Structure is assembled to high altitude steel construction vestibule Download PDF

Info

Publication number
CN115095013A
CN115095013A CN202210649503.6A CN202210649503A CN115095013A CN 115095013 A CN115095013 A CN 115095013A CN 202210649503 A CN202210649503 A CN 202210649503A CN 115095013 A CN115095013 A CN 115095013A
Authority
CN
China
Prior art keywords
rod
positioning
support
hinged
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210649503.6A
Other languages
Chinese (zh)
Other versions
CN115095013B (en
Inventor
姜新新
殷海龙
于兆波
田树雨
陆玲玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202210649503.6A priority Critical patent/CN115095013B/en
Publication of CN115095013A publication Critical patent/CN115095013A/en
Application granted granted Critical
Publication of CN115095013B publication Critical patent/CN115095013B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0046—Loggias
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19—Three-dimensional [3D] framework structures
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19—Three-dimensional [3D] framework structures
    • E04B1/1903—Connecting nodes specially adapted therefor
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19—Three-dimensional [3D] framework structures
    • E04B2001/1924—Struts specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及一种连廊拼装结构。本发明涉及一种高空钢结构连廊拼装结构。其包括两个固定装置,固定装置的内部设有定位装置,固定装置的一侧设有支撑装置,固定装置包括支撑杆,支撑杆的一端固定连接有插杆。本发明在将两个支撑杆拼接在一起时,插杆插入至插接槽的内部,使滑块发生滑动,滑块同时带通过支撑结构和支撑装置使支撑杆和横杆移动,能够将该连廊拼装结构快速便捷的展开,能够节省工人的大量时间,并且在运输时收缩在一起,相比于传统的连廊拼装结构来说,能够节省大量的空间,便于运输,并且在该连廊拼装结构展开时通过三角形结构对支撑杆和横杆进行固定,固定效果更好。

Figure 202210649503

The invention relates to a corridor assembling structure. The invention relates to an assembly structure of a high-altitude steel structure connecting corridor. It includes two fixing devices, a positioning device is arranged inside the fixing device, a support device is arranged on one side of the fixing device, the fixing device includes a support rod, and one end of the support rod is fixedly connected with an insertion rod. In the present invention, when two supporting rods are spliced together, the plugging rod is inserted into the interior of the plugging slot, so that the sliding block slides, and the sliding block moves the supporting rod and the cross rod through the supporting structure and the supporting device at the same time. The corridor assembly structure can be quickly and conveniently unfolded, which can save a lot of time for workers, and can be shrunk together during transportation. Compared with the traditional corridor assembly structure, it can save a lot of space and facilitate transportation. When the assembled structure is unfolded, the support rod and the cross rod are fixed by the triangular structure, and the fixing effect is better.

Figure 202210649503

Description

Structure is assembled to high altitude steel construction vestibule
Technical Field
The invention relates to a corridor assembly structure, in particular to a corridor assembly structure with a high-altitude steel structure.
Background
Vestibule, the former is a form of china ancient building, building and the connection structures between the building promptly, and the steel construction vestibule is then at present common connection structures that can install fast, and common steel construction vestibule uses bolt and nut to fix steel, and this kind of mode construction speed is slower to the installation is all comparatively troublesome with the dismantlement, and the steel construction vestibule that will install transports then can occupy a lot of spaces to the position of use, the transportation of being not convenient for.
Disclosure of Invention
The invention aims to provide a corridor splicing structure of a high-altitude steel structure, which aims to solve the problems in the background technology.
In order to achieve the purpose, the corridor assembly structure with the high-altitude steel structure comprises two fixing devices, wherein a positioning device is arranged inside each fixing device, a supporting device is arranged on one side of each fixing device, each fixing device comprises a supporting rod, an inserting rod is fixedly connected to one end of each supporting rod, an inserting groove is formed in the other end of each supporting rod, one end of each inserting groove penetrates through the corresponding supporting rod, clamping grooves are formed in two sides of the inner wall of each inserting groove, the inserting rods are matched with the inserting grooves in an inserting mode, a cross rod is arranged at the top of each supporting rod, a supporting structure is arranged between each supporting rod and the corresponding cross rod and used for determining the relative position between each supporting rod and the corresponding cross rod, the inserting rods drive the supporting structures to move when being inserted into the inserting grooves, each positioning device comprises two positioning blocks, the positioning blocks are matched with the clamping grooves in a clamping mode, the positioning device comprises a positioning block and a supporting device, wherein one end of the positioning block penetrates through an insertion rod, the positioning block is connected with the insertion rod in a sliding mode, a pushing structure is arranged on one side of the positioning block, the insertion rod is inserted into an insertion groove and moves to a set position to drive the pushing structure to move, the pushing structure is used for driving the positioning block to move, the supporting device is used for determining the relative position of two supporting rods, and the insertion rod is inserted into the insertion groove to drive the supporting device to move.
As a further improvement of the technical scheme, the supporting structure comprises a supporting rod, the bottom end of the supporting rod is hinged to the supporting rod, the top end of the supporting rod is hinged to a sliding plate, and the sliding plate is connected with the cross rod in a sliding mode.
As a further improvement of the technical scheme, one end of the cross rod is fixedly connected with a positioning rod, the other end of the cross rod is provided with a positioning groove, and the positioning rod is in plug-in fit with the positioning groove.
As a further improvement of the technical scheme, the supporting structure further comprises an upright rod, the top end of the upright rod is hinged with the stay bar, and the bottom end of the upright rod is hinged with a sliding block.
As a further improvement of the technical scheme, the sliding block is arranged in the supporting rod in a sliding mode, and when the inserted link is inserted into the insertion groove, one end of the inserted link is attached to one end of the sliding block.
As a further improvement of the technical scheme, the positioning frame is arranged between the positioning blocks, the inner wall of the positioning frame is hinged to two supporting plates, one end of each supporting plate is hinged to the corresponding positioning block, a push rod is fixedly connected to one end of each positioning frame, and a push plate is fixedly connected to one end of each push rod.
As a further improvement of the technical scheme, when the sliding block moves to a set position, one side of the sliding block is attached to one side of the push plate, the side wall of the push rod is fixedly connected with the baffle, one side of the baffle is fixedly connected with the positioning spring, and one end of the positioning spring is fixedly connected with the supporting rod.
As a further improvement of the technical scheme, the supporting device comprises a sliding frame, one end of the sliding frame penetrates through the supporting rod, the sliding frame is connected with the supporting rod in a sliding mode, one end of the sliding frame is fixedly connected with the sliding block, the inner wall of the other end of the sliding frame is hinged to a supporting column, and one end of the supporting column is hinged to a fixing block.
As a further improvement of the technical scheme, the fixing block is fixedly connected with the supporting rod, an auxiliary rod is hinged to the position, close to the middle, of one side of the supporting column, a sliding frame is hinged to one end of the auxiliary rod, and the sliding frame is fixedly connected with the sliding block.
As a further improvement of the technical scheme, two be equipped with a plurality of synchronizer between the horizontal pole, synchronizer includes the mount, mount and horizontal pole fixed connection, the inner wall of mount articulates there is the synchronizing bar, the one end of synchronizing bar articulates there is the synchronizing frame, the one end of synchronizing frame articulates there is the setting element, setting element and horizontal pole fixed connection.
Compared with the prior art, the invention has the following beneficial effects:
1. during this structure is assembled to high altitude steel construction vestibule, when splicing two bracing pieces together, the inserted bar inserts to the inside of inserting groove, make the slider take place to slide, the slider simultaneously takes to make bracing piece and horizontal pole remove through bearing structure and strutting arrangement, can assemble the quick convenient expansion of structure with this vestibule, can save workman's a large amount of time, and shrink when the transportation together, compare in traditional vestibule and assemble the structure, can save a large amount of spaces, be convenient for transport, and assemble the structure at this vestibule and fix bracing piece and horizontal pole through the triangle-shaped structure when expanding, fixed effect is better.
2. During this structure is assembled to high altitude steel construction vestibule, after inserting the inserted bar into the inside of inserting groove, the locating piece can be corresponding slide and the draw-in groove cooperation, accomplish the fixed to the inserted bar position, the phenomenon that the inserted bar can not take place to loosen this moment, and the connection effect between the bracing piece is more firm.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a second schematic view of the overall structure of the present invention;
FIG. 3 is a schematic structural view of the fixing device of the present invention;
FIG. 4 is a schematic view of a positioning device according to the present invention;
FIG. 5 is a schematic structural view of the supporting device of the present invention;
fig. 6 is a schematic structural diagram of a synchronization device of the present invention.
The various reference numbers in the figures mean:
1. a fixing device;
11. a support bar; 111. inserting grooves; 112. a card slot; 12. inserting a rod; 13. a stay bar; 14. erecting a rod; 15. a slider; 16. a sliding plate; 17. a cross bar; 171. positioning a groove; 18. positioning a rod;
2. a positioning device;
21. pushing the plate; 22. a push rod; 23. a baffle plate; 24. a positioning spring; 25. a positioning frame; 26. a supporting plate; 27. positioning blocks;
3. a support device;
31. a carriage; 32. a support pillar; 33. an auxiliary lever; 34. a fixed block;
4. a synchronization device;
41. a fixed mount; 42. a synchronization rod; 43. a synchronous frame; 44. a positioning member.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "central," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," and the like are used in the orientations and positional relationships indicated in the drawings, which are based on the orientation or positional relationship shown in the drawings, and are used merely for convenience in describing the invention and to simplify the description, but do not indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus are not to be construed as limiting the invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
Example 1
The present embodiment aims at providing a jointing structure of a corridor with a high-altitude steel structure, please refer to fig. 1-3, including two fixing devices 1, a positioning device 2 is disposed inside the fixing device 1, a supporting device 3 is disposed on one side of the fixing device 1, the fixing device 1 includes a supporting rod 11, the supporting rod 11 is used for determining the position of a supporting rod 13 and helping to fix the position of the corridor, one end of the supporting rod 11 is fixedly connected with an inserting rod 12, the inserting rod 12 is used for cooperating with the inserting groove 111 to determine the position of the supporting rod 11, the other end of the supporting rod 11 is provided with an inserting groove 111, one end of the inserting groove 111 penetrates through the supporting rod 11, the inserting groove 111 is used for cooperating with the inserting rod 12 to fix the positions of two adjacent supporting rods 11, two sides of the inner wall of the inserting groove 111 are provided with clamping grooves 112, the clamping grooves 112 are used for cooperating with the positioning blocks 27 to make the matching of the inserting rod 12 and the inserting groove 111 more firm, the inserted bar 12 is inserted into and matched with the insertion groove 111, a cross bar 17 is arranged at the top of the supporting bar 11, in order to enable the cross bar 17 to be lifted and enable the positions of the supporting bar 11 and the cross bar 17 to be fixed, a supporting structure is arranged between the supporting bar 11 and the cross bar 17 and used for determining the relative position between the supporting bar 11 and the cross bar 17, the inserted bar 12 drives the supporting structure to move when inserted into the insertion groove 111, the supporting structure comprises a supporting bar 13, the supporting bar 13 is used for matching with an upright bar 14 to drive the cross bar 17 to move upwards, the bottom end of the supporting bar 13 is hinged with the supporting bar 11, the top end of the supporting bar 13 is hinged with a sliding plate 16, the sliding plate 16 is used for matching with the supporting bar 13 to drive the cross bar 17 to move upwards, the sliding plate 16 is connected with the cross bar 17 in a sliding manner, a positioning rod 18 is fixedly connected to one end of the cross bar 17, the positioning rod 18 is used for matching with a positioning groove 171 to enable the positions of the two cross bars 17 to be fixed, the other end of the cross bar 17 is provided with a positioning groove 171, the positioning bar 18 is in inserting fit with the positioning groove 171, the supporting structure further comprises an upright rod 14, the upright rod 14 is used for driving a stay bar 13 to rotate, the top end of the upright rod 14 is hinged with the stay bar 13, the bottom end of the upright rod 14 is hinged with a sliding block 15, the sliding block 15 is used for driving the upright rod 14 to move, the sliding block 15 is arranged inside the supporting bar 11 in a sliding manner, when the inserted bar 12 is inserted into the inserting groove 111 in the other supporting bar 11, one end of the inserted bar 12 is attached to one end of the sliding block 15, wherein when the inserted bar 12 on one supporting bar 11 is inserted into the inserting groove 111 in the other supporting bar 11, the inserted bar 12 pushes the sliding block 15 to slide inside the supporting bar 11, the sliding block 15 drives the stay bar 13 to rotate through the upright rod 14, the stay bar 13 is matched with the sliding block 16 to drive the cross bar 17 to move upwards, at the positioning bar 18 is inserted into the positioning groove 171 at the moment, so as to complete the fixation of the relative position between the supporting bar 11 and the cross bar 17, moreover, a triangular supporting structure is formed among the supporting rods 13, the vertical rods 14 and the supporting rods 11, so that the supporting effect on the cross rods 17 is better;
in order to avoid falling off after the insertion rod 12 is inserted into the insertion slot 111, please refer to fig. 4, the positioning device 2 includes two positioning blocks 27, the positioning blocks 27 are used for cooperating with the locking slots 112 to prevent the insertion rod 12 from shaking after being inserted into the insertion slot 111, the positioning blocks 27 are in locking cooperation with the locking slots 112, one end of the positioning blocks 27 penetrates through the insertion rod 12, the positioning blocks 27 are slidably connected with the insertion rod 12, one side of the positioning blocks 27 is provided with a pushing structure, the insertion rod 12 is inserted into the insertion slot 111 and moves to a set position to drive the pushing structure to move, the pushing structure is used for driving the positioning blocks 27 to move, a positioning frame 25 is arranged between the two positioning blocks 27, the positioning frame 25 is used for driving the supporting plate 26 to move, the inner wall of the positioning frame 25 is hinged with two supporting plates 26, the supporting plate 26 is used for driving the positioning blocks 27 to move, one end of the supporting plate 26 is hinged with the positioning blocks 27, one end of the positioning frame 25 is fixedly connected with the pushing rod 22, the push rod 22 is used for driving the positioning frame 25 to move, one end of the push rod 22 is fixedly connected with the push plate 21, the push plate 21 is used for driving the push rod 22 to move, one side of the slide block 15 is attached to one side of the push plate 21 when the slide block 15 moves to a set position, the side wall of the push rod 22 is fixedly connected with the baffle plate 23, the baffle plate 23 is used for determining the position of the positioning spring 24, one side of the baffle plate 23 is fixedly connected with the positioning spring 24, the positioning spring 24 is used for pushing the baffle plate 23 to move, one end of the positioning spring 24 is fixedly connected with the supporting rod 11, wherein when the inserted rod 12 is inserted into the insertion groove 111 and moves to a certain position, the inserted rod 12 pushes the push plate 21 to drive the push rod 22 to move, the push rod 22 drives the positioning frame 25 to move, the positioning frame 25 enables the two supporting plates 26 to simultaneously rotate, the supporting plates 26 drive the positioning block 27 to move, the positioning block 27 is matched with the clamping groove 112 to enable the insertion rod 12 to be more tightly matched with the insertion groove 111, at the moment, the inserted link 12 cannot fall off due to shaking;
in order to fix the positions of the two support rods 11 after being opened, please refer to fig. 5, in which the support device 3 is used to determine the relative positions of the two support rods 11, the insertion rod 12 is inserted into the insertion slot 111 to move the support device 3, the support device 3 includes a sliding frame 31, the sliding frame 31 is used to drive a support column 32 to move when a sliding block 15 moves, one end of the sliding frame 31 penetrates through the support rods 11, the sliding frame 31 is slidably connected with the support rods 11, one end of the sliding frame 31 is fixedly connected with the sliding block 15, the inner wall of the other end of the sliding frame 31 is hinged with the support column 32, the support column 32 is used to fix the relative positions of the two support rods 11, one end of the support column 32 is hinged with a fixed block 34, the fixed block 34 is used to determine the position of the support column 32, the fixed block 34 is fixedly connected with the support rods 11, and an auxiliary rod 33 is hinged at a position near the middle of one side of the support column 32, the auxiliary rod 33 is used for supporting the supporting column 32 and driving the supporting column 32 to move, one end of the auxiliary rod 33 is hinged with the sliding frame 31, the sliding frame 31 is fixedly connected with the sliding block 15, when the inserting rod 12 is inserted into the inserting groove 111, the inserting rod 12 drives the sliding block 15 to move, the sliding block 15 drives the sliding frame 31 to slide, the sliding frame 31 drives the supporting column 32 and the auxiliary rod 33 to move, the distance between the two supporting rods 11 is further and further increased, the supporting rod is fixed when the inserting rod 12 moves to the limit distance, and a triangular supporting structure is formed among the auxiliary rod 33, the fixing block 34 and the supporting rods 11, so that the fixing effect between the two supporting rods 11 is better;
in order to enable the two cross bars 17 to move synchronously, please refer to fig. 6, a plurality of synchronizing devices 4 are arranged between the two cross bars 17, each synchronizing device 4 includes a fixing frame 41, the fixing frame 41 is used for determining the position of a synchronizing rod 42, the fixing frame 41 is fixedly connected with the cross bars 17, the inner wall of the fixing frame 41 is hinged with a synchronizing rod 42, the synchronizing rod 42 is used for matching with the synchronizing frame 43 to fix the positions of the two cross bars 17, one end of the synchronizing rod 42 is hinged with a synchronizing frame 43, the synchronizing frame 43 is used for matching with the synchronizing rod 42 to fix the positions of the two cross bars 17, one end of the synchronizing frame 43 is hinged with a positioning member 44, the positioning member 44 is used for determining the positions of the synchronizing frame 43, the positioning member 44 is fixedly connected with the cross bars 17, wherein when the distance between the two cross bars 17 is longer, the synchronizing rod 42 and the synchronizing frame 43 relatively rotate, the cross bars 17 on both sides can be pulled when the synchronizing rod 42 and the synchronizing frame 43 rotate to the extreme positions, the determination of the positions of the cross rods 17 is completed, and the effect that the two cross rods 17 are always at the same horizontal height is achieved.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, and the preferred embodiments of the present invention are described in the above embodiments and the description, and the present invention is not limited to the embodiments, and various changes and modifications may be made without departing from the spirit and scope of the present invention, and these changes and modifications fall within the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (10)

1.一种高空钢结构连廊拼装结构,其特征在于:包括两个固定装置(1),所述固定装置(1)的内部设有定位装置(2),所述固定装置(1)的一侧设有支撑装置(3),所述固定装置(1)包括支撑杆(11),所述支撑杆(11)的一端固定连接有插杆(12),所述支撑杆(11)的另一端开设有插接槽(111),所述插接槽(111)的一端贯穿支撑杆(11),所述插接槽(111)内壁的两侧开设有卡槽(112),所述插杆(12)和插接槽(111)插接配合,所述支撑杆(11)的顶部设有横杆(17),所述支撑杆(11)和横杆(17)之间设有支撑结构,所述支撑结构用于确定支撑杆(11)和横杆(17)之间的相对位置,所述插杆(12)在插入插接槽(111)的内部时带动支撑结构移动,所述定位装置(2)包括两个定位块(27),所述定位块(27)和卡槽(112)卡接配合,所述定位块(27)的一端贯穿插杆(12),所述定位块(27)和插杆(12)滑动连接,所述定位块(27)的一侧设有推动结构,所述插杆(12)插入至插接槽(111)内部并移动至设定位置时带动推动结构移动,所述推动结构用于带动定位块(27)移动,所述支撑装置(3)用于确定两个支撑杆(11)的相对位置,所述插杆(12)插入至插接槽(111)的内部时带动支撑装置(3)移动。1. A high-altitude steel structure connecting corridor assembly structure, characterized in that: comprising two fixing devices (1), the interior of the fixing device (1) is provided with a positioning device (2), and the fixing device (1) is provided with a positioning device (2). A support device (3) is provided on one side, the fixing device (1) includes a support rod (11), one end of the support rod (11) is fixedly connected with an insertion rod (12), and the support rod (11) is The other end is provided with an insertion slot (111), one end of the insertion slot (111) penetrates the support rod (11), and two sides of the inner wall of the insertion slot (111) are provided with card slots (112). The insertion rod (12) and the insertion slot (111) are inserted and matched, the top of the support rod (11) is provided with a cross rod (17), and a cross rod (17) is provided between the support rod (11) and the cross rod (17). a support structure, the support structure is used to determine the relative position between the support rod (11) and the cross rod (17), the insertion rod (12) drives the support structure to move when inserted into the insertion slot (111), The positioning device (2) includes two positioning blocks (27), the positioning blocks (27) are snap-fitted with the card slot (112), and one end of the positioning block (27) penetrates the insertion rod (12), so the The positioning block (27) and the insertion rod (12) are slidably connected, one side of the positioning block (27) is provided with a pushing structure, and the insertion rod (12) is inserted into the insertion slot (111) and moved to the setting position. When the position is fixed, the push structure is driven to move, and the push structure is used to drive the positioning block (27) to move, the support device (3) is used to determine the relative position of the two support rods (11), and the insertion rod (12) When inserted into the insertion slot (111), the supporting device (3) is driven to move. 2.根据权利要求1所述的高空钢结构连廊拼装结构,其特征在于:所述支撑结构包括撑杆(13),所述撑杆(13)的底端和支撑杆(11)铰接,所述撑杆(13)的顶端铰接有滑动板(16),所述滑动板(16)和横杆(17)滑动连接。2. The high-altitude steel structure corridor assembly structure according to claim 1, wherein the support structure comprises a strut (13), and the bottom end of the strut (13) is hinged with the support rod (11), A sliding plate (16) is hinged on the top end of the strut (13), and the sliding plate (16) is slidably connected with the cross bar (17). 3.根据权利要求2所述的高空钢结构连廊拼装结构,其特征在于:所述横杆(17)的一端固定连接有定位杆(18),所述横杆(17)的另一端开设有定位槽(171),所述定位杆(18)和定位槽(171)插接配合。3. The high-altitude steel structure corridor assembly structure according to claim 2, characterized in that: one end of the cross bar (17) is fixedly connected with a positioning bar (18), and the other end of the cross bar (17) is opened There is a positioning groove (171), and the positioning rod (18) is inserted and matched with the positioning groove (171). 4.根据权利要求3所述的高空钢结构连廊拼装结构,其特征在于:所述支撑结构还包括立杆(14),所述立杆(14)的顶端和撑杆(13)铰接,所述立杆(14)的底端铰接有滑块(15)。4. The high-altitude steel structure corridor assembly structure according to claim 3, characterized in that: the support structure further comprises a vertical rod (14), and the top of the vertical rod (14) is hinged with the strut (13), The bottom end of the vertical rod (14) is hinged with a sliding block (15). 5.根据权利要求4所述的高空钢结构连廊拼装结构,其特征在于:所述滑块(15)滑动设置于支撑杆(11)的内部,所述插杆(12)插入至插接槽(111)的内部时,插杆(12)的一端和滑块(15)的一端贴合。5. The high-altitude steel structure corridor assembly structure according to claim 4, characterized in that: the slider (15) is slidably arranged inside the support rod (11), and the insertion rod (12) is inserted into the plug-in connection When inside the groove (111), one end of the insertion rod (12) is abutted with one end of the slider (15). 6.根据权利要求4所述的高空钢结构连廊拼装结构,其特征在于:两个所述定位块(27)之间设有定位架(25),所述定位架(25)的内壁铰接有两个撑板(26),所述撑板(26)的一端和定位块(27)铰接,所述定位架(25)的一端固定连接有推杆(22),所述推杆(22)的一端固定连接有推板(21)。6. The high-altitude steel structure corridor assembly structure according to claim 4, wherein a positioning frame (25) is arranged between the two positioning blocks (27), and the inner wall of the positioning frame (25) is hinged There are two support plates (26), one end of the support plate (26) is hinged with the positioning block (27), and one end of the positioning frame (25) is fixedly connected with a push rod (22), the push rod (22) ) is fixedly connected with a push plate (21). 7.根据权利要求6所述的高空钢结构连廊拼装结构,其特征在于:所述滑块(15)移动至设定位置时,滑块(15)的一侧和推板(21)的一侧贴合,所述推杆(22)的侧壁固定连接有挡板(23),所述挡板(23)的一侧固定连接有定位弹簧(24),所述定位弹簧(24)的一端和支撑杆(11)固定连接。7. The high-altitude steel structure corridor assembly structure according to claim 6, characterized in that: when the slider (15) moves to the set position, one side of the slider (15) and the edge of the push plate (21) One side is attached, a baffle plate (23) is fixedly connected to the side wall of the push rod (22), a positioning spring (24) is fixedly connected to one side of the baffle plate (23), and the positioning spring (24) One end is fixedly connected with the support rod (11). 8.根据权利要求1所述的高空钢结构连廊拼装结构,其特征在于:所述支撑装置(3)包括滑动架(31),所述滑动架(31)的一端贯穿支撑杆(11),所述滑动架(31)和支撑杆(11)滑动连接,所述滑动架(31)的一端和滑块(15)固定连接,所述滑动架(31)另一端的内壁铰接有支撑柱(32),所述支撑柱(32)的一端铰接有固定块(34)。8. The high-altitude steel structure corridor assembly structure according to claim 1, characterized in that: the support device (3) comprises a sliding frame (31), and one end of the sliding frame (31) penetrates the support rod (11) , the sliding frame (31) is slidably connected to the support rod (11), one end of the sliding frame (31) is fixedly connected to the slider (15), and the inner wall of the other end of the sliding frame (31) is hinged with a support column (32), one end of the support column (32) is hinged with a fixing block (34). 9.根据权利要求8所述的高空钢结构连廊拼装结构,其特征在于:所述固定块(34)和支撑杆(11)固定连接,所述支撑柱(32)一侧的靠近中部位置铰接有辅助杆(33),所述辅助杆(33)的一端铰接有滑动架(31),所述滑动架(31)和滑块(15)固定连接。9. The high-altitude steel structure corridor assembly structure according to claim 8, characterized in that: the fixing block (34) is fixedly connected with the support rod (11), and one side of the support column (32) is close to the middle position An auxiliary rod (33) is hingedly connected, one end of the auxiliary rod (33) is hinged with a sliding frame (31), and the sliding frame (31) is fixedly connected with the sliding block (15). 10.根据权利要求1所述的高空钢结构连廊拼装结构,其特征在于:两个所述横杆(17)之间设有若干同步装置(4),所述同步装置(4)包括固定架(41),所述固定架(41)和横杆(17)固定连接,所述固定架(41)的内壁铰接有同步杆(42),所述同步杆(42)的一端铰接有同步架(43),所述同步架(43)的一端铰接有定位件(44),所述定位件(44)和横杆(17)固定连接。10. The high-altitude steel structure corridor assembly structure according to claim 1, wherein a plurality of synchronizing devices (4) are arranged between the two cross bars (17), and the synchronizing devices (4) comprise fixed frame (41), the fixing frame (41) is fixedly connected with the cross bar (17), the inner wall of the fixing frame (41) is hinged with a synchronizing rod (42), and one end of the synchronizing rod (42) is hinged with a synchronizing rod (42). A frame (43), one end of the synchronization frame (43) is hinged with a positioning member (44), and the positioning member (44) is fixedly connected with the cross bar (17).
CN202210649503.6A 2022-06-10 2022-06-10 A high-altitude steel structure corridor assembled structure Expired - Fee Related CN115095013B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210649503.6A CN115095013B (en) 2022-06-10 2022-06-10 A high-altitude steel structure corridor assembled structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210649503.6A CN115095013B (en) 2022-06-10 2022-06-10 A high-altitude steel structure corridor assembled structure

Publications (2)

Publication Number Publication Date
CN115095013A true CN115095013A (en) 2022-09-23
CN115095013B CN115095013B (en) 2024-01-26

Family

ID=83288277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210649503.6A Expired - Fee Related CN115095013B (en) 2022-06-10 2022-06-10 A high-altitude steel structure corridor assembled structure

Country Status (1)

Country Link
CN (1) CN115095013B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117071731A (en) * 2023-09-19 2023-11-17 中铁建工集团有限公司 Assembled steel structure and construction methods
CN118241746A (en) * 2024-04-23 2024-06-25 中建七局第四建筑有限公司 A steel structure corridor hoisting assembly structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU850785A1 (en) * 1979-10-31 1981-07-30 Украинский Государственный Ин-Ститут По Проектированию Метал-Лургических Заводов Method of erecting the span structure of a gallery
CN111206675A (en) * 2020-01-16 2020-05-29 广东省建筑构件工程有限公司 Steel structure corridor structure and hoisting construction method
CN112064780A (en) * 2020-09-04 2020-12-11 中交投资南京有限公司 Splicing device for overhead gallery bridge
CN213926680U (en) * 2020-09-30 2021-08-10 丁攀峰 Urban building shock-proof type vestibule structure
CN114319576A (en) * 2022-01-17 2022-04-12 深圳嘉西亚建筑设计有限公司 A kind of steel structure corridor structure and its hoisting method
CN216446163U (en) * 2021-12-30 2022-05-06 临沂广惠建设工程有限公司 A steel structure connecting corridor for building engineering construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU850785A1 (en) * 1979-10-31 1981-07-30 Украинский Государственный Ин-Ститут По Проектированию Метал-Лургических Заводов Method of erecting the span structure of a gallery
CN111206675A (en) * 2020-01-16 2020-05-29 广东省建筑构件工程有限公司 Steel structure corridor structure and hoisting construction method
CN112064780A (en) * 2020-09-04 2020-12-11 中交投资南京有限公司 Splicing device for overhead gallery bridge
CN213926680U (en) * 2020-09-30 2021-08-10 丁攀峰 Urban building shock-proof type vestibule structure
CN216446163U (en) * 2021-12-30 2022-05-06 临沂广惠建设工程有限公司 A steel structure connecting corridor for building engineering construction
CN114319576A (en) * 2022-01-17 2022-04-12 深圳嘉西亚建筑设计有限公司 A kind of steel structure corridor structure and its hoisting method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117071731A (en) * 2023-09-19 2023-11-17 中铁建工集团有限公司 Assembled steel structure and construction methods
CN118241746A (en) * 2024-04-23 2024-06-25 中建七局第四建筑有限公司 A steel structure corridor hoisting assembly structure

Also Published As

Publication number Publication date
CN115095013B (en) 2024-01-26

Similar Documents

Publication Publication Date Title
CN115095013B (en) A high-altitude steel structure corridor assembled structure
CN201709171U (en) Novel planting box
CN111588182A (en) Fingerprint unlocking timing closed type intelligent compact shelf
CN219643003U (en) Energy storage battery box
CN115717476A (en) A shear wall steel formwork component and its construction method
CN112360082B (en) High-stability assembled wallboard for interior decoration
CN204965601U (en) Automatic vending machine and a goods way layer frame track module thereof
CN111335680A (en) A kind of exhibition hall structure and its construction method
CN221300628U (en) LED display screen module with wind-resistant frame structure
CN217697867U (en) A portable basketball storage rack
CN110725454A (en) Safe hidden frame building curtain wall structure and assembling and disassembling method thereof
CN218164578U (en) Improved movable folding goods shelf for home accessories
CN114875821A (en) Property-based safety warning device and method
CN213814545U (en) Computer host hard disk mounting structure
CN211228895U (en) Foldable movable cell culture room
CN217652377U (en) A light-weight partition board quick installation device
CN209401076U (en) A kind of installing mechanism easy to assemble of recognition of face gate
CN217950370U (en) Combined supporting leg for shield trolley track
CN113197423A (en) Embedded dust protected medical information ization data record workstation
CN211124579U (en) Display device that international economy and trade teaching were used
CN223677420U (en) Quick assembly disassembly support device of LCM screen
CN217899383U (en) LED display screen back frame
CN222763903U (en) DIN-rail Industrial Ethernet Switch
CN222742793U (en) Combined trailer
CN217321372U (en) Printed circuit board temporary storage rack

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20240126

CF01 Termination of patent right due to non-payment of annual fee