CN114592520A - Building foundation pit construction equipment and building foundation pit construction method - Google Patents
Building foundation pit construction equipment and building foundation pit construction method Download PDFInfo
- Publication number
- CN114592520A CN114592520A CN202210348377.0A CN202210348377A CN114592520A CN 114592520 A CN114592520 A CN 114592520A CN 202210348377 A CN202210348377 A CN 202210348377A CN 114592520 A CN114592520 A CN 114592520A
- Authority
- CN
- China
- Prior art keywords
- soil
- plate
- foundation pit
- sleeve
- auger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
- E21B10/44—Bits with helical conveying portion, e.g. screw type bits; Augers with leading portion or with detachable parts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Geology (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Paleontology (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Abstract
The invention relates to the technical field of foundation pit construction devices and discloses building foundation pit construction equipment and a building foundation pit construction method, wherein the building foundation pit construction equipment comprises a base and a track frame on the base, an auger is connected to the track frame in a sliding mode, an extrusion part is connected to the auger in a sliding mode and used for extruding on the inner wall of the ground, a power part is further mounted inside the auger and used for driving the extrusion part to slide, the extrusion part comprises a support sleeve connected to the auger in a sliding mode, a push plate is mounted inside the support sleeve and used for leveling the inner wall of the ground, a square sleeve is further mounted on the auger, a trapezoidal block is mounted on the square sleeve, and a semicircular elastic sheet is further mounted on the support sleeve. The support sleeve and the push plate are driven to rotate by the spiral drill, so that the push plate can press the inner wall of the soil hole uniformly, and the soil in the hole after the spiral drill drills is prevented from collapsing as much as possible.
Description
Technical Field
The invention relates to the technical field of foundation pit construction devices, in particular to building foundation pit construction equipment and a building foundation pit construction method.
Background
With the rapid development of social economy, the foundation pit is a soil pit excavated at the design position of the foundation according to the elevation of the foundation and the plane size of the foundation. Before excavation, according to geological and hydrological data, an excavation scheme is determined by combining the conditions of buildings nearby a site, waterproof drainage work is well done, a side slope placing method can be used for people who do not excavate deeply, the soil slope is stable, the gradient size is determined according to relevant construction regulations, people who excavate deeply and nearby buildings can use a foundation pit wall supporting method, a concrete spraying wall protecting method, and large foundation pits even adopt methods of interlocking underground continuous walls and column type bored concrete piles and the like to prevent the outside soil layer from collapsing.
However, in the existing building foundation pit, when a deep hole needs to be dug, pile arrangement supporting needs to be carried out, the pile arrangement supporting is to drill a plurality of deep holes with the same digging depth at equal intervals through a drilling machine, cement is poured in the deep holes, and then pile arrangement supporting is formed, wherein the pile arrangement supporting is used for ensuring the safety of buildings, structures, pipes, lines and cables at the adjacent side, and in the excavation process of the foundation pit and during the use period of the foundation pit, the soil body at the adjacent side is kept stable to ensure the safety of construction, so that the pile arrangement supporting is particularly important, but a common drilling machine cannot ensure that soil in the hole does not collapse after drilling, and the soil is layered and water flows in the soil, so that the soil in the hole of the common drilling machine collapses after drilling, and the subsequent cement pouring is influenced.
Disclosure of Invention
The invention provides construction equipment and a construction method for a building foundation pit, which have the beneficial effect that soil in a hole of a general drilling machine after drilling does not collapse, and solve the problems that the soil in the hole of the general drilling machine after drilling does not collapse due to layering of the soil and water flow in the soil, so that the soil in the hole of the general drilling machine collapses after drilling, and the subsequent cement pouring is influenced.
The invention provides the following technical scheme: the construction equipment for the building foundation pit comprises a base and a track frame on the base, wherein an auger is connected onto the track frame in a sliding mode, an extrusion component is connected onto the auger in a sliding mode and used for extruding on the inner wall of the ground, and a power component is further installed inside the auger and used for driving the extrusion component to slide;
the extrusion part comprises a supporting sleeve which is slidably connected onto the spiral drill, a push plate is installed inside the supporting sleeve and used for leveling the inner wall of the soil, a square sleeve is further installed on the spiral drill, a trapezoidal block is installed on the square sleeve, a semicircular elastic sheet is further installed on the supporting sleeve and used for abutting against the trapezoidal block.
As an alternative of the construction equipment for the foundation pit of the building of the present invention, wherein: still sliding connection has the second extrusion post in the push pedal, install the flattening board on the second extrusion post, the flattening board is used for flattening soil inner wall, still install the fourth spring in the push pedal, the fourth spring is connected with the second extrusion post.
As an alternative of the construction equipment for the foundation pit of the building of the present invention, wherein: the inner sliding connection of the supporting sleeve is provided with a sliding plate, a push rod is installed on the sliding plate, an adjusting plate is further installed on the push rod, the adjusting plate penetrates through the supporting sleeve, a first extrusion column is further connected onto the adjusting plate in a sliding mode, a third spring is further installed on the adjusting plate, and the third spring is connected with the first extrusion column.
As an alternative of the construction equipment for the foundation pit of the building of the present invention, wherein: the sliding plate is connected with the square sleeve in a sliding mode and used for driving the leveling plate to slide up and down, a first spring is further mounted inside the spiral drill and connected with the spiral drill;
the support sleeve is further provided with an arc-shaped elastic sheet, the arc-shaped elastic sheet is connected with the sliding plate, and the arc-shaped elastic sheet is used for driving the support sleeve to reset.
As an alternative of the construction equipment for the foundation pit of the building of the present invention, wherein: the hydraulic cylinder is installed inside the spiral drill, the connecting sleeve is installed on the hydraulic cylinder, the power component comprises a frustum connected with the connecting sleeve, and the frustum is used for abutting against the sliding plate.
As an alternative of the construction equipment for the foundation pit of the building of the present invention, wherein: be provided with the chute on the frustum, the sliding plate is used for sliding connection in the inside of chute, the inside of adapter sleeve is provided with the helicla flute, the internally mounted of auger has the montant, montant sliding connection is in the inside of adapter sleeve, still install the lug on the montant, lug sliding connection is in the inside of helicla flute.
As an alternative of the construction equipment for the foundation pit of the building of the present invention, wherein: the inner wall of the connecting sleeve is also provided with a vertical groove, the vertical groove is communicated with the spiral groove, and the convex block is used for being connected inside the convex block in a sliding manner.
As an alternative of the construction equipment for the foundation pit of the building of the present invention, wherein: the connecting sleeve is further provided with a pressing plate, the pressing plate is used for abutting against the sliding plate, the supporting sleeve is further connected with an inserting rod in a sliding mode, the spiral drill is further provided with a limiting hole, the inserting rod penetrates through the supporting sleeve and the square sleeve and is connected to the inside of the limiting hole in a sliding mode, a fifth spring is further installed inside the supporting sleeve and is connected with the inserting rod, a trapezoidal groove is further formed in the sliding plate, and the inserting rod is connected to the inside of the trapezoidal groove in a sliding mode.
As an alternative of the construction equipment for the foundation pit of the building of the present invention, wherein: and a second spring is further installed in the support sleeve and is connected with the sliding plate, and the second spring is used for pushing the sliding plate to reset.
The invention also provides a construction method of the building foundation pit construction equipment,
s1, moving the base to a designated position, then drilling downwards by using the rotation of the auger, and abutting against soil by using a push plate, so that the soil in the hole of the auger after drilling does not collapse as much as possible;
s2, pressing and compacting the soil of different levels by the three leveling plates through pressing the second extrusion column and sliding the leveling plates, and extruding the soil on the second extrusion column again through the first extrusion column, so that the force of the leveling plates for extruding the soil is increased, and the soil on a soft layer can be extruded and compacted;
s3, the frustum and the chute can continuously push the leveling plate to strike on the soil through the rotation of the frustum, so that the leveling plate can better extrude the soil, and the inner wall of a soil hole is prevented from collapsing as much as possible;
and S4, after the deep hole is drilled by the auger, cement is poured into the deep hole to build the row pile support, and then the excavator begins to excavate soil in the foundation pit to form the foundation pit.
The invention has the following beneficial effects:
1. this building foundation ditch construction equipment to utilize the auger to drive support cover and push pedal rotation, make the push pedal can press even real earth hole inner wall, make the auger in its downthehole earth of drilling back produce the phenomenon of collapsing as far as possible.
2. This building foundation ditch construction equipment promotes three flattening board through three fourth spring and realizes pressing tightly the reality to the earth of different levels to realize that the downthehole wall of earth does not produce the phenomenon of collapsing as far as possible.
3. This building foundation ditch construction equipment through the reciprocal drive flattening board up-and-down motion of slide, realizes that the flattening board can the large tracts of land press earth, can also rework the earth of being pressed many times to further let the downthehole wall of earth not produce the phenomenon of collapsing as far as possible.
Drawings
Fig. 1 is a schematic structural view of the whole of the present invention.
Fig. 2 is a cross-sectional view of the auger of the present invention.
FIG. 3 is a schematic view of a portion of the structure of FIG. 2 according to the present invention.
FIG. 4 is a schematic view of a portion of the structure shown in FIG. 3B according to the present invention.
FIG. 5 is a schematic view of the structure of the leveling plate and the adjusting plate of the present invention.
Fig. 6 is a schematic structural view of the power unit of the present invention.
FIG. 7 is a schematic structural diagram of the plunger and the push rod of the present invention.
In the figure: 1. a base; 2. a rail frame; 3. a screw drill; 4. a power component; 5. an extrusion member; 10. a hydraulic cylinder; 11. connecting sleeves; 12. a slide plate; 13. a first spring; 14. a square sleeve; 51. a support sleeve; 52. a slide plate; 53. pushing the plate; 54. an arc-shaped elastic sheet; 55. a semicircular elastic sheet; 56. a trapezoidal block; 57. a push rod; 58. a second spring; 59. an adjusting plate; 61. a third spring; 62. a first extrusion column; 64. a screed plate; 65. a second extrusion column; 66. a fourth spring; 67. a trapezoidal groove; 68. a limiting hole; 69. inserting a rod; 70. a fifth spring; 41. a frustum; 42. a chute; 43. a vertical rod; 44. a vertical slot; 45. a bump; 46. a helical groove; 47. and pressing the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without making any creative effort based on the embodiments in the present invention, belong to the protection scope of the present invention.
Example 1
Referring to fig. 1-4, the construction equipment for the building foundation pit and the construction method for the building foundation pit are disclosed, wherein the construction equipment for the building foundation pit comprises a base 1 and a track frame 2 on the base 1, an auger 3 is connected on the track frame 2 in a sliding manner, an extrusion part 5 is connected on the auger 3 in a sliding manner, the extrusion part 5 is used for extruding on the inner wall of the ground, a power part 4 is further installed inside the auger 3, and the power part 4 is used for driving the extrusion part 5 to slide;
the extrusion part 5 comprises a support sleeve 51 which is connected to the auger 3 in a sliding mode, a push plate 53 is installed on the interior of the support sleeve 51, the push plate 53 is used for leveling the inner wall of the ground, a square sleeve 14 is further installed on the auger 3, a trapezoidal block 56 is installed on the square sleeve 14, a semicircular elastic sheet 55 is further installed on the support sleeve 51, the semicircular elastic sheet 55 is used for abutting against the trapezoidal block 56, a second spring 58 is further installed on the interior of the support sleeve 51, the second spring 58 is connected with the sliding plate 52, and the second spring 58 is used for pushing the sliding plate 52 to reset.
The pile arrangement support is characterized in that a plurality of deep holes with the same digging depth are drilled at equal intervals through a drilling machine, cement is poured in the deep holes, and then the pile arrangement support is formed.
Therefore, in order to solve the problem that soil in the hole of the drilling machine does not collapse after the drilling of the drilling machine, the push plates 53 are connected to two sides of the spiral drill 3 in a sliding mode, the spiral drill 3 rotates downwards to drill the hole, meanwhile, the spiral drill 3 can drive the push plates 53 to abut against the soil, and the push plates 53 are used for extruding the inner wall of the hole of the ground, so that the soil in the hole of the drilling machine does not collapse as much as possible after the drilling of the hole.
Beating soil: specifically, as shown in fig. 2, the auger 3 is rotated to insert soil for punching, as shown in fig. 3 and 4, the support sleeve 51 is pushed to slide to the left side, the semicircular spring 55 on the support sleeve 51 is abutted against the trapezoidal block 56, when the force pushing the support sleeve 51 to slide to the left is increased, the support sleeve 51 can rapidly penetrate through the trapezoidal block 56, so that the support sleeve 51 rapidly drives the push plate 53 to strike on the inner wall of the soil hole, and then the auger 3 drives the support sleeve 51 and the push plate 53 to rotate, so that the push plate 53 can press the inner wall of the soil hole to be even, and the soil in the hole of the auger 3 after drilling is prevented from collapsing as much as possible;
it should be particularly noted that the support sleeve 51 and the push plate 53 are driven to slide in a reciprocating manner, so that the push plate 53 can hit the inner wall of the soil hole for multiple times and tamp the inner wall of the soil hole, and further the inner wall of the soil hole is prevented from collapsing as much as possible.
Example 2
The present embodiment is an improvement made on the basis of embodiment 1, and specifically, referring to fig. 1 to 5, a second extrusion column 65 is further slidably connected to the push plate 53, a leveling plate 64 is mounted on the second extrusion column 65, the leveling plate 64 is used for leveling the inner wall of the ground, a fourth spring 66 is further mounted on the push plate 53, and the fourth spring 66 is connected to the second extrusion column 65.
Pressing according to local conditions: because layering exists in the soil, the push plate 53 in embodiment 1 can only press relatively compact soil, but cannot press and form soft soil in an extrusion manner, three leveling plates 64 are sequentially arranged on the push plate 53 in order to press and compact the soil at different levels, and the leveling plates 64 are slidably connected to the push plate 53 according to fig. 5, and the third spring 61 drives the second extrusion column 65 and the leveling plates 64 to extend and retract;
when the supporting sleeve 51 drives the push plate 53 to collide on the soil, the push plate 64 collides on the soil, the soil is extruded through the push plate 64 to be compact, when the compactness of the soil extruded by the push plate 64 reaches a certain degree, the soil can reversely push the push plate 64 to slide leftwards, and then the push plate 64 and the soil are prevented from generating too large friction, so that the three push plates 64 are pushed through the three fourth springs 66 to press the soil at different levels to be compact, and the inner wall of the soil hole is prevented from generating collapse as much as possible.
Example 3
The present embodiment is an improvement made on the basis of embodiment 2, specifically, referring to fig. 1 to 5, a sliding plate 52 is slidably connected inside a support sleeve 51, a push rod 57 is installed on the sliding plate 52, an adjusting plate 59 is further installed on the push rod 57, the adjusting plate 59 penetrates through the support sleeve 51, a first extrusion column 62 is further slidably connected on the adjusting plate 59, a third spring 61 is further installed on the adjusting plate 59, and the third spring 61 is connected with the first extrusion column 62.
Increasing the degree of pressing force: according to embodiment 2, the three leveling plates 64 are pushed by the three fourth springs 66 to compact the soil at different levels, but when the soil layer is soft, the leveling plates 64 pushed by the fourth springs 66 can not achieve the effect of compacting the soil in the soft layer, so that the adjusting plate 59 is slidably connected to the inside of the supporting sleeve 51 on the basis of embodiment 2, as shown in fig. 5, when the leveling plates 64 are abutted to the soil, the adjusting plate 59 is slid to make the first extrusion columns 62 on the adjusting plate 59 extrude the second extrusion columns 65 to slide leftward, thereby increasing the force of the leveling plates 64 to extrude the soil, so that the soil in the soft layer can also be compacted, and when the originally compacted soil is extruded by the leveling plates 64, and the first extrusion columns 62 extrude the second extrusion columns 65, the compacted soil can not be extruded, so that the leveling plates 64 and the second extrusion columns 65 can reversely act to push the first extrusion columns 62 to slide rightward And thus avoid the screed plate 64 from having a large friction with the earth.
Firstly, the inner wall of the soil is pressed: it should be noted that, according to fig. 5, the sliding plate 52 is slidably connected inside the support sleeve 51, the sliding plate 52 slides leftward, the second spring 58 and the support sleeve 51 are pushed by the sliding plate 52 to slide leftward together, and the elastic force of the second spring 58 is greater than that of the semicircular elastic sheet 55, so that the sliding plate 52 pushes the support sleeve 51 and the push plate 53 to abut against the soil, and then when the sliding plate 52 continues to slide leftward, the sliding plate 52 compresses the second spring 58, so that the sliding plate 52 pushes the push rod 57 and the adjusting plate 59 to slide leftward, thereby allowing the screed 64 to abut against the inner wall of the soil, and allowing the first extrusion column 62 to extrude the screed 64 to press the soil.
Example 4
The present embodiment is an improvement on the basis of embodiment 3, specifically, referring to fig. 1 to 5, a sliding plate 12 is slidably connected to the auger 3, the sliding plate 12 is connected to the square sleeve 14, the sliding plate 12 is used for driving the leveling plate 64 to slide up and down, a first spring 13 is further installed inside the auger 3, and the first spring 13 is connected to the auger 3;
the support sleeve 51 is further provided with an arc-shaped elastic sheet 54, the arc-shaped elastic sheet 54 is connected with the sliding plate 12, and the arc-shaped elastic sheet 54 is used for driving the support sleeve 51 to reset.
Enlarging the pressing area: according to fig. 5, the sliding plate 12 moves downwards, so that the sliding plate 12 drives the square sleeve 14 and the supporting sleeve 51 to move downwards, the supporting sleeve 51 drives the leveling plate 64 to move downwards, and then the leveling plate 64 can press the inner soil wall in a large area, when the sliding plate 12 drives the square sleeve 14 and the supporting sleeve 51 to reset upwards, the leveling plate 64 presses the processed soil again, the device drives the leveling plate 64 to move upwards and downwards in a reciprocating manner through the sliding plate 12, the leveling plate 64 can press the soil in a large area, and the pressed soil can be reworked for many times, so that the inner soil hole wall is prevented from collapsing as much as possible.
Example 5
The present embodiment is an improvement on embodiment 4, specifically, referring to fig. 1 to 6, a hydraulic cylinder 10 is installed inside the auger 3, a connecting sleeve 11 is installed on the hydraulic cylinder 10, the power unit 4 includes a frustum 41 connected to the connecting sleeve 11, and the frustum 41 is used for abutting against the sliding plate 52.
Automatic extrusion: according to fig. 6, the connecting sleeve 11 is pushed by the hydraulic cylinder 10 to slide downwards, so that the frustum 41 on the connecting sleeve 11 presses the sliding plate 52 to slide leftwards, and because the frustum 41 is conical, the force for pressing the sliding plate 52 is gradually increased by using the frustum 41, so that the leveling plate 64 can be pressed on the soil better.
Example 6
In this embodiment, an improvement is made on the basis of embodiment 5, specifically, referring to fig. 1 to 6, an inclined groove 42 is provided on the frustum 41, a sliding plate 52 is used for being slidably connected inside the inclined groove 42, a spiral groove 46 is provided inside the connecting sleeve 11, a vertical rod 43 is installed inside the auger 3, the vertical rod 43 is slidably connected inside the connecting sleeve 11, a projection 45 is further installed on the vertical rod 43, and the projection 45 is slidably connected inside the spiral groove 46.
And (3) rotating and beating: according to fig. 6, by arranging the inclined groove 42 on the frustum 41, the connecting sleeve 11 drives the frustum 41 to slide downwards, the lug 45 on the vertical rod 43 is slidably connected inside the spiral groove 46, the frustum 41 is rotated, so that the sliding plate 52 abutting against the frustum 41 is slidably connected inside the inclined groove 42, then the sliding plate 52 and the supporting sleeve 51 are pulled by the arc-shaped elastic sheet 54 to be reset, the frustum 41 is continuously rotated, the sliding plate 52 slides out of the inclined groove 42 through the inclined surface on the inclined groove 42, the sliding plate 52 abuts against the frustum 41 again, the sliding plate 52 and the leveling plate 64 are squeezed by the frustum 41 to slide to the left side again, the leveling plate 64 is hit on the soil, and the frustum 41 is rotated and reciprocated in such a way that the frustum 41 and the inclined groove 42 can continuously push the leveling plate 64 to hit on the soil, so that the leveling plate 64 can better squeeze the soil, the inner wall of the soil hole is prevented from collapsing as much as possible.
Example 7
In this embodiment, an improvement is made on the basis of embodiment 6, specifically, referring to fig. 1 to 7, the inner wall of the connecting sleeve 11 is further provided with a vertical groove 44, the vertical groove 44 is communicated with a spiral groove 46, and a bump 45 is used for being slidably connected inside the bump 45;
the connecting sleeve 11 is further provided with a pressing plate 47, the pressing plate 47 is used for abutting against the sliding plate 52, the supporting sleeve 51 is further connected with an inserting rod 69 in a sliding mode, the auger 3 is further provided with a limiting hole 68, the inserting rod 69 penetrates through the supporting sleeve 51 and the square sleeve 14 and is connected to the inside of the limiting hole 68 in a sliding mode, a fifth spring 70 is further installed inside the supporting sleeve 51, the fifth spring 70 is connected with the inserting rod 69, the sliding plate 52 is further provided with a trapezoidal groove 67, and the inserting rod 69 is connected to the inside of the trapezoidal groove 67 in a sliding mode.
Firstly pressing and then sliding: as shown in fig. 7, when the frustum 41 pushes the sliding plate 52 and the support sleeve 51 to slide leftward, the inserting rod 69 penetrates through the supporting sleeve 51 and the square sleeve 14 and is connected inside the limiting hole 68 in a sliding mode, so that the insert rod 69 can fix the square sleeve 14 without sliding the leveling plate 64 downward, and then abutting against the soil through the leveling plate 64, when the frustum 41 continues to press the slide plate 52 to slide leftward, the slide plate 52 compresses the second spring 58 to slide leftward, so that the insert rod 69, which abuts on the slide plate 52, is pulled by the fifth spring 70, and the insert rod 69 is pulled to be slidably coupled inside the trapezoidal groove 67, and further pressed on the sliding plate 52 by the pressing plate 47, so that the pressing plate 47 presses the sliding plate 52 to slide downwards, therefore, the leveling plate 64 is driven to move up and down by the reciprocating motion of the sliding plate 12 in embodiment 4, so that the leveling plate 64 can press soil in a large area and can rework the pressed soil for many times.
Example 8
The invention also provides a construction method of the construction equipment for the building foundation pit,
s1, moving the base 1 to a designated position, then using the auger 3 to rotate and drill downwards, and using the push plate 53 to collide on the soil, so that the soil in the hole of the auger 3 does not collapse after drilling;
s2, pressing and compacting the soil of different levels by the three leveling plates 64 by pressing the second extrusion column 65 and the leveling plates 64 to slide, and extruding the soil on the second extrusion column 65 again by the first extrusion column 62, so that the force of the leveling plates 64 for extruding the soil is increased, and the soil on the soft layer can also be extruded and compacted;
s3, the frustum 41 and the chute 42 can continuously push the leveling plate 64 to hit on the soil through the rotation of the frustum 41, so that the leveling plate 64 can better extrude the soil, and the inner wall of a soil hole is prevented from collapsing as much as possible;
and S4, after the deep hole is mined by the auger 3, cement is poured into the deep hole to build the row pile support, and then the excavator begins to excavate soil in the foundation pit to form the foundation pit.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the technical principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.
Claims (10)
1. The utility model provides a building foundation ditch construction equipment, includes track frame (2) on base (1) and base (1), sliding connection has auger (3) on track frame (2), its characterized in that: the auger (3) is connected with a squeezing component (5) in a sliding mode, the squeezing component (5) is used for squeezing the inner wall of the ground, a power component (4) is further mounted inside the auger (3), and the power component (4) is used for driving the squeezing component (5) to slide;
the extruding part (5) comprises a supporting sleeve (51) which is slidably connected onto the spiral drill (3), a push plate (53) is installed inside the supporting sleeve (51), the push plate (53) is used for leveling the inner wall of the ground, a square sleeve (14) is further installed on the spiral drill (3), a trapezoidal block (56) is installed on the square sleeve (14), a semicircular elastic sheet (55) is further installed on the supporting sleeve (51), and the semicircular elastic sheet (55) is used for abutting against the trapezoidal block (56).
2. The construction equipment for the foundation pit of claim 1, wherein: still sliding connection has second extrusion post (65) on push pedal (53), install screed (64) on second extrusion post (65), screed (64) are used for the flattening soil inner wall, still install fourth spring (66) on push pedal (53), fourth spring (66) are connected with second extrusion post (65).
3. The construction equipment for building foundation pit according to claim 2, wherein: support the inside sliding connection of cover (51) and have slide plate (52), install push rod (57) on slide plate (52), there is adjusting plate (59) still to install on push rod (57), adjusting plate (59) run through and support cover (51), it has first extrusion post (62) still to sliding connection on adjusting plate (59), still install third spring (61) on adjusting plate (59), third spring (61) are connected with first extrusion post (62).
4. The construction equipment for the foundation pit of claim 2, wherein: a sliding plate (12) is connected onto the spiral drill (3) in a sliding mode, the sliding plate (12) is connected with a square sleeve (14), the sliding plate (12) is used for driving a leveling plate (64) to slide up and down, a first spring (13) is further installed inside the spiral drill (3), and the first spring (13) is connected with the spiral drill (3);
the support sleeve (51) is further provided with an arc-shaped elastic sheet (54), the arc-shaped elastic sheet (54) is connected with the sliding plate (12), and the arc-shaped elastic sheet (54) is used for driving the support sleeve (51) to reset.
5. The construction equipment for the building foundation pit according to claim 4, wherein: the hydraulic cylinder (10) is installed in the auger (3), the connecting sleeve (11) is installed on the hydraulic cylinder (10), the power part (4) comprises a frustum (41) connected with the connecting sleeve (11), and the frustum (41) is used for abutting against the sliding plate (52).
6. The construction equipment for the building foundation pit according to claim 5, wherein: be provided with chute (42) on frustum (41), slide board (52) are used for sliding connection in the inside of chute (42), the inside of adapter sleeve (11) is provided with helicla flute (46), the internally mounted of auger (3) has montant (43), montant (43) sliding connection is in the inside of adapter sleeve (11), still install lug (45) on montant (43), lug (45) sliding connection is in the inside of helicla flute (46).
7. The construction equipment for the building foundation pit according to claim 6, wherein: the inner wall of the connecting sleeve (11) is further provided with a vertical groove (44), the vertical groove (44) is communicated with the spiral groove (46), and the bump (45) is connected to the inside of the bump (45) in a sliding mode.
8. The construction equipment for the building foundation pit according to claim 7, wherein: still install on adapter sleeve (11) and press board (47), press board (47) are used for contradicting on skid plate (52), it has inserted bar (69) to support still sliding connection on cover (51), still be provided with spacing hole (68) on auger (3), inserted bar (69) run through support cover (51) and square cover (14) and sliding connection in the inside in spacing hole (68), the inside of support cover (51) still installs fifth spring (70), fifth spring (70) are connected with inserted bar (69), still be provided with trapezoidal recess (67) on skid plate (52), inserted bar (69) sliding connection is in the inside of trapezoidal recess (67).
9. The construction equipment for the foundation pit of claim 1, wherein: and a second spring (58) is further installed in the support sleeve (51), the second spring (58) is connected with the sliding plate (52), and the second spring (58) is used for pushing the sliding plate (52) to reset.
10. The construction method of the construction foundation pit construction equipment according to claim 9, wherein:
s1, moving the base (1) to a designated position, then using the spiral drill (3) to rotate and drill downwards, and using the push plate (53) to collide against the soil, so that the soil in the hole of the spiral drill (3) does not collapse as much as possible after drilling;
s2, pressing and compacting the soil of different levels by the three leveling plates (64) through pressing the second extrusion column (65) and sliding the leveling plates (64), and extruding the soil again on the second extrusion column (65) through the first extrusion column (62), so that the force of the leveling plates (64) for extruding the soil is increased, and the soil of a soft layer can also be extruded and compacted;
s3, the frustum (41) and the inclined grooves (42) can continuously push the leveling plate (64) to strike on soil through the rotation of the frustum (41), so that the leveling plate (64) can better extrude the soil, and the inner wall of a soil hole is prevented from collapsing as much as possible;
and S4, after the deep hole is mined by the auger (3), cement is poured into the deep hole to build the row pile support, and then the excavator begins to excavate soil in the foundation pit to form the foundation pit.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210348377.0A CN114592520A (en) | 2022-04-01 | 2022-04-01 | Building foundation pit construction equipment and building foundation pit construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210348377.0A CN114592520A (en) | 2022-04-01 | 2022-04-01 | Building foundation pit construction equipment and building foundation pit construction method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN114592520A true CN114592520A (en) | 2022-06-07 |
Family
ID=81821472
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202210348377.0A Withdrawn CN114592520A (en) | 2022-04-01 | 2022-04-01 | Building foundation pit construction equipment and building foundation pit construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN114592520A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115341848A (en) * | 2022-08-15 | 2022-11-15 | 安徽盛风建设工程有限公司 | Pit digging device with anti-collapse effect for municipal road soft foundation construction and construction method thereof |
| CN117248783A (en) * | 2023-08-29 | 2023-12-19 | 中铁上海工程局集团有限公司 | A kind of railway cylindrical prefabricated component installation assembly and installation method |
-
2022
- 2022-04-01 CN CN202210348377.0A patent/CN114592520A/en not_active Withdrawn
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115341848A (en) * | 2022-08-15 | 2022-11-15 | 安徽盛风建设工程有限公司 | Pit digging device with anti-collapse effect for municipal road soft foundation construction and construction method thereof |
| CN115341848B (en) * | 2022-08-15 | 2024-09-20 | 安徽盛风建设工程有限公司 | Pit digging device with collapse prevention function for municipal road soft foundation construction and construction method thereof |
| CN117248783A (en) * | 2023-08-29 | 2023-12-19 | 中铁上海工程局集团有限公司 | A kind of railway cylindrical prefabricated component installation assembly and installation method |
| CN117248783B (en) * | 2023-08-29 | 2024-04-09 | 中铁上海工程局集团有限公司 | Railway column prefabricated component installation assembly and installation method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US3999392A (en) | Method of constructing a wall for supporting earth | |
| DE202023102149U1 (en) | Drainage well structure for excavation pit drainage | |
| CN113417293B (en) | Deep foundation pit supporting structure for building construction | |
| CN101029559B (en) | Long-spiral replaceable and extruded borehole construction | |
| KR101031433B1 (en) | Soil Drilling Machine | |
| KR101031447B1 (en) | Soil Drilling Machine | |
| CN113832991A (en) | Reverse construction method of pile plate wall | |
| CN211849469U (en) | Anti-collapse device for building foundation pit construction | |
| CN110529042A (en) | A kind of hole-forming method of precipitation well | |
| CN105064379A (en) | H-shaped steel foundation pit supporting device and method | |
| CN211113623U (en) | Pile driver for construction | |
| CN118774600A (en) | A kind of boring and grouting pile construction equipment and construction method for complex geological conditions | |
| CN111926821A (en) | Construction method of novel slope protection pile | |
| CN213897097U (en) | Long steel protects a section of thick bamboo for pile foundation construction | |
| CN110258526A (en) | The method of prefabricated diaphram wall and construct outer wall of basement and floor | |
| CN114215480B (en) | Rotary drilling drill for drift sand geology and long casing slurry pore-forming method adopting rotary drilling drill | |
| CN218346188U (en) | Foundation ditch excavation strutting arrangement for civil engineering | |
| CN214363521U (en) | Deep basal pit wall body bearing structure | |
| KR102059051B1 (en) | Method for excavating vertical shaft | |
| CN213204101U (en) | Pile foundation mud jacking device | |
| CN115977130A (en) | A concrete caisson structure and its construction method | |
| CN113832965A (en) | Steel sleeve wall protection device and sand-gravel region cast-in-place pile construction method | |
| CN215165609U (en) | Deep foundation pit grouting device | |
| RU2610053C1 (en) | Male die for grouted piles establishment by pressing method of establishment grouted concrete, reinforced concrete and fibercrete piles by pressing by means of grouted pile establishment with widening, using tremic accessory, male die | |
| CN223329873U (en) | Construction structure for constructing open caisson |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WW01 | Invention patent application withdrawn after publication | ||
| WW01 | Invention patent application withdrawn after publication |
Application publication date: 20220607 |