CN114635552A - Elevator shaft lifting construction protection operation platform - Google Patents

Elevator shaft lifting construction protection operation platform Download PDF

Info

Publication number
CN114635552A
CN114635552A CN202210303576.XA CN202210303576A CN114635552A CN 114635552 A CN114635552 A CN 114635552A CN 202210303576 A CN202210303576 A CN 202210303576A CN 114635552 A CN114635552 A CN 114635552A
Authority
CN
China
Prior art keywords
elevator shaft
platform
protective
protective platform
protection operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210303576.XA
Other languages
Chinese (zh)
Inventor
麻成博
胡江
陆松威
胡海云
覃必英
黄修书
蒙少牙
梁高于
黄以和
陆振官
莫脉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group Construction Engineering General Contracting Co ltd
Original Assignee
Guangxi Construction Engineering Group Construction Engineering General Contracting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Construction Engineering Group Construction Engineering General Contracting Co ltd filed Critical Guangxi Construction Engineering Group Construction Engineering General Contracting Co ltd
Priority to CN202210303576.XA priority Critical patent/CN114635552A/en
Publication of CN114635552A publication Critical patent/CN114635552A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

本发明涉及电梯井施工技术领域,特别涉及电梯井升降施工防护操作平台,包括可吊挂下放至电梯井内的防护平台、多个活动插接在防护平台侧面的伸缩块、安装在防护平台内的驱动机构和安装在防护平台上表面的升降机构;驱动机构用于驱动伸缩块伸出防护平台使伸缩块穿置入电梯井壁预留洞口内以支撑防护平台;升降机构用于支撑工作人员上升或下降。本发明可以支撑在电梯井壁预留洞口,并调节工人的施工高度。

Figure 202210303576

The invention relates to the technical field of elevator shaft construction, in particular to a protective operation platform for elevator shaft lifting construction, comprising a protective platform that can be hung and lowered into the elevator shaft, a plurality of telescopic blocks that are movably plugged on the side of the protective platform, and a protective platform installed in the protective platform. The driving mechanism and the lifting mechanism installed on the upper surface of the protective platform; the driving mechanism is used to drive the telescopic block to extend out of the protective platform, so that the telescopic block is inserted into the reserved hole in the elevator shaft wall to support the protective platform; the lifting mechanism is used to support the staff to ascend or drop. The invention can support the reserved hole in the elevator shaft wall and adjust the construction height of workers.

Figure 202210303576

Description

电梯井升降施工防护操作平台Elevator shaft lifting construction protection operation platform

技术领域technical field

本发明涉及电梯井施工技术领域,特别涉及电梯井升降施工防护操作平台。The invention relates to the technical field of elevator shaft construction, in particular to an elevator shaft lifting construction protection operation platform.

背景技术Background technique

在电梯井的施工中,电梯井内通常需要搭建电梯井操作平台,方便工人在该平台上进行电梯井内的砌筑、布线等操作。In the construction of elevator shafts, it is usually necessary to build an elevator shaft operation platform in the elevator shaft, which is convenient for workers to perform operations such as masonry and wiring in the elevator shaft on the platform.

目前电梯井操作平台的搭建主要采用两种方式:①从下往上搭设架子作为防护和施工操作平台,此方法施工成本高,且随着高度的增加安全隐患增大,日常检修也不便;②使用传统的成品电梯井操作平台,此方法楼层高度多变时需要定制多个,增加成本,且电梯井内模施工时需要在平台上安放门字架来调整高度,施工不够便利。At present, there are mainly two ways to build the elevator shaft operating platform: ① Set up a shelf from bottom to top as a protection and construction operation platform. This method has high construction cost, and with the increase of height, the potential safety hazard increases, and daily maintenance is inconvenient; ② Using the traditional finished elevator shaft operation platform, this method requires multiple customizations when the floor height is variable, which increases the cost, and the door frame needs to be placed on the platform to adjust the height during the construction of the elevator shaft inner mold, which is not convenient for construction.

发明内容SUMMARY OF THE INVENTION

针对上述问题,本发明目的在于提供了电梯井升降施工防护操作平台,可以支撑在电梯井壁预留洞口,并调节工人的施工高度。In view of the above problems, the purpose of the present invention is to provide an elevator shaft lifting construction protection operation platform, which can be supported on a reserved hole in the elevator shaft wall and adjust the construction height of workers.

本发明的上述技术目的是通过以下技术方案得以实现的:The above-mentioned technical purpose of the present invention is achieved through the following technical solutions:

电梯井升降施工防护操作平台,包括可吊挂下放至电梯井内的防护平台、多个活动插接在防护平台侧面的伸缩块、安装在防护平台内的驱动机构和安装在防护平台上表面的升降机构;所述驱动机构用于驱动伸缩块伸出防护平台使伸缩块穿置入电梯井壁预留洞口内以支撑防护平台;所述升降机构用于支撑工作人员上升或下降。Elevator shaft lifting construction protective operation platform, including a protective platform that can be hung and lowered into the elevator shaft, a plurality of telescopic blocks that are movably plugged into the side of the protective platform, a drive mechanism installed in the protective platform, and a lift installed on the upper surface of the protective platform mechanism; the driving mechanism is used to drive the telescopic block to extend out of the protective platform, so that the telescopic block is inserted into the reserved hole in the elevator shaft wall to support the protective platform; the lifting mechanism is used to support the staff to ascend or descend.

作为优选的,所述伸缩块的数量设置为四个,四个所述伸缩块分别活动插接在防护平台的四角处。Preferably, the number of the telescopic blocks is set to four, and the four telescopic blocks are respectively movably plugged at four corners of the protective platform.

作为优选的,所述驱动机构包括双轴步进电机和两根丝杆;所述防护平台两端均贯穿开设有沿防护平台长度方向延伸的滑槽,防护平台上表面中部开设有沿防护平台宽度方向延伸并连通两个滑槽的安装槽;四个所述伸缩块分别活动插接两个滑槽的四个槽口处;两根所述丝杆分别设置在两个滑槽内,丝杆两端分别与对应的伸缩块正、反螺纹连接,且丝杆中部同轴固定连接有蜗轮;所述双轴步进电机固定设置在安装槽内,双轴步进电机的两根输出轴的端部均同轴固定连接有蜗杆,两根所述蜗杆远离输出轴的一端分别与对应的蜗轮传动连接;所述双轴步进电机驱动蜗杆转动,通过蜗轮和蜗杆的传动连接带动丝杆转动,使得丝杆两端的两个伸缩块在反向螺纹的作用下同步相互远离而伸出滑槽,或者同步相互靠近而缩回滑槽。Preferably, the drive mechanism includes a biaxial stepping motor and two screw rods; both ends of the protective platform are provided with a chute extending along the length of the protective platform, and the middle of the upper surface of the protective platform is provided along the protective platform. The installation grooves extend in the width direction and communicate with the two chutes; the four telescopic blocks are respectively movably inserted into the four notches of the two chutes; the two screw rods are respectively arranged in the two chutes, and the wires The two ends of the rod are respectively connected with the corresponding telescopic blocks with positive and negative threads, and the middle part of the screw rod is coaxially fixedly connected with a worm wheel; the biaxial stepping motor is fixedly arranged in the installation groove, and the two output shafts of the biaxial stepping motor The ends of the two worms are coaxially and fixedly connected with worms, and the ends of the two worms away from the output shaft are respectively connected with the corresponding worm gears; the biaxial stepping motor drives the worms to rotate, and drives the screw through the transmission connection between the worm and the worm. Rotate, so that the two telescopic blocks at both ends of the screw rod move away from each other synchronously under the action of the reverse thread to extend out of the chute, or synchronously approach each other to retract the chute.

作为优选的,所述安装槽的槽口处竖直转动连接有用于打开和关闭安装槽的盖板。Preferably, a cover plate for opening and closing the installation slot is vertically rotatably connected to the slot of the installation slot.

作为优选的,所述双轴步进电机的输出轴通过联轴器与蜗杆同轴固定连接。Preferably, the output shaft of the biaxial stepping motor is coaxially and fixedly connected to the worm through a coupling.

作为优选的,所述蜗杆通过轴承座安装在安装槽内。Preferably, the worm is installed in the installation groove through a bearing seat.

作为优选的,所述防护平台上于滑槽槽口处设有上限位开关,滑槽内壁于伸缩块和蜗轮之间设有下限位开关;所述上限位开关和下限位开关均与双轴步进电机电连接。Preferably, an upper limit switch is arranged at the slot of the chute on the protective platform, and a lower limit switch is arranged on the inner wall of the chute between the telescopic block and the worm wheel; the upper limit switch and the lower limit switch are both connected to the double shaft The stepper motor is electrically connected.

作为优选的,所述升降机构为剪叉液压升降机。Preferably, the lifting mechanism is a scissor hydraulic lift.

作为优选的,所述防护平台上表面的四角处均设有吊钩。Preferably, hooks are provided at the four corners of the upper surface of the protective platform.

由于采用了上述技术方案,本发明具有如下有益效果:Owing to adopting the above-mentioned technical scheme, the present invention has the following beneficial effects:

本发明提供的电梯井升降施工防护操作平台,采用可吊挂下放至电梯井内的防护平台和多个活动插接在防护平台侧面的伸缩块,通过驱动机构可驱动伸缩块伸出防护平台使伸缩块穿置入电梯井壁预留洞口内以支撑防护平台,通过设置在防护平台上的升降机构,能够支撑工作人员上升或下降以满足施工高度的需求;与现有技术相比,本发明不需要从下往上搭设多个架子,节约成本、安全性高,且检修方便;同时也不需要额外安放门字架来调整高度,施工更方便,可周转利用。The elevator shaft lifting construction protective operation platform provided by the present invention adopts a protective platform that can be hung and lowered into the elevator shaft and a plurality of telescopic blocks that are movably inserted on the side of the protective platform. The block is inserted into the reserved opening of the elevator shaft wall to support the protective platform, and the lifting mechanism arranged on the protective platform can support the staff to rise or fall to meet the requirements of the construction height; compared with the prior art, the present invention does not It is necessary to set up multiple shelves from the bottom to the top, which saves cost, has high safety, and is easy to maintain. At the same time, there is no need to place additional door frames to adjust the height, which is more convenient for construction and can be used for turnover.

附图说明Description of drawings

图1是本发明的整体示意图;Fig. 1 is the overall schematic diagram of the present invention;

图2是本发明的正面示意图;Fig. 2 is the front schematic view of the present invention;

图3是本发明防护平台的立体图;Fig. 3 is the perspective view of the protection platform of the present invention;

图4是本发明防护平台的立体剖视图;Fig. 4 is the three-dimensional sectional view of the protection platform of the present invention;

图5是本发明驱动机构的立体图;Fig. 5 is the perspective view of the drive mechanism of the present invention;

图6是本发明驱动机构的俯视图;Fig. 6 is the top view of the drive mechanism of the present invention;

图7是本发明其中一较佳实施例的局部剖视图。FIG. 7 is a partial cross-sectional view of one of the preferred embodiments of the present invention.

附图中,1、防护平台;11、滑槽;12、安装槽;121、盖板;2、伸缩块;31、双轴步进电机;32、丝杆;33、蜗轮;34、蜗杆;4、升降机构;5、联轴器;6、轴承座;7、吊钩;81、上限位开关;82、下限位开关。In the drawings, 1, protective platform; 11, chute; 12, installation groove; 121, cover plate; 2, telescopic block; 31, dual-axis stepping motor; 32, screw; 33, worm gear; 34, worm; 4. Lifting mechanism; 5. Coupling; 6. Bearing seat; 7. Hook; 81. Upper limit switch; 82, Lower limit switch.

具体实施方式Detailed ways

下面结合附图对本发明专利的技术方案进行清楚、完整的描述,显然,所描述的实施例是本发明的一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域所属的技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions of the patent of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative efforts shall fall within the protection scope of the present invention.

在本发明的描述中,需要说明的是,如出现术语“中心”、“上”、“下”“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner" and "outer" appear as The orientation or positional relationship indicated by etc. is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation, with a specific orientation. The orientation configuration and operation are therefore not to be construed as limitations of the present invention.

在本发明的描述中,需要说明的是,除非另有明确的规定和限定,如出现术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接连接,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域所属的技术人员而言,可以具体情况理解上述术语在本实用型中的具体含义。In the description of the present invention, it should be noted that, unless otherwise expressly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it may be a fixed connection or a Removable connection, or integral connection; it can be mechanical connection or electrical connection; it can be direct connection or indirect connection through an intermediate medium, and it can be internal communication between two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood in specific situations.

参见图1-6,本实施例提供的电梯井升降施工防护操作平台,包括防护平台1、多个伸缩块2、驱动机构和升降机构4;该防护平台1呈方形,且尺寸略小于电梯井井口尺寸,使可防护平台1吊挂放进电梯井内的防护平台1;多个伸缩块2活动插接在防护平台1侧面,驱动机构安装在防护平台1内以驱动伸缩块2伸出防护平台1使伸缩块2穿置入电梯井壁预留洞口内,从而支撑防护平台1;升降机构4安装在防护平台1上表面以支撑工作人员上升或下降。1-6, the elevator shaft lifting construction protection operation platform provided in this embodiment includes a protection platform 1, a plurality of telescopic blocks 2, a driving mechanism and a lifting mechanism 4; the protection platform 1 is square, and its size is slightly smaller than the elevator shaft The size of the wellhead is such that the protective platform 1 can be hung into the protective platform 1 in the elevator shaft; a plurality of telescopic blocks 2 are movably inserted on the side of the protective platform 1, and the driving mechanism is installed in the protective platform 1 to drive the telescopic blocks 2 to extend out of the protective platform. 1. Insert the telescopic block 2 into the reserved hole of the elevator shaft wall to support the protective platform 1; the lifting mechanism 4 is installed on the upper surface of the protective platform 1 to support the staff to ascend or descend.

在本实施例中,可以将伸缩块2的数量设置为四个,四个伸缩块2分别活动插接在防护平台1的四角处。具体的,驱动机构包括双轴步进电机31和两根丝杆32;其中双轴步进电机31的型号为57HZ80-22,防护平台1两端均贯穿开设有沿防护平台1长度方向延伸的滑槽11,防护平台1上表面中部开设有沿防护平台1宽度方向延伸并连通两个滑槽11的安装槽12;四个伸缩块2分别活动插接两个滑槽11的四个槽口处;两根丝杆32分别贯穿转动设置在两个滑槽11内,丝杆32两端分别与对应的伸缩块2正、反螺纹连接,且丝杆32中部同轴固定连接有蜗轮33;双轴步进电机31固定设置在安装槽12内,双轴步进电机31的两根输出轴的端部均同轴固定连接有蜗杆34,两根蜗杆34远离输出轴的一端分别与对应的蜗轮33传动连接。使用时,双轴步进电机31驱动蜗杆34转动,通过蜗轮33和蜗杆34的传动连接带动丝杆32转动,使得丝杆32两端的两个伸缩块2在反向螺纹的作用下同步相互远离而伸出滑槽11以穿置入电梯井壁预留洞口内,从而支撑防护平台1,或者使得两个伸缩块2同步相互靠近而缩回滑槽11,从而使防护平台1失去电梯井壁的限制以吊出或放下防护平台1。In this embodiment, the number of the telescopic blocks 2 can be set to four, and the four telescopic blocks 2 are respectively movably plugged at the four corners of the protective platform 1 . Specifically, the driving mechanism includes a biaxial stepping motor 31 and two screw rods 32; the model of the biaxial stepping motor 31 is 57HZ80-22; The chute 11, the middle of the upper surface of the protective platform 1 is provided with a mounting groove 12 extending along the width direction of the protective platform 1 and connecting the two chutes 11; The two screw rods 32 are respectively arranged in the two chutes 11 through rotation, the two ends of the screw rod 32 are respectively connected with the corresponding telescopic blocks 2 forward and reverse threads, and the middle part of the screw rod 32 is coaxially fixedly connected with a worm wheel 33; The biaxial stepping motor 31 is fixedly arranged in the installation slot 12 , and the ends of the two output shafts of the biaxial stepping motor 31 are fixedly connected with worms 34 coaxially. The worm gear 33 is drive-connected. When in use, the biaxial stepping motor 31 drives the worm 34 to rotate, and drives the screw 32 to rotate through the transmission connection between the worm wheel 33 and the worm 34, so that the two telescopic blocks 2 at both ends of the screw 32 are synchronously away from each other under the action of the reverse thread. The protruding chute 11 is inserted into the reserved hole of the elevator shaft wall, thereby supporting the protective platform 1, or the two telescopic blocks 2 are synchronously approached to each other to retract the chute 11, so that the protective platform 1 loses the elevator shaft wall limit to lift or lower the protective platform 1.

在上述实施例的基础上,可以在安装槽12的槽口处竖直转动连接有盖板121,双轴步进电机31运行时,盖上盖板121关闭安装槽12,防止双轴步进电机31受掉落物的影响;需要维护时打开盖板121,使用方便。On the basis of the above embodiment, a cover plate 121 can be vertically rotatably connected to the notch of the installation groove 12. When the biaxial stepping motor 31 is running, the cover plate 121 is covered to close the installation groove 12 to prevent the biaxial stepping motor 31 from stepping. The motor 31 is affected by falling objects; the cover 121 is opened when maintenance is required, which is convenient to use.

进一步的,可以设置双轴步进电机31的输出轴通过联轴器5与蜗杆34同轴固定连接,联轴器5将双轴步进电机31的输出轴与蜗杆34牢固地联接起来一同旋转,并传递运动和扭矩蜗杆34,还可以防止蜗杆34承受过大的载荷,起到过载保护的作用。Further, the output shaft of the biaxial stepping motor 31 can be set to be coaxially and fixedly connected to the worm 34 through the coupling 5, and the coupling 5 firmly couples the output shaft of the biaxial stepping motor 31 and the worm 34 to rotate together. , and transmit the motion and torque to the worm 34, which can also prevent the worm 34 from bearing excessive load, and play the role of overload protection.

其中,还可以设置蜗杆34通过轴承座6安装在安装槽12内,轴承座6内的轴承套接在蜗杆34上,能够降低蜗杆34转动过程中的摩擦系数,并保证其回转精度。Among them, the worm 34 can also be installed in the installation groove 12 through the bearing seat 6, and the bearing in the bearing seat 6 is sleeved on the worm 34, which can reduce the friction coefficient during the rotation of the worm 34 and ensure its rotation accuracy.

在具体的实施方式中,可以将升降机构4设置为剪叉液压升降机,剪叉液压升降机是一种常用的高空作业专用设备,它是靠剪刀式支承架的展开与折叠来完成货物平台的升降,其动力是通过油缸的伸缩来推动剪刀的展开与折叠。它的剪叉机械结构,使升降台起升有较高的稳定性,宽大的作业平台和较高的承载能力,使高空作业范围更大、并适合多人同时作业。In a specific embodiment, the lifting mechanism 4 can be set as a hydraulic scissor lift. The hydraulic scissor lift is a commonly used special equipment for high-altitude work. , its power is to push the scissors to unfold and fold through the expansion and contraction of the oil cylinder. Its scissor mechanical structure makes the lifting platform have high stability, wide working platform and high bearing capacity, so that the aerial work range is larger, and it is suitable for multiple people to work at the same time.

作为优选的实施方案,可以在防护平台1上表面的四角处均焊接有弧形的吊钩7,使得起吊装置通过四个吊钩7吊起防护平台1时,防护平台1受力更均匀,移动更平稳。As a preferred embodiment, arc-shaped hooks 7 can be welded on the four corners of the upper surface of the protective platform 1, so that when the hoisting device lifts the protective platform 1 through the four hooks 7, the protective platform 1 is stressed more evenly, Move more smoothly.

参见图7,在另一较佳的实施例中,防护平台1上于滑槽11槽口处设有上限位开关81,滑槽11内壁于伸缩块2和蜗轮33之间设有下限位开关82;上限位开关81和下限位开关82均与双轴步进电机31电连接,伸缩块2在上限位开关81和下限位开关82之间移动时,双轴步进电机31正常工作;当伸缩块2伸出至与上限位开关81触碰或缩回至与下限位开关82触碰时,上限位开关81和下限位开关82均可断开双轴步进电机31的电路,防止伸缩块2伸出过度而脱离滑槽11或者缩回过度而脱离丝杆32的螺纹部。需要说明的是,上限位开关81和下限位开关82最好采用型号为LX19-121的单轮滚轮式限位开关。Referring to FIG. 7 , in another preferred embodiment, an upper limit switch 81 is provided on the protective platform 1 at the notch of the chute 11 , and a lower limit switch is provided on the inner wall of the chute 11 between the telescopic block 2 and the worm wheel 33 82; both the upper limit switch 81 and the lower limit switch 82 are electrically connected to the biaxial stepping motor 31, and when the telescopic block 2 moves between the upper limit switch 81 and the lower limit switch 82, the biaxial stepping motor 31 works normally; when When the telescopic block 2 extends to touch the upper limit switch 81 or retracts to touch the lower limit switch 82 , both the upper limit switch 81 and the lower limit switch 82 can disconnect the circuit of the dual-axis stepping motor 31 to prevent telescopic The block 2 is overextended and disengaged from the chute 11 or retracted overly and disengaged from the threaded portion of the lead screw 32 . It should be noted that, the upper limit switch 81 and the lower limit switch 82 are preferably single-wheel roller limit switches whose model is LX19-121.

本发明的工作过程及原理:Working process and principle of the present invention:

先使用吊挂装置吊起防护平台1将防护平台1移动下放至电梯井内,并使四个伸缩块2分别对准电梯井壁两侧的四个预留洞口,然后通过双轴步进电机31的开关使双轴步进电机31的输出轴正向转动以驱动蜗杆34转动,蜗杆34转动通过与蜗轮33的传动连接带动丝杆32转动,由于丝杆32两端分别与对应的伸缩块2正、反螺纹连接,使得丝杆32转动能够其两端的两个伸缩块2同步相互远离而伸出滑槽11以穿置入电梯井壁预留洞口内,从而支撑防护平台1;防护平台1支撑稳固后,工人站上升降机构4通过升降机构4调节施工高度至合适后进行施工。First, use the hanging device to lift the protective platform 1, move the protective platform 1 down into the elevator shaft, and make the four telescopic blocks 2 align with the four reserved holes on both sides of the elevator shaft wall, and then use the dual-axis stepping motor 31 The switch makes the output shaft of the biaxial stepping motor 31 rotate in the forward direction to drive the worm 34 to rotate, and the worm 34 rotates through the transmission connection with the worm wheel 33 to drive the screw 32 to rotate. Positive and negative screw connection, so that the two telescopic blocks 2 at both ends of the screw rod 32 can rotate synchronously away from each other and extend out of the chute 11 to be inserted into the reserved hole in the elevator shaft wall, thereby supporting the protective platform 1; the protective platform 1 After the support is stabilized, the worker stands on the lifting mechanism 4 to adjust the construction height to a suitable height through the lifting mechanism 4 to carry out construction.

施工结束后,重新使用吊挂装置连接防护平台1,再通过双轴步进电机31的开关使双轴步进电机31的输出轴反向转动,使得两个伸缩块2同步相互靠近而缩回滑槽11,从而使防护平台1失去电梯井壁的限制,最后即可通过吊挂装置吊出防护平台1。After the construction is completed, the hanging device is used to connect the protective platform 1 again, and then the output shaft of the double-axis stepping motor 31 is rotated in the opposite direction through the switch of the double-axis stepping motor 31, so that the two telescopic blocks 2 are synchronously approached and retracted. The chute 11, so that the protective platform 1 loses the restriction of the elevator shaft wall, and finally the protective platform 1 can be lifted out through the hanging device.

虽然,上文中已经用一般性说明及具体实施例对本发明作了详尽的描述,但在本发明基础上,可以对之作一些修改或改进,这对本领域技术人员而言是显而易见的。因此,在不偏离本发明精神的基础上所做的这些修改或改进,均属于本发明要求保护的范围。Although the present invention has been described in detail above with general description and specific embodiments, some modifications or improvements can be made on the basis of the present invention, which will be obvious to those skilled in the art. Therefore, these modifications or improvements made without departing from the spirit of the present invention fall within the scope of the claimed protection of the present invention.

Claims (9)

1.电梯井升降施工防护操作平台,其特征在于:包括可吊挂下放至电梯井内的防护平台(1)、多个活动插接在防护平台(1)侧面的伸缩块(2)、安装在防护平台(1)内的驱动机构和安装在防护平台(1)上表面的升降机构(4);所述驱动机构用于驱动伸缩块(2)伸出防护平台(1)使伸缩块(2)穿置入电梯井壁预留洞口内以支撑防护平台(1);所述升降机构(4)用于支撑工作人员上升或下降。1. The elevator shaft lifting construction protection operation platform is characterized in that: it comprises a protective platform (1) that can be hung and lowered into the elevator shaft, a plurality of telescopic blocks (2) that are movably inserted on the side of the protective platform (1), and installed in the elevator shaft. A driving mechanism in the protective platform (1) and a lifting mechanism (4) installed on the upper surface of the protective platform (1); the driving mechanism is used to drive the telescopic block (2) to extend out of the protective platform (1) to make the telescopic block (2) ) is inserted into the reserved opening of the elevator shaft wall to support the protective platform (1); the lifting mechanism (4) is used to support the staff to ascend or descend. 2.根据权利要求1所述的电梯井升降施工防护操作平台,其特征在于:所述伸缩块(2)的数量设置为四个,四个所述伸缩块(2)分别活动插接在防护平台(1)的四角处。2. The elevator shaft lifting construction protection operation platform according to claim 1, characterized in that: the number of the telescopic blocks (2) is set to four, and the four telescopic blocks (2) are respectively movably inserted in the protection at the four corners of the platform (1). 3.根据权利要求2所述的电梯井升降施工防护操作平台,其特征在于:所述驱动机构包括双轴步进电机(31)和两根丝杆(32);所述防护平台(1)两端均贯穿开设有沿防护平台(1)长度方向延伸的滑槽(11),防护平台(1)上表面中部开设有沿防护平台(1)宽度方向延伸并连通两个滑槽(11)的安装槽(12);四个所述伸缩块(2)分别活动插接两个滑槽(11)的四个槽口处;两根所述丝杆(32)分别设置在两个滑槽(11)内,丝杆(32)两端分别与对应的伸缩块(2)正、反螺纹连接,且丝杆(32)中部同轴固定连接有蜗轮(33);所述双轴步进电机(31)固定设置在安装槽(12)内,双轴步进电机(31)的两根输出轴的端部均同轴固定连接有蜗杆(34),两根所述蜗杆(34)远离输出轴的一端分别与对应的蜗轮(33)传动连接;所述双轴步进电机(31)驱动蜗杆(34)转动,通过蜗轮(33)和蜗杆(34)的传动连接带动丝杆(32)转动,使得丝杆(32)两端的两个伸缩块(2)在反向螺纹的作用下同步相互远离而伸出滑槽(11),或者同步相互靠近而缩回滑槽(11)。3. The elevator shaft lifting construction protection operation platform according to claim 2, characterized in that: the drive mechanism comprises a biaxial stepping motor (31) and two screw rods (32); the protection platform (1) Both ends are provided with a chute (11) extending along the length direction of the protective platform (1), and the middle of the upper surface of the protective platform (1) is provided with two chutes (11) extending along the width direction of the protective platform (1) and communicating with the two chutes (11) The four said telescopic blocks (2) are respectively movably inserted into the four notches of the two chutes (11); the two said screw rods (32) are respectively arranged in the two chutes In (11), the two ends of the screw rod (32) are respectively connected with the corresponding telescopic blocks (2) with positive and reverse threads, and the middle part of the screw rod (32) is coaxially and fixedly connected with a worm gear (33); the biaxial stepping The motor (31) is fixedly arranged in the installation groove (12), the ends of the two output shafts of the biaxial stepping motor (31) are coaxially and fixedly connected with worms (34), and the two worms (34) are far away from One end of the output shaft is respectively connected with the corresponding worm gear (33) in a drive; the biaxial stepping motor (31) drives the worm (34) to rotate, and drives the screw (32) through the drive connection between the worm gear (33) and the worm (34). ) rotates so that the two telescopic blocks (2) at both ends of the screw rod (32) move away from each other synchronously under the action of the reverse thread to extend out of the chute (11), or approach each other synchronously to retract the chute (11). 4.根据权利要求3所述的电梯井升降施工防护操作平台,其特征在于:所述安装槽(12)的槽口处竖直转动连接有用于打开和关闭安装槽(12)的盖板(121)。4. The elevator shaft lifting construction protection operation platform according to claim 3, characterized in that: a cover plate ( 121). 5.根据权利要求4所述的电梯井升降施工防护操作平台,其特征在于:所述双轴步进电机(31)的输出轴通过联轴器(5)与蜗杆(34)同轴固定连接。5. The elevator shaft lifting construction protection operation platform according to claim 4, characterized in that: the output shaft of the biaxial stepping motor (31) is coaxially and fixedly connected to the worm (34) through the coupling (5) . 6.根据权利要求5所述的电梯井升降施工防护操作平台,其特征在于:所述蜗杆(34)通过轴承座(6)安装在安装槽(12)内。6 . The elevator shaft lifting construction protection operation platform according to claim 5 , wherein the worm ( 34 ) is installed in the installation groove ( 12 ) through the bearing seat ( 6 ). 7 . 7.根据权利要求6所述的电梯井升降施工防护操作平台,其特征在于:所述防护平台(1)上于滑槽(11)槽口处设有上限位开关(81),滑槽(11)内壁于伸缩块(2)和蜗轮(33)之间设有下限位开关(82);所述上限位开关(81)和下限位开关(82)均与双轴步进电机(31)电连接。7. The elevator shaft lifting construction protection operation platform according to claim 6, wherein the protection platform (1) is provided with an upper limit switch (81) at the slot of the chute (11), and the chute (11) is provided with an upper limit switch (81). 11) The inner wall is provided with a lower limit switch (82) between the telescopic block (2) and the worm gear (33); the upper limit switch (81) and the lower limit switch (82) are both connected to the biaxial stepping motor (31) electrical connection. 8.根据权利要求1所述的电梯井升降施工防护操作平台,其特征在于:所述升降机构(4)为剪叉液压升降机。8 . The elevator shaft lifting construction protection operation platform according to claim 1 , wherein the lifting mechanism ( 4 ) is a scissor hydraulic lift. 9 . 9.根据权利要求1所述的电梯井升降施工防护操作平台,其特征在于:所述防护平台(1)上表面的四角处均设有吊钩(7)。9 . The elevator shaft lifting construction protection operation platform according to claim 1 , wherein hooks ( 7 ) are provided at the four corners of the upper surface of the protection platform ( 1 ). 10 .
CN202210303576.XA 2022-03-24 2022-03-24 Elevator shaft lifting construction protection operation platform Pending CN114635552A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210303576.XA CN114635552A (en) 2022-03-24 2022-03-24 Elevator shaft lifting construction protection operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210303576.XA CN114635552A (en) 2022-03-24 2022-03-24 Elevator shaft lifting construction protection operation platform

Publications (1)

Publication Number Publication Date
CN114635552A true CN114635552A (en) 2022-06-17

Family

ID=81950737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210303576.XA Pending CN114635552A (en) 2022-03-24 2022-03-24 Elevator shaft lifting construction protection operation platform

Country Status (1)

Country Link
CN (1) CN114635552A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115613841A (en) * 2022-10-24 2023-01-17 中国一冶集团有限公司 Socket joint formula derrick operation protector that can climb

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305536A (en) * 2019-11-27 2020-06-19 河南省第一建筑工程集团有限责任公司 Automatic formula of climbing design elevator shaft work platform
CN212957570U (en) * 2020-06-15 2021-04-13 中建中新建设工程有限公司 Remote control supporting leg automatic telescopic elevator shaft steel platform
CN112846325A (en) * 2020-12-24 2021-05-28 中航天水高新磨具有限公司 Production method of ground titanium steel composite board
CN213651552U (en) * 2020-11-17 2021-07-09 安徽万凯建设工程有限公司 A kind of building construction elevator shaft protection structure
CN217054273U (en) * 2022-03-24 2022-07-26 广西建工集团建筑工程总承包有限公司 Elevator shaft lifting construction protection operation platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305536A (en) * 2019-11-27 2020-06-19 河南省第一建筑工程集团有限责任公司 Automatic formula of climbing design elevator shaft work platform
CN212957570U (en) * 2020-06-15 2021-04-13 中建中新建设工程有限公司 Remote control supporting leg automatic telescopic elevator shaft steel platform
CN213651552U (en) * 2020-11-17 2021-07-09 安徽万凯建设工程有限公司 A kind of building construction elevator shaft protection structure
CN112846325A (en) * 2020-12-24 2021-05-28 中航天水高新磨具有限公司 Production method of ground titanium steel composite board
CN217054273U (en) * 2022-03-24 2022-07-26 广西建工集团建筑工程总承包有限公司 Elevator shaft lifting construction protection operation platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115613841A (en) * 2022-10-24 2023-01-17 中国一冶集团有限公司 Socket joint formula derrick operation protector that can climb

Similar Documents

Publication Publication Date Title
CN207451528U (en) A kind of rectilinear elevator of twin-screw
CN210505459U (en) Self-locking mechanism of hydraulic elevator
CN110707544A (en) A rotary electrical control cabinet based on intelligent control
CN114635552A (en) Elevator shaft lifting construction protection operation platform
CN216360352U (en) Prefabricated component lifting device for assembly type building
CN217054273U (en) Elevator shaft lifting construction protection operation platform
CN118419829B (en) Two-stage lifting platform and application method thereof
CN211313317U (en) Elevator shaft construction tool type operation platform and safety protection integrated structure
CN209538634U (en) A kind of mobile operating frame for architectural engineering
CN116675140B (en) Concrete prefabricated component lifts and aligns installation device
CN218201925U (en) Overhead hoist is built in room
CN209411656U (en) A kind of solid brick hanging device
CN112429681A (en) Electric scissor type lifting platform
CN215926629U (en) Scaffold frame that building engineering used
CN210635625U (en) Building engineering lifting device
CN210944687U (en) Energy-saving elevator for fire engine
CN211873746U (en) A lifting construction platform for house construction engineering
CN214495557U (en) A lift with a protective structure
CN109626264B (en) Small-size hydraulic elevator that can assemble has
CN217512506U (en) Tipping bucket type dustproof assembly for powder production based on kiln industry
CN216596677U (en) Display device of architectural design management system
CN112125246A (en) High-altitude load transferring platform and lifting device
CN212027305U (en) Stable structure of going up and down and being connected with stereo garage hoisting frame
CN222743991U (en) A construction material hoist
CN219773863U (en) Safety device for security engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination