CN115013057A - Novel coal mine airtight wall capable of being constructed quickly and construction process thereof - Google Patents

Novel coal mine airtight wall capable of being constructed quickly and construction process thereof Download PDF

Info

Publication number
CN115013057A
CN115013057A CN202210330103.9A CN202210330103A CN115013057A CN 115013057 A CN115013057 A CN 115013057A CN 202210330103 A CN202210330103 A CN 202210330103A CN 115013057 A CN115013057 A CN 115013057A
Authority
CN
China
Prior art keywords
wall
roadway
coal mine
eps
eps module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210330103.9A
Other languages
Chinese (zh)
Other versions
CN115013057B (en
Inventor
赵伟
董虎子
王凯
王龙
臧杰
苏明清
郭阳阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN202210330103.9A priority Critical patent/CN115013057B/en
Publication of CN115013057A publication Critical patent/CN115013057A/en
Application granted granted Critical
Publication of CN115013057B publication Critical patent/CN115013057B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F11/00Rescue devices or other safety devices, e.g. safety chambers or escape ways
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/90Passive houses; Double facade technology

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Emergency Management (AREA)
  • Pulmonology (AREA)
  • Building Environments (AREA)

Abstract

本发明公开了一种快速构筑的新型煤矿密闭墙及其施工工艺,包括巷道顶板、巷道底板、巷道两帮、凹槽、交叉钢筋和EPS模块墙体。该快速构筑的新型煤矿密闭墙按照以下过程施工:首先,在需要设置密闭墙体的巷道顶板、巷道底板和巷道两帮开凿深度为30cm凹槽;其次,将不同规格的EPS模块体插入预留的纵向钢筋,通过凹凸卡扣或者接插口固定,然后,在钢筋卡槽内放置横向钢筋,形成交叉钢筋;再者,在EPS模块墙体内,浇筑混泥土;最后,在封闭区里侧EPS模块墙体表面喷涂内防护涂层,封闭区外侧EPS模块墙体表面按照顺序喷涂膨胀玻化微珠层、粘接砂浆层、抗裂网格布、抹面砂浆层和外喷涂层。该快速构筑的新型煤矿密闭墙,结构坚固,抗压能力强,隔热性能好。

Figure 202210330103

The invention discloses a fast-constructed new type of coal mine airtight wall and its construction process, including a roadway roof, a roadway bottom plate, two sides of the roadway, grooves, cross bars and EPS module walls. The fast-constructed new coal mine airtight wall is constructed according to the following process: first, a groove with a depth of 30cm is dug in the roadway roof, roadway floor and roadway where the airtight wall needs to be set; secondly, EPS modules of different specifications are inserted into reserved The longitudinal steel bars are fixed by concave-convex buckles or sockets, and then horizontal steel bars are placed in the steel bar grooves to form cross steel bars; furthermore, concrete is poured in the EPS module wall; finally, EPS is placed inside the closed area. The surface of the module wall is sprayed with an inner protective coating, and the surface of the EPS module wall outside the closed area is sprayed with an expanded vitrified microbead layer, a bonding mortar layer, a crack-resistant mesh cloth, a plastering mortar layer and an outer spray layer in sequence. The rapidly constructed new type of coal mine airtight wall has a firm structure, strong compressive capacity and good thermal insulation performance.

Figure 202210330103

Description

一种快速构筑的新型煤矿密闭墙及其施工工艺A new type of coal mine airtight wall constructed quickly and its construction technology

技术领域technical field

本发明涉及煤矿临时和永久密闭墙技术领域,具体地说是一种快速构筑的新型煤矿密闭墙及其施工工艺。The invention relates to the technical field of temporary and permanent sealing walls of coal mines, in particular to a rapidly constructed new type of sealing walls of coal mines and a construction technique thereof.

背景技术Background technique

煤矿井下构筑的临时和永久密闭墙是矿井主要的通风构筑物及封闭火区的重要工程。目前,煤矿井下构筑的临时和永久密闭墙主要为砖石结构和全混凝土结构。砖石结构和混凝土结构的密闭墙构筑周期长达一周,所需墙体材料重量大,运输困难,且构筑工序复杂,工人劳动作业时间长。砖石和混凝土结构墙体,为全刚性结构,强度大。巷道来压时,容易损坏墙体,且重新修复墙体较为困难,煤矿易出现火区封闭不严和瓦斯异常涌出的危险情况。Temporary and permanent containment walls constructed underground in coal mines are the main ventilation structures in mines and an important project for closing fire areas. At present, the temporary and permanent containment walls constructed underground in coal mines are mainly masonry structures and all-concrete structures. The construction period of masonry structure and concrete structure airtight wall is as long as one week, the required wall material is heavy, transportation is difficult, and the construction process is complicated, and the labor time of workers is long. Masonry and concrete structural walls are fully rigid structures with high strength. When the roadway is pressed, it is easy to damage the wall, and it is difficult to restore the wall. Coal mines are prone to dangerous situations such as poor sealing of the fire zone and abnormal gas gushing.

因此,煤矿井下如何能够既快速和高效的构筑稳定性好的临时和永久密闭墙,保证煤矿的安全生产工作;又能节省煤矿的人力、物力、财力投入成为科研工作者亟待解决的问题。Therefore, how to quickly and efficiently construct temporary and permanent containment walls with good stability in coal mines to ensure the safe production of coal mines and save manpower, material resources and financial investment in coal mines has become an urgent problem for scientific researchers to solve.

发明内容SUMMARY OF THE INVENTION

本发明针对上述现有技术存在的构筑周期长,材料运输困难,工人劳动作业时间长,墙体结构稳定性差,破坏后修复困难等问题,提供一种快速构筑的新型煤矿密闭墙及其施工工艺。Aiming at the problems of the above-mentioned prior art, such as long construction period, difficult material transportation, long labor time for workers, poor wall structure stability, and difficulty in repairing after damage, the present invention provides a fast-constructed new type of coal mine airtight wall and its construction technology .

本发明的一种快速构筑的新型煤矿密闭墙及其施工工艺,包括巷道顶板(1)、巷道底板(2)、巷道两帮(3)、凹槽(4)、交叉钢筋(5)和EPS模块墙体(6);封闭区里侧所述EPS模块墙体(6)表面喷涂有高密度防火阻燃高分子材料的内防护涂层(7);封闭区外侧所述EPS模块墙体(6)表面按照顺序喷涂有膨胀玻化微珠层(8)、粘接砂浆层(9)、抗裂网格布(10)、抹面砂浆层(11)和外喷涂层(12);所述的一种快速构筑的新型煤矿密闭墙按照以下过程进行施工:A fast-constructed new type of coal mine airtight wall and a construction process thereof of the present invention comprise a roadway roof (1), a roadway bottom plate (2), two sides of the roadway (3), grooves (4), cross steel bars (5) and EPS. The module wall (6); the EPS module wall (6) on the inner side of the enclosed area is sprayed with an inner protective coating (7) of a high-density fire-retardant and flame-retardant polymer material; the EPS module wall (6) on the outer side of the enclosed area 6) The surface is sequentially sprayed with an expanded vitrified microbead layer (8), a bonding mortar layer (9), a crack-resistant mesh cloth (10), a plastering mortar layer (11) and an outer spray coating (12); the A new type of coal mine containment wall that is quickly constructed is constructed according to the following process:

第一阶段:在需要设置密闭墙体的巷道顶板(1)、巷道底板(2)和巷道两帮(3)开凿深度为30cm的凹槽(4);The first stage: dig grooves (4) with a depth of 30 cm in the roadway roof (1), roadway bottom plate (2) and roadway two sides (3) where airtight walls need to be installed;

第二阶段:根据设立密闭墙处的巷道断面形状,将不同种类、不同规格、不同形状的EPS模块体(13)插入预留的纵向钢筋(14),通过凹凸卡扣(1305)或者接插口(1302)固定,然后,在钢筋卡槽(1306)内放置横向钢筋(15),形成交叉钢筋(5);The second stage: According to the section shape of the roadway where the airtight wall is set up, insert EPS modules (13) of different types, specifications and shapes into the reserved longitudinal steel bars (14), and insert them through the concave and convex buckles (1305) or the sockets. (1302) Fixing, and then placing transverse reinforcement bars (15) in the reinforcement grooves (1306) to form cross reinforcement bars (5);

第三阶段:在形成的EPS模具墙体(6)内,浇筑混泥土(16)即可形成软—硬—软形式的坚固墙体;The third stage: in the formed EPS mold wall (6), pouring concrete (16) can form a solid wall in the form of soft-hard-soft;

第四阶段:在封闭区里侧EPS模块墙体(6)表面喷涂高密度防火阻燃高分子材料的内防护涂层(7),封闭区外侧EPS模块墙体(6)表面按照顺序喷涂膨胀玻化微珠层(8)、粘接砂浆层(9)、抗裂网格布(10)、抹面砂浆层(11)和外喷涂层(12)。The fourth stage: the inner protective coating (7) of high-density fire-retardant and flame-retardant polymer material is sprayed on the surface of the EPS module wall (6) on the inner side of the enclosed area, and the surface of the EPS module wall (6) outside the enclosed area is sprayed and expanded in sequence A vitrified microbead layer (8), a bonding mortar layer (9), a crack-resistant mesh cloth (10), a plastering mortar layer (11) and an outer spray coating (12).

所述的EPS模块体(13)用可发性珠粒加热发泡,通过工厂标准化生产设备一次成型制得的具有闭孔结构的泡沫塑料型材或构件,两侧保温板(1301)厚度为6cm,通过活动肋板连接(1303),中间有13cm的空隙。The EPS module body (13) is heated and foamed with expandable beads, and a foamed plastic profile or component with a closed-cell structure is obtained by one-time molding of factory standardized production equipment, and the thickness of the thermal insulation boards (1301) on both sides is 6cm. , connected by a movable rib (1303), with a gap of 13cm in the middle.

所述的EPS模块体(13)构件上,上下边均匀分布有接插口(1302),部分EPS模块体(13)构件左右两边有凹凸卡扣(1305)、内外表面有均匀分布的燕尾槽(1304),钢筋卡槽(1306)位于活动肋板(1303)上。On the components of the EPS module body (13), sockets (1302) are evenly distributed on the upper and lower sides, some EPS module body (13) components have concave and convex buckles (1305) on the left and right sides, and evenly distributed dovetail grooves (1305) on the inner and outer surfaces. 1304), the reinforcing bar slot (1306) is located on the movable rib (1303).

所述的交叉钢筋(5)中的纵向钢筋(14)和横向钢筋(15)通过细钢丝连接固定,且长度均需延伸至煤矿巷道顶板(1)、巷道底板(2)和巷道两帮(3)内。The longitudinal reinforcing bars (14) and the transverse reinforcing bars (15) in the cross bars (5) are connected and fixed by thin steel wires, and the lengths all need to be extended to the roof (1), the bottom plate (2) and the two sides (2) of the roadway of the coal mine. 3) inside.

所述的EPS模块墙体(6)每搭接三层EPS模块体(13)浇筑混凝土(16)一次。Concrete (16) is poured once every time the EPS module walls (6) are overlapped with three layers of EPS module bodies (13).

所述的粘接砂浆层(9)喷涂厚度为0.5cm。The spraying thickness of the bonding mortar layer (9) is 0.5 cm.

所述的抹面砂浆层(11)喷涂厚度为0.8cm。The spraying thickness of the plastering mortar layer (11) is 0.8 cm.

本发明的有益效果:本发明提供的一种快速构筑的新型煤矿密闭墙及其施工工艺,打破原始的砖石和混凝土密闭墙结构,提出使用重量较轻,造价更低的EPS模块体,采用搭积木式的简单施工工艺,构筑了软—硬—软式的临时或永久EPS模块墙体。该技术方案构筑的临时或永久密闭墙稳定性较高,能够有效的卸除矿井来压的破坏力,隔热密封性能优异,每平米造价相对于砖石结构节省200元;且采用上述的施工工艺,能够将密闭墙的构筑时长缩短至一个工作班(8小时以内),大大节省了煤矿的人力、物力和财力投入。Beneficial effects of the present invention: The present invention provides a rapidly constructed new type of coal mine airtight wall and its construction technology, which breaks the original masonry and concrete airtight wall structure, proposes the use of EPS modules with lighter weight and lower cost, and adopts the The simple construction process of building block constructs a soft-hard-soft temporary or permanent EPS module wall. The temporary or permanent sealing wall constructed by this technical solution has high stability, can effectively remove the destructive force of the mine pressure, has excellent thermal insulation and sealing performance, and saves 200 yuan per square meter of construction cost compared with the masonry structure; The technology can shorten the construction time of the airtight wall to one work shift (within 8 hours), which greatly saves the manpower, material resources and financial resources of the coal mine.

附图说明Description of drawings

图1是本发明提供的一种快速构筑的新型煤矿密闭墙整体结构示意图1 is a schematic diagram of the overall structure of a new type of coal mine airtight wall constructed quickly provided by the present invention

图2是图1的A—A剖面图Fig. 2 is A-A sectional view of Fig. 1

图3是凹卡扣和凸卡扣EPS模块体的连接示意图Figure 3 is a schematic diagram of the connection of the concave buckle and the convex buckle EPS module body

图4是不同形状EPS模块体结构示意图Figure 4 is a schematic diagram of the structure of EPS modules with different shapes

图5是单个EPS模块体与横向钢筋连接示意图Figure 5 is a schematic diagram of the connection between a single EPS module body and a transverse steel bar

图中:1-巷道顶板;2-巷道底板;3-巷道两帮;4-凹槽;5-交叉钢筋;6-EPS模块墙体;7-内防护涂层;8-膨胀玻化微珠层;9-粘接砂浆层;10-抗裂网格布;11-抹面砂浆层;12-外喷涂层;13-EPS模块体;1301-两侧保温板;1302-接插口;1303-活动肋板;1304-燕尾槽;1305-凹凸卡扣;1306-钢筋卡槽;14-纵向钢筋;15-横向钢筋;16-混凝土。In the picture: 1- Roadway roof; 2- Roadway bottom plate; 3- Roadway two gangs; 4- Groove; 5- Cross steel bar; 6- EPS module wall; 7- Inner protective coating; layer; 9-bonding mortar layer; 10-crack-resistant mesh cloth; 11-plastering mortar layer; 12-external spray layer; 13-EPS module body; 1301-insulation board on both sides; 1302-connection socket; Rib; 1304-dovetail groove; 1305-concave-convex buckle; 1306-steel groove; 14-longitudinal steel bar; 15-transverse steel bar; 16-concrete.

具体实施方式Detailed ways

下面结合附图,对本发明的一个具体实施范例进行详细说明:Below in conjunction with the accompanying drawings, a specific embodiment of the present invention will be described in detail:

如图1--图5所示:本发明的一种快速构筑的新型煤矿密闭墙及其施工工艺,包括巷道顶板1、巷道底板2、巷道两帮3、凹槽4、交叉钢筋5和EPS模块墙体6。封闭区里侧所述EPS模块墙体6表面喷涂有高密度防火阻燃高分子材料的内防护涂层7;封闭区外侧所述EPS模块墙体6表面按照顺序喷涂有膨胀玻化微珠层8、粘接砂浆层9、抗裂网格布10、抹面砂浆层11和外喷涂层12;As shown in Fig. 1--Fig. 5: a kind of fast-constructed novel coal mine airtight wall of the present invention and its construction technology, comprise roadway roof 1, roadway bottom plate 2, roadway two gangs 3, groove 4, cross steel bar 5 and EPS Modular wall 6. The surface of the EPS module wall 6 on the inner side of the enclosed area is sprayed with an inner protective coating 7 of high-density fire-retardant and flame-retardant polymer material; the surface of the EPS module wall 6 outside the enclosed area is sprayed with an expanded vitrified microbead layer in sequence. 8. Bonding mortar layer 9, anti-crack mesh cloth 10, plastering mortar layer 11 and outer spray layer 12;

在本发明具体实施范例中,EPS模块体13构件上,上下边均匀分布有接插口1302,部分EPS模块体13构件左右两边有凹凸卡扣1305、内外表面有均匀分布的燕尾槽1304,钢筋卡槽1306位于活动肋板1303上;交叉钢筋5中的纵向钢筋14和横向钢筋15通过细钢丝连接固定,且长度均需延伸至煤矿巷道顶板1、巷道底板2和巷道两帮3内;EPS模块墙体6每搭接三层EPS模块体13浇筑混凝土16一次;粘接砂浆层9喷涂厚度为0.5cm;抹面砂浆层11喷涂厚度为0.8cm。In the specific embodiment of the present invention, the components of the EPS module body 13 have sockets 1302 evenly distributed on the upper and lower sides, some of the components of the EPS module body 13 have concave and convex buckles 1305 on the left and right sides, and evenly distributed dovetail grooves 1304 on the inner and outer surfaces. The groove 1306 is located on the movable rib 1303; the longitudinal reinforcement 14 and the transverse reinforcement 15 in the cross reinforcement 5 are connected and fixed by thin steel wires, and the lengths need to extend to the roof 1 of the coal mine roadway, the roadway bottom plate 2 and the two sides of the roadway 3; EPS module The wall 6 is poured with concrete 16 once every three layers of EPS modules 13 are overlapped; the spraying thickness of the bonding mortar layer 9 is 0.5 cm; the spraying thickness of the plastering mortar layer 11 is 0.8 cm.

一种快速构筑的新型煤矿密闭墙按照以下过程进行施工:A rapidly constructed new type of coal mine containment wall is constructed according to the following process:

第一阶段:在需要设置密闭墙体的巷道顶板1、巷道底板2和巷道两帮3开凿深度为30cm的凹槽4;The first stage: dig a groove 4 with a depth of 30cm in the roadway roof 1, roadway bottom plate 2 and roadway two gangs 3 where a closed wall needs to be installed;

第二阶段:根据设立密闭墙处的巷道断面形状,将不同种类、不同规格、不同形状的EPS模块体13插入预留的纵向钢筋14,通过凹凸卡扣1305或者接插口1302固定,然后,在钢筋卡槽1306内放置横向钢筋15,形成交叉钢筋5;The second stage: according to the section shape of the roadway where the airtight wall is established, insert the EPS modules 13 of different types, specifications and shapes into the reserved longitudinal steel bars 14, and fix them through the concave and convex buckles 1305 or the sockets 1302, and then, in the The transverse reinforcement 15 is placed in the reinforcement slot 1306 to form a cross reinforcement 5;

第三阶段:在形成的EPS模具墙体6内,浇筑混泥土即可形成软—硬—软形式的坚固墙体;The third stage: in the formed EPS mold wall 6, pouring concrete can form a solid wall in the form of soft-hard-soft;

第四阶段:在封闭区里侧EPS模块墙体6表面喷涂高密度防火阻燃高分子材料的内防护涂层7,封闭区外侧EPS模块墙体6表面按照顺序喷涂膨胀玻化微珠层8、粘接砂浆层9、抗裂网格布10、抹面砂浆层11和外喷涂层12。The fourth stage: spray the inner protective coating 7 of high-density fire-retardant and flame-retardant polymer material on the surface of the EPS module wall 6 on the inner side of the enclosed area, and spray the expanded vitrified microbead layer 8 on the surface of the EPS module wall 6 outside the enclosed area in sequence. , Bonding mortar layer 9, anti-crack mesh cloth 10, plastering mortar layer 11 and outer spray layer 12.

Claims (7)

1.本发明公开了一种快速构筑的新型煤矿密闭墙及其施工工艺,包括巷道顶板(1)、巷道底板(2)、巷道两帮(3)、凹槽(4)、交叉钢筋(5)和EPS模块墙体(6);封闭区里侧所述EPS模块墙体(6)表面喷涂有高密度防火阻燃高分子材料的内防护涂层(7);封闭区外侧所述EPS模块墙体(6)表面按照顺序喷涂有膨胀玻化微珠层(8)、粘接砂浆层(9)、抗裂网格布(10)、抹面砂浆层(11)和外喷涂层(12);所述的一种快速构筑的新型煤矿密闭墙按照以下过程进行施工:1. The present invention discloses a fast-constructed new type of coal mine airtight wall and its construction process, including a roadway roof (1), a roadway bottom plate (2), two sides of the roadway (3), grooves (4), and intersecting steel bars (5). ) and the EPS module wall (6); the EPS module wall (6) on the inner side of the closed area is sprayed with an inner protective coating (7) of high-density fire-retardant and flame-retardant polymer material; the EPS module on the outer side of the closed area is sprayed with an inner protective coating (7) The surface of the wall (6) is sequentially sprayed with an expanded vitrified microbead layer (8), a bonding mortar layer (9), a crack-resistant mesh cloth (10), a plastering mortar layer (11) and an outer spray layer (12) ; Described a kind of rapid construction of new coal mine airtight wall is constructed according to the following process: 第一阶段:在需要设置密闭墙体的巷道顶板(1)、巷道底板(2)和巷道两帮(3)开凿深度为30cm的凹槽(4);The first stage: dig grooves (4) with a depth of 30 cm in the roadway roof (1), roadway bottom plate (2) and roadway two sides (3) where airtight walls need to be installed; 第二阶段:根据设立密闭墙处的巷道断面形状,将不同种类、不同规格、不同形状的EPS模块体(13)插入预留的纵向钢筋(14),通过凹凸卡扣(1305)或者接插口(1302)固定,然后,在钢筋卡槽(1306)内放置横向钢筋(15),形成交叉钢筋(5);The second stage: According to the section shape of the roadway where the airtight wall is set up, insert EPS modules (13) of different types, specifications and shapes into the reserved longitudinal steel bars (14), and insert them through the concave and convex buckles (1305) or the sockets. (1302) Fixing, and then placing transverse reinforcement bars (15) in the reinforcement grooves (1306) to form cross reinforcement bars (5); 第三阶段:在形成的EPS模具墙体(6)内,浇筑混泥土(16)即可形成软—硬—软形式的坚固墙体;The third stage: in the formed EPS mold wall (6), pouring concrete (16) can form a solid wall in the form of soft-hard-soft; 第四阶段:在封闭区里侧EPS模块墙体(6)表面喷涂高密度防火阻燃高分子材料的内防护涂层(7),封闭区外侧EPS模块墙体(6)表面按照顺序喷涂膨胀玻化微珠层(8)、粘接砂浆层(9)、抗裂网格布(10)、抹面砂浆层(11)和外喷涂层(12)。The fourth stage: the inner protective coating (7) of high-density fire-retardant and flame-retardant polymer material is sprayed on the surface of the EPS module wall (6) on the inner side of the enclosed area, and the surface of the EPS module wall (6) outside the enclosed area is sprayed and expanded in sequence A vitrified microbead layer (8), a bonding mortar layer (9), a crack-resistant mesh cloth (10), a plastering mortar layer (11) and an outer spray coating (12). 2.根据权利要求1所述一种快速构筑的新型煤矿密闭墙及其施工工艺,其特征在于:所述的EPS模块体(13)用可发性珠粒加热发泡,通过工厂标准化生产设备一次成型制得的具有闭孔结构的泡沫塑料型材或构件,两侧保温板(1301)厚度为6cm,通过活动肋板(1303)连接,中间有13cm的空隙。2. a kind of fast-constructed novel coal mine airtight wall and construction technique thereof according to claim 1, it is characterized in that: described EPS module body (13) is heated and foamed with expandable beads, by factory standardization production equipment A foamed plastic profile or component with a closed-cell structure obtained by one-time molding, the insulation boards (1301) on both sides have a thickness of 6cm, are connected by movable ribs (1303), and there is a gap of 13cm in the middle. 3.根据权利要求1所述一种快速构筑的新型煤矿密闭墙及其施工工艺,其特征在于:所述的EPS模块体(13)构件上,上下边均匀分布有接插口(1302),部分EPS模块体(13)构件左右两边有凹凸卡扣(1305)、内外表面有均匀分布的燕尾槽(1304),钢筋卡槽(1306)位于活动肋板(1303)上。3. A kind of fast-constructed novel coal mine airtight wall and construction technique thereof according to claim 1, it is characterized in that: on the described EPS module body (13) component, the upper and lower sides are evenly distributed with sockets (1302), part of The components of the EPS module body (13) are provided with concave-convex buckles (1305) on the left and right sides, dovetail grooves (1304) evenly distributed on the inner and outer surfaces, and the reinforcement grooves (1306) are located on the movable rib (1303). 4.根据权利要求1所述一种快速构筑的新型煤矿密闭墙及其施工工艺,其特征在于:所述的交叉钢筋(5)中的纵向钢筋(14)和横向钢筋(15)通过细钢丝连接固定,且长度均需延伸至煤矿巷道顶板(1)、巷道底板(2)和巷道两帮(3)内。4. a kind of fast-constructed novel coal mine airtight wall and construction technique thereof according to claim 1, it is characterized in that: the longitudinal steel bar (14) and the transverse steel bar (15) in the described cross bar (5) pass through the thin steel wire The connection is fixed, and the lengths need to be extended to the roof (1), the bottom plate (2) and the two sides (3) of the roadway of the coal mine. 5.根据权利要求1所述一种快速构筑的新型煤矿密闭墙及其施工工艺,其特征在于:所述的EPS模块墙体(6)每搭接三层EPS模块体(13)浇筑混凝土(16)一次。5. a kind of fast-constructed novel coal mine airtight wall and construction technique thereof according to claim 1, it is characterized in that: described EPS module wall body (6) every overlap three EPS module body (13) pouring concrete ( 16) Once. 6.根据权利要求1所述一种快速构筑的新型煤矿密闭墙及其施工工艺,其特征在于:所述的粘接砂浆层(9)喷涂厚度为0.5cm。6. A kind of fast-constructed novel coal mine airtight wall and construction technique thereof according to claim 1, characterized in that: the spraying thickness of the bonding mortar layer (9) is 0.5cm. 7.根据权利要求1所述一种快速构筑的新型煤矿密闭墙及其施工工艺,其特征在于:所述的抹面砂浆层(11)喷涂厚度为0.8cm。7. A kind of fast-constructed novel coal mine airtight wall and construction technique thereof according to claim 1, characterized in that: the spraying thickness of the plastering mortar layer (11) is 0.8cm.
CN202210330103.9A 2022-03-28 2022-03-28 A new type of rapidly constructed coal mine closed wall and its construction technology Active CN115013057B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210330103.9A CN115013057B (en) 2022-03-28 2022-03-28 A new type of rapidly constructed coal mine closed wall and its construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210330103.9A CN115013057B (en) 2022-03-28 2022-03-28 A new type of rapidly constructed coal mine closed wall and its construction technology

Publications (2)

Publication Number Publication Date
CN115013057A true CN115013057A (en) 2022-09-06
CN115013057B CN115013057B (en) 2023-12-12

Family

ID=83066789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210330103.9A Active CN115013057B (en) 2022-03-28 2022-03-28 A new type of rapidly constructed coal mine closed wall and its construction technology

Country Status (1)

Country Link
CN (1) CN115013057B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4516879A (en) * 1983-05-26 1985-05-14 The Celotex Corporation Foam slabs in mine tunnel stoppings
US20020017070A1 (en) * 2000-06-30 2002-02-14 Batch Juan R. Plastic module for insulated concrete waffle wall
CN206190323U (en) * 2016-11-22 2017-05-24 中国神华能源股份有限公司 Colliery is fire dam reinforced structure in pit
CN207892077U (en) * 2017-12-14 2018-09-21 王春宁 A kind of heat preserving type composite type reinforced concrete wall
CN111520187A (en) * 2020-04-08 2020-08-11 中国矿业大学 Modified EPS module composite high-water-content sealing wall and construction method thereof
CN213392269U (en) * 2020-10-15 2021-06-08 中国矿业大学(北京) Novel coal mine underground sealing wall using 3D printing technology

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4516879A (en) * 1983-05-26 1985-05-14 The Celotex Corporation Foam slabs in mine tunnel stoppings
US20020017070A1 (en) * 2000-06-30 2002-02-14 Batch Juan R. Plastic module for insulated concrete waffle wall
CN206190323U (en) * 2016-11-22 2017-05-24 中国神华能源股份有限公司 Colliery is fire dam reinforced structure in pit
CN207892077U (en) * 2017-12-14 2018-09-21 王春宁 A kind of heat preserving type composite type reinforced concrete wall
CN111520187A (en) * 2020-04-08 2020-08-11 中国矿业大学 Modified EPS module composite high-water-content sealing wall and construction method thereof
CN213392269U (en) * 2020-10-15 2021-06-08 中国矿业大学(北京) Novel coal mine underground sealing wall using 3D printing technology

Also Published As

Publication number Publication date
CN115013057B (en) 2023-12-12

Similar Documents

Publication Publication Date Title
CA2621224C (en) Modular elements, network, supporting structure, construction and process for obtaining thereof
CN110158853A (en) A kind of prefabricated sandwich heat preservation wallboard
KR100588788B1 (en) Foamed plastic hollow panel assembly
CN204551821U (en) Light steel occlusal pattern complex heat-preservation light wall assembling compound shear wall
KR102159180B1 (en) Architectural Middle Insulation System and Construction Method of this
CN204212346U (en) Heat insulation decoration formwork integral structure and comprise its structural wall
CN204475835U (en) Fire-proof compound insulation non-dismantling formwork
CN103556759A (en) Insulating and bearing shearing wall with cross-shaped embedded columns at central parts and single row of reinforcing bars and method
CN115013057A (en) Novel coal mine airtight wall capable of being constructed quickly and construction process thereof
KR102337510B1 (en) Asswmbly block for high thermal insulation light-weight structure from recycled waste styrofoam and method for manufacturing the same
CN205712703U (en) Unilateral composite thermal self-insulation building block
CN109958228B (en) Heat insulation bridge-cut-off building block for exterior enclosure wall beam and column and construction method
EP3194680B1 (en) A building wall and its method for manufacture
CN112459307A (en) Construction method of prefabricated heat-preservation-structure integrated wall external formwork
CN105464283A (en) Assembled wallboard and assembled station room
RU62949U1 (en) FORMWORK KIT
CN2911049Y (en) In-situ light-weight composite wall
KR101137218B1 (en) A architectural form structure
KR200338055Y1 (en) Expanded plastic hollow panel assembly
CN116357034B (en) No-removable formwork decorative panels for building exterior walls and building exterior wall structures
CN216810449U (en) Cast-in-place tear-free composite form of concrete
CN116556582B (en) Reinforced ALC plate, floor structure and wall structure
CN203654565U (en) Prefabricated cavity component
CN110714573A (en) HJ prefabricated multifunctional wall panel
CN204151955U (en) The double group of body Self-thermal-insulation System of building a wall that a kind of composite heat insulation block is built by laying bricks or stones

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant