CN115075362A - Sewage-removing and shunting transformation structure and method for combined underdrain - Google Patents

Sewage-removing and shunting transformation structure and method for combined underdrain Download PDF

Info

Publication number
CN115075362A
CN115075362A CN202210743836.5A CN202210743836A CN115075362A CN 115075362 A CN115075362 A CN 115075362A CN 202210743836 A CN202210743836 A CN 202210743836A CN 115075362 A CN115075362 A CN 115075362A
Authority
CN
China
Prior art keywords
underdrain
sewage
pipe
section
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210743836.5A
Other languages
Chinese (zh)
Other versions
CN115075362B (en
Inventor
漆磊
唐寅
王松林
刘飞
林亚楠
辛志远
熊易琰
徐庆龙
刘虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN202210743836.5A priority Critical patent/CN115075362B/en
Publication of CN115075362A publication Critical patent/CN115075362A/en
Application granted granted Critical
Publication of CN115075362B publication Critical patent/CN115075362B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/02Arrangement of sewer pipe-lines or pipe-line systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/0401Gullies for use in roads or pavements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)

Abstract

本发明涉及市政排水工程技术领域,具体涉及一种合流暗渠清污分流改造结构及方法,包括暗渠段、上游明涌段和下游明涌段连通;暗渠段包括暗渠本体,暗渠本体具有现状污水直排口;还包括雨水管、污水管和市政污水井,雨水管设置于暗渠本体内,且雨水管的两端分别伸至上游明涌段和下游明涌段内;暗渠本体的两端分别通过素混凝土封闭,雨水管的两端分别通过素混凝土固定;暗渠本体通过污水管与市政污水井连通。本发明将既有的合流暗渠改造为封闭的污水通道并连接至市政污水井,在暗渠本体内设置雨水管连接上下游明涌形成雨水通道,不仅结构简单,施工周期短,而且截污效果好,适用于难以截污地段,尤其适用于暗渠被房屋骑压且断面尺寸较小的条件下。

Figure 202210743836

The invention relates to the technical field of municipal drainage engineering, in particular to a structure and method for cleaning and diverting sewage from a confluence and culvert, including a culvert section, an upstream open section and a downstream open section connected; Drainage outlet; also includes rainwater pipes, sewage pipes and municipal sewage wells. The rainwater pipes are arranged in the underdrain body, and the two ends of the rainwater pipes are respectively extended to the upstream Mingchong section and the downstream Mingchong section; the two ends of the underdrain body are respectively closed by plain concrete The two ends of the rainwater pipe are respectively fixed by plain concrete; the underdrain body is connected with the municipal sewage well through the sewage pipe. The invention transforms the existing confluence culvert into a closed sewage channel and connects it to the municipal sewage well, and sets up a rainwater pipe in the culvert body to connect the upstream and downstream open swells to form a rainwater channel. It is suitable for areas where it is difficult to intercept pollution, especially when the culvert is pressed by the house and the section size is small.

Figure 202210743836

Description

一种合流暗渠清污分流改造结构及方法A structure and method for cleaning and diverting sewage in a confluence underdrain

技术领域technical field

本发明涉及市政排水工程技术领域,具体涉及一种合流暗渠清污分流改造结构及方法。The invention relates to the technical field of municipal drainage engineering, in particular to a structure and method for cleaning and diverting sewage from a confluence underdrain.

背景技术Background technique

随着城市的发展,自然河道、排洪沟渠往往被人为覆盖成暗渠,暗渠由于周边雨、污水排入而在其末端配套设置了截污闸实现末端截污,这样设置的弊端使得雨季既易形成城市内涝,又易造成河道水质反复,成为治水的一大顽疾。在实施合流暗渠清污分流改造过程中,部分暗渠被房屋骑压,且房屋污水排口直排进暗渠,当暗渠断面尺寸较小,受限于暗渠断面尺寸,施工人员难以进入暗渠内施工作业,难以采用暗渠内挂管及埋管截污。With the development of the city, natural rivers and flood drainage ditches are often artificially covered into culverts. Due to the inflow of surrounding rain and sewage, sewage interception gates are set at the ends of the culverts to realize the end sewage interception. The formation of urban waterlogging, and easy to cause repeated water quality of the river, has become a major stubborn disease of water control. During the renovation of the confluence culvert, some culverts were pressed by the house, and the sewage outlet of the house was directly discharged into the culvert. When the cross-section of the culvert is small, it is difficult for the construction personnel to enter the culvert for construction work due to the size of the cross-section of the culvert. , It is difficult to intercept sewage by hanging pipes and buried pipes in culverts.

发明内容SUMMARY OF THE INVENTION

本发明的目的是提供一种合流暗渠清污分流改造结构及方法,能够解决现有暗渠被房屋骑压、房屋污水排口直排进暗渠且暗渠断面尺寸较小的情况下难以进行清污分流的问题。The purpose of the present invention is to provide a confluence underdrain cleaning and diversion reconstruction structure and method, which can solve the problem that it is difficult to clean up and divert the existing underdrain under the situation that the existing underdrain is pressed by the house, the house sewage discharge port is directly discharged into the underdrain, and the cross-sectional size of the underdrain is small. The problem.

为实现上述目的,本发明的技术方案为一种合流暗渠清污分流改造结构,包括暗渠段、以及分别与所述暗渠段两端连通的上游明涌段和下游明涌段连通;所述暗渠段包括暗渠本体,所述暗渠本体具有现状污水直排口;还包括雨水管、污水管和市政污水井,所述雨水管设置于所述暗渠本体内,且所述雨水管的两端分别伸至所述上游明涌段和所述下游明涌段内;所述暗渠本体的两端分别通过素混凝土封闭,所述雨水管的两端分别通过所述素混凝土固定;所述暗渠本体通过污水管与所述市政污水井连通。In order to achieve the above purpose, the technical solution of the present invention is a combined underdrain cleaning and diversion reconstruction structure, including an underdrain section, and an upstream open chung section and a downstream open chung section that are respectively communicated with both ends of the underdrain section. The section includes an underdrain body with an existing straight sewage outlet; also includes a rainwater pipe, a sewage pipe and a municipal sewage well, the rainwater pipe is arranged in the underdrain body, and both ends of the rainwater pipe extend to the In the upstream open-chung section and the downstream open-chung section; the two ends of the underdrain body are respectively closed by plain concrete, and the two ends of the rainwater pipe are respectively fixed by the plain concrete; the underdrain body is connected with the Municipal sewage well connected.

进一步地,所述雨水管设置于所述暗渠本体的底部,且具有一定的坡度。Further, the rainwater pipe is arranged at the bottom of the underdrain body and has a certain slope.

进一步地,所述雨水管的长度小于等于50m。Further, the length of the rainwater pipe is less than or equal to 50m.

进一步地,所述下游明涌段的至少一侧设置有涌边污水井,所述暗渠本体通过污水管与所述涌边污水井连通,所述涌边污水井通过污水管与所述市政污水井连通。Further, at least one side of the downstream open gully section is provided with an edge sewage well, the underdrain body is communicated with the edge sewage well through a sewage pipe, and the edge sewage well is connected with the municipal sewage through a sewage pipe. Well connected.

更进一步地,所述污水管的管底标高低于或等于所述暗渠本体的底标高。Further, the bottom elevation of the sewage pipe is lower than or equal to the bottom elevation of the underdrain body.

更进一步地,所述涌边污水井和所述市政污水井上均设置有井盖。Furthermore, a manhole cover is provided on both the edge-gushing sewage well and the municipal sewage well.

进一步地,所述雨水管和所述污水管均采用耐腐蚀的高强塑料管。Further, both the rainwater pipe and the sewage pipe are made of corrosion-resistant high-strength plastic pipes.

本发明还提供一种合流暗渠清污分流改造方法,包括如下步骤:The present invention also provides a method for cleaning and diverting confluence of underdrains, comprising the following steps:

S1、在被房屋骑压的暗渠段上下游修筑临时围堰,并对临时围堰之间的水排干;S1. Build temporary cofferdams upstream and downstream of the underdrain section that is pressed by houses, and drain the water between the temporary cofferdams;

S2、采用牵引或拖拉将雨水管放在暗渠本体内,雨水管的两端伸出暗渠本体并预固定好位置;S2. Use traction or drag to put the rainwater pipe in the underdrain body, and the two ends of the rainwater pipe extend out of the underdrain body and pre-fix the position;

S3、将污水管的一端从下游明涌段伸至暗渠本体内并预固定好位置,另一端与市政污水井连通;S3. Extend one end of the sewage pipe from the downstream Mingchong section to the underdrain body and pre-fix the position, and the other end is connected to the municipal sewage well;

S4、采用素混凝土将暗渠本体的两端封闭,并将雨水管的两端以及污水管的一端固定好;S4. Use plain concrete to seal both ends of the underdrain body, and fix both ends of the rainwater pipe and one end of the sewage pipe;

S5、拆除临时围堰。S5. Remove the temporary cofferdam.

进一步地,步骤S3中,在临时围堰之间的下游明涌段建涌边污水井,并将污水管的另一端与涌边污水井连通,再将涌边污水井与市政污水井连通。Further, in step S3, a yongbian sewage well is built in the downstream Mingyong section between the temporary cofferdams, and the other end of the sewage pipe is connected to the yongbian sewage well, and then the yongbian sewage well is connected to the municipal sewage well.

更进一步地,所述涌边污水井采用钢筋混凝土结构。Further, the edge-flooding sewage well adopts a reinforced concrete structure.

与现有技术相比,本发明具有以下有益效果:Compared with the prior art, the present invention has the following beneficial effects:

本发明将既有的合流暗渠改造为封闭的污水通道并连接至市政污水井,在暗渠本体内设置雨水管连接上下游明涌形成雨水通道,并通过素混凝土固定雨水管两端,不仅结构简单,施工周期短,而且截污效果好,适用于难以截污地段,尤其适用于暗渠被房屋骑压且断面尺寸较小的条件下。The invention transforms the existing confluence underdrain into a closed sewage channel and connects it to the municipal sewage well, sets up a rainwater pipe in the underdrain body to connect the upstream and downstream open gully to form a rainwater channel, and fixes the two ends of the rainwater pipe by plain concrete, which not only has a simple structure, but also a construction The cycle is short and the pollution interception effect is good, so it is suitable for areas where it is difficult to intercept pollution, especially when the culvert is pressed by the house and the section size is small.

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其它的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative effort.

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其它的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative effort.

图1为本发明实施例提供的合流暗渠清污分流改造结构的平面布置图;1 is a plan layout diagram of a confluence underdrain cleaning and diversion reconstruction structure provided by an embodiment of the present invention;

图2为图1的B-B图;Fig. 2 is the B-B figure of Fig. 1;

图3为图1的A-A图;Fig. 3 is the A-A figure of Fig. 1;

图中:1、现状污水直排口,2、暗渠内污水通道,3、污水管,4、涌边污水井,5、市政污水井,6、素混凝土,7、雨水管。In the picture: 1. Existing sewage straight outlet, 2. Sewage channel in the underdrain, 3. Sewage pipe, 4. Yongbian sewage well, 5. Municipal sewage well, 6. Plain concrete, 7. Rainwater pipe.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

在本发明的描述中,需要理解的是,术语“中心”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In the description of the present invention, it should be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", The orientation or positional relationship indicated by "top", "bottom", "inner", "outer", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying The device or element referred to must have a particular orientation, be constructed and operate in a particular orientation, and therefore should not be construed as limiting the invention.

术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征;在本发明的描述中,除非另有说明,“多个”的含义是两个或两个以上。The terms "first" and "second" are only used for descriptive purposes, and should not be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, the features defined with "first" and "second" may expressly or implicitly include one or more of the features; in the description of the present invention, unless otherwise specified, the meaning of "multiple" is two or more.

如图1-图3所示,本实施例提供一种合流暗渠清污分流改造结构,包括暗渠段、以及分别与所述暗渠段两端连通的上游明涌段和下游明涌段连通;所述暗渠段包括暗渠本体,所述暗渠本体具有现状污水直排口1;还包括雨水管7、污水管3和市政污水井5,所述雨水管7设置于所述暗渠本体内,且所述雨水管7的两端分别伸至所述上游明涌段和所述下游明涌段内;所述暗渠本体的两端分别通过素混凝土6封闭,所述雨水管7的两端分别通过所述素混凝土6固定;所述暗渠本体内为暗渠内污水通道2,暗渠内污水通道2通过污水管3与所述市政污水井5连通。As shown in FIG. 1-FIG. 3, the present embodiment provides a combined underdrain cleaning and diversion reconstruction structure, including an underdrain section, and an upstream open chute section and a downstream open chung section that are respectively connected to both ends of the underdrain section. The underdrain section includes an underdrain body with an existing sewage straight outlet 1; also includes a rainwater pipe 7, a sewage pipe 3 and a municipal sewage well 5, the rainwater pipe 7 is arranged in the underdrain body, and the rainwater pipe 7 The two ends of the rainwater pipe extend into the upstream open chute section and the downstream open chung section respectively; the two ends of the underdrain body are respectively closed by the plain concrete 6, and the two ends of the rainwater pipe 7 are respectively fixed by the plain concrete 6 ; The body of the underdrain is the sewage channel 2 in the underdrain, and the sewage channel 2 in the underdrain is communicated with the municipal sewage well 5 through the sewage pipe 3.

本实施例将既有的合流暗渠改造为封闭的污水通道,并将污水通道连接至市政污水井,在暗渠本体内设置雨水管7连接上下游明涌形成雨水通道。In this embodiment, the existing confluence underdrain is transformed into a closed sewage channel, and the sewage channel is connected to the municipal sewage well, and a rainwater pipe 7 is arranged in the underdrain body to connect the upstream and downstream open surges to form a rainwater channel.

雨水通道:在暗渠本体的两端通过素混凝土6固定雨水管7的起终点,上游明涌段雨水在暗渠起点处进入雨水管7,雨水在暗渠内走雨水管7直至暗渠末端,然后排出至下游明涌段。Rainwater channel: at both ends of the underdrain body, the starting and ending points of the rainwater pipes 7 are fixed by plain concrete 6. The rainwater in the upstream open chute enters the rainwater pipe 7 at the starting point of the underdrain, and the rainwater goes through the rainwater pipes 7 in the underdrain to the end of the underdrain, and then is discharged to the downstream open chung. part.

污水通道:房屋污水通过现状污水直排口1进入暗渠内污水通道2,污水汇流至暗渠末端的污水管3内,污水管3连接至市政污水井5。其中,暗渠本体也采用钢筋混凝土结构,防止污水渗入地下,同时也可防止地下水渗入。Sewage channel: The house sewage enters the sewage channel 2 in the underdrain through the existing sewage straight discharge port 1, and the sewage converges to the sewage pipe 3 at the end of the underdrain, and the sewage pipe 3 is connected to the municipal sewage well 5. Among them, the main body of the culvert also adopts a reinforced concrete structure to prevent sewage from infiltrating into the ground, and at the same time, it can also prevent the infiltration of groundwater.

本实施例的结构不仅结构简单,截污效果好,外观简洁,而且不涉及污染源接驳,也无需施工人员进入暗渠内施工,适用于难以截污地段,特别是暗渠被房屋骑压且断面尺寸较小的条件下。The structure of this embodiment is not only simple in structure, good in interception effect, and concise in appearance, but also does not involve the connection of pollution sources, and does not require construction personnel to enter the underdrain for construction. under smaller conditions.

优化地,所述雨水管7设置于所述暗渠本体的底部,并通过素混凝土6固定,且具有一定的坡度,满足不淤流速。进一步地,所述雨水管7的长度应该小于等于50m,避免管道设置太长不方便检修,雨水管7可采用牵引或拖拉的方式放到暗渠本体内。Optimally, the rainwater pipe 7 is arranged at the bottom of the underdrain body, and is fixed by the plain concrete 6, and has a certain slope to meet the non-silt flow rate. Further, the length of the rainwater pipe 7 should be less than or equal to 50m, to avoid the pipeline being set too long and inconvenient for maintenance.

优化上述实施例,所述下游明涌段的至少一侧设置有涌边污水井4,所述暗渠本体通过污水管3与所述涌边污水井4连通,所述涌边污水井4通过污水管3与所述市政污水井5连通。进一步地,所述污水管3的管底标高低于或等于所述暗渠本体的底标高,使得暗渠内污水通道2内的污水在重力作用下可以自动流入污水管3中。To optimize the above embodiment, at least one side of the downstream open chong section is provided with an edge sewage well 4, the underdrain body is communicated with the edge sewage well 4 through a sewage pipe 3, and the edge sewage well 4 passes through sewage The pipe 3 communicates with the municipal sewage well 5 . Further, the bottom elevation of the sewage pipe 3 is lower than or equal to the bottom elevation of the underdrain body, so that the sewage in the sewage channel 2 in the underdrain can automatically flow into the sewage pipe 3 under the action of gravity.

更进一步地,所述涌边污水井4和所述市政污水井5上均设置有井盖,用于遮盖污水井,防止人或物体坠落,井盖的材质包括但不限于铸铁、混凝土、树脂等,同时井盖上应设置铭牌注明排水单元名称和污水性质。涌边污水井4和市政污水井5可参考《钢筋混凝土及砖砌排水检查井》(20S515)。Further, the edge sewage well 4 and the municipal sewage well 5 are all provided with a manhole cover, which is used to cover the sewage well and prevent people or objects from falling. The material of the manhole cover includes but is not limited to cast iron, concrete, resin, etc., At the same time, a nameplate should be set on the manhole cover to indicate the name of the drainage unit and the nature of the sewage. For the Yongbian sewage well 4 and the municipal sewage well 5, please refer to "Reinforced Concrete and Brick Drainage Inspection Well" (20S515).

本实施例中所述雨水管7和所述污水管3的管径应经计算取得,所述污水管3的管径应满足污水排放要求,所述雨水管7的管径应满足上游雨水排放要求;优化地,所述雨水管7和所述污水管3均采用耐腐蚀的高强塑料管,防止污水外渗,同时所述雨水管7和所述污水管3需保证一定的坡度,满足不淤流速。In this embodiment, the pipe diameters of the rainwater pipe 7 and the sewage pipe 3 should be obtained by calculation, the pipe diameter of the sewage pipe 3 should meet the sewage discharge requirements, and the pipe diameter of the rainwater pipe 7 should meet the upstream rainwater discharge requirements; Optimally, the rainwater pipe 7 and the sewage pipe 3 are made of corrosion-resistant high-strength plastic pipes to prevent sewage from seeping out. Meanwhile, the rainwater pipe 7 and the sewage pipe 3 need to ensure a certain slope to meet the non-silt flow rate.

如图1-图3所示,本实施例还提供一种合流暗渠清污分流改造方法,包括如下步骤:As shown in FIG. 1-FIG. 3, the present embodiment also provides a method for cleaning and diverting pollution in a confluence underdrain, which includes the following steps:

S1、在被房屋骑压的暗渠段上下游修筑临时围堰,并对临时围堰之间的水排干,保证干水作业;S1. Build temporary cofferdams upstream and downstream of the underdrain section that is pressed by houses, and drain the water between the temporary cofferdams to ensure dry water operations;

S2、采用牵引或拖拉将雨水管7放在暗渠本体内,雨水管7的两端伸出暗渠本体并预固定好位置;S2. Use traction or drag to put the rainwater pipe 7 in the underdrain body, and both ends of the rainwater pipe 7 extend out of the underdrain body and pre-fix the position;

S3、将污水管3的一端从下游明涌段伸至暗渠本体内并预固定好位置,另一端与市政污水井5连通;S3. Extend one end of the sewage pipe 3 from the downstream Mingchong section into the underdrain body and pre-fix the position, and the other end is communicated with the municipal sewage well 5;

S4、采用素混凝土6将暗渠本体的两端封闭,并将雨水管7的两端以及污水管3的一端固定好;S4, use plain concrete 6 to seal the two ends of the underdrain body, and fix both ends of the rainwater pipe 7 and one end of the sewage pipe 3;

S5、拆除临时围堰。S5. Remove the temporary cofferdam.

本实施例的施工方法简单,周期短,不涉及有限空间作业,尤其适用于暗渠被房屋骑压且断面尺寸较小的条件下;且上游明涌段雨水在暗渠段内走雨水管7直接排至下游明涌段,房屋污水通过现状污水直排口1进入暗渠内污水通道2并通过污水管3排至市政污水井5,截污效果良好。The construction method of this embodiment is simple, the cycle is short, and does not involve limited space operations, and is especially suitable for the condition that the underdrain is pressed by the house and the section size is small; and the rainwater in the upstream open chung section is directly discharged to the underdrain section through the rainwater pipe 7 In the downstream Mingyong section, the house sewage enters the sewage channel 2 in the underdrain through the existing sewage straight discharge port 1 and is discharged to the municipal sewage well 5 through the sewage pipe 3, and the sewage interception effect is good.

进一步地,步骤S3中,在临时围堰之间的下游明涌段建涌边污水井4,并将污水管3的另一端与涌边污水井4连通,再将涌边污水井4与市政污水井5连通。其中,涌边污水井4采用钢筋混凝土结构,防止污水井内污水渗出,同时也可防止河水渗入。Further, in step S3, the Yongbian sewage well 4 is built in the downstream Mingyong section between the temporary cofferdams, and the other end of the sewage pipe 3 is communicated with the Yongbian sewage well 4, and then the Yongbian sewage well 4 is connected with the municipal sewage well 4. The sewage well 5 is connected. Among them, the surging side sewage well 4 adopts a reinforced concrete structure to prevent the sewage in the sewage well from seeping out, and at the same time, it can also prevent the river water from infiltrating.

以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the scope of the present invention. within the scope of protection.

Claims (10)

1. A sewage-cleaning and shunting reconstruction structure of a confluence covered channel comprises a covered channel section, and an upstream open surge section and a downstream open surge section which are respectively communicated with two ends of the covered channel section; the underdrain section comprises an underdrain body, and the underdrain body is provided with a current sewage straight discharge port; the method is characterized in that: the underground ditch is characterized by also comprising a rainwater pipe, a sewage pipe and a municipal sewage well, wherein the rainwater pipe is arranged in the underground ditch body, and two ends of the rainwater pipe respectively extend into the upstream open-surge section and the downstream open-surge section; two ends of the underdrain body are respectively sealed by plain concrete, and two ends of the rainwater pipe are respectively fixed by the plain concrete; the underdrain body is communicated with the municipal sewage well through a sewage pipe.
2. The flow-merging underdrain decontamination flow-dividing transformation structure of claim 1, wherein: the rainwater pipe is arranged at the bottom of the underdrain body and has a certain gradient.
3. The flow-merging underdrain decontamination flow-dividing transformation structure of claim 1, wherein: the length of the rainwater pipe is less than or equal to 50 m.
4. The flow-merging underdrain decontamination flow-dividing transformation structure of claim 1, wherein: at least one side of the downstream open-surging section is provided with a surging-side sewer well, the underdrain body is communicated with the surging-side sewer well through a sewer pipe, and the surging-side sewer well is communicated with the municipal sewer well through a sewer pipe.
5. The flow-merging underdrain decontamination flow-dividing transformation structure of claim 4, wherein: the pipe bottom elevation of the sewage pipe is lower than or equal to the bottom elevation of the underdrain body.
6. The flow-merging underdrain decontamination flow-dividing transformation structure of claim 4, wherein: gush limit bilge well with all be provided with the well lid on the municipal administration bilge well.
7. The flow-merging underdrain decontamination flow-dividing transformation structure of claim 1, wherein: the rainwater pipe and the sewage pipe are both made of corrosion-resistant high-strength plastic pipes.
8. A sewage-cleaning and shunting transformation method for a confluence closed channel is characterized by comprising the following steps:
s1, building temporary cofferdams at the upstream and downstream of the underdrain section which is pressed by the house, and draining water between the temporary cofferdams;
s2, putting the rain pipe in the underdrain body by traction or dragging, wherein two ends of the rain pipe extend out of the underdrain body and are pre-fixed in position;
s3, extending one end of a sewage pipe from the downstream open surge section into the underdrain body and fixing the sewer body in advance, and communicating the other end of the sewage pipe with a municipal sewage well;
s4, sealing two ends of the underdrain body by adopting plain concrete, and fixing two ends of the rainwater pipe and one end of the sewage pipe;
and S5, removing the temporary cofferdam.
9. The flow-merging underdrain decontamination flow-dividing transformation method of claim 8, wherein: and step S3, building a surge edge bilge well at the downstream open surge section between the temporary cofferdams, communicating the other end of the bilge pipe with the surge edge bilge well, and communicating the surge edge bilge well with the municipal bilge well.
10. The flow-merging underdrain decontamination flow-dividing transformation method of claim 9, wherein: the surge edge sewage well is of a reinforced concrete structure.
CN202210743836.5A 2022-06-27 2022-06-27 A combined culvert cleaning and sewage diversion transformation structure and method Active CN115075362B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210743836.5A CN115075362B (en) 2022-06-27 2022-06-27 A combined culvert cleaning and sewage diversion transformation structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210743836.5A CN115075362B (en) 2022-06-27 2022-06-27 A combined culvert cleaning and sewage diversion transformation structure and method

Publications (2)

Publication Number Publication Date
CN115075362A true CN115075362A (en) 2022-09-20
CN115075362B CN115075362B (en) 2025-04-04

Family

ID=83256682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210743836.5A Active CN115075362B (en) 2022-06-27 2022-06-27 A combined culvert cleaning and sewage diversion transformation structure and method

Country Status (1)

Country Link
CN (1) CN115075362B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116254906A (en) * 2023-03-03 2023-06-13 中国电建集团市政规划设计研究院有限公司 Construction method of rainwater and sewage diversion in the existing brick confluence culvert

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200340906Y1 (en) * 2003-10-07 2004-02-11 김동수 Sewer system of sewage divide box
KR200356480Y1 (en) * 2004-03-17 2004-07-15 주식회사 한조엔지니어링 Composition drainage structure
CN111088839A (en) * 2019-11-21 2020-05-01 中电建生态环境集团有限公司 Rain and sewage diversion construction method applied to building
CN212561790U (en) * 2020-04-30 2021-02-19 东莞电建水环境治理技术有限公司 Rain and sewage separating device for urban drainage pipe network
CN215630565U (en) * 2021-02-24 2022-01-25 中铁第四勘察设计院集团有限公司 Sewage intercepting device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200340906Y1 (en) * 2003-10-07 2004-02-11 김동수 Sewer system of sewage divide box
KR200356480Y1 (en) * 2004-03-17 2004-07-15 주식회사 한조엔지니어링 Composition drainage structure
CN111088839A (en) * 2019-11-21 2020-05-01 中电建生态环境集团有限公司 Rain and sewage diversion construction method applied to building
CN212561790U (en) * 2020-04-30 2021-02-19 东莞电建水环境治理技术有限公司 Rain and sewage separating device for urban drainage pipe network
CN215630565U (en) * 2021-02-24 2022-01-25 中铁第四勘察设计院集团有限公司 Sewage intercepting device

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
何万春;: "旧城区社区雨污分流改造技术方案探讨――以广州市中心城区雨污分流工程修建性详细规划方案为例", 中华建设, no. 06, 28 June 2012 (2012-06-28) *
李志鹏;: "基于截污边渠的河涌截污研究", 低碳世界, no. 08, 15 March 2016 (2016-03-15) *
谢进;熊鸿斌;陈曦;阮学锋;朱永红;: "铜陵市主城区雨污分流改造工程实例分析", 能源环境保护, no. 05, 15 October 2020 (2020-10-15) *
邓雁辉;: "浅谈广州市雨污分流改造设计", 中国城市经济, no. 14, 15 July 2011 (2011-07-15) *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116254906A (en) * 2023-03-03 2023-06-13 中国电建集团市政规划设计研究院有限公司 Construction method of rainwater and sewage diversion in the existing brick confluence culvert

Also Published As

Publication number Publication date
CN115075362B (en) 2025-04-04

Similar Documents

Publication Publication Date Title
CN210827513U (en) Self-adaptation side slope drainage seepage prevention structure
CN207878610U (en) A kind of mating drainage arrangement based on geotextile tube bag sludge dewatering technology
CN213390415U (en) Rain and sewage diversion well and drainage system
CN211714133U (en) A rainwater and sewage diversion pipeline structure in an urban village
CN115075362A (en) Sewage-removing and shunting transformation structure and method for combined underdrain
CN209723004U (en) Built-in precipitation structure of raft and shut-in well structure of precipitation well
CN204983100U (en) Inspection well
CN204898828U (en) Rainwater conserves - restores integrative device
CN107386320B (en) Pass through the construction method of the underground pipe gallery of buried concrete waterpipe
CN105970882B (en) Solve the structure and its building method of face dam construction time dam body reverse osmosis water problems
CN205189114U (en) Pipeline desilting device
CN112726659A (en) Double-backflow-preventing retaining wall drain pipe and using method thereof
CN203174663U (en) Device for pouring rainwater on high-rise building roof underground
CN217232043U (en) Coal dust pollution place initial stage rainwater collection distribution well
CN114059460B (en) Municipal culvert sand-throwing type drainage device and use method thereof
CN202610962U (en) Siphon-type desilting device of water storage and drainage tunnel
CN114033017B (en) A multifunctional inspection well for the junction of new and old municipal drainage pipes
CN211171672U (en) New diversion structure for existing box culverts
CN206015598U (en) A kind of pipe-line system for hydraulic engineering river regulation
CN201202121Y (en) Foundation Pit Drainage Network
CN205503183U (en) Formula of covering delivery port structure in tunnel heat preservation escape canal
CN213625904U (en) Complicated topography rain and sewage pipeline coincide reposition of redundant personnel transformation system in old urban area
CN204551507U (en) A kind of rock foundation ductule local dewatering device
CN111663630A (en) A side wall type sewage interception bucket device and sewage interception system suitable for horizontal mixed flow outlet in culvert
CN211113431U (en) Well type water measuring building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant