Prior art keywords
sling
truss floor
support
hook
floor deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210150516.9A
Other languages
Chinese (zh)
Inventor
唐敏
刘勉
刘汉荣
李鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN202210150516.9A priority Critical patent/CN114572809A/en
Publication of CN114572809A publication Critical patent/CN114572809A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
    • B66C1/14—Slings with hooks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种用于钢筋桁架楼承板的吊具及方法,吊具包括2个平衡支撑、2个固定支撑、可调支撑、吊钩组件和吊带,2个固定支撑连接在可调支撑的两端,2个平衡支撑分别设置于2个固定支撑的末端,且固定支撑和可调支撑形成直线型,平衡支撑垂直于固定支撑和可调支撑设置,吊钩组件设置于平衡支撑上;本发明提供了一种安全、稳定、无损伤的用于钢筋桁架楼承板的吊具及方法。

Figure 202210150516

The invention discloses a spreader and a method for a steel bar truss floor slab. The spreader includes two balance supports, two fixed supports, adjustable supports, a hook assembly and a sling, and the two fixed supports are connected in the adjustable support. At both ends of the support, two balance supports are respectively arranged at the ends of the two fixed supports, and the fixed support and the adjustable support form a straight line, the balance support is perpendicular to the fixed support and the adjustable support, and the hook assembly is arranged on the balance support The invention provides a safe, stable and non-damaged hanger and method for steel truss floor deck.

Figure 202210150516

Description

一种用于钢筋桁架楼承板的吊具及方法A spreader and method for steel truss floor deck

技术领域technical field

本发明涉及建筑施工技术领域,具体是一种用于钢筋桁架楼承板的吊具及方法。The invention relates to the technical field of building construction, in particular to a hanger and a method for a steel bar truss floor deck.

背景技术Background technique

钢筋桁架楼承板系统是将混凝土楼板中的钢筋与施工模板组合为一体。在施工阶段,能够承受湿混凝土自重及施工荷载的承重构件,并且该构件在施工阶段可作为钢梁的侧向支撑使用。在使用阶段,钢筋桁架与混凝土共同工作,共同承受使用荷载。钢筋桁架楼承板目前被广泛用于多层厂房,多层、高层、超高层钢结构楼宇、各种不规则楼面、混凝土结构、高速铁路等结构和建筑领域。因其具有经济、便捷、安全、可靠的特点,越来越多的建筑商和业主选择更科学、更具效益的钢筋桁架楼承板。The steel truss floor deck system is a combination of the steel bars in the concrete floor and the construction formwork. In the construction stage, it is a load-bearing member that can bear the dead weight of the wet concrete and the construction load, and the member can be used as the lateral support of the steel beam in the construction stage. During the use phase, the steel trusses work together with the concrete to bear the service load together. Reinforced truss floor slabs are currently widely used in multi-storey workshops, multi-storey, high-rise, super high-rise steel structure buildings, various irregular floors, concrete structures, high-speed railways and other structural and construction fields. Because of its economical, convenient, safe and reliable features, more and more builders and owners choose more scientific and more efficient steel truss floor decks.

一般项目的钢筋桁架楼承板成型宽度较大,现场如果使用吊带直接卸车或吊装整捆的钢筋桁架楼承板,容易使楼承板的扣接缝造成变形,从而导致楼承板浇筑时容易漏浆,对结构安全造成隐患的同时且影响建筑整体的成型美观。The reinforced truss floor slabs of general projects have a large forming width. If the sling is used to unload the truck directly or hoist the whole bundle of reinforced truss floor slabs, it is easy to deform the buckle joints of the floor slabs. Slurry leakage will not only cause hidden dangers to structural safety, but also affect the overall appearance of the building.

综上所述,现有技术还缺少一种安全、稳定、无损伤的用于钢筋桁架楼承板的吊具及方法。To sum up, the prior art still lacks a safe, stable and damage-free spreader and method for steel truss floor decks.

发明内容SUMMARY OF THE INVENTION

本发明提供一种安全、稳定、无损伤的用于钢筋桁架楼承板的吊具及方法。The invention provides a safe, stable and damage-free hanger and method for steel truss floor deck.

为达此目的,本发明提供如下的技术方案:For this purpose, the present invention provides following technical scheme:

本发明提供了一种用于钢筋桁架楼承板的吊具,包括2个平衡支撑、2个固定支撑、可调支撑、吊钩组件和吊带,2个所述固定支撑连接在所述可调支撑的两端,2个所述平衡支撑分别设置于2个所述固定支撑的末端,且所述固定支撑和所述可调支撑形成直线型,所述平衡支撑垂直于所述固定支撑和所述可调支撑设置,所述吊钩组件设置于所述平衡支撑上;一种状态下,所述吊带捆绑钢筋桁架楼承板,所述吊钩组件挂接在所述吊带上。The present invention provides a spreader for a steel truss floor deck, comprising two balance supports, two fixed supports, adjustable supports, a hook assembly and a sling, and the two fixed supports are connected to the adjustable supports. At both ends of the support, the two balanced supports are respectively arranged at the ends of the two fixed supports, and the fixed support and the adjustable support form a straight line, and the balanced support is perpendicular to the fixed support and the fixed support. In the adjustable support arrangement, the hook assembly is arranged on the balance support; in one state, the sling is bound to the steel truss floor deck, and the hook assembly is hung on the sling.

优选的,所述吊钩组件包括第一卸扣、第二卸扣和吊钩,所述第一卸扣和所述第二卸扣分别设置于所述平衡支撑的上表面和下表面,且所述第一卸扣和所述第二卸扣垂直设置,所述吊钩连接所述第二卸扣,所述第一卸扣可外接机械设备的吊钩。Preferably, the hook assembly includes a first shackle, a second shackle and a hook, the first shackle and the second shackle are respectively disposed on the upper surface and the lower surface of the balance support, and The first shackle and the second shackle are arranged vertically, the hook is connected to the second shackle, and the first shackle can be connected to a hook of a mechanical device.

优选的,所述吊钩组件有4个,4个吊钩组件分为2组,每组2个,且每组的2个吊钩组件对称设置于平衡支撑上。Preferably, there are four hook assemblies, the four hook assemblies are divided into two groups, each group has two hook assemblies, and the two hook assemblies in each group are symmetrically arranged on the balance support.

优选的,每组的2个吊钩组件的水平间距不小于60cm。吊耳间距大于楼承板成型宽度60cm,确保吊装时吊带不对钢筋桁架楼承板底模的挤压,减少变形。Preferably, the horizontal distance between the two hook assemblies in each group is not less than 60 cm. The distance between the lifting lugs is greater than the forming width of the floor deck by 60cm, to ensure that the sling does not squeeze the bottom mold of the steel truss floor deck during hoisting and reduce deformation.

优选的,还包括吊带保护套,所述吊带保护套以所述吊带的中心位置为对称点设置在所述吊带上,且所述吊带保护套上设有刻度线。Preferably, it also includes a sling protective cover, the sling protective cover is arranged on the sling with the center position of the sling as a symmetrical point, and the sling protective cover is provided with a scale line.

优选的,所述吊带保护套的长度不小于60cm。Preferably, the length of the sling protective cover is not less than 60cm.

本发明提供的吊具可以通过可拆卸式连接的固定支撑和可调支撑进行任意组装,以便适用于不同尺寸的钢筋桁架楼承板。此外,本发明的吊具不仅适用于钢筋桁架楼承板,还可兼顾机电专业的设备或材料的吊装等。总而言之,本发明的吊具可调节性强,应用范围广。The spreader provided by the present invention can be arbitrarily assembled by detachably connected fixed supports and adjustable supports, so as to be suitable for steel truss floor decks of different sizes. In addition, the spreader of the present invention is not only suitable for steel truss floor decks, but also for the hoisting of mechanical and electrical equipment or materials. All in all, the spreader of the present invention has strong adjustability and wide application range.

本发明的第二个方面,提供了一种吊装钢筋桁架楼承板的方法,包括以下步骤:A second aspect of the present invention provides a method for hoisting a steel truss floor deck, comprising the following steps:

S1、将选取的可调支撑、固定支撑、平衡支撑、吊钩组件组装;S1. Assemble the selected adjustable support, fixed support, balance support, and hook components;

S2、将吊带穿过钢筋桁架楼承板,且通过吊带的吊带保护套和刻度线确定钢筋桁架楼承板放置于吊带的中心位置;S2. Pass the sling through the steel truss floor deck, and determine the steel truss floor deck to be placed at the center of the sling through the sling protection cover and the scale line of the sling;

S3、将4个吊钩挂接在吊带的四个边角上;S3. Hook the four hooks on the four corners of the sling;

S4、将机械设备的吊钩挂在4个第一卸扣上;S4. Hang the hooks of the mechanical equipment on the 4 first shackles;

S5、起吊。S5, lifting.

优选的,步骤S1中取的可调支撑的长度为1/4-1/2倍的钢筋桁架楼承板的长度。Preferably, the length of the adjustable support taken in step S1 is 1/4-1/2 times the length of the steel truss floor deck.

优选的,步骤S1中可调支撑和固定支撑的组装方式包括:在可调支撑和固定支撑的连接面上分别焊接法兰,然后采用高强螺栓连接可调支撑和固定支撑的法兰。通过对可调支撑的拆除,能满足吊装尺寸较小的其他设备或材料。Preferably, the assembling method of the adjustable support and the fixed support in step S1 includes: respectively welding flanges on the connecting surfaces of the adjustable support and the fixed support, and then using high-strength bolts to connect the flanges of the adjustable support and the fixed support. By dismantling the adjustable support, other equipment or materials with smaller size can be hoisted.

优选的,2个所述固定支撑连接在所述可调支撑的两端,2个所述平衡支撑分别设置于2个所述固定支撑的末端,且所述固定支撑和所述可调支撑形成直线型,所述平衡支撑垂直于所述固定支撑和所述可调支撑设置,所述吊钩组件设置于所述平衡支撑上;一种状态下,所述吊带捆绑钢筋桁架楼承板,所述吊钩组件挂接在所述吊带上。Preferably, the two fixed supports are connected at both ends of the adjustable supports, the two balanced supports are respectively arranged at the ends of the two fixed supports, and the fixed supports and the adjustable supports form a Linear type, the balance support is arranged perpendicular to the fixed support and the adjustable support, and the hook assembly is arranged on the balance support; The hook assembly is hung on the sling.

优选的,所述吊钩组件包括第一卸扣、第二卸扣和吊钩,所述第一卸扣和所述第二卸扣分别设置于所述平衡支撑的上表面和下表面,且所述第一卸扣和所述第二卸扣垂直设置,所述吊钩连接所述第二卸扣,所述第一卸扣可外接机械设备的吊钩。Preferably, the hook assembly includes a first shackle, a second shackle and a hook, the first shackle and the second shackle are respectively disposed on the upper surface and the lower surface of the balance support, and The first shackle and the second shackle are arranged vertically, the hook is connected to the second shackle, and the first shackle can be connected to a hook of a mechanical device.

优选的,所述吊钩组件有4个,4个吊钩组件分为2组,每组2个,且每组的2个吊钩组件对称设置于平衡支撑上。Preferably, there are four hook assemblies, the four hook assemblies are divided into two groups, each group has two hook assemblies, and the two hook assemblies in each group are symmetrically arranged on the balance support.

优选的,每组的2个吊钩组件的水平间距不小于60cm。Preferably, the horizontal distance between the two hook assemblies in each group is not less than 60 cm.

优选的,还包括吊带保护套,所述吊带保护套以所述吊带的中心位置为对称点设置在所述吊带上,且所述吊带保护套上设有刻度线。Preferably, it also includes a sling protective cover, the sling protective cover is arranged on the sling with the center position of the sling as a symmetrical point, and the sling protective cover is provided with a scale line.

优选的,所述吊带保护套的长度不小于60cm。Preferably, the length of the sling protective cover is not less than 60cm.

与现有技术相比,本发明有益效果及显著进步在于:Compared with the prior art, the beneficial effects and significant progress of the present invention are:

1、本发明的吊具加工简单方便,安装简易,施工效率高,对成品保护效果好,能实现吊具的重复使用;1. The spreader of the present invention is simple and convenient to process, easy to install, high in construction efficiency, good in protecting the finished product, and can realize the repeated use of the spreader;

2、使用本发明方法后,能够有效确保施工质量,减少对钢筋桁架楼承板变形修复及处理,能减少大量施工成本,提高效益。2. After using the method of the present invention, the construction quality can be effectively ensured, the deformation, repair and treatment of the steel truss floor deck can be reduced, a large amount of construction costs can be reduced, and benefits can be improved.

附图说明Description of drawings

为更清楚地说明本发明的技术方案,下面将对本发明的实施例所需使用的附图作一简单介绍。In order to illustrate the technical solutions of the present invention more clearly, the following briefly introduces the accompanying drawings required for the embodiments of the present invention.

显而易见地,下面描述中的附图仅是本发明中的部分实施例的附图,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图,但这些其他的附图同样属于本发明实施例所需使用的附图之内。Obviously, the drawings in the following description are only drawings of some embodiments of the present invention, and for those of ordinary skill in the art, without any creative effort, other drawings can also be obtained from these drawings. The accompanying drawings, but these other drawings also belong to the drawings required to be used in the embodiments of the present invention.

图1为本发明实施例的一种用于钢筋桁架楼承板的吊具的使用状态效果图;1 is an effect diagram of a use state of a spreader for a steel truss floor deck according to an embodiment of the present invention;

图2为本发明实施例的一种用于钢筋桁架楼承板的吊具的俯视图;2 is a top view of a spreader for a steel truss floor deck according to an embodiment of the present invention;

图3为本发明实施例的一种用于钢筋桁架楼承板的吊具的侧视图;3 is a side view of a spreader for a steel truss floor deck according to an embodiment of the present invention;

图4为本发明实施例的一种用于钢筋桁架楼承板的吊具的吊带结构示意图;4 is a schematic diagram of a sling structure of a sling for a reinforced truss floor deck according to an embodiment of the present invention;

附图标记,1、第一卸扣,2、第二卸扣,3、吊钩,4、固定支撑,5、可调支撑,6、高强螺栓,7、法兰,8、平衡支撑,9、吊带,10、钢筋桁架楼承板,11、吊带保护套。Reference numerals, 1, first shackle, 2, second shackle, 3, hook, 4, fixed support, 5, adjustable support, 6, high-strength bolt, 7, flange, 8, balance support, 9 , Sling, 10, reinforced truss floor deck, 11, sling protective cover.

具体实施方式Detailed ways

为使本发明实施例的目的、技术方案、有益效果及显著进步更加清楚,下面,将结合本发明实施例,对本发明实施例中的技术方案进行清楚、完整地描述。In order to make the purposes, technical solutions, beneficial effects and significant progress of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention.

显然,所有描述的这些实施例仅是本发明的部分实施例,而不是全部的实施例;基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。Obviously, all the described embodiments are only some of the embodiments of the present invention, not all of the embodiments; based on the embodiments of the present invention, all other implementations obtained by those of ordinary skill in the art without creative efforts For example, all belong to the protection scope of the present invention.

需要说明的是,本发明的说明书和权利要求书中的术语“第一”、“第二”和“第三”(如果存在)等,仅是用于区别不同的对象,而非用于描述特定的顺序。此外,术语“包括”以及它们的任何变形,意图在于覆盖不排他的包含。例如,包含了一系列步骤或单元的过程、方法、系统、产品或设备没有限定于已列出的步骤或单元,而是可选地还包括没有列出的步骤或单元,或可选地还包括对于这些过程、方法、产品或设备固有的其它步骤或单元。It should be noted that the terms "first", "second" and "third" (if any) in the description and claims of the present invention are only used to distinguish different objects, rather than to describe specific order. Furthermore, the term "comprising" and any variations thereof are intended to cover non-exclusive inclusion. For example, a process, method, system, product or device comprising a series of steps or elements is not limited to the listed steps or elements, but optionally also includes unlisted steps or elements, or optionally also Include other steps or units inherent to these processes, methods, products or devices.

需要理解的是:What needs to be understood is:

在本发明中,除非另有明确的规定和限定,术语“安装”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接或活动连接,亦可是成为一体;可以是直接连接,也可以是通过中间媒介的间接连接或是无形的信号连接,甚至是光连接,可以是两个元件内部的连通或两个元件的相互作用关系,除非另有明确的限定。In the present invention, unless otherwise expressly specified and limited, the terms "installation", "connection", "fixed" and other terms should be understood in a broad sense, for example, it may be a fixed connection, a detachable connection or an active connection, It can also be integrated; it can be a direct connection, an indirect connection through an intermediate medium, an invisible signal connection, or even an optical connection, and it can be the internal connection of two elements or the interaction between the two elements, unless otherwise There are clear limits.

对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific situations.

还需要说明的是,以下的具体实施例可以相互结合,对于其中相同或相似的概念或过程可能在某些实施例中不再赘述。It should also be noted that the following specific embodiments may be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments.

下面,以具体的实施例对本发明的技术方案进行详细说明。Hereinafter, the technical solutions of the present invention will be described in detail with specific embodiments.

实施例1Example 1

如图1-4所示,示出了一种用于钢筋桁架楼承板的吊具,包括第一卸扣1、第二卸扣2、吊钩3、固定支撑4、可调支撑5、高强螺栓6、法兰7、平衡支撑8、吊带9、钢筋桁架楼承板10、吊带保护套11,2个固定支撑4连接在可调支撑5的两端,具体的连接方式为:在可调支撑5和固定支撑4的连接面上分别焊接法兰7,然后采用高强螺栓6连接可调支撑5和固定支撑4的法兰7。2个平衡支撑8分别设置于2个固定支撑4的末端,且固定支撑4和可调支撑5形成直线型,平衡支撑8垂直于固定支撑4和可调支撑5设置,吊钩组件设置于平衡支撑5上;一种状态下,吊带9捆绑钢筋桁架楼承板10,吊钩组件挂接在吊带9上。吊钩组件包括第一卸扣1、第二卸扣2和吊钩3,第一卸扣1和第二卸扣2分别设置于平衡支撑8的上表面和下表面,且第一卸扣1和第二卸扣2垂直设置,吊钩3连接第二卸扣2,第一卸扣1可外接机械设备的吊钩。吊钩组件有4个,4个吊钩组件分为2组,每组2个,且每组的2个吊钩组件对称设置于平衡支撑8上。吊带9上还设有吊带保护套11,吊带保护套11以吊带9的中心位置为对称点设置在吊带9上,且吊带保护套11上设有刻度线。As shown in Figures 1-4, a spreader for steel truss floor deck is shown, including a first shackle 1, a second shackle 2, a hook 3, a fixed support 4, an adjustable support 5, High-strength bolts 6, flanges 7, balance supports 8, slings 9, steel truss floor decks 10, sling protection sleeves 11, and two fixed supports 4 are connected to both ends of the adjustable support 5. The specific connection method is: Flanges 7 are welded on the connecting surfaces of the adjustable support 5 and the fixed support 4 respectively, and then high-strength bolts 6 are used to connect the flanges 7 of the adjustable support 5 and the fixed support 4. Two balance supports 8 are respectively arranged on the two fixed supports 4 At the end, the fixed support 4 and the adjustable support 5 form a straight line, the balance support 8 is arranged perpendicular to the fixed support 4 and the adjustable support 5, and the hook assembly is arranged on the balance support 5; in one state, the sling 9 is tied to the steel bar truss The floor deck 10 and the hook assembly are hung on the suspender 9 . The hook assembly includes a first shackle 1, a second shackle 2 and a hook 3. The first shackle 1 and the second shackle 2 are respectively arranged on the upper surface and the lower surface of the balance support 8, and the first shackle 1 Vertically arranged with the second shackle 2, the hook 3 is connected to the second shackle 2, and the first shackle 1 can be connected to a hook of a mechanical device. There are 4 hook assemblies, and the 4 hook assemblies are divided into 2 groups of 2, and the 2 hook assemblies of each group are symmetrically arranged on the balance support 8 . The sling 9 is also provided with a sling protective cover 11 , the sling protective cover 11 is arranged on the sling 9 with the center of the sling 9 as a symmetrical point, and the sling protective cover 11 is provided with a scale line.

在本实施例中,每组的2个吊钩组件的水平间距不小于60cm。In this embodiment, the horizontal distance between the two hook assemblies in each group is not less than 60 cm.

在本实施例中,吊带保护套的长度不小于60cm。In this embodiment, the length of the protective cover of the sling is not less than 60cm.

在本实施例中,固定支撑4、可调支撑5为钢管。In this embodiment, the fixed support 4 and the adjustable support 5 are steel pipes.

在本实施例中,吊带保护套为防滑橡胶层。In this embodiment, the protective cover of the sling is a non-slip rubber layer.

综上所述,本实施例的用于钢筋桁架楼承板的吊具对比普通的模板支撑体系具有更明显的优势,其施工效率快、安全、成型效果好,可在钢结构框架体系中正大面积推广,由于其独特的构造,底模一般都采用镀锌薄板,在成捆打包后进行吊装时容易对镀锌底模造成挤压变形,会对后期混凝土浇筑造成漏浆及影响成品美观。因此提出本实施例的一种专用吊具解决楼承板吊装变形的问题,同时考虑项目后期机电设备的吊装使用,通过设计可调支撑,仅对可调支撑进行拆装,便能实现了资源的可重复利用。本实施例的用于钢筋桁架楼承板的吊具主要由固定端支撑和可调支撑组成,固定端支撑与可调支撑支撑采用钢管做成,末端焊接连接法兰,法兰间通过高强螺栓进行连接固定,平衡支撑末端设置吊耳,吊耳间距大于楼承板成型宽度60cm,确保吊装时吊带不对钢筋桁架楼承板底模的挤压,减少变形。通过对可调支撑的拆除,能满足吊装尺寸较小的其他设备或材料。吊钩的使用能确保吊带进行快速挂钩及摘钩,吊带选用长度合适的尺寸,取吊带中心,并在中心设置对称的吊带保护套,保护套两侧设置刻度标记,便于吊装时快速找正被吊物中心。To sum up, the spreader used for the steel truss floor deck of this embodiment has more obvious advantages than the ordinary formwork support system, and its construction efficiency is fast, safe, and the forming effect is good, and it can be used in the steel structure frame system. Area promotion, due to its unique structure, the bottom mold is generally made of galvanized sheet, which is easy to squeeze and deform the galvanized bottom mold when hoisting after being packed in bundles, which will cause slurry leakage in the later concrete pouring and affect the appearance of the finished product. Therefore, a special hoisting tool of this embodiment is proposed to solve the problem of hoisting and deformation of the floor deck, and at the same time, considering the hoisting and use of electromechanical equipment in the later stage of the project, by designing adjustable supports, only by disassembling and assembling the adjustable supports, resources can be realized. reusable. The spreader for the steel truss floor deck in this embodiment is mainly composed of a fixed end support and an adjustable support. The fixed end support and the adjustable support support are made of steel pipes, and the ends are welded to connect flanges, and high-strength bolts are connected between the flanges. Connect and fix, and set lifting lugs at the end of the balance support. The distance between the lifting lugs is 60cm greater than the forming width of the floor deck to ensure that the sling does not squeeze the bottom mold of the steel truss floor deck during hoisting to reduce deformation. By dismantling the adjustable support, other equipment or materials with smaller size can be hoisted. The use of the sling can ensure that the sling can be quickly hooked and unhooked. The sling should be selected with a suitable length, take the center of the sling, and set a symmetrical sling protective cover in the center. There are scale marks on both sides of the protective cover to facilitate the quick alignment of the quilt during hoisting. Hanging center.

实施例2Example 2

一种吊装钢筋桁架楼承板的方法,包括以下步骤:A method for hoisting a steel bar truss floor deck, comprising the following steps:

S1、将选取的可调支撑、固定支撑、平衡支撑、吊钩组件组装;S1. Assemble the selected adjustable support, fixed support, balance support, and hook components;

S2、将吊带穿过钢筋桁架楼承板,且通过吊带的吊带保护套和刻度线确定钢筋桁架楼承板放置于吊带的中心位置;S2. Pass the sling through the steel truss floor deck, and determine the steel truss floor deck to be placed at the center of the sling through the sling protection cover and the scale line of the sling;

S3、将4个吊钩挂接在吊带的四个边角上;S3. Hook the four hooks on the four corners of the sling;

S4、将机械设备的吊钩挂在4个第一卸扣上;S4. Hang the hooks of the mechanical equipment on the 4 first shackles;

S5、起吊。S5, lifting.

优选的,步骤S1中取的可调支撑的长度为1/4-1/2倍的钢筋桁架楼承板的长度。Preferably, the length of the adjustable support taken in step S1 is 1/4-1/2 times the length of the steel truss floor deck.

优选的,步骤S1中可调支撑和固定支撑的组装方式包括:在可调支撑和固定支撑的连接面上分别焊接法兰,然后采用高强螺栓连接可调支撑和固定支撑的法兰。Preferably, the assembling method of the adjustable support and the fixed support in step S1 includes: respectively welding flanges on the connecting surfaces of the adjustable support and the fixed support, and then using high-strength bolts to connect the flanges of the adjustable support and the fixed support.

在上述说明书的描述过程中:During the description of the above specification:

术语“本实施例”、“本发明实施例”、“如……所示”、“进一步的”、“进一步改进的技术分方案”等的描述,意指该实施例或示例描述的具体特征、结构、材料或者特点包含于本发明的至少一个实施例或示例中;在本说明书中,对上述术语的示意性表述不是必须针对相同的实施例或示例,而且,描述的具体特征、结构、材料或者特点等可以在任意一个或者多个实施例或示例中以合适的方式结合或组合;此外,在不产生矛盾的前提下,本领域的普通技术人员可以将本说明书中描述的不同实施例或示例以及不同实施例或示例的特征进行结合或组合。The description of the terms "this embodiment", "this embodiment of the present invention", "as shown", "further", "further improved technical sub-scheme", etc., mean the specific features described in this embodiment or example , structures, materials or features are included in at least one embodiment or example of the present invention; in this specification, schematic representations of the above terms are not necessarily directed to the same embodiment or example, and the specific features, structures, Materials or features, etc. may be combined or combined in any suitable manner in any one or more embodiments or examples; in addition, under the premise of no contradiction, those of ordinary skill in the art may combine the different embodiments described in this specification or examples and features of different embodiments or examples are combined or combined.

最后应说明的是:Finally, it should be noted that:

以上各实施例仅用以说明本发明的技术方案,而非是对其的限制;The above embodiments are only used to illustrate the technical solutions of the present invention, but not to limit them;

尽管参照前述各实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换,而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的范围,本领域技术人员根据本说明书内容所做出的非本质改进和调整或者替换,均属本发明所要求保护的范围。Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that the technical solutions described in the foregoing embodiments can still be modified, or some or all of the technical features thereof can be equivalently replaced. , and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and the non-essential improvements, adjustments or replacements made by those skilled in the art according to the contents of this specification belong to the present invention. Scope of Claimed Protection.

Claims (9)

1.一种用于钢筋桁架楼承板的吊具,其特征在于,包括2个平衡支撑、2个固定支撑、可调支撑、吊钩组件和吊带,2个所述固定支撑连接在所述可调支撑的两端,2个所述平衡支撑分别设置于2个所述固定支撑的末端,且所述固定支撑和所述可调支撑形成直线型,所述平衡支撑垂直于所述固定支撑和所述可调支撑设置,所述吊钩组件设置于所述平衡支撑上;1. a spreader for steel truss floor deck, is characterized in that, comprises 2 balanced supports, 2 fixed supports, adjustable support, hook assembly and sling, 2 described fixed supports are connected in the described At both ends of the adjustable supports, the two balanced supports are respectively arranged at the ends of the two fixed supports, and the fixed supports and the adjustable supports form a straight line, and the balanced supports are perpendicular to the fixed supports and the adjustable support arrangement, the hook assembly is arranged on the balance support; 一种状态下,所述吊带捆绑钢筋桁架楼承板,所述吊钩组件挂接在所述吊带上。In one state, the sling is bound to the steel truss floor deck, and the hook assembly is hung on the sling. 2.如权利要求1所述的一种用于钢筋桁架楼承板的吊具,其特征在于,所述吊钩组件包括第一卸扣、第二卸扣和吊钩,所述第一卸扣和所述第二卸扣分别设置于所述平衡支撑的上表面和下表面,且所述第一卸扣和所述第二卸扣垂直设置,所述吊钩连接所述第二卸扣,所述第一卸扣可外接机械设备的吊钩。2 . The spreader for steel truss floor deck according to claim 1 , wherein the hook assembly comprises a first shackle, a second shackle and a hook, and the first shackle The buckle and the second shackle are respectively arranged on the upper surface and the lower surface of the balance support, and the first shackle and the second shackle are arranged vertically, and the hook is connected to the second shackle , the first shackle can be connected to a hook of a mechanical device. 3.如权利要求2所述的一种用于钢筋桁架楼承板的吊具,其特征在于,所述吊钩组件有4个,4个吊钩组件分为2组,每组2个,且每组的2个吊钩组件对称设置于平衡支撑上。3. a kind of spreader for steel truss floor deck as claimed in claim 2 is characterized in that, described hook assembly has 4, and 4 hook assemblies are divided into 2 groups, each group 2, And the two hook assemblies of each group are symmetrically arranged on the balance support. 4.如权利要求3所述的一种用于钢筋桁架楼承板的吊具,其特征在于,每组的2个吊钩组件的水平间距不小于60cm。4 . The spreader for steel truss floor decks according to claim 3 , wherein the horizontal spacing of the two hook assemblies in each group is not less than 60 cm. 5 . 5.如权利要求1所述的一种用于钢筋桁架楼承板的吊具,其特征在于,还包括吊带保护套,所述吊带保护套以所述吊带的中心位置为对称点设置在所述吊带上,且所述吊带保护套上设有刻度线。5 . The sling for steel truss floor deck according to claim 1 , further comprising a sling protective sleeve, and the sling protective sleeve is arranged at the center of the sling as a symmetrical point. 6 . on the sling, and the sling protective cover is provided with a scale line. 6.如权利要求1所述的一种用于钢筋桁架楼承板的吊具,其特征在于,所述吊带保护套的长度不小于60cm。6 . The sling for reinforced truss floor deck according to claim 1 , wherein the length of the sling protection sleeve is not less than 60 cm. 7 . 7.一种吊装钢筋桁架楼承板的方法,其特征在于,包括以下步骤:7. A method for hoisting steel bar truss floor deck is characterized in that, comprises the following steps: S1、将选取的可调支撑、固定支撑、平衡支撑、吊钩组件组装;S1. Assemble the selected adjustable support, fixed support, balance support, and hook components; S2、将吊带穿过钢筋桁架楼承板,且通过吊带的吊带保护套和刻度线确定钢筋桁架楼承板放置于吊带的中心位置;S2. Pass the sling through the steel truss floor deck, and determine the steel truss floor deck to be placed at the center of the sling through the sling protection cover and the scale line of the sling; S3、将4个吊钩挂接在吊带的四个边角上;S3. Hook the four hooks on the four corners of the sling; S4、将机械设备的吊钩挂在4个第一卸扣上;S4. Hang the hooks of the mechanical equipment on the 4 first shackles; S5、起吊。S5, lifting. 8.如权利要求1所述的一种吊装钢筋桁架楼承板的方法,其特征在于,步骤S1中的可调支撑的长度为1/4-1/2倍的钢筋桁架楼承板的长度。8. a kind of method for hoisting steel bar truss floor deck as claimed in claim 1 is characterized in that, the length of the adjustable support in step S1 is 1/4-1/2 times the length of the steel bar truss floor deck . 9.如权利要求1所述的一种吊装钢筋桁架楼承板的方法,其特征在于,步骤S1中可调支撑和固定支撑的组装方式包括:在可调支撑和固定支撑的连接面上分别焊接法兰,然后采用高强螺栓连接可调支撑和固定支撑的法兰。9 . The method for hoisting a steel truss floor deck according to claim 1 , wherein the assembling method of the adjustable support and the fixed support in step S1 comprises: on the connecting surfaces of the adjustable support and the fixed support, respectively. 10 . Weld the flanges, then use high-strength bolts to connect the flanges of the adjustable support and the fixed support.
CN202210150516.9A 2022-02-18 2022-02-18 Lifting appliance and method for steel bar truss floor support plate Pending CN114572809A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210150516.9A CN114572809A (en) 2022-02-18 2022-02-18 Lifting appliance and method for steel bar truss floor support plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210150516.9A CN114572809A (en) 2022-02-18 2022-02-18 Lifting appliance and method for steel bar truss floor support plate

Publications (1)

Publication Number Publication Date
CN114572809A true CN114572809A (en) 2022-06-03

Family

ID=81774559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210150516.9A Pending CN114572809A (en) 2022-02-18 2022-02-18 Lifting appliance and method for steel bar truss floor support plate

Country Status (1)

Country Link
CN (1) CN114572809A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117049359A (en) * 2023-06-29 2023-11-14 中国葛洲坝集团建设工程有限公司 A method for dismantling and lifting horizontal support beams

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117049359A (en) * 2023-06-29 2023-11-14 中国葛洲坝集团建设工程有限公司 A method for dismantling and lifting horizontal support beams

Similar Documents

Publication Publication Date Title
CN109879155B (en) A device for quickly hoisting laminated boards
CN111456425A (en) Floor deck temporary support device, temporary support structure and temporary support method
CN209455933U (en) A kind of spreader for lamination board hoisting
CN210597279U (en) Pile foundation steel reinforcement cage installation device
CN112573344A (en) Hoisting and turning-over device for super-large concrete prefabricated stand plate and using method thereof
CN210439705U (en) Precast concrete superimposed sheet hoist device
CN206477497U (en) A kind of trussing for exempting to support steel form
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN120172239A (en) A multifunctional sling capable of being quickly installed and a construction method thereof
CN210853369U (en) A protection device for vertical transport of blocks by tower crane
CN218508255U (en) Large-span corrugated steel web cantilever assembling structure
CN205955150U (en) Instrument formula windrow operation integration platform
CN206530032U (en) Scaffold can be moved integrally
CN215717067U (en) Construction platform suitable for concrete composite shear wall structure
CN212773550U (en) A kind of lifting device for steel truss floor deck
CN209778062U (en) An extension spreader for hoisting steel pipe arch bridge lattice girders
CN210193201U (en) A special fixture for hoisting prefabricated blocks for construction
CN211169608U (en) Hanging basket prismatic sheet hoisting device
CN223468074U (en) A prefabricated box beam hanger
CN216475048U (en) A new type of steel cage hanging system
CN114809659A (en) Unloading platform for construction engineering and construction method thereof
CN209081239U (en) The boom hoisting of prefabricated cabin formula unit equipment
CN219929387U (en) Assembled forklift lifting rod
CN219792145U (en) A hanger device for lifting prefabricated T-beams
CN219078879U (en) A small lifting device used in narrow space building floors

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination