CN114888571A - Welding device and process for cladding and forming of copper-clad aluminum alloy wire - Google Patents

Welding device and process for cladding and forming of copper-clad aluminum alloy wire Download PDF

Info

Publication number
CN114888571A
CN114888571A CN202210689463.8A CN202210689463A CN114888571A CN 114888571 A CN114888571 A CN 114888571A CN 202210689463 A CN202210689463 A CN 202210689463A CN 114888571 A CN114888571 A CN 114888571A
Authority
CN
China
Prior art keywords
copper
copper strip
fixedly connected
alloy wire
welding device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210689463.8A
Other languages
Chinese (zh)
Other versions
CN114888571B (en
Inventor
王凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yingtan Zhengwang Technology Co ltd
Original Assignee
Yingtan Zhengwang Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yingtan Zhengwang Technology Co ltd filed Critical Yingtan Zhengwang Technology Co ltd
Priority to CN202210689463.8A priority Critical patent/CN114888571B/en
Publication of CN114888571A publication Critical patent/CN114888571A/en
Application granted granted Critical
Publication of CN114888571B publication Critical patent/CN114888571B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P23/00—Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00—Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00—Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass
    • B23K37/003—Cooling means for welding or cutting
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10—Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Arc Welding In General (AREA)

Abstract

The invention belongs to the field of alloy wire processing, in particular to a welding device for cladding and forming an aluminum-clad alloy wire, which aims at solving the problem that the stains on the outer surface of a copper strip can not be removed and the subsequent welding quality is influenced before the existing copper strip is welded, and provides the following scheme, wherein the welding device comprises a copper strip material rack, an aluminum rod straightening device, an aluminum rod polishing device, a cladding device, an argon arc welding device and a wire blank winding device which are sequentially arranged, and the invention also provides a welding process of the welding device for cladding and forming the copper-clad aluminum alloy wire, which comprises the following steps: s1: the copper strips are placed on the copper strip rack and pass through the copper strip cleaning mechanism, and the aluminum rods are straightened by the aluminum rod straightening device and then polished by the aluminum rod polishing device.

Description

一种铜包铝合金线包覆成型用的焊接装置及工艺A welding device and process for overmolding copper-clad aluminum alloy wire

技术领域technical field

本发明涉及合金线加工技术领域,尤其涉及一种铜包铝合金线包覆成型用的焊接装置及工艺。The invention relates to the technical field of alloy wire processing, in particular to a welding device and a process for cladding and forming a copper-clad aluminum alloy wire.

背景技术Background technique

铜包铝线是采用先进的包覆焊接制造技术,将高品质铜带同心地包覆在铝杆或钢丝等芯线的外表面,并使铜层和芯线之间形成牢固的原子间的冶金结合,铜包铝线同时具备铜的导电性与铝的密度小的复合特性,因而具有广阔的应用范围。The copper-clad aluminum wire is made of advanced cladding welding manufacturing technology, and the high-quality copper strip is concentrically wrapped on the outer surface of the core wire such as aluminum rod or steel wire, and a firm interatomic bond is formed between the copper layer and the core wire. Metallurgically combined, copper-clad aluminum wire has both the electrical conductivity of copper and the composite characteristics of low density of aluminum, so it has a wide range of applications.

经检索,授权公开号为CN112652421A公开的一种新型铜包铝线包覆焊接设备,包括依次设置的铝杆校直装置、钢丝抛光轮、导带槽、铜带包覆装置、定型模、氩弧焊接装置、定径模、氩气冷却装置以及线坯收卷装置,该装置在使用时,虽然能够解决散热的问题,但是在铜带焊接前,不能将铜带外表的污渍去除,影响后续焊接质量,为此提出一种铜包铝合金线包覆成型用的焊接装置及工艺。After retrieval, a new type of copper-clad aluminum wire cladding welding equipment disclosed in the authorized publication number CN112652421A includes an aluminum rod straightening device, a steel wire polishing wheel, a guide belt groove, a copper belt cladding device, a setting die, an argon Arc welding device, sizing die, argon gas cooling device and wire blank winding device, although the device can solve the problem of heat dissipation, but before the copper strip is welded, the stains on the surface of the copper strip cannot be removed, which will affect the subsequent Welding quality, for this purpose, a welding device and process for overmolding copper-clad aluminum alloy wire are proposed.

发明内容SUMMARY OF THE INVENTION

本发明的目的是为了解决现有技术中存在在铜带焊接前,不能将铜带外表的污渍去除,影响后续焊接质量的缺点,而提出的一种铜包铝合金线包覆成型用的焊接装置及工艺。The purpose of the present invention is to solve the problem in the prior art that the stains on the surface of the copper strip cannot be removed before the copper strip is welded, which affects the quality of subsequent welding. device and process.

为了实现上述目的,本发明采用了如下技术方案:In order to achieve the above object, the present invention adopts the following technical solutions:

一种铜包铝合金线包覆成型用的焊接装置,包括依次设置的铜带料架、铝杆矫直装置、铝杆抛光装置、包覆装置、氩弧焊接装置和线坯收卷装置,所述铜带料架与铝杆矫直装置之间设有用于对铜带进行处理的铜带清洗机构,所述氩弧焊接装置与线坯收卷装置之间设有用于对焊接后的合金线进行降温的降温机构;A welding device for overmolding copper-clad aluminum alloy wire, comprising a copper strip rack, an aluminum rod straightening device, an aluminum rod polishing device, a coating device, a argon arc welding device and a wire blank winding device, which are arranged in sequence, A copper strip cleaning mechanism for processing the copper strip is arranged between the copper strip material rack and the aluminum rod straightening device, and between the argon arc welding device and the wire billet winding device is arranged for welding the alloy after welding. The cooling mechanism for cooling the line;

所述铜带清洗机构包括清洗箱,所述清洗箱设置在铜带料架与铝杆矫直装置之间,所述清洗箱的两侧内壁之间转动连接有两个导料辊,其中一个所述导料辊的圆周固定连接有对称设置的两个凸轮,所述清洗箱的两侧内壁均开设有两个滑槽,同一高度的两个滑槽之间均滑动连接有刷板,刷板的一侧均固定连接有对称设置的两个推动架,且同侧相邻的两个推动架分别位于凸轮的两侧,同侧的两个所述滑槽相反的一侧均固定连接有弹簧,且弹簧的另一端分别与两个刷板相固定。The copper strip cleaning mechanism includes a cleaning box, the cleaning box is arranged between the copper strip material rack and the aluminum rod straightening device, and two guide rollers are rotatably connected between the two inner walls of the cleaning box, one of which is The circumference of the guide roller is fixedly connected with two symmetrically arranged cams, the inner walls on both sides of the cleaning box are provided with two chutes, and a brush plate is slidably connected between the two chutes at the same height. One side of the plate is fixedly connected with two symmetrically arranged push frames, and the two adjacent push frames on the same side are respectively located on both sides of the cam, and the opposite sides of the two chutes on the same side are fixedly connected with springs, and the other ends of the springs are respectively fixed with the two brush plates.

进一步的,所述清洗箱的两侧内壁之间固定连接有两个刮水板。Further, two wipers are fixedly connected between two inner walls of the cleaning box.

进一步的,所述清洗箱的两侧内壁之间转动连接有两个安装轴,两个安装轴圆周的一侧均固定连接有刮除板,所述安装轴的两端均套设有扭簧,扭簧的两端分别与清洗箱和刮除板相固定。Further, two installation shafts are rotatably connected between the inner walls on both sides of the cleaning box, a scraper plate is fixedly connected to one side of the circumference of the two installation shafts, and both ends of the installation shaft are sleeved with torsion springs. , the two ends of the torsion spring are respectively fixed with the cleaning box and the scraper.

进一步的,所述清洗箱的一侧固定连通有排放管。Further, a discharge pipe is fixedly connected to one side of the cleaning box.

进一步的,所述降温机构包括冷却箱,所述冷却箱设置在氩弧焊接装置和线坯收卷装置之间,所述冷却箱的两侧内壁转动连接有多个压辊和多个导向辊,所述冷却箱的两侧内壁之间固定连接有隔板,所述冷却箱的一侧固定连接有水泵,水泵进水端贯穿冷却箱,所述水泵的出水端固定连接有排水管,所述冷却箱的一侧固定连通有连接管,连接管与排水管之间设有换热罐。Further, the cooling mechanism includes a cooling box, the cooling box is arranged between the argon arc welding device and the wire blank winding device, and the inner walls on both sides of the cooling box are rotatably connected with a plurality of pressing rollers and a plurality of guide rollers. , a partition plate is fixedly connected between the inner walls on both sides of the cooling box, a water pump is fixedly connected to one side of the cooling box, the water inlet end of the water pump runs through the cooling box, and the water outlet end of the water pump is fixedly connected with a drain pipe, so One side of the cooling box is fixedly connected with a connecting pipe, and a heat exchange tank is arranged between the connecting pipe and the drain pipe.

进一步的,所述换热罐的两端内壁固定分别固定连接有第一连接桶和第二连接桶,所述排水管和连接管的一端均穿过换热罐并分别与第一连接桶和第二连接桶固定连通,所述第一连接桶和第二连接桶之间固定连通有多个支管,所述换热罐的圆周固定连通有两个导水管。Further, the inner walls of both ends of the heat exchange tank are fixedly connected with a first connection barrel and a second connection barrel respectively, and one end of the drain pipe and the connection pipe both pass through the heat exchange tank and are respectively connected with the first connection barrel and the second connection barrel. The second connecting barrel is fixedly connected, a plurality of branch pipes are fixedly connected between the first connecting barrel and the second connecting barrel, and two water conduits are fixedly connected to the circumference of the heat exchange tank.

进一步的,所述冷却箱的两侧内壁之间固定连接有橡胶板,橡胶板的一侧开设有贯穿的穿孔。Further, rubber sheets are fixedly connected between two inner walls of the cooling box, and one side of the rubber sheets is provided with through holes.

进一步的,其中一个所述隔板的底部开设有安装口,安装口内固定连接有连通管,所述冷却箱的一侧内壁固定连接有多个温度传感器,所述冷却箱的一侧内壁固定连接有滤盒,且水泵进水端位于滤盒内。Further, an installation port is opened at the bottom of one of the partitions, and a communication pipe is fixedly connected in the installation port, a plurality of temperature sensors are fixedly connected to one side of the inner wall of the cooling box, and one side of the inner wall of the cooling box is fixedly connected. There is a filter box, and the water inlet end of the pump is located in the filter box.

本发明还提出一种铜包铝合金线包覆成型用的焊接装置的焊接工艺,包括以下步骤:The present invention also proposes a welding process of a welding device for overmolding a copper-clad aluminum alloy wire, comprising the following steps:

S1:铜带放置在铜带料架上,并经过铜带清洗机构,铝杆经过铝杆矫直装置的矫直后,再被铝杆抛光装置抛光,随后与清洗后的铜带一起进入包覆装置内进行包覆,包覆完成后通过氩弧焊接装置进行焊接,焊接后的合金线经过降温机构的降温后被线坯收卷装置收集;S1: The copper strip is placed on the copper strip rack, and passes through the copper strip cleaning mechanism. After the aluminum rod is straightened by the aluminum rod straightening device, it is polished by the aluminum rod polishing device, and then enters the package together with the cleaned copper strip. The coating is carried out in the coating device, and after the coating is completed, the welding is carried out by the argon arc welding device, and the welded alloy wire is cooled by the cooling mechanism and collected by the wire blank winding device;

S2:在铜带经过清洗箱时,绕过第一个导料辊的下方,当铜带在移动时,使导料辊转动,其中一个导料辊带动凸轮转动,凸轮与推动架接触时,能够推动推动架移动,进而使刷板移动,通过刷板对铜带进行清洗;S2: When the copper strip passes through the cleaning box, it bypasses the bottom of the first guide roller. When the copper strip is moving, the guide roller rotates. One of the guide rollers drives the cam to rotate. When the cam contacts the push frame, It can push the push frame to move, then move the brush plate, and clean the copper strip through the brush plate;

S3:清洗过的铜带经过两个刮除板之间,通过两个刮除板将铜带表面进行进一步的刮除,随后经过两个刮水板之间,通过两个刮水板将其表面的水刮除;S3: The cleaned copper strip passes between two scrapers, and the surface of the copper strip is further scraped by the two scrapers, and then passes between the two wipers, and is removed by the two wipers. Surface water scraping;

S4:将焊接好的合金线进行降温,降温时,合金线往复的穿过压辊的底部和导向辊的上方,并将换热罐上的导水管与冷却循环水连通,然后启动水泵,水泵抽取其中一个隔板一侧的热水,然后通过排水管排入换热罐内,经过换热后通过连接管排入冷却箱内,然后凉水通过连通管进入到两个隔板之间,随后溢过另一个隔板,再次被水泵抽取。S4: Cool the welded alloy wire. During cooling, the alloy wire reciprocates through the bottom of the pressing roller and the top of the guide roller, and connects the water conduit on the heat exchange tank with the cooling circulating water, and then starts the water pump. The hot water on one side of one of the partitions is extracted, and then discharged into the heat exchange tank through the drain pipe. After heat exchange, it is discharged into the cooling box through the connecting pipe, and then the cold water enters between the two partitions through the connecting pipe. It overflows another baffle and is pumped again by the pump.

与现有技术相比,本发明的有益效果是:Compared with the prior art, the beneficial effects of the present invention are:

1.本发明通过两个刷板能够进行往复运动的设置,使得铜带在经过两个刷板之间后,表面和底部的杂质能够被刷除,避免杂质影响到焊接。1. In the present invention, two brush plates can be set for reciprocating motion, so that after the copper strip passes between the two brush plates, the impurities on the surface and the bottom can be brushed off, so as to avoid impurities affecting the welding.

2.本发明通过两个刮除板的设置,使得两个刮除板在扭簧的带动下,能够与铜带接触,进而对铜带表面被清理下来的杂质进行刮除,进一步提高铜带的洁净性。2. In the present invention, through the arrangement of two scraping plates, the two scraping plates can be brought into contact with the copper strip under the drive of the torsion spring, and then scrape off the impurities cleaned on the surface of the copper strip, thereby further improving the copper strip. of cleanliness.

3.本发明通过在冷却箱内安装多个隔板的设置,使得冷却箱内不同隔板的两侧温度不同,使冷却箱内的水温产生温度差,避免刚焊接完的合金线骤冷破损,提高合金线的质量。3. In the present invention, by installing a plurality of partitions in the cooling box, the temperature on both sides of different partitions in the cooling box is different, so that the water temperature in the cooling box has a temperature difference, and the alloy wire that has just been welded is prevented from being damaged by sudden cooling. , to improve the quality of the alloy wire.

4.本发明通过第一连接桶、第二连接桶和支管的配合使用,使得导水管连接循环冷却水后,经过排水管的热水能够充分的与循环冷却水进行热量交换,提高散热效果。4. The present invention uses the first connecting barrel, the second connecting barrel and the branch pipe, so that after the water conduit is connected to the circulating cooling water, the hot water passing through the drain pipe can fully exchange heat with the circulating cooling water to improve the heat dissipation effect.

本发明中,铜带在经过两个刷板之间后,表面和底部的杂质能够被刷除,避免杂质影响到焊接,还通过刮除板对铜带表面被清理下来的杂质进行刮除,进一步提高铜带的洁净性。In the present invention, after the copper strip passes between the two brush plates, the impurities on the surface and the bottom can be brushed off, so as to prevent the impurities from affecting the welding, and the scraping plate is used to scrape off the cleaned impurities on the surface of the copper strip. Further improve the cleanliness of the copper strip.

附图说明Description of drawings

图1为本发明提出的一种铜包铝合金线包覆成型用的焊接装置的三维结构示意图;Fig. 1 is a three-dimensional structural schematic diagram of a welding device for overmolding copper-clad aluminum alloy wire proposed by the present invention;

图2为本发明提出的一种铜包铝合金线包覆成型用的焊接装置的铜带清洗机构三维结构示意图;2 is a three-dimensional structural schematic diagram of a copper strip cleaning mechanism of a welding device for copper-clad aluminum alloy wire wrap-molding proposed by the present invention;

图3为本发明提出的一种铜包铝合金线包覆成型用的焊接装置的铜带清洗机构剖视结构示意图;3 is a cross-sectional structural schematic diagram of a copper strip cleaning mechanism of a welding device for copper-clad aluminum alloy wire overmolding proposed by the present invention;

图4为本发明提出的一种铜包铝合金线包覆成型用的焊接装置的降温机构剖视结构示意图;4 is a cross-sectional structural schematic diagram of a cooling mechanism of a welding device for overmolding copper-clad aluminum alloy wire proposed by the present invention;

图5为本发明提出的一种铜包铝合金线包覆成型用的焊接装置的换热罐剖视结构示意图。5 is a schematic cross-sectional structural diagram of a heat exchange tank of a welding device for overmolding copper-clad aluminum alloy wires proposed by the present invention.

图中:1、铜带料架;2、铝杆矫直装置;3、铝杆抛光装置;4、包覆装置;5、氩弧焊接装置;6、线坯收卷装置;7、铜带清洗机构;8、降温机构;9、清洗箱;10、刮水板;11、导料辊;12、排放管;13、滑槽;14、刷板;15、弹簧;16、推动架;17、凸轮;18、刮除板;181、安装轴;19、扭簧;20、压辊;21、导向辊;22、隔板;221、连通管;23、温度传感器;24、橡胶板;25、穿孔;26、水泵;27、滤盒;28、排水管;29、换热罐;30、连接管;31、冷却箱;32、第一连接桶;33、第二连接桶;34、支管;35、导水管。In the picture: 1. Copper strip rack; 2. Aluminum rod straightening device; 3. Aluminum rod polishing device; 4. Coating device; 5. Argon arc welding device; 6. Wire blank winding device; 7. Copper strip Cleaning mechanism; 8. Cooling mechanism; 9. Cleaning box; 10. Wiper plate; 11. Material guide roller; 12. Discharge pipe; 13. Chute; 14. Brush plate; 15. Spring; 16. Push frame; 17 , cam; 18, scraping plate; 181, installation shaft; 19, torsion spring; 20, pressure roller; 21, guide roller; 22, partition plate; 221, connecting pipe; 23, temperature sensor; 24, rubber plate; 25 , perforation; 26, water pump; 27, filter box; 28, drain pipe; 29, heat exchange tank; 30, connecting pipe; 31, cooling box; 32, first connecting barrel; 33, second connecting barrel; 34, branch pipe ; 35, aqueduct.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments.

实施例一Example 1

参照图1-图5,一种铜包铝合金线包覆成型用的焊接装置,包括依次设置的铜带料架1、铝杆矫直装置2、铝杆抛光装置3、包覆装置4、氩弧焊接装置5和线坯收卷装置6,铜带料架1与铝杆矫直装置2之间设有用于对铜带进行处理的铜带清洗机构7,氩弧焊接装置5与线坯收卷装置6之间设有用于对焊接后的合金线进行降温的降温机构8,铜带清洗机构7包括清洗箱9,清洗箱9设置在铜带料架1与铝杆矫直装置2之间,清洗箱9的两侧内壁之间转动连接有两个导料辊11,其中一个导料辊11的圆周固定连接有对称设置的两个凸轮17,清洗箱9的两侧内壁均开设有两个滑槽13,同一高度的两个滑槽13之间均滑动连接有刷板14,刷板14的一侧均固定连接有对称设置的两个推动架16,且同侧相邻的两个推动架16分别位于凸轮17的两侧,同侧的两个滑槽13相反的一侧均固定连接有弹簧15,且弹簧15的另一端分别与两个刷板14相固定。1-5, a welding device for copper-clad aluminum alloy wire overmolding, including a copper strip rack 1, an aluminum rod straightening device 2, an aluminum rod polishing device 3, a coating device 4, The argon arc welding device 5 and the wire billet winding device 6, the copper strip cleaning mechanism 7 for processing the copper strip is provided between the copper strip material rack 1 and the aluminum rod straightening device 2, the argon arc welding device 5 and the wire billet A cooling mechanism 8 for cooling the welded alloy wire is provided between the winding devices 6, and the copper strip cleaning mechanism 7 includes a cleaning box 9, which is arranged between the copper strip rack 1 and the aluminum rod straightening device 2. During the time, two guide rollers 11 are rotatably connected between the inner walls on both sides of the cleaning box 9, and two cams 17 arranged symmetrically are fixedly connected to the circumference of one of the guide rollers 11. Two chutes 13, brush plates 14 are slidably connected between the two chutes 13 of the same height, and two push frames 16 symmetrically arranged on one side of the brush plates 14 are fixedly connected, and two adjacent ones on the same side are fixedly connected with each other. The two push frames 16 are respectively located on both sides of the cam 17 , and the opposite sides of the two sliding grooves 13 on the same side are fixedly connected with springs 15 , and the other ends of the springs 15 are respectively fixed to the two brush plates 14 .

实施例二Embodiment 2

参照图1-图5,本发明提供一种新的技术方案:一种铜包铝合金线包覆成型用的焊接装置,包括依次设置的铜带料架1、铝杆矫直装置2、铝杆抛光装置3、包覆装置4、氩弧焊接装置5和线坯收卷装置6,铜带料架1与铝杆矫直装置2之间设有用于对铜带进行处理的铜带清洗机构7,氩弧焊接装置5与线坯收卷装置6之间设有用于对焊接后的合金线进行降温的降温机构8,铜带放置在铜带料架1上,并经过铜带清洗机构7,铝杆经过铝杆矫直装置2的矫直后,再被铝杆抛光装置3抛光,随后与清洗后的铜带一起进入包覆装置4内进行包覆,包覆完成后通过氩弧焊接装置5进行焊接,焊接后的合金线经过降温机构8的降温后被线坯收卷装置6收集;1-5, the present invention provides a new technical solution: a welding device for copper-clad aluminum alloy wire overmolding, including a copper strip rack 1, an aluminum rod straightening device 2, an aluminum Rod polishing device 3, cladding device 4, argon arc welding device 5 and wire blank winding device 6, between the copper strip rack 1 and the aluminum rod straightening device 2, there is a copper strip cleaning mechanism for processing the copper strip 7. A cooling mechanism 8 for cooling the welded alloy wire is provided between the argon arc welding device 5 and the wire blank winding device 6, and the copper strip is placed on the copper strip rack 1, and passes through the copper strip cleaning mechanism 7 After the aluminum rod is straightened by the aluminum rod straightening device 2, it is polished by the aluminum rod polishing device 3, and then enters the coating device 4 together with the cleaned copper strip for coating. After the coating is completed, it is welded by argon arc welding. The device 5 is welded, and the welded alloy wire is collected by the wire blank winding device 6 after being cooled by the cooling mechanism 8;

铜带清洗机构7包括清洗箱9,清洗箱9设置在铜带料架1与铝杆矫直装置2之间,清洗箱9的两侧内壁之间转动连接有两个导料辊11,其中一个导料辊11的圆周固定连接有对称设置的两个凸轮17,清洗箱9的两侧内壁均开设有两个滑槽13,同一高度的两个滑槽13之间均滑动连接有刷板14,刷板14的一侧均固定连接有对称设置的两个推动架16,且同侧相邻的两个推动架16分别位于凸轮17的两侧,凸轮17与推动架16接触时,能够推动推动架16移动,进而使刷板14移动,通过刷板14对铜带进行清洗,同侧的两个滑槽13相反的一侧均固定连接有弹簧15,且弹簧15的另一端分别与两个刷板14相固定,弹簧15起到在刷板14移动后使刷板14进行复位的作用,清洗箱9的两侧内壁之间固定连接有两个刮水板10,刮水板10为橡胶,能够将清洗后铜带上的水渍刮除,清洗箱9的两侧内壁之间转动连接有两个安装轴181,两个安装轴181圆周的一侧均固定连接有刮除板18,安装轴181的两端均套设有扭簧19,扭簧19的两端分别与清洗箱9和刮除板18相固定,两个刮除板18在扭簧19的带动下,能够与铜带接触,进而对铜带表面被清理下来的杂质进行刮除,进一步提高铜带的洁净性,清洗箱9的一侧固定连通有排放管12,通过排放管12,方便对清洗液进行排放。The copper strip cleaning mechanism 7 includes a cleaning box 9. The cleaning box 9 is arranged between the copper strip material rack 1 and the aluminum rod straightening device 2. Two guide rollers 11 are rotatably connected between the inner walls on both sides of the cleaning box 9. The circumference of a guide roller 11 is fixedly connected with two symmetrically arranged cams 17, the inner walls on both sides of the cleaning box 9 are provided with two chute 13, and a brush plate is slidably connected between the two chute 13 at the same height. 14. One side of the brush plate 14 is fixedly connected with two symmetrically arranged push frames 16, and the two adjacent push frames 16 on the same side are respectively located on both sides of the cam 17. When the cam 17 is in contact with the push frame 16, it can be Push the push frame 16 to move, and then move the brush plate 14, and clean the copper strip through the brush plate 14. The opposite sides of the two chutes 13 on the same side are fixedly connected with springs 15, and the other ends of the springs 15 are respectively connected with The two brush plates 14 are fixed to each other, and the spring 15 plays the role of resetting the brush plate 14 after the brush plate 14 moves. Two wiper plates 10 are fixedly connected between the inner walls of the cleaning box 9 on both sides. It is rubber, which can scrape off the water stains on the copper belt after cleaning. Two installation shafts 181 are rotatably connected between the inner walls of the two sides of the cleaning box 9, and a scraper plate is fixedly connected to one side of the circumference of the two installation shafts 181. 18. Both ends of the installation shaft 181 are sleeved with torsion springs 19. Both ends of the torsion springs 19 are respectively fixed with the cleaning box 9 and the scraper plate 18. The two scraper plates 18 can be driven by the torsion spring 19. Contact with the copper strip, and then scrape off the impurities cleaned on the surface of the copper strip to further improve the cleanliness of the copper strip. A discharge pipe 12 is fixedly connected to one side of the cleaning box 9. emission.

本发明中,降温机构8包括冷却箱31,冷却箱31设置在氩弧焊接装置5和线坯收卷装置6之间,冷却箱31的两侧内壁转动连接有多个压辊20和多个导向辊21,冷却箱31的两侧内壁之间固定连接有隔板22,冷却箱31的一侧固定连接有水泵26,水泵26进水端贯穿冷却箱31,水泵26的出水端固定连接有排水管28,冷却箱31的一侧固定连通有连接管30,连接管30与排水管28之间设有换热罐29,启动水泵26,水泵26抽取其中一个隔板22一侧的热水,然后通过排水管28排入换热罐29内,经过换热后通过连接管30排入冷却箱31内,然后凉水通过连通管221进入到两个隔板22之间,随后溢过另一个隔板22,再次被水泵26抽取,合金线往复的穿过压辊20的底部和导向辊21的上方,从而起到降温的效果,换热罐29的两端内壁固定分别固定连接有第一连接桶32和第二连接桶33,排水管28和连接管30的一端均穿过换热罐29并分别与第一连接桶32和第二连接桶33固定连通,第一连接桶32和第二连接桶33之间固定连通有多个支管34,换热罐29的圆周固定连通有两个导水管35,导水管35连接循环冷却水后,经过排水管28的热水能够充分的与循环冷却水进行热量交换,提高散热效果,冷却箱31的两侧内壁之间固定连接有橡胶板24,橡胶板24的一侧开设有贯穿的穿孔25,冷却后的合金线通过穿孔25,通过穿孔25将合金线上的水渍刮除,其中一个隔板22的底部开设有安装口,安装口内固定连接有连通管221,冷却箱31的一侧内壁固定连接有多个温度传感器23,通过温度传感器23方便查看冷却箱31内的水温,冷却箱31的一侧内壁固定连接有滤盒27,且水泵26进水端位于滤盒27内,滤盒27能够对水泵26抽取的液体进行过滤。In the present invention, the cooling mechanism 8 includes a cooling box 31. The cooling box 31 is arranged between the argon arc welding device 5 and the wire blank winding device 6. The inner walls on both sides of the cooling box 31 are rotatably connected with a plurality of pressing rollers 20 and a plurality of The guide roller 21, the partition plate 22 is fixedly connected between the two inner walls of the cooling box 31, the water pump 26 is fixedly connected to one side of the cooling box 31, the water inlet end of the water pump 26 penetrates the cooling box 31, and the water outlet end of the water pump 26 is fixedly connected with a Drain pipe 28, one side of the cooling box 31 is fixedly connected with a connecting pipe 30, a heat exchange tank 29 is arranged between the connecting pipe 30 and the drain pipe 28, the water pump 26 is started, and the water pump 26 extracts the hot water on the side of one of the partitions 22 , and then discharged into the heat exchange tank 29 through the drain pipe 28, and then discharged into the cooling box 31 through the connecting pipe 30 after heat exchange, and then the cold water enters between the two partitions 22 through the connecting pipe 221, and then overflows the other The partition plate 22 is pumped again by the water pump 26, and the alloy wire reciprocates through the bottom of the pressing roller 20 and the top of the guide roller 21, so as to achieve the effect of cooling, and the inner walls of the two ends of the heat exchange tank 29 are fixed and connected respectively. Connecting the barrel 32 and the second connecting barrel 33, one end of the drain pipe 28 and the connecting pipe 30 both pass through the heat exchange tank 29 and are in fixed communication with the first connecting barrel 32 and the second connecting barrel 33, respectively. A plurality of branch pipes 34 are fixedly connected between the two connecting barrels 33, and two water conduits 35 are fixedly connected to the circumference of the heat exchange tank 29. After the water conduits 35 are connected to the circulating cooling water, the hot water passing through the drain pipe 28 can be fully circulated The cooling water conducts heat exchange to improve the heat dissipation effect. A rubber plate 24 is fixedly connected between the inner walls on both sides of the cooling box 31. One side of the rubber plate 24 is provided with a through hole 25, and the cooled alloy wire passes through the hole 25 and passes through the hole. 25 Scrape off the water stains on the alloy wire, one of the partitions 22 is provided with an installation port at the bottom, a communication pipe 221 is fixedly connected in the installation port, and a plurality of temperature sensors 23 are fixedly connected to one side of the inner wall of the cooling box 31. The sensor 23 is convenient for checking the water temperature in the cooling box 31. A filter box 27 is fixedly connected to one inner wall of the cooling box 31, and the water inlet end of the water pump 26 is located in the filter box 27. The filter box 27 can filter the liquid extracted by the water pump 26.

本发明还提出一种铜包铝合金线包覆成型用的焊接装置的焊接工艺,包括以下步骤:The present invention also proposes a welding process of a welding device for overmolding a copper-clad aluminum alloy wire, comprising the following steps:

S1:铜带放置在铜带料架1上,并经过铜带清洗机构7,铝杆经过铝杆矫直装置2的矫直后,再被铝杆抛光装置3抛光,随后与清洗后的铜带一起进入包覆装置4内进行包覆,包覆完成后通过氩弧焊接装置5进行焊接,焊接后的合金线经过降温机构8的降温后被线坯收卷装置6收集;S1: The copper strip is placed on the copper strip rack 1, and passes through the copper strip cleaning mechanism 7. After the aluminum rod is straightened by the aluminum rod straightening device 2, it is polished by the aluminum rod polishing device 3, and then cleaned with the cleaned copper rod. The strips enter the coating device 4 together for coating, and after the coating is completed, the welding is carried out by the argon arc welding device 5, and the welded alloy wire is cooled by the cooling mechanism 8 and collected by the wire blank winding device 6;

S2:在铜带经过清洗箱9时,绕过第一个导料辊11的下方,当铜带在移动时,使导料辊11转动,其中一个导料辊11带动凸轮17转动,凸轮17与推动架16接触时,能够推动推动架16移动,进而使刷板14移动,通过刷板14对铜带进行清洗;S2: When the copper strip passes through the cleaning box 9, it bypasses the bottom of the first guide roller 11. When the copper strip is moving, the guide roller 11 is rotated. One of the guide rollers 11 drives the cam 17 to rotate, and the cam 17 When in contact with the push frame 16, the push frame 16 can be pushed to move, thereby making the brush plate 14 move, and the copper strip is cleaned by the brush plate 14;

S3:清洗过的铜带经过两个刮除板18之间,通过两个刮除板18将铜带表面进行进一步的刮除,随后经过两个刮水板10之间,通过两个刮水板10将其表面的水刮除;S3: The cleaned copper strip passes between the two scraping plates 18, and the surface of the copper strip is further scraped by the two scraping plates 18, and then passes between the two scraping plates 10, and passes through the two scraping plates 18. The plate 10 scrapes the water off its surface;

S4:将焊接好的合金线进行降温,降温时,合金线往复的穿过压辊20的底部和导向辊21的上方,并将换热罐29上的导水管35与冷却循环水连通,然后启动水泵26,水泵26抽取其中一个隔板22一侧的热水,然后通过排水管28排入换热罐29内,经过换热后通过连接管30排入冷却箱31内,然后凉水通过连通管221进入到两个隔板22之间,随后溢过另一个隔板22,再次被水泵26抽取。S4: Cool the welded alloy wire. During cooling, the alloy wire reciprocates through the bottom of the pressing roller 20 and the top of the guide roller 21, and the water conduit 35 on the heat exchange tank 29 is communicated with the cooling circulating water, and then Start the water pump 26, the water pump 26 extracts the hot water on the side of one of the partitions 22, and then discharges it into the heat exchange tank 29 through the drain pipe 28. After heat exchange, it is discharged into the cooling tank 31 through the connecting pipe 30, and then the cold water passes through the communication The pipe 221 enters between the two baffles 22 and then overflows the other baffle 22 and is pumped again by the water pump 26 .

然而,如本领域技术人员所熟知的,水泵26和温度传感器23的工作原理和接线方法是司空见惯的,其均属于常规手段或者公知常识,在此就不再赘述,本领域技术人员可以根据其需要或者便利进行任意的选配。However, as known to those skilled in the art, the working principles and wiring methods of the water pump 26 and the temperature sensor 23 are commonplace, and they are all conventional means or common knowledge, and will not be repeated here. Arbitrary options are required or convenient.

以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. The equivalent replacement or change of the inventive concept thereof shall be included within the protection scope of the present invention.

Claims (9)

1.一种铜包铝合金线包覆成型用的焊接装置,包括依次设置的铜带料架(1)、铝杆矫直装置(2)、铝杆抛光装置(3)、包覆装置(4)、氩弧焊接装置(5)和线坯收卷装置(6),其特征在于,所述铜带料架(1)与铝杆矫直装置(2)之间设有用于对铜带进行处理的铜带清洗机构(7),所述氩弧焊接装置(5)与线坯收卷装置(6)之间设有用于对焊接后的合金线进行降温的降温机构(8);1. A welding device for overmolding a copper-clad aluminum alloy wire, comprising a copper strip rack (1), an aluminum rod straightening device (2), an aluminum rod polishing device (3), a coating device ( 4), the argon arc welding device (5) and the wire blank winding device (6), characterized in that, between the copper strip rack (1) and the aluminum rod straightening device (2), there is a device for aligning the copper strip A copper strip cleaning mechanism (7) for processing, a cooling mechanism (8) for cooling the welded alloy wire is provided between the argon arc welding device (5) and the wire blank winding device (6); 所述铜带清洗机构(7)包括清洗箱(9),所述清洗箱(9)设置在铜带料架(1)与铝杆矫直装置(2)之间,所述清洗箱(9)的两侧内壁之间转动连接有两个导料辊(11),其中一个所述导料辊(11)的圆周固定连接有对称设置的两个凸轮(17),所述清洗箱(9)的两侧内壁均开设有两个滑槽(13),同一高度的两个滑槽(13)之间均滑动连接有刷板(14),刷板(14)的一侧均固定连接有对称设置的两个推动架(16),且同侧相邻的两个推动架(16)分别位于凸轮(17)的两侧,同侧的两个所述滑槽(13)相反的一侧均固定连接有弹簧(15),且弹簧(15)的另一端分别与两个刷板(14)相固定。The copper strip cleaning mechanism (7) includes a cleaning box (9), the cleaning box (9) is arranged between the copper strip material rack (1) and the aluminum rod straightening device (2), and the cleaning box (9) ) are rotatably connected between two inner walls on both sides of the guide rollers (11), and two symmetrically arranged cams (17) are fixedly connected to the circumference of one of the guide rollers (11), and the cleaning box (9). ) on both sides of the inner walls are provided with two chute (13), a brush plate (14) is slidably connected between the two chute (13) at the same height, and one side of the brush plate (14) is fixedly connected with a brush plate (14). Two push frames (16) are symmetrically arranged, and the two adjacent push frames (16) on the same side are respectively located on both sides of the cam (17), and the two sliding grooves (13) on the same side are on the opposite side Both are fixedly connected with a spring (15), and the other ends of the spring (15) are respectively fixed with the two brush plates (14). 2.根据权利要求1所述的一种铜包铝合金线包覆成型用的焊接装置,其特征在于,所述清洗箱(9)的两侧内壁之间固定连接有两个刮水板(10)。2. The welding device for copper-clad aluminum alloy wire overmolding according to claim 1, characterized in that, two wipers ( 10). 3.根据权利要求1所述的一种铜包铝合金线包覆成型用的焊接装置,其特征在于,所述清洗箱(9)的两侧内壁之间转动连接有两个安装轴(181),两个安装轴(181)圆周的一侧均固定连接有刮除板(18),所述安装轴(181)的两端均套设有扭簧(19),扭簧(19)的两端分别与清洗箱(9)和刮除板(18)相固定。3. The welding device for copper-clad aluminum alloy wire overmolding according to claim 1, characterized in that two mounting shafts (181) are rotatably connected between the inner walls on both sides of the cleaning box (9). ), a scraper (18) is fixedly connected to one side of the circumference of the two installation shafts (181), and torsion springs (19) are sleeved at both ends of the installation shafts (181). Both ends are respectively fixed with the cleaning box (9) and the scraper (18). 4.根据权利要求1所述的一种铜包铝合金线包覆成型用的焊接装置,其特征在于,所述清洗箱(9)的一侧固定连通有排放管(12)。4 . The welding device for overmolding copper-clad aluminum alloy wire according to claim 1 , wherein a discharge pipe ( 12 ) is fixedly connected to one side of the cleaning box ( 9 ). 5 . 5.根据权利要求1所述的一种铜包铝合金线包覆成型用的焊接装置,其特征在于,所述降温机构(8)包括冷却箱(31),所述冷却箱(31)设置在氩弧焊接装置(5)和线坯收卷装置(6)之间,所述冷却箱(31)的两侧内壁转动连接有多个压辊(20)和多个导向辊(21),所述冷却箱(31)的两侧内壁之间固定连接有隔板(22),所述冷却箱(31)的一侧固定连接有水泵(26),水泵(26)进水端贯穿冷却箱(31),所述水泵(26)的出水端固定连接有排水管(28),所述冷却箱(31)的一侧固定连通有连接管(30),连接管(30)与排水管(28)之间设有换热罐(29)。5 . The welding device for overmolding copper-clad aluminum alloy wire according to claim 1 , wherein the cooling mechanism ( 8 ) comprises a cooling box ( 31 ), and the cooling box ( 31 ) is provided with 5 . Between the argon arc welding device (5) and the wire blank winding device (6), a plurality of pressing rollers (20) and a plurality of guide rollers (21) are rotatably connected to the inner walls of the cooling box (31) on both sides, A partition plate (22) is fixedly connected between two inner walls of the cooling box (31), a water pump (26) is fixedly connected to one side of the cooling box (31), and the water inlet end of the water pump (26) penetrates through the cooling box (31), the water outlet end of the water pump (26) is fixedly connected with a drain pipe (28), one side of the cooling box (31) is fixedly connected with a connecting pipe (30), and the connecting pipe (30) is connected with the drain pipe (31). A heat exchange tank (29) is arranged between 28). 6.根据权利要求5所述的一种铜包铝合金线包覆成型用的焊接装置,其特征在于,所述换热罐(29)的两端内壁固定分别固定连接有第一连接桶(32)和第二连接桶(33),所述排水管(28)和连接管(30)的一端均穿过换热罐(29)并分别与第一连接桶(32)和第二连接桶(33)固定连通,所述第一连接桶(32)和第二连接桶(33)之间固定连通有多个支管(34),所述换热罐(29)的圆周固定连通有两个导水管(35)。6. The welding device for copper-clad aluminum alloy wire overmolding according to claim 5, characterized in that, the inner walls of both ends of the heat exchange tank (29) are fixedly connected with a first connection barrel (29) respectively. 32) and the second connecting barrel (33), one end of the drain pipe (28) and the connecting pipe (30) both pass through the heat exchange tank (29) and are respectively connected with the first connecting barrel (32) and the second connecting barrel (33) Fixed communication, a plurality of branch pipes (34) are fixedly connected between the first connection barrel (32) and the second connection barrel (33), and two heat exchange tanks (29) are fixedly connected at the circumference of the heat exchange tank (29). Aqueduct (35). 7.根据权利要求5所述的一种铜包铝合金线包覆成型用的焊接装置,其特征在于,所述冷却箱(31)的两侧内壁之间固定连接有橡胶板(24),橡胶板(24)的一侧开设有贯穿的穿孔(25)。7. The welding device for overmolding copper-clad aluminum alloy wire according to claim 5, wherein a rubber plate (24) is fixedly connected between the inner walls on both sides of the cooling box (31), One side of the rubber plate (24) is provided with a through hole (25). 8.根据权利要求5所述的一种铜包铝合金线包覆成型用的焊接装置,其特征在于,其中一个所述隔板(22)的底部开设有安装口,安装口内固定连接有连通管(221),所述冷却箱(31)的一侧内壁固定连接有多个温度传感器(23),所述冷却箱(31)的一侧内壁固定连接有滤盒(27),且水泵(26)进水端位于滤盒(27)内。8 . The welding device for overmolding copper-clad aluminum alloy wire according to claim 5 , wherein an installation port is opened at the bottom of one of the partitions ( 22 ), and a communication connection is fixedly connected in the installation port. 9 . Pipe (221), a plurality of temperature sensors (23) are fixedly connected to one side inner wall of the cooling box (31), a filter box (27) is fixedly connected to one side inner wall of the cooling box (31), and the water pump ( 26) The water inlet end is located in the filter box (27). 9.根据权利要求1-8任意一条所述的一种铜包铝合金线包覆成型用的焊接装置的焊接工艺,其特征在于,包括以下步骤:9. The welding process of a welding device for overmolding a copper-clad aluminum alloy wire according to any one of claims 1-8, characterized in that, comprising the following steps: S1:铜带放置在铜带料架(1)上,并经过铜带清洗机构(7),铝杆经过铝杆矫直装置(2)的矫直后,再被铝杆抛光装置(3)抛光,随后与清洗后的铜带一起进入包覆装置(4)内进行包覆,包覆完成后通过氩弧焊接装置(5)进行焊接,焊接后的合金线经过降温机构(8)的降温后被线坯收卷装置(6)收集;S1: The copper strip is placed on the copper strip rack (1), and passes through the copper strip cleaning mechanism (7). polishing, and then entering the coating device (4) together with the cleaned copper strip for coating, after the coating is completed, welding is performed by the argon arc welding device (5), and the welded alloy wire is cooled by the cooling mechanism (8). and then collected by the wire blank winding device (6); S2:在铜带经过清洗箱(9)时,绕过第一个导料辊(11)的下方,当铜带在移动时,使导料辊(11)转动,其中一个导料辊(11)带动凸轮(17)转动,凸轮(17)与推动架(16)接触时,能够推动推动架(16)移动,进而使刷板(14)移动,通过刷板(14)对铜带进行清洗;S2: When the copper strip passes through the cleaning box (9), it bypasses the bottom of the first guide roller (11). When the copper strip is moving, the guide roller (11) is rotated. One of the guide rollers (11) ) drives the cam (17) to rotate, and when the cam (17) is in contact with the push frame (16), it can push the push frame (16) to move, thereby making the brush plate (14) move, and the copper strip is cleaned through the brush plate (14). ; S3:清洗过的铜带经过两个刮除板(18)之间,通过两个刮除板(18)将铜带表面进行进一步的刮除,随后经过两个刮水板(10)之间,通过两个刮水板(10)将其表面的水刮除;S3: The cleaned copper strip passes between the two scraping plates (18), the surface of the copper strip is further scraped by the two scraping plates (18), and then passes between the two scraping plates (10) , the water on its surface is wiped off by two wiper blades (10); S4:将焊接好的合金线进行降温,降温时,合金线往复的穿过压辊(20)的底部和导向辊(21)的上方,并将换热罐(29)上的导水管(35)与冷却循环水连通,然后启动水泵(26),水泵(26)抽取其中一个隔板(22)一侧的热水,然后通过排水管(28)排入换热罐(29)内,经过换热后通过连接管(30)排入冷却箱(31)内,然后凉水通过连通管(221)进入到两个隔板(22)之间,随后溢过另一个隔板(22),再次被水泵(26)抽取。S4: Cool down the welded alloy wire. During cooling, the alloy wire reciprocates through the bottom of the pressing roller (20) and the top of the guide roller (21), and the water conduit (35) on the heat exchange tank (29) is reciprocated. ) is communicated with the cooling circulating water, then the water pump (26) is started, and the water pump (26) extracts the hot water on one side of the partition plate (22), and then discharges it into the heat exchange tank (29) through the drain pipe (28), After heat exchange, it is discharged into the cooling box (31) through the connecting pipe (30), and then the cold water enters between the two partitions (22) through the connecting pipe (221), and then overflows the other partition (22), and again is pumped by the water pump (26).
CN202210689463.8A 2022-06-16 2022-06-16 Welding device and process for cladding and molding copper-clad aluminum alloy wire Active CN114888571B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210689463.8A CN114888571B (en) 2022-06-16 2022-06-16 Welding device and process for cladding and molding copper-clad aluminum alloy wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210689463.8A CN114888571B (en) 2022-06-16 2022-06-16 Welding device and process for cladding and molding copper-clad aluminum alloy wire

Publications (2)

Publication Number Publication Date
CN114888571A true CN114888571A (en) 2022-08-12
CN114888571B CN114888571B (en) 2023-06-13

Family

ID=82728181

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210689463.8A Active CN114888571B (en) 2022-06-16 2022-06-16 Welding device and process for cladding and molding copper-clad aluminum alloy wire

Country Status (1)

Country Link
CN (1) CN114888571B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116493942A (en) * 2023-06-26 2023-07-28 太仓优尼卡机械设备制造有限公司 Welding device for steel roller production and welding method thereof
CN120755674A (en) * 2025-09-10 2025-10-10 西安西电光电缆有限责任公司 A 5G leaky cable spiral corrugated copper tube inner conductor welding corrugation device and method

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1170035A (en) * 1967-05-05 1969-11-12 Westinghouse Electric Corp Method of Electrically Cleaning Insulated Foil Conductor
CN101121228A (en) * 2007-08-02 2008-02-13 大连齐大机电设备制造有限公司 Bimetallic composite wire rod high-efficient production line
CN108856683A (en) * 2018-07-18 2018-11-23 王同浩 A kind of aluminium alloy clean manufacturing water cooling equipment
CN210458305U (en) * 2019-07-15 2020-05-05 天津博世达电子电线有限公司 A wheelbase adjustment mechanism of a copper wire annealing device with convenient adjustment
CN111672835A (en) * 2020-06-18 2020-09-18 烟台暄炜智能科技有限公司 Water pipe belt cleaning device for water and electricity construction
CN212168253U (en) * 2020-05-15 2020-12-18 江西铜钹山环保科技有限公司 A kind of cooling and cooling equipment for copper rod production
CN212199641U (en) * 2020-05-07 2020-12-22 福建永盛合成革有限公司 Synthetic leather washing device with cleaning performance is good
CN112474465A (en) * 2020-11-03 2021-03-12 宁波市东霓新材料科技有限公司 Environment-friendly production method of electrolytic copper foil
CN112652421A (en) * 2020-08-21 2021-04-13 湖南科技学院 Novel cladding welding equipment for copper-clad aluminum wires
CN214235198U (en) * 2020-08-16 2021-09-21 敬业钢铁有限公司 Surface cleaning device for wire rod treatment
CN214348181U (en) * 2020-12-23 2021-10-08 永鑫精密材料(无锡)有限公司 Stainless steel band cleaning machine
CN214718602U (en) * 2021-01-22 2021-11-16 江苏聚润硅谷新材料科技有限公司 Cleaning equipment is used in processing of gold bonding wire
CN215251103U (en) * 2021-07-01 2021-12-21 江阴市晨达新能源科技有限公司 Tin-coated welding strip production device for solar photovoltaic module
CN114074083A (en) * 2021-11-10 2022-02-22 广东嘉元科技股份有限公司 Surface processing treatment equipment for copper foil manufacturing

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1170035A (en) * 1967-05-05 1969-11-12 Westinghouse Electric Corp Method of Electrically Cleaning Insulated Foil Conductor
CN101121228A (en) * 2007-08-02 2008-02-13 大连齐大机电设备制造有限公司 Bimetallic composite wire rod high-efficient production line
CN108856683A (en) * 2018-07-18 2018-11-23 王同浩 A kind of aluminium alloy clean manufacturing water cooling equipment
CN210458305U (en) * 2019-07-15 2020-05-05 天津博世达电子电线有限公司 A wheelbase adjustment mechanism of a copper wire annealing device with convenient adjustment
CN212199641U (en) * 2020-05-07 2020-12-22 福建永盛合成革有限公司 Synthetic leather washing device with cleaning performance is good
CN212168253U (en) * 2020-05-15 2020-12-18 江西铜钹山环保科技有限公司 A kind of cooling and cooling equipment for copper rod production
CN111672835A (en) * 2020-06-18 2020-09-18 烟台暄炜智能科技有限公司 Water pipe belt cleaning device for water and electricity construction
CN214235198U (en) * 2020-08-16 2021-09-21 敬业钢铁有限公司 Surface cleaning device for wire rod treatment
CN112652421A (en) * 2020-08-21 2021-04-13 湖南科技学院 Novel cladding welding equipment for copper-clad aluminum wires
CN112474465A (en) * 2020-11-03 2021-03-12 宁波市东霓新材料科技有限公司 Environment-friendly production method of electrolytic copper foil
CN214348181U (en) * 2020-12-23 2021-10-08 永鑫精密材料(无锡)有限公司 Stainless steel band cleaning machine
CN214718602U (en) * 2021-01-22 2021-11-16 江苏聚润硅谷新材料科技有限公司 Cleaning equipment is used in processing of gold bonding wire
CN215251103U (en) * 2021-07-01 2021-12-21 江阴市晨达新能源科技有限公司 Tin-coated welding strip production device for solar photovoltaic module
CN114074083A (en) * 2021-11-10 2022-02-22 广东嘉元科技股份有限公司 Surface processing treatment equipment for copper foil manufacturing

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116493942A (en) * 2023-06-26 2023-07-28 太仓优尼卡机械设备制造有限公司 Welding device for steel roller production and welding method thereof
CN116493942B (en) * 2023-06-26 2023-09-26 太仓优尼卡机械设备制造有限公司 Welding device for steel roller production and welding method thereof
CN120755674A (en) * 2025-09-10 2025-10-10 西安西电光电缆有限责任公司 A 5G leaky cable spiral corrugated copper tube inner conductor welding corrugation device and method

Also Published As

Publication number Publication date
CN114888571B (en) 2023-06-13

Similar Documents

Publication Publication Date Title
CN114888571B (en) Welding device and process for cladding and molding copper-clad aluminum alloy wire
CN212620285U (en) A high-performance chemical tubular heat exchanger
CN108085704B (en) Wire acid pickling process
CN119566081B (en) A wire drawing device for copper wire processing
CN117696529B (en) A cleaning device and method for fishhook production
CN110681639A (en) Multi-groove type ultrasonic cleaning machine
CN220356142U (en) A tube bundle high pressure heat exchanger
CN111530948B (en) A kind of degreasing method of plate degreasing system for cold rolling mill
CN115055427B (en) Outer steam cleaning device of tinned copper wire
CN113953339A (en) Wire drawing device is used in enameled wire production
CN104154770B (en) The horizontal scraping fluid condenser of shell based on siphon principle
CN219745870U (en) Aluminum profile discharging and cooling equipment
CN219653070U (en) Quenching tank
CN109504979A (en) A kind of pre-procesor of pickling coil of strip
CN112474465A (en) Environment-friendly production method of electrolytic copper foil
CN114636264B (en) Blank cooling device for metallurgy
CN219766160U (en) Copper area surface degreasing cleaning line
CN224128043U (en) Copper wire surface impurity removing device for copper wire annealing tinning machine
CN223352592U (en) A composite aluminum strip straightening mechanism
CN224094835U (en) A cleaning device for pickling steel strips
CN221810416U (en) A cleaning device for oriented silicon steel decarburization annealing line
CN222744364U (en) Steel band annealing heat sink
CN222153113U (en) A cleaning device for strip steel production
CN219107829U (en) Copper-depositing multistage rinsing equipment
CN118513192B (en) Zinc-plated steel plate coating passivation device adopting organic resin

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A welding device and process for covered forming of copper-clad aluminum alloy wire

Granted publication date: 20230613

Pledgee: Bank of China Limited by Share Ltd. Yujiang sub branch

Pledgor: Yingtan Zhengwang Technology Co.,Ltd.

Registration number: Y2025980017986

PE01 Entry into force of the registration of the contract for pledge of patent right