CN114742388A - Home decoration construction site milestone automatic generation method, medium, system and equipment - Google Patents

Home decoration construction site milestone automatic generation method, medium, system and equipment Download PDF

Info

Publication number
CN114742388A
CN114742388A CN202210339871.0A CN202210339871A CN114742388A CN 114742388 A CN114742388 A CN 114742388A CN 202210339871 A CN202210339871 A CN 202210339871A CN 114742388 A CN114742388 A CN 114742388A
Authority
CN
China
Prior art keywords
milestone
decoration
milestones
construction site
house
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210339871.0A
Other languages
Chinese (zh)
Inventor
胡斐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baianju Information Technology Shanghai Co ltd
Original Assignee
Baianju Information Technology Shanghai Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baianju Information Technology Shanghai Co ltd filed Critical Baianju Information Technology Shanghai Co ltd
Priority to CN202210339871.0A priority Critical patent/CN114742388A/en
Publication of CN114742388A publication Critical patent/CN114742388A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a method, medium, system and equipment for automatically generating house decoration construction site milestones. Extracting common milestones and processes of decoration projects, standardizing and generating the milestones with unique identifications and processes; configuring corresponding milestones and process templates according to the decoration type and house type information and the unique identification; acquiring signing data in a signing contract, and storing the signing data in a database table in a classified manner; generating an online construction site through the house construction site data in the database table; inquiring a corresponding milestone template according to the house construction site decoration type and the house type, and inquiring a corresponding process list according to the milestone codes; and automatically generating construction site milestones and procedures at the online construction site and carrying out visualization processing. The invention realizes the automatic generation of home decoration milestones and procedures for customers to check a plurality of milestones and time schedule in the decoration process, and improves the accuracy and the working efficiency of the establishment of the milestones and the procedures.

Description

Home decoration construction site milestone automatic generation method, medium, system and equipment
Technical Field
The invention relates to the field of home decoration, in particular to a home decoration construction site milestone automatic generation method, medium, system and equipment.
Background
Most decoration companies in the market can manually create construction site corresponding milestones and procedures after the home decoration construction site is created in the digital transformation process, the whole process is complicated, manual operation is easy to make mistakes, the home decoration milestones and procedures are extremely troublesome to adjust, the efficiency is low, and the operation cost is increased.
Disclosure of Invention
In view of the above-mentioned shortcomings of the prior art, it is an object of the present invention to provide a home decoration site milestone automatic generation method, medium, system and apparatus for solving the above problems in the prior art.
To achieve the above and other related objects, the present invention provides a home decoration site milestone automatic generation method, comprising: extracting common milestones and processes of decoration projects, carrying out standardization processing, and generating milestones and processes with unique identifications; configuring corresponding milestones and procedure templates according to the decoration type and house type information and the unique identifier; acquiring signing data in a signing contract, and storing the signing data in a database table in a classified manner; generating an online construction site through the house construction site data in the database table; inquiring a corresponding milestone template according to the house construction site decoration type and the house type, and inquiring a corresponding process list according to the milestone codes; and automatically generating construction site milestones and procedures at the online construction site and carrying out visualization processing.
In an embodiment of the present invention, the method further includes: standardizing the common milestone into start-up, hidden engineering, earth work engineering, woodworking engineering, paint engineering, installation engineering and completion acceptance; standardizing the decoration types into personalized overall decoration, personalized local decoration, suit decoration and local suit; according to a milestone template corresponding to the standardized decoration type and the house type configuration, configuring a corresponding process list in the milestone template corresponding to the milestone; and generating a unique coded identification for the milestone.
In an embodiment of the present invention, the method further includes: obtaining the signing information in the signing contract: the contract information comprises contract codes, customer names, mobile phone numbers, house addresses, construction site plan starting time, finishing time, project addresses, areas, house types and contract money; and storing the subscription information into a corresponding database table.
In an embodiment of the present invention, the method further includes: inquiring a delay factor list according to the contract codes in the database table to obtain delay factor codes and factor names; acquiring a corresponding milestone template from the house construction site decoration type and house type query milestone template list, wherein the milestone template information comprises milestone names, codes, starting days, planning days, message notification days, sequencing and customer confirmation acceptance field information; and acquiring a corresponding process list according to the milestone code, wherein the process list comprises process names, starting days, planning days, sequencing and process code field information.
In an embodiment of the present invention, the method further includes: circularly acquiring signing data required by the milestone template list from the database table, and filling the signing data into milestone template information; circularly acquiring signing data required by the procedure template list from the database table, and filling the signing data into procedure list information; and acquiring a delay period according to the delay factor and the house type information, and changing the milestones and the starting days and the planning days corresponding to the process list according to the delay period.
In an embodiment of the present invention, the method further includes: and calling a storage interface to store the cyclically acquired milestone list and data information, the process list and the data information into a database.
In an embodiment of the present invention, the method further includes: and generating the milestones and the procedures in the online construction site according to the milestones and the procedures data in the database.
To achieve the above and other related objects, the present invention provides a home decoration site milestone automatic generation system, comprising: the data processing module is used for extracting common milestones and processes of decoration projects, carrying out standardization processing and generating milestones and processes with unique identifications; the configuration module is used for configuring corresponding milestones and procedure templates according to the decoration type and house type information and the unique identification; the storage module is used for acquiring the signing data in the signing contract and storing the signing data into the database table in a classified manner; a building site creation module for generating an online building site from the house building site data in the database table; the query module: inquiring a corresponding milestone template according to the house construction site decoration type and the house type, and inquiring a corresponding process list according to the milestone codes; a milestone generation module: and automatically generating construction site milestones and procedures at the online construction site and carrying out visualization processing.
To achieve the above and other related objects, the present invention provides a computer-readable storage medium, wherein a computer program is stored, and when the computer program is loaded and executed by a processor, the method for automatically generating a home decoration site milestone is implemented.
To achieve the above and other related objects, the present invention provides an electronic device, comprising: a processor, a memory, and a communication interface; wherein the memory is for storing a computer program; the processor is used for loading and executing the computer program to enable the electronic equipment to execute the automatic home decoration construction site milestone generation method; the communication interface is used for realizing communication between the access device and other equipment.
As described above, according to the method, medium, system and device for automatically generating the home decoration site milestones, provided by the invention, aiming at the problems of tedious work and low efficiency of manually creating the home decoration site milestones, the home decoration site milestones and the working procedures are automatically generated by the method and the device after being generated so that customers can check a plurality of milestones and time schedule in the decoration process, and the accuracy and the working efficiency of creating the milestones and the working procedures are improved.
Drawings
Fig. 1 is a flowchart illustrating an automatic generation method of home decoration site milestones according to an embodiment of the present invention.
Fig. 2 is a block diagram of an automatic home decoration site milestone generation system according to an embodiment of the present invention.
Fig. 3 is a schematic structural diagram of an electronic device according to an embodiment of the invention.
Detailed Description
The embodiments of the present invention are described below with reference to specific embodiments, and other advantages and effects of the present invention will be easily understood by those skilled in the art from the disclosure of the present specification. The invention is capable of other and different embodiments and of being practiced or of being carried out in various ways, and its several details are capable of modification in various respects, all without departing from the spirit and scope of the present invention. It is to be noted that the features in the following embodiments and examples may be combined with each other without conflict. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
It should be noted that the drawings provided in the following embodiments are only for illustrating the basic idea of the present invention, and the components related to the present invention are only shown in the drawings rather than drawn according to the number, shape and size of the components in actual implementation, and the type, quantity and proportion of the components in actual implementation may be changed freely, and the layout of the components may be more complicated.
In order to solve the problems of complicated flow, low efficiency and high personnel and time cost of manually creating and modifying the decoration milestone in the prior art, the invention provides a method, a medium, a system and equipment for automatically generating the milestone of a home decoration construction site.
As shown in fig. 1, the present embodiment provides an automatic generation method of a home decoration site milestone, which includes the following steps:
s11: and extracting common milestones and processes of decoration projects, carrying out standardization treatment, and generating the milestones and processes with unique identifications.
Specifically, according to cognition of decoration progress and milestones in a decoration market, important stages in the home decoration field are analyzed to carry out standardized processing on decoration milestones and working procedures in the field, and at the moment, common milestones recognized by the public in the home decoration market are standardized into start-up, hidden, earth work, woodworking, paint, installation and completion acceptance; the process standardization treatment comprises the following steps: the method comprises the following steps of on-site bottom crossing, water and electricity paying-off and slotting construction, strong and weak circuit calandria threading construction, water supply pipe installation, pipe cage and scattered powder repair, kitchen wall brick construction, toilet wall surface waterproof, toilet wall brick construction, marble window board installation, threshold stone and floor tile paving, carpentry ceiling panel installation, door pocket base layer installation, on-site wooden product modeling construction, wall and top surface base layer repairing, wall skin shoveling, wall and top surface putty embedding, wall and top surface emulsion paint, wood floor paving, finished product suit door, window wrap installation, door moving and coat booth, door wall paper paving, wardrobe and table board installation, kitchen and electricity installation, sanitary ware, hardware installation, switch, socket panel and lamp installation, wall surface emulsion paint repairing, cleaning and cleaning. And finally, generating a corresponding unique code identifier for each milestone and process.
Further, the decoration types are standardized and processed into personalized overall decoration, personalized local decoration, suit decoration and local suit.
S12: and configuring corresponding milestones and procedure templates according to the decoration type and house type information and the unique identifier.
Specifically, further, according to a milestone template corresponding to the standardized decoration type and the house type configuration, a corresponding process list is configured in the milestone template corresponding to the milestone. For example: configuring a personalized integral package and a package decoration with a self-contained milestone template, and configuring a personalized local decoration and a local package decoration with a local milestone template, wherein the self-contained milestone template comprises the following milestones: the method comprises the following steps of starting, hiding engineering, clay engineering, woodworking engineering, paint engineering, installation engineering and completion acceptance; the local milestone template comprises the steps of starting work and completion acceptance inspection.
Further, each milestone is assigned to a corresponding standardized procedure, such as: the start-up milestone configuration process comprises site crossing; the hidden project milestone configuration procedure comprises the steps of water and electricity paying-off and slotting construction, strong and weak circuit calandria threading construction and water supply pipe installation; the clay work engineering milestone configuration process comprises the steps of tube cage and scattered powder repair, kitchen wall brick construction, toilet wall surface waterproof, toilet wall brick construction, marble window board installation, threshold stone installation and floor tile paving; the milestone configuration procedure of the woodworking project comprises installing a woodworking ceiling panel, installing a door pocket base layer and constructing a field wooden product model; the paint engineering milestone preparation process comprises the steps of repairing a wall and a top surface base layer, shoveling wall skin, embedding wall and top surface putty in batches, and preparing wall and top surface emulsion paint; the milestone configuration procedure of the installation project comprises wood floor laying, finished product door sleeving, window sleeve installation and the like, door moving clothes and hat room and wardrobe installation, wallpaper paving, cupboard and table board installation and construction, kitchen electricity installation, sanitary ware, hardware installation and the like, and switch, socket panel and lamp installation; the preparation process of the completion acceptance milestone comprises the steps of repairing, cleaning and cleaning the wall surface emulsion paint.
Preferably, each milestone code and the unique code of the process in the corresponding process list are mapped and bound, and when the specific configuration is performed, the configuration is performed by using the unique code identifier.
S13: and acquiring the signing data in the signing contract, and storing the signing data in a database table in a classified manner.
Specifically, the contract information in the contract is obtained and stored in one or more tables of the corresponding database. The contract signing information comprises contract codes, customer names, mobile phone numbers, house addresses, construction site plan starting time, finishing time, project addresses, areas, house types, contract amounts and the like.
S14: and generating an online construction site through the house construction site data in the database table.
Specifically, an online construction site is generated through an api interface according to information such as house addresses and project addresses in a database table.
S15: and inquiring a corresponding milestone template according to the house construction site decoration type and the house type, and inquiring a corresponding process list according to the milestone codes.
Specifically, a delay factor list is queried according to a contract code in a database table to obtain a delay factor code and a factor name, namely whether a construction period delay risk exists, such as whether an item address is an old cell.
Further, the corresponding milestone templates are obtained by inquiring the milestone template list through house construction site decoration types and house types, wherein the milestone template comprises the milestone list obtained under the template and the milestone name, code, starting days, planning days, message notification days, sequencing and customer confirmation acceptance field information of each milestone.
Further, the method comprises the steps of obtaining a corresponding process list according to the mapping binding relationship of each milestone code and the process code, and obtaining basic information of each process, wherein the basic information comprises process names, starting days, planning days, sequencing and process code field information.
Further, the signing data required by each milestone in the milestone template list is circularly obtained from the database table, and the obtained signing data is filled in the milestone field information; then circularly acquiring the signing data required by each procedure in the procedure template list from the database table, and filling the acquired signing data into procedure field information; and finally, acquiring a delay period according to the inquired delay factor and the house type information, and changing the milestones, the starting days corresponding to the process list and the planning days according to the delay period. Circularly acquiring the construction site ID, construction days, name, start time, completion time, actual start time, actual end time, customer confirmation acceptance, state, message notification days acceptance time, order number, construction site ID, order number and other information of the project construction site according to the milestone list through a database table, and filling the information into field information of each milestone; circularly acquiring the start time, the completion time, the start days, the construction days, the sequence, the order number and the construction site ID according to the process list, and filling the construction site ID and the order number into field information of each milestone; when a delay factor is inquired, for example, the project site is an old cell, the corresponding milestone construction period and the corresponding process construction period (namely the difference between the start time and the completion time) are logically increased, 1 house is increased by 1 day, 2 houses are increased by 2 days, 3 houses are increased by 3 days, 4 houses are increased by 4 days, and the other milestone construction periods and the process construction periods are delayed.
Furthermore, after data are acquired in each cycle and filled in, a storage method is called to store the milestone list and the data information acquired in the cycle, and the process list and the data information are stored in a database.
S15: and automatically generating construction site milestones and procedures at the online construction site and carrying out visualization processing.
Specifically, after the corresponding milestone template and the corresponding work sequence list are inquired according to the decoration type and the house type of the customer, the milestone and the work procedure are generated in the online work site generated in S14 according to the milestone and the work procedure data in the database, and the information is visualized, so that the customer can visually check the milestone, the work procedure and the corresponding progress condition in the decoration project.
All or a portion of the steps of implementing the above-described method embodiments may be performed by hardware associated with a computer program. Based upon such an understanding, the present invention also provides a computer program product comprising one or more computer instructions. The computer instructions may be stored in a computer readable storage medium. The computer-readable storage medium can be any available medium that a computer can store or a data storage device, such as a server, a data center, etc., that is integrated with one or more available media.
Referring to fig. 2, the present embodiment provides an automatic generation system 20 for home decoration site milestones, which is installed in an electronic device as a piece of software to execute the automatic generation method for home decoration site milestones according to the foregoing method embodiments during operation. Since the technical principle of the embodiment of the system is similar to that of the embodiment of the method, repeated description of the same technical details is omitted.
The automatic home decoration site milestone generation system 20 of the present embodiment specifically includes: data processing module 21, configuration module 22, storage module 23, worksite creation module 24, query module 25, milestone generation module 26. The data processing module 21 is used for extracting common milestones and processes of decoration projects, carrying out standardization processing and generating milestones and processes with unique identifications; the configuration module 22 is used for configuring corresponding milestones and procedure templates according to the decoration type and house type information and the unique identifier; the storage module 23 is configured to obtain the signing data in the signing contract and store the signing data in a database table in a classified manner; the site creation module 24 is used for generating an online site from the house site data in the database tables; the query module 25 queries a corresponding milestone template according to the house construction site decoration type and the house type, and queries a corresponding process list according to the milestone code; a milestone generation module 26 automatically generates and visualizes worksite milestones and procedures at the online worksite.
Those skilled in the art should understand that the division of the modules in the embodiment of fig. 2 is only a logical division, and the actual implementation can be fully or partially integrated into one or more physical entities. And the modules can be realized in a form that all software is called by the processing element, or in a form that all the modules are realized in a form that all the modules are called by the processing element, or in a form that part of the modules are called by the hardware. For example, the query module 25 may be a separate processing element, or may be integrated in a chip, or may be stored in a memory in the form of program code, and the function of the query module 25 is called and executed by a certain processing element. The other modules are implemented similarly. The processing element described herein may be an integrated circuit having signal processing capabilities. In implementation, each step of the above method or each module above may be implemented by an integrated logic circuit of hardware in a processor element or an instruction in the form of software.
Referring to fig. 3, the embodiment provides an electronic device, which may be a portable computer, a smart phone, a tablet computer, or the like. In detail, the electronic device comprises at least, connected by a bus 31: a memory 32, a processor 33, and a communication interface 34, wherein the communication interface 34 is used for implementing communication between the data access apparatus and other devices, the memory 32 is used for storing computer programs, and the processor 33 is used for executing the computer programs stored in the memory 32 to execute all or part of the steps in the foregoing method embodiments.
The above-mentioned system bus may be a Peripheral Component Interconnect (PCI) bus, an Extended Industry Standard Architecture (EISA) bus, or the like. The system bus may be divided into an address bus, a data bus, a control bus, and the like. For ease of illustration, only one thick line is shown, but this does not mean that there is only one bus or one type of bus. The communication interface is used for realizing communication between the database access device and other equipment (such as a client, a read-write library and a read-only library). The Memory may include a Random Access Memory (RAM), and may further include a non-volatile Memory (non-volatile Memory), such as at least one disk Memory.
The Processor may be a general-purpose Processor, and includes a Central Processing Unit (CPU), a Network Processor (NP), and the like; the Integrated Circuit may also be a Digital Signal Processor (DSP), an Application Specific Integrated Circuit (ASIC), a Field Programmable Gate Array (FPGA) or other Programmable logic device, a discrete Gate or transistor logic device, or a discrete hardware component.
In summary, according to the method, the medium, the system and the equipment for automatically generating the home decoration construction site milestone, provided by the invention, for the problems of low efficiency and high operation cost caused by high operation error rate and complicated work of manually creating the home decoration construction site milestone, after the construction site is signed and created by a contract, the construction site decoration milestone and procedures are automatically generated for a client to check, the follow-up attention on decoration progress is facilitated, the work flow is reduced, the work efficiency is improved, and the operation cost is reduced. Therefore, the invention effectively overcomes various defects in the prior art and has high industrial utilization value.
The foregoing embodiments are merely illustrative of the principles and utilities of the present invention and are not intended to limit the invention. Any person skilled in the art can modify or change the above-mentioned embodiments without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which can be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.

Claims (10)

1. A home decoration construction site milestone automatic generation method is characterized by comprising the following steps:
extracting common milestones and processes of decoration projects, carrying out standardization processing, and generating milestones and processes with unique identifications;
configuring corresponding milestones and procedure templates according to the decoration type and house type information and the unique identifier;
acquiring signing data in a signing contract, and storing the signing data in a database table in a classified manner;
generating an online construction site through the house construction site data in the database table;
inquiring a corresponding milestone template according to the house construction site decoration type and the house type, and inquiring a corresponding process list according to the milestone codes;
and automatically generating construction site milestones and procedures at the online construction site and carrying out visualization processing.
2. The method of claim 1, further comprising:
standardizing the common milestone into start-up, hidden engineering, mud engineering, woodworking engineering, paint engineering, installation engineering and completion acceptance inspection;
standardizing the decoration types into personalized overall decoration, personalized local decoration, suit decoration and local suit;
according to a milestone template corresponding to the standardized decoration type and the house type configuration, configuring a corresponding process list in the milestone template corresponding to the milestone;
and generating a unique coded identification for the milestone.
3. The method of claim 1, further comprising:
obtaining the signing information in the signing contract: the contract information comprises contract codes, customer names, mobile phone numbers, house addresses, construction site plan starting time, finishing time, project addresses, areas, house types and contract money;
and storing the signing information into a corresponding database table.
4. The method of claim 1, 2 or 3, further comprising:
inquiring a delay factor list according to the contract codes in the database table to obtain delay factor codes and factor names;
acquiring a corresponding milestone template from the house construction site decoration type and house type query milestone template list, wherein the milestone template information comprises milestone names, codes, starting days, planning days, message notification days, sequencing and customer confirmation acceptance field information;
and acquiring a corresponding process list according to the milestone code, wherein the process list comprises process names, starting days, planning days, sequencing and process code field information.
5. The method of claim 4, further comprising:
circularly acquiring signing data required by the milestone template list from the database table, and filling the signing data into milestone template information;
circularly acquiring signing data required by the procedure template list from the database table, and filling the signing data into procedure list information;
and acquiring a delay period according to the delay factor and the house type information, and changing the milestones, the starting days corresponding to the process list and the planning days according to the delay period.
6. The method of claim 5, further comprising:
and calling a storage interface to store the milestone list and the data information, the process list and the data information which are acquired in a circulating mode into a database.
7. The method of claim 6, further comprising:
and generating the milestones and the procedures in the online construction site according to the milestones and the procedures data in the database.
8. An automatic home decoration site milestone generation system, the system comprising:
the data processing module is used for extracting common milestones and processes of the decoration projects, carrying out standardization processing on the common milestones and processes, and generating the milestones and processes with unique identifications;
the configuration module is used for configuring corresponding milestones and procedure templates according to the decoration type and house type information and the unique identification;
the storage module is used for acquiring the signing data in the signing contract and storing the signing data into the database table in a classified manner;
a building site creation module for generating an online building site from the house building site data in the database table;
the query module: inquiring a corresponding milestone template according to the house construction site decoration type and the house type, and inquiring a corresponding process list according to the milestone codes;
a milestone generation module: and automatically generating construction site milestones and procedures at the online construction site and carrying out visualization processing.
9. A computer-readable storage medium, in which a computer program is stored, which, when loaded and executed by a processor, carries out a method of automatically generating a home decoration site milestone according to any one of claims 1 to 7.
10. An electronic device, comprising: a processor, a memory, and a communication interface; wherein,
the memory is used for storing a computer program;
the processor is configured to load and execute the computer program to cause the electronic device to perform the home decoration worksite milestone automatic generation method according to any one of claims 1 to 7;
the communication interface is used for realizing communication between the access device and other equipment.
CN202210339871.0A 2022-04-01 2022-04-01 Home decoration construction site milestone automatic generation method, medium, system and equipment Pending CN114742388A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210339871.0A CN114742388A (en) 2022-04-01 2022-04-01 Home decoration construction site milestone automatic generation method, medium, system and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210339871.0A CN114742388A (en) 2022-04-01 2022-04-01 Home decoration construction site milestone automatic generation method, medium, system and equipment

Publications (1)

Publication Number Publication Date
CN114742388A true CN114742388A (en) 2022-07-12

Family

ID=82278718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210339871.0A Pending CN114742388A (en) 2022-04-01 2022-04-01 Home decoration construction site milestone automatic generation method, medium, system and equipment

Country Status (1)

Country Link
CN (1) CN114742388A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100968708B1 (en) * 2010-04-08 2010-07-06 지에스건설 주식회사 System and method to creation of the construction project schedule
CN112232784A (en) * 2020-10-27 2021-01-15 杭州天宽科技有限公司 Engineering progress inversion method and system based on job ticket information
CN112580915A (en) * 2019-09-30 2021-03-30 北京国双科技有限公司 Project milestone determination method and device, storage medium and electronic equipment
CN113780860A (en) * 2021-09-17 2021-12-10 上海易立德信息技术股份有限公司 Progress display method and system for milestone and storage medium

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100968708B1 (en) * 2010-04-08 2010-07-06 지에스건설 주식회사 System and method to creation of the construction project schedule
CN112580915A (en) * 2019-09-30 2021-03-30 北京国双科技有限公司 Project milestone determination method and device, storage medium and electronic equipment
CN112232784A (en) * 2020-10-27 2021-01-15 杭州天宽科技有限公司 Engineering progress inversion method and system based on job ticket information
CN113780860A (en) * 2021-09-17 2021-12-10 上海易立德信息技术股份有限公司 Progress display method and system for milestone and storage medium

Similar Documents

Publication Publication Date Title
KR101752913B1 (en) Building construction operating management system and method to use bim
AU2016209908B2 (en) Method, computer program product and apparatus for providing a building options configuration
CA2582402A1 (en) Systems and methods for manufacturing customized prefabricated buildings
US20180315137A1 (en) Systems and methods for quantitative evaluation of a property for renovation
US20210383033A1 (en) Structural construction system employing architectural modeling
Cha et al. A case study of time/cost analysis for aged-housing renovation using a pre-made BIM database structure
US11899626B2 (en) Layer mapping
CN115470552A (en) BIM deepening method for quickly building automobile workshop
CN109360123B (en) Multi-professional construction management method and system based on room
CN106203812A (en) The industrialized data processing method of building decoration, Apparatus and system
da Rocha et al. Method to implement delayed product differentiation in construction of high-rise apartment building projects
CN108229014A (en) Building ground decoration industrialization data processing method, electronic equipment and storage medium
CN114742388A (en) Home decoration construction site milestone automatic generation method, medium, system and equipment
Toan et al. Application of Building Information Modeling (BIM) for automatic integration of construction costs management information into 3D models in consideration of Vietnamese regulations
CN116738555B (en) Intelligent home decoration design system
CN109992806A (en) Industrialized data processing method, electronic equipment and storage medium for building decoration base
CN114718307B (en) Method, apparatus, device, medium and program product for constructing fabricated building
US20240111929A1 (en) Interface for virtual building model
KR20210114621A (en) Design system of building
JP4476671B2 (en) Precut construction system for exterior materials using network
Kendall Developments toward a residential fit-out industry
CN115168961A (en) Material construction planned amount generation method and device, computer equipment and storage medium
CN114510763A (en) Template configuration method and device based on spatial structure, computer equipment and medium
US20180253807A1 (en) System and method for providing customized single family, multi family and sheltered structure
Mukkavaara et al. Approach for automated planning using 5D-BIM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination