vertical and detachable;

将锚固段或张拉段支撑于支架系统,且使锚固段或张拉段的第一端水平贯穿于锚垫板的板面;Support the anchoring section or the tensioning section on the bracket system, and make the first end of the anchoring section or the tensioning section horizontally penetrate the surface of the anchor plate;

自锚固段或张拉段的第二端至锚垫板的方向,在锚固段或张拉段的外侧套设预埋管,且将预埋管邻近于锚垫板的一端与锚垫板的板面固定连接,所述预埋管位于锚垫板的一侧,该侧为锚垫板邻近锚固段或张拉段的第二端的一侧。From the second end of the anchoring section or the tensioning section to the direction of the anchor plate, a pre-embedded pipe is sleeved on the outside of the anchoring section or the tensioning section, and the pre-embedded pipe is adjacent to one end of the anchor plate and the anchor plate. The plate surfaces are fixedly connected, and the embedded pipe is located on one side of the anchor plate, which is the side of the anchor plate adjacent to the second end of the anchoring section or the tensioning section.

进一步的,所述支架系统包括平台和凹槽形的固定装置,所述在预设组装场地架设支架系统包括:Further, the bracket system includes a platform and a groove-shaped fixing device, and the bracket system erected at a preset assembly site includes:

在预设组装场地架设平台;Erection of platforms at preset assembly sites;

将固定装置设置于平台的顶面,且使固定装置的槽口朝向钢拉杆的张拉段;Set the fixing device on the top surface of the platform, and make the notch of the fixing device face the tension section of the steel tie rod;

将锚垫板竖向卡设于固定装置的凹槽内,且锚垫板抵持于固定装置。The anchor plate is vertically clamped in the groove of the fixing device, and the anchor plate is pressed against the fixing device.

进一步的,所述支架系统还包括限位组件,所述将锚固段支撑于支架系统,且使锚固段的第一端水平贯穿于锚垫板的板面还包括:Further, the bracket system further includes a limiting component, the supporting the anchoring section on the bracket system and the first end of the anchoring section extending horizontally through the plate surface of the anchor plate further includes:

在锚固段的第一端水平贯穿于锚垫板的板面之前,沿钢拉杆的延伸方向,在平台的顶面设置用于锚固段定位的限位组件。Before the first end of the anchoring section horizontally penetrates the plate surface of the anchor plate, along the extension direction of the steel tie rod, a limit assembly for positioning the anchoring section is arranged on the top surface of the platform.

进一步的,所述对接系统包括连接套和施拧扳手,所述施拧扳手包括扳头、握柄和链条,所述利用对接系统将锚固段与张拉段对接包括:Further, the docking system includes a connecting sleeve and a screwing wrench, and the screwing wrench includes a wrench, a handle and a chain, and the use of the docking system to dock the anchoring section with the tensioning section includes:

将连接套套设于张拉段的外侧;The connecting sleeve is sleeved on the outside of the tension section;

将扳头扣设于连接套,并将链条捆绑于连接套的外壁;Buckle the wrench on the connecting sleeve, and bind the chain to the outer wall of the connecting sleeve;

转动扳头,使连接套转动,并带动张拉段朝锚固段移动,直至张拉段与锚固段对接。Turn the wrench to make the connecting sleeve rotate and drive the tensioning section to move towards the anchoring section until the tensioning section is connected to the anchoring section.

进一步的,所述对接系统还包括锁紧螺母和螺栓,所述利用对接系统将锚固段与张拉段对接还包括:Further, the docking system further includes locking nuts and bolts, and the docking between the anchoring section and the tension section using the docking system further includes:

在连接套套设于张拉段的外侧之前,在张拉段和锚固段的外侧各套设一个锁紧螺母;Before the connecting sleeve is sleeved on the outer side of the tensioning section, a locking nut is sleeved on the outer side of the tensioning section and the anchoring section;

在连接套的侧壁贯穿插设螺栓,使连接套与张拉段抵接;Bolts are inserted through the side wall of the connecting sleeve to make the connecting sleeve abut against the tension section;

在张拉段与锚固段对接之后,转动锚固段的锁紧螺母,使其与连接套抵接;After the tensioning section is butted with the anchoring section, turn the locking nut of the anchoring section to make it abut with the connecting sleeve;

在连接套的侧壁贯穿插设螺栓,使连接套与锚固段抵接。Bolts are inserted through the side wall of the connecting sleeve to make the connecting sleeve abut against the anchoring section.

还提供一种悬索桥钢拉杆锚固系统的分段安装系统,其包括:Also provided is a segmented installation system for a suspension bridge steel tie rod anchoring system, comprising:

支架系统,其架设于预设组装场地;A support system, which is erected at a preset assembly site;

钢拉杆,其包括锚固段和张拉段,当锚固段或张拉段处于组装状态时,所述锚固段或张拉段支撑于所述支架系统;A steel tie rod, which includes an anchoring section and a tensioning section, when the anchoring section or the tensioning section is in an assembled state, the anchoring section or the tensioning section is supported on the bracket system;

对接系统,其用于所述锚固段和张拉段对接。A docking system for docking the anchoring section and the tensioning section.

进一步的,所述安装系统还包括锚垫板和预埋管,所述锚垫板竖向且可拆卸地设置于所述支架系统,当锚固段或张拉段处于组装状态时,所述锚固段或张拉段水平贯穿于所述锚垫板的板面,所述预埋管套设于所述钢拉杆的外侧,且预埋管的端部固定连接于所述锚垫板。Further, the installation system further includes an anchor plate and a pre-embedded pipe, the anchor plate is vertically and detachably arranged on the bracket system, and when the anchoring section or the tensioning section is in an assembled state, the anchoring The section or tension section runs horizontally through the plate surface of the anchor plate, the embedded pipe is sleeved on the outer side of the steel tie rod, and the end of the embedded pipe is fixedly connected to the anchor plate.

进一步的,所述支架系统包括平台和凹槽形的固定装置,所述固定装置固定设置于所述平台的顶面,且固定装置的槽口朝向钢拉杆的张拉段的方向,所述锚垫板竖向且可拆卸地设置于所述固定装置的槽口内,且抵持于所述固定装置。Further, the bracket system includes a platform and a groove-shaped fixing device, the fixing device is fixedly arranged on the top surface of the platform, and the notch of the fixing device faces the direction of the tension section of the steel tie rod, and the anchor The backing plate is vertically and detachably arranged in the slot of the fixing device, and is pressed against the fixing device.

进一步的,其特征在于:所述对接系统包括连接套和施拧扳手,所述施拧扳手包括扳头、握柄和链条,所述连接套套设于所述锚固段与张拉段的对接处,所述扳头为圆弧形结构,其一端连接于所述握柄,另一端连接于所述链条;Further, it is characterized in that: the docking system includes a connecting sleeve and a tightening wrench, the tightening wrench includes a wrench head, a handle and a chain, and the connecting sleeve is sleeved at the butt joint of the anchoring section and the tensioning section , the wrench head is a circular arc structure, one end of which is connected to the handle, and the other end is connected to the chain;

当施拧扳手位于施拧状态时,扳头扣设于所述连接套,链条绑设于连接套的外壁。When the tightening wrench is in the tightening state, the wrench head is buckled on the connecting sleeve, and the chain is bound on the outer wall of the connecting sleeve.

本申请提供的技术方案带来的有益效果包括:The beneficial effects brought by the technical solution provided by this application include:

本申请实施例提供了一种悬索桥钢拉杆锚固系统的分段安装方法及安装系统,该方法先将钢拉杆分为锚固段和张拉段,并且将锚固段和张拉段分别吊装至支架系统,利用支架系统将张拉段和锚固段分别组装完成,再将组装完成后的张拉段和锚固段分别吊装至预设对接场地,利用对接系统将张拉段和锚固段对接。因此,本申请实施例在吊装过程中,将钢拉杆分段吊装,有效解决了钢拉杆的长度长、重量大难以吊装的问题。The embodiment of the present application provides a method and an installation system for segmented installation of a steel tie rod anchoring system for a suspension bridge. The method first divides the steel tie rod into an anchoring section and a tensioning section, and hoisting the anchoring section and the tensioning section to the support system respectively , use the bracket system to assemble the tensioning section and the anchoring section respectively, and then hoist the assembled tensioning section and the anchoring section to the preset docking site respectively, and use the docking system to dock the tensioning section and the anchoring section. Therefore, in the hoisting process of the embodiment of the present application, the steel tie rod is hoisted in sections, which effectively solves the problems of long length and heavy weight of the steel tie rod, which are difficult to hoist.

附图说明Description of drawings

为了更清楚地说明本申请实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本申请的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions in the embodiments of the present application more clearly, the following briefly introduces the drawings that are used in the description of the embodiments. Obviously, the drawings in the following description are only some embodiments of the present application. For those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative effort.

图1为本申请实施例的整体结构示意图;1 is a schematic diagram of the overall structure of an embodiment of the application;

图2为图1中的对接系统中的连接套、锁紧螺母、螺栓的结构示意图;2 is a schematic structural diagram of a connecting sleeve, a locking nut and a bolt in the docking system in FIG. 1;

图3为图1中的对接系统中的施拧扳手的结构示意图;FIG. 3 is a schematic structural diagram of a wrench in the docking system in FIG. 1;

图4为图1中的A-A剖面图;Fig. 4 is A-A sectional view in Fig. 1;

图5为图1中的B-B剖面图;Fig. 5 is the B-B sectional view in Fig. 1;

图6为图1中的支架系统中的平台、固定装置的俯视示意图。FIG. 6 is a schematic top view of the platform and the fixing device in the support system in FIG. 1 .

附图标记:Reference number:

1、支架系统;11、平台;111、立柱;112、顶板;12、固定装置;121固定板;122、卡板;123加劲板;13、限位组件;131、垫块;132、夹板;2、锚垫板;3、钢拉杆;31、锚固段;32、张拉段;4、对接系统;41、连接套;42、施拧扳手;421、扳头;422、握柄;423、链条;424、连接部;43、锁紧螺母;44、螺栓;5、预埋管;6、连接管。1. Bracket system; 11. Platform; 111. Upright column; 112. Top plate; 12. Fixing device; 121. Fixing plate; 2. Anchor plate; 3. Steel tie rod; 31. Anchoring section; 32. Tensioning section; 4. Docking system; 41. Connecting sleeve; Chain; 424, connecting part; 43, locking nut; 44, bolt; 5, embedded pipe; 6, connecting pipe.

具体实施方式Detailed ways

为使本申请实施例的目的、技术方案和优点更加清楚,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本申请的一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动的前提下所获得的所有其他实施例,都属于本申请保护的范围。In order to make the purposes, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be described clearly and completely below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments It is a part of the embodiments of this application, but not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the protection scope of the present application.

本申请实施例提供了一种悬索桥钢拉杆锚固系统的分段安装方法及安装系统,其能解决悬索桥锚固系统的钢拉杆的长度长、重量大,导致其吊装难度大的问题。The embodiments of the present application provide a method and an installation system for segmented installation of a steel tie rod anchoring system for a suspension bridge, which can solve the problems of long length and heavy weight of the steel tie rod of the suspension bridge anchorage system, which make it difficult to hoist.

如图1所示,一种悬索桥钢拉杆锚固系统的分段安装方法,其中,钢拉杆3包括锚固段31和张拉段32。悬索桥锚固系统的安装方法包括如下步骤:As shown in FIG. 1 , a segmented installation method of a steel tie rod anchoring system for a suspension bridge, wherein the steel tie rod 3 includes an anchoring section 31 and a tension section 32 . The installation method of the suspension bridge anchoring system includes the following steps:

步骤1:在预设组装场地架设支架系统1。Step 1: Erection support system 1 at the preset assembly site.

步骤2:利用支架系统1将锚固段31和张拉段32分别进行组装。Step 2: Assemble the anchoring section 31 and the tensioning section 32 respectively by using the bracket system 1 .

步骤3:将组装后的锚固段31和张拉段32分别吊装至预设对接场地。Step 3: Lift the assembled anchoring section 31 and tensioning section 32 to the preset docking site respectively.

步骤4:利用对接系统4将锚固段31的第二端的端部与张拉段32的端部对接形成钢拉杆3。Step 4: Use the docking system 4 to butt the end of the second end of the anchoring section 31 with the end of the tension section 32 to form the steel tie rod 3 .

具体的,上述步骤2中,先将组装前的锚固段31和张拉段32分别吊装至预设组装场地,先利用支架系统1对锚固段31进行组装,组装完成后,将组装完成的锚固段31进行卸载。再利用支架系统1对张拉段32进行组装。上述锚固段31和张拉段32的组装顺序可以根据实际情况来调整。上述预设组装场地可以根据实际情况进行确定。Specifically, in the above step 2, the anchoring section 31 and the tensioning section 32 before assembly are respectively hoisted to the preset assembly site, and the anchoring section 31 is assembled by the bracket system 1. After the assembly is completed, the assembled anchoring Section 31 is unloaded. The tension section 32 is then assembled using the bracket system 1 . The assembling sequence of the anchoring segment 31 and the tensioning segment 32 can be adjusted according to the actual situation. The above-mentioned preset assembly site can be determined according to the actual situation.

具体的,上述步骤3中,预设对接场地可以根据实际情况进行确定,优选的,预设组装场地和预设对接场地的距离比较近,以便于提高吊装的效率。Specifically, in the above step 3, the preset docking site can be determined according to the actual situation. Preferably, the distance between the preset assembly site and the preset docking site is relatively close, so as to improve the efficiency of hoisting.

进一步的,上述步骤2包括:在支架系统1上设置锚垫板2,锚垫板2为竖向且可拆卸。将锚固段31或张拉段32支撑于支架系统1,且使锚固段31或张拉段32的第一端水平贯穿于锚垫板2的板面。Further, the above step 2 includes: disposing an anchor plate 2 on the support system 1, and the anchor plate 2 is vertical and detachable. The anchoring section 31 or the tensioning section 32 is supported on the bracket system 1 , and the first end of the anchoring section 31 or the tensioning section 32 is horizontally penetrated through the surface of the anchor plate 2 .

自锚固段31或张拉段32的第二端至锚垫板2的方向,在锚固段31或张拉段32的外侧套设预埋管,且将预埋管5邻近于锚垫板2的一端与锚垫板2的板面固定连接,预埋管5位于锚垫板2的一侧,该侧为锚垫板2邻近锚固段31或张拉段32的第二端的一侧。From the second end of the anchoring section 31 or the tensioning section 32 to the direction of the anchor plate 2, a pre-embedded pipe is sleeved on the outside of the anchoring section 31 or the tensioning section 32, and the pre-embedded pipe 5 is adjacent to the anchoring plate 2 One end of the anchor plate 2 is fixedly connected to the plate surface of the anchor plate 2. The embedded pipe 5 is located on one side of the anchor plate 2, which is the side of the anchor plate 2 adjacent to the second end of the anchoring section 31 or the tensioning section 32.

具体的,在上述步骤中,预埋管5与钢拉杆3之间留设有间隙,该间隙的大小可以根据实际情况来确定。Specifically, in the above steps, a gap is left between the embedded pipe 5 and the steel tie rod 3 , and the size of the gap can be determined according to the actual situation.

具体的,上述步骤具体为:在支架系统1上设置锚垫板2,锚垫板2为竖向且可拆卸。将锚固段31支撑于支架系统1,且使锚固段31的第一端水平贯穿于锚垫板2的板面。Specifically, the above steps are as follows: an anchor plate 2 is arranged on the support system 1, and the anchor plate 2 is vertical and detachable. The anchoring section 31 is supported on the bracket system 1 , and the first end of the anchoring section 31 horizontally penetrates the surface of the anchor plate 2 .

自锚固段31的第二端至锚垫板2的方向,在锚固段31的外侧套设预埋管,且将预埋管5邻近于锚垫板2的一端与锚垫板2的板面固定连接,预埋管5位于锚垫板2的一侧,该侧为锚垫板2邻近锚固段31的第二端的一侧。将锚垫板2与锚固段31一起从支架系统1拆下。From the second end of the anchoring section 31 to the direction of the anchoring plate 2, a pre-embedded pipe is sleeved on the outer side of the anchoring section 31, and the embedded pipe 5 is adjacent to one end of the anchoring plate 2 and the plate surface of the anchoring plate 2 For fixed connection, the embedded pipe 5 is located on one side of the anchor plate 2 , which is the side of the anchor plate 2 adjacent to the second end of the anchoring section 31 . The anchor plate 2 is removed from the support system 1 together with the anchoring segments 31 .

再进行张拉段32的组装,具体步骤为:在支架系统1上重新设置锚垫板2,锚垫板2为竖向且可拆卸。将张拉段32支撑于支架系统1,且使张拉段32的第一端水平贯穿于锚垫板2的板面。The tensioning section 32 is then assembled, and the specific steps are: re-arrange the anchor plate 2 on the support system 1, and the anchor plate 2 is vertical and detachable. The tensioning section 32 is supported on the bracket system 1 , and the first end of the tensioning section 32 horizontally penetrates the surface of the anchor plate 2 .

自张拉段32的第二端至锚垫板2的方向,在张拉段32的外侧套设预埋管,且将预埋管5邻近于锚垫板2的一端与锚垫板2的板面固定连接,预埋管5位于锚垫板2的一侧,该侧为锚垫板2邻近张拉段32的第二端的一侧。将锚垫板2与锚固段31一起从支架系统1拆下。From the second end of the tensioning section 32 to the direction of the anchor plate 2, a pre-embedded pipe is sleeved on the outer side of the tensioning section 32, and the pre-embedded pipe 5 is adjacent to one end of the anchor plate 2 and the end of the anchor plate 2. The plate surfaces are fixedly connected, and the embedded pipe 5 is located on one side of the anchor plate 2 , which is the side of the anchor plate 2 adjacent to the second end of the tensioning section 32 . The anchor plate 2 is removed from the support system 1 together with the anchoring segments 31 .

上述锚固段31和张拉段32的组装顺序可以根据实际情况进行调整。The assembly sequence of the anchoring section 31 and the tensioning section 32 can be adjusted according to the actual situation.

具体的,上述钢拉杆3的锚固段31或张拉段32的外侧的预埋管5为多节段,每相邻两节段预埋管5的端部通过连接管6对接固定。上述预埋管5为多节段,也可以减小吊装的难度,并且预埋管5分段控制,可以提高预埋管5的安装精度。在对预埋管5进行套设时,可以一节段一节段地套设,并将每相邻两节段预埋管5的端部对接,再在该对接处的外侧套设连接管6进行固定。Specifically, the embedded pipe 5 on the outside of the anchoring section 31 or the tensioning section 32 of the steel tie rod 3 is multi-segment, and the ends of the embedded pipes 5 of every two adjacent sections are butted and fixed by the connecting pipe 6 . The above-mentioned pre-embedded pipe 5 is multi-section, which can also reduce the difficulty of hoisting, and the pre-embedded pipe 5 is controlled in sections, which can improve the installation accuracy of the pre-embedded pipe 5 . When the embedded pipe 5 is sheathed, it can be sheathed segment by segment, and the ends of the pre-embedded pipes 5 of every two adjacent segments are butted, and then a connecting pipe is sheathed on the outside of the butt joint. 6 to be fixed.

进一步的,如图4至图6所示,上述支架系统1包括平台11和凹槽形的固定装置12,上述步骤1还包括:在预设组装场地架设平台11。将固定装置12设置于平台11的顶面,且使固定装置12的槽口朝向钢拉杆3的张拉段32。将锚垫板2竖向卡设于固定装置12的凹槽内,且锚垫板2抵持于固定装置12。Further, as shown in FIGS. 4 to 6 , the above-mentioned support system 1 includes a platform 11 and a groove-shaped fixing device 12 , and the above-mentioned step 1 further includes: erecting the platform 11 at a preset assembly site. The fixing device 12 is arranged on the top surface of the platform 11 , and the notch of the fixing device 12 is directed to the tension section 32 of the steel tie rod 3 . The anchor plate 2 is vertically clamped in the groove of the fixing device 12 , and the anchor plate 2 is pressed against the fixing device 12 .

具体的,在上述步骤中,平台11包括顶板112和多根立柱111,多根立柱111支撑于预设组装场地,顶板112设置于多根立柱111的顶端,保证顶板112的平稳性。在本申请实施例中,顶板112的顶面与多根立柱111的顶面平齐,在其他实施例中,顶板112也可以支撑于多根立柱111的顶面。Specifically, in the above steps, the platform 11 includes a top plate 112 and a plurality of uprights 111 , the plurality of uprights 111 are supported on a preset assembly site, and the top plate 112 is arranged at the top of the plurality of uprights 111 to ensure the stability of the top plate 112 . In the embodiment of the present application, the top surface of the top plate 112 is flush with the top surfaces of the plurality of uprights 111 . In other embodiments, the top plate 112 may also be supported on the top surfaces of the plurality of uprights 111 .

具体的,上述固定装置12与平台11固定连接,固定装置12可以避免钢拉杆3的锚固段31或张拉段32在组装的过程中随意移动,影响钢拉杆3的组装效率。上述固定装置12为凹槽形,可以增加固定装置12与锚垫板2的接触面积,从而进一步保证锚垫板2的稳定性。Specifically, the above-mentioned fixing device 12 is fixedly connected to the platform 11 , and the fixing device 12 can prevent the anchoring section 31 or the tensioning section 32 of the steel tie rod 3 from moving freely during the assembly process, which affects the assembly efficiency of the steel tie rod 3 . The above-mentioned fixing device 12 is in the shape of a groove, which can increase the contact area between the fixing device 12 and the anchor pad 2 , thereby further ensuring the stability of the anchor pad 2 .

具体的,在上述步骤中,固定装置12包括固定板121、两个卡板122和加劲板123。上述步骤还包括:将固定板121竖向设置于平台11的顶面,使固定板121与锚垫板2平行。将两个卡板122沿固定板121的板面间隔布置,并且将每个卡板122的底部均与平台11的顶面固定连接,使固定板121与两个卡板122形成凹槽形结构。在固定板121背向锚垫板2的侧面与平台11之间设置加劲板123,起到加强连接的作用,保证了固定板121的稳定性和承载能力。加劲板123的数量可以根据实际情况来确定,并且,加劲板123可以为三角形板,也可以为四方形板等等。Specifically, in the above steps, the fixing device 12 includes a fixing plate 121 , two clamping plates 122 and a stiffening plate 123 . The above steps further include: vertically disposing the fixing plate 121 on the top surface of the platform 11 so that the fixing plate 121 is parallel to the anchor plate 2 . The two card boards 122 are arranged at intervals along the board surface of the fixed board 121, and the bottom of each card board 122 is fixedly connected to the top surface of the platform 11, so that the fixed board 121 and the two card boards 122 form a groove-shaped structure . A stiffening plate 123 is provided between the side of the fixing plate 121 facing away from the anchor plate 2 and the platform 11 to strengthen the connection and ensure the stability and bearing capacity of the fixing plate 121 . The number of the stiffening plates 123 can be determined according to the actual situation, and the stiffening plates 123 can be triangular plates, square plates or the like.

进一步的,上述支架系统1还包括限位组件13,上述步骤3还包括:在锚固段31的第一端水平贯穿于锚垫板2的板面之前,沿钢拉杆3的延伸方向,在平台11的顶面设置用于锚固段31定位的限位组件13。Further, the above-mentioned support system 1 further includes a limit component 13, and the above-mentioned step 3 further includes: before the first end of the anchoring section 31 horizontally penetrates the plate surface of the anchor plate 2, along the extension direction of the steel tie rod 3, on the platform The top surface of 11 is provided with a limiting component 13 for positioning the anchoring segment 31 .

具体的,在上述步骤中,限位组件13可以与平台11固定连接,也可以为可拆卸连接。可知道的是,多个限位组件13位于同一水平线,并且多个限位组件13的布置方向垂直于锚垫板2的板面,多个限位组件13可以使钢拉杆3的锚固段31或张拉段32在组装的过程中始终处于水平的状态,还可以保证钢拉杆3的锚固段31或张拉段32在组装的过程中始终与锚垫板2的板面垂直,以免在钢拉杆3的对接安装过程中,钢拉杆3出现变形或错位的情况。Specifically, in the above steps, the limiting component 13 may be fixedly connected to the platform 11 or may be detachably connected. It can be known that the multiple limit assemblies 13 are located on the same horizontal line, and the arrangement direction of the multiple limit assemblies 13 is perpendicular to the plate surface of the anchor plate 2 , and the multiple limit assemblies 13 can make the anchoring section 31 of the steel tie rod 3 . Or the tensioning section 32 is always in a horizontal state during the assembly process, and it can also ensure that the anchoring section 31 or the tensioning section 32 of the steel tie rod 3 is always perpendicular to the plate surface of the anchor plate 2 during the assembly process, so as to prevent the steel During the butt installation of the tie rod 3, the steel tie rod 3 is deformed or dislocated.

具体的,在本申请实施例中,上述每个限位组件13包括垫块131和夹板132,夹板132具有用于钢拉杆3贯穿的孔洞。每个限位组件13的安装过程包括:在锚固段31的第一端水平贯穿于锚垫板2的板面之前,将垫块131设置于平台11的顶面。将夹板132设置于垫块131的顶端,且使夹板132与锚垫板2平行。Specifically, in the embodiment of the present application, each of the above-mentioned limiting components 13 includes a spacer block 131 and a clamping plate 132 , and the clamping plate 132 has a hole for the steel tie rod 3 to pass through. The installation process of each limiting assembly 13 includes: before the first end of the anchoring section 31 horizontally penetrates the surface of the anchor plate 2 , disposing the cushion block 131 on the top surface of the platform 11 . The splint 132 is arranged on the top of the spacer block 131 , and the splint 132 is parallel to the anchor plate 2 .

可知道的是,在锚固段31或张拉段32的第一端水平贯穿于锚垫板2的板面之后,锚固段31或张拉段32的底部搁置于垫块131的顶面,同时,锚固段31贯穿夹板132。多个垫块131位于同一直线,并且高度相等,多个夹板132也位于同一高度,并且多个夹板132的孔洞的中心连线垂直于锚垫板2的板面。可以保证钢拉杆3的锚固段31或张拉段32在组装的过程中始终处于水平的状态,并且可以保证钢拉杆3的锚固段31始终与锚垫板2的板面垂直。It can be known that, after the first end of the anchoring section 31 or the tensioning section 32 horizontally penetrates the surface of the anchor plate 2, the bottom of the anchoring section 31 or the tensioning section 32 rests on the top surface of the spacer block 131, and at the same time , the anchoring section 31 penetrates the splint 132 . The plurality of spacers 131 are located on the same straight line and have the same height, the plurality of clamping plates 132 are also located at the same height, and the center line connecting the holes of the plurality of clamping plates 132 is perpendicular to the plate surface of the anchor plate 2 . It can ensure that the anchoring section 31 or the tensioning section 32 of the steel tie rod 3 is always in a horizontal state during the assembly process, and can ensure that the anchoring section 31 of the steel tie rod 3 is always perpendicular to the plate surface of the anchor plate 2 .

进一步的,如图2和图3所示,在上述步骤4中,对接系统4包括连接套41和施拧扳手42,施拧扳手42包括扳头421、握柄422和链条423。上述步骤4包括:将连接套41套设于张拉段32的外侧。将扳头421扣设于连接套41,并将链条423捆绑于连接套41的外壁。转动扳头421,使连接套41转动,并带动张拉段32朝锚固段31移动,直至张拉段32与锚固段31对接。Further, as shown in FIGS. 2 and 3 , in the above step 4 , the docking system 4 includes a connecting sleeve 41 and a wrench 42 , and the wrench 42 includes a wrench 421 , a handle 422 and a chain 423 . The above-mentioned step 4 includes: sleeving the connecting sleeve 41 on the outer side of the tensioning section 32 . The wrench 421 is buckled on the connecting sleeve 41 , and the chain 423 is bound to the outer wall of the connecting sleeve 41 . Rotating the wrench head 421 makes the connecting sleeve 41 rotate, and drives the tensioning section 32 to move toward the anchoring section 31 until the tensioning section 32 is connected to the anchoring section 31 .

具体的,在上述步骤中,钢拉杆3的外壁具有螺纹,连接套41的内部具有与钢拉杆3相匹配的螺纹。连接套41可以与钢拉杆3的锚固段31和张拉段32固定连接,也可以与钢拉杆3的锚固段31和张拉段32固定连接可拆卸连接。Specifically, in the above steps, the outer wall of the steel tie rod 3 has threads, and the interior of the connecting sleeve 41 has threads that match the steel tie rod 3 . The connecting sleeve 41 can be fixedly connected to the anchoring section 31 and the tensioning section 32 of the steel tie rod 3 , or can be fixedly and detachably connected to the anchoring section 31 and the tensioning section 32 of the steel tie rod 3 .

具体的,在本申请实施例中,扳头421的形状与连接套41的形状相匹配,施拧扳手42的扳头421为半圆形结构,扳头421恰好可以与连接套41扣住。在其他实施例中,扳头421可以为3/4圆形结构,也可以为其他结构,可以根据实际情况来设定,并且保证扳头421与连接套41恰好可以扣接。Specifically, in the embodiment of the present application, the shape of the wrench head 421 matches the shape of the connecting sleeve 41 , the wrench head 421 of the tightening wrench 42 is a semicircular structure, and the wrench head 421 can just be fastened with the connecting sleeve 41 . In other embodiments, the wrench head 421 may have a 3/4 circular structure or other structures, which may be set according to actual conditions, and ensure that the wrench head 421 and the connecting sleeve 41 can be just snapped together.

具体的,在本申请实施例中,上述施拧扳手42还包括连接部424,连接部424的一端连接于扳头421的一端,另一端连接于握柄422。Specifically, in the embodiment of the present application, the screwing wrench 42 further includes a connecting portion 424 , one end of the connecting portion 424 is connected to one end of the wrench 421 , and the other end is connected to the handle 422 .

具体的,连接部424可以提高扳头421和握柄422的连接紧密性。在一些实施例中,连接部424可以与扳头421和握柄422均为可拆卸连接,以便于适配多种尺寸的扳头421或握柄422,提高本申请实施例的适用性。Specifically, the connection portion 424 can improve the connection tightness between the wrench 421 and the handle 422 . In some embodiments, the connecting portion 424 can be detachably connected to the wrench 421 and the handle 422, so as to adapt to the wrench 421 or the handle 422 of various sizes and improve the applicability of the embodiments of the present application.

进一步的,上述对接系统4还包括锁紧螺母43和螺栓44,上述步骤4还包括:在连接套41套设于张拉段32的外侧之前,在张拉段32和锚固段31的外侧各套设一个锁紧螺母43。在连接套41的侧壁贯穿插设螺栓44,使连接套41与张拉段32抵接。Further, the above-mentioned docking system 4 also includes a locking nut 43 and a bolt 44, and the above-mentioned step 4 further includes: before the connecting sleeve 41 is sleeved on the outer side of the tensioning section 32, the outer sides of the tensioning section 32 and the anchoring section 31 are respectively A lock nut 43 is sleeved. Bolts 44 are inserted through the side wall of the connecting sleeve 41 to make the connecting sleeve 41 abut against the tension section 32 .

在张拉段32与锚固段31对接之后,转动锚固段31的锁紧螺母43,使其与连接套41抵接。在连接套41的侧壁贯穿插设螺栓44,使连接套41与锚固段32抵接。After the tensioning section 32 is docked with the anchoring section 31 , the locking nut 43 of the anchoring section 31 is rotated to make it abut against the connecting sleeve 41 . Bolts 44 are inserted through the side wall of the connecting sleeve 41 to make the connecting sleeve 41 abut against the anchoring section 32 .

具体的,在本申请实施例中,连接套41与钢拉杆3的锚固段31和张拉段32通过锁紧螺母43和螺栓44进行可拆卸连接,以便于可以随时调整连接套41的位置,保证安装精度,并且还可以周转使用,节省成本。Specifically, in the embodiment of the present application, the connecting sleeve 41 is detachably connected with the anchoring section 31 and the tensioning section 32 of the steel tie rod 3 through the locking nut 43 and the bolt 44, so that the position of the connecting sleeve 41 can be adjusted at any time, Guaranteed installation accuracy, and can also be used in turnaround, saving costs.

具体的,在上述步骤中,锁紧螺母43具有两个,并且一个锁紧螺母43套设于锚固段31的外侧,另一个锁紧螺母43套设于张拉段32的外侧。每个锁紧螺母43的内壁具有与钢拉杆3相匹配的螺纹。两个锁紧螺母43分别抵持于连接套41的两端,可以避免连接套41随意滑动,影响钢拉杆3的锚固段31和张拉段32的对接精度,提高安装效率。Specifically, in the above steps, there are two locking nuts 43 , and one locking nut 43 is sleeved on the outside of the anchoring section 31 , and the other locking nut 43 is sleeved on the outside of the tensioning section 32 . The inner wall of each lock nut 43 has threads that match the steel tie rod 3 . The two locking nuts 43 are respectively abutted against both ends of the connecting sleeve 41, which can prevent the connecting sleeve 41 from sliding freely, affecting the docking accuracy of the anchoring section 31 and the tensioning section 32 of the steel tie rod 3, and improving the installation efficiency.

具体的,上述螺栓44的数量为至少两个,且锚固段31至少设置有一个螺栓44,张拉段32至少设置有一个螺栓44,保证连接套41与锚固段31和张拉段32的连接牢固性。在本申请实施例中,螺栓44的数量为4个,其中两个贯穿插设于锚固段31,另外两个贯穿插设于张拉段32,并且四个螺栓44为对称布置,保证连接套41与锚固段31、张拉段32的连接均匀性,并且可以使连接41受力平衡,有利于整体结构稳定性。Specifically, the number of the above-mentioned bolts 44 is at least two, and the anchoring section 31 is provided with at least one bolt 44, and the tensioning section 32 is provided with at least one bolt 44 to ensure the connection between the connecting sleeve 41 and the anchoring section 31 and the tensioning section 32. firmness. In the embodiment of the present application, the number of bolts 44 is four, two of which are inserted through the anchoring section 31, and the other two are inserted through the tension section 32, and the four bolts 44 are symmetrically arranged to ensure that the connecting sleeve is connected. The connection between 41 and the anchoring section 31 and the tensioning section 32 is uniform, and the force of the connection 41 can be balanced, which is beneficial to the overall structural stability.

如图1所示,本申请实施例还提供一种悬索桥钢拉杆锚固系统的安装系统,其包括支架系统1、锚垫板2、钢拉杆3和对接系统4。As shown in FIG. 1 , an embodiment of the present application further provides an installation system of a steel tie rod anchoring system for a suspension bridge, which includes a bracket system 1 , an anchor plate 2 , a steel tie rod 3 and a docking system 4 .

其中,支架系统1架设于预设组装场地。钢拉杆3包括锚固段31和张拉段32,钢拉杆3支撑于支架系统1,当锚固段31或张拉段32处于组装状态时,锚固段31或张拉段32支撑于支架系统1。对接系统4用于锚固段31和张拉段3对接。Wherein, the bracket system 1 is erected on a preset assembly site. The steel tie rod 3 includes an anchoring section 31 and a tensioning section 32 . The steel tie rod 3 is supported by the bracket system 1 . When the anchoring section 31 or the tensioning section 32 is in an assembled state, the anchoring section 31 or the tensioning section 32 is supported on the bracket system 1 . The docking system 4 is used for docking the anchoring section 31 and the tensioning section 3 .

具体的,当锚固段31处于组装状态时,锚固段31支撑于支架系统1。当张拉段32处于组装状态时,张拉段32支撑于支架系统1。Specifically, when the anchoring section 31 is in an assembled state, the anchoring section 31 is supported on the stent system 1 . When the tensioning section 32 is in an assembled state, the tensioning section 32 is supported by the bracket system 1 .

进一步的,本申请实施例的安装系统还包括锚垫板2和预埋管5,锚垫板2竖向且可拆卸地设置于支架系统1,当锚固段31或张拉段32处于组装状态时,锚固段31或张拉段32水平贯穿于锚垫板2的板面。预埋管5套设于钢拉杆3的外侧,且预埋管5的端部固定连接于锚垫板2。Further, the installation system of the embodiment of the present application further includes an anchor plate 2 and a pre-embedded pipe 5. The anchor plate 2 is vertically and detachably arranged on the bracket system 1. When the anchoring section 31 or the tensioning section 32 is in an assembled state , the anchoring section 31 or the tensioning section 32 horizontally penetrates the surface of the anchor plate 2 . The embedded pipe 5 is sleeved on the outer side of the steel tie rod 3 , and the end of the embedded pipe 5 is fixedly connected to the anchor plate 2 .

具体的,当锚固段31处于组装状态时,锚固段31水平贯穿于锚垫板2的板面,预埋管5套设于钢拉杆3的锚固段31的外侧,且预埋管5的端部固定连接于锚垫板2。当张拉段32处于组装状态时,张拉段32水平贯穿于锚垫板2的板面,预埋管5套设于钢拉杆3的张拉段32的外侧,且预埋管5的端部固定连接于锚垫板2。Specifically, when the anchoring section 31 is in the assembled state, the anchoring section 31 horizontally penetrates the surface of the anchor plate 2, the embedded pipe 5 is sleeved on the outside of the anchoring section 31 of the steel tie rod 3, and the end of the embedded pipe 5 The part is fixedly connected to the anchor plate 2. When the tensioning section 32 is in the assembled state, the tensioning section 32 horizontally penetrates the surface of the anchor plate 2, the embedded pipe 5 is sleeved on the outside of the tensioning section 32 of the steel tie rod 3, and the end of the embedded pipe 5 The part is fixedly connected to the anchor plate 2.

具体的,上述预埋管5与钢拉杆3之间留设有间隙。该间隙的大小可以根据实际情况来确定。Specifically, a gap is left between the pre-embedded pipe 5 and the steel tie rod 3 . The size of the gap can be determined according to the actual situation.

进一步的,上述预埋管5为多节段,每相邻两节段预埋管5的端部通过连接管6对接固定。Further, the above-mentioned pre-embedded pipes 5 are multi-segmented, and the ends of the pre-embedded pipes 5 of every two adjacent segments are butted and fixed by connecting pipes 6 .

具体的,上述钢拉杆3的锚固段31或张拉段32的外侧的预埋管5为多节段,每相邻两节段预埋管5的端部通过连接管6对接固定。上述预埋管5为多节段,也可以减小吊装的难度,并且预埋管5分段控制,可以提高预埋管5的安装精度。在对预埋管5进行套设时,可以一节段一节段地套设,并将每相邻两节段预埋管5的端部对接,再在该对接处的外侧套设连接管6进行固定。Specifically, the embedded pipe 5 on the outside of the anchoring section 31 or the tensioning section 32 of the steel tie rod 3 is multi-segment, and the ends of the embedded pipes 5 of every two adjacent sections are butted and fixed by the connecting pipe 6 . The above-mentioned pre-embedded pipe 5 is multi-section, which can also reduce the difficulty of hoisting, and the pre-embedded pipe 5 is controlled in sections, which can improve the installation accuracy of the pre-embedded pipe 5 . When the embedded pipe 5 is sheathed, it can be sheathed segment by segment, and the ends of the pre-embedded pipes 5 of every two adjacent segments are butted, and then a connecting pipe is sheathed on the outside of the butt joint. 6 to be fixed.

进一步的,如图2和图3所示,上述对接系统4包括连接套41和施拧扳手42,所述施拧扳手42包括扳头421、握柄422和链条423,连接套41套设于锚固段31与张拉段32的对接处,扳头421为圆弧形结构,其一端连接于握柄422,另一端连接于所述链条423。当施拧扳手42位于施拧状态时,扳头421扣设于所述连接套41,链条423绑设于连接套41的外壁。Further, as shown in FIG. 2 and FIG. 3 , the above-mentioned docking system 4 includes a connecting sleeve 41 and a tightening wrench 42. The tightening wrench 42 includes a wrench head 421, a handle 422 and a chain 423, and the connecting sleeve 41 is sleeved on the At the butt joint of the anchoring section 31 and the tensioning section 32 , the wrench 421 is a circular arc structure, one end of which is connected to the handle 422 and the other end is connected to the chain 423 . When the screwing wrench 42 is in the screwing state, the wrench head 421 is fastened to the connecting sleeve 41 , and the chain 423 is bound to the outer wall of the connecting sleeve 41 .

具体的,上述钢拉杆3的外壁具有螺纹,连接套41的内部具有与钢拉杆3相匹配的螺纹。连接套41可以与钢拉杆3的锚固段31和张拉段32固定连接,也可以与钢拉杆3的锚固段31和张拉段32固定连接可拆卸连接。Specifically, the outer wall of the steel tie rod 3 has threads, and the interior of the connecting sleeve 41 has threads that match the steel tie rod 3 . The connecting sleeve 41 can be fixedly connected to the anchoring section 31 and the tensioning section 32 of the steel tie rod 3 , or can be fixedly and detachably connected to the anchoring section 31 and the tensioning section 32 of the steel tie rod 3 .

具体的,在本申请实施例中,扳头421的形状与连接套41的形状相匹配,施拧扳手42的扳头421为半圆形结构,扳头421恰好可以与连接套41扣住。在其他实施例中,扳头421可以为3/4圆形结构,也可以为其他结构,可以根据实际情况来设定,并且保证扳头421与连接套41恰好可以扣接。Specifically, in the embodiment of the present application, the shape of the wrench head 421 matches the shape of the connecting sleeve 41 , the wrench head 421 of the tightening wrench 42 is a semicircular structure, and the wrench head 421 can just be fastened with the connecting sleeve 41 . In other embodiments, the wrench head 421 may have a 3/4 circular structure or other structures, which may be set according to actual conditions, and ensure that the wrench head 421 and the connecting sleeve 41 can be just snapped together.

进一步的,上述施拧扳手42还包括连接部424,连接部424的一端连接于扳头421的一端,另一端连接于握柄422。Further, the above-mentioned tightening wrench 42 further includes a connecting portion 424 , one end of the connecting portion 424 is connected to one end of the wrench head 421 , and the other end is connected to the handle 422 .

具体的,连接部424可以便于将扳头421和握柄422更紧密地连接。在一些实施例中,连接部424可以与扳头421和握柄422均为可拆卸连接,以便于适配多种尺寸的扳头421,提高适用性。Specifically, the connecting portion 424 can facilitate the connection of the wrench 421 and the handle 422 more closely. In some embodiments, the connecting portion 424 can be detachably connected to the wrench head 421 and the handle 422, so as to adapt to wrench heads 421 of various sizes and improve applicability.

进一步的,上述对接系统4还包括两个锁紧螺母43和多个螺栓44,两个锁紧螺母43分别抵持于连接套41的两端,多个螺栓44贯穿插设于连接套41,连接套41通过多个螺栓44抵接与钢拉杆3,且锚固段31至少设置有一个螺栓44,张拉段32至少设置有一个螺栓44。Further, the above-mentioned docking system 4 also includes two locking nuts 43 and a plurality of bolts 44, the two locking nuts 43 are respectively abutted against both ends of the connecting sleeve 41, and the plurality of bolts 44 are inserted through the connecting sleeve 41, The connecting sleeve 41 abuts against the steel tie rod 3 through a plurality of bolts 44 , the anchoring section 31 is provided with at least one bolt 44 , and the tension section 32 is provided with at least one bolt 44 .

具体的,在本申请实施例中,连接套41与钢拉杆3的锚固段31和张拉段32通过锁紧螺母43和螺栓44进行可拆卸连接,以便于可以随时调整连接套41的位置,保证安装精度,并且还可以周转使用,节省成本。Specifically, in the embodiment of the present application, the connecting sleeve 41 is detachably connected with the anchoring section 31 and the tensioning section 32 of the steel tie rod 3 through the locking nut 43 and the bolt 44, so that the position of the connecting sleeve 41 can be adjusted at any time, Guaranteed installation accuracy, and can also be used in turnaround, saving costs.

具体的,上述锁紧螺母43具有两个,并且一个锁紧螺母43套设于锚固段31的外侧,另一个螺母套设于张拉段32的外侧。每个锁紧螺母43的内壁具有与钢拉杆3相匹配的螺纹。两个锁紧螺母43分别抵持于连接套41的两端,可以避免连接套41随意滑动,影响钢拉杆3的锚固段31和张拉段32的对接精度,提高安装效率。Specifically, there are two locking nuts 43 , and one locking nut 43 is sleeved on the outer side of the anchoring section 31 , and the other nut is sleeved on the outer side of the tensioning section 32 . The inner wall of each lock nut 43 has threads that match the steel tie rod 3 . The two locking nuts 43 are respectively abutted against both ends of the connecting sleeve 41, which can prevent the connecting sleeve 41 from sliding freely, affecting the docking accuracy of the anchoring section 31 and the tensioning section 32 of the steel tie rod 3, and improving the installation efficiency.

具体的,上述螺栓44的数量为至少两个,且锚固段31至少设置有一个螺栓44,张拉段32至少设置有一个螺栓44,保证连接套41与锚固段31和张拉段32的连接牢固性。在本申请实施例中,螺栓44的数量为4个,其中两个贯穿插设于锚固段31,另外两个贯穿插设于张拉段32,并且四个螺栓44为对称布置,保证连接套41与锚固段31、张拉段32的连接均匀性,并且可以使连接套41受力平衡,有利于整体结构稳定性。Specifically, the number of the above-mentioned bolts 44 is at least two, and the anchoring section 31 is provided with at least one bolt 44, and the tensioning section 32 is provided with at least one bolt 44 to ensure the connection between the connecting sleeve 41 and the anchoring section 31 and the tensioning section 32. firmness. In the embodiment of the present application, the number of bolts 44 is four, two of which are inserted through the anchoring section 31, and the other two are inserted through the tension section 32, and the four bolts 44 are symmetrically arranged to ensure that the connecting sleeve is connected. The connection between 41 and the anchoring section 31 and the tensioning section 32 is uniform, and the force of the connecting sleeve 41 can be balanced, which is beneficial to the overall structural stability.

进一步的,如图4至图6所示,上述支架系统1包括平台11和凹槽形的固定装置12,固定装置12固定设置于所述平台11的顶面,且固定装置12的槽口朝向钢拉杆3的张拉段32的方向,锚垫板2竖向且可拆卸地设置于固定装置12的槽口内,且抵持于所述固定装置12。Further, as shown in FIGS. 4 to 6 , the above-mentioned bracket system 1 includes a platform 11 and a groove-shaped fixing device 12 , the fixing device 12 is fixedly arranged on the top surface of the platform 11 , and the notch of the fixing device 12 faces In the direction of the tensioning section 32 of the steel tie rod 3 , the anchor plate 2 is vertically and detachably disposed in the slot of the fixing device 12 and abuts against the fixing device 12 .

具体的,上述平台11包括顶板112和多根立柱111,多根立柱111支撑于预设组装场地,顶板112设置于多根立柱111的顶端,保证顶板112的平稳性。在本申请实施例中,顶板112的顶面与多根立柱111的顶面平齐,在其他实施例中,顶板112也可以支撑于111的顶面。Specifically, the platform 11 includes a top plate 112 and a plurality of uprights 111 , the plurality of uprights 111 are supported on a preset assembly site, and the top plate 112 is arranged at the top of the plurality of uprights 111 to ensure the stability of the top plate 112 . In the embodiment of the present application, the top surface of the top plate 112 is flush with the top surfaces of the plurality of uprights 111 . In other embodiments, the top plate 112 may also be supported on the top surface of the 111 .

具体的,上述固定装置12与平台11固定连接,固定装置12可以避免钢拉杆3的锚固段31或张拉段32在组装的过程中随意移动,影响钢拉杆3的组装效率。上述固定装置12设置为凹槽形,可以增加固定装置12与锚垫板2的接触面积,从而进一步保证锚垫板2的稳定性。Specifically, the above-mentioned fixing device 12 is fixedly connected to the platform 11 , and the fixing device 12 can prevent the anchoring section 31 or the tensioning section 32 of the steel tie rod 3 from moving freely during the assembly process, which affects the assembly efficiency of the steel tie rod 3 . The above-mentioned fixing device 12 is provided in a groove shape, which can increase the contact area between the fixing device 12 and the anchor plate 2 , thereby further ensuring the stability of the anchor plate 2 .

进一步的,固定装置12包括固定板121、两个卡板122和加劲板123。固定板121竖向设置于平台11的顶面,且固定板121与锚垫板2平行,两个所述卡板122竖向设置于平台11的顶面,且沿固定板121的板面间隔布置,并且,每个卡板122的底部均与平台11的顶面固定连接,固定板121与两个卡板122形成凹槽形结构。固定板121背向锚垫板2的侧面与平台11之间设置有加劲板123,起到加强连接的作用,保证了固定板121的稳定性和承载能力。加劲板123的数量可以根据实际情况来确定,并且,加劲板123可以为三角形板,也可以为四方形板等等。Further, the fixing device 12 includes a fixing plate 121 , two clamping plates 122 and a stiffening plate 123 . The fixing plate 121 is vertically arranged on the top surface of the platform 11 , and the fixing plate 121 is parallel to the anchor plate 2 . The two clamping plates 122 are vertically arranged on the top surface of the platform 11 and are spaced apart along the plate surface of the fixing plate 121 . In addition, the bottom of each card board 122 is fixedly connected with the top surface of the platform 11 , and the fixed board 121 and the two card boards 122 form a groove-shaped structure. A stiffening plate 123 is provided between the side of the fixing plate 121 facing away from the anchor plate 2 and the platform 11 to strengthen the connection and ensure the stability and bearing capacity of the fixing plate 121 . The number of the stiffening plates 123 can be determined according to the actual situation, and the stiffening plates 123 can be triangular plates, square plates or the like.

进一步的,上述支架系统1包括平台11和凹槽形的固定装置12,上述支架系统1还包括用于锚固段31定位的多个限位组件13,多个限位组件13沿钢拉杆3的延伸方向排布,且每个限位组件13固定连接于平台11。Further, the above-mentioned bracket system 1 includes a platform 11 and a groove-shaped fixing device 12 , and the above-mentioned bracket system 1 also includes a plurality of limit components 13 for positioning the anchoring section 31 . Arranged in the extending direction, and each limiting component 13 is fixedly connected to the platform 11 .

具体的,限位组件13可以与平台11固定连接,也可以为可拆卸连接。可知道的是,多个限位组件13位于同一水平线,并且多个限位组件13的布置方向垂直于锚垫板2的板面,多个限位组件13可以使钢拉杆3的锚固段31或张拉段32在组装的过程中始终处于水平的状态,还可以保证钢拉杆3的的锚固段31或张拉段32在组装的过程中始终与锚垫板2的板面垂直,以免在钢拉杆3的对接安装过程中,钢拉杆3出现变形或错位的情况。Specifically, the limiting component 13 may be fixedly connected with the platform 11 or may be detachably connected. It can be known that the multiple limit assemblies 13 are located on the same horizontal line, and the arrangement direction of the multiple limit assemblies 13 is perpendicular to the plate surface of the anchor plate 2, and the multiple limit assemblies 13 can make the anchoring section 31 of the steel tie rod 3 Or the tensioning section 32 is always in a horizontal state during the assembly process, and it can also ensure that the anchoring section 31 or the tensioning section 32 of the steel tie rod 3 is always perpendicular to the plate surface of the anchor plate 2 during the assembly process, so as to avoid During the butt installation process of the steel tie rod 3, the steel tie rod 3 is deformed or dislocated.

进一步的,每个限位组件13包括垫块131和夹板132,垫块131固定连接于平台11,夹板132设置于垫块131的顶端,夹板132平行于锚垫板2,且具有用于钢拉杆3贯穿的孔洞。Further, each limiting assembly 13 includes a cushion block 131 and a clamp plate 132, the cushion block 131 is fixedly connected to the platform 11, the clamp plate 132 is arranged on the top of the cushion block 131, the clamp plate 132 is parallel to the anchor plate 2, and has a The hole through which the tie rod 3 passes.

具体的,在锚固段31或张拉段32的第一端水平贯穿于锚垫板2的板面之后,锚固段31或张拉段32的底部搁置于垫块131的顶面,同时,锚固段31贯穿夹板132。多个垫块131位于同一直线,并且高度相等,多个夹板132也位于同一高度,并且多个夹板132的孔洞的中心连线垂直于锚垫板2的板面。可以保证钢拉杆3的锚固段31或张拉段32始终处于水平的状态,并且可以保证钢拉杆3的锚固段31始终与锚垫板2的板面垂直。Specifically, after the first end of the anchoring section 31 or the tensioning section 32 horizontally penetrates the surface of the anchor plate 2, the bottom of the anchoring section 31 or the tensioning section 32 rests on the top surface of the cushion block 131, and at the same time, the anchoring The segment 31 penetrates the splint 132 . The plurality of spacers 131 are located on the same straight line and have the same height, the plurality of clamping plates 132 are also located at the same height, and the center line connecting the holes of the plurality of clamping plates 132 is perpendicular to the plate surface of the anchor plate 2 . It can ensure that the anchoring section 31 or the tensioning section 32 of the steel tie rod 3 is always in a horizontal state, and it can ensure that the anchoring section 31 of the steel tie rod 3 is always perpendicular to the plate surface of the anchor plate 2 .

在本申请的描述中,需要说明的是,术语“上”、“下”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本申请中的具体含义。In the description of this application, it should be noted that the orientation or positional relationship indicated by the terms "upper", "lower", etc. is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the application and simplifying the description, Rather than indicating or implying that the referred device or element must have a particular orientation, be constructed and operate in a particular orientation, it should not be construed as a limitation on the application. Unless otherwise expressly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it may be a fixed connection, a detachable connection, or an integral connection; it may be a mechanical connection, It can also be an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or an internal connection between two components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific situations.

需要说明的是,在本申请中,诸如“第一”和“第二”等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that in this application, relational terms such as "first" and "second" etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that Any such actual relationship or sequence exists between these entities or operations. Moreover, the terms "comprising", "comprising" or any other variation thereof are intended to encompass a non-exclusive inclusion such that a process, method, article or device that includes a list of elements includes not only those elements, but also includes not explicitly listed or other elements inherent to such a process, method, article or apparatus. Without further limitation, an element qualified by the phrase "comprising a..." does not preclude the presence of additional identical elements in a process, method, article or apparatus that includes the element.

以上所述仅是本申请的具体实施方式,使本领域技术人员能够理解或实现本申请。对这些实施例的多种修改对本领域的技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本申请的精神或范围的情况下,在其它实施例中实现。因此,本申请将不会被限制于本文所示的这些实施例,而是要符合与本文所申请的原理和新颖特点相一致的最宽的范围。The above descriptions are only specific embodiments of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, this application is not intended to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features claimed herein.

Claims (10)

1. A sectional installation method of a suspension bridge steel tie anchoring system, characterized in that the steel tie (3) comprises an anchoring section (31) and a tensioning section (32), the installation method comprising the steps of:
erecting a support system (1) at a preset assembly site;
assembling the anchoring section (31) and the tensioning section (32) by using a bracket system (1) respectively;
respectively hoisting the assembled anchoring section (31) and the assembled tensioning section (32) to a preset butt joint field;
and the anchoring section (31) is butted with the tensioning section (32) by utilizing a butting system (4) to form the steel pull rod (3).
2. The sectional installation method of the suspension bridge steel stay anchoring system according to claim 1, wherein the assembling the anchoring section (31) and the tensioning section (32) with the bracket system (1) respectively comprises:
an anchor backing plate (2) is arranged on the support system (1), and the anchor backing plate (2) is vertical and detachable;
supporting the anchoring section (31) or the tensioning section (32) on the bracket system (1), and enabling a first end of the anchoring section (31) or the tensioning section (32) to horizontally penetrate through the plate surface of the anchor backing plate (2);
from the second end of anchor section (31) or stretch-draw section (32) to the direction of anchor backing plate (2), establish pre-buried pipe (5) in the outside cover of anchor section (31) or stretch-draw section (32), and with pre-buried pipe (5) be adjacent to the one end of anchor backing plate (2) and the face fixed connection of anchor backing plate (2), pre-buried pipe (5) are located one side of anchor backing plate (2), and this side is the one side of the second end of anchor backing plate (2) adjacent anchor section (31) or stretch-draw section (32).
3. The sectional installation method of the suspension bridge steel stay anchoring system according to claim 2, wherein the bracket system (1) comprises a platform (11) and a groove-shaped fixing device (12), and the erection of the bracket system (1) at a predetermined assembly site comprises:
erecting a platform (11) on a preset assembly site;
arranging a fixing device (12) on the top surface of the platform (11), and enabling a notch of the fixing device (12) to face a tensioning section (32) of the steel pull rod (3);
the anchor backing plate (2) is vertically clamped in the groove of the fixing device (12), and the anchor backing plate (2) is propped against the fixing device (12).
4. The sectional installation method of the suspension bridge steel tie rod anchoring system according to claim 3, wherein the bracket system (1) further comprises a limiting component (13), the supporting the anchoring section (31) on the bracket system (1), and the horizontally penetrating the first end of the anchoring section (31) on the plate surface of the anchor backing plate (2) further comprises:
and a limiting component (13) for positioning the anchoring section (31) is arranged on the top surface of the platform (11) along the extending direction of the steel pull rod (3) before the first end of the anchoring section (31) horizontally penetrates through the plate surface of the anchor backing plate (2).
5. The segmental installation method of a suspension bridge steel stay anchoring system as claimed in claim 1, wherein the docking system (4) comprises a connection sleeve (41) and an wrenching wrench (42), the wrenching wrench (42) comprising a wrench head (421), a grip (422) and a chain (423), and the docking of the anchoring section (31) with the tension section (32) by means of the docking system (4) comprises:
sleeving the connecting sleeve (41) on the outer side of the tensioning section (32);
the wrench head (421) is buckled on the connecting sleeve (41), and the chain (423) is bound on the outer wall of the connecting sleeve (41);
the wrench head (421) is rotated to rotate the connecting sleeve (41) and drive the tension section (32) to move towards the anchoring section (31) until the tension section (32) is in butt joint with the anchoring section (31).
6. The segmental installation method of a suspension bridge steel stay anchoring system as claimed in claim 5, wherein the docking system (4) further comprises a lock nut (43) and a bolt (44), and the docking of the anchoring section (31) with the tensioning section (32) using the docking system (4) further comprises:
before the connecting sleeve (41) is sleeved on the outer side of the tensioning section (32), a locking nut (43) is sleeved on the outer sides of the tensioning section (32) and the anchoring section (31) respectively;
inserting a bolt (44) through the side wall of the connecting sleeve (41) to enable the connecting sleeve (41) to be abutted against the tensioning section (32);
after the tensioning section (32) is butted with the anchoring section (31), a locking nut (43) of the anchoring section (31) is rotated to be butted with the connecting sleeve (41);
a bolt (44) is inserted through the side wall of the connection sleeve (41) so that the connection sleeve (41) is in contact with the anchor section (32).
7. A segmental installation system of a suspension bridge steel stay anchoring system, comprising:
the support system (1) is erected on a preset assembly site;
a steel tie rod (3) comprising an anchoring section (31) and a tensioning section (32), the anchoring section (31) or tensioning section (32) being supported to the scaffolding system (1) when the anchoring section (31) or tensioning section (32) is in an assembled state;
a docking system (4) for docking the anchoring section (31) and the tensioning section (32).
8. The segmental installation system of a suspension bridge steel stay anchoring system of claim 7, characterized in that: installing the system still includes anchor backing plate (2) and buried pipe (5) in advance, anchor backing plate (2) vertical and detachably set up in mounting system (1) when anchor section (31) or stretch-draw section (32) are in the assembled state, anchor section (31) or stretch-draw section (32) level run through in the face of anchor backing plate (2), buried pipe (5) cover is located the outside of steel pull rod (3), and the tip fixed connection of buried pipe (5) in anchor backing plate (2).
9. The segmented installation system of suspension bridge steel tie rod anchoring system of claim 8, wherein: mounting system (1) includes fixing device (12) of platform (11) and recess shape, fixing device (12) fixed set up in the top surface of platform (11), and the notch of fixing device (12) is towards the direction of stretch-draw section (32) of steel pull rod (3), anchor backing plate (2) vertical and detachably set up in the notch of fixing device (12), and support hold in fixing device (12).
10. The segmented installation system of suspension bridge steel tie rod anchoring system of claim 7, wherein: the butt joint system (4) comprises a connecting sleeve (41) and an screwing wrench (42), the screwing wrench (42) comprises a wrench head (421), a grab handle (422) and a chain (423), the connecting sleeve (41) is sleeved at the butt joint position of the anchoring section (31) and the tensioning section (32), the wrench head (421) is of an arc-shaped structure, one end of the wrench head is connected to the grab handle (422), and the other end of the wrench head is connected to the chain (423);
when the screwing wrench (42) is in the screwing state, the wrench head (421) is buckled on the connecting sleeve (41), and the chain (423) is bound on the outer wall of the connecting sleeve (41).
CN202210678572.XA 2022-06-15 2022-06-15 Sectional installation method and installation system for suspension bridge steel pull rod anchoring system Pending CN115162171A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210678572.XA CN115162171A (en) 2022-06-15 2022-06-15 Sectional installation method and installation system for suspension bridge steel pull rod anchoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210678572.XA CN115162171A (en) 2022-06-15 2022-06-15 Sectional installation method and installation system for suspension bridge steel pull rod anchoring system

Publications (1)

Publication Number Publication Date
CN115162171A true CN115162171A (en) 2022-10-11

Family

ID=83484872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210678572.XA Pending CN115162171A (en) 2022-06-15 2022-06-15 Sectional installation method and installation system for suspension bridge steel pull rod anchoring system

Country Status (1)

Country Link
CN (1) CN115162171A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116122587A (en) * 2023-02-28 2023-05-16 江苏省华建建设股份有限公司 Sectional installation method of high-altitude large-diameter steel pull rod

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017036514A1 (en) * 2015-08-31 2017-03-09 Vsl International Ag Cable anchorage system
CN206157578U (en) * 2016-08-30 2017-05-10 巨力索具股份有限公司 Novel reinforcing pull rod anchor system
CN207534715U (en) * 2017-09-07 2018-06-26 合肥普赛机械自动化有限公司 A kind of general-purpose monkey wrench
CN207944349U (en) * 2018-03-05 2018-10-09 河北圣宣桥梁模板科技有限公司 A kind of anchoring part for bridge abutment moulding plate
CN211103857U (en) * 2019-12-05 2020-07-28 南京兴宇铁路工艺装备制造有限公司 Novel draw pull rod equipment frock
CN216731412U (en) * 2021-12-14 2022-06-14 中铁大桥局集团第八工程有限公司 Pull rod sleeve group assembling device
CN217579783U (en) * 2022-06-15 2022-10-14 中铁大桥局集团第八工程有限公司 Mounting system of suspension bridge steel pull rod anchoring system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017036514A1 (en) * 2015-08-31 2017-03-09 Vsl International Ag Cable anchorage system
CN108026706A (en) * 2015-08-31 2018-05-11 Vsl 国际股份公司 Cable anchor system
CN206157578U (en) * 2016-08-30 2017-05-10 巨力索具股份有限公司 Novel reinforcing pull rod anchor system
CN207534715U (en) * 2017-09-07 2018-06-26 合肥普赛机械自动化有限公司 A kind of general-purpose monkey wrench
CN207944349U (en) * 2018-03-05 2018-10-09 河北圣宣桥梁模板科技有限公司 A kind of anchoring part for bridge abutment moulding plate
CN211103857U (en) * 2019-12-05 2020-07-28 南京兴宇铁路工艺装备制造有限公司 Novel draw pull rod equipment frock
CN216731412U (en) * 2021-12-14 2022-06-14 中铁大桥局集团第八工程有限公司 Pull rod sleeve group assembling device
CN217579783U (en) * 2022-06-15 2022-10-14 中铁大桥局集团第八工程有限公司 Mounting system of suspension bridge steel pull rod anchoring system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116122587A (en) * 2023-02-28 2023-05-16 江苏省华建建设股份有限公司 Sectional installation method of high-altitude large-diameter steel pull rod
CN116122587B (en) * 2023-02-28 2024-04-30 江苏省华建建设股份有限公司 Sectional installation method of high-altitude large-diameter steel pull rod

Similar Documents

Publication Publication Date Title
US7159262B2 (en) Bridge overhang bracket
CN212503601U (en) Installation die for unit sections of vertical pipes of pipe well
CA2534944C (en) Bridge overhang bracket
CN110725525A (en) Supporting device of assembled cantilever scaffold and construction method thereof
CN115162171A (en) Sectional installation method and installation system for suspension bridge steel pull rod anchoring system
US3960357A (en) Form support means for use with performed girders
CN217579783U (en) Mounting system of suspension bridge steel pull rod anchoring system
JPH01105867A (en) Wall formwork supporter
CN112049415A (en) Construction method of cornice formwork
CN218815294U (en) Steel construction platform of unloading
CN117449261A (en) Plate-type ship backing member mounting process
CN117090366A (en) Construction method of split prefabricated bay window system
CN211228136U (en) Combined construction platform for hogging moment tensioning of prefabricated T-shaped beam
CN210658671U (en) Hub type precast concrete beam column assembly type self-resetting system
CN111206507B (en) Ride-mounted support structure and construction method of continuous bridge after simple support
CN219968353U (en) Prefabricated pedestal of assembled steel structure beam body
JPH0438038Y2 (en)
CN221897284U (en) A vertical pipe support used on autoclaved aerated concrete slab wall
CN111042192A (en) A single-sided formwork support system for basement exterior wall and construction method thereof
CN217808424U (en) Tower crane strutting arrangement's mounting structure
CN111395196A (en) Temporary buttress anchoring system of continuous beam bridge and construction method thereof
JPH1113276A (en) Scaffold structure
CN112813827B (en) Open-hole steel pipe and steel concrete combined beam bridge structure and construction method thereof
JP2002061116A (en) Scaffold support device and scaffold device in bridge structure
CN114000695B (en) Scaffold for supporting multilayer concrete structure and mounting method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20221011