CN114808709A - A bridge wet joint formwork lifting device - Google Patents
A bridge wet joint formwork lifting device Download PDFInfo
- Publication number
- CN114808709A CN114808709A CN202210324942.XA CN202210324942A CN114808709A CN 114808709 A CN114808709 A CN 114808709A CN 202210324942 A CN202210324942 A CN 202210324942A CN 114808709 A CN114808709 A CN 114808709A
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- lifting device
- bridge
- wet joint
- formwork lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/06—Arrangement, construction or bridging of expansion joints
- E01D19/067—Flat continuous joints cast in situ
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Handcart (AREA)
Abstract
Description
技术领域technical field
本发明涉及建筑技术领域,具体为一种桥梁湿接缝模板提升装置。The invention relates to the technical field of construction, in particular to a bridge wet joint template lifting device.
背景技术Background technique
湿接缝指预应力混凝土梁体分块预制,悬臂拚装成大跨度连续梁,梁体间采用现浇混凝土把梁块连成整体的接缝。Wet joints refer to prestressed concrete beams prefabricated in blocks, cantilevered to form large-span continuous beams, and cast-in-place concrete is used between beams to connect the beams as a whole.
近年来,大力发展装配式环保材料成为了建筑行业新趋势,围绕桥梁湿接缝施工研发一种节工省能,解决施工的工期紧、标准高的建设方案,旨在提高工作效率、缩短生产工期、严控质量指标,鉴于这种情况,发明一种桥梁湿接缝模板提升装置以解决上述问题。In recent years, vigorously developing prefabricated environmental protection materials has become a new trend in the construction industry. Focusing on the construction of bridge wet joints, we have developed a labor-saving and energy-saving construction plan that solves the tight construction period and high standards, aiming to improve work efficiency and shorten production. In view of this situation, a bridge wet joint template lifting device is invented to solve the above problems.
发明内容SUMMARY OF THE INVENTION
(一)解决的技术问题(1) Technical problems solved
针对现有技术的不足,本发明提供了一种桥梁湿接缝模板提升装置,具备高效率,便于组装等优点,解决了不便于拆卸,工作效率低的问题。Aiming at the deficiencies of the prior art, the present invention provides a bridge wet joint template lifting device, which has the advantages of high efficiency, easy assembly and the like, and solves the problems of inconvenient disassembly and low work efficiency.
(二)技术方案(2) Technical solutions
为实现上述高效率,便于组装的目的,本发明提供如下技术方案:一种桥梁湿接缝模板提升装置,包括数量为两个的竖向支撑架,两个所述竖向支撑架相对的一侧均固定连接有连接组件,两个所述竖向支撑架的底部均固定连接有万向轮,两个所述连接组件相对的一侧设置有横向支撑组件,两个所述竖向支撑架的顶部固定连接有防护罩棚,两个所述竖向支撑架的顶部活动连接有插杆,所述插杆的外表面套设有卡箍,所述卡箍的底部固定连接有电动卷扬机;In order to achieve the above-mentioned purpose of high efficiency and easy assembly, the present invention provides the following technical solution: a bridge wet joint template lifting device, comprising two vertical support frames, one of which is opposite to the two vertical support frames. The sides are fixedly connected with connecting components, the bottoms of the two vertical support frames are fixedly connected with universal wheels, the opposite sides of the two connecting components are provided with lateral support components, and the two vertical support frames are A protective hood is fixedly connected to the top of the two vertical support frames, and an insertion rod is movably connected to the top of the two vertical support frames. The outer surface of the insertion rod is sleeved with a clamp, and the bottom of the clamp is fixedly connected with an electric winch;
所述连接组件包括有数量为两个的连接块,两个所述连接块的内部与横向支撑组件活动连接,两个所述连接块的顶部均固定连接有支撑块,两个所述支撑块的外表面活动连接有盖板,两个所述连接块的顶部均固定连接有工作箱,所述工作箱的内壁固定连接有弹簧,所述弹簧远离工作箱的一侧固定连接有活动板,所述活动板远离弹簧的一侧固定连接有卡块,所述活动板远离卡块的一侧固定连接有拉杆。The connecting assembly includes two connecting blocks, the interiors of the two connecting blocks are movably connected with the lateral support assembly, the tops of the two connecting blocks are fixedly connected with support blocks, and the two support blocks are A cover plate is movably connected to the outer surface of the two connecting blocks, a working box is fixedly connected to the top of the two connecting blocks, a spring is fixedly connected to the inner wall of the working box, and a movable plate is fixedly connected to the side of the spring away from the working box, A clamping block is fixedly connected to the side of the movable plate away from the spring, and a pull rod is fixedly connected to the side of the movable plate away from the clamping block.
优选的,所述横向支撑组件包括有横杆,所述横杆底部的左右两侧均固定连接有连接片,两个所述连接片的外表面均活动连接有撑杆,两个所述竖向支撑架相对的一侧均固定连接有固定块,两个所述撑杆远离连接片的一端位于固定块的内部,所述固定块与撑杆的内部活动连接有螺栓,所述横杆的外表面固定连接有绑带。Preferably, the transverse support assembly includes a transverse rod, the left and right sides of the bottom of the transverse rod are fixedly connected with connecting pieces, the outer surfaces of the two connecting pieces are movably connected with struts, and the two vertical A fixing block is fixedly connected to the opposite side of the support frame, one end of the two struts away from the connecting piece is located inside the fixing block, the fixing block is movably connected with the inside of the strut The outer surface is fixedly connected with a strap.
优选的,所述工作箱的数量为四个,且工作箱以两个为一组的方式分别分布在两个连接块的顶部。Preferably, the number of the working boxes is four, and the working boxes are distributed on top of the two connecting blocks in a group of two.
优选的,所述绑带的底部固定连接有固定带,所述固定带的底部固定连接有魔术贴。Preferably, a fixing strap is fixedly connected to the bottom of the strap, and a Velcro is fixedly connected to the bottom of the fixing strap.
优选的,所述万向轮的数量为四个,且分别分布在两个支撑架的底部,所述万向轮为刹车万向脚轮。Preferably, the number of the universal wheels is four, and they are respectively distributed on the bottom of the two support frames, and the universal wheels are brake universal casters.
优选的,所述卡箍的数量为两个,且均匀分布在电动卷扬机的顶部,所述卡箍的底部与电动卷扬机的顶部焊接。Preferably, the number of the clamps is two, which are evenly distributed on the top of the electric winch, and the bottom of the clamp is welded with the top of the electric winch.
优选的,所述横向支撑组件的数量为三个,且每个横向支撑组件顶部的左右两侧均设置的连接组件数量为两个。Preferably, the number of the lateral support assemblies is three, and the number of connection assemblies disposed on the left and right sides of the top of each lateral support assembly is two.
优选的,所述电动卷扬机位于插杆的中心,所述竖向支撑架的顶部与防护罩棚通过螺栓固定连接。Preferably, the electric hoist is located at the center of the insertion rod, and the top of the vertical support frame is fixedly connected to the protective cover by bolts.
优选的,所述撑杆的数量为六个,且六个撑杆的长度相同。Preferably, the number of the struts is six, and the lengths of the six struts are the same.
(三)有益效果(3) Beneficial effects
与现有技术相比,本发明提供了一种桥梁湿接缝模板提升装置,具备以下有益效果:Compared with the prior art, the present invention provides a bridge wet joint template lifting device, which has the following beneficial effects:
该桥梁湿接缝模板提升装置,通过竖向支撑架与横向支撑组件通过连接组件进行固定,从而起到了便于拼接,拆卸快捷的作用,在不适用时,也方便将其进行拆卸存放,移动式组装型装置,转场工地方便,电动卷扬机通过卡箍与插杆连接,从而可利用该装置来调节电动卷扬机与结构物之间的距离,来调节高度,有效的解决了死角部位无法提升的问题。The bridge wet joint formwork lifting device is fixed by the vertical support frame and the horizontal support assembly through the connecting assembly, so as to facilitate splicing and quick disassembly. When not applicable, it is also convenient to disassemble and store. The assembly type device is convenient for transferring the construction site. The electric hoist is connected with the insertion rod through the clamp, so that the distance between the electric hoist and the structure can be adjusted by this device, and the height can be adjusted, which effectively solves the problem that the dead corner cannot be lifted. .
附图说明Description of drawings
图1为本发明提出的一种桥梁湿接缝模板提升装置结构示意图;1 is a schematic structural diagram of a bridge wet joint template lifting device proposed by the present invention;
图2为本发明提出的一种桥梁湿接缝模板提升装置图1中A部局部结构放大图;Fig. 2 is an enlarged view of the partial structure of part A in Fig. 1 of a bridge wet joint formwork lifting device proposed by the present invention;
图3为本发明提出的一种桥梁湿接缝模板提升装置中连接块与盖板连接结构俯视图;Fig. 3 is a top view of the connection structure between the connecting block and the cover plate in a bridge wet joint formwork lifting device proposed by the present invention;
图4为本发明提出的一种桥梁湿接缝模板提升装置中固定块与撑杆连接结构俯视图。FIG. 4 is a top view of the connection structure between the fixed block and the strut in a bridge wet joint formwork lifting device proposed by the present invention.
图中:1竖向支撑架、2连接组件、201连接块、202支撑块、203盖板、 204工作箱、205弹簧、206活动板、207卡块、208拉杆、3万向轮、4支撑组件、401横杆、402连接片、403撑杆、404固定块、405螺栓、406绑带、 5防护罩棚、6插杆、7卡箍、8电动卷扬机。In the picture: 1 vertical support frame, 2 connection components, 201 connection block, 202 support block, 203 cover plate, 204 work box, 205 spring, 206 movable plate, 207 block, 208 pull rod, 3 universal wheel, 4 support Components, 401 cross bar, 402 connecting piece, 403 strut, 404 fixing block, 405 bolt, 406 strap, 5 protective cover, 6 insert rod, 7 clamp, 8 electric winch.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
请参阅图1-4,一种桥梁湿接缝模板提升装置,包括数量为两个的竖向支撑架1,两个竖向支撑架1相对的一侧均固定连接有连接组件2,两个竖向支撑架1的底部均固定连接有万向轮3,万向轮3的数量为四个,且分别分布在两个支撑架1的底部,万向轮3为刹车万向脚轮,便于将其进行固定和移动,提高工作使用效率,两个连接组件2相对的一侧设置有横向支撑组件4,横向支撑组件4的数量为三个,且每个横向支撑组件4顶部的左右两侧均设置的连接组件2数量为两个,两个竖向支撑架1的顶部固定连接有防护罩棚5,两个竖向支撑架1的顶部活动连接有插杆6,插杆6的外表面套设有卡箍7,卡箍7的底部固定连接有电动卷扬机8,卡箍7的数量为两个,且均匀分布在电动卷扬机8的顶部,电动卷扬机8位于插杆6的中心,竖向支撑架1的顶部与防护罩棚5通过螺栓固定连接,卡箍7的底部与电动卷扬机8的顶部焊接,可利用卡箍7便于将电动卷扬机8固定在插杆6上,从而起到了便于拼装的作用。Please refer to Figure 1-4, a bridge wet joint formwork lifting device, including two vertical support frames 1, two vertical support frames 1 are fixedly connected to the opposite sides with connecting components 2, two The bottom of the vertical support frame 1 is fixedly connected with universal wheels 3, and the number of universal wheels 3 is four, and they are distributed at the bottom of the two support frames 1 respectively. It is fixed and moved to improve work efficiency. The opposite side of the two connecting assemblies 2 is provided with
竖向支撑架1与横向支撑组件4通过连接组件2进行固定,从而起到了便于拼接,拆卸快捷的作用,在不适用时,也方便将其进行拆卸存放,移动式组装型装置,转场工地方便,电动卷扬机8通过卡箍7与插杆6连接,从而可利用该装置来调节电动卷扬机8与结构物之间的距离,来调节高度,有效的解决了死角部位无法提升的问题。The vertical support frame 1 and the
横向支撑组件4包括有横杆401,横杆401底部的左右两侧均固定连接有连接片402,两个连接片402的外表面均活动连接有撑杆403,撑杆403的数量为六个,且六个撑杆403的长度相同,两个竖向支撑架1相对的一侧均固定连接有固定块404,两个撑杆403远离连接片402的一端位于固定块404的内部,固定块404与撑杆403的内部活动连接有螺栓405,横杆401的外表面固定连接有绑带406,绑带406的底部固定连接有固定带,固定带的底部固定连接有魔术贴,当拆卸需要收纳时,转动撑杆403,可通过固定带上的魔术贴将撑杆403围绕一圈,从而便于将撑杆403进行固定收纳。The
横杆401通过连接片402与撑杆403活动连接,从而转动撑杆403,使撑杆403移动到固定块404中,由于固定块404与撑杆403的内部活动连接有螺栓405,从而可通过螺栓405便于将撑杆403和固定块404进行安装,使横杆401形成三角稳定,并且在拆卸后,转动撑杆403,可利用绑带406将转动撑杆403进行固定,从而起到了便于收纳,便于运输的作用。The
其中,连接组件2包括有数量为两个的连接块201,两个连接块201的内部与横向支撑组件4活动连接,两个连接块201的顶部均固定连接有支撑块 202,两个支撑块202的外表面活动连接有盖板203,两个连接块201的顶部均固定连接有工作箱204,工作箱204的数量为四个,且工作箱204以两个为一组的方式分别分布在两个连接块201的顶部,工作箱204的内壁固定连接有弹簧205,弹簧205远离工作箱204的一侧固定连接有活动板206,活动板206远离弹簧205的一侧固定连接有卡块207,活动板206远离卡块207的一侧固定连接有拉杆208。Wherein, the connecting assembly 2 includes two connecting
通过横向支撑组件4中的横杆401插入连接块201的内部,转动盖板203,使盖板203与连接块201的顶部贴合,通过工作箱204的内壁通过弹簧205 与活动板206连接,从而可带动活动板206上的卡块207复位,使卡块207 位于盖板203的上方,从而将盖板203卡住,有效的防止横杆401在受到撞击力时从连接块201中移动出,增加了装置拼接的安全性。Insert the
综上,该桥梁湿接缝模板提升装置,通过竖向支撑架1与横向支撑组件4 通过连接组件2进行固定,从而起到了便于拼接,拆卸快捷的作用,在不适用时,也方便将其进行拆卸存放,移动式组装型装置,转场工地方便,电动卷扬机8通过卡箍7与插杆6连接,从而可利用该装置来调节电动卷扬机8 与结构物之间的距离,来调节高度,有效的解决了死角部位无法提升的问题。In summary, the bridge wet joint formwork lifting device is fixed by the vertical support frame 1 and the
并且,通过横向支撑组件4中的横杆401插入连接块201的内部,转动盖板203,使盖板203与连接块201的顶部贴合,通过工作箱204的内壁通过弹簧205与活动板206连接,从而可带动活动板206上的卡块207复位,使卡块207位于盖板203的上方,从而将盖板203卡住,有效的防止横杆401 在受到撞击力时从连接块201中移动出,增加了装置拼接的安全性,横杆401 通过连接片402与撑杆403活动连接,从而转动撑杆403,使撑杆403移动到固定块404中,由于固定块404与撑杆403的内部活动连接有螺栓405,从而可通过螺栓405便于将撑杆403和固定块404进行安装,使横杆401形成三角稳定,在拆卸后,转动撑杆403,可利用绑带406将转动撑杆403进行固定,从而起到了便于收纳,便于运输的作用。In addition, insert the
需要说明的是,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that the terms "comprising", "comprising" or any other variation thereof are intended to encompass a non-exclusive inclusion such that a process, method, article or device comprising a series of elements includes not only those elements, but also no Other elements expressly listed, or which are also inherent to such a process, method, article or apparatus. Without further limitation, an element qualified by the phrase "comprising a..." does not preclude the presence of additional identical elements in a process, method, article or apparatus that includes the element.
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, and substitutions can be made in these embodiments without departing from the principle and spirit of the invention and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210324942.XA CN114808709A (en) | 2022-03-30 | 2022-03-30 | A bridge wet joint formwork lifting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210324942.XA CN114808709A (en) | 2022-03-30 | 2022-03-30 | A bridge wet joint formwork lifting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN114808709A true CN114808709A (en) | 2022-07-29 |
Family
ID=82532546
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202210324942.XA Pending CN114808709A (en) | 2022-03-30 | 2022-03-30 | A bridge wet joint formwork lifting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN114808709A (en) |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN205312918U (en) * | 2016-01-19 | 2016-06-15 | 郑州市华中路桥设备有限公司 | Portal frame changes outfit |
| CN209194970U (en) * | 2018-12-07 | 2019-08-02 | 中国建筑第二工程局有限公司 | Detachable vertical well lift platform of superelevation layer |
| CN111236628A (en) * | 2020-03-12 | 2020-06-05 | 广西建工集团冶金建设有限公司 | A lattice type sliding form lifting frame |
| CN111501570A (en) * | 2020-05-08 | 2020-08-07 | 黑龙江省龙建路桥第三工程有限公司 | Automatic adjusting and supporting die frame for small-span arch bridge |
| CN111731988A (en) * | 2020-07-07 | 2020-10-02 | 中国建筑第四工程局有限公司 | A kind of lifting installation method and device of T beam wet joint formwork |
| WO2021000290A1 (en) * | 2019-07-03 | 2021-01-07 | 广州五羊建设机械有限公司 | Construction method for integral lifting of l-shaped bidirectional cantilever structure |
| CN112249927A (en) * | 2020-10-29 | 2021-01-22 | 杭州优图工业设计有限公司 | Mechanical equipment is with playing gallows convenient to equipment |
| CN215593695U (en) * | 2021-06-17 | 2022-01-21 | 中建七局交通建设有限公司 | Adjustable bridge wet joint template lifting device |
-
2022
- 2022-03-30 CN CN202210324942.XA patent/CN114808709A/en active Pending
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN205312918U (en) * | 2016-01-19 | 2016-06-15 | 郑州市华中路桥设备有限公司 | Portal frame changes outfit |
| CN209194970U (en) * | 2018-12-07 | 2019-08-02 | 中国建筑第二工程局有限公司 | Detachable vertical well lift platform of superelevation layer |
| WO2021000290A1 (en) * | 2019-07-03 | 2021-01-07 | 广州五羊建设机械有限公司 | Construction method for integral lifting of l-shaped bidirectional cantilever structure |
| CN111236628A (en) * | 2020-03-12 | 2020-06-05 | 广西建工集团冶金建设有限公司 | A lattice type sliding form lifting frame |
| CN111501570A (en) * | 2020-05-08 | 2020-08-07 | 黑龙江省龙建路桥第三工程有限公司 | Automatic adjusting and supporting die frame for small-span arch bridge |
| CN111731988A (en) * | 2020-07-07 | 2020-10-02 | 中国建筑第四工程局有限公司 | A kind of lifting installation method and device of T beam wet joint formwork |
| CN112249927A (en) * | 2020-10-29 | 2021-01-22 | 杭州优图工业设计有限公司 | Mechanical equipment is with playing gallows convenient to equipment |
| CN215593695U (en) * | 2021-06-17 | 2022-01-21 | 中建七局交通建设有限公司 | Adjustable bridge wet joint template lifting device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108316477B (en) | The connection structure and construction method of the mid-node between the flat steel tube concrete column and the steel beam | |
| WO2022016899A1 (en) | Quick-assembly and quick-disassembly formwork system of building ribbed structure, and construction process therefor | |
| CN103774838B (en) | A kind of construction of lift well assembling safe operation platform and using method | |
| CN114808709A (en) | A bridge wet joint formwork lifting device | |
| CN216997320U (en) | Prefabricated T roof beam template dismouting hoist | |
| CN206143781U (en) | Concrete column cap reinforcing bar protection casing | |
| CN216552610U (en) | Cast-in-place area of assembled superimposed sheet hangs mould device can have enough to meet need | |
| CN221168615U (en) | A mobile cantilever frame quick-detachable trolley | |
| CN111688009A (en) | Building maintenance spray set for construction | |
| CN204149320U (en) | The producing device of steel bar framework of box beam | |
| CN209835533U (en) | Lifting device for be used for building mould shell transport | |
| CN209469000U (en) | Truss and truss aluminium alloy tunnel form for aluminum alloy mould plate | |
| CN207245599U (en) | A kind of regularization assembled gate | |
| CN223241055U (en) | Building facade renewal equipment | |
| CN211596310U (en) | Temporary construction platform for surface finishing in garden road construction process | |
| CN223983942U (en) | Movable platform frame for construction maintenance operation of overpass | |
| CN207553651U (en) | A kind of support device for the composite beam construction stage | |
| CN208163928U (en) | A kind of producing device of stiffened column | |
| CN218059763U (en) | A detachable transitional connection device for the connection of the basement post-casting belt | |
| CN218541500U (en) | Supporting structure | |
| CN206000188U (en) | Rim of a cup basis steel column installs perpendicularity adjustment holding device | |
| CN218489667U (en) | A small plate transfer device | |
| CN221143222U (en) | High-strength early-strength prefabricated part | |
| CN221894559U (en) | Lifting device for building construction | |
| CN218090403U (en) | A tool for handling and installing precast concrete curbs |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20220729 |