CN115055303A - A glass bottle spray paint coloring system - Google Patents

A glass bottle spray paint coloring system Download PDF

Info

Publication number
CN115055303A
CN115055303A CN202210766059.6A CN202210766059A CN115055303A CN 115055303 A CN115055303 A CN 115055303A CN 202210766059 A CN202210766059 A CN 202210766059A CN 115055303 A CN115055303 A CN 115055303A
Authority
CN
China
Prior art keywords
chamber
primer
dust removal
spraying
paint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210766059.6A
Other languages
Chinese (zh)
Inventor
翁莉
郑雪婷
吕超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bengbu Xinzhong Glass Technology Co ltd
Original Assignee
Bengbu Xinzhong Glass Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bengbu Xinzhong Glass Technology Co ltd filed Critical Bengbu Xinzhong Glass Technology Co ltd
Priority to CN202210766059.6A priority Critical patent/CN115055303A/en
Publication of CN115055303A publication Critical patent/CN115055303A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0285Stands for supporting individual articles to be sprayed, e.g. doors, vehicle body parts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0221Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B14/00Arrangements for collecting, re-using or eliminating excess spraying material
    • B05B14/40Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths
    • B05B14/43Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths by filtering the air charged with excess material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B15/00Details of spraying plant or spraying apparatus not otherwise provided for; Accessories
    • B05B15/60Arrangements for mounting, supporting or holding spraying apparatus
    • B05B15/68Arrangements for adjusting the position of spray heads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/20Arrangements for spraying in combination with other operations, e.g. drying; Arrangements enabling a combination of spraying operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/10Cleaning by methods involving the use of tools characterised by the type of cleaning tool
    • B08B1/12Brushes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/30Cleaning by methods involving the use of tools by movement of cleaning members over a surface
    • B08B1/32Cleaning by methods involving the use of tools by movement of cleaning members over a surface using rotary cleaning members
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

The invention discloses a glass bottle paint spraying and coloring system which comprises a bottle feeding area, a primary dedusting area, a fine dedusting chamber, a preheating chamber, a primer spraying chamber, a first buffer chamber, a finish paint spraying chamber, a second buffer chamber, a drying chamber and a cooling chamber, wherein the bottle feeding area, the primary dedusting area, the fine dedusting chamber, the preheating chamber, the primer spraying chamber, the first buffer chamber, the finish paint spraying chamber, the second buffer chamber, the drying chamber and the cooling chamber are communicated through a glass bottle conveying chain for conveying glass bottles; this system scheme is improved in the aspect of removing dust, divide into and just removes dust and smart dust removal two parts, just remove dust and rotate through the motor and carry out preliminary dust removal to the body through the first dust removal cloth that the motor drove in the pivot, smart dust removal drives the smart dust removal brush in the pivot through the motor and rotates and carry out more meticulous dust removal processing to the body, dust and impurity that are infected with on the body that can significantly reduce twice remove dust, the subsequent quality of coloring of spraying paint of body has been improved.

Description

一种玻璃瓶喷漆上色系统A glass bottle spray paint coloring system

技术领域technical field

本发明涉及玻璃瓶加工技术领域,更具体地说,涉及一种玻璃瓶喷漆上色系统。The invention relates to the technical field of glass bottle processing, and more particularly, to a glass bottle spray paint coloring system.

背景技术Background technique

玻璃瓶常用于对各种酒类和饮料的包装存贮,而有些酒类和饮料不宜阳光照射,或者工厂为了区分不同的产品,往往需要对透明的玻璃瓶进行喷漆上色处理。Glass bottles are often used for packaging and storage of various wines and beverages, and some wines and beverages are not suitable for sunlight, or factories often need to paint and color transparent glass bottles in order to distinguish different products.

现有的玻璃瓶喷漆上色工艺一般是上瓶,擦瓶,火焰处理,静电除尘,喷涂,预热,固化,冷却,下瓶,包装,在过程中往往会遇到瓶身固定不稳、除尘不尽、喷漆不均匀和工艺成本高的问题,另外对于加工过程产生的污水处理方式往往也是简单的过滤然后直接排放,不利于环境保护,所以需要设计一种新型的喷漆上色系统,以解决上述问题。The existing glass bottle spraying and coloring process is generally bottle loading, bottle cleaning, flame treatment, electrostatic dust removal, spraying, preheating, curing, cooling, bottle loading, and packaging. In addition to the problems of inexhaustible dust removal, uneven painting and high process cost, the sewage treatment method generated during processing is often simple filtration and then directly discharged, which is not conducive to environmental protection. Therefore, it is necessary to design a new type of painting and coloring system. Solve the above problem.

发明内容SUMMARY OF THE INVENTION

1.要解决的技术问题1. Technical problems to be solved

针对现有技术中存在的问题,本发明的目的在于提供一种玻璃瓶喷漆上色系统,本方案通过对瓶口插槽、除尘方面、喷漆方面和加工过程中的污水处理方案进行改进,解决了玻璃瓶加工过程中瓶身固定不稳、除尘不尽、喷漆不均匀和工艺成本高等问题,并且实现了对污水的循环利用,利于环境保护。In view of the problems existing in the prior art, the purpose of the present invention is to provide a glass bottle spraying and coloring system. This solution improves the bottle mouth slot, dust removal, painting and sewage treatment during processing. It solves the problems of unstable fixing of the bottle body, endless dust removal, uneven painting and high process cost during the processing of glass bottles, and realizes the recycling of sewage, which is beneficial to environmental protection.

2.技术方案2. Technical solutions

为解决上述问题,本发明采用如下的技术方案。In order to solve the above problems, the present invention adopts the following technical solutions.

一种玻璃瓶喷漆上色系统,包括上瓶区、初除尘区、精除尘室、预热室、底漆喷涂室、第一缓冲室、面漆喷涂室、第二缓冲室、烘干室和冷却室,所述上瓶区、初除尘区、精除尘室、预热室、底漆喷涂室、第一缓冲室、面漆喷涂室、第二缓冲室、烘干室和冷却室之间通过用于输送玻璃瓶的玻璃瓶输送链相连通;A glass bottle spraying and coloring system, comprising a bottle loading area, a primary dust removal area, a fine dust removal room, a preheating room, a primer spraying room, a first buffer room, a topcoat spraying room, a second buffer room, a drying room and Cooling room, passing between the bottle upper area, the primary dust removal area, the fine dust removal room, the preheating room, the primer spraying room, the first buffer room, the topcoat spraying room, the second buffer room, the drying room and the cooling room The glass bottle conveyor chain for conveying glass bottles is connected;

所述上瓶区内设置有上瓶台,所述上瓶台的台顶部开设有用于玻璃瓶输送链穿过的上瓶输送链槽,所述玻璃瓶输送链的链条顶部固定连接有用于放置玻璃瓶的瓶架;The bottle loading area is provided with a bottle loading table, the top of the bottle loading table is provided with a bottle loading chain groove for the glass bottle transport chain to pass through, and the top of the chain of the glass bottle transport chain is fixedly connected with a container for placing the bottle. bottle holder for glass bottles;

所述初除尘区内设置有初除尘台,所述初除尘台的台顶部开设有用于玻璃瓶输送链穿过的初除尘输送链槽,所述初除尘台的正上方固定安装有初除尘架,所述初除尘架的顶部安装有初除尘电机组,所述初除尘电机组的每个电机轴输出端均通过联轴器连接有初除尘转轴,所述初除尘台的顶部对应初除尘转轴的位置均嵌有初除尘轴承,且初除尘转轴的下轴端与初除尘轴承的内环固定连接,所述初除尘转轴的轴体上通过固定螺栓和固定螺母固定连接有用于擦拭玻璃瓶的初除尘布;The primary dust removal area is provided with a primary dust removal table, the top of the primary dust removal table is provided with a primary dust removal conveyor chain groove for the glass bottle conveyor chain to pass through, and a primary dust removal rack is fixed directly above the primary dust removal table. The top of the primary dust removal rack is installed with a primary dust removal motor unit, each motor shaft output end of the primary dust removal motor unit is connected with a primary dust removal shaft through a coupling, and the top of the primary dust removal table corresponds to the primary dust removal shaft A primary dust removal bearing is embedded in the position of the primary dust removal shaft, and the lower shaft end of the primary dust removal shaft is fixedly connected with the inner ring of the primary dust removal bearing. Initial dust cloth;

所述精除尘室内设置有精除尘台,所述精除尘台的台顶部开设有用于玻璃瓶输送链穿过的精除尘输送链槽,所述精除尘台的正上方固定安装有精除尘架,所述精除尘架的顶部安装有精除尘电机组,所述精除尘电机组的每个电机轴输出端均通过联轴器连接有精除尘转轴,所述精除尘台的顶部对应精除尘转轴的位置均嵌有精除尘轴承,且精除尘转轴的下轴端与精除尘轴承的内环固定连接,所述精除尘转轴的轴体上固定连接有用于扫刷玻璃瓶的精除尘毛刷;The fine dust removal chamber is provided with a fine dust removal table, the top of the fine dust removal table is provided with a fine dust removal conveyor chain groove for the glass bottle conveyor chain to pass through, and a fine dust removal rack is fixedly installed directly above the fine dust removal table. The top of the fine dust removal rack is installed with a fine dust removal motor unit, each motor shaft output end of the fine dust removal motor unit is connected with a fine dust removal shaft through a coupling, and the top of the fine dust removal table corresponds to the fine dust removal shaft. Fine dust removal bearings are embedded in all positions, and the lower shaft end of the fine dust removal shaft is fixedly connected with the inner ring of the fine dust removal bearing, and the fine dust removal brush for cleaning glass bottles is fixedly connected to the shaft body of the fine dust removal shaft;

所述底漆喷涂室内设置有底漆台,所述底漆台的台顶部开设有用于玻璃瓶输送链穿过的底漆室输送链槽,所述底漆台的台顶一侧等间距固定安装有三个底漆普通喷架,所述底漆台的台顶另一侧固定安装有底漆静电喷架,所述底漆喷涂室的顶部后侧固定安装有底漆室喷淋头组,所述底漆喷涂室的室内后侧开设有底漆室滤水池;The primer spraying chamber is provided with a primer table, the top of the primer table is provided with a primer chamber conveyor chain groove for the glass bottle conveyor chain to pass through, and the top side of the primer table is fixed at equal intervals Three primer common spray racks are installed, the primer electrostatic spray rack is fixedly installed on the other side of the top of the primer table, and the primer room spray head group is fixedly installed on the top rear side of the primer spray booth. A primer room filter tank is opened on the indoor rear side of the primer spraying room;

所述面漆喷涂室内设置有面漆台,所述面漆台的台顶部开设有用于玻璃瓶输送链穿过的面漆室输送链槽,所述面漆台的台顶一侧等间距固定安装有三个面漆普通喷架,所述面漆台的台顶另一侧固定安装有面漆静电喷架,所述面漆喷涂室的顶部后侧固定安装有面漆室喷淋头组,所述面漆喷涂室的室内后侧开设有面漆室滤水池;The top paint spraying room is provided with a top paint table, the top of the top paint table is provided with a top paint room conveyor chain groove for the glass bottle conveyor chain to pass through, and one side of the top of the top paint table is fixed at equal intervals. Three topcoat common spraying racks are installed, the topcoat electrostatic spraying rack is fixedly installed on the other side of the top of the topcoating table, and the topcoating room spray head group is fixedly installed on the top rear side of the topcoating spraying room. The interior rear side of the topcoat spraying room is provided with a topcoat room filter pool;

所述烘干室内设置有烘干台,所述烘干台的台顶部开设有用于玻璃瓶输送链穿过的烘干输送链槽,所述烘干室的室内顶部固定安装有用于加热室内温度的制热电阻丝组;The drying chamber is provided with a drying table, the top of the drying table is provided with a drying conveyor chain slot for the glass bottle conveyor chain to pass through, and the indoor top of the drying chamber is fixedly installed for heating the indoor temperature. The heating resistance wire group;

所述冷却室内设置有冷却台,所述冷却台的台顶部开设有用于玻璃瓶输送链穿过的冷却输送链槽,所述冷却室的室内顶部固定安装有固定吊板,所述固定吊板的底部固定安装风扇固定架,所述风扇固定架的底部固定安装有冷却风扇组;The cooling chamber is provided with a cooling table, the top of the cooling table is provided with a cooling conveyor chain slot for the glass bottle conveyor chain to pass through, a fixed hanging plate is fixedly installed on the indoor top of the cooling chamber, and the fixed hanging plate is A fan fixing frame is fixedly installed at the bottom of the fan fixing frame, and a cooling fan group is fixedly installed at the bottom of the fan fixing frame;

所述底漆室滤水池的底部连接有底漆室出污水管,所述面漆室滤水池的底部连接有面漆室出污水管,所述底漆室出污水管和面漆室出污水管的出口部连接有沉淀池,所述沉淀池的出水口部连接有第一水泵,所述第一水泵的输出端口连接有循环池,所述循环池的出水口部连接有第二水泵,所述第二水泵的输出端口连接有全自动压滤机,所述全自动压滤机的正下方设置有净水池,所述净水池的底部开设有净水出口,所述净水出口的端部连接有第三水泵,所述第三水泵的输出端口连接有底漆室进水管和面漆室进水管,所述底漆室进水管的出水端口与底漆室喷淋头组相连通,所述面漆室进水管的出水端口与面漆室喷淋头组相连通。The bottom of the primer chamber filter tank is connected with a primer chamber outlet pipe, the bottom of the topcoat chamber filter tank is connected with a finish paint chamber outlet pipe, the primer chamber outlet pipe and the finish paint chamber outlet sewage The outlet of the pipe is connected with a sedimentation tank, the water outlet of the sedimentation tank is connected with a first water pump, the output port of the first water pump is connected with a circulation tank, and the water outlet of the circulation tank is connected with a second water pump, The output port of the second water pump is connected with a fully automatic filter press, a water purification pool is arranged directly below the fully automatic filter press, and a purified water outlet is opened at the bottom of the purified water pool, and the purified water outlet The end of the paint chamber is connected with a third water pump, the output port of the third water pump is connected with the primer chamber water inlet pipe and the finish paint chamber water inlet pipe, and the water outlet port of the primer chamber water inlet pipe is connected with the primer chamber sprinkler head group The water outlet port of the water inlet pipe of the topcoat room is communicated with the spray head group of the topcoat room.

进一步的,所述瓶架包括固定于玻璃瓶输送链上的齿轮,所述齿轮的顶部固定连接有支柱,所述支柱的顶部固定连接有瓶口插槽,所述瓶口插槽的内部固定连接有瓶口插柱,所述瓶口插柱的柱体上套有橡胶圈。Further, the bottle rack includes a gear fixed on the glass bottle conveying chain, the top of the gear is fixedly connected with a pillar, the top of the pillar is fixedly connected with a bottle mouth slot, and the inside of the bottle mouth slot is fixed. A bottle opening post is connected, and a rubber ring is sleeved on the cylinder body of the bottle opening post.

进一步的,所述初除尘架的顶部一侧安装有气泵,所述初除尘台的一侧顶部固定连接有固定柱,所述固定柱靠近玻璃瓶输送链的一侧固定连接有喷气管,所述喷气管的进气口通过连接管与气泵的出气口相连通。Further, an air pump is installed on one side of the top of the primary dust removal rack, a fixed column is fixedly connected to the top of one side of the primary dust removal table, and a jet pipe is fixedly connected to the side of the fixed column close to the glass bottle conveying chain, so The air inlet of the jet pipe is communicated with the air outlet of the air pump through a connecting pipe.

进一步的,所述精除尘架的架体顶部左右两侧均安装有抽风机和集尘箱,所述抽风机的出风口通过抽尘管与集尘箱相连通。Further, an exhaust fan and a dust collection box are installed on the left and right sides of the top of the frame body of the fine dust removal rack, and the air outlet of the exhaust fan is communicated with the dust collection box through a dust extraction pipe.

进一步的,所述底漆普通喷架包括固定于底漆台上的第一立柱,所述第一立柱的柱体上套有第一高度调节块,所述第一高度调节块的块体上螺纹连接有用于固定第一高度调节块位置的第一高度固定栓,所述第一高度调节块的一侧固定连接有第一夹块,所述第一夹块的内部夹持有第一喷头连接杆,所述第一夹块的顶部螺纹连接用于固定第一喷头连接杆的第一连接杆固定栓,所述第一喷头连接杆靠近玻璃瓶输送链的一端通过第一铰接件铰接有底漆普通喷头,所述底漆静电喷架的结构与底漆普通喷架的结构相同,且底漆静电喷架上夹持的是底漆静电喷头,所述底漆普通喷头和底漆静电喷头上均连接有用于与喷漆机连接的第一进漆管。Further, the primer common spray rack includes a first column fixed on the primer table, the column body of the first column is covered with a first height adjustment block, and the block body of the first height adjustment block is covered. A first height fixing bolt for fixing the position of the first height adjusting block is threadedly connected, a first clamping block is fixedly connected to one side of the first height adjusting block, and a first nozzle is clamped inside the first clamping block A connecting rod, the top of the first clamping block is threadedly connected to a first connecting rod fixing bolt used to fix the first spray head connecting rod, and one end of the first spray head connecting rod close to the glass bottle conveying chain is hinged with a first hinge piece. The primer ordinary nozzle, the structure of the primer electrostatic spray rack is the same as that of the primer ordinary spray rack, and the primer electrostatic spray rack clamps the primer electrostatic nozzle, the primer ordinary nozzle and the primer electrostatic sprayer Each of the spray heads is connected with a first paint inlet pipe for connecting with the paint sprayer.

进一步的,所述面漆普通喷架包括固定于面漆台上的第二立柱,所述第二立柱的柱体上套有第二高度调节块,所述第二高度调节块的块体上螺纹连接有用于固定第二高度调节块位置的第二高度固定栓,所述第二高度调节块的一侧固定连接有第二夹块,所述第二夹块的内部夹持有第二喷头连接杆,所述第二夹块的顶部螺纹连接用于固定第二喷头连接杆的第二连接杆固定块,所述第二喷头连接杆靠近玻璃瓶输送链的一端通过第二铰接件铰接有面漆普通喷头,所述面漆静电喷架的结构与面漆普通喷架的结构相同,且面漆静电喷架上夹持的是面漆静电喷头,所述面漆普通喷头和面漆静电喷头上均连接有用于与喷漆机连接的第二进漆管。Further, the common spray rack for topcoat includes a second column fixed on the topcoat table, the column of the second column is covered with a second height adjustment block, and the block of the second height adjustment block is covered. A second height fixing bolt for fixing the position of the second height adjusting block is threadedly connected, a second clamping block is fixedly connected to one side of the second height adjusting block, and a second nozzle is clamped inside the second clamping block A connecting rod, the top of the second clamping block is threadedly connected to a second connecting rod fixing block for fixing the second spray head connecting rod, and one end of the second spray head connecting rod close to the glass bottle conveying chain is hinged with a second hinge piece. Ordinary topcoat nozzle, the structure of the topcoat electrostatic spraying rack is the same as that of the topcoat common spraying rack, and the topcoat electrostatic spraying rack clamps the topcoat electrostatic nozzle, the topcoat common nozzle and the topcoat electrostatic sprayer Each of the spray heads is connected with a second paint inlet pipe for connecting with the paint sprayer.

进一步的,所述底漆喷涂室的室内后侧顶部固定安装有底漆室水帘布条,所述面漆喷涂室的室内后侧顶部固定安装有面漆室水帘布条。Further, a primer room water curtain cloth strip is fixedly installed on the indoor rear top of the primer spraying room, and a finish paint room water curtain cloth strip is fixedly installed on the indoor rear top of the topcoat spraying room.

进一步的,所述净水池的一侧开设有可以开合的池门,所述净水池的池内设置有色块滤板,所述色块滤板的底部固定连接有连接架,所述连接架的底部固定安装有滚轮,所述色块滤板靠近池门的一端固定连接有拉手。Further, one side of the water purification pool is provided with a pool door that can be opened and closed, a color block filter plate is arranged in the pool of the water purification pool, and a connecting frame is fixedly connected to the bottom of the color block filter plate. A roller is fixedly installed at the bottom of the rack, and a handle is fixedly connected to one end of the color block filter plate close to the pool door.

进一步的,所述烘干输送链槽、冷却输送链槽和风扇固定架均为连续S型结构,且冷却输送链槽和风扇固定架的上下位置相对应。Further, the drying conveying chain groove, the cooling conveying chain groove and the fan fixing frame are all continuous S-shaped structures, and the upper and lower positions of the cooling conveying chain groove and the fan fixing frame are corresponding.

3.有益效果3. Beneficial effects

相比于现有技术,本发明的优点在于:Compared with the prior art, the advantages of the present invention are:

(1)本系统方案通过对瓶口插槽进行改进,在瓶口插槽内设置瓶口插柱,使玻璃瓶口可以受到内外双向支力,使其在输送加工过程中更加稳定,不易倾斜和摔倒,并且瓶口插柱上的橡胶圈可以增加与瓶口内侧的摩擦力,一方面起到保护瓶口不易被磨损的作用,另一方面也减小了瓶身脱离输送轨道的可能性,大大提高了加工的稳定性。(1) This system scheme improves the bottle mouth slot, and sets the bottle mouth plug in the bottle mouth slot, so that the glass bottle mouth can be supported by both internal and external forces, making it more stable during the conveying process and not easy to tilt and fall, and the rubber ring on the bottle mouth pin can increase the friction with the inside of the bottle mouth, on the one hand, it protects the bottle mouth from being worn out, and on the other hand, it also reduces the possibility of the bottle body falling off the conveying track. It greatly improves the stability of processing.

(2)本系统方案对除尘方面进行了改进,分为初除尘和精除尘两部分,初除尘通过电机带动转轴上的初除尘布转动来对瓶身进行初步的除尘,精除尘通过电机带动转轴上的精除尘毛刷转动来对瓶身进行更加精细的除尘处理,两次除尘可以大大减少瓶身上沾染的灰尘和杂质,提高了瓶身后续的喷漆上色的稳定性已经上色的质量。(2) The system scheme has improved the dust removal, which is divided into two parts: primary dust removal and fine dust removal. The primary dust removal is driven by the motor to drive the primary dust removal cloth on the rotating shaft to perform preliminary dust removal on the bottle body, and the fine dust removal is driven by the motor. The fine dust removal brush on the top rotates to perform more fine dust removal treatment on the bottle body. Two times of dust removal can greatly reduce the dust and impurities contaminated on the bottle body, and improve the stability of subsequent spray painting and coloring of the bottle body. The quality of the color.

(3)本系统方案对喷漆方面进行了改进,底漆和面漆均分为两部分,一部分是普通喷漆,另一部分是静电喷漆,可以在消除瓶身静电的同时,减少加工的成本,并且普通喷漆通过三个喷架对瓶身上中下三个位置进行喷涂,保证了喷涂的漆色均匀,而且喷架上的喷头位置方便调整,可以适应不同款式大小的玻璃瓶加工,免去了工厂加工不同的玻璃瓶需要更换设备的风险,节省了一定的成本。(3) This system scheme improves the spray painting. The primer and topcoat are divided into two parts, one part is ordinary spray paint, and the other part is electrostatic spray paint, which can eliminate the static electricity of the bottle and reduce the processing cost, and Ordinary spray paint sprays the middle and lower three positions on the bottle body through three spray racks, which ensures the sprayed paint color is uniform, and the position of the nozzles on the spray rack is easy to adjust, which can adapt to the processing of glass bottles of different styles and sizes, eliminating the need for factories Processing different glass bottles requires the risk of changing equipment, saving a certain cost.

(4)本系统方案对加工过程中的污水处理方案进行了改进,在底漆喷漆室和面漆喷漆室安装喷淋头,喷漆过程中产生的多余雾状漆溶于喷淋头喷下的水中,污水经过沉淀池沉淀,再通过循环池净化,最后通过全自动压滤机将水中的油漆杂质过滤,然后利用水泵再将过滤后的水输送到喷淋头上,实现了污水的循环利用,同时也对环境保护起到了一定的作用。(4) This system plan improves the sewage treatment plan in the process of processing, and installs sprinkler heads in the primer spray room and the top paint spray room, and the excess mist paint generated during the painting process dissolves in the spray sprayed by the spray head. In the water, the sewage is precipitated in the sedimentation tank, and then purified by the circulation tank. Finally, the paint impurities in the water are filtered by the automatic filter press, and then the filtered water is transported to the sprinkler head by the water pump, realizing the recycling of the sewage. , but also play a certain role in environmental protection.

附图说明Description of drawings

图1为本发明的系统图;1 is a system diagram of the present invention;

图2为本发明的上瓶台主视图;Fig. 2 is the front view of the bottle loading table of the present invention;

图3为本发明的上瓶台俯视图;Fig. 3 is the top view of the bottle loading table of the present invention;

图4为本发明的瓶口插槽结构示意图;Fig. 4 is the bottle mouth slot structure schematic diagram of the present invention;

图5为本发明的初除尘台主视图;Fig. 5 is the front view of the initial dust removal table of the present invention;

图6为本发明的初除尘台右视图;Fig. 6 is the right side view of the initial dust removal table of the present invention;

图7为本发明的图6中A部放大图;Fig. 7 is the enlarged view of A part in Fig. 6 of the present invention;

图8为本发明的精除尘台主视图;Fig. 8 is the front view of the fine dust removal table of the present invention;

图9为本发明的精除尘台右视图;Fig. 9 is the right side view of the fine dust removal table of the present invention;

图10为本发明的底漆喷涂室主视图;Figure 10 is a front view of a primer spray booth of the present invention;

图11为本发明的底漆喷涂室内部俯视图;Figure 11 is a top view of the interior of the primer spray chamber of the present invention;

图12为本发明的面漆喷涂室主视图;Fig. 12 is the front view of the paint spraying chamber of the present invention;

图13为本发明的面漆喷涂室内部俯视图;Figure 13 is a top view of the interior of the paint spraying chamber of the present invention;

图14为本发明的烘干室主视图;Fig. 14 is the front view of the drying chamber of the present invention;

图15为本发明的烘干输送链槽部结构示意图;Figure 15 is a schematic structural diagram of the drying conveyor chain groove part of the present invention;

图16为本发明的冷却室主视图;16 is a front view of the cooling chamber of the present invention;

图17为本发明的冷却输送链槽部结构示意图;Figure 17 is a schematic diagram of the structure of the cooling conveyor chain groove part of the present invention;

图18为本发明的风扇固定架部结构示意图;FIG. 18 is a schematic structural diagram of the fan fixing frame part of the present invention;

图19为本发明的压滤池内部结构示意图;Figure 19 is a schematic diagram of the internal structure of the filter press of the present invention;

图20为本发明的压滤池内部结构右视图。Figure 20 is a right side view of the internal structure of the filter press of the present invention.

图中标号说明:Description of the labels in the figure:

1、上瓶区;101、上瓶台;102、上瓶输送链槽;103、瓶架;1031、齿轮;1032、支柱;1033、瓶口插槽;1034、瓶口插柱;1035、橡胶圈;2、初除尘区;201、初除尘台;202、初除尘输送链槽;203、初除尘架;204、初除尘电机组;205、初除尘转轴;206、初除尘轴承;207、固定螺栓;208、固定螺母;209、初除尘布;210、气泵;211、固定柱;212、喷气管;213、连接管;3、精除尘室;301、精除尘台;302、精除尘输送链槽;303、精除尘架;304、精除尘电机组;305、精除尘转轴;306、精除尘轴承;307、精除尘毛刷;308、抽风机;309、集尘箱;310、抽尘管;4、预热室;5、底漆喷涂室;501、底漆台;502、底漆室输送链槽;503、底漆普通喷架;5031、第一立柱;5032、第一高度调节块;5033、第一高度固定栓;5034、第一夹块;5035、第一喷头连接杆;5036、第一连接杆固定栓;5037、第一铰接件;5038、底漆普通喷头;5039、第一进漆管;504、底漆静电喷架;5041、底漆静电喷头;505、底漆室喷淋头组;506、底漆室滤水池;507、底漆室水帘布条;6、第一缓冲室;7、面漆喷涂室;701、面漆台;702、面漆室输送链槽;703、面漆普通喷架;7031、第二立柱;7032、第二高度调节块;7033、第二高度固定栓;7034、第二夹块;7035、第二喷头连接杆;7036、第二连接杆固定块;7037、第二铰接件;7038、面漆普通喷头;7039、第二进漆管;704、面漆静电喷架;7041、面漆静电喷头;705、面漆室喷淋头组;706、面漆室滤水池;707、面漆室水帘布条;8、第二缓冲室;9、烘干室;901、烘干台;902、烘干输送链槽;903、制热电阻丝组;10、冷却室;1001、冷却台;1002、冷却输送链槽;1003、固定吊板;1004、风扇固定架;1005、冷却风扇组;11、底漆室出污水管;12、沉淀池;13、面漆室出污水管;14、第一水泵;15、循环池;16、第二水泵;17、净水池;1701、净水出口;1702、色块滤板;1703、连接架;1704、滚轮;1705、拉手;1706、池门;18、第三水泵;19、底漆室进水管;20、面漆室进水管;21、玻璃瓶输送链;22、全自动压滤机。1. Bottle loading area; 101, bottle loading table; 102, bottle loading chain groove; 103, bottle rack; 1031, gear; 1032, pillar; 1033, bottle mouth slot; 1034, bottle mouth post; 1035, rubber circle; 2. Primary dust removal area; 201, Primary dust removal table; 202, Primary dust removal conveyor chain slot; 203, Primary dust removal frame; 204, Primary dust removal motor unit; 205, Primary dust removal shaft; 206, Primary dust removal bearing; 207, Fixed Bolt; 208, fixed nut; 209, primary dust removal cloth; 210, air pump; 211, fixed column; 212, jet pipe; 213, connecting pipe; 3, fine dust removal room; 301, fine dust removal table; 302, fine dust removal conveyor chain slot; 303, fine dust removal rack; 304, fine dust removal motor unit; 305, fine dust removal shaft; 306, fine dust removal bearing; 307, fine dust removal brush; 308, exhaust fan; 309, dust collection box; 310, dust extraction pipe ;4, preheating room; 5, primer spraying room; 501, primer table; 502, primer room conveyor chain slot; 503, primer common spray rack; 5031, first column; 5032, first height adjustment block 5033, the first height fixing bolt; 5034, the first clamping block; 5035, the first nozzle connecting rod; 5036, the first connecting rod fixing bolt; 5037, the first hinge; A paint inlet pipe; 504, primer electrostatic spray frame; 5041, primer electrostatic spray head; 505, primer room spray head group; 506, primer room filter tank; 507, primer room water curtain strip; 6, the first 1. Buffer room; 7. Topcoat spraying room; 701, Topcoat table; 702, Topcoat room conveyor chain slot; 703, Topcoat common spray rack; 7031, Second column; 7032, Second height adjustment block; 7033, The second height fixing bolt; 7034, the second clamping block; 7035, the second nozzle connecting rod; 7036, the second connecting rod fixing block; 7037, the second hinge; Tube; 704, electrostatic spraying rack for topcoat; 7041, electrostatic spraying head for topcoating; 705, spraying head group for topcoating room; 706, filter tank for topcoating room; 707, water curtain strip for topcoating room; 8. Second buffer room 9. Drying room; 901. Drying table; 902. Drying conveyor chain slot; 903. Heating resistance wire group; 10. Cooling room; 1001. Cooling table; 1002. Cooling conveyor chain slot; Board; 1004, fan fixing frame; 1005, cooling fan group; 11, sewage pipe from primer room; 12, sedimentation tank; 13, sewage pipe from top paint room; 14, first water pump; 15, circulating pool; 16, 2nd water pump; 17, water purification pool; 1701, purified water outlet; 1702, color block filter plate; 1703, connecting frame; 1704, roller; 1705, handle; 1706, pool door; 18, third water pump; 19, bottom Paint room inlet pipe; 20, paint room inlet pipe; 21, glass bottle conveyor chain; 22, automatic filter press.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述;显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例,基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, not all of the embodiments. The embodiments of the present invention, and all other embodiments obtained by those of ordinary skill in the art without creative work, fall within the protection scope of the present invention.

在本发明的描述中,需要说明的是,术语“上”、“下”、“内”、“外”、“顶/底端”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present invention, it should be noted that the orientations or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "top/bottom", etc. are based on the orientations shown in the accompanying drawings Or the positional relationship is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed to indicate or imply relative importance.

在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“设置有”、“套设/接”、“连接”等,应做广义理解,例如“连接”,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should be noted that, unless otherwise expressly specified and limited, the terms "installation", "provided with", "sleeve/connection", "connection", etc., should be understood in a broad sense, such as " Connection", which can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be an internal connection between two components. of connectivity. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood in specific situations.

实施例一:Example 1:

请参阅图1-20,一种玻璃瓶喷漆上色系统,包括上瓶区1、初除尘区2、精除尘室3、预热室4、底漆喷涂室5、第一缓冲室6、面漆喷涂室7、第二缓冲室8、烘干室9和冷却室10,上瓶区1、初除尘区2、精除尘室3、预热室4、底漆喷涂室5、第一缓冲室6、面漆喷涂室7、第二缓冲室8、烘干室9和冷却室10之间通过用于输送玻璃瓶的玻璃瓶输送链21相连通,玻璃瓶输送链21为现有技术中常规的输送系统,本技术方案中未对其结构进行详细描述,玻璃瓶通过在玻璃瓶输送链21上移动,经过各个区室,完成上色加工的完整工艺;Please refer to Figure 1-20, a glass bottle spraying and coloring system, including bottle loading area 1, primary dust removal area 2, fine dust removal chamber 3, preheating chamber 4, primer spraying chamber 5, first buffer chamber 6, surface Paint spraying room 7, second buffer room 8, drying room 9 and cooling room 10, bottle loading area 1, primary dust removal area 2, fine dust removal room 3, preheating room 4, primer spraying room 5, first buffer room 6. The topcoat spraying chamber 7, the second buffer chamber 8, the drying chamber 9 and the cooling chamber 10 are connected through a glass bottle conveyor chain 21 for conveying glass bottles, and the glass bottle conveyor chain 21 is conventional in the prior art The conveying system is not described in detail in this technical solution. The glass bottle moves on the glass bottle conveying chain 21 and passes through each compartment to complete the complete process of coloring processing;

上瓶区1内设置有上瓶台101,上瓶台101的台顶部开设有用于玻璃瓶输送链21穿过的上瓶输送链槽102,玻璃瓶输送链21的链条顶部固定连接有用于放置玻璃瓶的瓶架103;The bottle loading area 1 is provided with a bottle loading table 101. The top of the bottle loading table 101 is provided with a bottle loading chain slot 102 for the glass bottle transport chain 21 to pass through. bottle holder 103 for glass bottles;

初除尘区2内设置有初除尘台201,初除尘台201的台顶部开设有用于玻璃瓶输送链21穿过的初除尘输送链槽202,初除尘台201的正上方固定安装有初除尘架203,初除尘架203的顶部安装有初除尘电机组204,初除尘电机组204的每个电机轴输出端均通过联轴器连接有初除尘转轴205,初除尘台201的顶部对应初除尘转轴205的位置均嵌有初除尘轴承206,且初除尘转轴205的下轴端与初除尘轴承206的内环固定连接,初除尘转轴205的轴体上通过固定螺栓207和固定螺母208固定连接有用于擦拭玻璃瓶的初除尘布209,固定螺栓207和固定螺母208方便对初除尘布209进行固定和拆卸,便于初除尘布209的更换;A primary dust removal table 201 is arranged in the primary dust removal area 2. The top of the primary dust removal table 201 is provided with a primary dust removal conveyor chain groove 202 for the glass bottle conveyor chain 21 to pass through. A primary dust removal rack is fixed directly above the primary dust removal table 201. 203, a preliminary dust removal motor unit 204 is installed on the top of the primary dust removal frame 203, and each motor shaft output end of the primary dust removal motor unit 204 is connected with a primary dust removal shaft 205 through a coupling, and the top of the primary dust removal table 201 corresponds to the primary dust removal shaft. The positions of 205 are embedded with primary dust removal bearings 206, and the lower shaft end of primary dust removal shaft 205 is fixedly connected with the inner ring of primary dust removal bearings 206. The shaft body of primary dust removal shaft 205 is fixedly connected by fixing bolts 207 and fixing nuts 208. For the initial dust cloth 209 for wiping glass bottles, the fixing bolts 207 and the fixing nuts 208 are convenient for fixing and disassembling the initial dust cloth 209, and it is convenient for the replacement of the initial dust cloth 209;

精除尘室3内设置有精除尘台301,精除尘台301的台顶部开设有用于玻璃瓶输送链21穿过的精除尘输送链槽302,精除尘台301的正上方固定安装有精除尘架303,精除尘架303的顶部安装有精除尘电机组304,精除尘电机组304的每个电机轴输出端均通过联轴器连接有精除尘转轴305,精除尘台301的顶部对应精除尘转轴305的位置均嵌有精除尘轴承306,且精除尘转轴305的下轴端与精除尘轴承306的内环固定连接,精除尘转轴305的轴体上固定连接有用于扫刷玻璃瓶的精除尘毛刷307;The fine dust removal chamber 3 is provided with a fine dust removal table 301 , the top of the fine dust removal table 301 is provided with a fine dust removal conveyor chain groove 302 for the glass bottle conveyor chain 21 to pass through, and a fine dust removal rack is fixed directly above the fine dust removal table 301 303, a fine dust removal motor unit 304 is installed on the top of the fine dust removal rack 303, each motor shaft output end of the fine dust removal motor unit 304 is connected with a fine dust removal shaft 305 through a coupling, and the top of the fine dust removal table 301 corresponds to the fine dust removal shaft The position of 305 is embedded with a fine dust removal bearing 306, and the lower shaft end of the fine dust removal shaft 305 is fixedly connected with the inner ring of the fine dust removal bearing 306, and the shaft body of the fine dust removal shaft 305 is fixedly connected with a fine dust removal for brushing glass bottles. brush 307;

底漆喷涂室5内设置有底漆台501,底漆台501的台顶部开设有用于玻璃瓶输送链21穿过的底漆室输送链槽502,底漆台501的台顶一侧等间距固定安装有三个底漆普通喷架503,底漆台501的台顶另一侧固定安装有底漆静电喷架504,底漆喷涂室5的顶部后侧固定安装有底漆室喷淋头组505,底漆喷涂室5的室内后侧开设有底漆室滤水池506;The primer spraying chamber 5 is provided with a primer table 501, the top of the primer table 501 is provided with a primer chamber conveyor chain groove 502 for the glass bottle conveyor chain 21 to pass through, and the top side of the primer table 501 is equally spaced. Three primer general spraying racks 503 are fixedly installed, the primer electrostatic spraying rack 504 is fixedly installed on the other side of the top of the primer table 501, and the primer room spray head group is fixedly installed on the top rear side of the primer spraying room 5 505, a primer room filter tank 506 is provided on the indoor rear side of the primer spraying room 5;

面漆喷涂室7内设置有面漆台701,面漆台701的台顶部开设有用于玻璃瓶输送链21穿过的面漆室输送链槽702,面漆台701的台顶一侧等间距固定安装有三个面漆普通喷架703,面漆台701的台顶另一侧固定安装有面漆静电喷架704,面漆喷涂室7的顶部后侧固定安装有面漆室喷淋头组705,面漆喷涂室7的室内后侧开设有面漆室滤水池706;The top paint spraying room 7 is provided with a top paint table 701, the top of the top paint table 701 is provided with a top paint room conveyor chain groove 702 for the glass bottle conveyor chain 21 to pass through, and the top side of the top paint table 701 is equally spaced on one side. Three topcoat common spraying racks 703 are fixedly installed, a topcoat electrostatic spraying rack 704 is fixedly installed on the other side of the top of the topcoating table 701, and a topcoating room shower head group is fixedly installed on the top rear side of the topcoat spraying room 7 705, the interior rear side of the topcoat spraying room 7 is provided with a topcoat room filter tank 706;

烘干室9内设置有烘干台901,烘干台901的台顶部开设有用于玻璃瓶输送链21穿过的烘干输送链槽902,烘干室9的室内顶部固定安装有用于加热室内温度的制热电阻丝组903,制热温度在100~150℃;The drying chamber 9 is provided with a drying table 901. The top of the drying table 901 is provided with a drying conveyor chain slot 902 for the glass bottle conveyor chain 21 to pass through. Temperature heating resistance wire group 903, the heating temperature is 100~150℃;

冷却室10内设置有冷却台1001,冷却台1001的台顶部开设有用于玻璃瓶输送链21穿过的冷却输送链槽1002,冷却室10的室内顶部固定安装有固定吊板1003,固定吊板1003的底部固定安装风扇固定架1004,风扇固定架1004的底部固定安装有冷却风扇组1005,冷却使用风扇模拟自然风吹玻璃瓶,避免出现瓶身爆裂;The cooling chamber 10 is provided with a cooling table 1001, the top of the cooling table 1001 is provided with a cooling conveyor chain slot 1002 for the glass bottle conveyor chain 21 to pass through, and a fixed hanging plate 1003 is fixedly installed on the indoor top of the cooling chamber 10. The fixed hanging plate A fan fixing frame 1004 is fixedly installed at the bottom of the 1003, and a cooling fan group 1005 is fixedly installed at the bottom of the fan fixing frame 1004. The cooling fan is used to simulate the natural wind blowing the glass bottle to avoid the bottle body bursting;

底漆室滤水池506的底部连接有底漆室出污水管11,面漆室滤水池706的底部连接有面漆室出污水管13,底漆室出污水管11和面漆室出污水管13的出口部连接有沉淀池12,沉淀池12的出水口部连接有第一水泵14,第一水泵14的输出端口连接有循环池15,循环池15的出水口部连接有第二水泵16,第二水泵16的输出端口连接有全自动压滤机22,全自动压滤机22的型号为XMA1/450,全自动压滤机22的正下方设置有净水池17,净水池17的底部开设有净水出口1701,净水出口1701的端部连接有第三水泵18,第三水泵18的输出端口连接有底漆室进水管19和面漆室进水管20,底漆室进水管19的出水端口与底漆室喷淋头组505相连通,面漆室进水管20的出水端口与面漆室喷淋头组705相连通,底漆喷涂室5的室内后侧顶部固定安装有底漆室水帘布条507,面漆喷涂室7的室内后侧顶部固定安装有面漆室水帘布条707,底漆室水帘布条507和面漆室水帘布条707可以增加空气中漆雾的附着效果,再通过底漆室喷淋头组505和面漆室喷淋头组705的冲刷,可以增加除漆雾效果。The bottom of the primer chamber filter tank 506 is connected with the primer chamber outlet sewage pipe 11, and the bottom of the finish paint chamber filter tank 706 is connected with the top paint chamber outlet sewage pipe 13, the primer chamber outlet sewage pipe 11 and the finish paint chamber outlet sewage pipe The outlet of 13 is connected with the sedimentation tank 12, the water outlet of the sedimentation tank 12 is connected with the first water pump 14, the output port of the first water pump 14 is connected with the circulating pool 15, and the water outlet of the circulating pool 15 is connected with the second water pump 16 , the output port of the second water pump 16 is connected with an automatic filter press 22, the model of the automatic filter press 22 is XMA1/450, and a water purification tank 17 is arranged directly below the automatic filter press 22, and the water purification tank 17 There is a water purification outlet 1701 at the bottom of the bottom, and the end of the water purification outlet 1701 is connected with the third water pump 18. The output port of the third water pump 18 is connected with the primer chamber water inlet pipe 19 and the finish paint chamber water inlet pipe 20, and the primer chamber inlet pipe The water outlet port of the water pipe 19 is communicated with the primer chamber sprinkler head group 505, the water outlet port of the finish paint chamber water inlet pipe 20 is communicated with the finish paint chamber shower head group 705, and the top of the indoor rear side of the primer spray chamber 5 is fixedly installed. There is a primer room water curtain strip 507, the top of the interior rear side of the top paint spraying room 7 is fixedly installed with a top paint room water curtain strip 707, the primer room water curtain strip 507 and the top paint room water curtain strip 707 can increase the air paint The adhesion effect of the fog can be increased by the scouring of the spray head group 505 in the primer room and the spray head group 705 in the finish paint room to increase the effect of removing paint mist.

实施例二:Embodiment 2:

请参阅图2-4,为了增加瓶身的稳定效果,对瓶架103进行改进,瓶架103包括固定于玻璃瓶输送链21上的齿轮1031,齿轮1031用于玻璃瓶输送链21和输送电机配合实现玻璃瓶输送链21的移动,此为现有技术常规方案,齿轮1031的顶部固定连接有支柱1032,支柱1032的顶部固定连接有瓶口插槽1033,瓶口插槽1033的内部固定连接有瓶口插柱1034,瓶口插柱1034的柱体上套有橡胶圈1035;在瓶口插槽1033内设置瓶口插柱1034,使玻璃瓶口可以受到内外双向支力,使其在输送加工过程中更加稳定,不易倾斜和摔倒,并且瓶口插柱1034上的橡胶圈1035可以增加与瓶口内侧的摩擦力,一方面起到保护瓶口不易被磨损的作用,另一方面也减小了瓶身脱离输送轨道的可能性,大大提高了加工的稳定性。2-4, in order to increase the stabilization effect of the bottle body, the bottle rack 103 is improved. The bottle rack 103 includes a gear 1031 fixed on the glass bottle conveying chain 21, and the gear 1031 is used for the glass bottle conveying chain 21 and the conveying motor. The movement of the glass bottle conveying chain 21 is realized by cooperation, which is a conventional solution in the prior art. The top of the gear 1031 is fixedly connected with a pillar 1032, the top of the pillar 1032 is fixedly connected with a bottle mouth slot 1033, and the inside of the bottle mouth slot 1033 is fixedly connected There is a bottle opening post 1034, and the cylinder body of the bottle opening post 1034 is covered with a rubber ring 1035; a bottle opening post 1034 is arranged in the bottle opening slot 1033, so that the glass bottle opening can be supported by internal and external bidirectional force, so that it can be It is more stable during the conveying process, and it is not easy to tilt and fall, and the rubber ring 1035 on the bottle opening post 1034 can increase the friction force with the inside of the bottle opening, on the one hand, it protects the bottle opening from being worn away, on the other hand. It also reduces the possibility that the bottle body is separated from the conveying track, and greatly improves the stability of processing.

请参阅图5-7,为了增加初除尘效率,在初除尘架203的顶部一侧安装有气泵210,初除尘台201的一侧顶部固定连接有固定柱211,固定柱211靠近玻璃瓶输送链21的一侧固定连接有喷气管212,喷气管212的进气口通过连接管213与气泵210的出气口相连通;出气口对瓶口进行吹气,去除大颗粒杂质,增加除尘效率。Referring to Fig. 5-7, in order to increase the efficiency of primary dust removal, an air pump 210 is installed on the top side of the primary dust removal rack 203, and a fixed column 211 is fixedly connected to the top of one side of the primary dust removal table 201. The fixed column 211 is close to the glass bottle conveyor chain One side of 21 is fixedly connected with an air jet pipe 212, and the air inlet of the air jet pipe 212 is connected with the air outlet of the air pump 210 through a connecting pipe 213;

请参阅图8-9,精除尘架303的架体顶部左右两侧均安装有抽风机308和集尘箱309,抽风机308的出风口通过抽尘管310与集尘箱309相连通;抽风机308持续抽取室内灰尘,避免灰尘积累造成后续玻璃瓶污染,增加除尘效率,工作人员定期清理集尘箱309。Please refer to Fig. 8-9, the top left and right sides of the frame body of the fine dust removal rack 303 are installed with an exhaust fan 308 and a dust collection box 309, and the air outlet of the exhaust fan 308 is communicated with the dust collection box 309 through a dust extraction pipe 310; The machine 308 continuously extracts indoor dust to avoid subsequent contamination of glass bottles caused by dust accumulation and increase the dust removal efficiency. The staff regularly cleans the dust collection box 309.

实施例三:Embodiment three:

请参阅图10-13,为了增加喷漆效率,底漆普通喷架503包括固定于底漆台501上的第一立柱5031,第一立柱5031的柱体上套有第一高度调节块5032,第一高度调节块5032的块体上螺纹连接有用于固定第一高度调节块5032位置的第一高度固定栓5033,第一高度调节块5032的一侧固定连接有第一夹块5034,第一夹块5034的内部夹持有第一喷头连接杆5035,第一夹块5034的顶部螺纹连接用于固定第一喷头连接杆5035的第一连接杆固定栓5036,第一喷头连接杆5035靠近玻璃瓶输送链21的一端通过第一铰接件5037铰接有底漆普通喷头5038,底漆静电喷架504的结构与底漆普通喷架503的结构相同,且底漆静电喷架504上夹持的是底漆静电喷头5041,底漆普通喷头5038和底漆静电喷头5041上均连接有用于与喷漆机连接的第一进漆管5039,面漆普通喷架703包括固定于面漆台701上的第二立柱7031,第二立柱7031的柱体上套有第二高度调节块7032,第二高度调节块7032的块体上螺纹连接有用于固定第二高度调节块7032位置的第二高度固定栓7033,第二高度调节块7032的一侧固定连接有第二夹块7034,第二夹块7034的内部夹持有第二喷头连接杆7035,第二夹块7034的顶部螺纹连接用于固定第二喷头连接杆7035的第二连接杆固定块7036,第二喷头连接杆7035靠近玻璃瓶输送链21的一端通过第二铰接件7037铰接有面漆普通喷头7038,面漆静电喷架704的结构与面漆普通喷架703的结构相同,且面漆静电喷架704上夹持的是面漆静电喷头7041,面漆普通喷头7038和面漆静电喷头7041上均连接有用于与喷漆机连接的第二进漆管7039;底漆和面漆均分为两部分,一部分是普通喷漆,另一部分是静电喷漆,可以在消除瓶身静电的同时,减少加工的成本,并且普通喷漆通过三个喷架对瓶身上中下三个位置进行喷涂,保证了喷涂的漆色均匀,而且喷架上的喷头位置方便调整,可以适应不同款式大小的玻璃瓶加工,免去了工厂加工不同的玻璃瓶需要更换设备的风险,节省了一定的成本。Please refer to FIGS. 10-13 , in order to increase the painting efficiency, the common primer spraying frame 503 includes a first column 5031 fixed on the primer table 501 , and a first height adjustment block 5032 is sleeved on the column of the first column 5031 . A first height fixing bolt 5033 for fixing the position of the first height adjusting block 5032 is threadedly connected to the block body of a height adjusting block 5032, and a first clamping block 5034 is fixedly connected to one side of the first height adjusting block 5032. The first clamp A first nozzle connecting rod 5035 is clamped inside the block 5034, and the top of the first clamping block 5034 is threadedly connected to a first connecting rod fixing bolt 5036 for fixing the first nozzle connecting rod 5035, and the first nozzle connecting rod 5035 is close to the glass bottle One end of the conveyor chain 21 is hinged with a primer ordinary spray head 5038 through a first hinge 5037. The structure of the primer electrostatic spray rack 504 is the same as that of the primer ordinary spray rack 503, and the primer electrostatic spray rack 504 is clamped. The primer electrostatic spray head 5041, the primer common spray head 5038 and the primer electrostatic spray head 5041 are all connected with a first paint inlet pipe 5039 for connecting with the paint sprayer. Two uprights 7031, a second height adjusting block 7032 is sleeved on the cylinder of the second upright 7031, and a second height fixing bolt 7033 for fixing the position of the second height adjusting block 7032 is threadedly connected to the block of the second height adjusting block 7032 , a second clamping block 7034 is fixedly connected to one side of the second height adjusting block 7032, the second clamping block 7034 is clamped with a second nozzle connecting rod 7035 inside, and the top of the second clamping block 7034 is threaded for fixing the second The second connecting rod fixing block 7036 of the spray head connecting rod 7035, the end of the second spray head connecting rod 7035 close to the glass bottle conveying chain 21 is hinged with the top paint ordinary spray head 7038 through the second hinge 7037, and the structure of the top paint electrostatic spray frame 704 is the same as The topcoat common spraying rack 703 has the same structure, and the topcoat electrostatic spraying rack 704 clamps the topcoat electrostatic spraying head 7041. The topcoat common spraying head 7038 and the topcoat electrostatic spraying head 7041 are connected with the first paint sprayer. Two-inlet paint pipe 7039; the primer and topcoat are divided into two parts, one part is ordinary spray paint, and the other part is electrostatic spray paint, which can eliminate the static electricity of the bottle and reduce the processing cost, and the ordinary spray paint passes through three spray racks The spraying is carried out on the middle and lower three positions on the bottle body to ensure the uniform paint color, and the position of the spray head on the spray rack is easy to adjust, which can adapt to the processing of glass bottles of different styles and sizes, eliminating the need to replace different glass bottles processed by the factory. Risk of equipment, saving a certain cost.

请参阅15、17和18,为了增加烘干和冷却效率,烘干输送链槽902、冷却输送链槽1002和风扇固定架1004均为连续S型结构,且冷却输送链槽1002和风扇固定架1004的上下位置相对应;连续S型结构可以节省室内空间,使玻璃瓶在有限的空间内烘干或者冷却更长的时间,增加加工效率。Please refer to 15, 17 and 18, in order to increase the drying and cooling efficiency, the drying conveyor chain slot 902, the cooling conveyor chain slot 1002 and the fan fixing frame 1004 are all continuous S-shaped structures, and the cooling conveying chain slot 1002 and the fan fixing frame are all continuous S-shaped structures. The upper and lower positions of 1004 correspond; the continuous S-shaped structure can save indoor space, make the glass bottle dry or cool in a limited space for a longer time, and increase the processing efficiency.

请参阅图19-20,为了方便工作人员处理全自动压滤机22产生的色块,净水池17的一侧开设有可以开合的池门1706,净水池17的池内设置有色块滤板1702,色块滤板1702的底部固定连接有连接架1703,连接架1703的底部固定安装有滚轮1704,色块滤板1702靠近池门1706的一端固定连接有拉手1705;色块掉落在色块滤板1702上后,打开池门1706既可以在滚轮1704的作用下将色块滤板1702拉出,方便省力。19-20, in order to facilitate the staff to handle the color blocks generated by the automatic filter press 22, a pool door 1706 that can be opened and closed is opened on one side of the water purification tank 17, and a color block filter is arranged in the pool of the water purification tank 17. Plate 1702, the bottom of the color block filter plate 1702 is fixedly connected with a connecting frame 1703, the bottom of the connecting frame 1703 is fixedly installed with a roller 1704, and one end of the color block filter plate 1702 close to the pool door 1706 is fixedly connected with a handle 1705; After the color block filter plate 1702 is installed, opening the pool door 1706 can pull out the color block filter plate 1702 under the action of the roller 1704, which is convenient and labor-saving.

原理及优点:工作人员在上瓶区1将玻璃瓶口倒插于瓶口插槽1033内的瓶口插柱1034进行瓶身固定,玻璃瓶随着玻璃瓶输送链21的移动进入初除尘区2,初除尘电机组204带动初除尘转轴205上的初除尘布209对玻璃瓶进行初步除尘,然后玻璃瓶进入精除尘室3,精除尘电机组304带动精除尘转轴305上的精除尘毛刷307对玻璃瓶进行精细除尘,进行了两次除尘的玻璃瓶进入预热室4进行预热,预热后的瓶身可以增加油漆的附着力,增加喷漆的喷涂效果,进入底漆喷漆室后,三组底漆普通喷架503事先调整好底漆普通喷头5038的喷涂位置,对瓶身的上中下三个不同的位置进行喷漆处理,然后再经过底漆静电喷架504上的底漆静电喷头5041喷漆,完成底漆喷涂,经过第一缓冲室6后进入面漆喷涂室7,与底漆喷漆室的工作步骤相同,对瓶身进行面漆喷涂,完成面漆喷涂之后玻璃瓶进入第二缓冲室8,然后进入烘干室9,制热电阻丝组903进行加热对瓶身进行油漆烘干处理,瓶身上的油漆烘干之后进入到冷却室10,冷却风扇组1005进行吹风,使得瓶身的温度下降,从而使瓶身上的油漆加速固化,牢牢地附着在瓶身上,玻璃瓶从冷却室10输送出之后工作人员即可包装处理;在喷漆过程中,底漆喷涂室5和面漆喷涂室7产生的污水会经过沉淀池12沉淀,通过第一水泵14将污水抽取到循环池15内进一步沉淀净化,然后通过第二水泵16将污水抽取到全自动压滤机22内进行压滤,全自动压滤机22将水中的油漆杂质过滤,然后利用第三水泵18再将过滤后的水输送到底漆室喷淋头组505和面漆室喷淋头组705上,实现了污水的循环利用。Principle and advantages: In the bottle loading area 1, the staff inserts the glass bottle mouth into the bottle mouth pin 1034 in the bottle mouth slot 1033 to fix the bottle body, and the glass bottle enters the primary dust removal area with the movement of the glass bottle conveyor chain 21 2. The primary dust removal motor unit 204 drives the primary dust removal cloth 209 on the primary dust removal shaft 205 to perform preliminary dust removal on the glass bottle, and then the glass bottle enters the fine dust removal chamber 3. The fine dust removal motor unit 304 drives the fine dust removal brush on the fine dust removal shaft 305 307 finely dusts the glass bottles. The glass bottles that have been dedusted twice enter the preheating chamber 4 for preheating. The preheated bottle body can increase the adhesion of the paint and increase the spraying effect of the spray paint. After entering the primer spray booth , the three groups of primer ordinary spray racks 503 have adjusted the spraying positions of the primer ordinary spray heads 5038 in advance, and spray paint on three different positions of the upper, middle and lower parts of the bottle body, and then pass the primer on the primer electrostatic spray rack 504. The electrostatic spray head 5041 sprays paint, completes the primer spraying, and enters the topcoat spraying room 7 after passing through the first buffer chamber 6. The working steps are the same as the primer spraying room. The bottle body is sprayed with topcoat, and after the topcoat is sprayed, the glass bottle enters The second buffer chamber 8 enters the drying chamber 9, and the heating resistance wire group 903 heats the bottle body to perform paint drying treatment. After the paint on the bottle body is dried, it enters the cooling chamber 10, and the cooling fan group 1005 blows air. The temperature of the bottle body is lowered, so that the paint on the bottle body is accelerated to solidify, and is firmly attached to the bottle body. After the glass bottle is transported from the cooling chamber 10, the staff can pack it; during the painting process, the primer spraying chamber 5 The sewage generated by the paint spraying room 7 will be deposited in the sedimentation tank 12, the sewage will be pumped into the circulation tank 15 by the first water pump 14 for further sedimentation and purification, and then the sewage will be pumped into the automatic filter press 22 through the second water pump 16. Carry out pressure filtration, the automatic filter press 22 filters the paint impurities in the water, and then uses the third water pump 18 to send the filtered water to the primer room sprinkler head group 505 and the top paint room sprinkler head group 705, The recycling of sewage is realized.

以上所述,仅为本发明较佳的具体实施方式;但本发明的保护范围并不局限于此。任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其改进构思加以等同替换或改变,都应涵盖在本发明的保护范围内。The above description is only a preferred embodiment of the present invention; however, the protection scope of the present invention is not limited thereto. Any person skilled in the art who is familiar with the technical scope of the present invention, according to the technical solution of the present invention and its improvement concept, equivalently replaces or changes, should be covered within the protection scope of the present invention.

Claims (9)

1. The utility model provides a glass bottle system of coloring that sprays paint, includes bottle district (1), first dust removal district (2), fine dust removal room (3), preheating chamber (4), priming paint spray booth (5), first buffer room (6), finish paint spray booth (7), second buffer room (8), drying chamber (9) and cooling chamber (10), its characterized in that: the upper bottle area (1), the primary dust removal area (2), the fine dust removal chamber (3), the preheating chamber (4), the primer spraying chamber (5), the first buffer chamber (6), the finish spraying chamber (7), the second buffer chamber (8), the drying chamber (9) and the cooling chamber (10) are communicated through a glass bottle conveying chain (21) for conveying glass bottles;
an upper bottle table (101) is arranged in the upper bottle area (1), an upper bottle conveying chain groove (102) for a glass bottle conveying chain (21) to pass through is formed in the top of the upper bottle table (101), and a bottle rack (103) for placing glass bottles is fixedly connected to the top of the chain of the glass bottle conveying chain (21);
a primary dust removing table (201) is arranged in the primary dust removing area (2), a primary dust removing conveying chain groove (202) for a glass bottle conveying chain (21) to pass through is formed in the top of the primary dust removing table (201), a primary dust removal frame (203) is fixedly arranged right above the primary dust removal table (201), a primary dust removal motor set (204) is arranged at the top of the primary dust removal frame (203), the output end of each motor shaft of the primary dust removal motor set (204) is connected with a primary dust removal rotating shaft (205) through a coupler, a primary dust removal bearing (206) is embedded at the position of the top of the primary dust removal platform (201) corresponding to the primary dust removal rotating shaft (205), the lower shaft end of the primary dedusting rotating shaft (205) is fixedly connected with the inner ring of the primary dedusting bearing (206), a shaft body of the primary dust removal rotating shaft (205) is fixedly connected with primary dust removal cloth (209) for wiping the glass bottle through a fixing bolt (207) and a fixing nut (208);
the glass bottle cleaning machine is characterized in that a fine dust removing table (301) is arranged in the fine dust removing chamber (3), a fine dust removing conveying chain groove (302) for a glass bottle conveying chain (21) to pass through is formed in the table top of the fine dust removing table (301), a fine dust removing frame (303) is fixedly installed right above the fine dust removing table (301), a fine dust removing motor set (304) is installed at the top of the fine dust removing frame (303), each motor shaft output end of the fine dust removing motor set (304) is connected with a fine dust removing rotating shaft (305) through a coupler, fine dust removing bearings (306) are embedded in positions, corresponding to the fine dust removing rotating shafts (305), of the top of the fine dust removing table (301), lower shaft ends of the fine dust removing rotating shafts (305) are fixedly connected with inner rings of the fine dust removing bearings (306), and fine dust removing brushes (307) for brushing glass bottles are fixedly connected to shaft bodies of the fine dust removing rotating shafts (305);
a primer platform (501) is arranged in the primer spraying chamber (5), a primer chamber conveying chain groove (502) for a glass bottle conveying chain (21) to pass through is formed in the top of the primer platform (501), three primer common spraying frames (503) are fixedly installed on one side of the top of the primer platform (501) at equal intervals, a primer electrostatic spraying frame (504) is fixedly installed on the other side of the top of the primer platform (501), a primer chamber spraying head group (505) is fixedly installed on the rear side of the top of the primer spraying chamber (5), and a primer chamber water filtering pool (506) is arranged on the indoor rear side of the primer spraying chamber (5);
a finish paint platform (701) is arranged in the finish paint spraying chamber (7), a finish paint chamber conveying chain groove (702) for a glass bottle conveying chain (21) to penetrate through is formed in the top of the finish paint platform (701), three finish paint common spraying frames (703) are fixedly installed on one side of the top of the finish paint platform (701) at equal intervals, a finish paint electrostatic spraying frame (704) is fixedly installed on the other side of the top of the finish paint platform (701), a finish paint chamber spraying head group (705) is fixedly installed on the rear side of the top of the finish paint spraying chamber (7), and a finish paint chamber water filtering pool (706) is formed in the indoor rear side of the finish paint spraying chamber (7);
a drying table (901) is arranged in the drying chamber (9), a drying conveying chain groove (902) for a glass bottle conveying chain (21) to pass through is formed in the top of the drying table (901), and a heating resistance wire set (903) for heating the indoor temperature is fixedly mounted at the indoor top of the drying chamber (9);
a cooling table (1001) is arranged in the cooling chamber (10), a cooling conveying chain groove (1002) for a glass bottle conveying chain (21) to pass through is formed in the top of the cooling table (1001), a fixed hanging plate (1003) is fixedly installed at the indoor top of the cooling chamber (10), a fan fixing frame (1004) is fixedly installed at the bottom of the fixed hanging plate (1003), and a cooling fan group (1005) is fixedly installed at the bottom of the fan fixing frame (1004);
the bottom of the priming paint chamber water filtering pool (506) is connected with a priming paint chamber sewage outlet pipe (11), the bottom of the finishing paint chamber water filtering pool (706) is connected with a finishing paint chamber sewage outlet pipe (13), the outlet parts of the priming paint chamber sewage outlet pipe (11) and the finishing paint chamber sewage outlet pipe (13) are connected with a sedimentation pool (12), the water outlet part of the sedimentation pool (12) is connected with a first water pump (14), the output port of the first water pump (14) is connected with a circulating pool (15), the water outlet part of the circulating pool (15) is connected with a second water pump (16), the output port of the second water pump (16) is connected with a full-automatic filter press (22), a water purifying pool (17) is arranged under the full-automatic filter press (22), the bottom of the water purifying pool (17) is provided with a water purifying outlet (1701), and the end part of the water purifying outlet (1701) is connected with a third water pump (18), an output port of the third water pump (18) is connected with a primer chamber water inlet pipe (19) and a finish chamber water inlet pipe (20), a water outlet port of the primer chamber water inlet pipe (19) is communicated with a primer chamber spray head group (505), and a water outlet port of the finish chamber water inlet pipe (20) is communicated with a finish chamber spray head group (705).
2. The paint spraying and coloring system for glass bottles of claim 1, wherein: the bottle rack (103) comprises a gear (1031) fixed on a glass bottle conveying chain (21), the top of the gear (1031) is fixedly connected with a support pillar (1032), the top of the support pillar (1032) is fixedly connected with a bottle opening insertion slot (1033), the inside of the bottle opening insertion slot (1033) is fixedly connected with a bottle opening insertion column (1034), and a rubber ring (1035) is sleeved on a column body of the bottle opening insertion column (1034).
3. The paint spraying and coloring system for glass bottles of claim 1, wherein: an air pump (210) is installed on one side of the top of the primary dust removal frame (203), a fixing column (211) is fixedly connected to the top of one side of the primary dust removal table (201), an air injection pipe (212) is fixedly connected to one side, close to the glass bottle conveying chain (21), of the fixing column (211), and an air inlet of the air injection pipe (212) is communicated with an air outlet of the air pump (210) through a connecting pipe (213).
4. The paint spraying and coloring system for glass bottles of claim 1, wherein: an exhaust fan (308) and a dust collection box (309) are installed on the left side and the right side of the top of the fine dust removal frame (303), and an air outlet of the exhaust fan (308) is communicated with the dust collection box (309) through a dust extraction pipe (310).
5. The paint spraying and coloring system for glass bottles of claim 1, wherein: the common primer spraying frame (503) comprises a first upright post (5031) fixed on a primer platform (501), a first height adjusting block (5032) is sleeved on a post body of the first upright post (5031), a first height fixing bolt (5033) used for fixing the position of the first height adjusting block (5032) is connected onto a block body of the first height adjusting block (5032) in a threaded manner, a first clamping block (5034) is fixedly connected to one side of the first height adjusting block (5032), a first nozzle connecting rod (5035) is clamped inside the first clamping block (5034), a first connecting rod fixing bolt (5036) used for fixing a first nozzle connecting rod (5035) is connected to the top of the first clamping block (5034) in a threaded manner, one end, close to a glass bottle conveying chain (21), of the first nozzle connecting rod (5035) is hinged to a common primer spraying head (5038) through a first hinge joint piece (5037), and the structure of the electrostatic primer spraying frame (504) is the same as that of the common primer spraying frame (503), and a primer electrostatic spray head (5041) is clamped on the primer electrostatic spray frame (504), and a first paint inlet pipe (5039) used for being connected with a paint spraying machine is connected to both the primer common spray head (5038) and the primer electrostatic spray head (5041).
6. The paint spraying and coloring system for glass bottles of claim 1, wherein: the common finish paint spraying frame (703) comprises a second upright post (7031) fixed on a finish paint platform (701), a second height adjusting block (7032) is sleeved on a column body of the second upright post (7031), a second height fixing bolt (7033) used for fixing the position of the second height adjusting block (7032) is connected onto a block body of the second height adjusting block (7032) in a threaded manner, a second clamping block (7034) is fixedly connected onto one side of the second height adjusting block (7032), a second sprayer connecting rod (7035) is clamped inside the second clamping block (7034), the top of the second clamping block (7034) is connected with a second connecting rod fixing block (7036) used for fixing a second sprayer connecting rod (7035) in a threaded manner, one end, close to the glass bottle conveying chain (21), of the second sprayer connecting rod (7035) is hinged to a common sprayer (7038) through a second finish paint hinge, and the structure of the common finish paint spraying frame (704) is the same as that of the common finish paint spraying frame (703), and a finish paint electrostatic spray head (7041) is clamped on the finish paint electrostatic spray frame (704), and a second paint inlet pipe (7039) used for being connected with a paint spraying machine is connected to both the finish paint common spray head (7038) and the finish paint electrostatic spray head (7041).
7. The paint spraying and coloring system for glass bottles of claim 1, wherein: and a primer chamber water curtain cloth strip (507) is fixedly installed at the top of the indoor rear side of the primer spraying chamber (5), and a finish chamber water curtain cloth strip (707) is fixedly installed at the top of the indoor rear side of the finish spraying chamber (7).
8. The paint spraying and coloring system for glass bottles of claim 1, wherein: the pond door (1706) that can open and shut is seted up to one side of clean water reservoir (17), be provided with color lump filter plate (1702) in the pond of clean water reservoir (17), the bottom fixedly connected with link (1703) of color lump filter plate (1702), the bottom fixed mounting of link (1703) has gyro wheel (1704), one end fixedly connected with handle (1705) that color lump filter plate (1702) are close to pond door (1706).
9. The paint spraying and coloring system for glass bottles of claim 1, wherein: the drying conveying chain groove (902), the cooling conveying chain groove (1002) and the fan fixing frame (1004) are of a continuous S-shaped structure, and the upper and lower positions of the cooling conveying chain groove (1002) and the fan fixing frame (1004) correspond to each other.
CN202210766059.6A 2022-06-30 2022-06-30 A glass bottle spray paint coloring system Pending CN115055303A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210766059.6A CN115055303A (en) 2022-06-30 2022-06-30 A glass bottle spray paint coloring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210766059.6A CN115055303A (en) 2022-06-30 2022-06-30 A glass bottle spray paint coloring system

Publications (1)

Publication Number Publication Date
CN115055303A true CN115055303A (en) 2022-09-16

Family

ID=83204686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210766059.6A Pending CN115055303A (en) 2022-06-30 2022-06-30 A glass bottle spray paint coloring system

Country Status (1)

Country Link
CN (1) CN115055303A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116422511A (en) * 2023-04-21 2023-07-14 昆山市曙光照明器材有限公司 A glassware coloring device

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4098932A (en) * 1975-05-22 1978-07-04 Indian Head Inc. Ultra high speed bottle coating process
CN103182353A (en) * 2011-12-27 2013-07-03 苏州互友工业设备有限公司 Automatic reciprocation painting line
CN206215437U (en) * 2016-06-27 2017-06-06 重庆市欣荣城机电有限公司 A kind of compact intelligent painting line
CN107470073A (en) * 2017-08-24 2017-12-15 太仓市众翔精密五金有限公司 The UV painting lines and its technique of a kind of environment-friendly high-efficiency
CN208643078U (en) * 2018-07-06 2019-03-26 盐城金龙达机械制造有限公司 A kind of multifunctional spraying japanning room
CN209255064U (en) * 2018-12-06 2019-08-16 杭州雅妍化妆品有限公司 A kind of rotation type bottle body cleaning spray equipment
CN112427205A (en) * 2020-11-20 2021-03-02 杭州富阳永恒涂装有限公司 Spraying production line of cosmetic bottle
CN213670122U (en) * 2020-10-16 2021-07-13 青岛铃诚妆器有限公司 Bottle spraying device
CN214440348U (en) * 2020-11-17 2021-10-22 重庆市川渝玻陶包装股份有限公司 Glass bottle paint spraying system
CN216137646U (en) * 2021-08-12 2022-03-29 吉永梅 Gravel rapid impurity filtering device for constructional engineering
CN217550184U (en) * 2022-06-30 2022-10-11 蚌埠市鑫众玻璃科技有限公司 Glass bottle paint spraying and coloring system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4098932A (en) * 1975-05-22 1978-07-04 Indian Head Inc. Ultra high speed bottle coating process
CN103182353A (en) * 2011-12-27 2013-07-03 苏州互友工业设备有限公司 Automatic reciprocation painting line
CN206215437U (en) * 2016-06-27 2017-06-06 重庆市欣荣城机电有限公司 A kind of compact intelligent painting line
CN107470073A (en) * 2017-08-24 2017-12-15 太仓市众翔精密五金有限公司 The UV painting lines and its technique of a kind of environment-friendly high-efficiency
CN208643078U (en) * 2018-07-06 2019-03-26 盐城金龙达机械制造有限公司 A kind of multifunctional spraying japanning room
CN209255064U (en) * 2018-12-06 2019-08-16 杭州雅妍化妆品有限公司 A kind of rotation type bottle body cleaning spray equipment
CN213670122U (en) * 2020-10-16 2021-07-13 青岛铃诚妆器有限公司 Bottle spraying device
CN214440348U (en) * 2020-11-17 2021-10-22 重庆市川渝玻陶包装股份有限公司 Glass bottle paint spraying system
CN112427205A (en) * 2020-11-20 2021-03-02 杭州富阳永恒涂装有限公司 Spraying production line of cosmetic bottle
CN216137646U (en) * 2021-08-12 2022-03-29 吉永梅 Gravel rapid impurity filtering device for constructional engineering
CN217550184U (en) * 2022-06-30 2022-10-11 蚌埠市鑫众玻璃科技有限公司 Glass bottle paint spraying and coloring system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116422511A (en) * 2023-04-21 2023-07-14 昆山市曙光照明器材有限公司 A glassware coloring device

Similar Documents

Publication Publication Date Title
CN113680576B (en) Double-sided paint spraying device for furniture board processing
CN109261416A (en) A kind of spray-painting plant of dedusting drying all-in-one structure
CN208865855U (en) A kind of fire resistant doorsets spray painting drying unit
CN112439620B (en) Environment-friendly spraying device and using method thereof
CN208786765U (en) Spray-painting plant is used in a kind of production of auto parts and components
CN204868419U (en) Edging and dust pelletizing system that building ceramic tile spouts seal, stoving, edger unit
CN109604229A (en) Sheet metal component production technology and its dust pelletizing system
CN115055303A (en) A glass bottle spray paint coloring system
CN217550184U (en) Glass bottle paint spraying and coloring system
CN113304571A (en) Dust removal machine for producing dust
CN112310247A (en) A kind of silicon material processing equipment for solar panel manufacturing
CN111876818A (en) High-precision gear tooth surface galvanizing equipment and galvanizing method thereof
CN203842899U (en) Rotary wind dry cleaning machine for filtering tubes
CN113996478A (en) High-purity gas steel cylinder rust-proof treatment device
CN221537566U (en) Toughened glass processing is with wasing drying device
CN113714013A (en) Cylinder liner paint spraying apparatus is used in pneumatic cylinder processing of environmental protection
CN221161458U (en) Plastic conduit cooling mechanism
CN221141883U (en) Steel plate surface cleaning equipment
CN220530683U (en) Self-cleaning spray dryer
CN217450712U (en) Spraying device with drying function
CN213378142U (en) Rubber roll cleaning device of paperboard laminating machine
CN213529354U (en) Quick coating drying machine is used in protection film production
CN212703199U (en) Glass apron is substrate surface dust collector for coating film
CN210816616U (en) Full-automatic glass bottle ash removal device
CN211990018U (en) Spectacle frame cleaning device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination