CN114561881B - Longitudinal deviation correcting and resetting method suitable for soft soil foundation bridge - Google Patents
Longitudinal deviation correcting and resetting method suitable for soft soil foundation bridge Download PDFInfo
- Publication number
- CN114561881B CN114561881B CN202210264991.9A CN202210264991A CN114561881B CN 114561881 B CN114561881 B CN 114561881B CN 202210264991 A CN202210264991 A CN 202210264991A CN 114561881 B CN114561881 B CN 114561881B
- Authority
- CN
- China
- Prior art keywords
- pier
- longitudinal
- bridge
- steel
- deviation correcting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 239000002689 soil Substances 0.000 title claims abstract description 26
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 68
- 239000010959 steel Substances 0.000 claims abstract description 68
- 238000006243 chemical reaction Methods 0.000 claims abstract description 30
- 238000010276 construction Methods 0.000 claims abstract description 11
- 238000006073 displacement reaction Methods 0.000 claims description 15
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 12
- 238000005553 drilling Methods 0.000 claims description 6
- 229910052742 iron Inorganic materials 0.000 claims description 6
- 238000012544 monitoring process Methods 0.000 claims description 6
- 238000002360 preparation method Methods 0.000 claims description 6
- 238000007789 sealing Methods 0.000 claims description 6
- 238000003466 welding Methods 0.000 claims description 6
- 230000002159 abnormal effect Effects 0.000 claims description 4
- 239000011398 Portland cement Substances 0.000 claims description 3
- 238000007599 discharging Methods 0.000 claims description 3
- 239000006260 foam Substances 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 239000002245 particle Substances 0.000 claims description 3
- 230000003068 static effect Effects 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 4
- 230000001360 synchronised effect Effects 0.000 abstract description 3
- 238000012423 maintenance Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D35/00—Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D37/00—Repair of damaged foundations or foundation structures
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210264991.9A CN114561881B (en) | 2022-03-17 | 2022-03-17 | Longitudinal deviation correcting and resetting method suitable for soft soil foundation bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210264991.9A CN114561881B (en) | 2022-03-17 | 2022-03-17 | Longitudinal deviation correcting and resetting method suitable for soft soil foundation bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114561881A CN114561881A (en) | 2022-05-31 |
CN114561881B true CN114561881B (en) | 2024-05-28 |
Family
ID=81719879
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210264991.9A Active CN114561881B (en) | 2022-03-17 | 2022-03-17 | Longitudinal deviation correcting and resetting method suitable for soft soil foundation bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114561881B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115467253B (en) * | 2022-09-23 | 2023-09-19 | 中铁桥研科技有限公司 | Bridge pier deviation correcting and beam body resetting method for no-back frame |
CN115897641A (en) * | 2023-03-09 | 2023-04-04 | 中交第一航务工程局有限公司 | Jacking segment method final joint steel support locking device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102953348A (en) * | 2012-12-12 | 2013-03-06 | 重庆桥都桥梁技术有限公司 | Correcting and resetting method for pier stud of bridge |
CN103205940A (en) * | 2013-04-22 | 2013-07-17 | 成都建筑工程集团总公司 | Slope-variable proportional alternate jacking construction method for continuous beam bridges |
CN206204807U (en) * | 2016-10-28 | 2017-05-31 | 柳州欧维姆工程有限公司 | A kind of horizontal deviation correcting device of self-balancing type for old bridge deviation rectification |
CN107151980A (en) * | 2017-06-09 | 2017-09-12 | 中铁建大桥工程局集团第五工程有限公司 | Large-span Steel Box Beam liftable self-propelled successively incremeantal launching method system and its construction method |
CN108149591A (en) * | 2018-01-23 | 2018-06-12 | 广西交通工程检测有限公司 | Bridge superstructure deviation correcting device and method based on jack counter-force self-balancing |
CN109356042A (en) * | 2018-10-15 | 2019-02-19 | 浙江交工集团股份有限公司 | A kind of replacing and rectificating method after pier slope |
CN110820817A (en) * | 2019-10-11 | 2020-02-21 | 福建省建科工程技术有限公司 | Bridge pier stud pile foundation combination deviation rectifying method |
WO2021022608A1 (en) * | 2019-08-05 | 2021-02-11 | 山东恒堃机械有限公司 | Removal-and-mounting-free movable formwork across concrete continuous girder |
-
2022
- 2022-03-17 CN CN202210264991.9A patent/CN114561881B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102953348A (en) * | 2012-12-12 | 2013-03-06 | 重庆桥都桥梁技术有限公司 | Correcting and resetting method for pier stud of bridge |
CN103205940A (en) * | 2013-04-22 | 2013-07-17 | 成都建筑工程集团总公司 | Slope-variable proportional alternate jacking construction method for continuous beam bridges |
CN206204807U (en) * | 2016-10-28 | 2017-05-31 | 柳州欧维姆工程有限公司 | A kind of horizontal deviation correcting device of self-balancing type for old bridge deviation rectification |
CN107151980A (en) * | 2017-06-09 | 2017-09-12 | 中铁建大桥工程局集团第五工程有限公司 | Large-span Steel Box Beam liftable self-propelled successively incremeantal launching method system and its construction method |
CN108149591A (en) * | 2018-01-23 | 2018-06-12 | 广西交通工程检测有限公司 | Bridge superstructure deviation correcting device and method based on jack counter-force self-balancing |
CN109356042A (en) * | 2018-10-15 | 2019-02-19 | 浙江交工集团股份有限公司 | A kind of replacing and rectificating method after pier slope |
WO2021022608A1 (en) * | 2019-08-05 | 2021-02-11 | 山东恒堃机械有限公司 | Removal-and-mounting-free movable formwork across concrete continuous girder |
CN110820817A (en) * | 2019-10-11 | 2020-02-21 | 福建省建科工程技术有限公司 | Bridge pier stud pile foundation combination deviation rectifying method |
Non-Patent Citations (1)
Title |
---|
PHC管桩-土相互作用受力性能拟静力试验;庄一舟;黄福云;钱海敏;熊铮晖;中国公路学报;20171231;第30卷(第4期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN114561881A (en) | 2022-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114561881B (en) | Longitudinal deviation correcting and resetting method suitable for soft soil foundation bridge | |
CN108130910A (en) | A kind of support system and its design method of the displacement of active control foundation pit | |
CN102505636A (en) | Construction method of No.0 block of continuous rigid frame bridge of double-thin-wall pier | |
CN108265618B (en) | A kind of underground reverse layer-adding construction method for viaduct column pier foundation | |
CN113756209B (en) | Cable-stayed pushing construction method for large-span steel beam | |
CN102561212A (en) | Method for strengthening vertical crack of single-pillar concrete pier | |
CN106012872A (en) | Non-back cable cable-stayed reinforcement system and construction method of continuous rigid frame bridge | |
CN210439301U (en) | Foundation section steel concrete waist rail supporting structure | |
CN219793664U (en) | V-shaped pier construction bent frame system | |
CN217438744U (en) | Pier reinforcing device for pushing construction of three-main-truss steel truss girder bridge | |
CN217419647U (en) | Prestress applying structure and foundation pit beam string steel pull rod prestress applying node | |
CN207277211U (en) | Large steel pipe truss for bent cap cast-in-place construction | |
CN208121552U (en) | A kind of reverse increasing layer construction underpinning structure in overpass pier base underground | |
CN216713138U (en) | Building reinforcement is rectified and is traded and prop device | |
CN212956140U (en) | Support system device of large cantilever bent cap of soft foundation | |
CN104532758A (en) | A Construction Support for No. 0 Block of Prestressed Concrete Cantilevered Continuous Beam | |
CN214939311U (en) | Prefabricated bridge pier and beam integrated bridge girder erection machine | |
CN214614236U (en) | Vertical anti-pulling static load test counterforce device of concrete filling pile | |
CN112813852B (en) | A repair and reinforcement method for bridge deck subsidence of in-service bridges | |
CN111155554B (en) | A rock wall crane beam structure, design and construction method for an underground cavern with soft surrounding rock | |
CN114753235A (en) | Semi-flexible support system for arch beams of mid-support arch bridges | |
CN114370008A (en) | A kind of reinforcement system and construction method for rapidly increasing the bearing capacity of bridges | |
CN113756554A (en) | Construction platform and construction method for cast-in-place reinforced concrete support cantilever scaffold | |
CN114214919A (en) | Counter-force prepressing construction method and system for oversized zero-block bracket of cable-stayed bridge in water area | |
CN219011202U (en) | Anchor cable vertical loading system for building inclination correction technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Jin Hui Inventor after: Zhuang Yizhou Inventor after: Li Jiwei Inventor after: Shen Yijun Inventor after: Shao Guotao Inventor after: Lu Guang Inventor after: Jiang Jinyue Inventor before: Jin Hui Inventor before: Zhuang Yizhou Inventor before: Li Jiwei Inventor before: Shen Yijun Inventor before: Shao Guotao Inventor before: Lu Guang Inventor before: Jiang Jinyue |