CN115125784A - Paving method for reducing rainwater runoff in outdoor hardened field - Google Patents
Paving method for reducing rainwater runoff in outdoor hardened field Download PDFInfo
- Publication number
- CN115125784A CN115125784A CN202210984002.3A CN202210984002A CN115125784A CN 115125784 A CN115125784 A CN 115125784A CN 202210984002 A CN202210984002 A CN 202210984002A CN 115125784 A CN115125784 A CN 115125784A
- Authority
- CN
- China
- Prior art keywords
- outdoor
- paving
- plain
- foundation
- rabbet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 239000004567 concrete Substances 0.000 claims abstract description 16
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 16
- 239000002689 soil Substances 0.000 claims abstract description 14
- 239000004575 stone Substances 0.000 claims abstract description 9
- 238000009412 basement excavation Methods 0.000 claims description 8
- 239000010410 layer Substances 0.000 description 10
- 238000010276 construction Methods 0.000 description 9
- 239000011449 brick Substances 0.000 description 5
- 239000004576 sand Substances 0.000 description 5
- 241000255925 Diptera Species 0.000 description 4
- 230000008602 contraction Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 238000004140 cleaning Methods 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 239000010426 asphalt Substances 0.000 description 1
- 238000009395 breeding Methods 0.000 description 1
- 230000001488 breeding effect Effects 0.000 description 1
- 230000008094 contradictory effect Effects 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 239000003814 drug Substances 0.000 description 1
- 229940079593 drug Drugs 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
- E01C5/06—Pavings made of prefabricated single units made of units with cement or like binders
- E01C5/08—Reinforced units with steel frames
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/225—Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/04—Foundations produced by soil stabilisation
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
- E01C5/06—Pavings made of prefabricated single units made of units with cement or like binders
- E01C5/08—Reinforced units with steel frames
- E01C5/085—Reinforced units with steel frames on prefabricated supporting structures or prefabricated foundation elements except coverings made of layers of similar elements
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C2201/00—Paving elements
- E01C2201/12—Paving elements vertically interlocking
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C2201/00—Paving elements
- E01C2201/20—Drainage details
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a paving method for reducing rainwater runoff in an outdoor hardening site, which comprises the following steps of 1, excavating a foundation in the outdoor site needing hardening according to a set depth, and tamping the foundation to form a plain soil foundation; 2, paving a plain concrete cushion layer on the plain soil foundation at the preset buttress position; then, building a buttress on the plain concrete cushion layer; 3, paving a sandy soil layer on the plain soil foundation between the adjacent buttresses; and 4, paving reinforced concrete rabbet building blocks between the adjacent buttresses, wherein a plurality of water passing holes are formed in the reinforced concrete rabbet building blocks, gaps are reserved between the adjacent reinforced concrete rabbet building blocks, and then filling fine stones in the gaps for caulking. The invention has the advantages that in the rainstorm season, rainwater falling on an outdoor hardening field is converged into an overhead space at the lower part of the concrete rabbet building block through the water hole; can be completely consumed on the spot without being discharged outside, and the purpose of reducing the rainwater runoff of the outdoor hardening site is realized.
Description
Technical Field
The invention relates to a paving method of an outdoor hardening site, in particular to a paving method for reducing rainwater runoff of the outdoor hardening site.
Background
The outdoor hardening field of the small building room in the city, the outdoor public square and the like are the main fields for providing outdoor activities and exercising body of people. However, water accumulation in the sections is serious every time of heavy rain, and the phenomenon of waterlogging in building districts and outdoor public squares is common. The reason is that the indoor and outdoor hardened sites of the building districts occupy a certain proportion, the runoff coefficient is large, and the water-discharging capacity of a rainwater pipe network is exceeded quickly in the heavy rainfall period, so that the runoff time generated on the ground surface is short in the heavy rainfall period, and the waterlogging of the building districts is caused.
Disclosure of Invention
The invention aims to provide a paving method for reducing rainwater runoff in an outdoor hardened field, which can reduce rainwater runoff superposition in rainstorm seasons and relieve urban waterlogging.
In order to achieve the purpose, the invention adopts the following technical scheme:
the invention relates to a paving method for reducing rainwater runoff of an outdoor hardened field, which comprises the following steps:
step 1, excavating a foundation in an outdoor site needing hardening according to a set depth, and tamping the foundation to form a plain soil foundation;
Optionally, in step 1, the set excavation depth principle is: the excavation depth is less than the various pipeline burying depths of the lower part of the outdoor hardening site, so that the normal use of various pipelines is not influenced in the construction process, and the excavation construction is simpler.
Optionally, in step 2, the thickness of the laid plain concrete cushion layer is more than or equal to 100mm, so as to prevent the buttress from settling.
Optionally, in the step 4, a gap reserved between adjacent reinforced concrete tongue-and-groove building blocks is 10 mm; the joint caulking by the fine stones can offset the influence of expansion with heat and contraction with cold, and can play a role of water passing in rainy season.
The advantages of the invention are embodied in the following aspects:
1. in rainstorm seasons, rainwater falling on an outdoor hardening site is converged into an overhead space at the lower part of the concrete rabbet building block through the water holes; it can be seen that the rainfall of tens of millimeters or hundreds of millimeters can be completely consumed on the spot without being discharged outside.
2. When the hardened site outside the existing building small room is reformed, the influence on the daily life of residents is very limited. From the beginning of paying off and excavating, foundation treatment (tamping) at the lower part of the buttress, buttress building, tongue-and-groove block paving and the like, the construction process is very simple, and the construction speed is high. Even if the individual tongue-and-groove paving building blocks are uneven due to construction reasons or buttress settlement, the maintenance is easier.
3. Compared with common pavement bricks, water permeable bricks and stone pavements on the street, the rabbet building block is relatively heavy in weight, and four corners of the rabbet building block are supported by the brick-built buttresses, so that the phenomena of loosening, breaking and the like which are common in the pavement of the street are not easy to occur.
4. When the outdoor hardening site area is large, the construction can be carried out in batches, and the recovery can be carried out while the construction is carried out.
5. The excavation depth is shallow, and various pipelines at the lower part of the hardening site outside the small building room cannot be influenced.
6. When the building blocks are paved, a gap of 10mm is reserved, the influence of expansion with heat and contraction with cold can be offset, meanwhile, the gap is embedded by fine stones, and the effect of water passing can be achieved in rainy seasons.
7. After the device is used for some years, some tongue-and-groove building blocks can be lifted, the silting condition of the lower part is checked, and necessary cleaning and maintenance are carried out according to the needs. Compared with the existing permeable asphalt, permeable concrete and permeable brick ground, the method can recover the rainwater runoff control function through the cleaning and maintenance mode.
8. In summer, in order to prevent the breeding of mosquitoes and flies, a plurality of drugs for killing mosquitoes and flies can be regularly sprayed downwards through the water through holes on the rabbet building blocks.
9. The rainwater runoff reducing and rapid reconstruction method is suitable for rapid reconstruction of rainwater runoff reduction of hardened sites outside existing building districts, and has certain practical significance for newly built building districts, schools, hospitals and other sites.
10. The height of the brick buttress can be combined with the actual situation of the area, and the area with small rainfall capacity is lower than a certain point; in areas with large rainfall, the height is higher than a certain point; according to the actual situation, the conditions are adjusted according to the local conditions.
11. When the tongue-and-groove building blocks are prefabricated, corresponding surface patterns can be designed when a mould is manufactured according to use requirements, and a flexible landscape effect can be created after paving.
Drawings
Fig. 1 is a schematic view of the paving structure of an outdoor hardened ground implemented according to the method of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It is to be understood that, unless otherwise expressly stated or limited, the terms "connected" and "secured" are used broadly and encompass both fixed and removable connections, or integral parts thereof; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be interconnected within two elements or in a relationship where two elements interact with each other unless otherwise specifically limited. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
In addition, the meaning of "and/or" appearing throughout is to include three juxtapositions, exemplified by "A and/or B," including either the A or B arrangement, or both A and B satisfied arrangement. In addition, technical solutions between the embodiments may be combined with each other, but must be based on the realization of the technical solutions by a person skilled in the art, and when the technical solutions are contradictory to each other or cannot be realized, such a combination should not be considered to exist, and is not within the protection scope of the present invention.
As shown in figure 1, the paving method for reducing the rainwater runoff of the outdoor hardened field adopts the reinforced concrete rabbet building block 1 to pave, and the reinforced concrete rabbet building block 1 can be prefabricated in a factory or on the spot, and is recommended to be prefabricated in the factory, so that the paving method is favorable for ensuring the quality. The specification of the tongue-and-groove building block can be set to various specifications such as 500mm multiplied by 1000mm, 1000mm multiplied by 1000mm, 100mm multiplied by 1500mm, 1500mm multiplied by 2000mm, 2000mm multiplied by 2000mm and the like; the condition of the grade and the reinforcing bars of the concrete can be determined by calculation according to the use characteristics of the outdoor hardening field. In order to meet the requirement of water passing, when the rabbet building block is prefabricated, water passing holes 2 with the diameter of 20, 25 or 30 are reserved on the rabbet building block, and the number of the water passing holes 2 is determined according to a rainfall test in local rainstorm seasons.
The paving steps are as follows:
step 1, after paying off an outdoor field needing hardening, excavating a foundation according to a set depth;
beneficially or exemplarily, the excavation depth is smaller than the burying depth of various pipelines at the lower part of an outdoor site needing hardening, so that the normal use of various pipelines is not influenced in the construction process, and the excavation construction is simpler; then, tamping the excavated foundation to form a plain soil foundation 3;
and 2, paving a plain concrete cushion layer 4 with the thickness of more than or equal to 100mm on the plain soil foundation 3 at the preset buttress position to prevent the buttress from settling. Then, building a buttress 5 on the plain concrete cushion layer 4;
advantageously or exemplarily, the buttress 5 is a brick-laid buttress, the buttress height H can be selected to be 120mm, 180mm or 240mm, etc., but must meet the modulus requirements of the brick; the selection of the height H of the buttress mainly considers that the requirement of water storage capacity is met, a certain overhead space is built at the lower part of a hardening surface layer, and the reduction of rainwater runoff in a rainstorm period is inevitably facilitated;
Claims (4)
1. The paving method for reducing the rainwater runoff of the outdoor hardened field is characterized by comprising the following steps:
step 1, excavating a foundation in an outdoor site needing hardening according to a set depth, and tamping the foundation to form a plain soil foundation;
step 2, laying a plain concrete cushion layer on the plain soil foundation at a preset buttress position; then, building a buttress on the plain concrete cushion layer;
step 3, paving a sandy soil layer on the plain soil foundation between the adjacent buttresses;
step 4, paving reinforced concrete rabbet building blocks between adjacent buttresses, wherein a plurality of water through holes are formed in the reinforced concrete rabbet building blocks; gaps are reserved between adjacent reinforced concrete tongue-and-groove building blocks, and then fine stones are filled in the gaps for caulking.
2. The paving method for reducing the rainwater runoff of the outdoor hardening site according to claim 1, wherein in the step 1, the set excavation depth principle is as follows: the excavation depth is less than the burying depth of various pipelines at the lower part of an outdoor site needing hardening.
3. The paving method for reducing the rainwater runoff of the outdoor hardening site according to claim 1 or 2, wherein in the step 2, the thickness of the laid plain concrete cushion layer is more than or equal to 100 mm.
4. The paving method for reducing the rainwater runoff on the outdoor hardened field according to claim 1 or 2, wherein in the step 4, the reserved gap between the adjacent reinforced concrete rabbet blocks is 10 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210984002.3A CN115125784A (en) | 2022-08-16 | 2022-08-16 | Paving method for reducing rainwater runoff in outdoor hardened field |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210984002.3A CN115125784A (en) | 2022-08-16 | 2022-08-16 | Paving method for reducing rainwater runoff in outdoor hardened field |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115125784A true CN115125784A (en) | 2022-09-30 |
Family
ID=83387067
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210984002.3A Withdrawn CN115125784A (en) | 2022-08-16 | 2022-08-16 | Paving method for reducing rainwater runoff in outdoor hardened field |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115125784A (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20315152U1 (en) * | 2003-10-01 | 2004-02-12 | Braun, Marc Christopher | Two-part protection plate for protecting buildings from rainwater comprises a concrete brick plate, and a natural stone material e.g. basalt or gravel pressed with concrete/cement and water |
US20110110717A1 (en) * | 2009-11-09 | 2011-05-12 | Nowak & Eisenhardt Llc | Structure for Supporting Vehicular Traffic |
CN103669145A (en) * | 2013-12-31 | 2014-03-26 | 北京东方园林股份有限公司 | Pavement method of permeable pavement structure |
CN106049217A (en) * | 2016-06-16 | 2016-10-26 | 昆山通海建材科技有限公司 | Assembly type permeable pavement paving c, block bodies and paving structure |
CN107090755A (en) * | 2017-05-03 | 2017-08-25 | 海绵城市环保新材料(深圳)有限公司 | A kind of paving structure of permeable Footpath brick and porous pavement |
CN209703229U (en) * | 2019-03-19 | 2019-11-29 | 成都城投建筑科技投资管理集团有限公司 | A kind of recyclable prefabricated plate paving structure |
CN211571249U (en) * | 2019-10-31 | 2020-09-25 | 南京市城市与交通规划设计研究院股份有限公司 | Water storage permeable pavement for sponge city |
CN215758320U (en) * | 2021-08-31 | 2022-02-08 | 武汉市政工程设计研究院有限责任公司 | Sponge city gap formula structure of mating formation that permeates water |
CN215829174U (en) * | 2021-06-30 | 2022-02-15 | 福建海环海滨资源开发有限公司 | Concrete brick permeates water |
KR20220070917A (en) * | 2020-11-23 | 2022-05-31 | 콘비젼스 주식회사 | Construction method of cast-in-place type pavement layer used for large car lane |
CN114592396A (en) * | 2022-03-14 | 2022-06-07 | 济南四建集团建材有限责任公司 | Rapid permeable pavement |
-
2022
- 2022-08-16 CN CN202210984002.3A patent/CN115125784A/en not_active Withdrawn
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20315152U1 (en) * | 2003-10-01 | 2004-02-12 | Braun, Marc Christopher | Two-part protection plate for protecting buildings from rainwater comprises a concrete brick plate, and a natural stone material e.g. basalt or gravel pressed with concrete/cement and water |
US20110110717A1 (en) * | 2009-11-09 | 2011-05-12 | Nowak & Eisenhardt Llc | Structure for Supporting Vehicular Traffic |
CN103669145A (en) * | 2013-12-31 | 2014-03-26 | 北京东方园林股份有限公司 | Pavement method of permeable pavement structure |
CN106049217A (en) * | 2016-06-16 | 2016-10-26 | 昆山通海建材科技有限公司 | Assembly type permeable pavement paving c, block bodies and paving structure |
CN107090755A (en) * | 2017-05-03 | 2017-08-25 | 海绵城市环保新材料(深圳)有限公司 | A kind of paving structure of permeable Footpath brick and porous pavement |
CN209703229U (en) * | 2019-03-19 | 2019-11-29 | 成都城投建筑科技投资管理集团有限公司 | A kind of recyclable prefabricated plate paving structure |
CN211571249U (en) * | 2019-10-31 | 2020-09-25 | 南京市城市与交通规划设计研究院股份有限公司 | Water storage permeable pavement for sponge city |
KR20220070917A (en) * | 2020-11-23 | 2022-05-31 | 콘비젼스 주식회사 | Construction method of cast-in-place type pavement layer used for large car lane |
CN215829174U (en) * | 2021-06-30 | 2022-02-15 | 福建海环海滨资源开发有限公司 | Concrete brick permeates water |
CN215758320U (en) * | 2021-08-31 | 2022-02-08 | 武汉市政工程设计研究院有限责任公司 | Sponge city gap formula structure of mating formation that permeates water |
CN114592396A (en) * | 2022-03-14 | 2022-06-07 | 济南四建集团建材有限责任公司 | Rapid permeable pavement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110306565B (en) | Road ecological slope protection system and construction method | |
CN108532406A (en) | Can rapid construction high-bearing capacity pervious surface and laying method | |
CN211199978U (en) | Pavement paving structure for permeable sidewalk | |
CN207062672U (en) | A kind of permeable pavement structure | |
CN109826065B (en) | High-fill roadbed protection system and construction method thereof | |
CN108086333A (en) | The control method of filling roadbed stability of slope | |
CN112726325B (en) | Sidewalk drainage structure and combined drainage method of sidewalk drainage structure and drainage curb | |
CN202627166U (en) | Novel water-discharging ecological zone for town road | |
CN207130558U (en) | A kind of roadbed filling structure | |
CN208748462U (en) | Can rapid construction high-bearing capacity pervious surface | |
CN115125784A (en) | Paving method for reducing rainwater runoff in outdoor hardened field | |
RU2516408C1 (en) | Road structure | |
WO2011057042A1 (en) | Structure for supporting vehicular traffic | |
CN212247721U (en) | Brick structure of mating formation permeates water | |
CN209924091U (en) | Rectangular side ditch structure for reducing roadbed water level and discharging road surface | |
CN111749073A (en) | Water permeable reconstruction technology based on existing road base layer | |
CN210049321U (en) | Rainwater regulation instrument suitable for in park mountain forest environment | |
CN110439014B (en) | Underground layered drainage structure and construction method thereof | |
CN113152190A (en) | Building garbage recycled aggregate water permeable brick and paving and construction process thereof | |
CN107829347B (en) | Sidewalk structure for urban natural turf and construction method thereof | |
CN106868960B (en) | High ferro ballastless track roadbed guarded drainage method for maintaining | |
CN111455755A (en) | Highway subgrade structure capable of preventing subgrade from softening | |
CN217869799U (en) | Low-maintenance urban landscape ecological ground | |
CN105220596A (en) | A kind of brick construction of seepage pavement method | |
CN110700034A (en) | Novel distributed permeable pavement and paving method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20220930 |
|
WW01 | Invention patent application withdrawn after publication |