CN115125784A - Paving method for reducing rainwater runoff in outdoor hardened field - Google Patents

Paving method for reducing rainwater runoff in outdoor hardened field Download PDF

Info

Publication number
CN115125784A
CN115125784A CN202210984002.3A CN202210984002A CN115125784A CN 115125784 A CN115125784 A CN 115125784A CN 202210984002 A CN202210984002 A CN 202210984002A CN 115125784 A CN115125784 A CN 115125784A
Authority
CN
China
Prior art keywords
outdoor
paving
plain
foundation
rabbet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202210984002.3A
Other languages
Chinese (zh)
Inventor
崔景立
李振文
王自振
孔文
汪洋海
马旭改
李洪涛
张俊红
刘建旭
高冬冬
包晓涛
樊森
付涛
周军榕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guoji Zhongxing Engineering Consulting Co ltd
Original Assignee
Guoji Zhongxing Engineering Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guoji Zhongxing Engineering Consulting Co ltd filed Critical Guoji Zhongxing Engineering Consulting Co ltd
Priority to CN202210984002.3A priority Critical patent/CN115125784A/en
Publication of CN115125784A publication Critical patent/CN115125784A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/06Pavings made of prefabricated single units made of units with cement or like binders
    • E01C5/08Reinforced units with steel frames
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/06Pavings made of prefabricated single units made of units with cement or like binders
    • E01C5/08Reinforced units with steel frames
    • E01C5/085Reinforced units with steel frames on prefabricated supporting structures or prefabricated foundation elements except coverings made of layers of similar elements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/12Paving elements vertically interlocking
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/20Drainage details

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a paving method for reducing rainwater runoff in an outdoor hardening site, which comprises the following steps of 1, excavating a foundation in the outdoor site needing hardening according to a set depth, and tamping the foundation to form a plain soil foundation; 2, paving a plain concrete cushion layer on the plain soil foundation at the preset buttress position; then, building a buttress on the plain concrete cushion layer; 3, paving a sandy soil layer on the plain soil foundation between the adjacent buttresses; and 4, paving reinforced concrete rabbet building blocks between the adjacent buttresses, wherein a plurality of water passing holes are formed in the reinforced concrete rabbet building blocks, gaps are reserved between the adjacent reinforced concrete rabbet building blocks, and then filling fine stones in the gaps for caulking. The invention has the advantages that in the rainstorm season, rainwater falling on an outdoor hardening field is converged into an overhead space at the lower part of the concrete rabbet building block through the water hole; can be completely consumed on the spot without being discharged outside, and the purpose of reducing the rainwater runoff of the outdoor hardening site is realized.

Description

Paving method for reducing rainwater runoff in outdoor hardened field
Technical Field
The invention relates to a paving method of an outdoor hardening site, in particular to a paving method for reducing rainwater runoff of the outdoor hardening site.
Background
The outdoor hardening field of the small building room in the city, the outdoor public square and the like are the main fields for providing outdoor activities and exercising body of people. However, water accumulation in the sections is serious every time of heavy rain, and the phenomenon of waterlogging in building districts and outdoor public squares is common. The reason is that the indoor and outdoor hardened sites of the building districts occupy a certain proportion, the runoff coefficient is large, and the water-discharging capacity of a rainwater pipe network is exceeded quickly in the heavy rainfall period, so that the runoff time generated on the ground surface is short in the heavy rainfall period, and the waterlogging of the building districts is caused.
Disclosure of Invention
The invention aims to provide a paving method for reducing rainwater runoff in an outdoor hardened field, which can reduce rainwater runoff superposition in rainstorm seasons and relieve urban waterlogging.
In order to achieve the purpose, the invention adopts the following technical scheme:
the invention relates to a paving method for reducing rainwater runoff of an outdoor hardened field, which comprises the following steps:
step 1, excavating a foundation in an outdoor site needing hardening according to a set depth, and tamping the foundation to form a plain soil foundation;
step 2, laying a plain concrete cushion layer on the plain soil foundation at a preset buttress position; then, building a buttress on the plain concrete cushion layer;
step 3, paving a sand layer on the plain soil foundation between the adjacent buttresses, wherein the thickness of the sand layer is equal to that of the plain concrete cushion;
step 4, paving reinforced concrete rabbet building blocks between adjacent buttresses, wherein a plurality of water passing holes are formed in the reinforced concrete rabbet building blocks, and the number of the water passing holes is determined according to a rainfall test of local rainstorm seasons; gaps are reserved between adjacent reinforced concrete tongue-and-groove building blocks, and then fine stones are filled in the gaps for caulking.
Optionally, in step 1, the set excavation depth principle is: the excavation depth is less than the various pipeline burying depths of the lower part of the outdoor hardening site, so that the normal use of various pipelines is not influenced in the construction process, and the excavation construction is simpler.
Optionally, in step 2, the thickness of the laid plain concrete cushion layer is more than or equal to 100mm, so as to prevent the buttress from settling.
Optionally, in the step 4, a gap reserved between adjacent reinforced concrete tongue-and-groove building blocks is 10 mm; the joint caulking by the fine stones can offset the influence of expansion with heat and contraction with cold, and can play a role of water passing in rainy season.
The advantages of the invention are embodied in the following aspects:
1. in rainstorm seasons, rainwater falling on an outdoor hardening site is converged into an overhead space at the lower part of the concrete rabbet building block through the water holes; it can be seen that the rainfall of tens of millimeters or hundreds of millimeters can be completely consumed on the spot without being discharged outside.
2. When the hardened site outside the existing building small room is reformed, the influence on the daily life of residents is very limited. From the beginning of paying off and excavating, foundation treatment (tamping) at the lower part of the buttress, buttress building, tongue-and-groove block paving and the like, the construction process is very simple, and the construction speed is high. Even if the individual tongue-and-groove paving building blocks are uneven due to construction reasons or buttress settlement, the maintenance is easier.
3. Compared with common pavement bricks, water permeable bricks and stone pavements on the street, the rabbet building block is relatively heavy in weight, and four corners of the rabbet building block are supported by the brick-built buttresses, so that the phenomena of loosening, breaking and the like which are common in the pavement of the street are not easy to occur.
4. When the outdoor hardening site area is large, the construction can be carried out in batches, and the recovery can be carried out while the construction is carried out.
5. The excavation depth is shallow, and various pipelines at the lower part of the hardening site outside the small building room cannot be influenced.
6. When the building blocks are paved, a gap of 10mm is reserved, the influence of expansion with heat and contraction with cold can be offset, meanwhile, the gap is embedded by fine stones, and the effect of water passing can be achieved in rainy seasons.
7. After the device is used for some years, some tongue-and-groove building blocks can be lifted, the silting condition of the lower part is checked, and necessary cleaning and maintenance are carried out according to the needs. Compared with the existing permeable asphalt, permeable concrete and permeable brick ground, the method can recover the rainwater runoff control function through the cleaning and maintenance mode.
8. In summer, in order to prevent the breeding of mosquitoes and flies, a plurality of drugs for killing mosquitoes and flies can be regularly sprayed downwards through the water through holes on the rabbet building blocks.
9. The rainwater runoff reducing and rapid reconstruction method is suitable for rapid reconstruction of rainwater runoff reduction of hardened sites outside existing building districts, and has certain practical significance for newly built building districts, schools, hospitals and other sites.
10. The height of the brick buttress can be combined with the actual situation of the area, and the area with small rainfall capacity is lower than a certain point; in areas with large rainfall, the height is higher than a certain point; according to the actual situation, the conditions are adjusted according to the local conditions.
11. When the tongue-and-groove building blocks are prefabricated, corresponding surface patterns can be designed when a mould is manufactured according to use requirements, and a flexible landscape effect can be created after paving.
Drawings
Fig. 1 is a schematic view of the paving structure of an outdoor hardened ground implemented according to the method of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It is to be understood that, unless otherwise expressly stated or limited, the terms "connected" and "secured" are used broadly and encompass both fixed and removable connections, or integral parts thereof; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be interconnected within two elements or in a relationship where two elements interact with each other unless otherwise specifically limited. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
In addition, the meaning of "and/or" appearing throughout is to include three juxtapositions, exemplified by "A and/or B," including either the A or B arrangement, or both A and B satisfied arrangement. In addition, technical solutions between the embodiments may be combined with each other, but must be based on the realization of the technical solutions by a person skilled in the art, and when the technical solutions are contradictory to each other or cannot be realized, such a combination should not be considered to exist, and is not within the protection scope of the present invention.
As shown in figure 1, the paving method for reducing the rainwater runoff of the outdoor hardened field adopts the reinforced concrete rabbet building block 1 to pave, and the reinforced concrete rabbet building block 1 can be prefabricated in a factory or on the spot, and is recommended to be prefabricated in the factory, so that the paving method is favorable for ensuring the quality. The specification of the tongue-and-groove building block can be set to various specifications such as 500mm multiplied by 1000mm, 1000mm multiplied by 1000mm, 100mm multiplied by 1500mm, 1500mm multiplied by 2000mm, 2000mm multiplied by 2000mm and the like; the condition of the grade and the reinforcing bars of the concrete can be determined by calculation according to the use characteristics of the outdoor hardening field. In order to meet the requirement of water passing, when the rabbet building block is prefabricated, water passing holes 2 with the diameter of 20, 25 or 30 are reserved on the rabbet building block, and the number of the water passing holes 2 is determined according to a rainfall test in local rainstorm seasons.
The paving steps are as follows:
step 1, after paying off an outdoor field needing hardening, excavating a foundation according to a set depth;
beneficially or exemplarily, the excavation depth is smaller than the burying depth of various pipelines at the lower part of an outdoor site needing hardening, so that the normal use of various pipelines is not influenced in the construction process, and the excavation construction is simpler; then, tamping the excavated foundation to form a plain soil foundation 3;
and 2, paving a plain concrete cushion layer 4 with the thickness of more than or equal to 100mm on the plain soil foundation 3 at the preset buttress position to prevent the buttress from settling. Then, building a buttress 5 on the plain concrete cushion layer 4;
advantageously or exemplarily, the buttress 5 is a brick-laid buttress, the buttress height H can be selected to be 120mm, 180mm or 240mm, etc., but must meet the modulus requirements of the brick; the selection of the height H of the buttress mainly considers that the requirement of water storage capacity is met, a certain overhead space is built at the lower part of a hardening surface layer, and the reduction of rainwater runoff in a rainstorm period is inevitably facilitated;
step 3, paving a sand layer 6 on the plain soil foundation 3 between the adjacent buttresses 5, wherein the thickness of the sand layer 6 is equal to that of the plain concrete cushion 4, and the sand layer 6 is used for absorbing and storing moisture;
step 4, paving reinforced concrete rabbet building blocks 1 between adjacent buttresses 5, reserving a gap of 10mm between the adjacent reinforced concrete rabbet building blocks 1 on the buttresses 5, and filling fine stones 7 in the gap for caulking; the purpose of adopting the fine stone caulking is to offset the influence of the expansion caused by heat and the contraction caused by cold of the reinforced concrete rabbet building block 1, and the fine stone caulking can play a role of water passing in rainy seasons.

Claims (4)

1. The paving method for reducing the rainwater runoff of the outdoor hardened field is characterized by comprising the following steps:
step 1, excavating a foundation in an outdoor site needing hardening according to a set depth, and tamping the foundation to form a plain soil foundation;
step 2, laying a plain concrete cushion layer on the plain soil foundation at a preset buttress position; then, building a buttress on the plain concrete cushion layer;
step 3, paving a sandy soil layer on the plain soil foundation between the adjacent buttresses;
step 4, paving reinforced concrete rabbet building blocks between adjacent buttresses, wherein a plurality of water through holes are formed in the reinforced concrete rabbet building blocks; gaps are reserved between adjacent reinforced concrete tongue-and-groove building blocks, and then fine stones are filled in the gaps for caulking.
2. The paving method for reducing the rainwater runoff of the outdoor hardening site according to claim 1, wherein in the step 1, the set excavation depth principle is as follows: the excavation depth is less than the burying depth of various pipelines at the lower part of an outdoor site needing hardening.
3. The paving method for reducing the rainwater runoff of the outdoor hardening site according to claim 1 or 2, wherein in the step 2, the thickness of the laid plain concrete cushion layer is more than or equal to 100 mm.
4. The paving method for reducing the rainwater runoff on the outdoor hardened field according to claim 1 or 2, wherein in the step 4, the reserved gap between the adjacent reinforced concrete rabbet blocks is 10 mm.
CN202210984002.3A 2022-08-16 2022-08-16 Paving method for reducing rainwater runoff in outdoor hardened field Withdrawn CN115125784A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210984002.3A CN115125784A (en) 2022-08-16 2022-08-16 Paving method for reducing rainwater runoff in outdoor hardened field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210984002.3A CN115125784A (en) 2022-08-16 2022-08-16 Paving method for reducing rainwater runoff in outdoor hardened field

Publications (1)

Publication Number Publication Date
CN115125784A true CN115125784A (en) 2022-09-30

Family

ID=83387067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210984002.3A Withdrawn CN115125784A (en) 2022-08-16 2022-08-16 Paving method for reducing rainwater runoff in outdoor hardened field

Country Status (1)

Country Link
CN (1) CN115125784A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20315152U1 (en) * 2003-10-01 2004-02-12 Braun, Marc Christopher Two-part protection plate for protecting buildings from rainwater comprises a concrete brick plate, and a natural stone material e.g. basalt or gravel pressed with concrete/cement and water
US20110110717A1 (en) * 2009-11-09 2011-05-12 Nowak & Eisenhardt Llc Structure for Supporting Vehicular Traffic
CN103669145A (en) * 2013-12-31 2014-03-26 北京东方园林股份有限公司 Pavement method of permeable pavement structure
CN106049217A (en) * 2016-06-16 2016-10-26 昆山通海建材科技有限公司 Assembly type permeable pavement paving c, block bodies and paving structure
CN107090755A (en) * 2017-05-03 2017-08-25 海绵城市环保新材料(深圳)有限公司 A kind of paving structure of permeable Footpath brick and porous pavement
CN209703229U (en) * 2019-03-19 2019-11-29 成都城投建筑科技投资管理集团有限公司 A kind of recyclable prefabricated plate paving structure
CN211571249U (en) * 2019-10-31 2020-09-25 南京市城市与交通规划设计研究院股份有限公司 Water storage permeable pavement for sponge city
CN215758320U (en) * 2021-08-31 2022-02-08 武汉市政工程设计研究院有限责任公司 Sponge city gap formula structure of mating formation that permeates water
CN215829174U (en) * 2021-06-30 2022-02-15 福建海环海滨资源开发有限公司 Concrete brick permeates water
KR20220070917A (en) * 2020-11-23 2022-05-31 콘비젼스 주식회사 Construction method of cast-in-place type pavement layer used for large car lane
CN114592396A (en) * 2022-03-14 2022-06-07 济南四建集团建材有限责任公司 Rapid permeable pavement

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20315152U1 (en) * 2003-10-01 2004-02-12 Braun, Marc Christopher Two-part protection plate for protecting buildings from rainwater comprises a concrete brick plate, and a natural stone material e.g. basalt or gravel pressed with concrete/cement and water
US20110110717A1 (en) * 2009-11-09 2011-05-12 Nowak & Eisenhardt Llc Structure for Supporting Vehicular Traffic
CN103669145A (en) * 2013-12-31 2014-03-26 北京东方园林股份有限公司 Pavement method of permeable pavement structure
CN106049217A (en) * 2016-06-16 2016-10-26 昆山通海建材科技有限公司 Assembly type permeable pavement paving c, block bodies and paving structure
CN107090755A (en) * 2017-05-03 2017-08-25 海绵城市环保新材料(深圳)有限公司 A kind of paving structure of permeable Footpath brick and porous pavement
CN209703229U (en) * 2019-03-19 2019-11-29 成都城投建筑科技投资管理集团有限公司 A kind of recyclable prefabricated plate paving structure
CN211571249U (en) * 2019-10-31 2020-09-25 南京市城市与交通规划设计研究院股份有限公司 Water storage permeable pavement for sponge city
KR20220070917A (en) * 2020-11-23 2022-05-31 콘비젼스 주식회사 Construction method of cast-in-place type pavement layer used for large car lane
CN215829174U (en) * 2021-06-30 2022-02-15 福建海环海滨资源开发有限公司 Concrete brick permeates water
CN215758320U (en) * 2021-08-31 2022-02-08 武汉市政工程设计研究院有限责任公司 Sponge city gap formula structure of mating formation that permeates water
CN114592396A (en) * 2022-03-14 2022-06-07 济南四建集团建材有限责任公司 Rapid permeable pavement

Similar Documents

Publication Publication Date Title
CN110306565B (en) Road ecological slope protection system and construction method
CN108532406A (en) Can rapid construction high-bearing capacity pervious surface and laying method
CN211199978U (en) Pavement paving structure for permeable sidewalk
CN207062672U (en) A kind of permeable pavement structure
CN109826065B (en) High-fill roadbed protection system and construction method thereof
CN108086333A (en) The control method of filling roadbed stability of slope
CN112726325B (en) Sidewalk drainage structure and combined drainage method of sidewalk drainage structure and drainage curb
CN202627166U (en) Novel water-discharging ecological zone for town road
CN207130558U (en) A kind of roadbed filling structure
CN208748462U (en) Can rapid construction high-bearing capacity pervious surface
CN115125784A (en) Paving method for reducing rainwater runoff in outdoor hardened field
RU2516408C1 (en) Road structure
WO2011057042A1 (en) Structure for supporting vehicular traffic
CN212247721U (en) Brick structure of mating formation permeates water
CN209924091U (en) Rectangular side ditch structure for reducing roadbed water level and discharging road surface
CN111749073A (en) Water permeable reconstruction technology based on existing road base layer
CN210049321U (en) Rainwater regulation instrument suitable for in park mountain forest environment
CN110439014B (en) Underground layered drainage structure and construction method thereof
CN113152190A (en) Building garbage recycled aggregate water permeable brick and paving and construction process thereof
CN107829347B (en) Sidewalk structure for urban natural turf and construction method thereof
CN106868960B (en) High ferro ballastless track roadbed guarded drainage method for maintaining
CN111455755A (en) Highway subgrade structure capable of preventing subgrade from softening
CN217869799U (en) Low-maintenance urban landscape ecological ground
CN105220596A (en) A kind of brick construction of seepage pavement method
CN110700034A (en) Novel distributed permeable pavement and paving method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20220930

WW01 Invention patent application withdrawn after publication