CN114837679A - Profile steel frame body assisting shield launching - Google Patents

Profile steel frame body assisting shield launching Download PDF

Info

Publication number
CN114837679A
CN114837679A CN202210456835.2A CN202210456835A CN114837679A CN 114837679 A CN114837679 A CN 114837679A CN 202210456835 A CN202210456835 A CN 202210456835A CN 114837679 A CN114837679 A CN 114837679A
Authority
CN
China
Prior art keywords
plate
steel
wall
shaped steel
profiled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210456835.2A
Other languages
Chinese (zh)
Inventor
傅鑫晖
姚元辉
陈宏�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Strait Construction and Development Co Ltd
Original Assignee
CSCEC Strait Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Strait Construction and Development Co Ltd filed Critical CSCEC Strait Construction and Development Co Ltd
Priority to CN202210456835.2A priority Critical patent/CN114837679A/en
Publication of CN114837679A publication Critical patent/CN114837679A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0621Shield advancing devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明涉及盾构施工技术领域,公开了一种辅助盾构始发的型钢架体,包括站立于地面上的第一型钢立柱和第二型钢立柱,第二型钢立柱设于第一型钢立柱之间,相邻第一型钢立柱之间预留有供盾构台车通过的施工空间,相邻第二型钢立柱之间也预留有供盾构台车通过的施工空间,横向相邻的第一型钢立柱之间设有第一型钢梁,竖向相邻的第一型钢立柱之间设有第二型钢梁,横向相邻的第二型钢立柱之间设有第三型钢梁,竖向相邻的第二型钢立柱之间设有第四型钢梁,第一型钢立柱与与其横向相邻的第二型钢立柱之间设有第五型钢梁;本发明具有缩短盾构始发时间、提高整体施工效率的特点。

Figure 202210456835

The invention relates to the technical field of shield construction, and discloses a profiled steel frame body for assisting the initiation of a shield, comprising a first profiled steel column and a second profiled steel column standing on the ground, and the second profiled steel column is arranged on the first profiled steel column There is a construction space reserved for shield machine trolleys to pass between adjacent first-shaped steel columns, and a construction space for shield machine trolleys to pass between adjacent second-shaped steel columns. A first-shaped steel beam is arranged between the first-shaped steel columns, a second-shaped steel beam is arranged between the vertically adjacent first-shaped steel columns, and a third-shaped steel beam is arranged between the horizontally adjacent second-shaped steel columns , a fourth-shaped steel beam is arranged between the vertically adjacent second-shaped steel columns, and a fifth-shaped steel beam is arranged between the first-shaped steel column and the horizontally adjacent second-shaped steel column; the invention has the advantages of shortening the shield The characteristics of starting time and improving the overall construction efficiency.

Figure 202210456835

Description

Profile steel frame body assisting shield launching
Technical Field
The invention relates to the technical field of shield construction, in particular to a profile steel frame body for assisting shield starting.
Background
At present, with the rapid development of the economy of China, the national trip mode is gradually converted into subway trip as the first big country of population in the global scope, and the construction of urban subways can not only perfectly meet the demand but also do not occupy the ground space. The construction of the shield interval is an important component of subway construction, and in order to ensure the rapid promotion of the shield construction, the shield is usually initiated before the subway station is capped; among the prior art, the shaped steel support body that subway station adopted is mostly the bowl and detains the frame or the frame is detained to the dish, but these two kinds of support bodies are difficult to satisfy the shield platform truck before not demolising and put required space, need demolish the length rear about 100 meters with it and can provide the shield and construct the condition of originating, have the trouble of being under construction, shield the problem that the time of originating is late.
Disclosure of Invention
In view of this, the invention provides a section steel frame body for assisting shield launching.
In order to solve the technical problem, the technical scheme of the invention is as follows: a profile steel frame body for assisting shield starting comprises a first profile steel stand column and a second profile steel stand column which stand on the ground, wherein the first profile steel stand column and the second profile steel stand column are distributed in a rectangular shape;
first section steel beams are arranged between all transversely adjacent first section steel stand columns, second section steel beams are arranged between all vertically adjacent first section steel stand columns, third section steel beams are arranged between all transversely adjacent second section steel stand columns, fourth section steel beams are arranged between all vertically adjacent second section steel stand columns, fifth section steel beams are arranged between all first section steel stand columns and the second section steel stand columns transversely adjacent to the first section steel stand columns, sixth section steel beams are arranged between all vertically adjacent first section steel beams, seventh section steel beams are arranged between all horizontally adjacent fourth section steel beams, and eighth section steel beams are arranged between all vertically adjacent fifth section steel beams;
and the first section steel stand columns at the two ends of the section steel frame body and the first section steel stand columns and the second section steel stand columns which are transversely adjacent to the first section steel stand columns are respectively provided with a round steel pipe which is horizontally arranged and an angle steel which is crosswise arranged.
Furthermore, all be equipped with first steel sheet on the both ends of first shaped steel roof beam, all the activity runs through on the first steel sheet of both sides has first screw, and the pin fin end of first screw still activity runs through the flange board that corresponds the first shaped steel stand of side and locks into and has first nut.
Furthermore, all be equipped with the second steel sheet on the both ends of second type girder steel, the equal activity of both sides second steel sheet is run through and is had the second screw, and the nail head end of second screw still activity is run through the web that corresponds the first shaped steel stand of side and is locked into and has the second nut.
Furthermore, all be equipped with the third steel sheet on the both ends of third shaped steel roof beam, be equipped with first pair of stay bolt between all horizontal adjacent third shaped steel roof beams, the first pair of stay bolt activity is run through the web that corresponds second shaped steel stand, and both ends still activity is run through the third steel sheet on the third shaped steel roof beam of corresponding side and is locked into and has first lock nut.
Furthermore, all be equipped with the fourth steel sheet on the both ends of fourth shaped steel roof beam, all the activity is run through on the fourth steel sheet of both sides has the third screw, and the pin fin end of third screw still activity is run through the flange board that corresponds side second shaped steel stand and is locked in and has the third nut.
Furthermore, all be equipped with the fifth steel sheet on the both ends of fifth shaped steel roof beam, it has the fourth screw to go through to press close to the activity on the fifth steel sheet of first shaped steel stand side, the pin fin end of fourth screw still activity is run through the flange board that corresponds the first shaped steel stand of side and is locked in and is had the fourth nut, press close to and be equipped with the second split bolt between the fifth steel sheet of second shaped steel stand side and the third shaped steel roof beam on press close to the fifth shaped steel roof beam side, the activity of second split bolt is run through the web that corresponds second shaped steel stand, and both ends still activity is run through the fifth steel sheet and the third steel sheet that correspond the side and is locked in and has the second lock nut.
Further, all first shaped steel stand links together through setting up first connecting piece with corresponding first shaped steel roof beam, first connecting piece includes first limiting plate, the top of first limiting plate is equipped with first strengthening rib, the bottom of first limiting plate is equipped with first stopper and is the first mounting panel that "L" font set up, it has the first inserting groove that suits with the edge of a wing plate thickness of first shaped steel stand to reserve between the vertical siding of first mounting panel and the first stopper, first shaped steel stand links together with first connecting piece in inserting first inserting groove through the flange plate, set up the first mounting groove that suits with the edge of a wing plate of first shaped steel roof beam on the horizontal siding of first mounting panel, the distance between the bottom cell wall of first mounting groove and the diapire of first limiting plate suits with the height of first shaped steel roof beam, first shaped steel roof beam links together with first connecting piece in the space between the bottom cell wall of first mounting groove and the diapire of first limiting plate through inserting The bottom wall of the transverse plate wall of the first mounting plate is provided with a second reinforcing rib; all the first section steel upright posts and the corresponding second section steel beams are connected together by arranging second connecting pieces, each second connecting piece comprises a second limiting plate, the top of each second limiting plate is provided with a third reinforcing rib, the bottom of each second limiting plate is provided with a second limiting block and a second mounting plate arranged in an L shape, a second inserting groove adaptive to the thickness of a web plate of each first section steel upright post is reserved between the vertical plate wall of each second mounting plate and the corresponding second limiting block, the first section steel upright posts are connected into the second inserting grooves through the web plates and connected with the second connecting pieces together, the transverse plate walls of the second mounting plates are provided with second mounting grooves adaptive to the flange plates of the second section steel beams, the distance between the bottom groove walls of the second mounting grooves and the bottom walls of the second limiting plates is adaptive to the height of the second section steel beams, the second section steel beams are connected with the second connecting pieces through connecting spaces between the bottom groove walls of the second mounting grooves and the bottom walls of the second limiting plates, and a fourth reinforcing rib is arranged on the bottom wall of the transverse plate wall of the second mounting plate.
Furthermore, all the second section steel upright columns are connected with the corresponding third section steel beams and the corresponding fourth section steel beams through third connecting pieces, each third connecting piece comprises a third limiting plate, fifth reinforcing ribs are arranged at the top of each third limiting plate, third mounting plates and fourth mounting plates are arranged at the bottoms of the third limiting plates in an L shape and are symmetrically arranged at the bottoms of the third limiting plates, third inserting grooves corresponding to the web thicknesses of the second section steel upright columns are reserved between the vertical plate walls of the third mounting plates at the two sides, the second section steel upright columns are connected with the third connecting pieces through the webs, third mounting grooves corresponding to the flange plates of the third section steel beams are formed in the transverse plate walls of the third mounting plates at the two sides, the distance between the bottom groove walls of the third mounting grooves and the bottom walls of the third limiting plates is matched with the height of the third section steel beams, the third shaped steel roof beam links together with the third connecting piece in the space between the bottom cell wall of third mounting groove and the diapire of third limiting plate through inserting, be equipped with the sixth strengthening rib on the diapire of the horizontal siding wall of third mounting panel, set up the fourth mounting groove that suits with the flange board of fourth shaped steel roof beam on the horizontal siding wall of fourth mounting panel, distance between the bottom cell wall of fourth mounting groove and the third limiting plate suits with the height of fourth shaped steel roof beam, the fourth shaped steel roof beam links together with the third connecting piece in the space between the bottom cell wall of fourth mounting groove and the diapire of third limiting plate through inserting, the diapire of the horizontal siding wall of fourth mounting panel is equipped with the seventh strengthening rib.
Furthermore, all the first steel upright posts and the fifth steel beams are connected together by a fourth connecting piece, the fourth connecting piece comprises a fourth limiting plate, the top of the fourth limiting plate is provided with an eighth reinforcing rib, the bottom of the fourth limiting plate is provided with a third limiting block and a fifth mounting plate arranged in an L shape, a fourth inserting groove adaptive to the thickness of the flange plate of the first steel upright post is reserved between the vertical plate wall of the fifth mounting plate and the third limiting block, the first steel upright posts are connected with the fourth connecting piece by the flange plate, the transverse plate wall of the fifth mounting plate is provided with a fifth mounting groove adaptive to the thickness of the flange plate of the fifth steel beam, the distance between the bottom groove wall of the fifth mounting groove and the bottom wall of the fourth limiting plate is adaptive to the height of the fifth steel beam, the fifth steel beam is connected with the fourth connecting piece by being connected into the space between the bottom groove wall of the fifth mounting groove and the bottom wall of the fourth limiting plate, and a ninth reinforcing rib is arranged on the bottom wall of the transverse plate wall of the fifth mounting plate.
Furthermore, all the second section steel upright columns are connected with the corresponding third section steel beams, the corresponding fourth section steel beams and the corresponding fifth section steel beams through a fifth connecting piece, the fifth connecting piece comprises a fifth limiting plate, a tenth reinforcing rib is arranged at the top of the fifth limiting plate, a sixth mounting plate, a seventh mounting plate and an eighth mounting plate are arranged at the bottom of the fifth limiting plate, the sixth mounting plate, the seventh mounting plate and the eighth mounting plate are arranged in an L shape, the seventh mounting plate and the eighth mounting plate are symmetrically arranged at the bottom of the fifth limiting plate, a fifth inserting groove adaptive to the thickness of a web plate of the second section steel upright column is reserved between the vertical plate wall of the seventh mounting plate and the vertical plate wall of the eighth mounting plate, the second section steel upright column is connected with the fifth connecting piece through the web plate, a sixth mounting groove adaptive to the flange plate of the third section steel beam is arranged on the horizontal plate wall of the sixth mounting plate, the distance between the bottom groove wall of the sixth mounting groove and the bottom wall of the fifth limiting plate is matched with the height of the third steel beam, the third steel beam is connected with the fifth connecting piece by being inserted into the space between the bottom groove wall of the sixth mounting groove and the bottom wall of the fifth limiting plate, the bottom wall of the transverse plate wall of the sixth mounting plate is provided with an eleventh reinforcing rib, the transverse plate wall of the seventh mounting plate is provided with a seventh mounting groove matched with the flange plate of the fourth steel beam, the distance between the bottom groove wall of the seventh mounting groove and the fifth limiting plate is matched with the height of the fourth steel beam, the fourth steel beam is connected with the fifth connecting piece by being inserted into the space between the bottom groove wall of the seventh mounting groove and the bottom wall of the fifth limiting plate, the bottom wall of the transverse plate wall of the seventh mounting plate is provided with a twelfth reinforcing rib, the transverse plate wall of the eighth mounting plate is provided with an eighth mounting groove matched with the flange plate of the fifth steel beam, the distance between the bottom cell wall of eighth mounting groove and the fifth limiting plate suits with the height of fifth shaped steel roof beam, and the fifth shaped steel roof beam links together with the fifth connecting piece in the space between the bottom cell wall of eighth mounting groove and the diapire of fifth limiting plate, and the diapire of the horizontal plate wall of eighth mounting panel is equipped with the thirteenth strengthening rib.
Compared with the prior art, the invention has the advantages that:
1. according to the profile steel frame body for assisting the shield starting, the construction space for the shield trolley to pass through is reserved between all the vertically adjacent first profile steel stand columns in the profile steel frame body, and the construction space for the shield trolley to pass through is reserved between all the vertically adjacent second profile steel stand columns, so that when the shield starting is needed by the profile steel frame body, the shield trolley can directly perform shield operation through the construction space without dismantling the profile steel frame body, and compared with the prior art, the profile steel frame body has the advantages that the shield starting time is shortened, and the overall construction efficiency is improved.
2. According to the invention, the first connecting piece, the second connecting piece, the third connecting piece, the fourth connecting piece and the fifth connecting piece are arranged, so that the first section steel upright post and the corresponding first section steel beam, the first section steel upright post and the corresponding second section steel beam, the second section steel upright post and the corresponding third section steel beam and fourth section steel beam, the first section steel upright post and the fifth section steel beam, the second section steel upright post and the corresponding third section steel beam, the fourth section steel beam and the fifth section steel beam can be quickly connected, and the traditional complex welding and bolt connection mode is replaced by the insertion limiting mode.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of embodiment 1;
FIG. 3 is an enlarged view at A;
FIG. 4 is an enlarged view at B;
FIG. 5 is an enlarged view at C;
FIG. 6 is a schematic structural view of embodiment 2;
FIG. 7 is an enlarged view at D;
FIG. 8 is an enlarged view at E;
FIG. 9 is an enlarged view at F;
FIG. 10 is a first structural schematic view of the first connector;
FIG. 11 is a second structural view of the first connecting member;
FIG. 12 is a first structural schematic view of the second connector;
FIG. 13 is a second structural view of the second connector;
FIG. 14 is a first structural schematic view of the third connector;
FIG. 15 is a second structural view of the third connecting member;
FIG. 16 is a third structural view of the third link;
FIG. 17 is a first structural view of a fourth link;
FIG. 18 is a second structural view of the fourth connecting member;
FIG. 19 is a first structural schematic view of the fifth link;
FIG. 20 is a second structural view of the fifth link;
FIG. 21 is a third structural view of a fifth link;
fig. 22 is a fourth structural view of the fifth connecting member.
Reference numerals: 1. a first profile steel upright; 2. a second type steel column; 3. constructing a space; 4. a first section steel beam; 5. a second type steel beam; 6. a third section steel beam; 7. a fourth section steel beam; 8. a fifth section steel beam; 9. a sixth section steel beam; 10. a seventh section steel beam; 11. an eighth section steel beam; 12. round steel pipes; 13. angle steel; 14. a first steel plate; 15. a first screw; 16. a first nut; 17. a second steel plate; 18. a second screw; 10. a second nut; 20. a third steel plate; 21. a first tie bolt; 22. a first lock nut; 23. a fourth steel plate; 24. a third screw; 25. a third nut; 26. a fifth steel plate; 27. a fourth screw; 28. a fourth nut; 29. a second tie bolt; 30. a second lock nut; 40. a first connecting member; 400. a first limit plate; 401. a first reinforcing rib; 402. a first stopper; 403. a first mounting plate; 404. a first insertion groove; 405. a first mounting groove; 406. a second reinforcing rib; 50. a second connecting member; 500. a second limiting plate; 501. a third reinforcing rib; 502. a second limiting block; 503. a second mounting plate; 504. a second insertion groove; 505. a second mounting groove; 506. a fourth reinforcing rib; 60. a third connecting member; 600. a third limiting plate; 601. fifthly, strengthening the tendons; 602. a third mounting plate; 603. a fourth mounting plate; 604. a third insertion groove; 605. a third mounting groove; 606. a sixth reinforcing rib; 607. a fourth mounting groove; 608. a seventh reinforcing rib; 70. a fourth connecting member; 700. a fourth limiting plate; 701. an eighth reinforcing rib; 702. a third limiting block; 703. a fifth mounting plate; 704. a fourth plug groove; 705. a fifth mounting groove; 706. a ninth reinforcing rib; 80. a fifth connecting member; 800. a fifth limiting plate; 801. a tenth reinforcing rib; 802. a sixth mounting plate; 803. a seventh mounting plate; 804. an eighth mounting plate; 805. a fifth inserting groove; 806. a sixth mounting groove; 807. an eleventh reinforcing rib; 808. a seventh mounting groove; 809. a twelfth reinforcing rib; 810. an eighth mounting groove; 811. and a thirteenth reinforcing rib.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1: referring to fig. 1 to 5, the present embodiment provides a section steel frame body for assisting shield starting, including a first section steel upright 1 and a second section steel upright 2 standing on the ground, wherein bottoms of the first section steel upright 1 and the second section steel upright 2 are connected to the ground by using ground expansion bolts in the prior art; the first profile steel stand columns 1 and the second profile steel stand columns 2 are both distributed in a rectangular shape, the second profile steel stand columns 2 are arranged between the first profile steel stand columns 1, in the embodiment, the number of the first profile steel stand columns 1 is 10, the first profile steel stand columns are distributed in a horizontal five-vertical two mode, the number of the second profile steel stand columns 2 is 6, the second profile steel stand columns are distributed in a horizontal three-vertical two mode, and the 6 second profile steel stand columns 2 are arranged between the fourth and fifth profile steel stand columns 1 in the horizontal row; all reserve between all vertical adjacent first shaped steel stand 1 and have the construction space 3 that supplies the shield structure platform truck to pass through, all reserve between all vertical adjacent second shaped steel stand 2 and also reserve the construction space 3 that supplies the shield structure platform truck to when making this shaped steel support body in the use, need carry out the originating of shield structure, the shield structure car can directly carry out the shield structure operation through construction space 3, need not to demolish the shaped steel support body. When the section steel frame body is applied to the construction of a certain subway station, the shield starting time can be shortened by more than 2 months;
first section steel beams 4 are arranged between all transversely adjacent first section steel upright columns 1, second section steel beams 5 are arranged between all vertically adjacent first section steel upright columns 1, third section steel beams 6 are arranged between all transversely adjacent second section steel upright columns 2, fourth section steel beams 7 are arranged between all vertically adjacent second section steel upright columns 2, fifth section steel beams 8 are arranged between all first section steel upright columns 1 and the second section steel upright columns 2 transversely adjacent to the first section steel upright columns 1, sixth section steel beams 9 are arranged between all vertically adjacent first section steel beams 4, seventh section steel beams 10 are arranged between all transversely adjacent fourth section steel beams 7, and eighth section steel beams 11 are arranged between all vertically adjacent fifth section steel beams 8; the first section steel beam 4, the second section steel beam 5, the third section steel beam 6, the fourth section steel beam 7, the fifth section steel beam 8, the sixth section steel beam 9, the seventh section steel beam 10 and the eighth section steel beam 11 are arranged and used for erecting structures such as a station ceiling in later-stage construction.
Be located all be equipped with between first shaped steel stand 1 of both ends about this shaped steel support body and rather than horizontal adjacent first shaped steel stand 1 and the second shaped steel stand 2 and be the circular steel tube 12 of level setting and be the angle steel 13 of crossing form setting, the effect that additional strengthening was played in the setting of circular steel tube 12 and angle steel 13.
In this embodiment, all weld on the both ends of all first shaped steel roof beam 4 has first steel sheet 14, it has first screw 15 to run through all the activities on the first steel sheet 14 of both sides, the pin fin end of first screw 15 still activity runs through the flange board that corresponds the first shaped steel stand 1 of side and locks into and has first nut 16, thereby first shaped steel roof beam 4 is connected first steel sheet 14 and the flange board that corresponds first shaped steel stand 1 through first screw 15 and first nut 16 and can dismantle to be connected on corresponding first shaped steel stand 1.
In this embodiment, all weld on the both ends of all second type girder steel 5 has second steel sheet 17, all the activity runs through on the second steel sheet 17 of both sides has second screw 18, the pin fin end of second screw 18 still activity runs through the web that corresponds the first shaped steel stand 1 of side and lock into has second nut 19, thereby second type girder steel 5 is connected second steel sheet 17 and the flange board that corresponds first shaped steel stand 1 through second screw 18 and second nut 19 and can dismantle to be connected on corresponding first shaped steel stand 1.
In this embodiment, all weld on the both ends of all third shaped steel roof beams 6 has third steel sheet 20, be equipped with first a pair of stay bolt 21 between all horizontal adjacent third shaped steel roof beams 6, first a pair of stay bolt 21 screw thread runs through the web that corresponds second shaped steel stand 2, and both ends still activity run through the third steel sheet 20 on the third shaped steel roof beam 6 of corresponding side and lock into has first lock nut 22, thereby both sides third shaped steel roof beam 6 is through first a pair of stay bolt 21, first lock nut 22 is connected third steel sheet 20 on the corresponding side tip and the web that corresponds second shaped steel stand 2 and can dismantle and connect on corresponding second shaped steel stand 2.
In this embodiment, all weld on the both ends of all fourth shaped steel roof beams 7 has fourth steel sheet 23, all the activity runs through on the fourth steel sheet 23 of both sides has third screw 24, third screw 24's nail head end still activity runs through the flange board that corresponds side second shaped steel stand 2 and lock into has third nut 25, thereby fourth shaped steel roof beam 7 is connected fourth steel sheet 23 and the flange board that corresponds second shaped steel stand 2 through third screw 24 and third nut 25 and can dismantle to be connected on corresponding second shaped steel stand 2.
In this embodiment, the two end portions of all the fifth section steel beams 8 are provided with fifth steel plates 26, the fifth steel plates 26 close to the first section steel column 1 side are movably penetrated with fourth screws 27, the nail head ends of the fourth screws 27 also movably penetrate through the flange plates of the corresponding side first section steel column 1 and are locked with fourth nuts 28, and the end portions of the fifth section steel beams 8 at the ends connect the fifth steel plates 26 with the flange plates of the corresponding first section steel columns 1 through the fourth screws 27 and the fourth nuts 28 so as to be detachably connected to the corresponding first section steel columns 1; press close to and be equipped with second split bolt 29 between the third steel sheet 20 who presses close to the fifth shaped steel post 8 side on fifth steel sheet 26 and the third shaped steel roof beam 6 of second shaped steel stand 2 side, second split bolt 29 screw thread runs through the web that corresponds second shaped steel stand 2, and both ends still activity run through the fifth steel sheet 26 and the third steel sheet 20 that correspond the side and lock in has second lock nut 30, this side end of fifth shaped steel roof beam 8 passes through second split bolt 29, second lock nut 30 will correspond fifth steel sheet 26 on the side and correspond the third steel sheet 20 on the side and the web that corresponds second shaped steel stand 2 and connect can dismantle on corresponding second shaped steel stand 2.
Through the arrangement of the first steel plate 14, the second steel plate 17, the third steel plate 20, the fourth steel plate 23, the fifth steel plate 26 and the corresponding first screws 15, the first nuts 16, the second screws 18, the second nuts 19, the first counter bolts 21, the first lock nuts 22, the third screws 24, the third nuts 25, the second counter bolts and the second lock nuts 30, the first section steel beam 4 and the first section steel column 1, the second section steel beam 5 and the first section steel column 1, the third section steel beam 6 and the second section steel column 2, the fourth section steel beam 7 and the second section steel column 2, and the fifth section steel beam 8 and the first section steel column 1 and the second section steel column 2 are detachably connected, so that the disassembly, the replacement and other work in the construction process are facilitated.
In this embodiment, the two end portions of all the sixth section steel beams 9 are connected to the first section steel beams 4 on the corresponding side in a welded connection manner, the two end portions of all the seventh section steel beams 10 are connected to the fourth section steel beams 7 on the corresponding side in a welded connection manner, and the two end portions of all the eighth section steel beams 11 are connected to the fifth section steel beams 8 on the corresponding side in a welded connection manner; through the arrangement, the sixth section steel beam 9, the first section steel beam 4, the seventh section steel beam 10, the fourth section steel beam 7, the eighth section steel beam 11 and the fifth section steel beam 8 are prefabricated and formed in a welding mode, and therefore subsequent installation work can be facilitated.
In the embodiment, two end parts of all the round steel tubes 12 and two end parts of all the angle steels 13 are connected to the first section steel upright 1 and the second section steel upright 2 on the corresponding sides in a welding connection mode; through the aforesaid setting, adopt the welded mode with the vertical support body structure prefabrication shaping of this shaped steel support body both ends department earlier to this can be convenient for subsequent installation work.
In the embodiment 1, a large number of welding structures of steel plates and section steel beams and a large number of bolt connection structures are adopted, so that the problems of complex installation operation and low overall construction efficiency exist, and improvement is needed; therefore, example 2 is proposed on the basis of example 1.
Example 2: referring to fig. 1 and 6 to 22, the present embodiment provides a steel frame for assisting shield launching, including a first steel column 1, a second steel column 2, a first steel beam 4, a second steel beam 5, a third steel beam 6, a fourth steel beam 7, a fifth steel beam 8, a sixth steel beam 9, a seventh steel beam 10, an eighth steel beam 11, a circular steel tube 12 and angle steel 13, wherein the number and arrangement of the first steel column 1, the second steel column 2, the first steel beam 4, the second steel beam 5, the third steel beam 6, the fourth steel beam 7, the fifth steel beam 8, the sixth steel beam 9, the seventh steel beam 10, the eighth steel beam 11, the circular steel tube 12 and the angle steel 13 are the same as those in embodiment 1; the difference lies in that:
all the first section steel upright posts 1 are connected with the corresponding first section steel beams 4 through arranging first connecting pieces 40, each first connecting piece 40 comprises a first limiting plate 400, a first reinforcing rib 401 is arranged at the top of each first limiting plate 400, a first limiting block 402 and a first mounting plate 403 arranged in an L shape are arranged at the bottom of each first limiting plate 400, a first inserting groove 404 matched with the thickness of a flange plate of each first section steel upright post 1 is reserved between the vertical plate wall of each first mounting plate 403 and each first limiting block 402, each first section steel upright post 1 is connected with the corresponding first connecting piece 40 through the corresponding flange plate inserted into the corresponding first inserting groove 404, a first mounting groove 405 matched with the flange plate of each first section steel beam 4 is formed in the horizontal plate wall of each first mounting plate 403, the distance between the bottom groove wall of each first mounting groove 405 and the bottom wall of each first limiting plate 400 is matched with the height of each first section steel beam 4, the first section steel beam 4 is connected with the first connecting piece 40 by being connected into a space between the bottom groove wall of the first mounting groove 405 and the bottom wall of the first limiting plate 400, and the bottom wall of the transverse plate wall of the first mounting plate 403 is provided with a second reinforcing rib 406;
by the arrangement of the first connecting member 40, the first connecting member 40 is installed on the first steel column 1 by connecting the first inserting groove 404 and the flange plate of the first steel column 1, the first steel beam 4 can be connected with the first connecting member 40 by the space between the bottom groove wall of the first mounting groove 405 and the bottom wall of the first limiting plate 400, so that the first steel beam 4 is connected with the first steel column 1, when the first steel beam 4 is connected into the space between the bottom groove wall of the first mounting groove 405 and the bottom wall of the first limiting plate 400, the top wall of the first steel beam 4 is contacted with the bottom wall of the first limiting plate 400, the bottom wall of the first steel beam 4 is contacted with the bottom groove wall of the first mounting groove 405, so as to limit the up-down displacement of the first steel beam 4, the two side walls of the flange plate of the first steel beam 4 connected into the first mounting groove 405 are contacted with the two side groove walls of the first mounting groove 405 Together, with play its effect of controlling displacement to first shaped steel roof beam 4, in order to prevent that first shaped steel roof beam 4 from appearing the phenomenon that drops, second strengthening rib 406 is located on the diapire of the horizontal plank wall of first mounting panel 403 through a right-angle side, another right-angle side carries out the butt with the plank wall of the corresponding side flange board of first shaped steel stand 1, in order to play supporting role to the horizontal plank wall of first mounting panel 403, prevent that it from appearing buckling deformation or the phenomenon of rolling over appears, thereby guarantee that first connecting piece 40 can be fine when first shaped steel roof beam 4 inserts connect in first shaped steel stand 1, be difficult to lead to the emergence of the phenomenon that first connecting piece 40 appears dropping because of the gravity that first shaped steel roof beam 4 has, the setting of first strengthening rib 401 is used for preventing the phenomenon that buckling deformation appears in first limiting plate 400, the setting of first stopper 402 is used for preventing that first connecting piece 40 from appearing the phenomenon that drops because of the gravity that first shaped steel roof beam 4 has when first shaped steel roof beam 4 connects To further ensure the connection function of the first connecting member 40.
All the first section steel upright posts 1 are connected with the corresponding second section steel beams 5 through arranging second connecting pieces 50, each second connecting piece 50 comprises a second limiting plate 500, the top of each second limiting plate 500 is provided with a third reinforcing rib 501, the bottom of each second limiting plate 500 is provided with a second limiting block 502 and a second mounting plate 503 arranged in an L shape, a second inserting groove 504 adaptive to the thickness of a web plate of each first section steel upright post 1 is reserved between the vertical plate wall of each second mounting plate 503 and the corresponding second limiting block 502, each first section steel upright post 1 is connected with the corresponding second connecting piece 50 through the web plate inserted into the corresponding second inserting groove 504, the transverse plate wall of each second mounting plate 503 is provided with a second mounting groove 505 adaptive to the thickness of the flange plate of each second section steel beam 5, the distance between the bottom groove wall of each second mounting groove 505 and the bottom wall of each second limiting plate 500 is adaptive to the height of each second section steel beam 5, the second type steel beam 5 is connected with the second connecting piece 50 by being connected into a space between the bottom groove wall of the second mounting groove 505 and the bottom wall of the second limiting plate 500, and the bottom wall of the transverse plate wall of the second mounting plate 503 is provided with a fourth reinforcing rib 506;
by the arrangement of the second connecting member 50, the second connecting member 50 is installed on the first steel column 1 by the connection between the second inserting groove 504 and the web of the first steel column 1, and the second steel beam 5 can be connected with the second connecting member 50 by the space between the bottom groove wall of the second installing groove 505 and the bottom wall of the second limiting plate 500, so as to connect the second steel beam 5 with the second steel column 2, when the second steel beam 5 is connected into the space between the bottom groove wall of the second installing groove 505 and the bottom wall of the second limiting plate 500, the top wall of the second steel beam 5 can be contacted with the bottom wall of the second limiting plate 500, the bottom wall of the second steel beam 5 can be contacted with the bottom groove wall of the second installing groove 505, so as to limit the vertical displacement of the second steel beam 5, and the two side walls of the flange plate of the second steel beam 5 connected into the second installing groove 505 can be contacted with the two side groove walls of the second installing groove 505 at a same position Play, play its effect of left and right displacement of restriction with second type girder steel 5, in order to prevent the phenomenon that second type girder steel 5 from coming off, fourth strengthening rib 506 is located on the diapire of the horizontal siding wall of second mounting panel 503 through a right-angle side, another right-angle side carries out the butt with the siding wall of the web of first type steel stand 1, in order to play the supporting role to the horizontal siding wall of second mounting panel 503, prevent it from appearing buckling deformation or appearing turning over the phenomenon of rolling over, thereby guarantee that second connecting piece 50 can connect in first type steel stand 1 when second type girder steel 5 inserts well, be difficult to the emergence of the phenomenon that second connecting piece 50 appears coming off because of the gravity that second type girder steel 5 has, third strengthening rib 501's setting is used for preventing second limiting plate 500 from appearing the phenomenon that buckling deformation appears, second stopper 502's setting is used for preventing second connecting piece 50 from appearing turning over the emergence of coming off because of the gravity that second type girder steel 5 has when second type girder steel 5 inserts, to further ensure the connection function of the second connector 50.
All the second type steel upright columns 2 are connected with the corresponding third type steel beams 6 and the corresponding fourth type steel beams 7 through arranging a third connecting piece 60, the third connecting piece 60 comprises a third limiting plate 600, fifth reinforcing ribs 601 are arranged at the top of the third limiting plate 600, a third mounting plate 602 and a fourth mounting plate 603 are arranged at the bottom of the third limiting plate 600 in an L shape and are symmetrically arranged at the bottom of the third limiting plate 600, third inserting grooves 604 corresponding to the thickness of webs of the second type steel upright columns 2 are reserved between the vertical plate walls of the third mounting plates 602 at two sides, the second type steel upright columns 2 are connected with the third connecting piece 60 through the webs connected into the third inserting grooves 604, third mounting grooves 605 corresponding to the flange plates of the third type steel beams 6 are arranged on the transverse plate walls of the third mounting plates 602 at two sides, the distance between the bottom groove walls of the third mounting grooves 605 and the bottom walls of the third limiting plates 600 is corresponding to the height of the third type steel beams 6, the third section steel beam 6 is connected with the third connecting piece 60 by being connected into a space between the bottom groove wall of the third mounting groove 605 and the bottom wall of the third limiting plate 600, and the bottom wall of the transverse plate wall of the third mounting plate 602 is provided with a sixth reinforcing rib 606; a fourth mounting groove 607 matched with a flange plate of the fourth section steel beam 7 is formed in the transverse plate wall of the fourth mounting plate 603, the distance between the bottom groove wall of the fourth mounting groove 607 and the third limiting plate 600 is matched with the height of the fourth section steel beam 7, the fourth section steel beam 7 is connected with the third connecting piece 60 by being connected into the space between the bottom groove wall of the fourth mounting groove 607 and the bottom wall of the third limiting plate 600, and a seventh reinforcing rib 608 is arranged on the bottom wall of the transverse plate wall of the fourth mounting plate 603;
by the arrangement of the third connecting member 60, the third connecting member 60 is installed on the second type steel column 2 by connecting with the web of the second type steel column 2 through the third inserting groove 604, the third section steel beam 6 can be connected with the third connecting member 60 through the space between the bottom groove wall of the third mounting groove 605 and the bottom wall of the third limit plate 600, the fourth section steel beam 7 can be connected with the third connecting member 60 through the space between the bottom groove wall of the fourth mounting groove 607 and the bottom wall of the third limit plate 600, so that the third section steel beam 6, the fourth section steel beam 7 and the second type steel column 2 are connected together, when the third section steel beam 6 is inserted into the space between the bottom groove wall of the third mounting groove 605 and the bottom wall of the third limit plate 600, the top wall of the third section steel beam 6 contacts with the bottom wall of the third limit plate 600, the bottom wall of the third section steel beam 6 is in contact with the bottom groove wall of the third mounting groove 605 to limit the vertical displacement of the third section steel beam 6, the two side walls of the flange plate of the third section steel beam 6 inserted into the third mounting groove 605 are in contact with the two side groove walls of the third mounting groove 605 to limit the left and right displacement of the third section steel beam 6 to prevent the third section steel beam 6 from falling off, when the fourth section steel beam 7 is inserted into the space between the bottom groove wall of the fourth mounting groove 607 and the bottom wall of the third limiting plate 600, the top wall of the fourth section steel beam 7 is in contact with the bottom wall of the third limiting plate 600, the bottom wall of the fourth section steel beam 7 is in contact with the bottom groove wall of the fourth mounting groove 607 to limit the vertical displacement of the fourth section steel beam 7, the two side walls of the flange plate of the fourth section steel beam 7 inserted into the fourth mounting groove 607 are in contact with the two side groove walls of the fourth mounting groove 607, the fourth section steel beam 7 is limited in left-right displacement, and the phenomenon that the fourth section steel beam 7 falls off is prevented; the fifth reinforcing rib 601 is arranged on the bottom wall of the transverse plate wall of the third mounting plate 602 through a right-angle side, the other right-angle side is abutted against the plate wall of the web plate of the second profile steel upright post 2 to support the transverse plate wall of the third mounting plate 602 and prevent the third connecting member 60 from bending deformation or turning over, thereby ensuring that the third connecting member 60 can be well connected to the second profile steel upright post 2 when the third profile steel beam 6 is connected, the third connecting member 60 is difficult to fall off due to the gravity of the third profile steel beam 6, the sixth reinforcing rib 606 is arranged on the bottom wall of the transverse plate wall of the fourth mounting plate 603 through a right-angle side, the other right-angle side is abutted against the plate wall of the corresponding side flange plate of the second profile steel upright post 2 to support the transverse plate wall of the fourth mounting plate 603 and prevent the transverse plate wall of the fourth mounting plate 603 from bending deformation or turning over, thereby guarantee that third connecting piece 60 can be fine when fourth shaped steel roof beam 7 inserts connect on second shaped steel stand 2, be difficult to because of the gravity that fourth shaped steel roof beam 7 has leads to the emergence of the phenomenon that third connecting piece 60 appears droing, the setting of fourth strengthening rib 506 is used for preventing that buckling deformation's phenomenon from appearing in third limiting plate 600 to further guarantee the connection effect that third connecting piece 60 played.
All the first section steel upright posts 1 are connected with the fifth section steel beam 8 through the fourth connecting piece 70, the fourth connecting piece 70 comprises a fourth limiting plate 700, the top of the fourth limiting plate 700 is provided with an eighth reinforcing rib 701, the bottom of the fourth limiting plate 700 is provided with a third limiting block 702 and a fifth mounting plate 703 arranged in an L shape, a fourth inserting groove 704 adaptive to the thickness of the flange plate of the first section steel upright post 1 is reserved between the vertical plate wall of the fifth mounting plate 703 and the third limiting block 702, the first section steel upright post 1 is connected with the fourth connecting piece 70 through the flange plate inserted into the fourth inserting groove 704, the transverse plate wall of the fifth mounting plate 703 is provided with a fifth mounting groove 705 adaptive to the flange plate of the fifth section steel beam 8, the distance between the bottom groove wall of the fifth mounting groove 705 and the bottom wall of the fourth limiting plate 700 is adaptive to the height of the fifth section steel beam 8, the fifth section steel beam 8 is connected with the fourth connecting piece 70 by being connected into a space between the bottom groove wall of the fifth mounting groove 705 and the bottom wall of the fourth limiting plate 700, and a ninth reinforcing rib 706 is arranged on the bottom wall of the transverse plate wall of the fifth mounting plate 703;
by the arrangement of the fourth connection member 70, the fourth connection member 70 is installed on the first steel column 1 by connecting with the flange plate of the first steel column 1 through the fourth insertion groove 704, the fifth steel beam 8 can be connected with the fourth connection member 70 by the space between the bottom groove wall of the fifth installation groove 705 and the bottom wall of the fourth limiting plate 700, so that the fifth steel beam 8 is connected with the first steel column 1, when the fifth steel beam 8 is inserted into the space between the bottom groove wall of the fifth installation groove 705 and the bottom wall of the fourth limiting plate 700, the top wall of the fifth steel beam 8 is contacted with the bottom wall of the fourth limiting plate 700, the bottom wall of the fifth steel beam 8 is contacted with the bottom groove wall of the fifth installation groove 705, so as to limit the vertical displacement of the fifth steel beam 8, the two side walls of the flange plate where the fifth steel beam 8 is inserted into the fifth installation groove 705 are contacted with the two side groove walls of the fifth installation groove 705 Together, with play its effect of controlling displacement to fifth shaped steel roof beam 8, in order to prevent that fifth shaped steel roof beam 8 from appearing the phenomenon that drops, ninth strengthening rib 706 is located on the diapire of the horizontal siding wall of fifth mounting panel 703 through a square edge, another square edge carries out the butt with the siding of the corresponding side flange board of first shaped steel stand 1, in order to play supporting role to the horizontal siding wall of fifth mounting panel 703, prevent that it from appearing buckling deformation or the phenomenon of rolling over, thereby guarantee that fourth connecting piece 70 can be fine when fifth shaped steel roof beam 8 inserts connect on first shaped steel stand 1, be difficult to lead to the emergence of the phenomenon that drops to appear in fourth connecting piece 70 because of the gravity that fifth shaped steel roof beam 8 has, eighth strengthening rib 701 sets up and is used for preventing that fourth limiting plate 700 from appearing the phenomenon of buckling deformation, third stopper 702 sets up and is used for preventing that fourth connecting piece 70 from appearing the emergence of the phenomenon that drops because of the gravity that fifth shaped steel roof beam 8 has when connecting, fifth shaped steel roof beam 8 has turns over To further ensure the connection function of the fourth connecting member 70.
All the second type steel upright columns 2 are connected with the corresponding third type steel beams 6, fourth type steel beams 7 and fifth type steel beams 8 through fifth connecting pieces 80, the fifth connecting piece 80 comprises a fifth limiting plate 800, a tenth reinforcing rib 801 is arranged at the top of the fifth limiting plate 800, a sixth mounting plate 802, a seventh mounting plate 803 and an eighth mounting plate 804 are arranged at the bottom of the fifth limiting plate 800, the sixth mounting plate 802, the seventh mounting plate 803 and the eighth mounting plate 804 are arranged in an L shape, the seventh mounting plate 803 and the eighth mounting plate 804 are symmetrically arranged at the bottom of the fifth limiting plate 800, fifth inserting grooves 805 which are adaptive to the thickness of webs of the second type steel upright columns 2 are reserved between vertical plate walls of the seventh mounting plate 803 and vertical plate walls of the eighth mounting plate 804, the second type steel upright columns 2 are inserted into the fifth inserting grooves 805 through the webs to be connected with the fifth connecting pieces 80, a sixth installation groove 806 matched with the flange plate of the third section steel beam 6 is formed in the transverse plate wall of the sixth installation plate 802, the distance between the bottom groove wall of the sixth installation groove 806 and the bottom wall of the fifth limiting plate 800 is matched with the height of the third section steel beam 6, the third section steel beam 6 is connected with the fifth connecting piece 80 by being connected into the space between the bottom groove wall of the sixth installation groove 806 and the bottom wall of the fifth limiting plate 800, an eleventh reinforcing rib 807 is arranged on the bottom wall of the transverse plate wall of the sixth installation plate 802, in the embodiment, the eleventh reinforcing rib 807 is arranged in a right-angled triangular structure, one right-angled triangular edge of the eleventh reinforcing rib 807 is arranged on the bottom wall of the transverse plate wall of the sixth installation plate 802, the other right-angled edge is abutted against the plate wall of the web plate of the second section steel upright 2, a seventh installation groove 808 matched with the flange plate of the fourth section steel beam 7 is formed in the transverse plate wall of the seventh installation plate 803, the distance between the bottom groove wall of the seventh mounting groove 808 and the fifth limiting plate 800 is adapted to the height of the fourth section steel beam 7, the fourth section steel beam 7 is connected with the fifth connecting piece 80 by being inserted into the space between the bottom groove wall of the seventh mounting groove 808 and the bottom wall of the fifth limiting plate 800, the bottom wall of the transverse plate wall of the seventh mounting plate 803 is provided with a twelfth reinforcing rib 809, in the embodiment, the twelfth reinforcing rib 809 is arranged in a right-angled triangle structure, one right-angled triangle edge of the twelfth reinforcing rib 809 is arranged at the bottom wall of the transverse plate wall of the seventh mounting plate 803, the other right-angled edge is abutted against the plate wall of the corresponding side flange plate of the second section steel upright post 2, the transverse plate wall of the eighth mounting plate 804 is provided with an eighth mounting groove 810 adapted to the flange plate of the fifth section steel beam 8, the distance between the bottom groove wall of the eighth mounting groove 810 and the fifth limiting plate 800 is adapted to the height of the fifth section steel beam 8, fifth shaped steel roof beam 8 links together with fifth connecting piece 80 in the space between the bottom cell wall of the bottom of eighth mounting groove 810 and the diapire of fifth limiting plate 800, and the diapire of the horizontal board wall of eighth mounting panel 804 is equipped with thirteenth strengthening rib 811, and in this embodiment, thirteenth strengthening rib 811 is the right angle triangle structure setting, and the diapire of the horizontal board wall of eighth mounting panel 804 is located to a right angle triangle limit of thirteenth strengthening rib 811, and the board wall butt of the corresponding side flange board of another right angle limit and second shaped steel stand 2 is in the same place.
Through the arrangement of the fifth connecting member 80, the fifth connecting member 80 is installed on the second type steel upright 2 by the connection between the fifth inserting groove 805 and the web of the second type steel upright 2, the third type steel beam 6 can be connected with the fifth connecting member 80 by the space between the bottom groove wall of the sixth mounting groove 806 and the bottom wall of the fourth limiting plate 700, the fourth type steel beam 7 can be connected with the fifth connecting member 80 by the space between the bottom groove wall of the seventh mounting groove 808 and the bottom wall of the fourth limiting plate 700, the fifth type steel beam 8 can be connected with the fifth connecting member 80 by the space between the bottom groove wall of the eighth mounting groove 810 and the bottom wall of the fourth limiting plate 700, so that the third type steel beam 6, the fourth type steel beam 7, the fifth type steel beam 8 and the second type steel upright 2 are connected together, and the bottom groove wall of the sixth mounting groove 806 is connected with the bottom wall of the fifth limiting plate 800 by the third type steel beam 6 When the fourth section steel beam 7 is inserted into the space between the bottom groove wall of the seventh mounting groove 808 and the bottom wall of the fifth limiting plate 800, the top wall of the fourth section steel beam 7 is contacted with the bottom wall of the fifth limiting plate 800, the bottom wall of the third section steel beam 6 is contacted with the bottom groove wall of the sixth mounting groove 806, so as to limit the vertical displacement of the third section steel beam 6, the two side walls of the flange plate of the third section steel beam 6 inserted into the sixth mounting groove 806 are contacted with the two side groove walls of the sixth mounting groove 806, so as to limit the left and right displacement of the third section steel beam 6, so as to prevent the third section steel beam 6 from falling off, when the fourth section steel beam 7 is inserted into the space between the bottom groove wall of the seventh mounting groove 808 and the bottom wall of the fifth limiting plate 800, the top wall of the fourth section steel beam 7 is contacted with the bottom groove wall of the seventh mounting groove 808, so as to limit the vertical displacement of the fourth section steel beam 7, the two side walls of the flange plate of the fourth steel beam 7 connected into the seventh mounting groove 808 are contacted with the two side walls of the seventh mounting groove 808, so that the fourth steel beam 7 is limited in left and right displacement, and the fourth steel beam 7 is prevented from falling off; when the fifth section steel beam 8 is connected into a space between the bottom groove wall of the eighth mounting groove 810 and the bottom wall of the fifth limiting plate 800, the top wall of the fifth section steel beam 8 is in contact with the bottom wall of the fifth limiting plate 800, the bottom wall of the fifth section steel beam 8 is in contact with the bottom groove wall of the eighth mounting groove 810 to limit the vertical displacement of the fifth section steel beam 8, and the two side walls of the flange plate, which is connected into the eighth mounting groove 810, of the fifth section steel beam 8 are in contact with the two side groove walls of the eighth mounting groove 810 to limit the horizontal displacement of the fifth section steel beam 8, so that the fifth section steel beam 8 is prevented from falling off; the eleventh strengthening rib 807 is arranged on the bottom wall of the transverse plate wall of the sixth mounting plate 802 through a right-angle side, the other right-angle side is abutted against the plate wall of the web plate of the second profile steel upright post 2 to support the transverse plate wall of the sixth mounting plate 802 and prevent the fifth connecting member from bending deformation or turning over, thereby ensuring that the fifth connecting member 80 can be well connected to the second profile steel upright post 2 when the third profile steel beam 6 is connected, the fifth connecting member 80 is difficult to fall off due to the gravity of the third profile steel beam 6, the twelfth strengthening rib 809 is arranged on the bottom wall of the transverse plate wall of the seventh mounting plate 803 through a right-angle side, the other right-angle side is abutted against the plate wall of the corresponding side flange plate of the second profile steel upright post 2 to support the transverse plate wall of the seventh mounting plate 803 and prevent the transverse plate from bending deformation or turning over, thereby ensuring that the fifth connecting piece 80 can be well connected to the second section steel upright post 2 when the fourth section steel beam 7 is connected, the fifth connecting piece 80 is difficult to fall off due to the gravity of the fourth section steel beam 7, the thirteenth reinforcing rib 811 is arranged on the bottom wall of the transverse plate wall of the eighth mounting plate 804 through a right-angle side, the other right-angle side is abutted against the plate wall of the corresponding side flange plate of the second section steel upright post 2 to support the transverse plate wall of the eighth mounting plate 804, so as to prevent the transverse plate wall of the eighth mounting plate 804 from bending deformation or turning over, thereby ensuring that the fifth connecting piece 80 can be well connected to the second section steel upright post 2 when the fifth section steel beam 8 is connected, the fifth connecting piece 80 is difficult to fall off due to the gravity of the fifth section steel beam 8, and the tenth reinforcing rib 801 is arranged for preventing the fifth limiting plate 800 from bending deformation, to further ensure the connection function of the fifth connecting member 80.
Through aforementioned first connecting piece 40, the second connecting piece 50, the third connecting piece 60, the setting of fourth connecting piece 70 and fifth connecting piece 80, first shaped steel stand 1 with correspond first shaped steel roof beam 4, first shaped steel stand 1 with correspond second shaped steel roof beam 5, first shaped steel stand 1 with correspond fifth shaped steel roof beam 8, second shaped steel stand 2 with correspond third shaped steel roof beam 6, when fourth shaped steel roof beam 7 and fifth shaped steel roof beam 8 are connected, need not to adopt a large amount of welding and bolted connection's mode, only need use the mode of pegging graft alright accomplish to connect, it is quick to have the connection, improve whole efficiency of construction's advantage.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention.
In the present invention, unless otherwise expressly specified or limited, the terms "mounted," "disposed," "connected," "secured," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; the terms may be directly connected or indirectly connected through an intermediate, and may be communication between two elements or interaction relationship between two elements, unless otherwise specifically limited, and the specific meaning of the terms in the present invention will be understood by those skilled in the art according to specific situations.
The above are only typical examples of the present invention, and besides, the present invention may have other embodiments, and all technical solutions formed by equivalent substitutions or equivalent transformations fall within the scope of the present invention as claimed.

Claims (10)

1.一种辅助盾构始发的型钢架体,其特征在于:包括站立于地面上的第一型钢立柱(1)和第二型钢立柱(2),第一型钢立柱(1)和第二型钢立柱(2)均呈矩形状分布,第二型钢立柱(2)设于第一型钢立柱(1)之间,所有竖向相邻的第一型钢立柱(1)之间均预留有供盾构台车通过的施工空间(3),所有竖向相邻的第二型钢立柱(2)之间均也预留有供盾构台车通过的施工空间(3);1. A profiled steel frame body for auxiliary shield tunneling is characterized in that: comprising the first profiled steel column (1) and the second profiled steel column (2) standing on the ground, the first profiled steel column (1) and the second profiled steel column (1) The second-shaped steel columns (2) are distributed in a rectangular shape, the second-shaped steel columns (2) are arranged between the first-shaped steel columns (1), and all vertically adjacent first-shaped steel columns (1) are reserved between Construction space (3) for shield trolleys to pass through, and construction space (3) for shield trolleys to pass through is also reserved between all vertically adjacent second-shaped steel columns (2); 所有横向相邻的第一型钢立柱(1)之间均设有第一型钢梁(4),所有竖向相邻的第一型钢立柱(1)之间均设有第二型钢梁(5),所有横向相邻的第二型钢立柱(2)之间均设有第三型钢梁(6),所有竖向相邻的第二型钢立柱(2)之间均设有第四型钢梁(7),所有第一型钢立柱(1)与与其横向相邻的第二型钢立柱(2)之间均设有第五型钢梁(8),所有竖向相邻的第一型钢梁(4)之间均设有第六型钢梁(9),所有横向相邻的第四型钢梁(7)之间均设有第七型钢梁(10),所有竖向相邻的第五型钢梁(8)之间均设有第八型钢梁(11);First-shaped steel beams (4) are arranged between all horizontally adjacent first-shaped steel columns (1), and second-shaped steel beams (4) are arranged between all vertically adjacent first-shaped steel columns (1). 5), a third-shaped steel beam (6) is arranged between all horizontally adjacent second-shaped steel columns (2), and a fourth-shaped steel beam (6) is arranged between all vertically adjacent second-shaped steel columns (2). Steel beams (7), fifth-shaped steel beams (8) are provided between all the first-shaped steel columns (1) and the second-shaped steel columns (2) adjacent to them horizontally, and all vertically adjacent first-shaped steel columns (2) are provided with fifth-shaped steel beams (8). Sixth-shaped steel beams (9) are arranged between the steel beams (4), and seventh-shaped steel beams (10) are arranged between all horizontally adjacent fourth-shaped steel beams (7). Eighth-shaped steel beams (11) are arranged between adjacent fifth-shaped steel beams (8); 位于所述型钢架体两端的第一型钢立柱(1)与与其横向相邻的第一型钢立柱(1)和第二型钢立柱(2)之间均设有呈水平设置的圆钢管(12)和呈交叉状设置的角钢(13)。A horizontally arranged circular steel pipe (12) is provided between the first profiled steel uprights (1) located at both ends of the profiled steel frame body and the first profiled steel uprights (1) and the second profiled steel uprights (2) laterally adjacent to the first profiled steel uprights (1) ) and the angle steel (13) arranged in a cross shape. 2.根据权利要求1所述的一种辅助盾构始发的型钢架体,其特征在于:所有所述第一型钢梁(4)的两端部上均设有第一钢板(14),两侧第一钢板(14)上均活动贯穿有第一螺钉(15),第一螺钉(15)的钉头端还活动贯穿过对应侧第一型钢立柱(1)的翼缘板并锁入有第一螺母(16)。2. A profiled steel frame body for auxiliary shield starting according to claim 1, characterized in that: both ends of all the first profiled steel beams (4) are provided with first steel plates (14). ), the first steel plates (14) on both sides are movably penetrated with first screws (15), and the nail head ends of the first screws (15) also movably penetrate through the flange plates of the corresponding first section steel columns (1) and A first nut (16) is locked in. 3.根据权利要求1所述的一种辅助盾构始发的型钢架体,其特征在于:所有所述第二型钢梁(5)的两端部上均设有第二钢板(17),两侧第二钢板(17)上均活动贯穿有第二螺钉(18),第二螺钉(18)的钉头端还活动贯穿过对应侧第一型钢立柱(1)的腹板并锁入有第二螺母(19)。3. A profiled steel frame body for auxiliary shield starting according to claim 1, characterized in that: both ends of all the second profiled steel beams (5) are provided with second steel plates (17). ), second screws (18) are movably penetrated through the second steel plates (17) on both sides, and the nail head ends of the second screws (18) also movably penetrate through the web of the corresponding first section steel column (1) and lock the A second nut (19) is inserted. 4.根据权利要求1所述的一种辅助盾构始发的型钢架体,其特征在于:所有所述第三型钢梁(6)的两端部上均设有第三钢板(20),所有横向相邻的第三型钢梁(6)之间设有第一对拉螺栓(21),第一对拉螺栓(21)活动贯穿过对应第二型钢立柱(2)的腹板,且两端部还活动贯穿过对应侧第三型钢梁(6)上的第三钢板(20)并锁入有第一锁紧螺母(22)。4. A profiled steel frame body for auxiliary shield starting according to claim 1, characterized in that: both ends of all the third profiled steel beams (6) are provided with third steel plates (20). ), a first pair of pull bolts (21) are provided between all the horizontally adjacent third section steel beams (6), and the first pair of pull bolts (21) pass through the web corresponding to the second section steel column (2). , and both ends also pass through the third steel plate (20) on the corresponding side third-shaped steel beam (6) and are locked with a first locking nut (22). 5.根据权利要求1所述的一种辅助盾构始发的型钢架体,其特征在于:所有所述第四型钢梁(7)的两端部上均设有第四钢板(23),两侧第四钢板(23)上均活动贯穿有第三螺钉(24),第三螺钉(24)的钉头端还活动贯穿过对应侧第二型钢立柱(2)的翼缘板并锁入有第三螺母(25)。5. The profiled steel frame body according to claim 1, characterized in that: both ends of all the fourth profiled steel beams (7) are provided with fourth steel plates (23). ), the fourth steel plate (23) on both sides has a third screw (24) movably running through it, and the nail head end of the third screw (24) also movably passes through the flange plate of the second section steel column (2) on the corresponding side. A third nut (25) is locked in. 6.根据权利要求4所述的一种辅助盾构始发的型钢架体,其特征在于:所有所述第五型钢梁(8)的两端部上均设有第五钢板(26),贴近第一型钢立柱(1)侧的第五钢板(26)上活动贯穿有第四螺钉(27),第四螺钉(27)的钉头端还活动贯穿过对应侧第一型钢立柱(1)的翼缘板并锁入有第四螺母(28),贴近第二型钢立柱(2)侧的第五钢板(26)与第三型钢梁(6)上贴近第五型钢梁(8)侧的第三钢板(20)之间设有第二对拉螺栓(29),第二对拉螺栓(29)活动贯穿过对应第二型钢立柱(2)的腹板,且两端部还活动贯穿过对应侧的第五钢板(26)和第三钢板(20)并锁入有第二锁紧螺母(30)。6. The profiled steel frame body for auxiliary shield starting according to claim 4, characterized in that: both ends of all the fifth profiled steel beams (8) are provided with fifth steel plates (26). ), a fourth screw (27) is movably penetrated through the fifth steel plate (26) on the side of the first section steel column (1), and the head end of the fourth screw (27) also movably passes through the corresponding side first section steel column ( The flange plate of 1) is locked with a fourth nut (28), the fifth steel plate (26) on the side of the second section steel column (2) and the third section steel beam (6) are close to the fifth section steel beam ( 8) A second pair of pull bolts (29) are arranged between the third steel plates (20) on the side, and the second pair of pull bolts (29) pass through the web corresponding to the second section steel column (2), and both ends It also moves through the fifth steel plate (26) and the third steel plate (20) on the corresponding side and is locked with a second locking nut (30). 7.根据权利要求1所述的一种辅助盾构始发的型钢架体,其特征在于:所有所述第一型钢立柱(1)与对应第一型钢梁(4)通过设置第一连接件(40)连接在一起,第一连接件(40)包括第一限位板(400),第一限位板(400)的顶部设有第一加强筋(401),第一限位板(400)的底部设有第一限位块(402)和呈“L”字形设置的第一安装板(403),第一安装板(403)的竖向板壁与第一限位块(402)之间预留有与第一型钢立柱(1)的翼缘板厚度相适应的第一插接槽(404),第一型钢立柱(1)通过翼缘板接入第一插接槽(404)内与第一连接件(40)连接在一起,第一安装板(403)的横向板壁上开设有与第一型钢梁(4)的翼缘板相适应的第一安装槽(405),第一安装槽(405)的底部槽壁与第一限位板(400)的底壁之间的距离与第一型钢梁(4)的高度相适应,第一型钢梁(4)通过接入第一安装槽(405)的底部槽壁与第一限位板(400)的底壁之间的空间内与第一连接件(40)连接在一起,第一安装板(403)横向板壁的底壁上设有第二加强筋(406);所有第一型钢立柱(1)与对应第二型钢梁(5)通过设置第二连接件(50)连接在一起,第二连接件(50)包括第二限位板(500),第二限位板(500)的顶部设有第三加强筋(501),第二限位板(500)的底部设有第二限位块(502)和呈“L”字形设置的第二安装板(503),第二安装板(503)的竖向板壁与第二限位块(502)之间预留有与第一型钢立柱(1)的腹板厚度相适应的第二插接槽(504),第一型钢立柱(1)通过腹板接入第二插接槽(504)内与第二连接件(50)连接在一起,第二安装板(503)的横向板壁上开设有与第二型钢梁(5)的翼缘板相适应的第二安装槽(505),第二安装槽(505)的底部槽壁与第二限位板(500)的底壁之间的距离与第二型钢梁(5)的高度相适应,第二型钢梁(5)通过接入第二安装槽(505)的底部槽壁与第二限位板(500)的底壁之间的空间内与第二连接件(50)连接在一起,第二安装板(503)横向板壁的底壁上设有第四加强筋(506)。7. The profiled steel frame body of claim 1, characterized in that: all the first profiled steel columns (1) and the corresponding first profiled steel beams (4) are provided with a first profiled steel beam (4). The connecting pieces (40) are connected together, the first connecting piece (40) includes a first limiting plate (400), and the top of the first limiting board (400) is provided with a first reinforcing rib (401), and the first limiting board (400) is provided with a first reinforcing rib (401). The bottom of the plate (400) is provided with a first limiting block (402) and a first mounting plate (403) arranged in an "L" shape, the vertical wall of the first mounting plate (403) and the first limiting block (403). A first insertion slot (404) adapted to the thickness of the flange plate of the first section steel column (1) is reserved between 402), and the first section steel column (1) is connected to the first insertion slot through the flange plate (404) is connected with the first connecting piece (40), and a first installation groove ( 405), the distance between the bottom groove wall of the first installation groove (405) and the bottom wall of the first limiting plate (400) is adapted to the height of the first shaped steel beam (4), and the first shaped steel beam ( 4) Connecting with the first connecting piece (40) by connecting into the space between the bottom groove wall of the first installation groove (405) and the bottom wall of the first limiting plate (400), the first installation plate (400) 403) A second reinforcing rib (406) is provided on the bottom wall of the transverse plate wall; all the first-shaped steel columns (1) and the corresponding second-shaped steel beams (5) are connected together by setting a second connecting piece (50), The two connecting pieces (50) include a second limiting plate (500), the top of the second limiting plate (500) is provided with a third reinforcing rib (501), and the bottom of the second limiting plate (500) is provided with a second reinforcing rib (501). The limit block (502) and the second mounting plate (503) arranged in the shape of an "L" shape, and a space with the first The second insertion slot (504) is adapted to the thickness of the web of the profiled steel column (1), and the first profiled steel column (1) is connected to the second insertion slot (504) through the web to connect with the second connector (50) Connected together, the transverse wall of the second mounting plate (503) is provided with a second mounting groove (505) adapted to the flange plate of the second shaped steel beam (5), and the bottom of the second mounting groove (505) The distance between the groove wall and the bottom wall of the second limiting plate (500) is adapted to the height of the second shaped steel beam (5), and the second shaped steel beam (5) is connected to the second installation groove (505) The space between the bottom groove wall and the bottom wall of the second limiting plate (500) is connected with the second connecting piece (50), and the bottom wall of the transverse plate wall of the second mounting plate (503) is provided with a fourth Stiffeners (506). 8.根据权利要求1所述的一种辅助盾构始发的型钢架体,其特征在于:所有所述第二型钢立柱(2)与对应第三型钢梁(6)和第四型钢梁(7)通过设置第三连接件(60)连接在一起,第三连接件(60)包括第三限位板(600),第三限位板(600)的顶部设有第五加强筋(601),第三限位板(600)的底部设有呈“L”字形设置且对称设于第三限位板(600)底部的第三安装板(602)和呈“L”字形设置的第四安装板(603),两侧第三安装板(602)的竖向板壁之间预留有与第二型钢立柱(2)的腹板厚度相适应的第三插接槽(604),第二型钢立柱(2)通过腹板接入第三插接槽(604)内与第三连接件(60)连接在一起,两侧第三安装板(602)的横向板壁上开设有与第三型钢梁(6)的翼缘板相适应的第三安装槽(605),第三安装槽(605)的底部槽壁与第三限位板(600)的底壁之间的距离与第三型钢梁(6)的高度相适应,第三型钢梁(6)通过接入第三安装槽(605)的底部槽壁与第三限位板(600)的底壁之间的空间内与第三连接件(60)连接在一起,第三安装板(602)横向板壁的底壁上设有第六加强筋(606),第四安装板(603)的横向板壁上开设有与第四型钢梁(7)的翼缘板相适应的第四安装槽(607),第四安装槽(607)的底部槽壁与第三限位板(600)之间的距离与第四型钢梁(7)的高度相适应,第四型钢梁(7)通过接入第四安装槽(607)的底部槽壁与第三限位板(600)的底壁之间的空间内与第三连接件(60)连接在一起,第四安装板(603)横向板壁的底壁设有第七加强筋(608)。8. A profiled steel frame body for auxiliary shield starting according to claim 1, characterized in that: all the second profiled steel columns (2) correspond to the third profiled steel beams (6) and the fourth profiled steel beams (6) The steel beams (7) are connected together by arranging a third connecting piece (60), the third connecting piece (60) includes a third limiting plate (600), and the top of the third limiting board (600) is provided with a fifth reinforcement Ribs (601), the bottom of the third limiting plate (600) is provided with a third mounting plate (602) arranged in an "L" shape and symmetrically arranged at the bottom of the third limiting plate (600), and a third mounting plate (602) in an "L" shape The fourth mounting plate (603) is provided, and a third insertion slot (604) adapted to the thickness of the web of the second shaped steel column (2) is reserved between the vertical plate walls of the third mounting plates (602) on both sides. ), the second shaped steel column (2) is connected to the third insertion slot (604) through the web and is connected with the third connecting piece (60), and the transverse plate walls of the third mounting plates (602) on both sides are provided with A third installation groove (605) adapted to the flange plate of the third shaped steel beam (6), the bottom groove wall of the third installation groove (605) and the bottom wall of the third limit plate (600); The distance is adapted to the height of the third-shaped steel beam (6), and the third-shaped steel beam (6) is inserted between the bottom groove wall of the third installation groove (605) and the bottom wall of the third limiting plate (600). It is connected with the third connecting piece (60) in the space between the third mounting plate (602) and the bottom wall of the lateral wall of the third mounting plate (602) is provided with a sixth reinforcing rib (606), and the lateral wall of the fourth mounting plate (603) is provided with a sixth reinforcing rib (606). A fourth installation groove (607) adapted to the flange plate of the fourth type steel beam (7) is opened, and the distance between the bottom groove wall of the fourth installation groove (607) and the third limit plate (600) Compatible with the height of the fourth-shaped steel beam (7), the fourth-shaped steel beam (7) is inserted between the bottom groove wall of the fourth installation groove (607) and the bottom wall of the third limiting plate (600). It is connected with the third connecting piece (60) in the space of the fourth mounting plate (603), and the bottom wall of the transverse plate wall of the fourth mounting plate (603) is provided with a seventh reinforcing rib (608). 9.根据权利要求1所述的一种辅助盾构始发的型钢架体,其特征在于:所有所述第一型钢立柱(1)与第五型钢梁(8)通过设置第四连接件(70)连接在一起,第四连接件(70)包括第四限位板(700),第四限位板(700)的顶部设有第八加强筋(701),第四限位板(700)的底部设有第三限位块(702)和呈“L”字形设置的第五安装板(703),第五安装板(703)的竖向板壁与第三限位块(702)之间预留有与第一型钢立柱(1)的翼缘板厚度相适应的第四插接槽(704),第一型钢立柱(1)通过翼缘板接入第四插接槽(704)内与第四连接件(70)连接在一起,第五安装板(703)的横向板壁上开设有与第五型钢梁(8)的翼缘板相适应的第五安装槽(705),第五安装槽(705)的底部槽壁与第四限位板(700)的底壁之间的距离与第五型钢梁(8)的高度相适应,第五型钢梁(8)通过接入第五安装槽(705)的底部槽壁与第四限位板(700)的底壁之间的空间内与第四连接件(70)连接在一起,第五安装板(703)横向板壁的底壁上设有第九加强筋(706)。9. A profiled steel frame body for auxiliary shield starting according to claim 1, characterized in that: all the first profiled steel columns (1) and the fifth profiled steel beams (8) are connected by setting a fourth The parts (70) are connected together, and the fourth connecting part (70) includes a fourth limiting plate (700), the top of the fourth limiting plate (700) is provided with an eighth reinforcing rib (701), and the fourth limiting plate (700) The bottom of (700) is provided with a third limiting block (702) and a fifth mounting plate (703) arranged in an "L" shape, and the vertical wall of the fifth mounting plate (703) and the third limiting block (702) ), a fourth insertion slot (704) adapted to the thickness of the flange plate of the first section steel column (1) is reserved, and the first section steel column (1) is connected to the fourth insertion slot ( 704) is connected with the fourth connecting piece (70), and a fifth mounting groove (705) which is adapted to the flange plate of the fifth shaped steel beam (8) is opened on the lateral wall of the fifth mounting plate (703). ), the distance between the bottom groove wall of the fifth installation groove (705) and the bottom wall of the fourth limiting plate (700) is adapted to the height of the fifth-shaped steel beam (8), and the fifth-shaped steel beam (8) ) is connected with the fourth connector (70) by accessing the space between the bottom groove wall of the fifth mounting groove (705) and the bottom wall of the fourth limiting plate (700), and the fifth mounting plate (703) ) A ninth reinforcing rib (706) is arranged on the bottom wall of the transverse plate wall. 10.根据权利要求1所述的一种辅助盾构始发的型钢架体,其特征在于:所有所述第二型钢立柱(2)与对应第三型钢梁(6)、第四型钢梁(7)和第五型钢梁(8)通过设置第五连接件(80)连接在一起,第五连接件(80)包括第五限位板(800),第五限位板(800)的顶部设有第十加强筋(801),第五限位板(800)的底部第六安装板(802)、第七安装板(803)和第八安装板(804),第六安装板(802)、第七安装板(803)和第八安装板(804)均呈“L”字形设置,且第七安装板(803)和第八安装板(804)在第五限位板(800)的底部呈对称设置,第七安装板(803)的竖向板壁与第八安装板(804)的竖向板壁之间预留有与第二型钢立柱(2)的腹板厚度相适应的第五插接槽(805),第二型钢立柱(2)通过腹板接入第五插接槽(805)内与第五连接件(80)连接在一起,第六安装板(802)的横向板壁上开设有与第三型钢梁(6)的翼缘板相适应的第六安装槽(806),第六安装槽(806)的底部槽壁与第五限位板(800)的底壁之间的距离与第三型钢梁(6)的高度相适应,第三型钢梁(6)通过接入第六安装槽(806)的底部槽壁与第五限位板(800)的底壁之间的空间内与第五连接件(80)连接在一起,第六安装板(802)横向板壁的底壁上设有第十一加强筋(807),第七安装板(803)的横向板壁上开设有与第四型钢梁(7)的翼缘板相适应的第七安装槽(808),第七安装槽(808)的底部槽壁与第五限位板(800)之间的距离与第四型钢梁(7)的高度相适应,第四型钢梁(7)通过接入第七安装槽(808)的底部槽壁与第五限位板(800)的底壁之间的空间内与第五连接件(80)连接在一起,第七安装板(803)横向板壁的底壁设有第十二加强筋(809),第八安装板(804)的横向板壁上开设有与第五型钢梁(8)的翼缘板相适应的第八安装槽(810),第八安装槽(810)的底部槽壁与第五限位板(800)之间的距离与第五型钢梁(8)的高度相适应,第五型钢梁(8)通过接入第八安装槽(810)的底部槽壁与第五限位板(800)的底壁之间的空间内与第五连接件(80)连接在一起,第八安装板(804)横向板壁的底壁设有第十三加强筋(811)。10. A profiled steel frame body for auxiliary shield starting according to claim 1, characterized in that: all the second profiled steel columns (2) and the corresponding third profiled steel beams (6), the fourth profiled steel column (2) The steel beam (7) and the fifth-shaped steel beam (8) are connected together by arranging a fifth connecting piece (80), and the fifth connecting piece (80) includes a fifth limiting plate (800), and the fifth limiting plate ( 800) is provided with a tenth reinforcing rib (801) at the top, a sixth mounting plate (802), a seventh mounting plate (803) and an eighth mounting plate (804) at the bottom of the fifth limiting plate (800). The mounting plate (802), the seventh mounting plate (803) and the eighth mounting plate (804) are all arranged in an "L" shape, and the seventh mounting plate (803) and the eighth mounting plate (804) are at the fifth limit position The bottom of the plate (800) is symmetrically arranged, and the thickness of the web of the second shaped steel column (2) is reserved between the vertical plate wall of the seventh mounting plate (803) and the vertical plate wall of the eighth mounting plate (804). The corresponding fifth insertion slot (805), the second shaped steel column (2) is inserted into the fifth insertion slot (805) through the web and connected with the fifth connector (80), and the sixth mounting plate ( 802) is provided with a sixth installation groove (806) adapted to the flange plate of the third shaped steel beam (6), and the bottom groove wall of the sixth installation groove (806) is connected to the fifth limit plate (802). The distance between the bottom walls of 800) is adapted to the height of the third-shaped steel beam (6), and the third-shaped steel beam (6) is connected to the fifth limit by connecting to the bottom groove wall of the sixth installation groove (806). The space between the bottom walls of the plates (800) is connected with the fifth connecting piece (80). The bottom wall of the transverse plate wall of the sixth mounting plate (802) is provided with an eleventh reinforcing rib (807). A seventh installation groove (808) adapted to the flange plate of the fourth-shaped steel beam (7) is opened on the lateral plate wall of the installation plate (803), and the bottom groove wall of the seventh installation groove (808) is connected with the fifth limiter. The distance between the position plates (800) is adapted to the height of the fourth-shaped steel beam (7), and the fourth-shaped steel beam (7) is connected to the fifth limit by connecting to the bottom groove wall of the seventh installation groove (808). The space between the bottom walls of the plates (800) is connected with the fifth connecting piece (80). The bottom wall of the transverse plate wall of the seventh mounting plate (803) is provided with a twelfth reinforcing rib (809). The transverse plate wall of the plate (804) is provided with an eighth installation groove (810) adapted to the flange plate of the fifth-shaped steel beam (8), the bottom groove wall of the eighth installation groove (810) and the fifth limiter The distance between the plates (800) is adapted to the height of the fifth-shaped steel beam (8), and the fifth-shaped steel beam (8) is connected to the fifth limiting plate by being connected to the bottom groove wall of the eighth installation groove (810). The space between the bottom walls of (800) is connected with the fifth connecting piece (80), and the bottom wall of the transverse plate wall of the eighth mounting plate (804) is provided with a thirteenth reinforcing rib (811).
CN202210456835.2A 2022-04-28 2022-04-28 Profile steel frame body assisting shield launching Pending CN114837679A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210456835.2A CN114837679A (en) 2022-04-28 2022-04-28 Profile steel frame body assisting shield launching

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210456835.2A CN114837679A (en) 2022-04-28 2022-04-28 Profile steel frame body assisting shield launching

Publications (1)

Publication Number Publication Date
CN114837679A true CN114837679A (en) 2022-08-02

Family

ID=82567853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210456835.2A Pending CN114837679A (en) 2022-04-28 2022-04-28 Profile steel frame body assisting shield launching

Country Status (1)

Country Link
CN (1) CN114837679A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4009662B1 (en) * 2007-05-31 2007-11-21 有限会社三橋製作所 Scaffolding / movable portal steel frame
CN102277908A (en) * 2011-05-05 2011-12-14 杨东佐 Connectors for building frame structures
WO2012099531A1 (en) * 2011-01-17 2012-07-26 Yen Chih-Cheng Multi-purpose mobile modular structure
CN207244894U (en) * 2017-09-28 2018-04-17 浙江明筑新材料有限公司 Removable emulation plant feature wall
CN111677116A (en) * 2020-06-15 2020-09-18 安徽跨宇钢结构网架工程有限公司 H-shaped steel beam and H-shaped steel column weak axis assembled node and construction method
CN112726823A (en) * 2020-12-30 2021-04-30 广东中烨建筑钢构有限公司 Steel structure node component
CN113944233A (en) * 2021-11-10 2022-01-18 中冶建工集团有限公司 Steel pipe column and concrete beam connecting structure and construction method thereof
CN215718762U (en) * 2021-06-22 2022-02-01 中铁广州工程局集团深圳工程有限公司 Support structure for synchronous construction of station and shield
CN217400898U (en) * 2022-04-28 2022-09-09 中建海峡建设发展有限公司 Profile steel frame body assisting shield launching

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4009662B1 (en) * 2007-05-31 2007-11-21 有限会社三橋製作所 Scaffolding / movable portal steel frame
WO2012099531A1 (en) * 2011-01-17 2012-07-26 Yen Chih-Cheng Multi-purpose mobile modular structure
CN102277908A (en) * 2011-05-05 2011-12-14 杨东佐 Connectors for building frame structures
CN207244894U (en) * 2017-09-28 2018-04-17 浙江明筑新材料有限公司 Removable emulation plant feature wall
CN111677116A (en) * 2020-06-15 2020-09-18 安徽跨宇钢结构网架工程有限公司 H-shaped steel beam and H-shaped steel column weak axis assembled node and construction method
CN112726823A (en) * 2020-12-30 2021-04-30 广东中烨建筑钢构有限公司 Steel structure node component
CN215718762U (en) * 2021-06-22 2022-02-01 中铁广州工程局集团深圳工程有限公司 Support structure for synchronous construction of station and shield
CN113944233A (en) * 2021-11-10 2022-01-18 中冶建工集团有限公司 Steel pipe column and concrete beam connecting structure and construction method thereof
CN217400898U (en) * 2022-04-28 2022-09-09 中建海峡建设发展有限公司 Profile steel frame body assisting shield launching

Similar Documents

Publication Publication Date Title
CN217400898U (en) Profile steel frame body assisting shield launching
CN114837679A (en) Profile steel frame body assisting shield launching
CN213773967U (en) End reinforced combined steel concrete shear wall
CN211775100U (en) A prefabricated low-rise building structure
CN211081900U (en) Tunnel reinforcing structure
CN209723337U (en) A prefabricated steel frame structure composite floor
CN218091267U (en) Connection structure of reinforced concrete prefabricated column and reinforced concrete prefabricated beam
CN217652373U (en) Super high-rise building roof platform of unloading
CN110388088A (en) A kind of increasing of steel-structure factory building is across remodeling method
CN214219990U (en) A Confined Concrete Column Composite Beam Connection Node Structure
CN215164707U (en) Combined bracket suitable for construction of multi-pier column large cantilever bent cap
CN114592590A (en) Assembled pipe rack
CN211472958U (en) Integral concrete structure of steel frame shear wall structure
CN222595522U (en) Large-section adjustable column back edge
CN115628066B (en) Combination Structure and Method of Launching Base and Reaction Frame for Large Shield Tunneling Machine in Enclosed Space
CN223893771U (en) Cantilever scaffold device for H-shaped steel girder
CN217461434U (en) Combined magnesium alloy plane early-dismantling template
CN219491816U (en) Column-beam connection reinforcing structure
CN220868806U (en) High-position corridor bracket column template supporting system
CN215253439U (en) Connection structure of secondary beam and main beam
CN220888947U (en) Connection structure of H type girder and secondary beam
CN217150611U (en) Assembled pipe rack
CN215405532U (en) Large-span steel truss bridge reinforcing structure
CN220058858U (en) Double-disc interlocked middle bearing frame and scaffold thereof
CN223410283U (en) Stable steel construction connected node

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination