CN114678866B - Power transmission line load transfer control method based on regulation and control cloud - Google Patents

Power transmission line load transfer control method based on regulation and control cloud Download PDF

Info

Publication number
CN114678866B
CN114678866B CN202210386313.XA CN202210386313A CN114678866B CN 114678866 B CN114678866 B CN 114678866B CN 202210386313 A CN202210386313 A CN 202210386313A CN 114678866 B CN114678866 B CN 114678866B
Authority
CN
China
Prior art keywords
load
kilovolt
power
node
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210386313.XA
Other languages
Chinese (zh)
Other versions
CN114678866A (en
Inventor
石倩倩
杨军伟
王波
王有军
刘夏
杜露露
储成娟
金明凤
徐强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority to CN202210386313.XA priority Critical patent/CN114678866B/en
Publication of CN114678866A publication Critical patent/CN114678866A/en
Application granted granted Critical
Publication of CN114678866B publication Critical patent/CN114678866B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/007Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources
    • H02J3/0073Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources for providing alternative feeding paths between load and source when the main path fails, e.g. transformers, busbars
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/10Power transmission or distribution systems management focussing at grid-level, e.g. load flow analysis, node profile computation, meshed network optimisation, active network management or spinning reserve management
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Human Computer Interaction (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种基于调控云的输电线路负荷转移控制方法,包括如下步骤:步骤1:从调控云平台读取设备台账数据,获取所有的输变电设备信息;步骤2:根据设备信息和连接关系,以单电源点方式生成树状电网拓扑模型;步骤3:读取调控云遥测数据和遥信数据,形成负载通路路径;步骤4:根据负荷通路模型,进行线路负荷跳闸风险判断;步骤5:对存在跳闸风险的线路,进行跳闸后负荷转移分析,快速评估负荷转移后造成的新风险。本发明采用树状结构而非传统的图状结构对电网进行分解,以高压等级母线作为根节点,通过线路负荷跳闸风险的评估方法进行输电路径分析,避免了传统方法中带来的回环返送的问题,可以做到事情预警,计算速度快,效率高。

The present invention discloses a load transfer control method for power transmission lines based on a control cloud, comprising the following steps: Step 1: Reading equipment ledger data from a control cloud platform to obtain all power transmission and transformation equipment information; Step 2: Generate a tree-like power grid topology model in a single power source point mode according to equipment information and connection relationships; Step 3: Reading control cloud telemetry data and telesignaling data to form a load path; Step 4: According to the load path model, perform line load tripping risk judgment; Step 5: For lines with tripping risks, perform post-tripping load transfer analysis to quickly assess new risks caused by load transfer. The present invention uses a tree structure rather than a traditional graph structure to decompose the power grid, takes a high-voltage busbar as the root node, and performs transmission path analysis through a line load tripping risk assessment method, thereby avoiding the loopback problem brought about by the traditional method, and can provide early warning of events, with fast calculation speed and high efficiency.

Description

一种基于调控云的输电线路负荷转移控制方法A load transfer control method for transmission lines based on control cloud

技术领域Technical Field

本发明属于电力调动自动化领域,具体涉及一种基于调控云的输电线路负荷转移控制方法。The present invention belongs to the field of electric power dispatching automation, and in particular relates to a transmission line load transfer control method based on a control cloud.

背景技术Background Art

现有的调度系统对输变电中存在的跳闸导致的输电线路负荷转移分析方法主要有两种:There are two main methods for analyzing the load transfer of transmission lines caused by tripping in power transmission and transformation in the existing dispatching system:

第一类方法将整个电网划分为电源区和负荷区,电源区和负荷区之间的线路设为输电断面;线路过载后通过计算开断分布因子在其所在的输电断面中搜索关键输电断面。这类搜索方法分为事前、事后两个阶段,搜索速度快,但仅适用于输电断面较为明显的纺锤型电网。The first method divides the entire power grid into power supply area and load area, and the line between the power supply area and the load area is set as the transmission section; after the line is overloaded, the key transmission section is searched in the transmission section where it is located by calculating the disconnection distribution factor. This type of search method is divided into two stages, pre-event and post-event, and the search speed is fast, but it is only applicable to spindle-type power grids with obvious transmission sections.

第二类方法将线路跳闸后的电网视为正常电网和故障电网的迭加,通过在故障电网中采用图论方法搜索主要功率转移路径,并判断主要功率转移路径上故障电流对正常电流的迭加作用来确定过载线路的关键输电断面。这类方法对电网的适应性好,但属于事后搜索,搜索速度慢。The second method regards the power grid after the line trip as the superposition of the normal power grid and the faulty power grid. It uses graph theory to search for the main power transfer path in the faulty power grid and determines the superposition effect of the fault current on the normal current on the main power transfer path to determine the key transmission section of the overloaded line. This method has good adaptability to the power grid, but it is a post-search and has a slow search speed.

发明内容Summary of the invention

本发明所要解决的技术问题是,提供一种基于调控云的输电线路负荷转移控制方法,采用树状结构而非传统的图状结构对电网进行分解,以高压等级母线作为根节点,通过线路负荷跳闸风险的评估方法进行输电路径分析,避免了传统方法中带来的回环返送的问题,可以做到事情预警,计算速度快,效率高。The technical problem to be solved by the present invention is to provide a transmission line load transfer control method based on a control cloud, which uses a tree structure rather than a traditional graph structure to decompose the power grid, takes the high-voltage bus as the root node, and performs transmission path analysis through a line load tripping risk assessment method, thereby avoiding the loop back problem brought about by the traditional method, and can achieve event early warning, fast calculation speed and high efficiency.

为解决上述技术问题,本发明采用的技术方案为:In order to solve the above technical problems, the technical solution adopted by the present invention is:

一种基于调控云的输电线路负荷转移控制方法,包括如下步骤:A transmission line load transfer control method based on a control cloud comprises the following steps:

步骤1:从调控云平台读取设备台账数据,获取所有的输变电设备信息;Step 1: Read the equipment ledger data from the control cloud platform to obtain all the power transmission and transformation equipment information;

步骤2:根据设备信息和连接关系,以单电源点方式生成树状电网拓扑模型;Step 2: Generate a tree-like power grid topology model in a single power point mode according to the device information and connection relationship;

步骤3:读取调控云遥测数据和遥信数据,形成负载通路路径;Step 3: Read the control cloud telemetry data and telesignal data to form a load path;

步骤4:根据负荷通路模型,进行线路负荷跳闸风险判断;Step 4: According to the load path model, the risk of line load tripping is judged;

步骤5:对存在跳闸风险的线路,进行跳闸后负荷转移分析,快速评估负荷转移后造成的新风险。Step 5: For lines with tripping risks, perform post-tripping load transfer analysis to quickly assess new risks caused by load transfer.

进一步的,步骤1具体操作为:从调控云库中获取所有最高电压等级小于或等于220千伏的变电站的名称、厂站ID、拥有者、厂站类型;并获取这些变电站中的设备信息,设备包括母线、变压器、交流线路端点、负荷、当前遥信值为1的隔离开关、当前遥信值为1断路器。Furthermore, the specific operation of step 1 is: obtain the name, plant ID, owner, and plant type of all substations with the highest voltage level less than or equal to 220 kV from the control cloud library; and obtain the equipment information in these substations, the equipment includes busbars, transformers, AC line terminals, loads, disconnectors with a current telesignal value of 1, and circuit breakers with a current telesignal value of 1.

进一步的,步骤2中树状电网拓扑模型的具体构建方式为:Furthermore, the specific construction method of the tree-like power grid topology model in step 2 is:

步骤2.1:选取当前电压Uab值大于220千伏的母线,并设其为电源点,设为E1、E2......En,如果该母线与同一变电站的其他220千伏母线相连,则记录这些母线为同一电源点;Step 2.1: Select the busbar whose current voltage Uab value is greater than 220 kV and set it as the power supply point, set as E1, E2...En. If the busbar is connected to other 220 kV buses in the same substation, record these buses as the same power supply point;

步骤2.2:取同一变电站的与电源点通过变压器相连的110千伏母线,110千伏母线记为节点110-1、110-2、110-3.....110-m,如果存在相连的110千伏母线则记录其为同一节点;获取节点上断路器遥信值为1的110千伏的线路,根据其连接关系记录与其相连的对端变电站的110千伏母线并记录为另一节点,然后继续获取节点上的线路搜索其他节点,重复该过程,直至完全索引110千伏节点,并记录电源点与110千伏母线之间的变压器为110千伏节点;Step 2.2: Take the 110 kV busbar of the same substation that is connected to the power source through the transformer, and record the 110 kV busbar as nodes 110-1, 110-2, 110-3.....110-m. If there is a connected 110 kV busbar, record it as the same node; obtain the 110 kV line with the circuit breaker telesignal value of 1 on the node, record the 110 kV busbar of the opposite substation connected to it according to its connection relationship and record it as another node, then continue to obtain the line on the node to search for other nodes, repeat the process until the 110 kV node is fully indexed, and record the transformer between the power source point and the 110 kV busbar as a 110 kV node;

步骤2.3:取步骤2.2中记录的110千伏节点,并取同一变电站的与该110千伏节点通过变压器相连的35千伏母线,35千伏母线记为节点35-1、35-2、35-3.....35-o,如果存在相连的35千伏母线则记录其为同一节点;获取节点上获取节点上断路器遥信值为1的35千伏的线路,根据其连接关系记录与其相连的对端变电站的35千伏母线并记录为另一节点,然后继续获取节点上的线路搜索其他节点,重复该过程,直至完全索引35千伏节点并记录其上级的110千伏节点,并记录110千伏节点与35千伏母线之间的变压器为35千伏节点;如果该35千伏节点上存在35千伏负荷设备,则记录该设备为35千伏末端负荷设备,并记录其上级节点为110千伏节点,与该35千伏节点不重合;Step 2.3: Take the 110 kV node recorded in step 2.2, and take the 35 kV bus connected to the 110 kV node through the transformer of the same substation. The 35 kV bus is recorded as nodes 35-1, 35-2, 35-3.....35-o. If there are connected 35 kV busbars, they are recorded as the same node; obtain the 35 kV line with the circuit breaker telesignal value of 1 on the node, and record the 35 kV line of the opposite substation connected to it according to its connection relationship. volt bus and record it as another node, then continue to obtain the lines on the node to search for other nodes, repeat the process until the 35 kV node is fully indexed and its superior 110 kV node is recorded, and the transformer between the 110 kV node and the 35 kV bus is recorded as a 35 kV node; if there is a 35 kV load device on the 35 kV node, then record the device as a 35 kV terminal load device, and record its superior node as a 110 kV node, which does not overlap with the 35 kV node;

步骤2.4:取步骤2.3中记录的35千伏节点,并取同一变电站的与该35千伏节点通过变压器相连的10千伏母线,获取10千伏母线上的10KV负荷设备,记录其上级节点,并记录该10千伏负荷设备为10千伏末端负荷设备;Step 2.4: Take the 35 kV node recorded in step 2.3, and take the 10 kV bus connected to the 35 kV node through the transformer of the same substation, obtain the 10KV load device on the 10 kV bus, record its upper node, and record the 10 kV load device as a 10 kV terminal load device;

步骤2.5:取步骤2.1中记录的电源点,取步骤2.2中记录的110千伏节点,然后取同一变电站的与110千伏节点通过变压器相连的35千伏母线,获取该35千伏母线上35千伏负荷,记录其上级节点,并记录该35千伏负荷为末端负荷设备;取步骤2.1中记录的电源点,取步骤2.2中记录的110千伏节点,取步骤2.3中记录的35千伏节点和35千伏末端负荷设备,取步骤2.4中记录的10千伏末端负荷设备;把35千伏和10千伏的末端负荷设备记为负荷点L1、L2......Lj;Step 2.5: Take the power point recorded in step 2.1, take the 110 kV node recorded in step 2.2, then take the 35 kV bus connected to the 110 kV node through the transformer of the same substation, obtain the 35 kV load on the 35 kV bus, record its upper node, and record the 35 kV load as the terminal load device; take the power point recorded in step 2.1, take the 110 kV node recorded in step 2.2, take the 35 kV node and 35 kV terminal load device recorded in step 2.3, take the 10 kV terminal load device recorded in step 2.4; record the 35 kV and 10 kV terminal load devices as load points L1, L2...Lj;

步骤2.5:根据步骤2.1-步骤2.4记录的设备连接关系,以树状结构根据电压等级由高到低,建立该电源点的树状电网拓扑模型,然后保存树状电网拓扑模型,树状电网拓扑模型记作t1、t2、t3......tn。Step 2.5: According to the equipment connection relationship recorded in steps 2.1 to 2.4, a tree-like power grid topology model of the power supply point is established in a tree structure according to the voltage level from high to low, and then the tree-like power grid topology model is saved. The tree-like power grid topology model is recorded as t1, t2, t3...tn.

优选的,步骤3具体为:Preferably, step 3 is specifically:

步骤3.1:从调控云中获取电网拓扑模型中变压器绕组的有功、无功、电流;母线的Uab线电压;交流线段端点的有功、无功、电流;Step 3.1: Obtain the active power, reactive power, and current of the transformer winding in the power grid topology model from the control cloud; the Uab line voltage of the bus; and the active power, reactive power, and current of the AC line segment endpoints;

步骤3.2:以每一个末端负荷设备为起点,电源点为终点,对末端负荷设备进行树状电网拓扑模型功率传输路径从下往上的搜索,获取树状电网拓扑模型中每一个末端负荷设备由起点到终点的最短路径,所有末端负荷设备最短路径的合集s1、s2、s3......sk,即为负载通路路径S。Step 3.2: Taking each terminal load device as the starting point and the power source point as the end point, search the power transmission path of the tree-like power grid topology model from bottom to top for the terminal load device, and obtain the shortest path from the starting point to the end point of each terminal load device in the tree-like power grid topology model. The collection of the shortest paths of all terminal load devices, s1, s2, s3...sk, is the load path S.

优选的,步骤3.2中末端负荷设备选取电流值大于5安培,有功值大于0.99兆瓦的负荷设备。Preferably, in step 3.2, the terminal load device is selected to have a current value greater than 5 amperes and an active power value greater than 0.99 megawatts.

进一步的,对于任一树状电网拓扑模型tn0,负载通路路径s1,s2,……,sn0中的第j条负载通路路径sq,从调控云库中取负荷点Lj所连的线路的额定有功值Pjmax,当负荷点Lj所连的线路的实际功率P>μPjmax时,则判断该线路处于重载状态,具有跳闸风险,其中,μ为负载率。Furthermore, for any tree-like power grid topology model tn0, the j-th load path sq in the load path s1, s2, ..., sn0, takes the rated active value Pjmax of the line connected to the load point Lj from the control cloud library. When the actual power P of the line connected to the load point Lj is greater than μPjmax, it is judged that the line is in an overloaded state and has a risk of tripping, where μ is the load rate.

优选的,μ=0.88。Preferably, μ=0.88.

进一步的,步骤5具体操作为:Furthermore, the specific operations of step 5 are:

步骤5.1:对于任一树状电网拓扑模型tn0,在负载通路路径s1,s2,……,sn0中去除存在跳闸风险的线路,形成新的负载通路路径s1’,s2’,……,sn1;Step 5.1: For any tree-like power grid topology model tn0, remove the lines with tripping risks in the load path s1, s2, ..., sn0 to form a new load path s1', s2', ..., sn1;

步骤5.2:根据功率路径转移判别公式,获取跳闸风险线路功率转移路径集合sn2;Step 5.2: According to the power path transfer judgment formula, obtain the tripping risk line power transfer path set sn2;

步骤5.3:功率转移路径集合sn2被转移到的有功功率为:Step 5.3: The active power transferred to the power transfer path set sn2 is:

其中,ΔPp1为功率转移路径集合sn2中第j条线路被转移到的负荷,Sn2中每个路径的结点数分别为o1、o2、o3......ow,Pnow为负荷所在的线路当前有功值,α为理论最小传输节点数,c为该功率转移路径包含电源点与负荷点在内的节点数,z为与该功率转移路径节点数相同的功率转移路径总数;Wherein, ΔP p1 is the load to which the jth line in the power transfer path set sn2 is transferred, the number of nodes of each path in Sn2 is o1, o2, o3, ... ow, P now is the current active value of the line where the load is located, α is the theoretical minimum number of transmission nodes, c is the number of nodes of the power transfer path including the power source point and the load point, and z is the total number of power transfer paths with the same number of nodes as the power transfer path;

步骤5.4:求解线路跳闸后发生功率转移时,其他负荷点所在的线路的实时功率:Step 5.4: Calculate the real-time power of the lines where other load points are located when power transfer occurs after the line trips:

Ptnow=Pnow+ΔPj1 P tnow = P now + ΔP j1

其中,Ptnow表示线路跳闸后发生功率转移时,其他负荷点所在的线路的实时功率;Among them, P tnow represents the real-time power of the line where other load points are located when power transfer occurs after the line trips;

步骤5.5:如果Ptnow>μPjmax,则该负荷作为连锁反应点;Step 5.5: If Ptnow>μPjmax, then the load is used as the chain reaction point;

步骤5.6:当连锁反应点大于1时,则存在连锁跳闸风险,输出跳闸风险负荷点和连锁反应点。Step 5.6: When the chain reaction point is greater than 1, there is a chain tripping risk, and the tripping risk load point and chain reaction point are output.

进一步的,功率路径转移判别公式为:Furthermore, the power path transfer judgment formula is:

其中,D(En,Lj)表示电源点为En负荷点为Lj的线路经过的节点数,Dj1表示电源点为En负荷点为Lj的线路跳闸后其他线路的节点数,r为功率路径转移率阈值。Wherein, D(E n ,L j ) represents the number of nodes that the line with source point En and load point Lj passes through, Dj1 represents the number of nodes of other lines after the line with source point En and load point Lj trips, and r represents the power path transfer rate threshold.

优选的,r=2。Preferably, r=2.

发明与现有技术相比,具有如下有益效果:Compared with the prior art, the invention has the following beneficial effects:

本发明所要解决的技术问题是,提供一种基于调控云的输电线路负荷转移控制方法,采用树状结构而非传统的图状结构对电网进行分解,以高压等级母线作为根节点,通过线路负荷跳闸风险的评估方法进行输电路径分析,避免了传统方法中带来的回环返送的问题,可以做到事情预警,计算速度快,效率高。The technical problem to be solved by the present invention is to provide a transmission line load transfer control method based on a control cloud, which uses a tree structure rather than a traditional graph structure to decompose the power grid, takes the high-voltage bus as the root node, and performs transmission path analysis through a line load tripping risk assessment method, thereby avoiding the loop back problem brought about by the traditional method, and can achieve event early warning, fast calculation speed and high efficiency.

1、本发明采用树状结构而非传统的图状结构对电网进行分解,以高压等级母线作为根节点,进行输电路径分析,避免了传统方法中带来的回环返送的问题,也避免了传统方案中通过矩阵或其他方式处理电网拓扑模型的计算量大的问题。1. The present invention uses a tree structure rather than a traditional graph structure to decompose the power grid, and uses the high-voltage bus as the root node to perform transmission path analysis, thereby avoiding the loopback problem brought about by the traditional method, and also avoiding the large amount of calculation required to process the power grid topology model through matrices or other methods in the traditional solution.

2、本发明设计的树状电网拓扑模型,忽略地区电网中电阻和横波带来的电流影响,把功率转移的影响限制在单220kV电源点所辐射的范围内部,与传统的功率转移方式相比,传统的纯理论计算方式考虑参数过多但对计算结果影响较少。由于剔除影响力较小但计算量大的多电源点作用,并忽略实际应用中较少出现的回环的电流通路,不需要大量浮点数和矩阵的计算,在应用中可以实现秒级的数据处理速度,可以及时得到计算结果。2. The tree-like grid topology model designed by the present invention ignores the current influence caused by resistance and transverse waves in the regional grid, and limits the influence of power transfer to the range radiated by a single 220kV power source point. Compared with the traditional power transfer method, the traditional purely theoretical calculation method considers too many parameters but has little influence on the calculation results. Since the effects of multiple power sources with small influence but large calculation amount are eliminated, and the loop current paths that rarely appear in practical applications are ignored, a large number of floating point numbers and matrix calculations are not required, and the data processing speed of seconds can be achieved in the application, and the calculation results can be obtained in time.

3、本发明设计的线路负荷跳闸风险的评估方法,摒弃了传统的负荷和电流的计算方式,如DFT算法,消除多次乘法和加法计算。由于实际数据与该算法相符,如做成图表观察则表现为毛刺较少,计算中自然可以摒弃大量的数据清洗处理和平滑处理过程,减少大量指数运算和加减法的加权处理,一般情况下这些计算需要CPU中存在特殊指令集或使用GPU加速才能加快计算速度,而CPU中的通用计算单元并不擅长处理这些,表现方式为计算速度较慢。3. The evaluation method of line load tripping risk designed by the present invention abandons the traditional calculation method of load and current, such as DFT algorithm, and eliminates multiple multiplication and addition calculations. Since the actual data is consistent with the algorithm, if it is made into a chart, it will show less burrs. In the calculation, a large amount of data cleaning and smoothing processing can naturally be abandoned, and a large amount of exponential operations and weighted processing of addition and subtraction can be reduced. In general, these calculations require special instruction sets in the CPU or use GPU acceleration to speed up the calculation speed, and the general computing unit in the CPU is not good at processing these, which is manifested in a slow calculation speed.

4、本发明负载通路路径设计的最短路径方法可以克服电网实际中存在多端T接线路和回环运行方式导致的负荷转移计算难的问题,传统的方式以基尔霍夫定律为基础,根据每个电网节点的电流和损耗率进行计算,计算量大且误差较大。采用这种直接进行估算,可以达到快速计算事前预警的效果,同时误差不大于传统电学方式。4. The shortest path method of the load path design of the present invention can overcome the problem of difficult load transfer calculation caused by the existence of multi-terminal T-connected lines and loop operation modes in the actual power grid. The traditional method is based on Kirchhoff's law and calculates according to the current and loss rate of each power grid node. The calculation amount is large and the error is large. Using this direct estimation, the effect of rapid calculation and advance warning can be achieved, and the error is no greater than that of the traditional electrical method.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1是本发明基于调控云的输电线路负荷转移控制方法的步骤图;FIG1 is a step diagram of a method for controlling load transfer of a power transmission line based on a control cloud according to the present invention;

图2是本发明基于调控云的输电线路负荷转移控制方法的流程示意图;FIG2 is a flow chart of a method for controlling load transfer of power transmission lines based on a control cloud according to the present invention;

图3是本发明基于调控云的输电线路负荷转移控制方法的树状电网拓扑模型的示意图。FIG3 is a schematic diagram of a tree-like power grid topology model of the power transmission line load transfer control method based on the control cloud of the present invention.

具体实施方式DETAILED DESCRIPTION

下面结合附图对本发明作更进一步地说明。The present invention will be further described below in conjunction with the accompanying drawings.

本发明公开了一种基于调控云的输电线路负荷转移计算方法的方法,属于电力调动自动化技术领域,包括从调控云调度自动化监控系统中获取电网实时运行数据、设备台账数据;根据获取的台账数据,建立电网的拓扑链接模型;对获取的电网实时运行数据进行分析,得到有效的量测数据;根据拓扑链接模型和有效量测数据,计算当线路由于种种原因跳闸时,线路负荷的转移路线,从而避免负荷转移造成的大面积线路跳闸风险;The present invention discloses a method for calculating a load transfer of a power transmission line based on a control cloud, which belongs to the technical field of power dispatching automation, and includes obtaining real-time operation data of a power grid and equipment ledger data from a control cloud dispatching automation monitoring system; establishing a topological link model of the power grid according to the acquired ledger data; analyzing the acquired real-time operation data of the power grid to obtain effective measurement data; calculating the transfer route of the line load when the line trips due to various reasons according to the topological link model and the effective measurement data, thereby avoiding the risk of large-area line tripping caused by load transfer;

线路负荷控制是保持电网安全运行的重要手段,该系统从调控云系统中获取集成的电力数据主要包电网电压、设备电流、设备有功、设备无功、电网设备台账、开关遥信等相关信息。准确判断线路的运行状态和发生线路跳闸事故时的负荷转移,为查找故障、分析故障及故障隔离提供充分的支持,可以进一步提高电网管理水平;Line load control is an important means to maintain the safe operation of the power grid. The system obtains integrated power data from the control cloud system, mainly including grid voltage, equipment current, equipment active power, equipment reactive power, grid equipment ledger, switch telemetering and other related information. Accurately judge the operating status of the line and the load transfer when a line tripping accident occurs, provide sufficient support for fault finding, fault analysis and fault isolation, and further improve the level of power grid management;

调控云调度自动化系统是一种立足电网主网调度运行管理需要,统一建设的一体化模型数据平台,实现电网模型和调控综合数据的管理与分工统一化,以提高电网运行管理水平、调控业务及电网运行数据的精细化与协同化和高效综合。采用云计算等新技术,整合控制来自于多个系统的电网运行综合数据,实现业务数据的关联,建立调控综合数据的管理体系。The control cloud dispatching automation system is an integrated model data platform built based on the needs of power grid main grid dispatching operation management, realizing the unified management and division of power grid model and comprehensive control data, so as to improve the power grid operation management level, control business and power grid operation data refinement and coordination and efficient integration. New technologies such as cloud computing are used to integrate and control the comprehensive power grid operation data from multiple systems, realize the association of business data, and establish a management system for comprehensive control data.

具体的,如图1-图2所示,一种基于调控云的输电线路负荷转移控制方法,包括如下步骤:Specifically, as shown in FIG. 1 and FIG. 2 , a transmission line load transfer control method based on a control cloud comprises the following steps:

步骤1:Step 1:

从调控云库中获取所有最高电压等级小于或等于220千伏的变电站的名称、厂站ID、拥有者、厂站类型;并获取这些变电站中的设备信息,设备包括母线、变压器、交流线路端点、负荷、当前遥信值为1的隔离开关、当前遥信值为1断路器。Obtain the names, plant IDs, owners, and plant types of all substations with the highest voltage level less than or equal to 220 kV from the control cloud library; and obtain the equipment information in these substations, including busbars, transformers, AC line terminals, loads, disconnectors with a current telesignal value of 1, and circuit breakers with a current telesignal value of 1.

步骤2:Step 2:

对于任意220千伏电压等级的变电站(步骤1中所获取的所有220千伏的电压等级变电站在步骤2-1中为电源点,然后在步骤2-2中根据电压等级大小220千伏->110千伏->35千伏->10千伏依此连接起来)。For any substation with a voltage level of 220 kV (all substations with a voltage level of 220 kV obtained in step 1 are power supply points in step 2-1, and then connected in step 2-2 according to the voltage level of 220 kV->110 kV->35 kV->10 kV).

选取当前电压Uab值大于220千伏的母线,并设其为电源点,设为E1、E2......En,如果该母线与同一变电站的其他220千伏母线相连,则记录这些母线为同一电源点。Select the bus whose current voltage Uab value is greater than 220 kV, and set it as the power supply point, set as E1, E2...En. If the bus is connected to other 220 kV busbars in the same substation, record these buses as the same power supply point.

取同一变电站的与电源点通过变压器相连的110千伏母线,110千伏母线记为节点110-1、110-2、110-3.....110-m,如果存在相连的110千伏母线则记录其为同一节点;Take the 110 kV busbar of the same substation connected to the power source point through the transformer, and record the 110 kV busbar as nodes 110-1, 110-2, 110-3...110-m. If there are connected 110 kV buses, they are recorded as the same node;

获取节点上断路器遥信值为1的110千伏的线路,根据其连接关系记录与其相连的对端变电站的110千伏母线并记录为另一节点,然后继续获取节点上的线路搜索其他节点,重复该过程,直至完全索引110千伏节点,并记录电源点与110千伏母线之间的变压器为110千伏节点。Get the 110 kV line with the circuit breaker telesignal value of 1 on the node, record the 110 kV bus of the opposite substation connected to it according to its connection relationship and record it as another node, then continue to get the line on the node to search for other nodes, repeat the process until the 110 kV node is fully indexed, and record the transformer between the power point and the 110 kV bus as a 110 kV node.

取步骤2-2中记录的110千伏节点,并取同一变电站的与该110千伏节点通过变压器相连的35千伏母线,35千伏母线记为节点35-1、35-2、35-3.....35-o,如果存在相连的35千伏母线则记录其为同一节点;获取节点上获取节点上断路器遥信值为1的35千伏的线路,根据其连接关系记录与其相连的对端变电站的35千伏母线并记录为另一节点,然后继续获取节点上的线路搜索其他节点,重复该过程,直至完全索引35千伏节点并记录其上级的110千伏节点,并记录110千伏节点与35千伏母线之间的变压器为35千伏节点。Take the 110 kV node recorded in step 2-2, and take the 35 kV bus connected to the 110 kV node through the transformer of the same substation, and record the 35 kV bus as nodes 35-1, 35-2, 35-3.....35-o. If there is a connected 35 kV bus, record it as the same node; obtain the 35 kV line on the node with a circuit breaker telesignal value of 1, record the 35 kV bus of the opposite substation connected to it according to its connection relationship and record it as another node, and then continue to obtain the line on the node to search for other nodes, repeat the process until the 35 kV node is fully indexed and its superior 110 kV node is recorded, and record the transformer between the 110 kV node and the 35 kV bus as a 35 kV node.

取步骤2-1中记录的电源点,取步骤2-2中记录的110千伏节点,然后获取并取同一变电站的与该节点通过变压器相连的35千伏母线,获取该35千伏母线上35千伏负荷,记录其上级节点,并记录该负荷为末端负荷设备;取步骤2-1中记录的电源点,取步骤2-2中记录的110千伏节点,取步骤2-3中记录的10千伏末端负荷设备;把35千伏和10千伏的末端负荷设备记为负荷点L1、L2......Lj。Take the power point recorded in step 2-1, take the 110 kV node recorded in step 2-2, then obtain and take the 35 kV bus connected to the node through a transformer in the same substation, obtain the 35 kV load on the 35 kV bus, record its upper node, and record the load as the terminal load equipment; take the power point recorded in step 2-1, take the 110 kV node recorded in step 2-2, take the 10 kV terminal load equipment recorded in step 2-3; record the 35 kV and 10 kV terminal load equipment as load points L1, L2...Lj.

根据上面四个步骤中记录的设备连接关系,以树状结构根据电压等级由高到低,建立该电源点的电网拓扑连接模型,然后保存该拓扑连接模型,拓扑连接模型记作t1、t2、t3......tn(拓扑连接模型数量与电源点数量是一致的),同时使被记录过的设备不再出现在其他电网拓扑连接模型中。According to the equipment connection relationship recorded in the above four steps, the grid topology connection model of the power supply point is established in a tree structure according to the voltage level from high to low, and then the topology connection model is saved. The topology connection model is recorded as t1, t2, t3...tn (the number of topology connection models is consistent with the number of power supply points), and at the same time, the recorded equipment will no longer appear in other grid topology connection models.

从调控云中获取该电源点的电网拓扑模型中变压器绕组的有功、无功、电流;母线的Uab线电压;交流线段端点的有功、无功、电流。The active power, reactive power and current of the transformer winding in the power grid topology model of the power source point are obtained from the control cloud; the Uab line voltage of the bus; and the active power, reactive power and current of the AC line segment endpoints.

对每个电流值大于5安培、有功值大于0.99兆瓦的负荷设备进行功率传输路径搜索,方法如下:The power transmission path search is performed for each load device with a current value greater than 5 amperes and an active value greater than 0.99 megawatts, as follows:

由该负荷点为起点,以穷举的方式搜索当前模型t中每条可以连接电源点的最短线路s,记为s1、s2、s3......sk,线路集合记作S。将线路中间连接的设备的ID、电源点、负荷点存入数据库,Starting from this load point, search exhaustively for the shortest line s that can connect to the power point in the current model t, denoted as s1, s2, s3...sk, and the line set is denoted as S. Store the ID, power point, and load point of the equipment connected in the middle of the line into the database.

如图3为一个典型的树状拓扑连接模型,负荷点L2的线路s2为:Figure 3 shows a typical tree topology connection model. The line s2 of the load point L2 is:

L2->35-2->110-2->E1;每个拓扑模型t中对应的线路集合记作S。L2->35-2->110-2->E1; the corresponding line set in each topology model t is denoted as S.

步骤3:Step 3:

对所有符合条件的220千伏电压等级的变电站进行步骤2操作后,取出一个模型tn,然后从tn的线路集合Sn中选取一条线路sj,并从调控云库中取负荷点Lj所连的线路的额定有功值Pjmax,tn中包含的每个负荷点的电流限值、有功值(负荷点在主网中是用户负荷的逻辑抽象,在配电网中才对于真实的设备,简单的说主网中的负荷点对应的是实际中一条街道或者一个工厂的整体用电负载,所以在主网中负荷点的电压等级必然为35千伏或10千伏,必然处于主电网的末端,故而不会分配在中部。E1下方分的子树在实际中存在0、1、2、3......n这种情况,这是根据实际中的电网设备连接关系决定的,图中仅仅为一种典型案例的示意)。After performing step 2 on all eligible 220 kV substations, take out a model tn, then select a line sj from the line set Sn of tn, and take the rated active value Pjmax of the line connected to the load point Lj from the control cloud library, the current limit and active value of each load point contained in tn (the load point is a logical abstraction of the user load in the main grid, and it corresponds to the real equipment in the distribution network. Simply put, the load point in the main grid corresponds to the overall power load of a street or a factory in reality, so the voltage level of the load point in the main grid must be 35 kV or 10 kV, and it must be at the end of the main grid, so it will not be distributed in the middle. The subtrees below E1 actually exist in 0, 1, 2, 3...n situations, which is determined by the actual connection relationship of the power grid equipment. The figure is just an illustration of a typical case).

当P>μPjmax,其中μ优选为0.88时,则判断该线路处于重载状态,具有跳闸风险,并记录负荷名称和有功功率至数据库中。(μ为经验数值,中文含义为负载率,一般认为μ<0.3时为轻载,0.3<μ<0.8时为正常工作,一般情况下在μ>0.8时定义为负荷重载,当出现μ>0.8时电网调度员就需要设法调整电网运行方式,防止跳闸,超过0.9时线路跳闸风险极高,这里设为0.88是为了比0.9保守一点)When P>μPjmax, where μ is preferably 0.88, the line is judged to be in a heavy load state and has a tripping risk, and the load name and active power are recorded in the database. (μ is an empirical value, which means load rate in Chinese. It is generally believed that μ<0.3 is light load, 0.3<μ<0.8 is normal operation, and μ>0.8 is generally defined as heavy load. When μ>0.8 occurs, the grid dispatcher needs to try to adjust the grid operation mode to prevent tripping. When it exceeds 0.9, the risk of line tripping is extremely high. It is set to 0.88 here to be more conservative than 0.9.)

在Sn中删除线路sj(在该模型下,线路的个数和负荷点的个数是一致的,这也是采用树状模型时自然被简化的计算),新的线路集合记作Sn1.Delete line sj from Sn (in this model, the number of lines is consistent with the number of load points, which is also a naturally simplified calculation when using the tree model), and the new line set is recorded as Sn1.

从新的线路集合Sn1中取负荷点Lj的线路跳闸后,功率转移路径集合(这里路径是线路的意思)Sn2,应满足:After the line tripping of the load point Lj is selected from the new line set Sn1, the power transfer path set (here the path means the line) Sn2 should satisfy:

其中En表示线路电源点,Lj表示线路负荷点,D(En,Lj)表示电源点为En负荷点为Lj的线路经过的节点数,Dj1表示电源点为En负荷点为Lj的线路跳闸后其他线路的节点数,r为设定阈值,优选为2.Where En represents the power source point of the line, Lj represents the load point of the line, D(E n ,L j ) represents the number of nodes that the line with power source point En and load point Lj passes through, Dj1 represents the number of nodes of other lines after the line with power source point En and load point Lj trips, and r is the set threshold, preferably 2.

若(1)式不满足,则表示该功率路径过长,不符合要求,不属于Sn2。If equation (1) is not satisfied, it means that the power path is too long, does not meet the requirements, and does not belong to Sn2.

设Sn2中每个路径的结点数分别为o1、o2、o3......ow,则于负荷点Lj连的线路sj跳闸后,每个处于集合Sn2中的线路被转移到的有功功率为:Assume that the number of nodes of each path in Sn2 is o1, o2, o3, ..., ow, then after the line sj connected to the load point Lj trips, the active power transferred to each line in the set Sn2 is:

其中ΔPj1为每条线路被转移到的负荷,Pnow为负荷所在的线路当前有功值,α为理论最小传输节点数优选为2,c为该功率转移路包含电源点与负荷点在内的节点数,z为与该功率转移路径节点数相同的功率转移路径总数。Wherein ΔP j1 is the load to which each line is transferred, P now is the current active value of the line where the load is located, α is the theoretical minimum number of transmission nodes, preferably 2, c is the number of nodes in the power transfer path including the power source point and the load point, and z is the total number of power transfer paths with the same number of nodes as the power transfer path.

求得线路跳闸后,发生功率转移时,其他负荷点所在的线路的实时功率Ptnow=Pnow+ΔPj1After the line trips, when power transfer occurs, the real-time power of the line where other load points are located is obtained as P tnow =P now +ΔP j1 .

步骤4:Step 4:

重新验证步骤3.2中记录的Sn2中每个负荷点的实时功率Ptnow,如果Ptnow>μPj1max,其中μ优选为0.88,则该点作为连锁反应点,记录该负荷点名称和对应的Ptnow至数据库中。Re-verify the real-time power Ptnow of each load point in Sn2 recorded in step 3.2. If Ptnow>μPj1max, where μ is preferably 0.88, then this point is used as a chain reaction point, and the load point name and corresponding Ptnow are recorded in the database.

当步骤4中被记录的连锁反应点大于1时,在软件前端界面显示当前存在连锁跳闸风险,并展示步骤3过程①中记录的跳闸风险负荷点和步骤4中记录的连锁反应点。When the chain reaction point recorded in step 4 is greater than 1, the software front-end interface displays the current chain tripping risk, and displays the tripping risk load point recorded in step 3 process ① and the chain reaction point recorded in step 4.

本发明通过详细技术方案中的步骤2所进行的步骤,把电网模型从多电源点多负荷点的需要大量矩阵计算的“图”,抽象为单电源点多负荷的树状模型,通过欧姆定律即可进行计算,并更符合实际的运行情况。The present invention, through the steps performed in step 2 of the detailed technical solution, abstracts the power grid model from a "graph" of multiple power points and multiple load points that requires a large number of matrix calculations into a tree-like model of single power point and multiple loads, which can be calculated using Ohm's law and is more in line with actual operating conditions.

本发明通过步骤3中的计算,摒弃了传统的负荷和电流的计算方式,如DFT算法,消除多次乘法和加法计算。由于实际数据与该算法相符,如做成图表观察则表现为毛刺较少,计算中自然可以摒弃大量的数据清洗处理和平滑处理过程,减少大量指数运算和加减法的加权处理,一般情况下这些计算需要CPU中存在特殊指令集或使用GPU加速才能加快计算速度,而CPU中的通用计算单元并不擅长处理这些,表现方式为计算速度较慢。The present invention abandons the traditional load and current calculation method, such as DFT algorithm, and eliminates multiple multiplication and addition calculations through the calculation in step 3. Since the actual data is consistent with the algorithm, if it is made into a chart, it will show less burrs. Naturally, a large amount of data cleaning and smoothing processes can be abandoned in the calculation, and a large amount of exponential operations and weighted processing of addition and subtraction can be reduced. Generally, these calculations require special instruction sets in the CPU or use GPU acceleration to speed up the calculation speed, but the general computing unit in the CPU is not good at processing these, which is manifested in a slow calculation speed.

本发明的创新点主要是结合计算机技术,可以使其达到秒级的运算速度,可以解决传统的设定阈值的监控方式,缺少预估性,无法事前评估电网存在的风险。也可以解决传统的方法,精细度有余但实时性不足的问题。The innovation of the present invention is mainly that it combines computer technology to achieve a computing speed of seconds, which can solve the problem that the traditional monitoring method of setting thresholds lacks predictability and cannot assess the risks of the power grid in advance. It can also solve the problem that the traditional method has more precision but less real-time performance.

以上所述仅是本发明的优选实施方式,应当指出:对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims (8)

1. The power transmission line load transfer control method based on the regulation cloud is characterized by comprising the following steps of:
Step 1: reading equipment account data from a regulation cloud platform, and acquiring all power transmission and transformation equipment information;
Step 2: generating a tree-shaped power grid topology model in a single power point mode according to the equipment information and the connection relation;
Step 3: reading regulation and control cloud telemetry data and remote signaling data to form a load path;
step 4: judging the tripping risk of the line load according to the load path model;
step 5: carrying out load transfer analysis after tripping on a circuit with tripping risk, and rapidly evaluating new risk caused by load transfer;
Wherein, the specific operation of the step 1 is as follows: acquiring the names, the station IDs, owners and the station types of all the substations with the highest voltage level less than or equal to 220 kilovolts from a regulation cloud base; the equipment information in the substations is acquired, wherein the equipment comprises a bus, a transformer, an alternating current line endpoint, a load, a disconnecting switch with the current remote signaling value of 1 and a breaker with the current remote signaling value of 1;
The specific construction mode of the tree-shaped power grid topology model in the step 2 is as follows:
Step 2.1: selecting a bus with a current voltage Uab value of more than 220 kilovolts, setting the bus as a power supply point, setting the bus as E1 and E2.
Step 2.2: taking 110 kilovolt buses of the same transformer substation, which are connected with a power supply point through a transformer, wherein the 110 kilovolt buses are recorded as nodes 110-1, 110-2 and 110-3. Acquiring a 110 kilovolt line with a remote signaling value of 1 of a circuit breaker on a node, recording a 110 kilovolt bus of an opposite-end transformer substation connected with the circuit breaker according to a connection relation of the circuit breaker as another node, continuously acquiring the line on the node to search for other nodes, repeating the process until the 110 kilovolt node is completely indexed, and recording that a transformer between a power supply point and the 110 kilovolt bus is the 110 kilovolt node;
Step 2.3: taking 110 kilovolt nodes recorded in the step 2.2, and taking 35 kilovolt buses connected with the 110 kilovolt nodes of the same transformer substation through a transformer, wherein the 35 kilovolt buses are recorded as nodes 35-1, 35-2 and 35-3. Acquiring a 35 kilovolt line with a remote signaling value of 1 of a circuit breaker on a node, recording a 35 kilovolt bus of an opposite-end transformer substation connected with the node according to a connection relation of the 35 kilovolt line as another node, continuously acquiring the line on the node to search for other nodes, repeating the process until the 35 kilovolt node is completely indexed and the 110 kilovolt node on the upper level is recorded, and recording that a transformer between the 110 kilovolt node and the 35 kilovolt bus is the 35 kilovolt node; if 35 kilovolt load equipment exists on the 35 kilovolt node, recording that the equipment is 35 kilovolt end load equipment, and recording that the upper node is 110 kilovolt node and is not overlapped with the 35 kilovolt node;
Step 2.4: taking the 35 KV node recorded in the step 2.3, taking a 10KV bus connected with the 35 KV node through a transformer of the same transformer substation, obtaining 10KV load equipment on the 10KV bus, recording the upper node of the 10KV load equipment, and recording that the 10KV load equipment is 10KV tail end load equipment;
Step 2.5: taking the power supply point recorded in the step 2.1, taking the 110 kilovolt node recorded in the step 2.2, then taking a 35 kilovolt bus connected with the 110 kilovolt node of the same transformer substation through a transformer, obtaining 35 kilovolt load on the 35 kilovolt bus, recording the upper node of the 35 kilovolt load, and recording the 35 kilovolt load as terminal load equipment; taking the power supply point recorded in the step 2.1, taking the 110 kilovolt node recorded in the step 2.2, taking the 35 kilovolt node and 35 kilovolt end load equipment recorded in the step 2.3, and taking the 10 kilovolt end load equipment recorded in the step 2.4; end load devices of 35 kv and 10 kv were recorded as load points L1, L2.
Step 2.5: according to the equipment connection relation recorded in the steps 2.1-2.5, a tree-shaped power grid topology model of the power supply point is built according to the voltage level from high to low in a tree-shaped structure, then the tree-shaped power grid topology model is stored, and the tree-shaped power grid topology model is recorded as t1, t2 and t3..
2. The power transmission line load transfer control method based on regulation and control cloud as set forth in claim 1, wherein step 3 specifically includes:
Step 3.1: active, reactive and current of a transformer winding in the power grid topology model are obtained from the regulation cloud; the Uab line voltage of the bus; active, reactive and current at the end points of the alternating current line segments;
Step 3.2: and searching the power transmission path of the tree-shaped power grid topological model from bottom to top by taking each end load device as a starting point and a power supply point as an ending point, and obtaining the shortest path from the starting point to the ending point of each end load device in the tree-shaped power grid topological model, wherein the aggregate S1, S2 and s3. of the shortest paths of all the end load devices is the load path S.
3. The method for controlling load transfer of a power transmission line based on regulation and control cloud according to claim 2, wherein in step 3.2, the terminal load equipment selects load equipment with a current value greater than 5 amperes and an active value greater than 0.99 megawatts.
4. The method for controlling load transfer of a power transmission line based on a regulatory cloud according to claim 3, wherein for any tree-shaped power grid topology model tn0, a j-th load path sq in load path paths s1, s2, … …, sn0 is taken from a regulatory cloud base, a rated active value Pjmax of a line connected with a load point Lj is taken, and when actual power P of the line connected with the load point Lj is greater than μ Pjmax, the line is judged to be in a heavy load state and has tripping risk, wherein μ is a load rate.
5. The method for controlling load transfer of a power transmission line based on a regulatory cloud of claim 4, wherein μ=0.88.
6. The method for controlling load transfer of a power transmission line based on a regulatory cloud of claim 5, wherein step 5 specifically operates as:
Step 5.1: for any tree-shaped power grid topology model tn0, removing a line with tripping risk from load path paths s1, s2, … … and sn0 to form new load path paths s1', s2', … … and sn1;
Step 5.2: acquiring a tripping risk line power transfer path set sn2 according to a power path transfer discrimination formula;
step 5.3: the active power to which the power transfer path set sn2 is transferred is:
Wherein Δp p1 is the load to which the j-th line in the power transfer path set Sn2 is transferred, the node number of each path in Sn2 is o1, o2, o3., respectively, P now is the current active value of the line where the load is located, α is the theoretical minimum transmission node number, c is the node number of the power transfer path including the power source point and the load point, and z is the total number of power transfer paths equal to the node number of the power transfer path;
Step 5.4: solving the real-time power of the circuit where other load points are located when the power transfer occurs after the circuit trips:
Ptnow=Pnow+ΔPj1
Wherein P tnow represents the real-time power of the line where other load points are located when the power transfer occurs after the line trips;
Step 5.5: if Ptnow > μ Pjmax, then this load acts as a chain reaction point;
step 5.6: when the chain reaction point is larger than 1, the chain tripping risk exists, and the tripping risk load point and the chain reaction point are output.
7. The method for controlling load transfer of a power transmission line based on regulatory cloud according to claim 6, wherein the power path transfer discrimination formula is:
Wherein D (E n,Lj) represents the number of nodes through which the line with the power point of En and the load point of Lj passes, dj1 represents the number of nodes of other lines after the line with the power point of En and the load point of Lj trips, and r is the power path transfer rate threshold.
8. The method for controlling load transfer of a power transmission line based on a regulatory cloud of claim 7, wherein r=2.
CN202210386313.XA 2022-04-13 2022-04-13 Power transmission line load transfer control method based on regulation and control cloud Active CN114678866B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210386313.XA CN114678866B (en) 2022-04-13 2022-04-13 Power transmission line load transfer control method based on regulation and control cloud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210386313.XA CN114678866B (en) 2022-04-13 2022-04-13 Power transmission line load transfer control method based on regulation and control cloud

Publications (2)

Publication Number Publication Date
CN114678866A CN114678866A (en) 2022-06-28
CN114678866B true CN114678866B (en) 2024-08-09

Family

ID=82078089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210386313.XA Active CN114678866B (en) 2022-04-13 2022-04-13 Power transmission line load transfer control method based on regulation and control cloud

Country Status (1)

Country Link
CN (1) CN114678866B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116915690B (en) * 2023-09-14 2023-12-12 国网江苏省电力有限公司徐州供电分公司 Power distribution line transmission efficiency evaluation method and system of passive tree topology
CN118889430B (en) * 2024-10-09 2025-02-21 福州锐丽信电子有限公司 A power distributor management method and system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102290811A (en) * 2011-08-10 2011-12-21 上海市电力公司 Method for evaluating accident prearranged plan and running way
WO2016120240A1 (en) * 2015-01-29 2016-08-04 Siemens Aktiengesellschaft Method for improving the capacity utilization of a low-voltage network

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102290811A (en) * 2011-08-10 2011-12-21 上海市电力公司 Method for evaluating accident prearranged plan and running way
WO2016120240A1 (en) * 2015-01-29 2016-08-04 Siemens Aktiengesellschaft Method for improving the capacity utilization of a low-voltage network

Also Published As

Publication number Publication date
CN114678866A (en) 2022-06-28

Similar Documents

Publication Publication Date Title
CN103914788B (en) The reliability estimation method of power grid multilink system
CN104103019B (en) Operation risk assessment method and assessment system of power distribution network containing distributed power supply
CN107506849A (en) A kind of intelligent optimization distribution transforming, which has a power failure, studies and judges system
CN114678866B (en) Power transmission line load transfer control method based on regulation and control cloud
CN104318374A (en) Method for assessing reliability of medium voltage distribution network for calculating upstream power restoration operation time
CN102982230B (en) A kind of short circuit current based on node impedance sensitivity exceeds standard aid decision-making method
CN104166940B (en) Power distribution network operation risk assessment method and assessment system
CN104112076A (en) Fuzzy mathematics based operational risk assessment method and fuzzy mathematics based operational risk assessment system
CN111211574A (en) Calculation method of DC side bipolar fault current based on half-bridge MMC multi-terminal DC grid
CN110705878A (en) Method for approximately estimating reliability of medium-voltage distribution network
CN116826725A (en) Multi-objective fault power supply recovery method for substation-oriented medium-voltage distribution power supply area (S-SCDN) feeder line group FC
CN105046011B (en) The electrical device status rapid analysis method calculated based on distributed electrical net topology
CN101860002A (en) Calculation Method of Preventive Control Measures for Short Circuit Current in Power System
CN111680375B (en) Load prediction method and system for distributed FA simulation system
CN117852773B (en) A distribution network fault location system
CN114065537A (en) Power distribution network power supply reliability simulation prediction method, system and storage medium
CN104348131B (en) A recovery system and method based on 35kV power failure of intelligent distribution network
CN113125882A (en) Power line route loss real-time monitoring system based on Internet of things
CN111224396A (en) Comprehensive analysis system and method for power transmission, transformation and distribution low-integration power grid information
CN104700318A (en) Method for identifying weak link of power distribution network based on equipment power flow topology
CN111880035B (en) Power distribution network fault monitoring system and method based on multi-source measurement data
CN110768246B (en) Method and device for analyzing cascading failure of power transmission section of alternating current-direct current power grid
Cao et al. Evaluation on Factors Affecting System Reliability of Urban Distribution Networks
CN111199289A (en) Line loss monitoring system based on big data
CN111126724A (en) A power grid dispatching management system based on big data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant