CN115008053A - A kind of processing and manufacturing method of curved variable section steel box girder - Google Patents

A kind of processing and manufacturing method of curved variable section steel box girder Download PDF

Info

Publication number
CN115008053A
CN115008053A CN202210633188.8A CN202210633188A CN115008053A CN 115008053 A CN115008053 A CN 115008053A CN 202210633188 A CN202210633188 A CN 202210633188A CN 115008053 A CN115008053 A CN 115008053A
Authority
CN
China
Prior art keywords
plate unit
welding
plate
unit
web
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210633188.8A
Other languages
Chinese (zh)
Other versions
CN115008053B (en
Inventor
张海川
黄治铭
刘祥伟
殷洪
罗恩洪
刘继彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN202210633188.8A priority Critical patent/CN115008053B/en
Publication of CN115008053A publication Critical patent/CN115008053A/en
Application granted granted Critical
Publication of CN115008053B publication Critical patent/CN115008053B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • B23K31/022Making profiled bars with soldered or welded seams
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass
    • B23K37/04Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass for holding or positioning work
    • B23K37/0426Fixtures for other work
    • B23K37/0435Clamps
    • B23K37/0443Jigs
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种曲线变截面钢箱梁加工制造方法,解决现有技术钢箱梁在工厂制造时空间线形和整体几何尺寸控制难的技术问题。本发明将钢箱梁分解为不同板单元分别加工,再将所加工的板单元采取倒拼装方式拼装成钢箱梁;板单元包括顶板单元、底板单元、腹板单元、隔板单元、以及横联和悬挑单元。本发明设计科学合理,可以有效地在工厂制造时控制好钢箱梁的空间线形和整体几何尺寸,以提高钢箱梁制造精度,减小钢箱梁焊接加工时的变形,分散焊接内应力,对钢箱梁采取板单元加工,然后再进行节段的总拼装,满足《公路桥涵施工技术规范》要求同时实现钢箱梁线性控制及加工精度。

Figure 202210633188

The invention discloses a processing and manufacturing method for a curved variable section steel box girder, which solves the technical problem of difficult control of the spatial alignment and the overall geometric dimension of the steel box girder in the prior art when it is manufactured in a factory. The invention decomposes the steel box girder into different plate units and processes them separately, and then assembles the processed plate units into the steel box beam by inverting assembly; Linked and cantilevered units. The invention is scientific and reasonable in design, and can effectively control the spatial alignment and overall geometric size of the steel box girder during factory manufacturing, so as to improve the manufacturing accuracy of the steel box girder, reduce the deformation during the welding process of the steel box girder, and disperse the welding internal stress. The steel box girder is processed by plate unit, and then the general assembly of the segments is carried out, which meets the requirements of the "Technical Specification for Highway Bridge and Culvert Construction" and realizes the linear control and processing accuracy of the steel box girder.

Figure 202210633188

Description

一种曲线变截面钢箱梁加工制造方法A kind of processing and manufacturing method of curved variable section steel box girder

技术领域technical field

本发明属于钢结构加工技术领域,具体涉及一种曲线变截面钢箱梁加工制造方法。The invention belongs to the technical field of steel structure processing, and in particular relates to a processing and manufacturing method for a curved variable-section steel box girder.

背景技术Background technique

目前,我国公路桥梁建设用钢显著,尤其是钢结构箱型桥梁,其具有跨越能力强、适合工厂化组拼制造、便于运输、安装施工速度快和修复及更换容易、抗扭刚度大、整体性能好、施工时对环境影响小等特点,应用最为广泛。目前我国钢箱梁在公路桥梁中应用越来越多,如何在工厂制造时控制好钢箱梁的空间线形和整体几何尺寸变得十分棘手。At present, the steel used in highway bridge construction in my country is remarkable, especially the steel structure box bridge, which has strong spanning ability, suitable for factory assembly and manufacturing, easy transportation, fast installation and construction speed, easy repair and replacement, high torsional rigidity, overall It has the characteristics of good performance and little impact on the environment during construction, so it is widely used. At present, steel box girders are used more and more in highway bridges in our country. How to control the spatial alignment and overall geometric size of steel box girders during factory manufacturing has become very difficult.

因此,设计一种曲线变截面钢箱梁加工制造方法,以有效地在工厂制造时控制好钢箱梁的空间线形和整体几何尺寸,成为所属技术领域技术人员亟待解决的技术问题。Therefore, designing a processing and manufacturing method of curved variable-section steel box girders to effectively control the spatial alignment and overall geometric dimensions of the steel box girders during factory manufacturing has become a technical problem to be solved urgently by those skilled in the art.

发明内容SUMMARY OF THE INVENTION

本发明要解决的技术问题是:提供一种曲线变截面钢箱梁加工制造方法,以至少解决上述部分技术问题。The technical problem to be solved by the present invention is to provide a processing and manufacturing method for a curved variable-section steel box girder, so as to solve at least some of the above-mentioned technical problems.

为实现上述目的,本发明采用的技术方案如下:For achieving the above object, the technical scheme adopted in the present invention is as follows:

一种曲线变截面钢箱梁加工制造方法,将钢箱梁分解为不同板单元分别加工,再将所加工的板单元采取倒拼装方式拼装成钢箱梁;板单元包括顶板单元、底板单元、腹板单元、隔板单元、以及横联和悬挑单元。A method for processing and manufacturing a steel box girder with a variable cross-section of a curve. The steel box girder is decomposed into different plate units to be processed separately, and then the processed plate units are assembled into a steel box beam by an inverted assembly method; the plate unit includes a top plate unit, a bottom plate unit, Web elements, diaphragm elements, and cross-link and cantilever elements.

进一步地,拼装钢箱梁包括以下步骤:Further, assembling the steel box girder includes the following steps:

步骤1、搭设倒拼装工装胎架;Step 1. Set up an inverted assembly tooling tire frame;

步骤2、在倒工装胎架上铺装顶板单元;Step 2. Pave the roof unit on the inverted tooling frame;

步骤3、在顶板单元上拼装隔板单元;Step 3. Assemble the partition unit on the top plate unit;

步骤4、在顶板单元和隔板单元上拼装腹板单元;Step 4. Assemble the web unit on the top plate unit and the partition unit;

步骤5、将顶板单元、隔板单元和腹板单元焊接成一体以形成三方箱体;Step 5. Weld the top plate unit, the baffle plate unit and the web plate unit into one body to form a three-sided box;

步骤6、搭设正拼装工装胎架;Step 6. Set up a positive assembly tooling tire frame;

步骤7、在正拼装工装胎架上铺装底板单元;Step 7. Lay the bottom plate unit on the assembling tooling frame;

步骤8、将三方箱体拼装至底板单元以形成四方箱体;Step 8. Assemble the three-sided box to the bottom plate unit to form a four-sided box;

步骤9、将横联和悬挑单元拼装至四方箱体上;Step 9. Assemble the horizontal and cantilever units to the square box;

步骤10、在四方箱体上装配顶板剪力键以形成钢箱梁。Step 10. Assemble the roof shear key on the square box to form the steel box girder.

进一步地,在所述步骤1中,搭设倒拼装工装胎架时,采用H350*150*20*20H型钢为材料进行倒拼装工装胎架的搭设,倒拼装工装胎架搭需设于硬化地面上,倒拼装工装胎架的立柱采用T型钢,并用剪刀撑连接成整体以保证倒拼装工装胎架的强度和稳定性;倒拼装工装胎架各支撑立柱定点的连线线型需与钢箱梁底板线型保持一致,各支点连线的线型需与钢箱梁纵、横向坡度及预拱度数值相一致;倒拼装工装胎架需设置纵、横基线和基准点,其外设独立基准线和基准点;倒拼装工装胎架搭设完毕后需对其整体性连线标高进行测量并对实测数据存档,以确保线型与图纸一致、完全正确后才能铺设顶板单元;每次组拼装前均应对倒拼装工装胎架进行检测,做好检测记录,合格后方可进行下一次的组拼装;Further, in the step 1, when erecting the inverted assembling tooling frame, H350*150*20*20H steel is used as the material to construct the inverted assembling tooling frame, and the inverted assembling tooling frame needs to be installed on the hardened ground. , The column of the inverted-assembled tooling frame is made of T-shaped steel, and is connected by scissors to ensure the strength and stability of the inverted-assembled tooling frame; The line type of the bottom plate should be consistent, and the line type of each fulcrum should be consistent with the longitudinal and transverse slopes and pre-camber values of the steel box girder; the vertical and horizontal baselines and reference points should be set for the inverted assembly tooling frame, and its peripherals should be equipped with independent benchmarks Lines and reference points; after the erection of the inverted assembly tooling tire frame, the overall connection elevation should be measured and the measured data should be archived to ensure that the line type is consistent with the drawing and completely correct before the roof unit can be laid; before each assembly assembly All of them should be tested for the inverted assembly tooling tire frame, and the test record should be made, and the next assembly can be carried out only after passing the test;

在所述步骤6中,搭设正拼装工装胎架时,正拼装工装胎架搭设在硬化地面上,正拼装工装胎架立柱采用T型钢并用剪刀撑连接成整体以保证正拼装工装胎架的强度和稳定性。In the step 6, when erecting the positive-assembling tooling frame, the positive-assembling tooling frame is erected on the hardened ground, and the positive-assembling tooling frame column adopts T-shaped steel and is connected with scissors to form a whole to ensure the strength of the positive-assembling tooling frame and stability.

进一步地,在所述步骤2中,在倒工装胎架上铺装顶板单元时,顶板单元需校正至自然状态下与倒工装胎架完全贴合,禁止采用点焊、楔码方式强行将顶板单元与倒工装胎架贴合;过程中需精确测量以控制顶板单元铺装的定位精度,顶板单元在顺桥向方向不能出现偏移,当出现偏移时,需立即调整顶板单元定位,确保每块顶板单元的纵向中心线与桥梁中心线平行。Further, in the step 2, when the top plate unit is installed on the inverted tooling frame, the top plate unit needs to be corrected to completely fit with the inverted tooling frame in a natural state, and it is forbidden to use spot welding and wedge code methods to force the top plate. The unit and the reverse tooling frame are fitted; during the process, precise measurement is required to control the positioning accuracy of the roof unit paving. The roof unit cannot be offset in the direction of the bridge. When the offset occurs, the positioning of the roof unit needs to be adjusted immediately to ensure The longitudinal centerline of each roof element is parallel to the bridge centerline.

进一步地,在所述步骤7中,在正拼装工装胎架上铺装底板单元时,底板单元在正拼装工装胎架上制作,底板肋焊接时采用自动化设备对称施焊以控制焊接变形,底板单元在焊完校正至自然状态下后需与正拼装工装胎架完全贴合,禁止采用点焊、楔码方式强行将底板单元与正拼装工装胎架贴合。Further, in the step 7, when the base plate unit is paved on the assembling tooling frame, the base plate unit is fabricated on the assembling tooling frame, and the base plate rib is welded symmetrically with automated equipment to control the welding deformation, and the base plate is welded. After the unit is welded and calibrated to the natural state, it needs to be completely fitted with the frame of the assembling tooling. It is forbidden to use spot welding and wedge coding to force the base unit and the frame of the assembling tooling to fit.

进一步地,隔板单元在平台上制作,腹板单元在腹板工装上制作,隔板单元的隔板肋和腹板单元的腹板肋在焊接时均采用自动化设备对称施焊以控制焊接变形,并且每次焊接完均需校正后方可流转至下道工序,隔板单元和腹板单元均采用吊线锤检查以确保隔板和腹板铅锤于大地;Further, the baffle unit is fabricated on the platform, the web unit is fabricated on the web tooling, and the baffle rib of the baffle unit and the web rib of the web unit are welded symmetrically using automated equipment to control welding deformation. , and after each welding, it needs to be corrected before it can be transferred to the next process. The diaphragm unit and the web unit are checked with a hanging wire hammer to ensure that the diaphragm and the web plumb weight are on the ground;

在所述步骤5中,将顶板单元、隔板单元和腹板单元焊接成一体时,先将隔板单元与腹板单元立焊,后将隔板单元与顶板单元平焊,并对称施焊以控制焊接变形;根据每个断面腹板单元高度不同,隔板单元与腹板单元立焊在底板单元长度方向预留1-2米不焊,待在正拼装工装胎架上将三方箱体与底板单元完成拼装后再行焊接;In the step 5, when the top plate unit, the baffle plate unit and the web plate unit are welded into one body, first the baffle plate unit and the web plate unit are vertically welded, and then the baffle plate unit and the top plate unit are flat-welded and welded symmetrically. In order to control the welding deformation; according to the height of the web unit of each section, the partition unit and the web unit are vertically welded in the length direction of the bottom unit to reserve 1-2 meters without welding, and the three-sided box will be placed on the assembling tooling frame. After the assembly with the base plate unit is completed, the welding is carried out;

在所述步骤10中,在四方箱体上装配顶板剪力键以形成钢箱梁后;需对钢箱梁进行校正、配钻螺栓孔,连接板采用冲钉精确定位,用普通螺栓压紧后对箱体进行配钻。In the step 10, after assembling the roof shear key on the square box to form the steel box girder; the steel box girder needs to be corrected, drilled with bolt holes, the connecting plate is precisely positioned with punching nails, and pressed with ordinary bolts Then drill the box.

进一步地,加工板单元方法按照如下步骤进行:Further, the processing board unit method is carried out according to the following steps:

步骤(1)、对加工材料进行放样、拼接、切割,过程中需进行焊缝探伤检验;Step (1), lofting, splicing, and cutting the processing materials, and welding seam inspection is required during the process;

步骤(2)、对所加工板单元进行放线及零部件焊接边打磨;Step (2): Paying off the processed plate unit and grinding the parts while welding;

步骤(3)、组装点焊板肋,过程中需进行焊缝探伤检验;Step (3), assembling the spot welding plate rib, and the welding seam flaw detection inspection is required in the process;

步骤(4)、板单元焊接,过程中需进行焊缝探伤检验;Step (4), the plate unit is welded, and the welding seam inspection is required during the process;

步骤(5)、板单元矫正,即可。Step (5), the plate unit is corrected, and that's it.

进一步地,按照加工板单元方法加工顶板单元时,加工顶板单元的材料采用12mm厚钢板和22mm厚度钢板,在顺桥向主梁腹板线处以及横桥向横联处采用22mm厚钢板,其余部位均采用12mm厚钢板;顶板单元包括厚度为22mm的纵横联和厚度为12mm的钢模板,下料时纵横联将腹板定位线用洋冲标记出来以保证相邻钢箱梁箱体腹板单元不出现错边情况;下料时,纵横联不开设坡口,12mm钢模板开坡口;下料时分别将纵横联和钢模板单独下料,然后进行拼接,拼接时分两边拼接以保证顶板平整度及减少因顶板单元焊缝多产生的焊接变形;Further, when the roof unit is processed according to the method of processing the plate unit, the material for processing the roof unit is 12mm thick steel plate and 22mm thick steel plate, and the 22mm thick steel plate is used at the web line of the main girder along the bridge and the transverse connection of the transverse bridge. All parts are made of 12mm thick steel plates; the roof unit includes vertical and horizontal joints with a thickness of 22mm and steel formwork with a thickness of 12mm. When cutting materials, the vertical and horizontal joints mark the web positioning line with a foreign punch to ensure that the adjacent steel box girder box webs There is no wrong side of the unit; when cutting, the vertical and horizontal links are not beveled, and the 12mm steel formwork is beveled; when blanking, the vertical and horizontal links and steel formwork are separately blanked, and then spliced. When splicing, the two sides are spliced to ensure the top plate Flatness and reduce welding deformation caused by the welding seam of roof unit;

腹板单元包括腹板和板肋,腹板截面高度3m-6m,按照加工板单元方法加工腹板单元时,腹板单元下料按每个工装划分长度进行下料,将腹板单元内外均打出隔板单元的洋冲眼以便于组装定位隔板单元,腹板单元开设40度的外坡口,不留钝边;加工时一个工装位的腹板为整段,焊接完成后进行切割断开若干个腹板节段,每个腹板节段提前钻单侧,减少空中钻孔量;腹板单元的组装、焊接和矫正均与顶板单元相一致。The web unit includes a web and a rib. The height of the web section is 3m-6m. When the web unit is processed according to the method of processing the panel unit, the blanking of the web unit is carried out according to the length of each tooling. Punch out the punch hole of the baffle unit to facilitate the assembly and positioning of the baffle unit. The web unit is provided with a 40-degree outer groove, leaving no blunt edges; the web of a tooling position is a whole section during processing, and it is cut after welding is completed. Several web segments are opened, and each web segment is drilled on one side in advance to reduce the amount of drilling holes in the air; the assembly, welding and correction of the web unit are consistent with the roof unit.

进一步地,隔板单元包括隔板面板、纵向和横向加劲板肋、人孔圈加劲板肋,按照加工板单元方法加工隔板单元时,将隔板面板放置在平整工装面上采用机器人按照先立缝后平缝、从中间朝两边对称施焊原则进行焊接以减小焊接变形,当纵向和横向加劲板肋及人孔圈加劲板肋的板厚>16mm时采取开坡口的部分熔透焊缝,当纵向和横向加劲板肋及人孔圈加劲板肋的板厚≤16mm时采取普通角焊缝;Further, the clapboard unit includes a clapboard panel, longitudinal and transverse stiffening ribs, and manhole ring stiffening ribs. When the clapboard unit is processed according to the method of processing the clapboard unit, the clapboard panel is placed on the flat tooling surface and the robot is used according to the first steps. After the vertical seam, the flat seam and the symmetrical welding principle from the middle to both sides are used for welding to reduce the welding deformation. When the plate thickness of the longitudinal and transverse stiffening ribs and the manhole ring stiffening ribs is greater than 16mm, the partial penetration of the open groove is adopted. For welds, ordinary fillet welds shall be adopted when the plate thickness of longitudinal and transverse stiffening ribs and manhole ring stiffening ribs is less than or equal to 16mm;

隔板面板双面设隔板加劲板肋,并且隔板加劲板肋处于自由收缩端,焊接后四周边会出现不同程度的翘曲变形,需对隔板面板进行平面度矫正;对隔板单元进行矫正时,采取火焰矫正和机械矫正相结合方式进行,对于隔板面板中间局部鼓泡部位采取“梅花点”的均布点状火焰矫正方式进行矫正;The baffle panel is provided with baffle stiffening ribs on both sides, and the baffle stiffening rib is at the free shrinkage end. After welding, there will be different degrees of warpage deformation around the four sides, and the baffle panel needs to be corrected for flatness; When rectifying, a combination of flame rectification and mechanical rectification should be used for rectification. For the partial bubbling part in the middle of the clapboard panel, the uniformly distributed point flame rectification method of "plum blossom" is used for rectification;

按照加工板单元方法加工底板单元时,底板单元包括主梁底板单元和标准断面底板单元,下料时,需标记出腹板单元定位线,存在弧形的底板单元纵向加劲肋采用数控下料,底板单元纵向加劲肋两端钻孔,底板单元连接板进行划线配钻;底板单元为板条肋,组装时采用无码组装设备同时对多条板条肋进行组装,主梁底板单元在反变形焊接胎架上进行焊接,采用板条肋自动焊接设备焊接,焊接完成后进行矫正处理;When the base plate unit is processed according to the method of processing the plate unit, the base plate unit includes the main beam base plate unit and the standard section base plate unit. When cutting the material, the positioning line of the web plate unit needs to be marked, and the longitudinal stiffeners of the arc-shaped base plate unit are cut by numerical control. Drill holes at both ends of the longitudinal stiffeners of the bottom plate unit, and the connecting plate of the bottom plate unit is marked and drilled; the bottom plate unit is a slat rib, and a codeless assembly equipment is used to assemble multiple slat ribs at the same time. Welding is carried out on the welding frame, using automatic slat rib welding equipment for welding, and rectification after welding is completed;

主梁底板单元在已超平处理的工装平台上采用火焰矫正方式校平,对板条肋焊缝对应部位的底板单元背面进行烘烤消应力处理,采用2米长铝合金板尺对校平后的主梁底板单元进行平整度检查;长度纵向上,底板单元焊接后搭设胎架检查、校正。The main girder base plate unit is leveled by flame rectification on the tooling platform that has been super flat, and the back of the base plate unit at the corresponding part of the slat rib weld is subjected to baking stress relief treatment, and a 2-meter-long aluminum alloy plate ruler is used for leveling. After the main girder floor unit is checked for flatness; longitudinally, the floor unit is welded and the tire frame is erected for inspection and correction.

进一步地,板单元在加工时钢板采用矫平机矫平并采用预处理整体生产线进行钢板表面除锈及喷涂车间底漆,除锈等级达到Sa2.5;零部件采用等离子数控切割,板条采用多头直条切割机抽直条下料以确保下料精度,制孔采用数控平面钻;Further, during the processing of the plate unit, the steel plate is leveled by a leveling machine, and the whole production line of pretreatment is used to remove rust on the surface of the steel plate and spray the shop primer, and the rust removal level reaches Sa2.5; The multi-head straight strip cutting machine draws straight strips to ensure the blanking accuracy, and the holes are made by CNC plane drilling;

板单元在组装胎架上组装并以板件边缘和端头作为定位基准,组装前按样图所给出曲线坐标逐点连出曲线并在顶、底、腹板单元上画出横隔板定位中心线,在顶板上画出各条板肋定位线间距,在横隔板经过点上画出板肋定位点,在两横隔板间点画出腹板定位边线并在其中心线上分段用洋冲打出标记,控制顶底腹板单元铺装定位精度以确保每块底板单元的纵向中心线与桥梁中心线平行,控制横隔板与补强圈组装焊接后平面度,板肋板单元组装尺寸偏差需控制在规范以内;The plate unit is assembled on the assembled tire frame and the edge and end of the plate are used as the positioning reference. Before assembly, the curve coordinates are given in the sample drawing to connect the curve point by point and draw the diaphragm on the top, bottom and web units. Locate the center line, draw the spacing of each rib locating line on the top plate, draw the rib locating point on the passing point of the diaphragm, and draw the web locating edge on the center line between the two diaphragms Mark the sections with foreign punches, control the positioning accuracy of the top and bottom web units to ensure that the longitudinal centerline of each floor unit is parallel to the bridge centerline, control the flatness of the diaphragm and the reinforcement ring after assembly and welding, and the plate ribs The assembly size deviation of the board unit should be controlled within the specification;

板单元在加工焊接时,组装焊接前清除待焊区域铁锈、氧化皮、油污及钢板预处理事车间底漆,焊道两侧清理范围均不低于30mm,板单元组装后需在24h内焊接,对待焊接区域湿度较大工况需在焊缝打磨后5h内施焊,焊接环境温度不低于0℃、湿度需小于80%,施焊时母材非焊接区域严禁焊接引弧,焊接后及时清除熔渣及飞溅物,多层焊接时需连续施焊并控制层间温度,每一层焊缝焊完后及时清除药皮、熔渣、溢流后再焊下一层;对接接头焊缝两端需设引弧板和熄弧板,焊接完毕后采用火焰切割去除引熄弧板并打磨平整;When the plate unit is processed and welded, remove the rust, oxide scale, oil stain and steel plate pretreatment workshop primer in the area to be welded before assembling and welding. The cleaning range on both sides of the welding bead is not less than 30mm. , The welding area should be welded within 5 hours after the welding seam is polished under the condition of high humidity in the welding area. The welding environment temperature should not be lower than 0 °C, and the humidity should be less than 80%. During welding, it is strictly forbidden to start welding in the non-welding area of the base metal. After welding Remove slag and spatter in time. Continuous welding and control the temperature between layers are required for multi-layer welding. After each layer of weld is welded, remove the coating, slag and overflow in time before welding the next layer; butt joint welding Both ends of the seam need to be equipped with arc ignition plates and arc quenching plates. After welding, flame cutting is used to remove the arc ignition and quenching plates and grind them flat;

板单元在加工焊接后需对其进行矫正,采取火焰矫正和机械矫正相结合方式进行,对面板中间局部鼓泡采取“梅花点”均布点状火焰矫正方式,采用热矫正时加热温度在600~800℃,矫正后零件温度需缓慢冷却,忌用水急冷。After the plate unit is processed and welded, it needs to be rectified by a combination of flame rectification and mechanical rectification. The partial bubbling in the middle of the panel is rectified with a "plum blossom" uniformly distributed point flame. The heating temperature during thermal rectification is 600~ 800 ℃, the temperature of the parts should be slowly cooled after correction, and quenching with water should not be used.

与现有技术相比,本发明具有以下有益效果:Compared with the prior art, the present invention has the following beneficial effects:

本发明设计科学合理,可以有效地在工厂制造时控制好钢箱梁的空间线形和整体几何尺寸,以提高钢箱梁制造精度,减小钢箱梁焊接加工时的变形,分散焊接内应力,对钢箱梁采取板单元加工,然后再进行节段的总拼装,满足《公路桥涵施工技术规范》要求同时实现钢箱梁线性控制及加工精度。The invention is scientific and reasonable in design, and can effectively control the spatial alignment and overall geometric size of the steel box girder during factory manufacturing, so as to improve the manufacturing accuracy of the steel box girder, reduce the deformation during the welding process of the steel box girder, and disperse the welding internal stress. The steel box girder is processed by plate unit, and then the general assembly of the segments is carried out, which meets the requirements of the "Technical Specification for Highway Bridge and Culvert Construction" and realizes the linear control and processing accuracy of the steel box girder.

附图说明Description of drawings

图1为本发明曲线变截面钢箱梁加工制造方法流程图。Fig. 1 is a flow chart of a method for manufacturing a curved variable-section steel box girder according to the present invention.

图2为本发明板单元加工方法流程图。FIG. 2 is a flow chart of the processing method of the board unit according to the present invention.

图3为本发明钢箱梁横断面示意图。3 is a schematic cross-sectional view of the steel box girder of the present invention.

图4为本发明板肋板单元示意图。Fig. 4 is a schematic diagram of the plate rib unit of the present invention.

图5为本发明22mm纵联合12mm模板示意图。FIG. 5 is a schematic diagram of a 22mm longitudinally combined 12mm template of the present invention.

图6为本发明标准断面底板单元示意图。FIG. 6 is a schematic diagram of a standard section base plate unit of the present invention.

图7为本发明主梁底板单元示意图。FIG. 7 is a schematic diagram of the main beam base plate unit of the present invention.

图8为本发明腹板定位线标记示意图。FIG. 8 is a schematic diagram of the marking of the positioning line of the web of the present invention.

图9为本发明底板单元示意图。FIG. 9 is a schematic diagram of the base plate unit of the present invention.

图10为本发明腹板单元示意图。Figure 10 is a schematic diagram of the web unit of the present invention.

图11为本发明倒拼装工装胎架搭设示意图。FIG. 11 is a schematic diagram of the erection of the inverted assembling tooling frame according to the present invention.

图12为本发明顶板单元在倒拼装工装胎架上铺装示意图。FIG. 12 is a schematic diagram of the top plate unit being installed on the inverted-assembled tooling frame according to the present invention.

图13为本发明隔板单元拼装示意图。FIG. 13 is a schematic diagram of the assembly of the partition unit of the present invention.

图14为本发明腹板单元拼装示意图。Figure 14 is a schematic diagram of the web unit assembly of the present invention.

图15为本发明隔板与腹板、顶板焊接示意图。Figure 15 is a schematic diagram of the welding of the partition plate, the web plate and the top plate according to the present invention.

图16为本发明正拼装工装胎架搭设示意图。FIG. 16 is a schematic diagram of the erection of the assembling tool tire frame according to the present invention.

图17为本发明底板单元在正拼装工装胎架上铺装示意图。Fig. 17 is a schematic diagram of paving the base plate unit on the assembling tooling frame according to the present invention.

图18为本发明四方箱体拼装示意图。FIG. 18 is a schematic diagram of the assembly of the square box of the present invention.

图19为本发明横联和悬挑拼装示意图。FIG. 19 is a schematic diagram of horizontal connection and cantilever assembly of the present invention.

图20为本发明装配顶板剪力键示意图。Fig. 20 is a schematic diagram of assembling the top plate shear key according to the present invention.

图21为本发明板肋组装尺寸允许偏差图例1。Fig. 21 is the diagram example 1 of the allowable deviation of the assembly size of the plate rib of the present invention.

图22为本发明板肋组装尺寸允许偏差图例2。Figure 22 is a diagram 2 of the allowable deviation of the assembly dimension of the plate rib of the present invention.

图23为本发明横隔板单元组装尺寸允许偏差图例1。Fig. 23 is the diagram example 1 of the allowable deviation of the assembly size of the diaphragm unit of the present invention.

具体实施方式Detailed ways

为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图,对本发明进一步详细说明。显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to make the objectives, technical solutions and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings. Obviously, the described embodiments are only some, but not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

如图1-8所示,本发明提供的一种曲线变截面钢箱梁加工制造方法,计科学合理,可以有效地在工厂制造时控制好钢箱梁的空间线形和整体几何尺寸,以提高钢箱梁制造精度,减小钢箱梁焊接加工时的变形,分散焊接内应力,对钢箱梁采取板单元加工,然后再进行节段的总拼装,满足《公路桥涵施工技术规范》要求同时实现钢箱梁线性控制及加工精度。本发明将钢箱梁分解为不同板单元分别加工,再将所加工的板单元采取倒拼装方式拼装成钢箱梁;板单元包括顶板单元、底板单元、腹板单元、隔板单元、以及横联和悬挑单元。拼装钢箱梁包括以下步骤:As shown in Figs. 1-8, the present invention provides a method for processing and manufacturing a steel box girder with variable cross-section, which is scientific and reasonable, and can effectively control the spatial alignment and overall geometric dimensions of the steel box girder during factory manufacturing, so as to improve the The manufacturing accuracy of steel box girder can reduce the deformation of steel box girder during welding, disperse welding internal stress, adopt plate element processing for steel box girder, and then carry out the general assembly of segments, which meets the requirements of "Technical Specification for Highway Bridge and Culvert Construction" at the same time. Realize the linear control and machining accuracy of steel box girder. The invention decomposes the steel box girder into different plate units and processes them separately, and then assembles the processed plate units into the steel box girder in a reverse assembly manner; Linked and cantilevered units. Assembling the steel box girder includes the following steps:

步骤1、搭设倒拼装工装胎架;Step 1. Set up an inverted assembly tooling tire frame;

步骤2、在倒工装胎架上铺装顶板单元;Step 2. Pave the roof unit on the inverted tooling frame;

步骤3、在顶板单元上拼装隔板单元;Step 3. Assemble the partition unit on the top plate unit;

步骤4、在顶板单元和隔板单元上拼装腹板单元;Step 4. Assemble the web unit on the top plate unit and the partition unit;

步骤5、将顶板单元、隔板单元和腹板单元焊接成一体以形成三方箱体;Step 5. Weld the top plate unit, the baffle plate unit and the web plate unit into one body to form a three-sided box;

步骤6、搭设正拼装工装胎架;Step 6. Set up a positive assembly tooling tire frame;

步骤7、在正拼装工装胎架上铺装底板单元;Step 7. Lay the bottom plate unit on the assembling tooling frame;

步骤8、将三方箱体拼装至底板单元以形成四方箱体;Step 8. Assemble the three-sided box to the bottom plate unit to form a four-sided box;

步骤9、将横联和悬挑单元拼装至四方箱体上;Step 9. Assemble the horizontal and cantilever units to the square box;

步骤10、在四方箱体上装配顶板剪力键以形成钢箱梁。Step 10. Assemble the roof shear key on the square box to form the steel box girder.

本发明在所述步骤1中,搭设倒拼装工装胎架时,采用H350*150*20*20H型钢为材料进行倒拼装工装胎架的搭设,倒拼装工装胎架搭需设于硬化地面上,倒拼装工装胎架的立柱采用T型钢,并用剪刀撑连接成整体以保证倒拼装工装胎架的强度和稳定性;倒拼装工装胎架各支撑立柱定点的连线线型需与钢箱梁底板线型保持一致,各支点连线的线型需与钢箱梁纵、横向坡度及预拱度数值相一致;倒拼装工装胎架需设置纵、横基线和基准点,其外设独立基准线和基准点;倒拼装工装胎架搭设完毕后需对其整体性连线标高进行测量并对实测数据存档,以确保线型与图纸一致、完全正确后才能铺设顶板单元;每次组拼装前均应对倒拼装工装胎架进行检测,做好检测记录,合格后方可进行下一次的组拼装。In the step 1 of the present invention, when erecting the inverted-assembled tooling frame, H350*150*20*20H steel is used as the material to construct the inverted-assembled tooling frame, and the inverted-assembled tooling must be installed on the hardened ground. The column of the inverted assembling tooling frame is made of T-shaped steel and connected by scissors to ensure the strength and stability of the inverted assembling tooling frame; The line type should be consistent, and the line type of each fulcrum connection should be consistent with the longitudinal and lateral slope and pre-camber values of the steel box girder; the vertical and horizontal baselines and reference points should be set for the inverted assembling tooling frame, and its peripheral independent reference line should be set. and the reference point; after the erection of the inverted assembly tooling tire frame, the overall connection elevation should be measured and the measured data should be archived to ensure that the line type is consistent with the drawing and completely correct before the roof unit can be laid; The inverted assembly tooling tire frame should be inspected, and the inspection record should be made. After passing the test, the next assembly can be carried out.

本发明在所述步骤6中,搭设正拼装工装胎架时,正拼装工装胎架搭设在硬化地面上,正拼装工装胎架立柱采用T型钢并用剪刀撑连接成整体以保证正拼装工装胎架的强度和稳定性。In the step 6 of the present invention, when erecting the positive-assembling tooling tire frame, the positive-assembling tooling tire frame is erected on the hardened ground, and the positive-assembling tooling tire frame column adopts T-shaped steel and is connected with scissors to form a whole to ensure the positive-assembling tooling tire frame strength and stability.

本发明在所述步骤2中,在倒工装胎架上铺装顶板单元时,顶板单元需校正至自然状态下与倒工装胎架完全贴合,禁止采用点焊、楔码方式强行将顶板单元与倒工装胎架贴合;过程中需精确测量以控制顶板单元铺装的定位精度,顶板单元在顺桥向方向不能出现偏移,当出现偏移时,需立即调整顶板单元定位,确保每块顶板单元的纵向中心线与桥梁中心线平行。In the step 2 of the present invention, when the top plate unit is installed on the inverted tire frame, the top plate unit needs to be corrected to completely fit with the inverted tire frame in a natural state, and it is prohibited to use spot welding and wedge coding to force the top plate unit. Fitting with the reverse tooling tire frame; precise measurement is required in the process to control the positioning accuracy of the roof unit paving. The roof unit cannot be offset in the direction of the bridge. When deviation occurs, the positioning of the roof unit needs to be adjusted immediately to ensure that every The longitudinal centerline of the block roof element is parallel to the bridge centerline.

本发明在所述步骤7中,在正拼装工装胎架上铺装底板单元时,底板单元在正拼装工装胎架上制作,底板肋焊接时采用自动化设备对称施焊以控制焊接变形,底板单元在焊完校正至自然状态下后需与正拼装工装胎架完全贴合,禁止采用点焊、楔码方式强行将底板单元与正拼装工装胎架贴合。In the step 7 of the present invention, when the base plate unit is installed on the assembling tool frame, the base plate unit is fabricated on the assembling tool frame, and the base plate rib is welded symmetrically with automatic equipment to control welding deformation, and the base plate unit is welded. After the welding is completed and corrected to the natural state, it must be completely fitted with the frame of the assembling tooling. It is prohibited to use spot welding and wedge coding to force the bottom plate unit and the frame of the assembling tooling to fit.

本发明隔板单元在平台上制作,腹板单元在腹板工装上制作,隔板单元的隔板肋和腹板单元的腹板肋在焊接时均采用自动化设备对称施焊以控制焊接变形,并且每次焊接完均需校正后方可流转至下道工序,隔板单元和腹板单元均采用吊线锤检查以确保隔板和腹板铅锤于大地。The separator unit of the invention is fabricated on the platform, the web unit is fabricated on the web tooling, the separator rib of the separator unit and the web rib of the web unit are welded symmetrically by automated equipment to control the welding deformation, And after each welding, it needs to be corrected before it can be transferred to the next process. Both the diaphragm unit and the web unit are checked with a hanging wire hammer to ensure that the diaphragm and the web are plumb on the ground.

本发明在所述步骤5中,将顶板单元、隔板单元和腹板单元焊接成一体时,先将隔板单元与腹板单元立焊,后将隔板单元与顶板单元平焊,并对称施焊以控制焊接变形;根据每个断面腹板单元高度不同,隔板单元与腹板单元立焊在底板单元长度方向预留1-2米不焊,待在正拼装工装胎架上将三方箱体与底板单元完成拼装后再行焊接。In the present invention, in the step 5, when the top plate unit, the baffle plate unit and the web plate unit are welded into one body, the baffle plate unit and the web plate unit are first welded vertically, and then the baffle plate unit and the top plate unit are flat-welded, and symmetrically Welding is performed to control the welding deformation; according to the height of the web unit of each section, the vertical welding of the bulkhead unit and the web unit is reserved for 1-2 meters in the length direction of the bottom plate unit without welding, and the three-way The box body and the bottom plate unit are assembled and then welded.

本发明在所述步骤10中,在四方箱体上装配顶板剪力键以形成钢箱梁后;需对钢箱梁进行校正、配钻螺栓孔,连接板采用冲钉精确定位,用普通螺栓压紧后对箱体进行配钻。In the present invention, in the step 10, after assembling the roof shear key on the square box to form the steel box girder; the steel box girder needs to be calibrated and drilled with bolt holes. After pressing, drill the box body.

本发明加工板单元方法按照如下步骤进行:The method of processing the plate unit of the present invention is carried out according to the following steps:

步骤(1)、对加工材料进行放样、拼接、切割,过程中需进行焊缝探伤检验;Step (1), lofting, splicing, and cutting the processing materials, and welding seam inspection is required during the process;

步骤(2)、对所加工板单元进行放线及零部件焊接边打磨;Step (2): Paying off the processed plate unit and grinding the parts while welding;

步骤(3)、组装点焊板肋,过程中需进行焊缝探伤检验;Step (3), assembling the spot welding plate rib, and the welding seam flaw detection inspection is required in the process;

步骤(4)、板单元焊接,过程中需进行焊缝探伤检验;Step (4), the plate unit is welded, and the welding seam inspection is required during the process;

步骤(5)、板单元矫正,即可。Step (5), the plate unit is corrected, and that's it.

本发明按照加工板单元方法加工顶板单元时,加工顶板单元的材料采用12mm厚钢板和22mm厚度钢板,在顺桥向主梁腹板线处以及横桥向横联处采用22mm厚钢板,其余部位均采用12mm厚钢板;顶板单元包括厚度为22mm的纵横联和厚度为12mm的钢模板,下料时纵横联将腹板定位线用洋冲标记出来以保证相邻钢箱梁箱体腹板单元不出现错边情况;下料时,纵横联不开设坡口,12mm钢模板开坡口;下料时分别将纵横联和钢模板单独下料,然后进行拼接,拼接时分两边拼接以保证顶板平整度及减少因顶板单元焊缝多产生的焊接变形。When the present invention processes the roof unit according to the method of processing the plate unit, the material for processing the roof unit adopts the 12mm thick steel plate and the 22mm thick steel plate, and the 22mm thick steel plate is used at the web line of the main girder along the bridge direction and the transverse joint in the transverse bridge direction. 12mm thick steel plates are used; the top plate unit includes vertical and horizontal joints with a thickness of 22mm and steel formwork with a thickness of 12mm. When cutting materials, the vertical and horizontal joints mark the web positioning line with Yang Chong to ensure the adjacent steel box girder box web plate unit There is no wrong side situation; when cutting, the vertical and horizontal links are not beveled, and the 12mm steel formwork is beveled; when blanking, the vertical and horizontal links and steel formwork are separately blanked, and then spliced. When splicing, the two sides are spliced to ensure that the top plate is flat and reduce the welding deformation caused by the welding seam of the roof unit.

本发明腹板单元包括腹板和板肋,腹板截面高度3m-6m,按照加工板单元方法加工腹板单元时,腹板单元下料按每个工装划分长度进行下料,将腹板单元内外均打出隔板单元的洋冲眼以便于组装定位隔板单元,腹板单元开设40度的外坡口,不留钝边;加工时一个工装位的腹板为整段,焊接完成后进行切割断开若干个腹板节段,每个腹板节段提前钻单侧,减少空中钻孔量;腹板单元的组装、焊接和矫正均与顶板单元相一致。The web unit of the present invention includes a web and a rib, and the height of the web section is 3m-6m. When the web unit is processed according to the method of processing the panel unit, the blanking of the web unit is performed according to the length of each tooling division, and the web unit is cut. The foreign punch holes of the baffle unit are punched both inside and outside to facilitate the assembly and positioning of the baffle unit. The web unit is provided with a 40-degree outer groove without leaving a blunt edge; the web of a tooling position is a whole section during processing, and the welding is completed after the completion. Several web segments are cut and disconnected, and each web segment is drilled on one side in advance to reduce the amount of drilling in the air; the assembly, welding and correction of the web unit are consistent with the roof unit.

本发明隔板单元包括隔板面板、纵向和横向加劲板肋、人孔圈加劲板肋,按照加工板单元方法加工隔板单元时,将隔板面板放置在平整工装面上采用机器人按照先立缝后平缝、从中间朝两边对称施焊原则进行焊接以减小焊接变形,当纵向和横向加劲板肋及人孔圈加劲板肋的板厚>16mm时采取开坡口的部分熔透焊缝,当纵向和横向加劲板肋及人孔圈加劲板肋的板厚≤16mm时采取普通角焊缝。The baffle unit of the invention includes baffle panels, longitudinal and transverse stiffening ribs, and manhole ring stiffening ribs. When the baffle unit is processed according to the method of processing the baffle unit, the baffle panel is placed on a flat tooling surface, and a robot is used to erect the baffle unit according to the first method. After the seam, the welding is carried out on the principle of flat seam and symmetrical welding from the middle to both sides to reduce the welding deformation. When the plate thickness of the longitudinal and transverse stiffening ribs and the manhole ring stiffening ribs is greater than 16mm, partial penetration welding with open grooves is adopted. When the plate thickness of longitudinal and transverse stiffening ribs and manhole ring stiffening ribs is less than or equal to 16mm, ordinary fillet welds shall be adopted.

本发明隔板面板双面设隔板加劲板肋,并且隔板加劲板肋处于自由收缩端,焊接后四周边会出现不同程度的翘曲变形,需对隔板面板进行平面度矫正;对隔板单元进行矫正时,采取火焰矫正和机械矫正相结合方式进行,对于隔板面板中间局部鼓泡部位采取“梅花点”的均布点状火焰矫正方式进行矫正。The baffle panel of the invention is provided with baffle stiffening ribs on both sides, and the baffle stiffening rib is at the free shrinkage end. After welding, the four peripheries will be warped and deformed to varying degrees, and the baffle panel needs to be corrected for flatness; When the plate unit is rectified, a combination of flame rectification and mechanical rectification is adopted. For the partial bubbling part in the middle of the baffle panel, the uniformly distributed point flame rectification method of "plum blossom" is used for rectification.

本发明按照加工板单元方法加工底板单元时,底板单元包括主梁底板单元和标准断面底板单元,下料时,需标记出腹板单元定位线,存在弧形的底板单元纵向加劲肋采用数控下料,底板单元纵向加劲肋两端钻孔,底板单元连接板进行划线配钻;底板单元为板条肋,组装时采用无码组装设备同时对多条板条肋进行组装,主梁底板单元在反变形焊接胎架上进行焊接,采用板条肋自动焊接设备焊接,焊接完成后进行矫正处理。When the present invention processes the base plate unit according to the method of processing the plate unit, the base plate unit includes the main beam base plate unit and the standard section base plate unit. When cutting the material, the positioning line of the web plate unit needs to be marked, and the longitudinal stiffeners of the arc-shaped base plate unit are processed by numerical control. materials, drill holes at both ends of the longitudinal stiffeners of the bottom plate unit, and carry out marking and drilling on the connecting plate of the bottom plate unit; the bottom plate unit is a slat rib. Welding is carried out on the anti-deformation welding frame, and welding is carried out by automatic slat rib welding equipment. After the welding is completed, the correction treatment is carried out.

本发明主梁底板单元在已超平处理的工装平台上采用火焰矫正方式校平,对板条肋焊缝对应部位的底板单元背面进行烘烤消应力处理,采用2米长铝合金板尺对校平后的主梁底板单元进行平整度检查;长度纵向上,底板单元焊接后搭设胎架检查、校正。The main girder base plate unit of the present invention is leveled by flame rectification on the tooling platform that has been super-flat processed, and the back of the base plate unit at the corresponding part of the slat rib weld is subjected to baking stress relief treatment, and a 2-meter-long aluminum alloy plate ruler is used to After leveling, the main beam floor unit is checked for flatness; longitudinally, the floor unit is welded and the tire frame is installed for inspection and correction.

本发明板单元在加工时钢板采用矫平机矫平并采用预处理整体生产线进行钢板表面除锈及喷涂车间底漆,除锈等级达到Sa2.5;零部件采用等离子数控切割,板条采用多头直条切割机抽直条下料以确保下料精度,制孔采用数控平面钻。During the processing of the plate unit of the present invention, the steel plate is leveled by a leveling machine, and the whole production line of pretreatment is used to remove rust on the surface of the steel plate and spray the shop primer, and the rust removal grade reaches Sa2.5; The straight strip cutting machine draws straight strips to ensure the blanking accuracy, and the holes are made by CNC plane drilling.

本发明板单元在组装胎架上组装并以板件边缘和端头作为定位基准,组装前按样图所给出曲线坐标逐点连出曲线并在顶、底、腹板单元上画出横隔板定位中心线,在顶板上画出各条板肋定位线间距,在横隔板经过点上画出板肋定位点,在两横隔板间点画出腹板定位边线并在其中心线上分段用洋冲打出标记,控制顶底腹板单元铺装定位精度以确保每块底板单元的纵向中心线与桥梁中心线平行,控制横隔板与补强圈组装焊接后平面度,对于板肋板单元必须作样检查组装尺寸偏差,组装尺寸必须控制在规范以内,板肋板单元作样尺寸允许偏差见表1所示。The plate unit of the present invention is assembled on the assembled tire frame and uses the edge and end of the plate as the positioning reference. Before assembly, the curve is connected point by point according to the curve coordinates given in the sample drawing, and horizontal lines are drawn on the top, bottom and web units. Clapboard positioning center line, draw the spacing of each rib positioning line on the top plate, draw the plate rib positioning point on the passing point of the transverse partition, and draw the web positioning edge at the point between the two transverse partitions and its center Mark the sections on the line with foreign punches, control the positioning accuracy of the top and bottom web units to ensure that the longitudinal centerline of each floor unit is parallel to the bridge centerline, and control the flatness of the diaphragm and the reinforcement ring after assembly and welding. For the plate and rib unit, samples must be made to check the assembly size deviation, and the assembly size must be controlled within the specification. The allowable deviation of the sample size of the plate and rib unit is shown in Table 1.

表1板肋板单元作样尺寸允许偏差表Table 1 The allowable deviation of the sample size of the plate rib unit

序号serial number 项目project 允许偏差(mm)Allowable deviation (mm) 11 对角线diagonal 1.01.0 22 平行线间距离和分段尺寸Distance between parallel lines and segment size ±1.0±1.0 33 宽度、长度width, length +0.5~-1.0+0.5~-1.0 44 加工样板的角度The angle of the processing template ±10’±10’ 55 曲线样板上任意点偏离Any point deviation on the curve template 1.01.0

本发明板单元在加工焊接时,组装焊接前清除待焊区域铁锈、氧化皮、油污及钢板预处理事车间底漆,焊道两侧清理范围均不低于30mm,板单元组装后需在24h内焊接,对待焊接区域湿度较大工况需在焊缝打磨后5h内施焊,焊接环境温度不低于0℃、湿度需小于80%,施焊时母材非焊接区域严禁焊接引弧,焊接后及时清除熔渣及飞溅物,多层焊接时需连续施焊并控制层间温度,每一层焊缝焊完后及时清除药皮、熔渣、溢流后再焊下一层;对接接头焊缝两端需设引弧板和熄弧板,焊接完毕后采用火焰切割去除引熄弧板并打磨平整。When the plate unit of the present invention is processed and welded, the rust, oxide scale, oil stain and steel plate pretreatment workshop primer in the area to be welded should be removed before assembly and welding, and the cleaning range on both sides of the welding bead is not less than 30mm. For internal welding, the welding area should be welded within 5 hours after the welding seam is polished under the condition of high humidity in the welding area. The welding environment temperature should not be lower than 0 °C and the humidity should be less than 80%. During welding, the welding arc is strictly prohibited in the non-welding area of the base metal. After welding, remove slag and spatter in time. When multi-layer welding, it is necessary to continuously weld and control the temperature between layers. After each layer of weld is welded, remove the coating, slag, and overflow in time, and then weld the next layer; Both ends of the welding seam of the joint shall be provided with arc ignition plates and arc quenching plates. After welding, the arc ignition and quenching plates shall be removed by flame cutting and smoothed.

本发明板单元在加工焊接后需对其进行矫正,采取火焰矫正和机械矫正相结合方式进行,对面板中间局部鼓泡采取“梅花点”均布点状火焰矫正方式,采用热矫正时加热温度在600~800℃,矫正后零件温度需缓慢冷却,忌用水急冷。零件矫正允许偏差如表2所示;板肋组装尺寸允许偏差如表3所示,表中字母见图21和图22;横隔板单元组装尺寸允许偏差如表4所示,表中字母见图23;其他零件组装尺寸允许偏差如表5所示。The panel unit of the present invention needs to be rectified after processing and welding, and it is carried out by a combination of flame rectification and mechanical rectification. The partial bubbling in the middle of the panel adopts the uniformly distributed point-like flame rectification method of "plum dots". 600 ~ 800 ℃, the temperature of the parts should be slowly cooled after correction, and quenching with water should not be used. The allowable deviation of parts correction is shown in Table 2; the allowable deviation of the plate rib assembly size is shown in Table 3, the letters in the table are shown in Figure 21 and Figure 22; the allowable deviation of the assembly size of the diaphragm unit is shown in Table 4, and the letters in the table are shown in Table 4. Figure 23; The allowable deviation of assembly dimensions of other parts is shown in Table 5.

表2零件矫正允许偏差(mm)Table 2 Parts Correction Allowable Deviation (mm)

Figure BDA0003680908470000121
Figure BDA0003680908470000121

表3板肋组装尺寸允许偏差(mm)Table 3. Allowable deviation of plate rib assembly size (mm)

Figure BDA0003680908470000122
Figure BDA0003680908470000122

Figure BDA0003680908470000131
Figure BDA0003680908470000131

表4横隔板单元组装尺寸允许偏差(mm)Table 4. Allowable deviation of assembly size of diaphragm unit (mm)

Figure BDA0003680908470000132
Figure BDA0003680908470000132

表5其他零件组装尺寸允许偏差(mm)Table 5 Allowable deviation of assembly dimensions of other parts (mm)

Figure BDA0003680908470000133
Figure BDA0003680908470000133

本发明工装胎架制作精度高,工装胎架自身具有足够强度和稳定性,满足钢箱梁钢箱梁拼装需求,采用H350*150*20*20H型钢来搭设,各支撑立柱定点连线线型与钢箱梁底板线型保持一致。各支点连线的线型将钢箱梁纵、横向坡度及预拱度数值一并考虑进去。工装胎架搭设好后,对整体性连线标高进行测量以确保线型与图纸一致、完全正确后方铺设地板单元。胎架上设置纵、横基线和基准点;胎架外设置独立的基准线、基准点。每次组装前均对胎架进行检测,做好检测记录,确认合格后方进行下一次的组拼;每次胎架标高均考虑桥梁竖曲线及预拱度造成的影响。The tooling frame of the invention has high production precision, and the tooling frame itself has sufficient strength and stability to meet the assembly requirements of steel box beams and steel box beams. The line type of the box girder bottom plate remains the same. The line type of each fulcrum connection takes into account the longitudinal, transverse slope and pre-camber values of the steel box girder. After the tooling tire frame is erected, the overall connection elevation is measured to ensure that the line type is consistent with the drawing, and the floor unit is completely correct behind. Vertical and horizontal baselines and reference points are set on the tire frame; independent reference lines and reference points are set outside the tire frame. The tire frame is tested before each assembly, and the inspection record is made. After confirming that it is qualified, the next assembly is carried out; each tire frame elevation takes into account the influence caused by the vertical curve of the bridge and the pre-camber.

本发明箱体横隔板加工精度高,包括周边几何尺寸、相邻边夹角控制和纵向板肋槽口位置精度控制,隔板下料尺寸偏差直接影响箱形的组装精度,控制横隔板与补强圈组装焊接后的平面度,平面度不合格横隔板在矫正合格后方能进行装配。The box diaphragm of the invention has high machining accuracy, including peripheral geometric size, adjacent side angle control and longitudinal plate rib slot position accuracy control. The flatness after assembly and welding with the reinforcing ring, the flatness of the diaphragm can not be assembled after the flatness is unqualified.

本发明顶、底、腹板单元下料精度高,按详图所给出曲线坐标逐点连出曲线,并在底、腹板上画出横隔板的定位中心线、顶板上在横隔板经过点上画出板肋定位点以防止横隔板中心与顶板上纵向板肋中心不一致。在两横隔板间应多点画出腹板定位边线,在其中心线上分段用洋冲打出标记。The top, bottom and web units of the invention have high blanking precision, and the curves are connected point by point according to the curve coordinates given in the detailed drawing, and the positioning center line of the transverse partition is drawn on the bottom and the web, and the top plate is on the transverse partition. The rib positioning points are drawn on the plate passing points to prevent the center of the diaphragm from being inconsistent with the center of the longitudinal rib on the top plate. Between the two transverse partitions, the positioning edge of the web should be drawn at multiple points, and the centerline should be marked with a punch.

本发明顶板单元铺装定位精度高,铺设底板单元时,随时精确测量,严格控制顶板单元铺装的定位精度,特别是顺桥向方向定位,不能出现较大偏移。当出现偏移时,需立即调整板单元定位,确保每块顶板单元纵向中心线与桥梁中心线平行。The invention has high positioning accuracy for the paving of the roof unit. When laying the floor unit, it can be accurately measured at any time, and the positioning accuracy of the roof unit paving is strictly controlled. When there is an offset, the positioning of the slab units needs to be adjusted immediately to ensure that the longitudinal centerline of each roof slab unit is parallel to the bridge centerline.

本发明板单元质量控制措施The quality control measures of the board unit of the present invention

本发明钢板及板肋预处理的控制。控制措施:钢板采用矫平机矫平,保证板面的平面度;采用预处理整体生产线进行钢板表面除锈及喷涂车间底漆,除锈等级达到Sa2.5。The control of the steel plate and the plate rib pretreatment of the present invention. Control measures: The steel plate is leveled by a leveling machine to ensure the flatness of the plate surface; the whole production line of pretreatment is used to remove rust on the surface of the steel plate and spray shop primer, and the rust removal level reaches Sa2.5.

本发明下料、数控切割精度的控制。控制措施:零部件采用等离子数控切割,板条采用多头直条切割机抽直条下料,确保下料精度;制孔采用数控平面钻;抽条、等离子切割异形板及制孔必须首检合格后方可批量加工。The invention controls the blanking and numerical control cutting precision. Control measures: Parts are cut by plasma numerical control, and the slats are cut by a multi-head straight cutting machine to ensure the cutting accuracy; CNC plane drilling is used for hole making; strips, plasma cutting special-shaped plates and holes must be qualified first inspection After batch processing.

本发明板单元组装精度的控制。控制措施:1)板单元应在组装胎架上进行组装,每次组装前应对组装胎架进行检查,确认合格后方可组装;在组装板单元时应以板件的边缘和端头(非二次切头端)作为定位基准。2)组装前应严格按详图给出的曲线坐标逐点连出曲线,并在顶、底、腹板上画出横隔板的定位中心线、在顶板上画出各条板肋定位线的间距误差不能过大,一定要在横隔板经过的点上画出板肋的定位点以防止横隔板中心与顶板上纵向板肋中心不一至。在两横隔板间应多点画出腹板的定位边线,在其中心线上分段用洋冲打出标记。3)严格控制顶底腹板单元铺装的定位精度,特别是顺桥向方向的定位,不能出现较大偏移,当出现偏移时,必须立即调整板单元定位,确保每块底板单元的纵向中心线与桥梁中心线平行。4)横隔板单元严格周边几何尺寸、相邻边的夹角的控制和纵向板肋槽口位置精度的控制,控制横隔板与补强圈组装焊接后的平面度,平面度不合格的横隔板需矫正合格后才能进行装配。5)对于板肋板单元必须作样检查组装尺寸偏差,组装尺寸必须控制在规范以内,作样尺寸允许偏差见表1。The control of the assembly precision of the board unit of the present invention. Control measures: 1) The board unit should be assembled on the assembled tire frame, and the assembled tire frame should be checked before each assembly, and it can be assembled after confirming that it is qualified; sub-cut head end) as the positioning reference. 2) Before assembly, the curve should be connected point by point in strict accordance with the curve coordinates given in the detailed drawing, and the positioning center line of the diaphragm should be drawn on the top, bottom and web plates, and the positioning lines of each plate rib should be drawn on the top plate. The spacing error should not be too large, and the positioning point of the plate rib must be drawn on the point where the diaphragm passes through to prevent the center of the diaphragm from being inconsistent with the center of the longitudinal plate rib on the top plate. The positioning edge of the web should be drawn at multiple points between the two transverse partitions, and the centerline should be marked with a punch. 3) Strictly control the positioning accuracy of the top and bottom web unit paving, especially the positioning along the bridge direction, and no large deviation can occur. When deviation occurs, the positioning of the plate unit must be adjusted immediately to ensure that each The longitudinal centerline is parallel to the bridge centerline. 4) The diaphragm unit shall strictly control the peripheral geometric dimensions, the included angle of adjacent sides, and the position accuracy of the longitudinal plate rib notch, and control the flatness of the diaphragm and the reinforcement ring after assembly and welding. The flatness is unqualified. The diaphragm needs to be rectified and qualified before it can be assembled. 5) For the plate and rib units, samples must be made to check the assembly size deviation, the assembly size must be controlled within the specification, and the allowable deviation of the sample size is shown in Table 1.

本发明板单元焊接质量的控制。1)施焊时应严格执行焊接工艺文件,质量检查人员应检查焊接工艺文件的贯彻执行情况。2)板单元组装前必须彻底清除待焊区域的铁锈、氧化皮、油污及钢板预处理事车间底漆等有害物,清理范围焊道两侧各不低于30mm。3)主要构件应在组装后24h内焊接,若超时,可依据实际情况对待焊接部位重新进行清理或去湿处理后进行施焊。对于梁段整体拼装和桥上焊接焊缝,由于环境湿度较大,焊接区容易生锈,打磨后的焊缝应及时焊接,间隔时间不宜大于5h。4)焊接工作宜在室内或防风防雨设施内进行,焊接低合金钢环境温度不应低于5℃,焊接普通碳素钢不应低于0℃,施焊环境湿度应小于80%。当不能满足上述要求时应采取必要的工艺措施及防护措施后进行焊接。5)施焊时母材的非焊接部位严禁焊接引弧,焊接后应及时清除熔渣及飞溅物。多层焊接时宜连续施焊,且应控制层间温度,每一层焊缝焊完后应及时清理检查,应在清除药皮、熔渣、溢流和其他缺陷后,再焊下一层。6)对接接头焊缝,其两端必须设置引弧板和熄弧板,其材料和坡口形式应与被焊工件相同。焊接完毕后采用火焰切割方式去除引熄弧板,并打磨平整,严禁用锤击落。7)焊接作业尽可能采用自动化设备进行焊接,特殊部位无法自动化设备焊接时可采用二保焊焊接,二保焊焊接选调持证焊工且技术能力较强的焊工进行焊接作业。The present invention controls the welding quality of the board unit. 1) The welding process documents should be strictly implemented during welding, and the quality inspector should check the implementation of the welding process documents. 2) Before the assembly of the plate unit, the rust, oxide scale, oil stain, steel plate pretreatment and shop primer must be thoroughly removed from the area to be welded. 3) The main components should be welded within 24 hours after assembly. If the time is exceeded, the welding parts can be cleaned or dehumidified according to the actual situation. For the overall assembly of the beam section and the welding seam on the bridge, due to the high ambient humidity, the welding area is easy to rust. The welded seam after grinding should be welded in time, and the interval should not be greater than 5h. 4) The welding work should be carried out indoors or in a wind and rainproof facility. The ambient temperature for welding low alloy steel should not be lower than 5°C, for ordinary carbon steel welding should not be lower than 0°C, and the humidity in the welding environment should be less than 80%. When the above requirements cannot be met, the necessary technological measures and protective measures shall be taken before welding. 5) When welding, the non-welded parts of the base metal are strictly prohibited from welding arc, and the slag and spatter should be removed in time after welding. In multi-layer welding, continuous welding should be performed, and the temperature between layers should be controlled. After each layer of welds is welded, it should be cleaned and inspected in time. After removing the coating, slag, overflow and other defects, the next layer should be welded. 6) For the welding seam of the butt joint, the arc striking plate and the arc quenching plate must be set at both ends, and the material and groove form should be the same as the workpiece to be welded. After welding, use flame cutting to remove the arc-quenching plate, and grind it flat, and it is strictly forbidden to use a hammer to knock it down. 7) Welding should be carried out with automatic equipment as much as possible. When special parts cannot be welded by automatic equipment, two-protection welding can be used. Second-protection welding shall select certified welders and welders with strong technical ability for welding operations.

本发明板单元焊接变形及矫正的控制。1)焊接变形控制措施,①选择与控制合理的焊接顺序,即是防止焊接应力的有效措施,亦是防止焊接变形的最有效的方法之一。根据不同的焊接方法,制定不同的焊接顺序,埋弧焊一般采用逆向法、退步法;CO2气体保护焊及手工焊采用对称法、分散均匀法;编制合理的焊接顺序的方针是“分散、对称、均匀、减小拘束度”。②板单元反变形控制焊接变形,主梁腹板、底板单元板肋焊接,采取在反变形胎架上进行焊接,其反变形胎架能有效的控制焊接产生的变形。③厚板对接焊后的变形主要是角变形,厚板焊接先焊正面的一部分焊道,翻转工件,碳刨清根后焊反面的焊道,再翻转工件,这样如此往复,直至焊满正面的各道焊缝。同时在施焊时要随时进行观察其角变形情况,注意随时准备翻身焊接,以尽可能的减少焊接变形及焊缝内应力。④在复杂构件焊缝较多情况下,应根据构件形状和焊缝的布置,采取先焊收缩量较大的焊缝,后焊收缩量较小的焊缝;先焊拘束度较大而不能自由收缩的焊缝,后焊拘束度较小而能自由收缩的焊缝以达到减小焊接应力的目的。The invention controls the welding deformation and correction of the plate unit. 1) Welding deformation control measures, ① Selecting and controlling a reasonable welding sequence is an effective measure to prevent welding stress and one of the most effective methods to prevent welding deformation. According to different welding methods, different welding sequences are formulated. Submerged arc welding generally adopts reverse method and step-back method; CO 2 gas shielded welding and manual welding adopt symmetrical method and uniform dispersion method; Symmetrical, uniform and less restrictive". ②The anti-deformation of the plate unit controls the welding deformation. The main girder web and the bottom plate unit plate rib are welded, and the welding is carried out on the anti-deformation tire frame, and the anti-deformation tire frame can effectively control the deformation caused by welding. ③The deformation after butt welding of thick plates is mainly corner deformation. When welding thick plates, first weld a part of the weld bead on the front side, turn the workpiece, carbon planer and clean the root, and then weld the weld bead on the reverse side, and then turn the workpiece, and so on and so forth until the front side is fully welded. of each weld. At the same time, it is necessary to observe the angular deformation at any time during welding, and pay attention to be ready to turn over and weld at any time, so as to reduce the welding deformation and the internal stress of the weld as much as possible. ④ In the case of many welds of complex components, according to the shape of the components and the layout of the welds, the welds with larger shrinkage should be welded first, and the welds with smaller shrinkage should be welded later; Free shrinkable welds and welds with less restraint after welding and free shrinkage to achieve the purpose of reducing welding stress.

2)矫正控制措施,①对板单元的矫正,主要采取火焰矫正+机械矫正二者结合方式进行,对于面板中间局部鼓泡的,可采取“梅花点”的均布点状火焰矫正方式。②矫正后的板单元和梁段表面不得有凹痕和其它损伤。局部修整采用锤击时须加垫,不得直接锤击构件。③采用热矫时,加热温度应控制在600~800℃,严禁过烧。矫正后零件温度应缓慢冷却,温度降至室温前不得锤击钢料或用水急冷。零部件允许偏差见表2。2) Correction control measures: ① The correction of the panel unit is mainly carried out by the combination of flame correction and mechanical correction. For the partial bubbling in the middle of the panel, the uniform point flame correction method of "plum blossom point" can be adopted. ②There should be no dents and other damages on the surface of the corrected plate element and beam section. When hammering is used for local trimming, pads must be added, and the components shall not be directly hammered. ③ When using hot straightening, the heating temperature should be controlled at 600 ~ 800 ℃, and overheating is strictly prohibited. After correction, the temperature of the parts should be slowly cooled, and the steel should not be hammered or quenched with water before the temperature drops to room temperature. See Table 2 for the allowable deviation of components.

本发明板单元整体外观控制。严格按照焊接工艺评定执行焊接作业减少焊接变形;对于板型肋板单元,采用板肋无码组装设备同时对多条板肋进行组装,减少焊疤打磨外观缺陷;施焊时母材的非焊接部位严禁焊接引弧;每道工序组焊后应及时清除药皮、熔渣、飞溅物、溢流、焊疤、气孔、咬边及其他外观缺陷。The overall appearance of the panel unit of the present invention is controlled. Strictly carry out welding operations in accordance with the welding process evaluation to reduce welding deformation; for plate rib plate units, use plate rib no-code assembly equipment to assemble multiple plate ribs at the same time to reduce the appearance defects of welding scar grinding; non-welded parts of the base metal during welding Welding arc ignition is strictly prohibited; after each process group welding, the coating, slag, spatter, overflow, welding scar, porosity, undercut and other appearance defects should be removed in time.

本发明板单元尺寸允许偏差。(1)板肋板单元(含主梁底板和腹板板单元)组装尺寸的允许偏差应符合表3。(2)钢箱梁节段拼装横隔板单元组装尺寸允许偏差应符合表4规定。(3)其他零件组装尺寸允许偏差应符合表5规定。The size of the board unit of the present invention allows deviation. (1) The allowable deviation of the assembly dimensions of the plate and rib units (including the main girder bottom plate and the web plate unit) shall comply with Table 3. (2) The allowable deviation of the assembly size of the steel box girder segment assembled diaphragm unit shall comply with the requirements in Table 4. (3) The allowable deviation of assembly dimensions of other parts shall comply with the provisions in Table 5.

本发明钢箱梁制作流程,为保证其焊接质量,钢箱梁节段的拼装方式,采取“倒拼装”方式,其拼装流程如下:The manufacturing process of the steel box girder of the present invention, in order to ensure its welding quality, the assembly method of the steel box girder segment adopts the "reverse assembly" method, and the assembly process is as follows:

1.倒工装胎架搭设。采用H350*150*20*20H型钢来搭设,工装搭设在硬化地面上,工装立柱采用T型钢,并用剪刀撑连接成整体,保证工装有足够的强度和稳定性;工装搭设完毕后,必须报质检验收,实测数据存档。1. Set up the reverse tooling tire frame. H350*150*20*20H steel is used to erect the tooling, the tooling is erected on the hardened ground, the tooling column is made of T-shaped steel, and is connected with scissors to form a whole to ensure sufficient strength and stability of the tooling; after the tooling is erected, it must be reported for quality Inspection and acceptance, the measured data is archived.

2.顶板单元铺装。顶板单元必须校正至自然状态下与工装完全贴合,禁止采用点焊、楔码等方式强行将顶板与工装贴合;铺装完毕后,报质检验收,检查顶板单元拼装尺寸以及与工装贴合情况。2. Roof unit paving. The roof unit must be calibrated to fully fit with the tooling in the natural state. It is forbidden to forcibly fit the roof and tooling by spot welding, wedge code, etc.; fit the situation.

3.隔板单元拼装。隔板单元在平台上制作,隔板肋焊接时采用自动化设备对称施焊以控制焊接变形,焊完校正后方可流转至下道工序;隔板单元总装,采用吊线锤检查,确保隔板铅锤于大地。3. Partition unit assembly. The baffle unit is made on the platform, and the baffle rib is welded symmetrically with automatic equipment to control the welding deformation. After the welding is corrected, it can be transferred to the next process; on the earth.

4.腹板单元拼装。腹板单元在腹板工装上制作,腹板肋焊接时采用自动化设备对称施焊以控制焊接变形,焊完校正后方可流转至下道工序;腹板单元总装,采用吊线锤检查,确保腹板铅锤于大地。4. Web unit assembly. The web unit is made on the web tooling, and the web rib is welded symmetrically with automatic equipment to control the welding deformation. After the welding is corrected, it can be transferred to the next process; A plumb bob on the earth.

5.隔板与腹板、顶板焊接。焊接顺序为:先隔板与腹板立焊,后隔板与顶板平焊,并对称施焊以控制焊接变形;根据每个断面腹板高度不同,隔板与腹板立焊在底板方向预留1-2米不焊,待正工装上三方箱体与底板完成拼装后再焊接。(注:图中悬挑、横联在正装时拼装)5. Weld the partition plate with the web plate and the top plate. The welding sequence is: vertical welding of the partition plate and the web plate first, flat welding between the partition plate and the top plate, and symmetrical welding to control the welding deformation; Leave 1-2 meters without welding, and then weld after the three-sided box and the bottom plate are assembled on the positive tooling. (Note: The cantilever and horizontal links in the picture are assembled during formal installation)

6.预拼正装胎架搭设。工装搭设在硬化地面上,工装立柱采用T型钢,并用剪刀撑连接成整体,保证工装有足够的强度和稳定性;工装搭设完毕后,必须报质检验收,实测数据存档。6. Pre-assembled formal tire frame erection. The tooling is erected on the hardened ground, and the tooling column is made of T-shaped steel and connected with scissors to form a whole to ensure sufficient strength and stability of the tooling;

7.底板单元铺装。底板单元在正工装上制作,底板肋焊接时采用自动化设备对称施焊以控制焊接变形,焊完校正至自然状态下与工装完全贴合,禁止采用点焊、楔码等方式强行将底板与工装贴合。7. Floor unit paving. The bottom plate unit is made on the positive tooling. When the bottom plate rib is welded, it is symmetrically welded with automatic equipment to control the welding deformation. After welding, it is corrected to the natural state and fully fitted with the tooling. It is forbidden to use spot welding, wedge code, etc. fit.

8.四方箱体拼装。8. Square box assembly.

9.横联和悬挑拼装。拼装完成后报质检检查,断面尺寸、箱体线形、与工装贴合度等,合格后方可施焊。9. Horizontal and cantilever assembly. After the assembly is completed, report to quality inspection and inspection, section size, box line shape, fit with tooling, etc., and welding can be performed after passing the test.

10.装配顶板剪力键。10. Assemble the top plate shear key.

11.校正、配钻螺栓孔。连接板采用冲钉精确定位,用普通螺栓压紧后对箱体进行配钻。11. Correction and drilling of bolt holes. The connecting plate is precisely positioned by punching nails, and the box body is drilled after being pressed with ordinary bolts.

最后应说明的是:以上各实施例仅仅为本发明的较优实施例用以说明本发明的技术方案,而非对其限制,当然更不是限制本发明的专利范围;尽管参照前述各实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的范围;也就是说,但凡在本发明的主体设计思想和精神上作出的毫无实质意义的改动或润色,其所解决的技术问题仍然与本发明一致的,均应当包含在本发明的保护范围之内;另外,将本发明的技术方案直接或间接的运用在其他相关的技术领域,均同理包括在本发明的专利保护范围内。Finally, it should be noted that the above embodiments are only preferred embodiments of the present invention to illustrate the technical solutions of the present invention, not to limit them, and certainly not to limit the patent scope of the present invention; although referring to the foregoing embodiments The present invention has been described in detail, and those of ordinary skill in the art should understand that: it is still possible to modify the technical solutions recorded in the foregoing embodiments, or perform equivalent replacements to some or all of the technical features; and these modifications or replacements , does not make the essence of the corresponding technical solution deviate from the scope of the technical solutions of the embodiments of the present invention; that is to say, any change or embellishment made in the main design idea and spirit of the present invention that has no substantial meaning, it solves the problem. If the technical problem is still consistent with the present invention, it shall be included in the protection scope of the present invention; in addition, the direct or indirect application of the technical solution of the present invention in other related technical fields shall be similarly included in the patent of the present invention within the scope of protection.

Claims (10)

1. A method for processing and manufacturing a curved variable cross-section steel box girder is characterized in that the steel box girder is decomposed into different plate units to be processed respectively, and the processed plate units are assembled into the steel box girder in an inverted assembling mode; the plate unit comprises a top plate unit, a bottom plate unit, a web plate unit, a partition plate unit, a transverse connection unit and an overhanging unit.
2. The method for processing and manufacturing the curved variable-section steel box girder according to claim 1, wherein the assembling of the steel box girder comprises the following steps:
step 1, erecting an inverted assembly tooling jig frame;
step 2, paving a top plate unit on the inverted tooling jig frame;
step 3, assembling partition plate units on the top plate units;
step 4, assembling web plate units on the top plate unit and the partition plate unit;
step 5, welding the top plate unit, the partition plate unit and the web plate unit into a whole to form a three-side box body;
step 6, erecting a positive assembling tooling jig frame;
step 7, paving a bottom plate unit on the assembling tooling jig frame;
step 8, assembling the three-side box body to the bottom plate unit to form a square box body;
step 9, assembling the transverse connection and cantilever units to the square box body;
and 10, assembling a top plate shear key on the square box body to form the steel box beam.
3. The method for processing and manufacturing the curved variable-cross-section steel box girder according to claim 2, wherein in the step 1, when the inverted assembly tooling jig frame is erected, H350X 150X 20H-shaped steel is used as a material for erecting the inverted assembly tooling jig frame, the inverted assembly tooling jig frame is erected on a hardened ground, and upright columns of the inverted assembly tooling jig frame are made of T-shaped steel and are connected into a whole by using a shear support to ensure the strength and stability of the inverted assembly tooling jig frame; the line type of the connecting line of each supporting upright post fixed point of the inverted assembly tooling jig frame needs to be consistent with the line type of a steel box girder bottom plate, and the line type of the connecting line of each fulcrum needs to be consistent with the longitudinal and transverse gradients and the pre-camber numerical value of the steel box girder; the inverted assembly tooling jig frame is required to be provided with a longitudinal baseline, a transverse baseline and a datum point, and an independent datum line and a datum point are arranged outside the inverted assembly tooling jig frame; after the inverted assembly tooling jig frame is erected, the integral connection line elevation of the inverted assembly tooling jig frame needs to be measured and actual measurement data is filed, so that the top plate unit can be laid after the line type is consistent with a drawing and is completely correct; before each assembling, the inverted assembling tooling jig frame is detected, detection records are made, and the next assembling can be carried out after the assembly is qualified;
in the step 6, when the assembling tooling jig frame is erected, the assembling tooling jig frame is erected on the hardened ground, and the assembling tooling jig frame upright posts are connected into a whole by adopting T-shaped steel and bridging to ensure the strength and stability of the assembling tooling jig frame.
4. The method for processing and manufacturing the curved variable-section steel box girder according to claim 2, wherein in the step 2, when the top plate unit is laid on the tooling reversing jig frame, the top plate unit needs to be corrected to be completely attached to the tooling reversing jig frame in a natural state, and the top plate unit is not forcibly attached to the tooling reversing jig frame in a spot welding and wedge code mode; in the process, the accurate measurement is needed to control the positioning accuracy of the pavement of the top plate units, the top plate units cannot deviate along the bridge direction, and when the deviation occurs, the positioning of the top plate units needs to be immediately adjusted, so that the longitudinal center line of each top plate unit is ensured to be parallel to the center line of the bridge.
5. The method for manufacturing and processing the curved variable cross-section steel box girder according to claim 2, wherein in the step 7, when the bottom plate unit is paved on the assembling tooling jig frame, the bottom plate unit is manufactured on the assembling tooling jig frame, automatic equipment is adopted for symmetrical welding during welding of bottom plate ribs to control welding deformation, the bottom plate unit is required to be completely attached to the assembling tooling jig frame after being welded and corrected to a natural state, and the bottom plate unit is forbidden to be forcibly attached to the assembling tooling jig frame in a spot welding and wedge code mode.
6. The method for processing and manufacturing the curved variable-section steel box girder according to claim 2, wherein the partition plate unit is manufactured on a platform, the web plate unit is manufactured on a web plate tool, the partition plate ribs of the partition plate unit and the web plate ribs of the web plate unit are symmetrically welded by automatic equipment during welding to control welding deformation, the partition plate ribs and the web plate ribs can be transferred to a next process after correction after each welding, and the partition plate unit and the web plate unit are checked by a plumb bob to ensure that the partition plate and the web plate are plumbed to the ground;
in the step 5, when the top plate unit, the partition plate unit and the web plate unit are welded into a whole, the partition plate unit and the web plate unit are firstly welded vertically, then the partition plate unit and the top plate unit are welded horizontally, and welding deformation is controlled by symmetrically welding; according to the different heights of web plate units of each section, a partition plate unit and the web plate unit are vertically welded in the length direction of a bottom plate unit for reserving 1-2 meters for non-welding, and after the assembly of the three-side box body and the bottom plate unit is completed on the assembling tooling jig frame, welding is carried out;
in the step 10, assembling a top plate shear key on the square box body to form a steel box beam; the steel box girder needs to be corrected and matched with a drill bolt hole, the connecting plate is accurately positioned by adopting a punching nail, and the box body is matched with a drill after being compressed by a common bolt.
7. The method for processing and manufacturing the curved variable-section steel box girder according to claim 1, wherein the method for processing the plate unit is carried out according to the following steps:
step (1), lofting, splicing and cutting are carried out on a processed material, and flaw detection of a welding seam is required in the process;
step (2), paying off the processed plate unit and polishing the welding edge of the part;
step (3) assembling spot welding plate ribs, wherein the welding seam flaw detection is required in the process;
step (4), welding the plate units, wherein the welding seam flaw detection is required in the process;
and (5) correcting the plate unit.
8. The method for processing and manufacturing the curved variable-section steel box girder according to the claim 7, wherein when the top plate unit is processed according to the plate unit processing method, a 12mm thick steel plate and a 22mm thick steel plate are adopted as materials for processing the top plate unit, a 22mm thick steel plate is adopted at a web plate line of a forward main girder and a transverse bridging transverse joint, and 12mm thick steel plates are adopted at the rest parts; the top plate unit comprises longitudinal and transverse links with the thickness of 22mm and a steel template with the thickness of 12mm, and web positioning lines are marked by the longitudinal and transverse links in blanking so as to ensure that the web units of adjacent steel box girder boxes are free from misalignment; during blanking, no groove is formed in the longitudinal and transverse connection, and a groove is formed in a 12mm steel template; the longitudinal and transverse connection and the steel template are respectively and independently blanked during blanking, then splicing is carried out, and two sides are spliced during splicing so as to ensure the flatness of the top plate and reduce the welding deformation caused by more welding lines of the top plate unit;
the web plate unit comprises a web plate and plate ribs, the cross section height of the web plate is 3m-6m, when the web plate unit is processed according to the plate processing unit method, the web plate unit is blanked according to the length divided by each tool, ocean punching holes of the partition plate units are punched inside and outside the web plate unit so as to assemble and position the partition plate units, the web plate unit is provided with an outer slope opening of 40 degrees, and no truncated edge is left; when the web plate of one tool position is machined into a whole section, cutting off a plurality of web plate sections after welding is finished, and drilling a single side of each web plate section in advance to reduce the air drilling amount; the assembly, welding and straightening of the web units are consistent with the top plate units.
9. The method for manufacturing a curved variable cross-section steel box girder according to claim 7, wherein the partition plate unit comprises a partition plate panel, longitudinal and transverse stiffening plate ribs and a manhole ring stiffening plate rib, when the partition plate unit is manufactured according to the method for manufacturing the partition plate unit, the partition plate panel is placed on a flat tooling surface and is welded by a robot according to the principle of first vertical joint and then horizontal joint and symmetrical welding from the middle to two sides so as to reduce welding deformation, when the plate thickness of the longitudinal and transverse stiffening plate ribs and the manhole ring stiffening plate rib is more than 16mm, a part of fusion welding seam with a groove is adopted, and when the plate thickness of the longitudinal and transverse stiffening plate ribs and the manhole ring stiffening plate rib is less than or equal to 16mm, a common fillet welding seam is adopted;
baffle stiffening plate ribs are arranged on two sides of the baffle panel, are positioned at the free contraction ends, and are subjected to warping deformation in different degrees at the periphery after welding, so that the flatness of the baffle panel needs to be corrected; when the baffle plate unit is corrected, a combined mode of flame correction and mechanical correction is adopted, and the middle local bubbling part of the baffle plate panel is corrected by adopting a uniformly distributed dot-shaped flame correction mode of 'quincunx dots';
when the bottom plate unit is processed according to the plate processing unit method, the bottom plate unit comprises a main beam bottom plate unit and a standard section bottom plate unit, web plate unit positioning lines need to be marked during blanking, the longitudinal stiffening ribs of the bottom plate unit with the arc shape adopt numerical control blanking, holes are drilled at two ends of the longitudinal stiffening ribs of the bottom plate unit, and a bottom plate unit connecting plate is subjected to scribing and matched drilling; the main beam bottom plate unit is welded on a reversible deformation welding jig frame and is welded by automatic lath rib welding equipment, and correction treatment is carried out after welding is finished;
leveling the main beam bottom plate unit on the tool platform which is subjected to the ultra-leveling treatment in a flame rectification mode, baking and stress relieving treatment is carried out on the back of the bottom plate unit at the position corresponding to the welding line of the plate rib, and flatness inspection is carried out on the leveled main beam bottom plate unit by adopting an aluminum alloy plate ruler with the length of 2 meters; and in the longitudinal direction, a bed jig is set up for checking and correcting after the bottom plate unit is welded.
10. The processing and manufacturing method of the curved variable cross-section steel box girder as claimed in claim 7, wherein the steel plate is leveled by a leveler and the surface of the steel plate is derusted and shop primer is sprayed by a pretreatment whole production line when the plate unit is processed, and the derusting grade reaches Sa2.5; the parts are cut by plasma numerical control, the lath is cut by a multi-head straight-bar cutting machine to ensure the blanking precision, and the hole is made by a numerical control plane drill;
the plate unit is assembled on an assembly jig frame, the edge and the end of a plate are used as positioning references, before assembly, a curve is connected point by point according to curve coordinates given by a sample drawing, transverse partition plate positioning center lines are drawn on a top plate, rib positioning line intervals of each strip plate are drawn on a top plate, rib positioning points are drawn on the transverse partition plates passing the points, web plate positioning side lines are drawn at the points between the two transverse partition plates, marks are drawn on the center lines of the transverse partition plates in a segmented mode by ocean punching, the paving and positioning accuracy of the top and bottom web plate units is controlled to ensure that the longitudinal center line of each bottom plate unit is parallel to the center line of a bridge, the flatness of the transverse partition plates after assembly and welding of a reinforcing ring is controlled, and the assembly size deviation of the plate rib plate units needs to be controlled within specifications;
when the plate unit is processed and welded, rust, oxide skin, oil stain and primer of a steel plate pretreatment workshop in a region to be welded are removed before assembly and welding are carried out, the cleaning range of two sides of a welding bead is not less than 30mm, the plate unit is required to be welded within 24h after assembly, welding is required to be carried out within 5h after a welding seam is polished under the working condition of high humidity in the region to be welded, the temperature of the welding environment is not lower than 0 ℃, the humidity is not less than 80%, welding starting is strictly prohibited in a non-welding region of a base metal during welding, slag and splashes are removed in time after welding, interlayer temperature is required to be continuously welded and controlled during multilayer welding, and a layer is welded after welding of each layer is finished; an arc striking plate and an arc extinguishing plate are required to be arranged at two ends of a butt joint welding seam, and the arc striking and extinguishing plates are removed by flame cutting and polished to be smooth after welding;
the plate unit needs to be corrected after being processed and welded, a combined mode of flame correction and mechanical correction is adopted, a mode of uniformly distributing point-shaped flame correction is adopted for local bubbling in the middle of the panel, the heating temperature is 600-800 ℃ during thermal correction, the temperature of parts needs to be slowly cooled after correction, and water quenching is avoided.
CN202210633188.8A 2022-06-07 2022-06-07 A method for processing and manufacturing a curved variable-section steel box beam Active CN115008053B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210633188.8A CN115008053B (en) 2022-06-07 2022-06-07 A method for processing and manufacturing a curved variable-section steel box beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210633188.8A CN115008053B (en) 2022-06-07 2022-06-07 A method for processing and manufacturing a curved variable-section steel box beam

Publications (2)

Publication Number Publication Date
CN115008053A true CN115008053A (en) 2022-09-06
CN115008053B CN115008053B (en) 2024-04-05

Family

ID=83073901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210633188.8A Active CN115008053B (en) 2022-06-07 2022-06-07 A method for processing and manufacturing a curved variable-section steel box beam

Country Status (1)

Country Link
CN (1) CN115008053B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115401424A (en) * 2022-09-26 2022-11-29 广东省水利水电第三工程局有限公司 Plate unit manufacturing process
CN115476066A (en) * 2022-10-08 2022-12-16 江苏京沪重工有限公司 Positive and negative manufacturing process of assembled and superposed twin-tire approach bridge steel box girder
CN115476064A (en) * 2022-09-14 2022-12-16 南通中远海运重工装备有限公司 Manufacturing process of main beam of tyre gantry crane
CN115505722A (en) * 2022-09-27 2022-12-23 中车长江车辆有限公司 Box beam adjusting and correcting method
CN116140854A (en) * 2023-03-10 2023-05-23 武汉一冶钢结构有限责任公司 Manufacturing and mounting method for twenty-four-square rounding of large-opening-angle section of stainless steel wind tunnel
CN116219889A (en) * 2023-03-13 2023-06-06 中国电建市政建设集团有限公司 Assembling platform and integral lofting method for special-shaped oversized steel bridge roof-floor unit
CN116728003A (en) * 2023-04-13 2023-09-12 中建钢构工程有限公司 Preparation method of steel anchor beam
CN116851877A (en) * 2023-06-27 2023-10-10 中铁宝桥(扬州)有限公司 Q690qD high-strength steel beam rod piece multi-chamber structure assembly welding method
CN117001281A (en) * 2023-08-11 2023-11-07 广东二十冶建设有限公司 A method of making steel box shear walls
CN117182461A (en) * 2023-08-28 2023-12-08 中交建筑集团有限公司 A method of manufacturing and construction control of continuous steel box beams with small curvature and high piers
CN119952324A (en) * 2024-05-13 2025-05-09 江苏京沪重工有限公司 A processing and manufacturing technology of a 40m wide single-box five-chamber integral steel box beam

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006118191A (en) * 2004-10-21 2006-05-11 Kawatetsu Kyoryo Tekko Kk Construction method and formwork structure of concrete floor slab for composite floor slab bridge
KR101066838B1 (en) * 2011-04-11 2011-09-26 고문혜 Double composite steel box girders and construction method
CN108301328A (en) * 2018-02-01 2018-07-20 广州市恒盛建设工程有限公司 One kind getting higher change and indulges horizontal curve steel box girder construction method
CN110541349A (en) * 2019-09-06 2019-12-06 中国五冶集团有限公司 A special-shaped steel box girder bridge section with space curved surface and its precision welding forming method
KR20200008726A (en) * 2018-07-17 2020-01-29 박정자 Steel-concrete hybrid box-type girders with incrementally-cast bottom concrete flange and its constructional method
CN111350121A (en) * 2020-03-18 2020-06-30 中国五冶集团有限公司 A modular assembly method for steel box girder bridges
CN111676835A (en) * 2020-05-22 2020-09-18 中国五冶集团有限公司 A construction method for jacking up the steel box girder of a cable-stayed bridge
CN111926705A (en) * 2020-05-08 2020-11-13 江苏中铁山桥重工有限公司 Method for integrally assembling ultra-wide framing steel box girder
CN112453831A (en) * 2020-11-11 2021-03-09 中铁二十五局集团第五工程有限公司 Manufacturing and welding process of steel box girder
CN112942053A (en) * 2021-02-07 2021-06-11 中铁四局集团有限公司 Bolt type steel box girder and manufacturing method thereof
CN113789729A (en) * 2021-10-13 2021-12-14 南通华川交通装备有限责任公司 Road and bridge steel box girder assembling construction method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006118191A (en) * 2004-10-21 2006-05-11 Kawatetsu Kyoryo Tekko Kk Construction method and formwork structure of concrete floor slab for composite floor slab bridge
KR101066838B1 (en) * 2011-04-11 2011-09-26 고문혜 Double composite steel box girders and construction method
CN108301328A (en) * 2018-02-01 2018-07-20 广州市恒盛建设工程有限公司 One kind getting higher change and indulges horizontal curve steel box girder construction method
KR20200008726A (en) * 2018-07-17 2020-01-29 박정자 Steel-concrete hybrid box-type girders with incrementally-cast bottom concrete flange and its constructional method
CN110541349A (en) * 2019-09-06 2019-12-06 中国五冶集团有限公司 A special-shaped steel box girder bridge section with space curved surface and its precision welding forming method
CN111350121A (en) * 2020-03-18 2020-06-30 中国五冶集团有限公司 A modular assembly method for steel box girder bridges
CN111926705A (en) * 2020-05-08 2020-11-13 江苏中铁山桥重工有限公司 Method for integrally assembling ultra-wide framing steel box girder
CN111676835A (en) * 2020-05-22 2020-09-18 中国五冶集团有限公司 A construction method for jacking up the steel box girder of a cable-stayed bridge
CN112453831A (en) * 2020-11-11 2021-03-09 中铁二十五局集团第五工程有限公司 Manufacturing and welding process of steel box girder
CN112942053A (en) * 2021-02-07 2021-06-11 中铁四局集团有限公司 Bolt type steel box girder and manufacturing method thereof
CN113789729A (en) * 2021-10-13 2021-12-14 南通华川交通装备有限责任公司 Road and bridge steel box girder assembling construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王连彬: "简支钢箱梁分块拼装施工工艺及荷载试验成果研究", 中国优秀硕士学位论文全文数据库工程科技Ⅱ辑, no. 5, pages 8 - 16 *
田利中;束新宇;顾志忠;付文东;: "装配式钢――混组合连续梁之槽型钢箱梁制造技术", 中国建筑金属结构, no. 11, pages 38 - 43 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115476064B (en) * 2022-09-14 2023-06-30 南通中远海运重工装备有限公司 Manufacturing process of main beam of tyre gantry crane
CN115476064A (en) * 2022-09-14 2022-12-16 南通中远海运重工装备有限公司 Manufacturing process of main beam of tyre gantry crane
CN115401424A (en) * 2022-09-26 2022-11-29 广东省水利水电第三工程局有限公司 Plate unit manufacturing process
CN115505722A (en) * 2022-09-27 2022-12-23 中车长江车辆有限公司 Box beam adjusting and correcting method
CN115476066A (en) * 2022-10-08 2022-12-16 江苏京沪重工有限公司 Positive and negative manufacturing process of assembled and superposed twin-tire approach bridge steel box girder
CN115476066B (en) * 2022-10-08 2024-02-20 江苏京沪重工有限公司 Forward and reverse manufacturing process of assembled and stacked twin-type approach bridge steel box girder
CN116140854A (en) * 2023-03-10 2023-05-23 武汉一冶钢结构有限责任公司 Manufacturing and mounting method for twenty-four-square rounding of large-opening-angle section of stainless steel wind tunnel
CN116219889A (en) * 2023-03-13 2023-06-06 中国电建市政建设集团有限公司 Assembling platform and integral lofting method for special-shaped oversized steel bridge roof-floor unit
CN116728003A (en) * 2023-04-13 2023-09-12 中建钢构工程有限公司 Preparation method of steel anchor beam
CN116851877A (en) * 2023-06-27 2023-10-10 中铁宝桥(扬州)有限公司 Q690qD high-strength steel beam rod piece multi-chamber structure assembly welding method
CN116851877B (en) * 2023-06-27 2025-09-19 中铁宝桥(扬州)有限公司 Q690qD high-strength steel beam rod piece multi-chamber structure assembly welding method
CN117001281A (en) * 2023-08-11 2023-11-07 广东二十冶建设有限公司 A method of making steel box shear walls
CN117182461A (en) * 2023-08-28 2023-12-08 中交建筑集团有限公司 A method of manufacturing and construction control of continuous steel box beams with small curvature and high piers
CN119952324A (en) * 2024-05-13 2025-05-09 江苏京沪重工有限公司 A processing and manufacturing technology of a 40m wide single-box five-chamber integral steel box beam

Also Published As

Publication number Publication date
CN115008053B (en) 2024-04-05

Similar Documents

Publication Publication Date Title
CN115008053A (en) A kind of processing and manufacturing method of curved variable section steel box girder
CN112453831B (en) Manufacturing and welding process of steel box girder
CN112342922B (en) Method for manufacturing streamline steel arch with special-shaped section box-type steel structure
CN102896472B (en) The preparation method of box type pillar beam
CN110695617B (en) Machining process of section steel column
CN112453661A (en) Welding manufacturing method for controlling thermal deformation of cross-shaped steel column
CN115229436B (en) Large double-amplitude bolting type steel box girder total splicing method
CN101691787A (en) Converse construction process for middle-high steel structure building
CN110777988B (en) Complex large-scale sheet metal copper lotus petal artistic curtain wall structure and construction method thereof
CN115847024A (en) Manufacturing process of large-span gate
CN114059721A (en) Construction method for continuously welding stainless steel metal roof of tennis court
CN115898219B (en) Split-structure light high-strength personnel door with leveling device and manufacturing method
CN115627806B (en) Pile leg lengthening process
CN113510446B (en) A construction method for processing special-shaped steel components by using a positioning frame
CN117182461B (en) A method for manufacturing and construction control of a continuous steel box girder with a small curvature and high pier
CN118342221A (en) H-shaped steel processing technology
CN118653569A (en) A modular construction method for assembled steel structure workshop
CN116275923A (en) A kind of H-shaped steel structure processing technology
CN103447785B (en) A kind of T girder steel formwork manufacture craft
CN108381128B (en) Manufacturing method of I-shaped weather-resistant steel edge girder with lifting point penetrating out
CN114109734A (en) Building process of integrated type lantern for offshore wind power generation
CN114160914A (en) Method and device for splitting T-shaped steel by H-shaped steel
CN119021078B (en) Bicycle viaduct attached to urban viaduct and manufacturing method thereof
CN116275660B (en) A method for splicing and assembling a large-size asymmetric special-shaped steel arch seat
CN121023935A (en) A fabrication process for an irregularly shaped hyperbolic steel box girder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant