CN114776040A - External wall insulation board installation construction mechanism for building - Google Patents

External wall insulation board installation construction mechanism for building Download PDF

Info

Publication number
CN114776040A
CN114776040A CN202210456080.6A CN202210456080A CN114776040A CN 114776040 A CN114776040 A CN 114776040A CN 202210456080 A CN202210456080 A CN 202210456080A CN 114776040 A CN114776040 A CN 114776040A
Authority
CN
China
Prior art keywords
frame
movable
seat
insulation board
wall insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210456080.6A
Other languages
Chinese (zh)
Other versions
CN114776040B (en
Inventor
周青
李向波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongantai New Material Technology Co ltd
Original Assignee
Hongantai New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongantai New Material Technology Co ltd filed Critical Hongantai New Material Technology Co ltd
Priority to CN202210456080.6A priority Critical patent/CN114776040B/en
Publication of CN114776040A publication Critical patent/CN114776040A/en
Application granted granted Critical
Publication of CN114776040B publication Critical patent/CN114776040B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/003Devices for storing material on the scaffold
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to the technical field of heat preservation plate installation, and particularly discloses an external wall heat preservation plate installation and construction mechanism for a building, which comprises a moving frame, wherein two ends of the top of the moving frame are respectively provided with a holding rod, the top of the moving frame is provided with a platform through an arranged lifting mechanism, the top of the platform is provided with a fence frame, a fixed frame is fixedly arranged below one side of the platform, two ends of the bottom of the fixed frame are respectively provided with a reinforcing mechanism, two ends of the inner side of the fixed frame are respectively provided with a movable plate in a sliding manner, one ends of the two movable plates, which are far away from the fixed frame, are jointly provided with a movable frame, the movable frames jointly slide on the outer side of the reinforcing mechanism, and two sides of the fixed frame are respectively provided with a furling mechanism. The heated board can be fixed before rubber coating and binding, has promoted the steadiness.

Description

External wall insulation board installation construction mechanism for building
Technical Field
The invention relates to the technical field of insulation board installation, and particularly discloses an external wall insulation board installation and construction mechanism for a building.
Background
The outer wall heat-insulating board is also called a horizontal line building outer wall decoration integrated board. The external wall insulation board is compounded by polymer mortar, glass fiber mesh cloth, flame-retardant molded polystyrene foam board (EPS) or extruded sheet (XPS) and other materials, and integrates functions of the external wall insulation board. The material is a preferred material for meeting the energy-saving requirement of the current house buildings and improving the heat-insulating level of the external walls of industrial and civil buildings, and is also a preferred material for energy-saving reconstruction of the existing buildings. The coating is used for high-rise outer walls, inner markets and industrial equipment, and has the advantages of low manufacturing cost, good effect, corrosion resistance and no pollution.
When the building construction, generally all be that the installer stands on the work frame, then bind at the wall of building, at this in-process, the later stage needs someone at ground supply panel, this working procedure not only installs panel inefficiency and delivers panel also comparatively wastes time and energy, secondly, be in outdoors, need artifically fix panel when binding panel, the installer need manual work fixed panel for a long time, just can ensure can not lead to the problem that panel shifted because of the reason of strong wind in the installation, it is especially inconvenient to install, therefore, we need improve it.
Disclosure of Invention
The invention aims to solve the defects in the background technology and provides an installation and construction mechanism of an external wall insulation board for a building.
In order to achieve the above purposes, the invention provides an installation and construction mechanism of an external wall insulation board for a building, which comprises a movable frame, wherein two ends of the top of the movable frame are respectively provided with a holding rod, the top of the movable frame is provided with a platform through an arranged lifting mechanism, the top of the platform is provided with a fence frame, a fixed frame is fixedly arranged at the lower position of one side of the platform, two ends of the bottom of the fixed frame are respectively provided with a reinforcing mechanism, two ends of the inner side of the fixed frame are respectively provided with a movable plate in a sliding manner, one ends of the two movable plates, which are far away from the fixed frame, are jointly provided with a movable frame, the movable frames jointly slide at the outer side of the reinforcing mechanism, two sides of the fixed frame are respectively provided with a furling mechanism, the end parts of the furling mechanisms are respectively connected with a connecting seat, one ends of the connecting seats, which are far away from the furling mechanisms, are provided with supporting plates, a transverse plate is clamped between the supporting plates, and one end, which is close to the fixed frame, is provided with a notch, the fence frame is far away from mount one end outside slidable mounting and has the removal seat, remove seat one side outer wall and be close to the top position and be provided with adjustment mechanism.
Preferably, elevating system is including the machine of lifting of respectively fixed mounting in removal frame top corner, four groups the flexible end of machine of lifting is connected the bottom at the platform jointly.
Preferably, the reinforcing mechanism includes all installing the perpendicular roof beam in mount bottom one end, erect the roof beam inboard and seted up the spout, the inside slidable mounting of spout has the slider, slider and adjustable shelf bottom fixed connection, it is provided with clamping mechanism to erect roof beam one side.
Preferably, the clamping mechanism comprises a plurality of groups of limiting holes formed in the surface of one side of the vertical beam, the position, close to the edge, of the inner side of the movable frame is movably inserted with a limiting bolt, and the end part of the limiting bolt is movably inserted into one group of limiting holes.
Preferably, draw in the mechanism and all include that fixed mounting is outside and be close to the L shape pole of top position in mount one side, mount one end top fixed mounting has the motor is kept away from to L shape pole, motor output fixed mounting has the spool, the outside winding of spool has wire rope, wire rope keeps away from the one end fixed mounting of spool and has the lifting hook, the lifting hook inboard is provided with the dead lever, dead lever fixed connection is in the outside of connecting seat.
Preferably, adjustment mechanism includes the fixing base of fixed mounting at removal seat top, fixing base outside top position is rotated and is installed the mount, the mount bottom is provided with the moving mechanism, the outside fixed mounting of one end that the fixing base was kept away from to the mount has the second pneumatic cylinder, the flexible end rotation of second pneumatic cylinder is installed the horizontal pole, the one end that the second pneumatic cylinder was kept away from to the horizontal pole is provided with laminating mechanism.
Preferably, the movable mechanism comprises a first hydraulic cylinder rotatably installed at the bottom of the frame seat, a supporting seat is rotatably installed at the bottom of the first hydraulic cylinder, and the outer wall of one side of the supporting seat is fixedly connected with the outer wall of the moving seat.
Preferably, laminating mechanism includes many spinal branchs vaulting pole that second pneumatic cylinder one end outer wall was kept away from to fixed mounting at the horizontal pole, many the sucking disc is all installed to the vaulting pole tip.
Preferably, a groove is formed in the middle of the inner side of the moving seat, a sleeve is vertically arranged in the groove, a movable rod is slidably arranged on the inner side of the sleeve, a clamping seat is fixedly arranged at one end, far away from the sleeve, of the movable rod, an anti-slip sleeve is arranged on the inner side of the clamping seat, and the anti-slip sleeve is movably sleeved on the outer side of the fence frame.
Compared with the prior art, the invention has the following beneficial effects:
1. through set up elevating system at removal frame top, accessible elevating system lifts the platform to this is convenient for adjust the platform, satisfies outdoor installation external wall insulation board's high needs.
2. Through the adjustable shelf that sets up mount and adjustable removal in one side of platform, can conveniently supply external wall insulation board in the installation, before at every turn the installation, can be in batches place the surface at adjustable shelf and mount with external wall insulation board, thereby make things convenient for the later stage to supply with, and the adjustable shelf passes through the setting of movable plate, can be according to external wall insulation board's different width, shift the regulation, and the perpendicular roof beam that the mount bottom set up, the stable effect of mount and adjustable shelf has been promoted, the external wall insulation board that lifts to the batchization carries out stabilizing support.
3. Through the adjustment mechanism who sets up, can conveniently fix external wall insulation board from one end surface in the installation, from this comes installer can carry out the rubber coating in the outside fast and bound the corner, and even if outdoor have strong wind also can not cause external wall insulation board aversion to rock the circumstances such as appear, and the installation of easy installer uses labour saving and time saving.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the connection between the fixing frame and the folding mechanism of the present invention;
FIG. 3 is a schematic view of a detachable structure between a fixed frame and a movable frame according to the present invention;
FIG. 4 is another schematic view of the detachable structure between the fixed frame and the movable frame according to the present invention;
FIG. 5 is a schematic view of an adjustment mechanism according to the present invention;
FIG. 6 is a schematic view of the structure of the groove of the movable base according to the present invention.
In the figure: 1. a movable frame; 2. a platform; 3. a lifter; 4. a support rod; 5. a motor; 6. a fence frame; 7. a first hydraulic cylinder; 8. a supporting seat; 9. a fixed seat; 10. a frame seat; 11. a second hydraulic cylinder; 12. a suction cup; 13. a fixed mount; 14. an L-shaped rod; 15. a wire rope; 16. fixing the rod; 17. a connecting seat; 18. a vertical beam; 19. a supporting plate; 20. a movable frame; 21. a limiting hole; 22. moving the plate; 23. a limit bolt; 24. a slider; 25. a sleeve; 26. a movable seat; 27. a cross bar; 28. a support bar; 29. a card holder; 30. a movable rod.
Detailed Description
In order that the above objects, features and advantages of the present invention can be more clearly understood, a more particular description of the invention will be rendered by reference to the appended drawings.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced otherwise than as specifically described herein and, therefore, the present invention is not limited to the specific embodiments disclosed below.
As shown in fig. 1-6, the construction mechanism for installing the external wall insulation board for the building comprises a moving frame 1, wherein two ends of the top of the moving frame 1 are respectively provided with a holding rod 4, the holding rods 4 can be used for driving the moving frame 1 to flexibly move, the moving frame 1 is conveniently pushed, and pulleys at the bottom of the moving frame 1 are respectively provided with a universal wheel with a brake mechanism.
Remove 1 top of frame and be provided with platform 2 through the elevating system who sets up, fence frame 6 is installed at 2 tops of platform, elevating system includes the machine of lifting 3 of difference fixed mounting in removing 1 top corner, the flexible end of machine of lifting 3 of four groups connects the bottom at platform 2 jointly, through the machine of lifting 3 that sets up, can be convenient for lift platform 2 at removal 1 top, with this satisfy when outdoor installation, lift the staff, thereby carry out the installation of outer wall insulation board, the machine of lifting 3 adopts fluid pressure type lifting means to use, fence frame 6 can ensure that the installer stands when the operation on 2 surfaces of platform, protect.
2 one side below position fixed mounting of platform has mount 13, mount 13 bottom both ends all are provided with reinforcing mechanism, the equal slidable mounting in mount 13 inboard both ends has movable plate 22, the one end that mount 13 was kept away from to two movable plates 22 is installed jointly the adjustable shelf 20, adjustable shelf 20 slides jointly in reinforcing mechanism's the outside, reinforcing mechanism is including all installing perpendicular roof beam 18 in mount 13 bottom one end, erect 18 inboard sides of roof beam and seted up the spout, the inside slidable mounting of spout has slider 24, slider 24 and 20 bottom fixed connection of adjustable shelf, it is provided with clamping mechanism to erect 18 one side of roof beam, clamping mechanism is including seting up the spacing hole 21 of multiunit at perpendicular 18 side surface of roof beam, the inboard border department activity cartridge that is close to of adjustable shelf 20 has spacing bolt 23, and spacing bolt 23 tip activity alternates in the inside of one of them a set of spacing hole 21.
Can be convenient for cooperate the use with adjustable shelf 20 in one side through setting up mount 13, adjustable shelf 20 passes through the setting of movable plate 22, and be sliding connection between the mount 13, the external wall insulation board that has just satisfied different width from this uses, when piling up external wall insulation board, earlier stretch the position of adjustable shelf 20 from the one end of mount 13 to the outside, until reaching the distance that can put into external wall insulation board easily after, pass spacing bolt 23 from adjustable shelf 20 inboard, then the tip screw in is to corresponding in the spacing hole 21 on the perpendicular roof beam 18, can be spacing with adjustable shelf 20, alright at this moment in batches with external wall insulation board mat formation, then along with platform 2's removal, together remove, install that perpendicular roof beam 18 in the bottom of mount 13 can promote adjustable shelf 20 and the holistic stability of mount 13 in one end.
Mount 13 both sides all are provided with the mechanism of drawing in, the tip of the mechanism of drawing in all is connected with connecting seat 17, connecting seat 17 is kept away from the one end of the mechanism of drawing in and is installed fagging 19, the diaphragm has clamped between fagging 19, the mechanism of drawing in all includes that fixed mounting is outside and be close to the L shape pole 14 of top position in mount 13 one side, 13 one end top fixed mounting of mount has motor 5 is kept away from to L shape pole 14, motor 5 output end fixed mounting has the spool, the outside winding of spool has wire rope 15, wire rope 15 keeps away from the one end fixed mounting of spool and has the lifting hook, the lifting hook inboard is provided with dead lever 16, dead lever 16 fixed connection is in the outside of connecting seat 17.
Through the connecting seat 17 that sets up, fagging 19, the diaphragm, can lift the external wall insulation board that is close to mount 13 and adjustable shelf 20 bottom, make the installer of standing on platform 2, the external wall insulation board of bottom of taking that can be light, safety and convenience have been provided under this basis, after connecting external power source through the motor 5 that sets up, the drive spool rotates, the spool drives outside wire rope 15 and draws in, lifting hook and dead lever 16 that wire rope 15 connects, can be with fagging 19, the diaphragm is hoisted, automatic lift the external wall insulation board.
The one end that fence frame 6 is close to mount 13 is seted up jaggedly, fence frame 6 is kept away from mount 13 one end outside slidable mounting and is removed seat 26, it is provided with adjustment mechanism to remove seat 26 one side outer wall and be close to the top position, adjustment mechanism includes fixed mounting and removes the fixing base 9 at 26 tops, 9 outside top positions of fixing base rotate and install frame seat 10, frame seat 10 bottom is provided with the moving mechanism, the outside fixed mounting of one end that fixing base 9 was kept away from to frame seat 10 has second pneumatic cylinder 11, 11 flexible ends of second pneumatic cylinder rotate and install horizontal pole 27, the one end that second pneumatic cylinder 11 was kept away from to horizontal pole 27 is provided with laminating mechanism.
Can conveniently slide the use in the outside of rail frame 6 through the removal seat 26 that sets up, do not promote in certain area and remove frame 1, also can shift, can be at bottom sprag frame seat 10 through the fixing base 9 that sets up, second hydraulic cylinder 11 can drive horizontal pole 27 and keep away from each other or be close to each other, cause to locate the flexible removal of drive horizontal pole 27 adaptation at platform 2, from one end regulation and the outer wall insulation board between the interval.
The movable mechanism comprises a first hydraulic cylinder 7 which is rotatably installed at the bottom of the frame seat 10, a supporting seat 8 is rotatably installed at the bottom of the first hydraulic cylinder 7, the outer wall of one side of the supporting seat 8 is fixedly connected with the outer wall of the moving seat 26, and the supporting seat 8 can be used by controlling the frame seat 10 to be turned over up and down under the first hydraulic cylinder 7, so that the requirements of users are met.
Laminating mechanism includes many spinal branch vaulting poles 28 that fixed mounting kept away from 11 one end outer walls of second pneumatic cylinder at horizontal pole 27, and sucking disc 12 is all installed to many spinal branch vaulting pole 28 tip, and many spinal branch vaulting poles 28 can be convenient for install the outside at horizontal pole 27 with multiunit sucking disc 12, and multiunit sucking disc 12 all adopts the silica gel material preparation to form, can fully laminate heat preservation side fascia.
It is fluted to remove to set up in the middle of 26 inboards of seat, the inside vertical sleeve 25 of installing of recess, the inboard slidable mounting of sleeve 25 has movable rod 30, sleeve 25's one end fixed mounting is kept away from to movable rod 30 has cassette 29, antiskid cover is installed to cassette 29 inboard, antiskid cover activity suit is in the outside of rail frame 6, but through the movable rod 30 slidable connection who sets up in sleeve 25's inside, movable rod 30 and cassette 29 are upwards tensile, then put down alright the dress in the outside of rail frame 6, rail frame 6 adopts multiunit stock and quarter butt to constitute, specifically clamp the outside at the stock, the area of contact between antiskid cover can strengthen and the stock, increase frictional resistance, with this purpose that reaches spacing removal seat 26.
Working principle; when the device is used, firstly, the movable frame 20 is stretched from one end according to the width of the external wall insulation board, the movable frame 20 can stably slide on the inner side of the fixed frame 13 under the connection of the vertical beam 18 and the movable plate 22, after the movable frame 20 is adjusted, the limit bolts 23 are correspondingly inserted into the inner sides of the movable frame 20 from two ends, and the end parts penetrate into the corresponding limit holes 21, so as to limit the movable frame 20, at the moment, the external wall insulation boards can be flatly laid in the movable frame 20 and the fixed frame 13 in batches, the external wall insulation boards at the bottom are attached to the surfaces of the transverse boards, when the lifting platform 2 of the lifting machine 3 moves, a plurality of external wall insulation boards can be supplied at the inner sides of the fixed frame 13 and the movable frame 20 at the later stage, thereby reducing the workload of ground personnel delivery, saving time and labor, installers standing on the surface of the platform 2 can control the motor 5 to drive the wire rope 15 to rotate, in the process of rotating and drawing in the steel wire rope 15, a lifting hook and a fixed rod 16 which are connected to the end part of the steel wire rope 15 and a connecting seat 17 can lift a transverse plate between two supporting plates 19 from two ends, so that an external wall insulation board which is not easy to take and is close to the inner lower part of the fixed frame 13 and the movable frame 20 can be quickly lifted to the upper parts of the fixed frame 13 and the movable frame 20, an installer can easily take the external wall insulation board close to the bottom in a standing state, convenience is provided for an installer standing on the surface of the platform 2 to a certain extent, meanwhile, safety is improved, when the external wall insulation board is bound, the installer pastes the external wall insulation board to a framework outside a building, the first hydraulic cylinder 7 and the second hydraulic cylinder 11 adjust the position of the transverse rod 27 according to the distance, and a plurality of groups of suction cups 12 on one side of the transverse rod 27 can assist the installer to attach and fix the external wall insulation board at one end, therefore, the installer can quickly and effectively bind and glue the external wall insulation board, and the stability is effectively improved.
In the present invention, the terms "mounting", "connecting", "fixing" and the like are used in a broad sense, for example, "connecting" may be a fixed connection, a detachable connection, or an integral connection; may be directly connected or indirectly connected through an intermediate. The specific meanings of the above terms in the present invention can be understood according to specific situations by those of ordinary skill in the art.
In the description herein, the appearances of the phrase "one embodiment," "some embodiments," "a specific embodiment," or the like, in various places in the specification are intended to mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are merely illustrative of the principles of the invention, but various changes and modifications may be made without departing from the spirit and scope of the invention, which is defined by the appended claims. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (9)

1. The utility model provides an external wall insulation board construction and installation mechanism for building, includes and removes frame (1), its characterized in that, handrail (4) are all installed at removal frame (1) top both ends, removal frame (1) top is provided with platform (2) through the elevating system who sets up, fence frame (6) are installed at platform (2) top, platform (2) one side below position fixed mounting has mount (13), mount (13) bottom both ends all are provided with reinforcing mechanism, mount (13) inboard both ends all slidable mounting have movable plate (22), two movable plate (22) keep away from the one end of mount (13) and install adjustable shelf (20) jointly, adjustable shelf (20) slide in reinforcing mechanism's the outside jointly, mount (13) both sides all are provided with draws in the mechanism, the tip that draws in the mechanism in all is connected with connecting seat (17), one end of the connecting seat (17) far away from the furling mechanism is provided with a supporting plate (19), a transverse plate is clamped between the supporting plates (19), one end of the fence frame (6) close to the fixing frame (13) is provided with a notch, the fence frame (6) far away from the outer side of one end of the fixing frame (13) is provided with a moving seat (26) in a sliding manner, and the outer wall of one side of the moving seat (26) is provided with an adjusting mechanism close to the upper position.
2. The exterior wall insulation board installation and construction mechanism for the building according to claim 1, wherein the lifting mechanism comprises lifting machines (3) respectively fixedly installed at the corners of the top of the movable frame (1), and the four groups of telescopic ends of the lifting machines (3) are connected to the bottom of the platform (2) together.
3. The mounting and construction mechanism for the external wall insulation board for the building according to claim 1, wherein the reinforcing mechanism comprises vertical beams (18) which are all mounted at one end of the bottom of the fixed frame (13), sliding grooves are formed in the inner sides of the vertical beams (18), sliding blocks (24) are slidably mounted in the sliding grooves, the sliding blocks (24) are fixedly connected with the bottom of the movable frame (20), and a clamping mechanism is arranged on one side of each vertical beam (18).
4. The mounting and construction mechanism for the external wall insulation board for the building according to claim 3, characterized in that the clamping mechanism comprises a plurality of sets of limiting holes (21) formed in one side surface of the vertical beam (18), a limiting bolt (23) is movably inserted at a position close to the edge of the inner side of the movable frame (20), and the end part of the limiting bolt (23) is movably inserted in one set of limiting holes (21).
5. The mounting and construction mechanism of the external wall insulation board for the building according to claim 1, wherein the folding mechanisms each comprise an L-shaped rod (14) fixedly mounted on an outer portion of one side of the fixing frame (13) and close to an upper position, the top of one end, away from the fixing frame (13), of the L-shaped rod (14) is fixedly mounted with a motor (5), an output end of the motor (5) is fixedly mounted with a bobbin, a steel wire rope (15) is wound on an outer side of the bobbin, a lifting hook is fixedly mounted at one end, away from the bobbin, of the steel wire rope (15), a fixing rod (16) is arranged on an inner side of the lifting hook, and the fixing rod (16) is fixedly connected to an outer side of the connecting seat (17).
6. The mounting and construction mechanism for the external wall insulation board for the building according to claim 1, wherein the adjusting mechanism comprises a fixed seat (9) fixedly mounted at the top of a movable seat (26), a frame seat (10) is rotatably mounted above the outer side of the fixed seat (9), a movable mechanism is arranged at the bottom of the frame seat (10), a second hydraulic cylinder (11) is fixedly mounted on the outer portion of one end, away from the fixed seat (9), of the frame seat (10), a cross rod (27) is rotatably mounted at the telescopic end of the second hydraulic cylinder (11), and a fitting mechanism is arranged at one end, away from the second hydraulic cylinder (11), of the cross rod (27).
7. The mounting and construction mechanism for the external wall insulation board of the building according to claim 6, characterized in that the movable mechanism comprises a first hydraulic cylinder (7) rotatably mounted at the bottom of the frame base (10), a supporting base (8) is rotatably mounted at the bottom of the first hydraulic cylinder (7), and the outer wall of one side of the supporting base (8) is fixedly connected with the outer wall of the movable base (26).
8. The mounting and construction mechanism of the external wall insulation board for the building according to claim 6, characterized in that the attaching mechanism comprises a plurality of support rods (28) fixedly mounted on the outer wall of one end of the cross rod (27) far away from the second hydraulic cylinder (11), and the suction cups (12) are mounted at the end parts of the plurality of support rods (28).
9. The mounting and construction mechanism of the exterior wall insulation board for the building according to claim 6, characterized in that a groove is formed in the middle of the inner side of the moving seat (26), a sleeve (25) is vertically installed inside the groove, a movable rod (30) is slidably installed inside the sleeve (25), a clamping seat (29) is fixedly installed at one end, far away from the sleeve (25), of the movable rod (30), an anti-slip sleeve is installed inside the clamping seat (29), and the anti-slip sleeve is movably sleeved outside the fence frame (6).
CN202210456080.6A 2022-04-28 2022-04-28 Outer wall heated board installation construction mechanism for building Active CN114776040B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210456080.6A CN114776040B (en) 2022-04-28 2022-04-28 Outer wall heated board installation construction mechanism for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210456080.6A CN114776040B (en) 2022-04-28 2022-04-28 Outer wall heated board installation construction mechanism for building

Publications (2)

Publication Number Publication Date
CN114776040A true CN114776040A (en) 2022-07-22
CN114776040B CN114776040B (en) 2024-07-16

Family

ID=82433068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210456080.6A Active CN114776040B (en) 2022-04-28 2022-04-28 Outer wall heated board installation construction mechanism for building

Country Status (1)

Country Link
CN (1) CN114776040B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115893006A (en) * 2023-01-17 2023-04-04 中铁十一局集团第四工程有限公司 An automated photovoltaic panel installation platform
CN116427669A (en) * 2023-04-18 2023-07-14 中铁六局集团有限公司 A kind of building insulation board automatic installation equipment
CN117536452A (en) * 2023-10-07 2024-02-09 中国建筑第五工程局有限公司 Paving system and method for heat preservation layer construction
CN119956941A (en) * 2025-04-11 2025-05-09 山西建筑工程集团有限公司 A construction and installation device for an external wall thermal insulation integrated panel

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN210918213U (en) * 2019-07-31 2020-07-03 正如(广东)机器人科技有限公司 Building outer wall template robot
CN111645740A (en) * 2020-06-16 2020-09-11 马鞍山观点信息科技有限公司 A panel haulage equipment for wall body is decorated
CN112459443A (en) * 2020-11-18 2021-03-09 温州方舵建筑有限公司 Assembled building hoist and mount construction platform
CN212866925U (en) * 2020-06-09 2021-04-02 杨正义 Moving platform for building construction
CN113062611A (en) * 2021-03-11 2021-07-02 银丰工程有限公司 Hoisting machine for building outer wall heat preservation and decoration integrated construction
CN213710436U (en) * 2020-08-27 2021-07-16 浙江建贤装饰工程有限公司 Double-deck ventilation curtain mounting tool
CN214942170U (en) * 2021-07-13 2021-11-30 河南金辉聚合新材料有限公司 Lifting device for aluminum single plate suspended ceiling
CN216076389U (en) * 2021-09-29 2022-03-18 安徽省公路桥梁工程有限公司 Combined mechanical auxiliary device for quickly installing complex metal curtain wall
CN216155371U (en) * 2021-09-18 2022-04-01 马振 Brick lifting device for building

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN210918213U (en) * 2019-07-31 2020-07-03 正如(广东)机器人科技有限公司 Building outer wall template robot
CN212866925U (en) * 2020-06-09 2021-04-02 杨正义 Moving platform for building construction
CN111645740A (en) * 2020-06-16 2020-09-11 马鞍山观点信息科技有限公司 A panel haulage equipment for wall body is decorated
CN213710436U (en) * 2020-08-27 2021-07-16 浙江建贤装饰工程有限公司 Double-deck ventilation curtain mounting tool
CN112459443A (en) * 2020-11-18 2021-03-09 温州方舵建筑有限公司 Assembled building hoist and mount construction platform
CN113062611A (en) * 2021-03-11 2021-07-02 银丰工程有限公司 Hoisting machine for building outer wall heat preservation and decoration integrated construction
CN214942170U (en) * 2021-07-13 2021-11-30 河南金辉聚合新材料有限公司 Lifting device for aluminum single plate suspended ceiling
CN216155371U (en) * 2021-09-18 2022-04-01 马振 Brick lifting device for building
CN216076389U (en) * 2021-09-29 2022-03-18 安徽省公路桥梁工程有限公司 Combined mechanical auxiliary device for quickly installing complex metal curtain wall

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115893006A (en) * 2023-01-17 2023-04-04 中铁十一局集团第四工程有限公司 An automated photovoltaic panel installation platform
CN116427669A (en) * 2023-04-18 2023-07-14 中铁六局集团有限公司 A kind of building insulation board automatic installation equipment
CN117536452A (en) * 2023-10-07 2024-02-09 中国建筑第五工程局有限公司 Paving system and method for heat preservation layer construction
CN119956941A (en) * 2025-04-11 2025-05-09 山西建筑工程集团有限公司 A construction and installation device for an external wall thermal insulation integrated panel
CN119956941B (en) * 2025-04-11 2025-07-22 山西建筑工程集团有限公司 A construction and installation device for an external wall thermal insulation integrated panel

Also Published As

Publication number Publication date
CN114776040B (en) 2024-07-16

Similar Documents

Publication Publication Date Title
CN114776040B (en) Outer wall heated board installation construction mechanism for building
CN215484465U (en) Movable suspended ceiling device for auxiliary installation of ceilings
CN116902753A (en) Large-size assembled vertical component hoisting method based on BIM technology
CN111668757A (en) Convenient support is used in cable erection convenient to adjustment cable interval
CN220414927U (en) A diagonal bracing system for prefabricated wall supports
CN211822955U (en) Windproof ventilating device for urban high-rise building
CN217494783U (en) A kind of ceramic floor tile processing and cutting equipment
CN213445117U (en) Vacuum negative pressure type ceramic tile transfer equipment with smooth driving action
CN215755920U (en) Plate hoisting device for building construction
CN213806446U (en) Ceiling installation device capable of preventing cracking
CN212642168U (en) An operating stand suitable for the external wall installation of ALC slats
CN220487147U (en) Positioning device for curtain wall construction
CN222974664U (en) Portable assembled building prefab hoist mechanism
CN216587561U (en) Ceiling mounting bracket is used to hotel's building decoration
CN218492902U (en) Balcony sun-shading device for green building
CN218466528U (en) Quick pile driving mechanism for building construction
CN222901463U (en) Glass brick colorant spraying device
CN219158464U (en) Prefabricated light partition wall installation mount
CN219774026U (en) Energy-saving electric curtain
CN218579459U (en) Lifting device for architectural decoration engineering construction
CN221567619U (en) Telescopic shed roof for steel bar processing shed
CN222475997U (en) A lifting and installation device for ALC lightweight partition wall strips
CN222936438U (en) A decorative curtain wall installation and adjustment device
CN219281190U (en) Building construction arm for building engineering
CN218715246U (en) Net rack sliding deviation correcting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant