CN114941377A - Assembly type concrete unit module structure and construction method thereof - Google Patents

Assembly type concrete unit module structure and construction method thereof Download PDF

Info

Publication number
CN114941377A
CN114941377A CN202210706076.0A CN202210706076A CN114941377A CN 114941377 A CN114941377 A CN 114941377A CN 202210706076 A CN202210706076 A CN 202210706076A CN 114941377 A CN114941377 A CN 114941377A
Authority
CN
China
Prior art keywords
wall panel
concrete
structural unit
connection opening
embedded bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210706076.0A
Other languages
Chinese (zh)
Inventor
何昌杰
周泉
唐宇轩
言雨桓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Hunan China Construction Fifth Bureau Green Municipal Engineering Research Center Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Hunan China Construction Fifth Bureau Green Municipal Engineering Research Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd, Hunan China Construction Fifth Bureau Green Municipal Engineering Research Center Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202210706076.0A priority Critical patent/CN114941377A/en
Publication of CN114941377A publication Critical patent/CN114941377A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34815Elements not integrated in a skeleton
    • E04B1/34823Elements not integrated in a skeleton the supporting structure consisting of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6801Fillings therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Residential Or Office Buildings (AREA)

Description

一种装配式混凝土单元模块结构及其施工方法A prefabricated concrete unit module structure and construction method thereof

技术领域technical field

本申请涉及装配式建筑技术领域,更具体地说,涉及一种装配式混凝土单元模块结构及其施工方法。The present application relates to the technical field of prefabricated buildings, and more particularly, to a prefabricated concrete unit module structure and a construction method thereof.

背景技术Background technique

目前,快速装配一体化建筑成为建筑行业的一个重要发展方向。针对跨度较小的地域建筑,装配式建筑主要用到装配式木结构、装配轻钢结构以及预制混凝土结构。轻钢活动板房具有运输方便、可拆卸、灵活性强等优点,但由于其质量轻、柔度大、阻力小、导热系数大等特点导致抗风、抗火、保温、隔声能力差;装配式木结构虽然抗震性能、保温性能较好,但防火、耐腐蚀性能较差,且成本较高。现有技术中也存在预制混凝土为主体结构的装配式建筑,但是现有技术中的混凝土装配式建筑施工效率往往不高,并难以快速形成完整、质量可靠的房屋空间单元。At present, the rapid assembly of integrated buildings has become an important development direction of the construction industry. For regional buildings with small spans, prefabricated buildings mainly use prefabricated wood structures, assembled light steel structures and prefabricated concrete structures. The light steel prefab house has the advantages of convenient transportation, disassembly, and strong flexibility, but due to its light weight, high flexibility, low resistance, and high thermal conductivity, it leads to poor wind resistance, fire resistance, thermal insulation, and sound insulation; Although the prefabricated wood structure has good seismic performance and thermal insulation performance, it has poor fire resistance and corrosion resistance and high cost. There are also prefabricated buildings with precast concrete as the main structure in the prior art, but the construction efficiency of the prefabricated concrete buildings in the prior art is often not high, and it is difficult to quickly form a complete and reliable house space unit.

发明内容SUMMARY OF THE INVENTION

本发明主要目的是提供一种装配式混凝土单元模块结构及其施工方法,旨在解决现有技术中混凝土装配式建筑施工效率往往不高,并难以快速形成完整、质量可靠的房屋空间单元的技术问题。The main purpose of the present invention is to provide a prefabricated concrete unit module structure and a construction method thereof, aiming to solve the technical problem that the construction efficiency of concrete prefabricated buildings in the prior art is often not high, and it is difficult to quickly form a complete and reliable housing space unit question.

为实现上述目的,本发明采用的技术方案是:一种装配式混凝土单元模块结构,其中,包括:In order to achieve the above purpose, the technical solution adopted in the present invention is: a prefabricated concrete unit module structure, which includes:

第一混凝土结构单元,包括多个第一混凝土墙体,所述多个第一混凝土墙体连接以围合成具有第一连接敞口的第一空间;a first concrete structural unit, comprising a plurality of first concrete walls connected to enclose a first space having a first connection opening;

第二混凝土结构单元,包括多个第二混凝土墙体,所述多个第二混凝土墙体连接以围合成具有第二连接敞口的第二空间;a second concrete structural unit, comprising a plurality of second concrete walls connected to enclose a second space having a second connection opening;

所述第一连接敞口周围的墙体结构与所述第二连接敞口周围的墙体结构连接以形成房屋空间单元。The wall structure around the first connection opening is connected with the wall structure around the second connection opening to form a house space unit.

进一步地,所述第一连接敞口周围的墙体结构设置有第一预埋螺栓连接件,所述第二连接敞口周围的墙体结构设置有第二预埋螺栓连接件,所述第一预埋螺栓连接件上具有第一螺纹孔,所述第二预埋螺栓连接件上具有第二螺纹孔,所述第一预埋螺栓连接件与所述第二预埋螺栓连接件通过穿设于所述第一螺纹孔和第二螺纹孔的螺栓连接。Further, the wall structure around the first connection opening is provided with a first embedded bolt connection, the wall structure around the second connection opening is provided with a second embedded bolt connection, and the first embedded bolt connection is provided. A pre-embedded bolt connector has a first threaded hole, the second pre-embedded bolt connector has a second threaded hole, the first pre-embedded bolt connector and the second pre-embedded bolt connector pass through the thread A bolt connection provided in the first threaded hole and the second threaded hole.

进一步地,所述第一连接敞口周围的墙体结构上具有第一凹槽,所述第一预埋螺栓连接件设置在所述第一凹槽中,所述第二连接敞口周围的墙体结构上具有第二凹槽,所述第二预埋螺栓连接件设置在所述第二凹槽中,所述第一凹槽与所述第二凹槽对齐并围合成填充空间。Further, the wall structure around the first connection opening has a first groove, the first embedded bolt connection is arranged in the first groove, and the wall around the second connection opening has a first groove. The wall structure is provided with a second groove, the second pre-embedded bolt connecting piece is arranged in the second groove, the first groove is aligned with the second groove and encloses a filling space.

进一步地,所述第一连接敞口周围的墙体结构上设置有围绕所述第一连接敞口一圈的第一密封槽,所述第二连接敞口周围的墙体结构上设置有围绕所述第二连接敞口一圈的第二密封槽,所述第一密封槽与所述第二密封槽对齐并围合成密封条安装空间,所述密封条安装空间中安装有密封条。Further, the wall structure around the first connection opening is provided with a first sealing groove surrounding the first connection opening, and the wall structure around the second connection opening is provided with a surrounding The second connection is an open second sealing groove, the first sealing groove is aligned with the second sealing groove and encloses a sealing strip installation space, and a sealing strip is installed in the sealing strip installation space.

进一步地,所述多个第一混凝土墙体包括第一背板以及首尾依次连接的第一底墙板、第一左墙板、第一顶墙板和第一右墙板,所述第一底墙板、第一左墙板、第一顶墙板和第一右墙板各自的一端分别连接所述第一背板以形成第一封闭端,所述第一底墙板、第一左墙板、第一顶墙板和第一右墙板各自远离所述第一封闭端的另一端形成所述第一连接敞口,所述多个第二混凝土墙体包括第二背板以及首尾依次连接的第二底墙板、第二左墙板、第二顶墙板和第二右墙板,所述第二底墙板、第二左墙板、第二顶墙板和第二右墙板各自的一端分别连接所述第二背板以形成第二封闭端,所述第二底墙板、第二左墙板、第二顶墙板和第二右墙板各自远离所述第二封闭端的另一端形成所述第二连接敞口。Further, the plurality of first concrete walls include a first back panel and a first bottom wall panel, a first left wall panel, a first top wall panel and a first right wall panel connected end to end in sequence, the first One ends of the bottom wall panel, the first left wall panel, the first top wall panel and the first right wall panel are respectively connected to the first back panel to form a first closed end, and the first bottom wall panel, the first left The other ends of the wall panel, the first top wall panel and the first right wall panel are away from the first closed end to form the first connection opening, and the plurality of second concrete walls include second back panels and end-to-end order. Connected second bottom wall panel, second left wall panel, second top wall panel and second right wall panel, said second bottom wall panel, second left wall panel, second top wall panel and second right wall panel One end of each panel is respectively connected to the second back panel to form a second closed end, and the second bottom wall panel, the second left wall panel, the second top wall panel and the second right wall panel are each away from the second The other end of the closed end forms the second connection opening.

进一步地,所述多个第一混凝土墙体中的至少一个墙体上设置有门窗洞口,所述多个第二混凝土墙体中的至少一个墙体上设置有门窗洞口。Further, at least one wall of the plurality of first concrete walls is provided with a door and window opening, and at least one wall of the plurality of second concrete walls is provided with a door and window opening.

此外,本发明还提供一种根据上述的装配式混凝土单元模块结构的施工方法,其特征在于,所述施工方法使用了导轨式辅助工具,所述导轨式辅助工具包括顶推装置、滑移支撑件、和间隔布置的两条导轨,各所述导轨的两端安装有所述顶推装置,各所述导轨上可滑移地安装有多个所述滑移支撑件,各所述滑移支撑件上安装有用于固定第一混凝土结构单元或第二混凝土结构单元的夹紧装置;In addition, the present invention also provides a construction method according to the above-mentioned prefabricated concrete unit module structure, characterized in that, the construction method uses a guide rail type auxiliary tool, and the guide rail type auxiliary tool includes a jacking device, a sliding support and two guide rails arranged at intervals, the pushing device is installed at both ends of each guide rail, and a plurality of the sliding supports are slidably installed on each of the guide rails. A clamping device for fixing the first concrete structural unit or the second concrete structural unit is installed on the support;

所述施工方法包括步骤:The construction method includes the steps:

a、将第一混凝土结构单元吊装至两条导轨上的滑移支撑件上,并使第一连接敞口的朝向与滑移支撑件在对应导轨上的滑移方向一致,并使夹紧装置将所述第一混凝土结构单元固定于所述滑移支撑件;a. Hoist the first concrete structural unit to the sliding supports on the two guide rails, make the orientation of the first connection opening consistent with the sliding direction of the sliding supports on the corresponding guide rails, and make the clamping device fixing the first concrete structural unit to the sliding support;

b、将第二混凝土结构单元吊装至两条导轨上的滑移支撑件上,并使第二连接敞口的朝向与滑移支撑件在对应导轨上的滑移方向一致,且使得第一连接敞口与第二连接敞口彼此面对,并使夹紧装置将所述第二混凝土结构单元固定于所述滑移支撑件;b. Hoist the second concrete structural unit to the sliding supports on the two guide rails, and make the orientation of the second connection opening consistent with the sliding direction of the sliding supports on the corresponding guide rails, and make the first connection The opening and the second connecting opening face each other and allow the clamping device to fix the second concrete structural unit to the sliding support;

c、在所述第一混凝土结构单元的第一密封槽与所述第二混凝土结构单元的第二密封槽之间放置密封条;c. Placing a sealing strip between the first sealing groove of the first concrete structural unit and the second sealing groove of the second concrete structural unit;

d、通过顶推装置推动第一混凝土结构单元和第二混凝土结构单元沿着导轨彼此靠近并贴合,使得第一密封槽与所述第二密封槽对齐并围合成密封条安装空间,并使得密封条被挤压安装在该密封条安装空间中;d. Push the first concrete structural unit and the second concrete structural unit to approach and fit along the guide rails by the pushing device, so that the first sealing groove is aligned with the second sealing groove and encloses a sealing strip installation space, and makes The sealing strip is squeezed and installed in the sealing strip installation space;

e、通过螺栓将第一预埋螺栓连接件和第二预埋螺栓连接件连接,并且从第一预埋螺栓连接件和第二预埋螺栓连接件的两侧分别在螺栓上安装螺母,并将螺母拧至压紧第一预埋螺栓连接件和第二预埋螺栓连接件。e. Connect the first embedded bolt connector and the second embedded bolt connector with bolts, and install nuts on the bolts from both sides of the first embedded bolt connector and the second embedded bolt connector respectively, and Tighten the nut to compress the first pre-embedded bolt connection and the second pre-embedded bolt connection.

进一步地,所述滑移支撑件为滑块,所述滑块的底部形成可滑移地夹持于导轨的夹槽,所述夹槽与对应的导轨接触的面上设置有润滑块。Further, the sliding support is a slider, the bottom of the slider forms a clamping groove slidably clamped to the guide rail, and a lubricating block is provided on the surface of the clamping groove in contact with the corresponding guide rail.

进一步地,所述施工方法还包括在所述步骤e结束后,对第一预埋螺栓连接件和第二预埋螺栓连接件所处的第一凹槽和第二凹槽进行填充封闭处理。Further, the construction method further includes filling and sealing the first groove and the second groove where the first embedded bolt connector and the second embedded bolt connector are located after the step e is completed.

进一步地,所述施工方法还包括在所述步骤e结束后的步骤:Further, the construction method also includes the steps after the end of the step e:

f、重复上述步骤a至e,形成多个房屋空间单元;f, repeat above-mentioned steps a to e, form a plurality of housing space units;

g、将多个房屋空间单元连接组合成单层或多层房屋建筑结构;g. Connect and combine multiple housing space units into a single-storey or multi-storey building structure;

h、在所述单层或多层房屋建筑结构的外围安装雨棚架、走廊架、楼梯架。h. Install a canopy frame, a corridor frame and a stair frame on the periphery of the single-storey or multi-storey building structure.

本申请提供的装配式混凝土单元模块结构的有益效果在于:The beneficial effects of the fabricated concrete unit module structure provided by the present application are:

该装配式混凝土单元模块结中,只需将预先制成的第一混凝土结构单元、第二混凝土结构单元通过第一连接敞口和第二连接敞口的对接即可快速高效的成型出一个房屋空间单元,只需通过一个连接位置(第一连接敞口周围的墙体结构与第二连接敞口周围的墙体结构)即可实现完整房屋空间单元的成型,使得成型的房屋结构的质量可靠,结构稳固,具有干法快速拆装、可循环使用、周转次数高,以及较高的建筑使用舒适度等优点,并且,通过不断地重复形成多个房屋空间单元,在竖直方向上形成多层房屋空间单元,并且在水平方向上形成多排以及/或多列房屋空间单元,可以快速形成一个具有大量房间的多层建筑,这对于需要快速形成临时甚至永久建筑的场合都能够极大地节省时间,可以满足大批量标准化、规模化的需求,例如,快速建立临时性的具有大量隔离病房的医院,或者施工厂房等等。In the modular structure of the prefabricated concrete unit, only the prefabricated first concrete structural unit and the second concrete structural unit are connected by the first connection opening and the second connection opening to form a house quickly and efficiently For the space unit, only one connection position (the wall structure around the first connection opening and the wall structure around the second connection opening) can realize the formation of the complete house space unit, so that the quality of the formed house structure is reliable. , the structure is stable, and has the advantages of quick disassembly and assembly by dry method, recyclable use, high turnover, and high building comfort. One-story house space units, and forming multiple rows and/or columns of house space units in the horizontal direction can quickly form a multi-storey building with a large number of rooms, which can greatly save the occasions that need to quickly form temporary or even permanent buildings Time, can meet the needs of large-scale standardization and large-scale, for example, to quickly build a temporary hospital with a large number of isolation wards, or to construct a workshop and so on.

附图说明Description of drawings

为了更清楚地说明本申请实施例中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本申请的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions in the embodiments of the present application more clearly, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the drawings in the following description are only for the present application. In some embodiments, for those of ordinary skill in the art, other drawings can also be obtained according to these drawings without any creative effort.

图1为本申请的一个实施例所提供的装配式混凝土单元模块结构的立体分解图;FIG. 1 is a perspective exploded view of a fabricated concrete unit module structure provided by an embodiment of the application;

图2为图1中A处的放大图;Fig. 2 is the enlarged view of A place in Fig. 1;

图3为本申请的装配式混凝土单元模块结构中的第一混凝土结构单元的立体;3 is a three-dimensional view of the first concrete structural unit in the fabricated concrete unit module structure of the application;

图4为图3中A处的放大图;Fig. 4 is the enlarged view of A place in Fig. 3;

图5为本申请的一个实施例所提供的装配式混凝土单元模块结构中上下两个第一混凝土结构单元相连接的局部示意图;5 is a partial schematic diagram of the connection of two upper and lower first concrete structural units in the fabricated concrete unit modular structure provided by an embodiment of the application;

图6为本申请的一个实施例所提供的装配式混凝土单元模块结构的施工方法中的一状态图;Fig. 6 is a state diagram in the construction method of the prefabricated concrete unit module structure provided by an embodiment of the application;

图7为图6中A处的放大图;Fig. 7 is the enlarged view of A place in Fig. 6;

图8为本申请的一个实施例所提供的装配式混凝土单元模块结构的施工方法中的另一状态图;Fig. 8 is another state diagram in the construction method of the prefabricated concrete unit module structure provided by an embodiment of the application;

图9为本申请的一个实施例所提供的装配式混凝土单元模块结构形成的多层房屋建筑结构的立体图。FIG. 9 is a perspective view of a multi-storey building structure formed by an assembled concrete unit module structure provided by an embodiment of the present application.

上述附图所涉及的标号明细如下:The details of the symbols involved in the above drawings are as follows:

1-第一连接敞口;2-第二连接敞口;3-门洞;4-窗洞;5-第一预埋螺栓连接件;6-第二预埋螺栓连接件;7-螺栓;8-第一凹槽;9-第二凹槽;10-第一密封槽;11-第二密封槽;12-密封条;13-顶推装置;14-滑移支撑件;15-导轨;16-螺栓板;17-拧紧螺栓;18-外围安装雨棚架;19-走廊架;20-楼梯架;21-润滑块;100-第一混凝土结构单元;101-第一背板;102-第一底墙板;103-第一左墙板;104-第一顶墙板;105-第一右墙板;141-夹槽;200-第二混凝土结构单元;201-第二背板;202-第二底墙板;203-第二左墙板;204-第二顶墙板;205-第二右墙板。1-First connection opening; 2-Second connection opening; 3-Door hole; 4-Window hole; 5-First embedded bolt connection; 6-Second embedded bolt connection; 7-Bolt; 8- 1st groove; 9-Second groove; 10-First sealing groove; 11-Second sealing groove; 12-Sealing strip; 13-Jumping device; 14-Sliding support; Bolt plate; 17-Tighten bolts; 18-Peripheral installation canopy frame; 19-Corridor frame; 20-Staircase frame; 21-Lubrication block; 100-First concrete structure unit; bottom wall panel; 103 - first left wall panel; 104 - first top wall panel; 105 - first right wall panel; 141 - clip slot; 200 - second concrete structural unit; 201 - second back panel; 202 - The second bottom wall panel; 203 - the second left wall panel; 204 - the second top wall panel; 205 - the second right wall panel.

具体实施方式Detailed ways

为了使本申请所要解决的技术问题、技术方案及有益效果更加清楚明白,以下结合附图及实施例,对本申请进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本申请,并不用于限定本申请。In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application clearer, the present application will be described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application, but not to limit the present application.

需要说明的是,当元件被称为“固定于”或“设置于”另一个元件,它可以直接在另一个元件上或者间接在该另一个元件上。当一个元件被称为是“连接于”另一个元件,它可以是直接连接到另一个元件或间接连接至该另一个元件上。It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.

需要理解的是,术语“长度”、“宽度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。It is to be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top" , "bottom", "inside", "outside", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, only for the convenience of describing the application and simplifying the description, rather than indicating or implying the indicated A device or element must have a particular orientation, be constructed and operate in a particular orientation, and therefore should not be construed as a limitation of the present application.

此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本申请的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。In addition, the terms "first" and "second" are only used for descriptive purposes, and should not be construed as indicating or implying relative importance or implying the number of indicated technical features. Thus, a feature defined as "first" or "second" may expressly or implicitly include one or more of that feature. In the description of the present application, "plurality" means two or more, unless otherwise expressly and specifically defined.

为了说明本申请所述的技术方案,以下结合具体附图及实施例进行详细说明。In order to illustrate the technical solutions described in the present application, a detailed description is given below with reference to the specific drawings and embodiments.

参见图1至图5,本发明实施例提供一种装配式混凝土单元模块结构,其中,包括:Referring to FIGS. 1 to 5 , an embodiment of the present invention provides an assembled concrete unit module structure, including:

第一混凝土结构单元100,包括多个第一混凝土墙体,多个第一混凝土墙体连接以围合成具有第一连接敞口1的第一空间;The first concrete structural unit 100 includes a plurality of first concrete walls, and the plurality of first concrete walls are connected to enclose a first space with a first connection opening 1;

第二混凝土结构单元200,包括多个第二混凝土墙体,多个第二混凝土墙体连接以围合成具有第二连接敞口2的第二空间;The second concrete structural unit 200 includes a plurality of second concrete walls, and the plurality of second concrete walls are connected to enclose a second space having a second connection opening 2;

第一连接敞口1周围的墙体结构与第二连接敞口2周围的墙体结构连接以形成房屋空间单元。The wall structure around the first connection opening 1 is connected with the wall structure around the second connection opening 2 to form a house space unit.

该装配式混凝土单元模块结中,只需将预先制成的第一混凝土结构单元100、第二混凝土结构单元200通过第一连接敞口1和第二连接敞口2的对接即可快速高效的成型出一个房屋空间单元,只需通过一个连接位置(第一连接敞口1周围的墙体结构与第二连接敞口2周围的墙体结构)即可实现完整房屋空间单元的成型,使得构建的房屋结构(例如房屋空间单元或整体房屋结构)的质量可靠,结构稳固,具有干法快速拆装、可循环使用、周转次数高,以及较高的建筑使用舒适度等优点,并且,通过不断地重复形成多个房屋空间单元,在竖直方向上形成多层房屋空间单元,并且在水平方向上形成多排以及/或多列房屋空间单元,可以快速形成一个具有大量房间的多层建筑,这对于需要快速形成临时甚至永久建筑的场合都能够极大地节省时间,可以满足大批量标准化、规模化的需求,例如,快速建立临时性的具有大量隔离病房的医院,或者施工厂房等等。In the modular construction of the prefabricated concrete unit, the prefabricated first concrete structural unit 100 and the second concrete structural unit 200 only need to be connected through the first connection opening 1 and the second connection opening 2 to quickly and efficiently To form a house space unit, only one connection position (the wall structure around the first connection opening 1 and the wall structure around the second connection opening 2) can realize the formation of a complete house space unit, so that the construction The quality of the house structure (such as house space unit or overall house structure) is reliable, the structure is stable, and it has the advantages of quick disassembly and assembly by dry method, recyclable use, high turnover times, and high building comfort. Repeatedly forming a plurality of house space units, forming multi-storey house space units in the vertical direction, and forming multi-row and/or multi-column house space units in the horizontal direction, can quickly form a multi-storey building with a large number of rooms, This can greatly save time for occasions that need to quickly form temporary or even permanent buildings, and can meet the needs of large-scale standardization and scale, such as the rapid establishment of temporary hospitals with a large number of isolation wards, or construction workshops and so on.

参见图1和图3,根据本发明的一个实施例,多个第一混凝土墙体包括第一背板101以及首尾依次连接的第一底墙板102、第一左墙板103、第一顶墙板104和第一右墙板105,第一底墙板102、第一左墙板103、第一顶墙板104和第一右墙板105各自的一端分别连接第一背板101以形成第一封闭端,第一底墙板102、第一左墙板103、第一顶墙板104和第一右墙板105各自远离第一封闭端的另一端形成第一连接敞口1,更具体地,第一底墙板102位于第一混凝土结构单元100的底部,第一顶墙板104位于第一混凝土结构单元100的的顶部,第一左墙板103和第一右墙板105彼此间隔立放布置,第一背板101、第一底墙板102、第一左墙板103、第一顶墙板104和第一右墙板105优选一体成型为预制混凝土整件,多个第二混凝土墙体包括第二背板201以及首尾依次连接的第二底墙板202、第二左墙板203、第二顶墙板204和第二右墙板205,第二底墙板202、第二左墙板203、第二顶墙板204和第二右墙板205各自的一端分别连接第二背板201以形成第二封闭端,第二底墙板202、第二左墙板203、第二顶墙板204和第二右墙板205各自远离第二封闭端的另一端形成第二连接敞口2,更具体地,第一底墙板102位于第一混凝土结构单元100的底部,第一顶墙板104位于第一混凝土结构单元100的的顶部,第一左墙板103和第一右墙板105彼此间隔立放布置,第一背板101、第一底墙板102、第一左墙板103、第一顶墙板104和第一右墙板105优选一体成型为预制混凝土整件。Referring to FIGS. 1 and 3 , according to an embodiment of the present invention, the plurality of first concrete walls include a first back panel 101 , a first bottom panel 102 , a first left panel 103 , a first top panel 102 , a first top panel 103 , and a first bottom panel 102 connected end to end in sequence. One end of the wall panel 104, the first right wall panel 105, the first bottom wall panel 102, the first left wall panel 103, the first top wall panel 104 and the first right wall panel 105 are respectively connected to the first back panel 101 to form The first closed end, the first bottom wall panel 102 , the first left wall panel 103 , the first top wall panel 104 and the first right wall panel 105 respectively form a first connection opening 1 at the other end away from the first closed end, more specifically Ground, the first bottom wall panel 102 is located at the bottom of the first concrete structural unit 100, the first top wall panel 104 is located at the top of the first concrete structural unit 100, and the first left wall panel 103 and the first right wall panel 105 are spaced from each other In a vertical arrangement, the first back panel 101 , the first bottom wall panel 102 , the first left wall panel 103 , the first top wall panel 104 and the first right wall panel 105 are preferably integrally formed as a whole precast concrete piece, and a plurality of second The concrete wall includes a second back panel 201 and a second bottom wall panel 202, a second left wall panel 203, a second top wall panel 204, and a second right wall panel 205 connected end to end in sequence. One ends of the two left wall panels 203 , the second top wall panels 204 and the second right wall panels 205 are respectively connected to the second back panel 201 to form a second closed end. The second bottom wall panel 202 , the second left wall panel 203 , The other ends of the second top wall panel 204 and the second right wall panel 205 away from the second closed end respectively form the second connection opening 2. More specifically, the first bottom wall panel 102 is located at the bottom of the first concrete structural unit 100. A top wall panel 104 is located on the top of the first concrete structural unit 100 , the first left wall panel 103 and the first right wall panel 105 are arranged to stand apart from each other, the first back panel 101 , the first bottom wall panel 102 , the first The left wall panel 103, the first top wall panel 104 and the first right wall panel 105 are preferably integrally formed as a single piece of precast concrete.

可以理解的是,根据需要,多个第一混凝土墙体中的至少一个墙体上设置有门窗洞口(具体分为门洞3和窗洞4),多个第二混凝土墙体中的至少一个墙体上设置有门窗洞口,例如在第一混凝土结构单元100对应的墙体上开设门洞3,门洞3可以优选开设在第一背板101上,在第二混凝土结构单元200对应的合适墙体位置开设窗洞4等等,窗洞4优选开设在第二背板201上,第一混凝土结构单元100又可称为正面混凝土结构单元,第二混凝土结构单元200又可称为背面混凝土结构单元,但正面混凝土结构单元也可以与背面混凝土结构单元互换,等等,根据需要,第一混凝土结构单元100与第二混凝土结构单元200的方位关系可以水平排布、竖直排布或者沿其他任意所需方向(例如与水平方向存在一定角度的倾斜方向)排布。It can be understood that, according to requirements, at least one wall of the plurality of first concrete walls is provided with door and window openings (specifically divided into door openings 3 and window holes 4), and at least one wall of the plurality of second concrete walls is provided. Door and window openings are provided on it, for example, a door opening 3 is opened on the wall corresponding to the first concrete structural unit 100, and the door opening 3 can preferably be opened on the first back plate 101, and the second concrete structural unit 200 corresponding to the appropriate wall position to open Window hole 4, etc., the window hole 4 is preferably opened on the second back plate 201, the first concrete structural unit 100 can also be called a front concrete structural unit, and the second concrete structural unit 200 can also be called a back concrete structural unit, but the front concrete structural unit The structural unit can also be interchanged with the back concrete structural unit, etc. According to needs, the azimuth relationship between the first concrete structural unit 100 and the second concrete structural unit 200 can be arranged horizontally, vertically or along any other desired direction (for example, an inclined direction with a certain angle to the horizontal direction) is arranged.

参见图1至图5,根据本发明的一个实施例,第一连接敞口1周围的墙体结构设置有第一预埋螺栓连接件5,第二连接敞口2周围的墙体结构设置有第二预埋螺栓连接件6,第一预埋螺栓连接件5和第二预埋螺栓连接件6可以是预埋与混凝土墙体的钢板等结构,作为一个具体示例,第一底墙板102和第一顶墙板104各自位于第一连接敞口1处的端部均横向间隔布置2个第一预埋螺栓连接件5,第二底墙板202和第二顶墙板204各自位于第一连接敞口1处的端部均间隔布置2个第二预埋螺栓连接件6,但第一预埋螺栓连接件5并不局限于设置在第一连接敞口1周围的墙体结构处,第二预埋螺栓连接件6也不局限于设置在第一连接敞口1周围的墙体结构处,为了实现更多的房屋空间单元直接的连接,第一混凝土结构单元100、第二混凝土结构单元200的其他位置也可以设置类似的预埋螺栓连接件,实现不同的房屋空间单元之间的连接(例如上下两个房屋空间单元之间的连接、水平方向上的两个房屋空间单元之间的连接等等),例如第一预埋螺栓连接件5设置在第一底墙板102、第一顶墙板104靠近第一背板101的位置或其他合适的任意位置,第二预埋螺栓连接件6设置在第二底墙板202、第二顶墙板204靠近第二背板201的位置或其他合适的任意位置。Referring to FIGS. 1 to 5 , according to an embodiment of the present invention, the wall structure around the first connection opening 1 is provided with a first embedded bolt connector 5 , and the wall structure around the second connection opening 2 is provided with a The second embedded bolt connector 6 , the first embedded bolt connector 5 and the second embedded bolt connector 6 may be structures such as steel plates embedded in the concrete wall. As a specific example, the first bottom wall panel 102 The ends of the first top wall panel 104 and the first top wall panel 104 respectively located at the first connection opening 1 are arranged with two first embedded bolt connectors 5 at lateral intervals, and the second bottom wall panel 202 and the second top wall panel 204 are respectively located at the first The ends of a connection opening 1 are arranged with two second embedded bolt connectors 6 at intervals, but the first embedded bolt connectors 5 are not limited to being arranged at the wall structure around the first connection opening 1 , the second embedded bolt connector 6 is not limited to be arranged at the wall structure around the first connection opening 1, in order to realize the direct connection of more house space units, the first concrete structure unit 100, the second concrete structure unit 100, the second concrete Similar pre-embedded bolt connectors can also be set at other positions of the structural unit 200 to realize the connection between different house space units (for example, the connection between the upper and lower house space units, the connection between the two house space units in the horizontal direction, etc.). For example, the first embedded bolt connector 5 is arranged at the position of the first bottom wall panel 102, the first top wall panel 104 close to the first back panel 101 or any other suitable position, and the second embedded bolt connection The bolt connection member 6 is disposed at the position of the second bottom wall panel 202, the second top wall panel 204 close to the second back panel 201 or any other suitable position.

进一步地,第一预埋螺栓连接件5上具有第一螺纹孔,第二预埋螺栓连接件6上具有第二螺纹孔,第一预埋螺栓连接件5与第二预埋螺栓连接件6通过穿设于第一螺纹孔和第二螺纹孔的螺栓7连接,具体地,通过螺栓7将第一预埋螺栓连接件5和第二预埋螺栓连接件6连接后,可以从第一预埋螺栓连接件5和第二预埋螺栓连接件6的两侧分别在螺栓7上安装螺母,并将螺母拧至压紧第一预埋螺栓连接件5和第二预埋螺栓连接件6,通过预埋件配合螺栓7的形式可以实现第一混凝土结构单元100与第二混凝土结构单元200快速便捷连接,正如前面提到的,第一混凝土结构单元100与第二混凝土结构单元200的方位关系可以水平排布、竖直排布或者沿其他任意所需方向(例如与水平方向存在一定角度的倾斜方向)排布,所以可以在第一混凝土墙和第二混凝土墙体的各种位置(不限于第一连接敞口1周围的墙体结构和第二连接敞口2周围的墙体结构)设置更多的预埋螺栓连接件,以适应沿不同方向排布的第一混凝土结构单元100与第二混凝土结构单元200的连接。Further, the first pre-embedded bolt connector 5 has a first threaded hole, the second pre-embedded bolt connector 6 has a second threaded hole, the first pre-embedded bolt connector 5 and the second pre-embedded bolt connector 6 The connection is made by the bolts 7 passing through the first threaded hole and the second threaded hole. Install nuts on the bolts 7 on both sides of the embedded bolt connector 5 and the second embedded bolt connector 6, respectively, and screw the nuts to compress the first embedded bolt connector 5 and the second embedded bolt connector 6. The first concrete structural unit 100 and the second concrete structural unit 200 can be quickly and easily connected by the form of the embedded parts with the bolts 7. As mentioned above, the orientation relationship between the first concrete structural unit 100 and the second concrete structural unit 200 It can be arranged horizontally, vertically, or in any other desired direction (such as an inclined direction with a certain angle from the horizontal), so it can be arranged in various positions of the first concrete wall and the second concrete wall (not Limited to the wall structure around the first connection opening 1 and the wall structure around the second connection opening 2), more pre-embedded bolt connections are provided to accommodate the first concrete structural units 100 arranged in different directions and the Connection of the second concrete structural unit 200 .

参见图1至图5,根据本发明的一个实施例,第一连接敞口1周围的墙体结构上具有第一凹槽8,第一预埋螺栓连接件5设置在第一凹槽8中,第二连接敞口2周围的墙体结构上具有第二凹槽9,第二预埋螺栓连接件6设置在第二凹槽9中,第一凹槽8与第二凹槽9对齐并围合成填充空间,设计凹槽的好处是,第一混凝土结构单元100与第二混凝土结构单元200通过螺栓7连接时,可以为拧紧螺栓7提供操作空间,完成螺栓7连接后,可将凹槽形成的填充空间进行填充封闭处理,不留连接空隙和缝隙,使得整体构造的密封性能优良。Referring to FIGS. 1 to 5 , according to an embodiment of the present invention, the wall structure around the first connection opening 1 has a first groove 8 , and the first embedded bolt connection 5 is arranged in the first groove 8 , the wall structure around the second connection opening 2 has a second groove 9, the second embedded bolt connection 6 is arranged in the second groove 9, and the first groove 8 is aligned with the second groove 9. The advantage of designing the groove is that when the first concrete structural unit 100 and the second concrete structural unit 200 are connected by the bolt 7, an operation space can be provided for tightening the bolt 7. After the bolt 7 is connected, the groove can be The formed filling space is filled and sealed, leaving no connecting voids and gaps, so that the sealing performance of the overall structure is excellent.

参见图1至图4,根据本发明的一个实施例,第一连接敞口1周围的墙体结构上设置有围绕第一连接敞口1一圈的第一密封槽10,具体形成在第一底墙板102、第一左墙板103、第一顶墙板104和第一右墙板105各自位于第一连接敞口1处的端面上,第二连接敞口2周围的墙体结构上设置有围绕第二连接敞口2一圈的第二密封槽11,具体形成在第二底墙板202、第二左墙板203、第二顶墙板204和第二右墙板205各自位于第二连接敞口2处的端面上,第一密封槽10与第二密封槽11对齐并围合成密封条安装空间,密封条安装空间中安装有密封条12,如此一来,第一混凝土结构单元100与第二混凝土结构单元200通过第一连接敞口1处和第二连接敞口2处形成了密封连接,保证第一混凝土结构单元100与第二混凝土结构单元200的连接处不会发生渗水等情况。Referring to FIGS. 1 to 4 , according to an embodiment of the present invention, the wall structure around the first connection opening 1 is provided with a first sealing groove 10 surrounding the first connection opening 1 . The bottom wall panel 102 , the first left wall panel 103 , the first top wall panel 104 and the first right wall panel 105 are respectively located on the end face of the first connection opening 1 , and on the wall structure around the second connection opening 2 . A second sealing groove 11 is provided around the second connection opening 2, and is specifically formed in the second bottom wall panel 202, the second left wall panel 203, the second top wall panel 204 and the second right wall panel 205 respectively located at the On the end face of the second connection opening 2, the first sealing groove 10 is aligned with the second sealing groove 11 and encloses a sealing strip installation space, and the sealing strip 12 is installed in the sealing strip installation space. In this way, the first concrete structure The unit 100 and the second concrete structural unit 200 form a sealed connection through the first connection opening 1 and the second connection opening 2 to ensure that the connection between the first concrete structural unit 100 and the second concrete structural unit 200 does not occur. seepage, etc.

参见图6至图9,此外,本发明还提供一种根据上述的装配式混凝土单元模块结构的施工方法,其中,施工方法使用了导轨式辅助工具,导轨式辅助工具包括顶推装置13、滑移支撑件14、和间隔布置的两条导轨15,各导轨15的两端安装有顶推装置13,各导轨15上可滑移地安装有多个滑移支撑件14,各滑移支撑件14上安装有用于固定第一混凝土结构单元100或第二混凝土结构单元200的夹紧装置,具体地,顶推装置13可以是电动推杆、气缸或液压缸,滑移支撑件14为滑块,滑块的底部形成可滑移地夹持于导轨15的夹槽141,夹槽141与对应的导轨15接触的面上设置有润滑块21,润滑块21优选低阻力材质,可由石墨铜制作而成,两条导轨15平行间隔设置,每条导轨15上可以布置4个滑块,其中两个滑块分配给第一混凝土结构单元100,另两个滑块分配给第二混凝土结构单元200,夹紧装置可以包括安装在滑块上的螺栓板16和穿设于螺栓板16上的拧紧螺栓17,每条导轨15上对应的滑块上的拧紧螺栓17可从两侧压紧第一混凝土结构单元100或第二混凝土结构单元200;6 to 9 , in addition, the present invention also provides a construction method according to the above-mentioned prefabricated concrete unit module structure, wherein the construction method uses a guide rail type auxiliary tool, and the guide rail type auxiliary tool includes a jacking device 13, a sliding The sliding supports 14 and the two guide rails 15 arranged at intervals, the two ends of each guide rail 15 are provided with a pushing device 13, and each guide rail 15 is slidably installed with a plurality of sliding supports 14, and each sliding support A clamping device for fixing the first concrete structural unit 100 or the second concrete structural unit 200 is installed on the 14, specifically, the pushing device 13 can be an electric push rod, an air cylinder or a hydraulic cylinder, and the sliding support 14 is a slider , the bottom of the slider is formed with a clamping groove 141 slidably clamped to the guide rail 15, and a lubricating block 21 is provided on the surface of the clamping groove 141 in contact with the corresponding guide rail 15. The lubricating block 21 is preferably a low-resistance material, which can be made of graphite copper As a result, the two guide rails 15 are arranged in parallel and spaced apart, and four sliders can be arranged on each guide rail 15 , wherein two sliders are assigned to the first concrete structural unit 100 , and the other two sliders are assigned to the second concrete structural unit 200 . , the clamping device may include a bolt plate 16 mounted on the slider and a tightening bolt 17 passing through the bolt plate 16. The tightening bolt 17 on the corresponding slider on each guide rail 15 can press the first the concrete structural unit 100 or the second concrete structural unit 200;

施工方法包括步骤:The construction method includes steps:

a、将第一混凝土结构单元100(第一混凝土结构单元100既可以是正面混凝土结构单元也可以与背面混凝土结构单元,二者先装后装无限制)吊装至两条导轨15上的滑移支撑件14上,并使第一连接敞口1的朝向与滑移支撑件14在对应导轨15上的滑移方向一致,并使夹紧装置将第一混凝土结构单元100固定于滑移支撑件14,具体可以是拧动两侧的拧紧螺栓17压紧第一混凝土结构单元100的第一左墙板103和第一右墙板105;a. Lifting the first concrete structural unit 100 (the first concrete structural unit 100 can be either the front concrete structural unit or the back concrete structural unit, the two are installed first and then installed without restriction) to the sliding sliding on the two guide rails 15 On the support 14, the orientation of the first connection opening 1 is consistent with the sliding direction of the sliding support 14 on the corresponding guide rail 15, and the clamping device fixes the first concrete structural unit 100 on the sliding support 14. Specifically, screw the tightening bolts 17 on both sides to compress the first left wall panel 103 and the first right wall panel 105 of the first concrete structural unit 100;

b、将第二混凝土结构单元200吊装至两条导轨15上的滑移支撑件14上,并使第二连接敞口2的朝向与滑移支撑件14在对应导轨15上的滑移方向一致,且使得第一连接敞口1与第二连接敞口2彼此面对,并使夹紧装置将第二混凝土结构单元200固定于滑移支撑件14,具体可以是拧动两侧的拧紧螺栓17压紧第混凝土结构单元的第二左墙板203和第二右墙板205,可以理解的是,为了方便吊装工具吊装第一混凝土结构单元100和第二混凝土结构单元200,它们各自的墙板的适当位置可以预埋吊装件或设置吊装孔位等等;b. Hoist the second concrete structural unit 200 to the sliding supports 14 on the two guide rails 15, and make the orientation of the second connection opening 2 consistent with the sliding direction of the sliding supports 14 on the corresponding guide rails 15 , and make the first connection opening 1 and the second connection opening 2 face each other, and make the clamping device fix the second concrete structural unit 200 to the sliding support 14, specifically, screw the tightening bolts on both sides 17 Press the second left wall panel 203 and the second right wall panel 205 of the first concrete structural unit. It can be understood that, in order to facilitate the hoisting tool to hoist the first concrete structural unit 100 and the second concrete structural unit 200, their respective walls The appropriate position of the board can be pre-buried with hoisting parts or set hoisting holes, etc.;

c、在第一混凝土结构单元100的第一密封槽10与第二混凝土结构单元200的第二密封槽11之间放置密封条12;c. Placing the sealing strip 12 between the first sealing groove 10 of the first concrete structural unit 100 and the second sealing groove 11 of the second concrete structural unit 200;

d、通过顶推装置13推动第一混凝土结构单元100和第二混凝土结构单元200沿着导轨15彼此靠近并贴合,使得第一密封槽10与第二密封槽11对齐并围合成密封条安装空间,并使得密封条12被挤压安装在该密封条安装空间中,从而对密封条12产生一定挤压力,增加密封条12与第一密封槽10和第二密封槽11的紧密配合性,从而更好地提升第一混凝土结构单元100与第二混凝土结构单元200之间的连接密封性能;d. Push the first concrete structural unit 100 and the second concrete structural unit 200 to approach and fit along the guide rail 15 by the pushing device 13, so that the first sealing groove 10 and the second sealing groove 11 are aligned and enclosed as a sealing strip for installation space, and the sealing strip 12 is squeezed and installed in the sealing strip installation space, so as to generate a certain pressing force on the sealing strip 12, and increase the tight fit between the sealing strip 12 and the first sealing groove 10 and the second sealing groove 11 , so as to better improve the sealing performance of the connection between the first concrete structural unit 100 and the second concrete structural unit 200;

e、通过螺栓7将第一预埋螺栓连接件5和第二预埋螺栓连接件6连接,并且从第一预埋螺栓连接件5和第二预埋螺栓连接件6的两侧分别在螺栓7上安装螺母,并将螺母拧至压紧第一预埋螺栓连接件5和第二预埋螺栓连接件6,从而形成了一个稳固的房屋空间单元。e. Connect the first pre-embedded bolt connector 5 and the second pre-embedded bolt connector 6 with bolts 7, and connect the bolts from both sides of the first pre-embedded bolt connector 5 and the second pre-embedded bolt connector 6, respectively. 7 Install the nut, and screw the nut to compress the first embedded bolt connection 5 and the second embedded bolt connection 6, thereby forming a stable house space unit.

此外,施工方法还包括在步骤e结束后,对第一预埋螺栓连接件5和第二预埋螺栓连接件6所处的第一凹槽8和第二凹槽9进行填充封闭处理,例如填充混凝土砂浆。In addition, the construction method further includes, after the step e is completed, filling and sealing the first groove 8 and the second groove 9 where the first embedded bolt connector 5 and the second embedded bolt connector 6 are located, for example Fill with concrete mortar.

此外,施工方法还包括在步骤e结束后的步骤:In addition, the construction method also includes the steps after the end of step e:

f、重复上述步骤a至e,形成多个房屋空间单元;f, repeat above-mentioned steps a to e, form a plurality of housing space units;

g、将多个房屋空间单元连接组合成单层或多层房屋建筑结构,具体可以将多个房屋空间单元通过吊起后堆叠,然后以竖向连接、水平向连接相邻的房屋空间单元等方式组合成单层或多层房屋建筑结构;g. Connect and combine multiple housing space units into a single-storey or multi-storey building structure. Specifically, multiple housing space units can be stacked after being hoisted, and then connected vertically and horizontally to adjacent housing space units, etc. way to form a single-storey or multi-storey building structure;

h、在单层或多层房屋建筑结构的外围安装雨棚架18、走廊架19、楼梯架20等其他建筑结构,以形成更为完整、功能更全面的具有多房间的整体房屋结构。h. Install other building structures such as canopy frame 18, corridor frame 19, stair frame 20 on the periphery of the single-storey or multi-storey building structure to form a more complete and functional overall house structure with multiple rooms.

以上所述仅为本申请的可选实施例而已,并不用以限制本申请,凡在本申请的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本申请的保护范围之内。The above descriptions are only optional embodiments of the present application, and are not intended to limit the present application. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present application shall be included in the protection of the present application. within the range.

Claims (10)

1.一种装配式混凝土单元模块结构,其特征在于,包括:1. A prefabricated concrete unit module structure is characterized in that, comprising: 第一混凝土结构单元,包括多个第一混凝土墙体,所述多个第一混凝土墙体连接以围合成具有第一连接敞口的第一空间;a first concrete structural unit, comprising a plurality of first concrete walls connected to enclose a first space having a first connection opening; 第二混凝土结构单元,包括多个第二混凝土墙体,所述多个第二混凝土墙体连接以围合成具有第二连接敞口的第二空间;a second concrete structural unit, comprising a plurality of second concrete walls connected to enclose a second space having a second connection opening; 所述第一连接敞口周围的墙体结构与所述第二连接敞口周围的墙体结构连接以形成房屋空间单元。The wall structure around the first connection opening is connected with the wall structure around the second connection opening to form a house space unit. 2.根据权利要求1所述的装配式混凝土单元模块结构,其特征在于,所述第一连接敞口周围的墙体结构设置有第一预埋螺栓连接件,所述第二连接敞口周围的墙体结构设置有第二预埋螺栓连接件,所述第一预埋螺栓连接件上具有第一螺纹孔,所述第二预埋螺栓连接件上具有第二螺纹孔,所述第一预埋螺栓连接件与所述第二预埋螺栓连接件通过穿设于所述第一螺纹孔和第二螺纹孔的螺栓连接。2 . The prefabricated concrete unit module structure according to claim 1 , wherein the wall structure around the first connection opening is provided with a first embedded bolt connection, and around the second connection opening. 3 . The wall structure is provided with a second pre-embedded bolt connector, the first pre-embedded bolt connector has a first threaded hole, the second pre-embedded bolt connector has a second threaded hole, the first The pre-embedded bolt connector is connected with the second pre-embedded bolt connector by bolts passing through the first threaded hole and the second threaded hole. 3.根据权利要求2所述的装配式混凝土单元模块结构,其特征在于,所述第一连接敞口周围的墙体结构上具有第一凹槽,所述第一预埋螺栓连接件设置在所述第一凹槽中,所述第二连接敞口周围的墙体结构上具有第二凹槽,所述第二预埋螺栓连接件设置在所述第二凹槽中,所述第一凹槽与所述第二凹槽对齐并围合成填充空间。3. The prefabricated concrete unit module structure according to claim 2, wherein the wall structure around the first connection opening has a first groove, and the first embedded bolt connection is provided in the In the first groove, the wall structure around the second connection opening has a second groove, the second pre-embedded bolt connection is arranged in the second groove, and the first The groove is aligned with the second groove and encloses a filling space. 4.根据权利要求3所述的装配式混凝土单元模块结构,其特征在于,所述第一连接敞口周围的墙体结构上设置有围绕所述第一连接敞口一圈的第一密封槽,所述第二连接敞口周围的墙体结构上设置有围绕所述第二连接敞口一圈的第二密封槽,所述第一密封槽与所述第二密封槽对齐并围合成密封条安装空间,所述密封条安装空间中安装有密封条。4. The prefabricated concrete unit module structure according to claim 3, wherein the wall structure around the first connection opening is provided with a first sealing groove that surrounds the first connection opening. , the wall structure around the second connection opening is provided with a second sealing groove around the second connection opening, the first sealing groove is aligned with the second sealing groove and enclosed into a seal A strip installation space is provided, and a sealing strip is installed in the sealing strip installation space. 5.根据权利要求1所述的装配式混凝土单元模块结构,其特征在于,所述多个第一混凝土墙体包括第一背板以及首尾依次连接的第一底墙板、第一左墙板、第一顶墙板和第一右墙板,所述第一底墙板、第一左墙板、第一顶墙板和第一右墙板各自的一端分别连接所述第一背板以形成第一封闭端,所述第一底墙板、第一左墙板、第一顶墙板和第一右墙板各自远离所述第一封闭端的另一端形成所述第一连接敞口,所述多个第二混凝土墙体包括第二背板以及首尾依次连接的第二底墙板、第二左墙板、第二顶墙板和第二右墙板,所述第二底墙板、第二左墙板、第二顶墙板和第二右墙板各自的一端分别连接所述第二背板以形成第二封闭端,所述第二底墙板、第二左墙板、第二顶墙板和第二右墙板各自远离所述第二封闭端的另一端形成所述第二连接敞口。5 . The fabricated concrete unit module structure according to claim 1 , wherein the plurality of first concrete walls comprise a first back plate, a first bottom wall plate and a first left wall plate connected end to end in sequence. 6 . , the first top wall panel and the first right wall panel, the respective ends of the first bottom wall panel, the first left wall panel, the first top wall panel and the first right wall panel are respectively connected to the first back panel to A first closed end is formed, and the other ends of the first bottom wall panel, the first left wall panel, the first top wall panel and the first right wall panel, respectively, away from the first closed end, form the first connection opening, The plurality of second concrete walls include a second backboard and a second bottom wallboard, a second left wallboard, a second top wallboard and a second right wallboard connected end to end in sequence, the second bottom wallboard , One end of the second left wall panel, the second top wall panel and the second right wall panel are respectively connected to the second back panel to form a second closed end, the second bottom wall panel, the second left wall panel, The other ends of the second top wall panel and the second right wall panel remote from the second closed end each form the second connection opening. 6.根据权利要求1至5中任意一项所述的装配式混凝土单元模块结构,其特征在于,所述多个第一混凝土墙体中的至少一个墙体上设置有门窗洞口,所述多个第二混凝土墙体中的至少一个墙体上设置有门窗洞口。6. The prefabricated concrete unit module structure according to any one of claims 1 to 5, wherein at least one of the plurality of first concrete walls is provided with a door and window opening, and the plurality of first concrete walls are provided with door and window openings. At least one of the second concrete walls is provided with door and window openings. 7.一种根据权利要求4所述的装配式混凝土单元模块结构的施工方法,其特征在于,所述施工方法使用了导轨式辅助工具,所述导轨式辅助工具包括顶推装置、滑移支撑件、和间隔布置的两条导轨,各所述导轨的两端安装有所述顶推装置,各所述导轨上可滑移地安装有多个所述滑移支撑件,各所述滑移支撑件上安装有用于固定第一混凝土结构单元或第二混凝土结构单元的夹紧装置;7 . The construction method of the prefabricated concrete unit module structure according to claim 4 , wherein the construction method uses a guide rail type auxiliary tool, and the guide rail type auxiliary tool comprises a jacking device and a sliding support. 8 . and two guide rails arranged at intervals, the pushing device is installed at both ends of each guide rail, and a plurality of the sliding supports are slidably installed on each of the guide rails. A clamping device for fixing the first concrete structural unit or the second concrete structural unit is installed on the support; 所述施工方法包括步骤:The construction method includes the steps: a、将第一混凝土结构单元吊装至两条导轨上的滑移支撑件上,并使第一连接敞口的朝向与滑移支撑件在对应导轨上的滑移方向一致,并使夹紧装置将所述第一混凝土结构单元固定于所述滑移支撑件;a. Hoist the first concrete structural unit to the sliding supports on the two guide rails, make the orientation of the first connection opening consistent with the sliding direction of the sliding supports on the corresponding guide rails, and make the clamping device fixing the first concrete structural unit to the sliding support; b、将第二混凝土结构单元吊装至两条导轨上的滑移支撑件上,并使第二连接敞口的朝向与滑移支撑件在对应导轨上的滑移方向一致,且使得第一连接敞口与第二连接敞口彼此面对,并使夹紧装置将所述第二混凝土结构单元固定于所述滑移支撑件;b. Hoist the second concrete structural unit to the sliding supports on the two guide rails, and make the orientation of the second connection opening consistent with the sliding direction of the sliding supports on the corresponding guide rails, and make the first connection The opening and the second connecting opening face each other and allow the clamping device to fix the second concrete structural unit to the sliding support; c、在所述第一混凝土结构单元的第一密封槽与所述第二混凝土结构单元的第二密封槽之间放置密封条;c. Placing a sealing strip between the first sealing groove of the first concrete structural unit and the second sealing groove of the second concrete structural unit; d、通过顶推装置推动第一混凝土结构单元和第二混凝土结构单元沿着导轨彼此靠近并贴合,使得第一密封槽与所述第二密封槽对齐并围合成密封条安装空间,并使得密封条被挤压安装在该密封条安装空间中;d. Push the first concrete structural unit and the second concrete structural unit to approach and fit along the guide rails by the pushing device, so that the first sealing groove is aligned with the second sealing groove and encloses a sealing strip installation space, and makes The sealing strip is squeezed and installed in the sealing strip installation space; e、通过螺栓将第一预埋螺栓连接件和第二预埋螺栓连接件连接,并且从第一预埋螺栓连接件和第二预埋螺栓连接件的两侧分别在螺栓上安装螺母,并将螺母拧至压紧第一预埋螺栓连接件和第二预埋螺栓连接件。e. Connect the first embedded bolt connector and the second embedded bolt connector with bolts, and install nuts on the bolts from both sides of the first embedded bolt connector and the second embedded bolt connector respectively, and Tighten the nuts to compress the first and second pre-embedded bolted connections. 8.根据权利要求7所述的装配式混凝土单元模块结构的施工方法,其特征在于,所述滑移支撑件为滑块,所述滑块的底部形成可滑移地夹持于导轨的夹槽,所述夹槽与对应的导轨接触的面上设置有润滑块。8 . The construction method of the prefabricated concrete unit module structure according to claim 7 , wherein the sliding support is a sliding block, and the bottom of the sliding block forms a clip slidably clamped to the guide rail. 9 . A lubricating block is provided on the surface of the clamping groove in contact with the corresponding guide rail. 9.根据权利要求7所述的装配式混凝土单元模块结构的施工方法,其特征在于,所述施工方法还包括在所述步骤e结束后,对第一预埋螺栓连接件和第二预埋螺栓连接件所处的第一凹槽和第二凹槽进行填充封闭处理。9 . The construction method of the prefabricated concrete unit module structure according to claim 7 , wherein the construction method further comprises, after the end of the step e, assembling the first pre-embedded bolt connection and the second pre-embedded bolt connection. The first groove and the second groove where the bolt connector is located are filled and sealed. 10.根据权利要求7所述的装配式混凝土单元模块结构的施工方法,其特征在于,所述施工方法还包括在所述步骤e结束后的步骤:10. The construction method of the prefabricated concrete unit module structure according to claim 7, wherein the construction method further comprises the steps after the end of the step e: f、重复上述步骤a至e,形成多个房屋空间单元;f, repeat above-mentioned steps a to e, form a plurality of housing space units; g、将多个房屋空间单元连接组合成单层或多层房屋建筑结构;g. Connect and combine multiple housing space units into a single-storey or multi-storey building structure; h、在所述单层或多层房屋建筑结构的外围安装雨棚架、走廊架、楼梯架。h. Install a canopy frame, a corridor frame and a stair frame on the periphery of the single-storey or multi-storey building structure.
CN202210706076.0A 2022-06-21 2022-06-21 Assembly type concrete unit module structure and construction method thereof Pending CN114941377A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210706076.0A CN114941377A (en) 2022-06-21 2022-06-21 Assembly type concrete unit module structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210706076.0A CN114941377A (en) 2022-06-21 2022-06-21 Assembly type concrete unit module structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN114941377A true CN114941377A (en) 2022-08-26

Family

ID=82911282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210706076.0A Pending CN114941377A (en) 2022-06-21 2022-06-21 Assembly type concrete unit module structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN114941377A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117248628A (en) * 2023-10-19 2023-12-19 中昇东浩(深圳)科技有限公司 Structure and method of high-stability assembled house

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2512970A1 (en) * 2005-07-22 2007-01-22 John David Orr Method for modular construction of multi-storey buildings
CN103195162A (en) * 2013-03-28 2013-07-10 东南大学 Standard unit assembled energy dissipating and damping structure system
CN107687211A (en) * 2017-10-12 2018-02-13 河北丽建丽筑集成房屋有限公司 A kind of full prefabricated buildings system
CN108824648A (en) * 2018-06-13 2018-11-16 北京乡墅科技有限公司 Space module house
CN109707048A (en) * 2019-02-21 2019-05-03 四川建安装配式工程科技股份有限公司 Cellular building module and assembled architecture main structure
US20200011076A1 (en) * 2018-07-09 2020-01-09 Yau Lee Wah Concrete Precast Products (Shenzhen) Company Limited Modular Integrated Building and Construction Method Thereof
CN214302372U (en) * 2020-12-30 2021-09-28 广东裕盛达建设有限公司 Assembled mixed wallboard structure
CN113529956A (en) * 2021-07-12 2021-10-22 重庆中建海龙两江建筑科技有限公司 Shear wall box type assembly type building structure and construction method thereof
CN215368012U (en) * 2021-01-13 2021-12-31 天津中金博奥重工机械有限责任公司 Assembled building energy-saving wall structure board
CN215522211U (en) * 2021-08-27 2022-01-14 重庆新洲建筑工程有限公司 Concrete pipe support construction aids

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2512970A1 (en) * 2005-07-22 2007-01-22 John David Orr Method for modular construction of multi-storey buildings
CN103195162A (en) * 2013-03-28 2013-07-10 东南大学 Standard unit assembled energy dissipating and damping structure system
CN107687211A (en) * 2017-10-12 2018-02-13 河北丽建丽筑集成房屋有限公司 A kind of full prefabricated buildings system
CN108824648A (en) * 2018-06-13 2018-11-16 北京乡墅科技有限公司 Space module house
US20200011076A1 (en) * 2018-07-09 2020-01-09 Yau Lee Wah Concrete Precast Products (Shenzhen) Company Limited Modular Integrated Building and Construction Method Thereof
CN109707048A (en) * 2019-02-21 2019-05-03 四川建安装配式工程科技股份有限公司 Cellular building module and assembled architecture main structure
CN214302372U (en) * 2020-12-30 2021-09-28 广东裕盛达建设有限公司 Assembled mixed wallboard structure
CN215368012U (en) * 2021-01-13 2021-12-31 天津中金博奥重工机械有限责任公司 Assembled building energy-saving wall structure board
CN113529956A (en) * 2021-07-12 2021-10-22 重庆中建海龙两江建筑科技有限公司 Shear wall box type assembly type building structure and construction method thereof
CN215522211U (en) * 2021-08-27 2022-01-14 重庆新洲建筑工程有限公司 Concrete pipe support construction aids

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117248628A (en) * 2023-10-19 2023-12-19 中昇东浩(深圳)科技有限公司 Structure and method of high-stability assembled house

Similar Documents

Publication Publication Date Title
CN111561074A (en) A kind of lightweight ultra-high sound insulation fireproof steel partition wall and construction method thereof
CN206591681U (en) A kind of connecting node of precast concrete partition wall and agent structure
CN111456250A (en) Swift assembled house
KR20230138756A (en) Connection structure of modular unit using guide-pin
CN114941377A (en) Assembly type concrete unit module structure and construction method thereof
CN215563529U (en) Novel assembled building wall structure
CN112814211B (en) An installation method of a prefabricated wall
CN209817104U (en) House frame connection structure
CN214785299U (en) A load-bearing prefabricated wall panel and its constructed wall system
CN215330503U (en) Connecting device for detachable modules of steel structure modular building
CN223293205U (en) A wall corner structure of an assembled steel-concrete house
CN116290996B (en) A concrete MiC structural system with an attached corridor
CN217759301U (en) Recyclable assembly type building
CN110761401A (en) A crack-resistant prefabricated building that uses fasteners to quickly tighten
CN223468905U (en) Building outer wall assembly wallboard
CN113047446A (en) Connecting device and connecting method for detachable modules of steel structure modular building
CN223358318U (en) Prefabricated spliced valve well
CN222976294U (en) Prefabricated wall panel dry connection node
CN224053773U (en) A centralized cable assembly structure
CN216973856U (en) Assembled indoor partition wall board stable in installation
CN217150770U (en) Sound-insulation and heat-preservation assembled wall
CN215758562U (en) Bolt connects whole mounting structure of steel purlin bridge node connecting plate crowd
CN210127576U (en) Novel assembled wallboard component
CN223647258U (en) A prefabricated light steel modular house wall connection structure
CN218894485U (en) Green construction of building encloses fender

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20220826