CN115142556A - Assembly type building supporting seat in building engineering and installation method thereof - Google Patents
Assembly type building supporting seat in building engineering and installation method thereof Download PDFInfo
- Publication number
- CN115142556A CN115142556A CN202210354278.3A CN202210354278A CN115142556A CN 115142556 A CN115142556 A CN 115142556A CN 202210354278 A CN202210354278 A CN 202210354278A CN 115142556 A CN115142556 A CN 115142556A
- Authority
- CN
- China
- Prior art keywords
- fixing
- plate
- ground anchor
- seat
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/36—Bearings or like supports allowing movement
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/92—Protection against other undesired influences or dangers
- E04B1/98—Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
- E04H9/021—Bearing, supporting or connecting constructions specially adapted for such buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Electromagnetism (AREA)
- Environmental & Geological Engineering (AREA)
- Physics & Mathematics (AREA)
- Emergency Management (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Business, Economics & Management (AREA)
- Mechanical Engineering (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本发明公开了一种建筑工程中的装配式建筑支撑座及其安装方法,支撑座包括支撑腿,支撑腿设置有四个,相邻的两个支撑腿之间固定连接有第一横杆和第二横杆,支撑腿一侧的上方设置有限位板,限位板的底部固定连接有固定座,第一横杆的一侧固定连接有连接座,连接座的中心转动连接有连接轴,连接轴的一端固定连接有连接套,固定座的中心转动连接有连接杆,连接杆的一端穿过连接套,限位板内设置有地锚螺栓,限位板的顶部还设置有防震底座,防震底座的顶部设置有柱体固定底板,本发明涉及建筑工程技术领域。该种建筑工程中的装配式建筑支撑座,解决了现有的地锚螺栓的固定不方便和容易发生偏移的问题,并提高了抗震能力。
The invention discloses a prefabricated building support base in a construction project and an installation method thereof. The support base comprises support legs, four support legs are arranged, and a first cross bar and a first cross bar are fixedly connected between two adjacent support legs. In the second cross bar, a limit plate is arranged above one side of the support leg, the bottom of the limit plate is fixedly connected with a fixing seat, one side of the first cross bar is fixedly connected with a connecting seat, and the center of the connecting seat is rotatably connected with a connecting shaft, One end of the connecting shaft is fixedly connected with a connecting sleeve, the center of the fixed seat is rotatably connected with a connecting rod, one end of the connecting rod passes through the connecting sleeve, the limit plate is provided with ground anchor bolts, and the top of the limit plate is also provided with an anti-vibration base. The top of the anti-vibration base is provided with a column fixing bottom plate, and the invention relates to the technical field of construction engineering. The prefabricated building support seat in the construction project solves the problems that the existing ground anchor bolts are inconvenient to fix and easily offset, and improves the seismic resistance.
Description
技术领域technical field
本发明涉及建筑工程技术领域,具体为一种建筑工程中的装配式建筑支撑座及其安装方法。The invention relates to the technical field of construction engineering, in particular to a prefabricated building support seat in construction engineering and an installation method thereof.
背景技术Background technique
装配式建筑是指把传统建造方式中的大量现场作业工作转移到工厂进行,在工厂加工制作好建筑用构件和配件(如楼板、墙板、楼梯、阳台等),运输到建筑施工现场,通过可靠的连接方式在现场装配安装而成的建筑。然而在装配式建筑中立柱和横梁是不可或缺的重要结构,承担着支撑整个建筑的重任。在对立柱进行安装时,为保证立柱的稳定性,通常预制立柱支撑座,然而现有的支撑座通常在地面挖坑将地锚螺栓放入并填上混凝土,地锚螺栓的固定既不方便,在浇筑过程中也容易发生偏移,造成了极大的不变,同时现有的立柱支撑座不具备抗震能力,在发生地震时难以应对。Prefabricated buildings refer to the transfer of a large number of on-site operations in traditional construction methods to factories, where building components and accessories (such as floors, wall panels, stairs, balconies, etc.) are processed and fabricated, and transported to the construction site. Reliable connections A building assembled and installed on site. However, in prefabricated buildings, columns and beams are indispensable and important structures that bear the heavy responsibility of supporting the entire building. When installing the column, in order to ensure the stability of the column, the column support seat is usually prefabricated. However, in the existing support seat, the ground anchor bolts are usually dug in the ground and filled with concrete, which is inconvenient to fix the ground anchor bolts. , It is also prone to offset during the pouring process, resulting in great changes. At the same time, the existing column support base does not have the ability to resist earthquakes, so it is difficult to deal with earthquakes.
发明内容SUMMARY OF THE INVENTION
(一)解决的技术问题(1) Technical problems solved
针对现有技术的不足,本发明提供了一种建筑工程中的装配式建筑支撑座及其安装方法,解决了现有的地锚螺栓的固定不方便和容易发生偏移的问题,并提高了抗震能力。Aiming at the deficiencies of the prior art, the present invention provides a prefabricated building support base in a construction project and an installation method thereof, which solves the problems of inconvenient fixation and easy deviation of the existing ground anchor bolts, and improves the earthquake resistance.
(二)技术方案(2) Technical solutions
为实现以上目的,本发明通过以下技术方案予以实现:一种建筑工程中的装配式建筑支撑座,包括支撑腿,所述支撑腿设置有四个,相邻的两个支撑腿之间固定连接有第一横杆和第二横杆,所述支撑腿一侧的上方设置有限位板,所述限位板的底部固定连接有固定座,所述第一横杆的一侧固定连接有连接座,所述连接座的中心转动连接有连接轴,所述连接轴的一端固定连接有连接套,所述固定座的中心转动连接有连接杆,所述连接杆的一端穿过连接套,所述连接杆的表面螺纹连接有固定螺母,所述固定螺母设置在连接套的两端,所述限位板内设置有地锚螺栓,所述限位板的顶部还设置有防震底座,防震底座的顶部设置有柱体固定底板。In order to achieve the above purpose, the present invention is achieved through the following technical solutions: a prefabricated building support base in a construction project, including support legs, the support legs are provided with four, and the two adjacent support legs are fixedly connected. There are a first cross bar and a second cross bar, a limit plate is arranged above one side of the support leg, the bottom of the limit plate is fixedly connected with a fixing seat, and one side of the first cross bar is fixedly connected with a connection The center of the connecting seat is rotatably connected with a connecting shaft, one end of the connecting shaft is fixedly connected with a connecting sleeve, the center of the fixed seat is rotatably connected with a connecting rod, and one end of the connecting rod passes through the connecting sleeve, so The surface of the connecting rod is threadedly connected with fixing nuts, the fixing nuts are arranged at both ends of the connecting sleeve, the ground anchor bolts are arranged in the limit plate, and the top of the limit plate is also provided with an anti-vibration base, the anti-vibration base The top is provided with a column fixing bottom plate.
优选的,所述防震底座包括固定箱,所述固定箱内壁的底部固定连接有第一固定套和第二固定套,所述第一固定套与地锚螺栓的位置相对应,所述地锚螺栓的表面且位于第一固定套内螺纹连接有锁紧螺母,所述第二固定套内设置有紧固螺栓,所述固定箱内设置有减震块,所述减震块的顶部设置有减震板,所述柱体固定底板设置在减震板的顶部,所述紧固螺栓的螺纹段延伸至柱体固定底板的上方。Preferably, the anti-vibration base includes a fixing box, a first fixing sleeve and a second fixing sleeve are fixedly connected to the bottom of the inner wall of the fixing box, the first fixing sleeve corresponds to the position of the ground anchor bolt, and the ground anchor A locking nut is threaded on the surface of the bolt and located in the first fixing sleeve, a tightening bolt is arranged in the second fixing sleeve, a shock absorbing block is arranged in the fixing box, and the top of the shock absorbing block is arranged with A shock absorbing plate, the column fixing bottom plate is arranged on the top of the shock absorbing plate, and the threaded section of the fastening bolt extends to the top of the column fixing bottom plate.
优选的,所述减震块为橡胶块,所述减震板为橡胶垫,所述紧固螺栓采用普通碳素结构钢。Preferably, the shock-absorbing block is a rubber block, the shock-absorbing plate is a rubber pad, and the fastening bolt is made of ordinary carbon structural steel.
优选的,所述减震板的表面开设有与第一固定套和第二固定套适配的通孔,所述第二固定套的顶部与减震板的顶部之间距离为5-15mm。Preferably, the surface of the shock absorbing plate is provided with through holes adapted to the first fixing sleeve and the second fixing sleeve, and the distance between the top of the second fixing sleeve and the top of the shock absorbing plate is 5-15 mm.
优选的,所述限位板的表面且位于地锚螺栓对应位置固定连接有套筒,所述限位板的顶部中央设置有水准泡。Preferably, a sleeve is fixedly connected to the surface of the limiting plate at the corresponding position of the ground anchor bolt, and a level bubble is provided in the center of the top of the limiting plate.
一种建筑工程中的装配式建筑支撑座安装方法,包括以下步骤:A method for installing a prefabricated building support seat in a construction project, comprising the following steps:
S1、将由支撑腿、第一横杆和第二横杆组成的框架放入基坑中,对限位板的位置进行调整并固定;S1. Put the frame composed of the support legs, the first cross bar and the second cross bar into the foundation pit, and adjust and fix the position of the limit plate;
S2、将地锚螺栓从限位板的底部穿过并用地锚螺母固定;S2. Pass the ground anchor bolts through the bottom of the limit plate and fix them with ground anchor nuts;
S3、往基坑中灌入混凝土,凝固;S3. Pour concrete into the foundation pit and solidify;
S4、取下地锚螺母,将防震底座安装在限位板的顶部;S4. Remove the ground anchor nut and install the anti-vibration base on the top of the limit plate;
S5、安装柱体,并用螺母紧固。S5. Install the column and fasten it with nuts.
优选的,在步骤S1中将连接杆的一端穿过连接套,并通过调整固定螺母的位置对限位板的位置调整并固定。Preferably, in step S1, one end of the connecting rod is passed through the connecting sleeve, and the position of the limiting plate is adjusted and fixed by adjusting the position of the fixing nut.
优选的,在步骤S2中若基坑内部空间较小,地锚螺栓可在安装限位板前穿在限位板上。Preferably, in step S2, if the inner space of the foundation pit is small, the ground anchor bolts can be passed through the limit plate before installing the limit plate.
优选的,在步骤S4中防震底座通过锁紧螺母固定。Preferably, in step S4, the anti-vibration base is fixed by a locking nut.
优选的,在步骤S5中,柱体安装时将柱体底部的柱体固定底板对准并放置在防震底座上,随后用对应的螺母固定。Preferably, in step S5, when the column is installed, the column fixing bottom plate at the bottom of the column is aligned and placed on the anti-vibration base, and then fixed with corresponding nuts.
(三)有益效果(3) Beneficial effects
本发明提供了一种建筑工程中的装配式建筑支撑座及其安装方法。具备以下有益效果:The invention provides a prefabricated building support seat in a construction project and an installation method thereof. Has the following beneficial effects:
通过由支撑腿、第一横杆和第二横杆组成的框架,在限位板底部设置连接杆,第一横杆一侧设置有可转动的连接套,实现了对限位板的位置进行调整和固定,避免了地锚螺栓固定不方便和在施工过程中易发生偏移的问题,保证了地锚螺栓定位准确;另外设置了防震底座,在地震发生时采用普通碳素结构钢制成的紧固螺栓发生断裂,由刚性连接转为柔性连接,实现了吸能,减少了地震的破坏性,地锚螺栓仍对限位板进行限位固定,保证了连接的可靠性。Through the frame composed of the support legs, the first cross bar and the second cross bar, a connecting rod is arranged at the bottom of the limit plate, and a rotatable connecting sleeve is arranged on one side of the first cross bar, so that the position of the limit plate can be adjusted. Adjustment and fixation avoid the problems of inconvenient fixation of ground anchor bolts and easy deviation during construction, and ensure accurate positioning of ground anchor bolts; in addition, an anti-vibration base is set up, which is made of ordinary carbon structural steel when an earthquake occurs. The anchor bolts are broken, and the rigid connection is changed to a flexible connection, which realizes energy absorption and reduces the destructiveness of the earthquake. The ground anchor bolts still limit and fix the limit plate to ensure the reliability of the connection.
附图说明Description of drawings
图1为本发明整体结构示意图;Fig. 1 is the overall structure schematic diagram of the present invention;
图2为本发明内部结构示意图;Fig. 2 is the internal structure schematic diagram of the present invention;
图3为本发明图2中A处放大图;Fig. 3 is the enlarged view of A place in Fig. 2 of the present invention;
图4为本发明支撑腿与第一横杆和第二横杆连接示意图;4 is a schematic diagram of the connection between the support leg and the first cross bar and the second cross bar according to the present invention;
图5为本发明限位板的结构示意图;Fig. 5 is the structural schematic diagram of the limiting plate of the present invention;
图6为本发明减震板顶部结构示意图。FIG. 6 is a schematic diagram of the top structure of the shock absorbing plate of the present invention.
图中:1-支撑腿、2-第一横杆、3-第二横杆、4-限位板、5-固定座、6-连接座、7-连接轴、8-连接套、9-连接杆、10-固定螺母、11-地锚螺栓、12-固定箱、13-柱体固定底板、14-第一固定套、15-锁紧螺母、16-第二固定套、17-紧固螺栓、18-减震块、19-减震板、20-套筒、21-水准泡。In the figure: 1-support leg, 2-first crossbar, 3-second crossbar, 4-limiting plate, 5-fixed seat, 6-connecting seat, 7-connecting shaft, 8-connecting sleeve, 9- Connecting rod, 10-fixing nut, 11-ground anchor bolt, 12-fixing box, 13-cylinder fixing bottom plate, 14-first fixing sleeve, 15-locking nut, 16-second fixing sleeve, 17-fastening Bolts, 18-shock block, 19-shock plate, 20-sleeve, 21-level bubble.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
请参阅图1-6,本发明提供一种技术方案:一种建筑工程中的装配式建筑支撑座,包括支撑腿1,支撑腿1设置有四个,相邻的两个支撑腿1之间固定连接有第一横杆2和第二横杆3,组成一个框架,可放入基坑内,支撑腿1一侧的上方设置有限位板4,限位板4的底部固定连接有固定座5,第一横杆2的一侧固定连接有连接座6,连接座6的中心转动连接有连接轴7,连接轴7的一端固定连接有连接套8,固定座5的中心转动连接有连接杆9,连接杆9的一端穿过连接套8,连接杆9的表面螺纹连接有固定螺母10,通过固定螺母10调节连接杆9穿入连接套8的长度,从而可以调整限位板4的位置,限位板4的表面且位于地锚螺栓11对应位置固定连接有套筒20,限位板4的顶部中央设置有水准泡21,固定螺母10设置在连接套8的两端,限位板4内设置有地锚螺栓11,地锚螺栓11穿过套筒20,通过限位板4实现对地锚螺栓11的定位,而地锚螺栓11的露出高度可通过地锚螺栓11表面连接的螺母进行调整;限位板4的顶部还设置有防震底座,防震底座的顶部设置有柱体固定底板13。1-6, the present invention provides a technical solution: a prefabricated building support base in a construction project, comprising
防震底座包括固定箱12,固定箱12内壁的底部固定连接有第一固定套14和第二固定套16,第一固定套14与地锚螺栓11的位置相对应,地锚螺栓11的表面且位于第一固定套14内螺纹连接有锁紧螺母15,通过锁紧螺母15可实现对固定箱12的固定,第二固定套16内设置有紧固螺栓17,紧固螺栓17采用普通碳素结构钢,紧固螺栓17的螺纹段延伸至柱体固定底板13的上方,保证了在不发生地震时能对柱体实现固定,保证了柱体连接的稳定性,当发生地震时,由于紧固螺栓17受力过大发生断裂,固定箱12内设置有减震块18,减震块18的顶部设置有减震板19,柱体固定底板13设置在减震板19的顶部,减震块18为橡胶块,减震板19为橡胶垫,通过减震块18和减震板19实现对柱体固定底板13进行支撑,并能够实现吸收地震波,减弱地震对柱体的影响。The anti-vibration base includes a
减震板19的表面开设有与第一固定套14和第二固定套16适配的通孔,第二固定套16的顶部与减震板19的顶部之间距离为5-15mm,保证利用紧固螺栓17在对柱体固定底板13固定后,柱体固定底板13底部与第二固定套16的顶部接触,实现对柱体固定底板13的稳定连接,保证了连接的稳定性。The surface of the shock-absorbing
一种建筑工程中的装配式建筑支撑座安装方法,包括以下步骤:A method for installing a prefabricated building support seat in a construction project, comprising the following steps:
S1、将由支撑腿、第一横杆和第二横杆组成的框架放入基坑中,对限位板的位置进行调整并固定;S1. Put the frame composed of the support legs, the first cross bar and the second cross bar into the foundation pit, and adjust and fix the position of the limit plate;
S2、将地锚螺栓从限位板的底部穿过并用地锚螺母固定;S2. Pass the ground anchor bolts through the bottom of the limit plate and fix them with ground anchor nuts;
S3、往基坑中灌入混凝土,凝固;S3. Pour concrete into the foundation pit and solidify;
S4、取下地锚螺母,将防震底座安装在限位板的顶部;S4. Remove the ground anchor nut and install the anti-vibration base on the top of the limit plate;
S5、安装柱体,并用螺母紧固。S5. Install the column and fasten it with nuts.
在步骤S1中将连接杆的一端穿过连接套,并通过调整固定螺母的位置对限位板的位置调整并固定。In step S1, one end of the connecting rod is passed through the connecting sleeve, and the position of the limiting plate is adjusted and fixed by adjusting the position of the fixing nut.
在步骤S2中若基坑内部空间较小,地锚螺栓可在安装限位板前穿在限位板上。In step S2, if the inner space of the foundation pit is small, the ground anchor bolts can be passed through the limit plate before installing the limit plate.
在步骤S4中防震底座通过锁紧螺母固定。In step S4, the anti-vibration base is fixed by a locking nut.
在步骤S5中,柱体安装时将柱体底部的柱体固定底板对准并放置在防震底座上,随后用对应的螺母固定。In step S5, when the column is installed, the column fixing bottom plate at the bottom of the column is aligned and placed on the anti-vibration base, and then fixed with corresponding nuts.
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个......”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that, in this document, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any relationship between these entities or operations. any such actual relationship or sequence exists. Moreover, the terms "comprising", "comprising" or any other variation thereof are intended to encompass a non-exclusive inclusion such that a process, method, article or device that includes a list of elements includes not only those elements, but also includes not explicitly listed or other elements inherent to such a process, method, article or apparatus. Without further limitation, an element defined by the phrase "comprising a..." does not preclude the presence of additional identical elements in a process, method, article or apparatus that includes the element.
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, and substitutions can be made in these embodiments without departing from the principle and spirit of the invention and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210354278.3A CN115142556B (en) | 2022-04-06 | 2022-04-06 | A kind of prefabricated building support base and its installation method in construction projects |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210354278.3A CN115142556B (en) | 2022-04-06 | 2022-04-06 | A kind of prefabricated building support base and its installation method in construction projects |
Publications (2)
Publication Number | Publication Date |
---|---|
CN115142556A true CN115142556A (en) | 2022-10-04 |
CN115142556B CN115142556B (en) | 2024-03-26 |
Family
ID=83406427
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210354278.3A Active CN115142556B (en) | 2022-04-06 | 2022-04-06 | A kind of prefabricated building support base and its installation method in construction projects |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115142556B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001073458A (en) * | 1999-09-08 | 2001-03-21 | Toshihiro Ochiai | Trestle for supporting column base fixing anchor bolt |
JP2002194746A (en) * | 2000-12-27 | 2002-07-10 | Taisei Corp | Installation method of anchor bolt |
CN203866974U (en) * | 2014-05-30 | 2014-10-08 | 广州市第三建筑工程有限公司 | Embedded bolt group locator |
CN204298842U (en) * | 2014-10-22 | 2015-04-29 | 中国建筑第八工程局有限公司 | Foundation bolt precast frame mounting structure |
CN210597646U (en) * | 2019-07-31 | 2020-05-22 | 重庆建工第一市政工程有限责任公司 | Steel column embedded part convenient to position |
CN211948530U (en) * | 2020-03-16 | 2020-11-17 | 山西四建集团有限公司 | A positioning device for burying anchor bolts |
-
2022
- 2022-04-06 CN CN202210354278.3A patent/CN115142556B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001073458A (en) * | 1999-09-08 | 2001-03-21 | Toshihiro Ochiai | Trestle for supporting column base fixing anchor bolt |
JP2002194746A (en) * | 2000-12-27 | 2002-07-10 | Taisei Corp | Installation method of anchor bolt |
CN203866974U (en) * | 2014-05-30 | 2014-10-08 | 广州市第三建筑工程有限公司 | Embedded bolt group locator |
CN204298842U (en) * | 2014-10-22 | 2015-04-29 | 中国建筑第八工程局有限公司 | Foundation bolt precast frame mounting structure |
CN210597646U (en) * | 2019-07-31 | 2020-05-22 | 重庆建工第一市政工程有限责任公司 | Steel column embedded part convenient to position |
CN211948530U (en) * | 2020-03-16 | 2020-11-17 | 山西四建集团有限公司 | A positioning device for burying anchor bolts |
Also Published As
Publication number | Publication date |
---|---|
CN115142556B (en) | 2024-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20190003197A1 (en) | Tie rod for protecting structures from wind and earthquake type stresses | |
CN112064789B (en) | Full-assembly type anti-seismic node of prestressed concrete frame structure | |
KR101372087B1 (en) | Strengthen method for steel frame structure using seismic control device | |
JP2011021332A (en) | Construction method for base isolation structure | |
CN110656583A (en) | Force balance supporting structure of longitudinal slope cast-in-place box girder and construction method thereof | |
WO2021184511A1 (en) | Energy dissipation lattice column structure provided with dense battens and use method | |
CN113250316A (en) | Anti-seismic device of beam-column joint of reinforced concrete structure | |
CN210947953U (en) | Seismic isolation and reduction system of fabricated building | |
CN115142556A (en) | Assembly type building supporting seat in building engineering and installation method thereof | |
CN107012952A (en) | A kind of concrete frame node | |
CN116657770B (en) | Assembly building connecting device with damping function and application method thereof | |
CN113235844B (en) | Shock-absorbing structure of house building | |
CN207160308U (en) | A kind of prefabrication structure with shock-absorbing function | |
CN212224667U (en) | Roof steel truss assembled tire frame | |
CN112459584B (en) | Wallboard concatenation and ground absorbing assembled frame construction | |
JP2010236289A (en) | Foundation structure | |
CN100353008C (en) | Novel embedded part for vibration isolation bearing and mounting method thereof | |
CN214885797U (en) | Reinforcing device for brick-concrete structure of constructional engineering | |
CN207761051U (en) | One kind being suitable for assembled square steel tube concrete column node structure | |
CN222835353U (en) | A seismic-resistant frame structure with adjustable size | |
CN219968353U (en) | Prefabricated pedestal of assembled steel structure beam body | |
CN215674218U (en) | Building antidetonation support connection structure | |
CN219387260U (en) | Assembled building construction superimposed sheet fixing device | |
CN114687358B (en) | Narrow foundation pit foundation reinforcement structure and reinforcement method thereof | |
CN219732265U (en) | A kind of prefabricated house building steel structure frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A prefabricated building support base and its installation method in construction engineering Granted publication date: 20240326 Pledgee: Ningxiang sub branch of Bank of Changsha Co.,Ltd. Pledgor: Hunan Dingsheng Green Building Group Co.,Ltd. Registration number: Y2025980018462 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |