CN114809659A - Unloading platform for construction engineering and construction method thereof - Google Patents
Unloading platform for construction engineering and construction method thereof Download PDFInfo
- Publication number
- CN114809659A CN114809659A CN202210529329.1A CN202210529329A CN114809659A CN 114809659 A CN114809659 A CN 114809659A CN 202210529329 A CN202210529329 A CN 202210529329A CN 114809659 A CN114809659 A CN 114809659A
- Authority
- CN
- China
- Prior art keywords
- unloading platform
- platform
- shaped support
- wedge
- support seat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 55
- 238000012407 engineering method Methods 0.000 title 1
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 61
- 239000010959 steel Substances 0.000 claims abstract description 61
- 238000009434 installation Methods 0.000 claims abstract description 21
- 238000000034 method Methods 0.000 claims description 17
- 239000000463 material Substances 0.000 abstract description 25
- 230000008569 process Effects 0.000 description 8
- 230000002787 reinforcement Effects 0.000 description 8
- 230000000694 effects Effects 0.000 description 5
- 230000008439 repair process Effects 0.000 description 4
- 230000001681 protective effect Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008447 perception Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/166—Landings, receiving platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3261—Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
- E04G21/3266—Safety nets
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种用于建筑工程的卸料平台及其搭建方法,用于建筑工程的卸料平台包括卸料平台底座和位于卸料平台底座上方的卸料平台本体;所述卸料平台底座包括对称设置的主梁以及固定安装在所述主梁底部的楔形支撑座,所述主梁与所述楔形支撑座垂直设置,所述楔形支撑座在所述主梁底部前后设置;所述平台本体固定连接在所述主梁之上,所述平台本体的顶部固定安装有多个护栏。本发明公开的用于建筑工程的卸料平台及其搭建方法无需在结构施工阶段预留安装条件,直接安装在墙体结构上的上翻梁位置。利用结构施工模板加固的螺栓孔配合钢管、可调拖撑等材料进行加固,安装拆卸便捷,使用方便。
The invention discloses an unloading platform for construction engineering and a construction method thereof. The unloading platform used for construction engineering comprises an unloading platform base and an unloading platform body located above the unloading platform base; the unloading platform The base includes a symmetrically arranged main beam and a wedge-shaped support seat fixedly installed at the bottom of the main beam, the main beam and the wedge-shaped support seat are vertically arranged, and the wedge-shaped support seat is arranged at the front and rear of the bottom of the main beam; the The platform body is fixedly connected on the main beam, and a plurality of guardrails are fixedly installed on the top of the platform body. The unloading platform and its construction method disclosed by the invention do not need to reserve installation conditions in the structural construction stage, and are directly installed on the upper turning beam position on the wall structure. The bolt holes reinforced by the structural construction template are reinforced with steel pipes, adjustable drag braces and other materials, which are easy to install and disassemble, and easy to use.
Description
技术领域technical field
本发明涉及建筑工程技术领域,特别是涉及一种用于建筑工程的卸料平台及其搭建方法。The invention relates to the technical field of construction engineering, in particular to a discharge platform for construction engineering and a construction method thereof.
背景技术Background technique
卸料平台作为楼层之间转运物料的关键平台,在工程施工中是无可或缺的,尤其在高层建筑施工中,卸料平台的使用更加频繁。As the key platform for transferring materials between floors, the unloading platform is indispensable in engineering construction. Especially in the construction of high-rise buildings, the unloading platform is used more frequently.
现有技术中,部分工程采用工字钢悬挑卸料平台配合塔吊进行材料的倒运工作。结构施工阶段提前预留卸料平台安装所需的孔洞、锚环及其他构配件。待砌筑工程开始施工时,安装卸料平台。使用塔吊将砌筑工程所需的材料吊运至卸料平台,再由人工将卸料平台上的材料倒运进楼内。平台拆除后将预留的洞口封闭,锚环拆除。In the prior art, some projects use the I-beam cantilevered unloading platform to cooperate with the tower crane to carry out the material inversion work. The holes, anchor rings and other components required for the installation of the unloading platform shall be reserved in advance during the structural construction phase. When the masonry project starts construction, install the unloading platform. The tower crane is used to lift the materials required for the masonry project to the unloading platform, and then the materials on the unloading platform are manually transported into the building. After the platform is removed, the reserved openings are closed and the anchor rings are removed.
现有技术需在结构施工阶段提前预留工字钢穿结构墙体洞口、平台固定锚环及钢丝绳拉结锚环的洞口;这样不仅增加了平台拆除后的恢复工作,成本高,且洞口二次封闭质量渗漏风险高,观感较差,还需在结构施工初期就介入平台安装的工序,工程一旦发生变更,产生的损失较大。In the prior art, it is necessary to reserve the openings of the I-beam through the structural wall, the fixed anchor ring of the platform and the anchor ring of the wire rope knot in advance in the structural construction stage; this not only increases the restoration work after the platform is dismantled, but also has a high cost, and the opening of the hole is two. The secondary sealing quality has high leakage risk and poor appearance. It is necessary to intervene in the platform installation process in the early stage of structural construction. Once the project is changed, the loss will be relatively large.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于提供一种用于建筑工程的卸料平台及其搭建方法,以解决上述背景技术中提出的问题。The purpose of the present invention is to provide an unloading platform for construction engineering and a construction method thereof, so as to solve the problems raised in the above background technology.
为实现上述目的,本发明提供如下技术方案:一种用于建筑工程的卸料平台,用于固定于建筑的结构梁,包括In order to achieve the above-mentioned purpose, the present invention provides the following technical solutions: a kind of unloading platform for construction engineering, for being fixed on the structural beam of the building, including
卸料平台底座,所述卸料平台底座包括对称设置的主梁以及固定安装在所述主梁底部的楔形支撑座,所述主梁与所述楔形支撑座垂直设置,所述楔形支撑座在所述主梁底部前后设置;The unloading platform base includes a symmetrically arranged main beam and a wedge-shaped support seat fixedly installed at the bottom of the main beam, the main beam and the wedge-shaped support seat are vertically arranged, and the wedge-shaped support seat is located at the bottom of the main beam. The bottom of the main beam is arranged at the front and rear;
以及卸料平台本体,卸料平台本体位于卸料平台底座上方,所述平台本体固定连接在所述主梁之上,所述平台本体的顶部固定安装有护栏,且护栏设有多个,多个护栏等距离间隔设置。And the unloading platform body, the unloading platform body is located above the unloading platform base, the platform body is fixedly connected on the main beam, the top of the platform body is fixedly installed with a guardrail, and the guardrail is provided with multiple, many The guardrails are set at equal distances.
优选的,所述楔形支撑座分为内侧楔形支撑座和外侧楔形支撑座,所述外侧楔形支撑座的尺寸大于内侧楔形支撑座的尺寸,且所述外侧楔形支撑座与所述内侧楔形支撑座之间的距离为所述结构梁的宽度。Preferably, the wedge-shaped support seat is divided into an inner wedge-shaped support seat and an outer wedge-shaped support seat, the size of the outer wedge-shaped support seat is larger than that of the inner wedge-shaped support seat, and the outer wedge-shaped support seat and the inner wedge-shaped support seat are The distance between is the width of the structural beam.
优选的,所述外侧楔形支撑座紧贴所述结构梁的一侧设置有外伸悬挑。Preferably, an overhanging cantilever is provided on one side of the outer wedge-shaped support seat which is close to the structural beam.
优选的,对称两所述楔形支撑座之间设置有连接横梁,所述连接横梁上设置有与所述结构梁固定的多个螺栓孔。Preferably, a connecting beam is arranged between two symmetrical wedge-shaped support bases, and a plurality of bolt holes fixed to the structural beam are arranged on the connecting beam.
优选的,所述连接横梁分为上连接横梁和下连接横梁,所述上连接横梁和下连接横梁位于同一平面,且紧贴所述结构梁的内外两侧。Preferably, the connecting beam is divided into an upper connecting beam and a lower connecting beam, and the upper connecting beam and the lower connecting beam are located on the same plane and are closely attached to the inner and outer sides of the structural beam.
优选的,所述卸料平台底座包括多根次梁,多根所述次梁与所述主梁固定连接,多根所述次梁与所述主梁位于同一平面。Preferably, the unloading platform base includes a plurality of secondary beams, the plurality of secondary beams are fixedly connected to the main beam, and the plurality of secondary beams and the main beam are located on the same plane.
优选的,所述卸料平台底座包括钢板,所述钢板设置于所述主梁之上,所述钢板与所述主梁和多根所述次梁固定连接。Preferably, the base of the unloading platform comprises a steel plate, the steel plate is arranged on the main beam, and the steel plate is fixedly connected to the main beam and a plurality of the secondary beams.
本发明还提供一种卸料平台的搭建方法,用于将卸料平台固定于建筑的结构梁,包括:将卸料平台吊至结构梁位置;通过对拉螺栓与结构梁上设置的螺栓孔配合,将卸料平台固定于结构梁。The present invention also provides a method for building an unloading platform, which is used to fix the unloading platform on a structural beam of a building, including: hoisting the unloading platform to the position of the structural beam; Cooperate to fix the unloading platform on the structural beam.
优选的,将卸料平台吊至结构梁位置包括:将卸料平台四角的吊环挂在塔吊的吊钩上;将卸料平台吊至安装楼层;将卸料平台安装于结构梁并使卸料平台的外侧楔形支撑座贴紧结构梁。Preferably, hoisting the unloading platform to the position of the structural beam includes: hanging the lifting rings at the four corners of the unloading platform on the hooks of the tower crane; hoisting the unloading platform to the installation floor; installing the unloading platform on the structural beam and making the unloading platform unload The outer wedge-shaped support seat of the platform is in close contact with the structural beam.
优选的,通过对拉螺栓与结构梁上设置的螺栓孔配合,将卸料平台固定于结构梁包括:在所述螺栓孔的两侧设置10mm厚钢板作为固定垫片;使直径16mm的对拉螺栓穿过螺栓孔;拧紧对拉螺栓两侧的螺母,以使固定垫片、卸料平台的连接横梁与结构梁紧贴。Preferably, fixing the unloading platform to the structural beam by matching the tension bolts with the bolt holes provided on the structural beam includes: setting 10mm thick steel plates on both sides of the bolt holes as fixing gaskets; The bolts pass through the bolt holes; tighten the nuts on both sides of the tension bolts so that the fixing gasket and the connecting beam of the unloading platform are in close contact with the structural beam.
与现有技术相比,本申请的技术方案具有以下有益技术效果:Compared with the prior art, the technical solution of the present application has the following beneficial technical effects:
本发明涉及的用于建筑工程的卸料平台及卸料平台的搭建方法可有效加快施工进度、节省工期;使用砌块专用卸料平台,在结构施工阶段无需预留安装条件,可保障结构整体性,避免后期修补造成的质量风险;砌块专用卸料平台及其加固配件均可周转使用,节约材料;材料倒运迅速、使用便捷,节约人力成本。同时还具有:The unloading platform for construction projects and the method for building the unloading platform of the invention can effectively speed up the construction progress and save the construction period; the use of the special unloading platform for blocks does not need to reserve installation conditions during the structural construction stage, and can ensure the overall structure of the structure. To avoid the quality risk caused by later repairs; the block-specific unloading platform and its reinforcement accessories can be used in turnaround, saving materials; materials are quickly transported, easy to use, and labor costs are saved. Also has:
1.缩短工期:在砌筑工程施工中使用此砌块专用卸料平台可以大量减少砌筑材料倒运所需的时间,达到缩短工期的目的。1. Shorten the construction period: The use of this block-specific unloading platform in the construction of masonry projects can greatly reduce the time required for the reverse transportation of masonry materials and achieve the purpose of shortening the construction period.
2.无质量风险:安装时直接安装在结构结构梁位置并进行加固,无需提前预留安装条件,如预留穿墙螺栓孔、工字钢穿墙结构留洞等。使用此项创新保障了结构的整体性,砌块专用卸料平台拆除后仅需按照正常的施工工艺对螺栓孔仅需封堵,对主体结构质量无影响,无二次修补造成的质量风险。2. No quality risk: It is installed directly at the position of the structural structural beam and reinforced during installation, and there is no need to reserve installation conditions in advance, such as reserving bolt holes through the wall, holes in the I-beam through-wall structure, etc. The use of this innovation ensures the integrity of the structure. After the special unloading platform for blocks is removed, the bolt holes only need to be blocked according to the normal construction process, which has no impact on the quality of the main structure and no quality risk caused by secondary repairs.
3.节约材料:砌块专用卸料平台及其加固配件拆卸方便、无需预埋于主体结构中,所有材料均可周转使用;在平台逐层提升的使用过程中,仅需准备一套加固配件,节约材料的使用及消耗。3. Material saving: The block-specific unloading platform and its reinforcement accessories are easy to disassemble and do not need to be pre-buried in the main structure, and all materials can be used in turnover; in the process of lifting the platform layer by layer, only one set of reinforcement accessories is required. , saving the use and consumption of materials.
4.成本节约:使用砌块专用卸料平台,可有效提升工效,加快工期,节材同时节约人工,降本增效效果明显。4. Cost saving: The use of a special unloading platform for blocks can effectively improve work efficiency, speed up the construction period, save materials and save labor at the same time, and the effect of cost reduction and efficiency increase is obvious.
本发明的其它特征和优点将在随后的说明书中阐述,并且,部分地从说明书中变得显而易见,或者通过实施本发明而了解。本发明的目的和其他优点可通过在说明书、权利要求书以及附图中所指出的结构来实现和获得。Other features and advantages of the present invention will be set forth in the description which follows, and in part will be apparent from the description, or may be learned by practice of the invention. The objectives and other advantages of the invention may be realized and attained by the structure pointed out in the description, claims and drawings.
附图说明Description of drawings
图1为本发明提供的一种用于建筑工程的卸料平台的结构示意图;Fig. 1 is the structural representation of a kind of unloading platform for construction engineering provided by the present invention;
图2为图1中楔形支撑座的结构示意图;Fig. 2 is the structural representation of the wedge-shaped support seat in Fig. 1;
图3为图1中左侧示意图;Fig. 3 is the left side schematic diagram in Fig. 1;
图4为图1中俯视区域的结构示意图。FIG. 4 is a schematic structural diagram of the top view area in FIG. 1 .
附图中,各标号所代表的部件列表如下:In the accompanying drawings, the list of components represented by each number is as follows:
1、卸料平台底座;101、主梁;102、楔形支撑座;1021、内侧楔形支撑座;1022、外侧楔形支撑座;103、次梁;104、钢板;105、立柱;1. The base of the unloading platform; 101, the main beam; 102, the wedge-shaped support seat; 1021, the inner wedge-shaped support seat; 1022, the outer wedge-shaped support seat; 103, the secondary beam; 104, the steel plate; 105, the column;
2、平台本体;201、护栏;202、护网;3、结构梁;4、外伸悬挑;5、连接横梁;501、上连接横梁;502、下连接横梁。2. Platform body; 201, guardrail; 202, guard net; 3, structural beam; 4, overhang; 5, connecting beam; 501, upper connecting beam; 502, lower connecting beam.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
本发明实施例提供一种用于建筑工程的卸料平台,用于固定于建筑的结构梁3,如图1所示,其中所述卸料平台包括卸料平台底座1和位于卸料平台底座1上方的卸料平台本体2;An embodiment of the present invention provides an unloading platform for a construction project, which is used to be fixed to a
所述卸料平台底座1包括对称设置的主梁101以及固定安装在所述主梁101底部的楔形支撑座102,所述主梁101与所述楔形支撑座102垂直设置,所述楔形支撑座102在所述主梁101底部前后设置;The
所述平台本体2固定连接在所述主梁101之上,所述平台本体2的顶部固定安装有护栏201,且护栏201设有多个,多个护栏201等距离间隔设置。The
需要说明的是,本发明创新研发一种用于建筑工程的卸料平台,用于砌筑工程的材料倒运。此用于建筑工程的卸料平台无需在结构施工阶段预留安装条件,直接安装在墙体结构上的翻梁位置。利用结构施工模板加固的螺栓孔配合钢管、可调拖撑等材料进行加固,安拆便捷,使用方便。It should be noted that the present invention innovatively develops an unloading platform for construction projects, which is used for the reverse transportation of materials in masonry projects. This unloading platform for construction projects does not need to reserve installation conditions in the structural construction stage, and is directly installed at the position of the turning beam on the wall structure. The bolt holes reinforced by the structural construction template are reinforced with steel pipes, adjustable drag braces and other materials, which are convenient for installation and disassembly and easy to use.
具体地,如图2所示,所述楔形支撑座102分为内侧楔形支撑座1021和外侧楔形支撑座1022,其中,所述外侧楔形支撑座1022的尺寸大于内侧楔形支撑座1021的尺寸,且所述外侧楔形支撑座10221与所述内侧楔形支撑座1021之间的距离为所述结构梁3的宽度。所述外侧楔形支撑座1022紧贴所述结构梁3的一侧设置有外伸悬挑4。Specifically, as shown in FIG. 2 , the wedge-shaped
需要说明的是,所述楔形支撑座102选用支撑三角槽钢、三角支撑定位,可以起到紧固不松动的效果。在结构梁3的两侧都设置支撑三角槽钢固定,在使用时能够将结构梁3卡在两三角槽钢之间,由于是三角固定,因此在结构梁3的内侧和外侧不管是哪一侧卸料平台底座1松动都能保证相应一侧的楔形支撑座102进行限位,在底座保证了卸料平台的安全。根据主体结构形式及使用需求对用于建筑工程的卸料平台底座1需进行场外集中加工。卸料平台底座1固定用螺栓孔在卸料平台拆除后可按照正常工序进行螺栓封堵,无需进行二次修补;砌块专用卸料平台逐层提升,加固用螺栓、钢管及可调拖撑可周转使用,材料投入较少,成本较低。It should be noted that, the wedge-shaped
在本实施例中,所述外伸悬挑4可横向或纵向设置在外侧楔形支撑座1022上,具体如图3所示为横向设置的外伸悬挑4,作为优选的,外伸悬挑4固定在外侧楔形支撑座1022上,同时,外伸悬挑4还可通过螺栓固定在结构梁3上。In this embodiment, the overhanging
具体地,如图3所示,对称两所述楔形支撑座102之间设置有连接横梁5,所述连接横梁5分为上连接横梁501和下连接横梁502,所述上连接横梁501和下连接横梁502位于同一平面,且紧贴所述结构梁3的内外两侧。所述连接横梁5上设置有与所述结构梁3固定的多个螺栓孔。Specifically, as shown in FIG. 3 , a connecting
需要说明的是,为了进一步保证卸料平台底座1的牢固,连接横梁5固定在卸料平台底座1横向的对称两所述楔形支撑座102之间,连接横梁5可设置为多个,在内侧楔形支撑座1021和外侧楔形支撑座1022都安装有连接横梁5,连接横梁5还分为上连接横梁501和下连接横梁502,上连接横梁501和下连接横梁502紧贴所述结构梁3的内外两侧。当卸料平台的一端受力较重时,其连接横梁5可以有效的顶紧结构梁3,为方便进一步增大接触面积和起固定的效果,外侧楔形支撑座1022紧贴所述结构梁3的一侧还设置有外伸悬挑4,所述外伸悬挑4与楔形支撑座102配合,通过三角固定,在受力过重时,卸料平台也不会发生倾覆。It should be noted that, in order to further ensure the firmness of the
在本实施例中,卸料平台尺寸为2.5m×1.66m。卸料平台悬挑长度为1.88m,所述楔形支撑座102由两根槽钢焊接完成。具体地,所述外侧楔形支撑座1022长度分别为830mm,所述内侧楔形支撑座1021长度为560mm,外侧楔形支撑座1022和内侧楔形支撑座1021通过木楔与结构梁3顶紧,所述楔形支撑座102间距320mm。In this embodiment, the size of the unloading platform is 2.5m×1.66m. The cantilever length of the unloading platform is 1.88m, and the wedge-shaped
具体地,如图4所示,所述卸料平台底座1包括多根次梁103,多根所述次梁103与所述主梁101固定连接,多根所述次梁103与所述主梁101位于同一平面。需要说明的是,主次梁103框架由工字钢和槽钢满焊连接。在本实施例中,所述次梁103选用槽钢。Specifically, as shown in FIG. 4 , the
所述卸料平台底座1包括钢板104,所述钢板104设置于所述主梁101之上,所述钢板104与所述主梁101和多根所述次梁103固定连接。需要说明的是,作为一种优选的实施方式,钢板104还可用木板代替,为方便取材,可选用施工现场的模具板。作为另一种优选的实施方式,钢板104还可用护网202代替,可将卸料平台底座1和卸料平台本体2全部铺设护网202,并用焊接固定,进一步的节约成本。The
所述卸料平台底座1包括立柱105,所述立柱105设置于所述主梁101上端,所述立柱105底端与所述主梁101固定连接,所述立柱105的顶端设置可调拖撑与结构楼板进行固定顶撑。The
需要说明的是,待卸料平台底座1底端固定后,在卸料平台底座1左右两侧焊接立柱105,在本实施例中,立柱105选用双方钢管,在立柱105的顶端设置可调拖撑与结构楼板进行固定顶撑,具体为将钢管套在200mm长C20粗钢筋棍上,调直钢管,并将可调拖撑拧紧。并使用水平拉杆将两根支撑钢管连接,保障平台稳固,无晃动。其中,焊接立柱105使用对拉螺栓与临近墙体固定,通过结构施工阶段的螺栓孔将平台支撑方钢与立柱105拉紧,并采用双螺母固定。固定完成后在卸料平台底座1上铺设支撑物。所述卸料平台底座1靠近楼板末端通过立柱105加可调拖撑的形式与结构板进行支撑。具体地,每个卸料平台配置可调拖撑两个。It should be noted that after the bottom end of the
多根所述立柱105设置于所述钢板104之上,多根所述立柱105与所述钢板104固定连接。在本实施例中,立柱105选用40*40*3mm方钢管。A plurality of the
具体地,为了方便吊装,所述卸料平台底座1的主梁101两侧还设置有吊装拉环。在本实施例中,所述主梁101选用工字钢。Specifically, in order to facilitate hoisting, hoisting pull rings are also provided on both sides of the
作为一种优选的实施方式,所述平台本体2包括护网202,所述护网202安装在所述护栏201上,所述护网202与所述钢板104固定连接。在本实施例中,所述护网202选用密目钢板网,密目钢板网与卸料平台四周的护栏201连接。在护网202内栏杆内侧设置硬质材料的挡板。随后,在卸料平台明显部位,悬挂限载吨数标志牌、平台操作规程及注意事项标志牌以及砌块限制数量牌。As a preferred embodiment, the
1、在本实施例中主要材料及其规格:1. Main materials and their specifications in this embodiment:
(1)主梁101:选用12#工字钢,长2.5m,共2根。(1) Main beam 101: 12# I-beam, 2.5m long, 2 in total.
(2)次梁103:选用10#槽钢,长1.66m,共5根。(2) Secondary beam 103: 10# channel steel, 1.66m long, 5 in total.
(3)楔形支撑座102:选用10#槽钢,长0.8m槽钢2根,长0.56m槽钢2根;长度1.3m槽钢2根、长0.58m槽钢2根。(3) Wedge-shaped support seat 102: select 10# channel steel, 2 channel steels with a length of 0.8m, 2 channel steels with a length of 0.56m; 2 channel steels with a length of 1.3m and 2 channel steels with a length of 0.58m.
(4)连接横梁5:选用40*40*3mm方钢管,高度不小于1.5m,共4根,与主梁101进行焊接固定。(4) Connecting beam 5: Use 40*40*3mm square steel pipe, with a height of not less than 1.5m, a total of 4 pieces, which are welded and fixed with the
(5)护网202:选用密目钢板网,1.9m×1.5m的两侧护网片;1.66m×1.5m的端部护网片,密目钢板与卸料平台四周的护栏201连接。(5) Guard net 202: choose dense mesh steel mesh, 1.9m×1.5m side guards; 1.66m×1.5m end guards, dense mesh steel plate and
(6)钢板104:选用xu1.66*0.5m钢板块,钢板104厚度为6mm厚,平台范围满焊。(6) Steel plate 104: choose xu1.66*0.5m steel plate, the thickness of
(7)立柱105:选用Φ48mm钢管,长度2.0m的钢管2根。(7) Column 105: choose Φ48mm steel pipe and 2 steel pipes with a length of 2.0m.
(8)方钢管:选用40×40×3.0mm方钢管,1.66m方钢管2根;0.4~0.6m方钢管12根。(8) Square steel pipe: choose 40×40×3.0mm square steel pipe, 2 1.66m square steel pipes; 12 0.4-0.6m square steel pipes.
(9)可调拖撑:每个卸料平台配置可调拖撑两个。(9) Adjustable drag braces: Each unloading platform is equipped with two adjustable drag braces.
(10)对拉螺栓:Φ16对拉螺栓3套,每个对拉螺栓端部双螺母加固。(10) Pull bolts: 3 sets of Φ16 pull bolts, each end of the pull bolt is reinforced with double nuts.
(11)吊装拉环件:使用Q235-B材质的吊装拉环4个。(11) Lifting ring parts:
(12)钢板104:100×150×10mm钢板104两块,钢板104中间开φ18圆洞。(12) Steel plate 104: two
本发明涉及的卸料平台结构形式新颖,无需结构施工提前预留安装条件,可直接固定在结构梁3之上,平台固定用螺栓孔在平台拆除后可按照正常工序进行螺栓封堵,无需进行二次修补;卸料平台逐层提升,加固用螺栓、钢管及可调拖撑可周转使用,材料投入较少,成本较低。The unloading platform involved in the present invention has a novel structure, does not need to reserve installation conditions in advance for structural construction, and can be directly fixed on the
本发明还提供一种卸料平台的搭建方法,用于将卸料平台固定于建筑的结构梁,包括:The present invention also provides a construction method for the unloading platform, which is used for fixing the unloading platform on the structural beam of the building, including:
将所述卸料平台吊至所述结构梁位置;lifting the unloading platform to the position of the structural beam;
通过对拉螺栓与所述结构梁上设置的螺栓孔配合,将所述卸料平台固定于所述结构梁。The unloading platform is fixed to the structural beam by matching the tension bolts with the bolt holes provided on the structural beam.
本发明涉及的卸料工具现场安装和拆除过程如下:The on-site installation and removal process of the unloading tool involved in the present invention is as follows:
1、现场安装1. On-site installation
卸料平台采用场外加工,施工现场进行整体吊装、加固的方式进行安装、使用。The unloading platform is processed off-site, and the construction site is installed and used by means of overall hoisting and reinforcement.
组装流程与安装方法:Assembly process and installation method:
检查→卸料平台吊装→加固平台→安装多层板及标识→验收Inspection → Lifting of unloading platform → Reinforcing platform → Installation of multi-layer boards and signs → Acceptance
(1)检查(1) Check
卸料平台吊装安装前组织卸料平台的进场验收。Before the unloading platform is hoisted and installed, the site acceptance of the unloading platform shall be organized.
(2)卸料平台吊装:(2) Lifting of unloading platform:
将所述卸料平台吊至所述结构梁位置。Lift the unloading platform to the position of the structural beam.
卸料平台进场经过验收合格后方可吊装。吊装时,先挂好四角的吊钩,吊钩的四条引绳应等长,保证平台在起吊过程中的平稳。平台吊至安装楼层时,慢慢放下平台,将平台平稳落在安装结构梁3上并使外侧楔形支撑座1022贴紧结构梁3,待平台加固完成后,可松去塔吊吊绳。The unloading platform can be hoisted only after it has passed the acceptance inspection. When hoisting, hang the hooks at the four corners first, and the four lead ropes of the hook should be of equal length to ensure the stability of the platform during the lifting process. When the platform is hoisted to the installation floor, slowly lower the platform, place the platform smoothly on the installation
(3)加固平台:(3) Reinforcement platform:
通过对拉螺栓与所述结构梁上设置的螺栓孔配合,将所述卸料平台固定于所述结构梁。The unloading platform is fixed to the structural beam by matching the tension bolts with the bolt holes provided on the structural beam.
卸料平台吊装完成后,使用φ16对拉螺栓加连接横梁5组合的形式,通过结构螺栓孔将平台上的连接横梁5与结构梁3拉紧,螺栓使用10mm厚钢板做固定垫片,端部使用双螺母固定,悬挑卸料平台应保证最少三道螺栓加固。After the unloading platform is hoisted, use the combination of φ16 pair of pull bolts and connecting
螺栓拧紧后,使用三角木楔将卸料平台内侧楔形支撑座1021与结构梁3楔紧。After the bolts are tightened, the wedge-shaped
同时采用直径48mm的立柱105加可调拖撑与结构楼板进行固定顶撑。将钢管套在200mm长C20粗钢筋棍上,调直钢管,并将可调拖撑拧紧。并使用水平拉杆将两根立柱105连接,保障平台稳固,无晃动。At the same time, a
(4)安装硬质防护并悬挂标识:(4) Install hard protection and hang signs:
在卸料平台安装、加固完毕后,在护网202内栏杆内侧设置硬质材料的挡板。随后,在平台明显部位,悬挂限载吨数标志牌、平台操作规程及注意事项标志牌以及砌块限制数量牌。After the unloading platform is installed and reinforced, a baffle plate of hard material is arranged on the inner side of the inner railing of the
(5)检查:(5) Check:
卸料平台安装完成后,应先进行一次试吊,在试吊过程中,如发现螺栓松动、平台扭曲、钢管支撑脱落等现象应及时进行二次加固。After the installation of the unloading platform is completed, a trial hoisting should be carried out first. During the trial hoisting process, if the bolts are loosened, the platform is twisted, the steel pipe supports fall off, etc., the secondary reinforcement should be carried out in time.
验收合格方可正式使用。It can be officially used only after the acceptance is passed.
需要说明的是,使用卸料平台进行砌筑工程施工材料倒运时。由信号工进行指挥,塔吊将蒸压混凝土加气块吊运至卸料平台上。材料放稳后由操作层工人将蒸压混凝土加气块倒运至作业层内。It should be noted that when the unloading platform is used to carry out the reverse transportation of the construction materials of the masonry project. Commanded by the signal worker, the tower crane lifts the autoclaved concrete aerated block to the unloading platform. After the materials are stabilized, the workers at the operation floor will transport the autoclaved concrete aerated blocks to the operation floor.
本发明涉及的卸料平台的使用采取逐层提升的方式,其提升流程为:提升前准备→拆除固定措施→卸料平台提升→卸料平台安装→验收;The use of the unloading platform involved in the present invention adopts a layer-by-layer lifting method, and the lifting process is: preparation before lifting → removal of fixing measures → lifting of the unloading platform → installation of the unloading platform → acceptance;
本发明涉及的卸料平台提升具体包括以下步骤:提升前清除平台上周转材料,专人负责指挥,缓慢降落塔吊吊钩与平台起吊勾钩挂牢固,稍绷紧吊绳;先将平台的端部支撑钢管拆除,再拆除三角木楔、对拉螺栓加立柱105的加固措施;卸料平台提升,待发出信号,先将平台向外侧水平移动至结构外侧安全距离,再匀速平稳提升至上一层。卸料平台提升时,必须在下方地面设立警戒区域,且有醒目标志并设有看护人员。卸料平台重新安装、加固,验收合格后使用。The lifting of the unloading platform involved in the present invention specifically includes the following steps: before lifting, remove the material on the platform, and a special person is responsible for the command, slowly lowering the hook of the tower crane and the lifting hook of the platform, and tightening the suspending rope slightly; The supporting steel pipe is removed, and then the reinforcement measures of the triangular wooden wedge, the tie bolt and the
2.现场拆除2. On-site demolition
本发明涉及的卸料平台现场拆除包括以下步骤:拆除时先用塔吊对卸料平台进行机械预紧,并注意吊点平衡,防止平台失稳下坠;The on-site dismantling of the unloading platform involved in the present invention includes the following steps: when dismantling, firstly use a tower crane to mechanically pre-tighten the unloading platform, and pay attention to the balance of the lifting point to prevent the platform from falling from instability;
将平台端部支撑钢管及可调拖撑缓慢拆除,拆除时操作人员应站在室内方向,严禁站在卸料平台上进行立杆的拆除作业;Slowly dismantle the supporting steel pipes and adjustable drag braces at the end of the platform. When dismantling, the operator should stand in the direction of the room, and it is strictly forbidden to stand on the unloading platform to dismantle the pole;
卸料平台拆除时,必须在下方地面设立警戒区域,且有醒目标志并设有看护人员;将卸料平台整体吊至平地。When the unloading platform is dismantled, a warning area must be set up on the ground below, with eye-catching signs and guards; the whole unloading platform is hoisted to the ground.
需要说明的是,建筑的主体结构混凝土达到设计强度后可安装所述卸料平台,所述卸料平台适用范围为砌体阶段和装修阶段,属于危险性较大工程,需专家论证。It should be noted that the unloading platform can be installed after the concrete of the main structure of the building reaches the design strength. The scope of application of the unloading platform is the masonry stage and the decoration stage, which is a relatively dangerous project and requires expert demonstration.
综上所述,本发明涉及的用于建筑工程的卸料平台无需在结构施工阶段预留安装条件,直接安装在墙体结构上的翻梁位置。利用结构施工模板加固的螺栓孔配合钢管、可调拖撑等材料进行加固,安拆便捷,使用方便。同时运用此卸料平台现有技术相比还具有工期缩短、质量观感更好、材料投入较少与更环保、成本较低、现场安装和拆除便捷的技术效果。To sum up, the unloading platform used in the construction project according to the present invention does not need to reserve installation conditions in the structural construction stage, and is directly installed at the position of the turning beam on the wall structure. The bolt holes reinforced by the structural construction template are reinforced with steel pipes, adjustable drag braces and other materials, which are convenient for installation and disassembly and easy to use. At the same time, compared with the existing technology of this unloading platform, it also has the technical effects of shortened construction period, better quality perception, less material input and more environmental protection, lower cost, and convenient on-site installation and removal.
在本文中,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,除了包含所列的那些要素,而且还可包含没有明确列出的其他要素。As used herein, the terms "comprising", "comprising" or any other variation thereof are intended to encompass non-exclusive inclusion, in addition to those elements listed, but also other elements not expressly listed.
在本文中,所涉及的前、后、上、下等方位词是以附图中零部件位于图中以及零部件相互之间的位置来定义的,只是为了表达技术方案的清楚及方便。应当理解,所述方位词的使用不应限制本申请请求保护的范围。In this document, the related terms such as front, rear, upper and lower are defined by the positions of the components in the drawings and the positions between the components, which are only for the clarity and convenience of expressing the technical solution. It should be understood that the use of the locative words should not limit the scope of protection claimed in this application.
以上所述仅为本发明的较佳实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection of the present invention. within the range.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210529329.1A CN114809659A (en) | 2022-05-16 | 2022-05-16 | Unloading platform for construction engineering and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210529329.1A CN114809659A (en) | 2022-05-16 | 2022-05-16 | Unloading platform for construction engineering and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114809659A true CN114809659A (en) | 2022-07-29 |
Family
ID=82514879
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210529329.1A Pending CN114809659A (en) | 2022-05-16 | 2022-05-16 | Unloading platform for construction engineering and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114809659A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115711044A (en) * | 2022-11-14 | 2023-02-24 | 中国五冶集团有限公司 | Integral regularization protector of material platform is changeed to construction elevator |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20318911U1 (en) * | 2003-12-05 | 2004-02-26 | Doka Industrie Gmbh | Railing for a formwork platform and stage element with a railing |
CN204781887U (en) * | 2015-06-30 | 2015-11-18 | 上海宝冶集团有限公司 | Prefabricated assembly type structure's no outrigger construction platform |
CN108756196A (en) * | 2018-08-20 | 2018-11-06 | 中建四局第六建筑工程有限公司 | A kind of assembled architecture main body protective device and its construction method |
CN209066837U (en) * | 2018-09-26 | 2019-07-05 | 中建八局第二建设有限公司 | A kind of combined type construction supporting platform |
CN212478487U (en) * | 2020-03-31 | 2021-02-05 | 王英妮 | Construction platform for building construction |
CN214062435U (en) * | 2020-11-26 | 2021-08-27 | 北京城建北方集团有限公司 | Support system for high-altitude ultra-long cantilever structure |
CN113802862A (en) * | 2021-07-20 | 2021-12-17 | 北京市建筑工程研究院有限责任公司 | Novel platform of unloading with overload alarming function |
CN114033154A (en) * | 2021-12-14 | 2022-02-11 | 中国十七冶集团有限公司 | Clamp type operation hanging basket suspension device and use method thereof |
-
2022
- 2022-05-16 CN CN202210529329.1A patent/CN114809659A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20318911U1 (en) * | 2003-12-05 | 2004-02-26 | Doka Industrie Gmbh | Railing for a formwork platform and stage element with a railing |
CN204781887U (en) * | 2015-06-30 | 2015-11-18 | 上海宝冶集团有限公司 | Prefabricated assembly type structure's no outrigger construction platform |
CN108756196A (en) * | 2018-08-20 | 2018-11-06 | 中建四局第六建筑工程有限公司 | A kind of assembled architecture main body protective device and its construction method |
CN209066837U (en) * | 2018-09-26 | 2019-07-05 | 中建八局第二建设有限公司 | A kind of combined type construction supporting platform |
CN212478487U (en) * | 2020-03-31 | 2021-02-05 | 王英妮 | Construction platform for building construction |
CN214062435U (en) * | 2020-11-26 | 2021-08-27 | 北京城建北方集团有限公司 | Support system for high-altitude ultra-long cantilever structure |
CN113802862A (en) * | 2021-07-20 | 2021-12-17 | 北京市建筑工程研究院有限责任公司 | Novel platform of unloading with overload alarming function |
CN114033154A (en) * | 2021-12-14 | 2022-02-11 | 中国十七冶集团有限公司 | Clamp type operation hanging basket suspension device and use method thereof |
Non-Patent Citations (1)
Title |
---|
吴志红,陈娟玲,张会: "建筑施工技术 第3版", 31 July 2020, 东南大学出版社, pages: 278 - 279 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115711044A (en) * | 2022-11-14 | 2023-02-24 | 中国五冶集团有限公司 | Integral regularization protector of material platform is changeed to construction elevator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107100358A (en) | Cantilever bracket, frame body and construction method for non-unloading industrialized safety protection | |
CN111255217A (en) | Elevator shaft shaping operation platform and operation method thereof | |
CN113931313B (en) | Construction method of super high-rise core tube horizontal structure | |
CN214653269U (en) | Simple ALC wallboard hoisting equipment | |
CN111236688A (en) | Liftable construction platform for reinforcing circular silo in vitro | |
CN210798252U (en) | Assembled outer protection frame system | |
CN106592962A (en) | Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus | |
CN114704064A (en) | Flow combination construction method for disk-buckle type self-overhanging operation frame and rope net operation frame | |
CN213774554U (en) | Assembled self-control sliding lifting construction unloading platform | |
CN115247498A (en) | Fixed bolster of prefabricated wallboard and contain braced system of this support | |
CN212336672U (en) | I-steel overhanging bearing frame of basket pull rod for constructional engineering | |
CN114809659A (en) | Unloading platform for construction engineering and construction method thereof | |
CN110735530A (en) | external wall steel formwork and internal wall aluminum formwork combination system and operation method thereof | |
CN211949737U (en) | A liftable construction platform for external reinforcement of circular silos | |
CN211923466U (en) | Elevator shaft regularization operation platform | |
CN115182482B (en) | Construction method of prefabricated hollow wall body without outer frame matching | |
CN218623494U (en) | Structure is demolishd to precast concrete cladding panel | |
CN117145200A (en) | Shallow circular bin top cone shell formwork structure and construction process thereof | |
CN110306784A (en) | A kind of aluminum tunnel modular system and its operating method | |
CN114737750A (en) | Construction method for reinforced concrete silo top plate template | |
CN115538678A (en) | Construction method for large-angle overhanging landscape platform side small platform | |
CN115853311A (en) | A method for dismantling and preserving Shikumen historic buildings | |
CN110118014B (en) | Exterior wall template system free of exterior scaffold and construction method thereof | |
CN210659227U (en) | Exterior wall formwork system free of external scaffold | |
CN111608377B (en) | Comprehensive construction method for building overhanging scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20220729 |
|
RJ01 | Rejection of invention patent application after publication |